TO: Board of Selectmen
MEMORANDUM
FROM: A.V. Fletcher, P.E., Superintendent
DATE: September 25, 1985
RE: Nike Site
DOUGLASS L. BARKER, Chairman
BARRY E. HAMPSON, Secretary
ARTHUR POLYCHROA'ES
ROBERT P. GRIFFIN
L R. BOUCHER
A. V. FLETCHM P.M. Superintendent
In evaluating the Nike Site for use as a Public Works Facility,
the following items should be considered as serious impediments to any
planned timetable.
a. Construction of an industrial complex in the Ipswich
River Watershed.
Downstream water users, and in particular, the Ipswich River
Water Commission, can ask for a MEPA review. I am advised by
several users that this will happen. The Secretary of Environmental
Affairs must respond to this request in 90 days with his determination
of condition at which time the proponent (The Town of Reading) has
90 days to respond. Appeals can be made by either party. If an appeal
is made regarding local conservation regulations however, the appeal
must be in Superior Court. The odds of getting a "quick" hearing are
slim. There are several basis upon which a MEPA review can be requested
by any person, or groups. For example, the Town of Reading requests a
MEPA review of Riverpark 93 and the Secretary required that an
Environmental Notice be filed, and subsequently required an Environmental
Impact Statement. This process has been underway for one (1) year and
is, at a minimum, another year from being resolved. The expense to
the Town of Reading has been in the area of $35,000 and to the developer
close to $500,000.
In addition to all of the above, the Town of Reading would become
a proponent of an industrial facility in an environmentally sensitive
area, while actively being an opponent to a project in the same
watershed.
There is a strong possibility that legal means will be used that
can effectively delay the construction of a BPW Facility for two (2)
to three (3) years.
Memorandum
September 25, 1985
Page 2
b. Access
The present 30.5' easement meets Haverhill Street at a 90° angle
and there is no available land for turning radius. When the Government
took this easement, provisions were made for screening and drainage
swales within the easement. It is virtually impossible to widen the
16' -0" pavement given those terms. Two plow mounted trucks could not
pass each other and the swing from Haverhill Street would be dangerous
for our vehicles and impossible for a tractor trailer or large low bed
delivering pipe, gravel or'stone to make.
In addition, the Town of Reading, acting through the Board of
Survey, expressly prohibits a road less than 40 feet in width which
must also have a turning radius not less than 30 feet on each side.
Precedent would be established for all future planned developments to
violate this requirement. To permit an entry such as the existing one
would be in violation of all sound engineering and planning criteria.
C. The Board of Public Works schedule of events to be in place to
meet the TASC agreement is based on development of the John Street site
only. The possibility of accomodating time consuming events at Nike
Site-preclude establishing a meaningful schedule.
AVF:cmk
NC�9v
r, ,.,7
ADJOURNED SUBSEQUENT TOWN MEETING
Reading Memorial High School November 14, 1985
The meeting was called to order by the Moderator, Stephen J. O'Leary, at 7:40 P.M.,
there being a quorum present.
The Invocation was given by the Rev. S. Lester Ralph, followed by the Pledge of
Allegiance to the Flag.
table. ARTICLE 1. On motion of Paul C. Dustin it was voted to take Article 1 from the
ARTICLE 1. On motion of Paul C. Dustin, the following report presented by John W.
Agnew, Jr. for the Task Force was accepted as a report of progress.
REPORT OF THE TASK FORCE ON RELOCATION OF THE BOARD OF PUBLIC WORKS
November 14, 1985
PREFACE
In doing this study and report, certain premises were determined by the Task Force
Although the Task Face realizes there has been controversy regarding the need for all
the facilities as requested by the D.P.W., they did not feel any determination along these
lines was in their charge from Town Meeting. Indeed they did not feel they had the
knowledge or time to make any such decisions.
All costs of land acquisition, right -of -way, or other costs that would have to be
negotiated and that are given in this report are only estimates. The estimates are based on
information for similar costs in other projects and were obtained from engineers, realtors,
etc., who are knowledgeable in the field. The Task Force felt it had no authority to enter
negotiations with anyone.
The Task Force briefly considered sites in other locations in Town that have already
been considered. It did so, however, not as a possible option for a full permanent site, but
only if perhaps some small part of the DPW functions might be located away from the main
facility. No conclusions were drawn.
When I took the job as Chairman of the Task Force, I must admit I was somewhat
apprehensive as the members initially seemed almost diametrically opposed in their
philosophies regarding a solution to the problem. I was delighted to find that everyone did
their best, exploring with equal effort all possibilities. The Town has a right to be thankful
they have such citizens, and I am grateful to them and honored to have served with them.
BIGGIO SITE
DESCRIPTION
John W. Agnew, Jr., Chairman
TASK FORCE COMMITTEE
The Biggio land consists of approximately 5.01 acres of land with .6 acres as a
developed house lot with a 175 foot frontage on Ash Street and the remainder undeveloped.
From Its Ash Street frontage the northwest property line abutts residential property running
in a northeasterly direction for about 165 feet. At this point the line turns about 90 degrees
running northwesterly along the rear of the abutting residential property for about 160 feet.
Making an opposite 90 degree turn, it again runs northeasterly for about 650 feet abutting
industrial properties and ends at the railroad tracks. The rear property line at the northeast
of the lot abutts the railroad tracks for about 350 feet, making another approximate 90
degree turn to the southwest back to Ash Street. This property line abutts Transitron
industrial land for about 665 feet, and then residential property to Ash Street for about 245
feet.
The front portion consisting of .6 acres is a developed house lot with a residential
house. At the rear of this lot the topography of the land drops from about 117 feet to about
85 feet. Fortunately, however, the major part of this drop is in the first 50 feet. A
borderline vegetated wetlands consisting of about an acre runs through the center of the
rear portion of the land with the wettest part abutting the railroad tracks. Currently the
only access to the property is from the Ash Street frontage.
t-1 3
368
THE STUDY
The Task Force approached this property as a possible site from four different
concerns: cost of development, access to the property, environmental concerns, and
potential for siting the proposed DPW facility on the property.
ENVIRONMENTAL CONCERNS
Wetlands - The wetland area on this site is approximately one acre in size (see Exhibit
A). wet and area receives runoff from the upland watershed of the northern side of Ash
Street. A defined channel running through the wetland basin directs the water flow toward
the railroad tracks. The wetland area is extremely flat and water moves through the site
slowly. The site also has been disturbed by human activity. In some sections, the topsoil has
been removed and the natural vegetation resultingly altered. The State law defines the
boundaries of wetlands by the existing vegetation. Predominant wetland plants on the site
include:
Buckhorn
Arrowwood
Sensitive Fern
Purple Loosestrife
Swamp Maple
Tussock Sedge
Black Alder
Swamp White Oak
Joe -Pye Weed
American Elm
Wetland Implications - Due to the wetland and floodplain conditions on this site, it
would be necessary to relocate the wetlands to a site on the property abutting the railroad.
Three different types of permits would be required.
1. Army Corps of Engineers, 404 Permit issued under the Federal Clean Water Act
(application delay period = 60 -90 days). This permit would be for the filling of a
wetland area and would involve an assessment of the potential impacts of this
proposed activity on the quality of the adjoining and downstream water.
2. Water Quality Certificate. This is a State permit Issued by the Department of
Environmental Quality Engineering (DEQE). This permit is required prior to the
issuance of the 404 Permit referred to above and the application delay period is 90
days.
3. State Wetlands Protection Act (application delay period = 90-120 days). This proposed
project calls for the alteration of more than the allowable maximum of wetlands under
the State Regulations (max. = 3000 sq. ft.). Therefore, a variance from the limitations
of this specific regulation would be required. This request for a variance would be
directed to the Commissioner of the DEQE for his approval. The request for a
variance should include the following information:
(a) a description of alternatives explored that would allow the project to proceed
in compliance with the regulation(s), and an explanation why each is unreasonable;
(b) a description of the mitigating measures to be used to contribute to the
protection of the wetland interests identified in the Wetland Protection Act; and
(c) evidence that an overriding public interest is associated with the project
which justifies waiver of the regulation.
Significant Interests - The wetland area of the Biggio property is presumed to be
significant to groundwater supply, to flood control, to storm damage prevention, and to the
prevention of pollution. The site must be studied to determine the actual wetland value of
these specific Interests. A request for a variance, as described above, should demonstrate
that the subject site does not provide the wetland value that is presumed as a part of the
Regulations. Also, the request for a variance must provide a replicated wetland area that
will function as well or better than the original.
- Runoff Problems: The Biggio property presently is wooded and offers significant
percolation for stormwater runoff. The proposed DPW facility, however, would
require the paving and roofing of major areas of the site. This Inevitable increase In
stormwater runoff (per unit time) would be required to be detained in a pond -like
basin. It is estimated that somewhere between one -half and three - quarters of an acre
would be required for this utility.
What the Regulations Mean: Environmentally, the Biggio property has significant
problems for its potential use as a DPW facility. From the outset, an alteration of the
quantity of wetlands proposed is outside the allowable tolerances of the State
AM RFgt s Th a variance must bq requested from the State.
we�hgly. "lthe variance request will only be considered if the "l
(9'
Adjauned & bsequent Tom Meeti 3 59
ng Novanber 14, 1985
Biggio property is a politically acceptable solution to the Town's siting of its DPW
facility. Other permits which are necessary quite possibly present less problems than
the variance procedure. It goes without saying, that any attempt to apply for permits
and variances would require the unanimous cooperation of Town government and the
Public.
Summation: The Biggio property presents serious environmental constraints. The fact
that the site preparation work for this site is outside the limits of the State permit
process casts serious doubt as to the feasibility of the project. Once the means of
access to this site is settled, the next major hurdle will be the request to alter more
than six times the allowable maximum of wetland area. The process for this
permitting will require a period of four months and will demand enlightened
preparation and political lobbying.
ACCESS TO THE PROPERTY
The Task Force examined the access problem from two points. First, an access road
from John Street with a right -of -way over the railroad tracks, and second, from a right -of -
way off Ash Street.
From a practical viewpoint the only site for a road from John Street to the rall tracks
would be along the property line of Boston Stove and the new TASC land. This is a distance
of about 950 feet. It would require a negotiated sale from TASC for the land.
There were two approaches to crossing the tracks: the first by a bridge, and the
second a grade crossing. Different types of bridge construction were examined from a pier
to a sloped fill section, as well as the amount of land needed for a bridge siting, and vehicle
maneuverability getting off and on at the Biggio side. Estimated costs ran from One to
Three and One Half Million Dollars. In addition, the bridge siting and access used up acres
of land. Although the B&M and MBTA favored a bridge over other types of crossing, the
Task Force rejected this option as too costly and not practical.
The second approach was a grade crossing which meant crossing four tracks at the
location considered. A rubberized crossing with signals and gates was proposed. Through
the efforts of Representative Geoff Beckwith we met with appropriate State Officials to
discuss the possibilities of crossing and to determine what steps and procedures are
necessary to gain State approval. Meetings were held with Tom Hubbard from the
Governor's Economic Development Office, Eugene Sullivan, Jr., MBTA Director of Railroad
Operations; and Daniel Breen, MBTA Assistant Chief Engineering Officer.
As a result of these meetings it was learned that two public hearings are necessary.
The first is before the Middlesex County Commissioners, at which time the Town and the
MBTA present their case for the Commissioner's approval. This has been scheduled for
December 3, 1985. The second is before the Massachusetts Department of Public Utilities.
Prior to this hearing the Town must request and pay for a study of costs to construct a grade
crossing which must be done by the MBTA. The cost for this will be $1500. It should be
pointed out that if a crossing is approved, the MBTA will handle all construction, although
the Town will pay for It. It should also be pointed out that the MBTA and the B&M are very
reluctant to approve any grade crossings, including this one and that only rarely are these
approved. Nevertheless, the Task Force feels there is a possibility for an approval.
Once across the track the crossing would end on land now owned by Transitron. It
should be noted that in September of this year Transitron had no permanent industrial access
to their property. At that time the Reading Board of Appeals allowed a variance to them to
cross residentially zoned property on Ash Street as a permanent access. This is currently
being contested in court by the residents of Ash Street. The amount of land needed for this
crossing is more or less academic, as at this location part of the Transitron land will be
needed to site the DPW facility. This will be taken up later in this report relating to siting.
It should also be pointed out that the cost of a crossing can be treated as a betterment
with part of this being charged to Transitron.
The Task Force spent a good deal of time trying to determine the cost of a grade
crossing access as discussed. Although some discussions were held with the principals
regarding the Biggio and Transitron land, there were no formal negotiations started or made.
No meetings were held with TASC. As a result, any cost figures here are only estimates
made from material gathered from realtors, engineers, etc. It should also be kept in mind
that all work must be done under law at the prevailing wage rate, at State and Federal
specifications, and by MBTA and B&M work crews.
Adjourned Subsequent Town Meeting
An estimated cost is as follows:
Cost of road construction from John Street
to tracks
$ 103,000
Cost of Right -of -Way from John Street
to tracks
240,000
Cost of Utilities
105,000
Water - 16,000
20,000
Sewer - 20,000
20,000
Gas - 9,000
11,000
Electric - 60,000
175,000
Cost of Crossing - Rubberized with Signals
650,000
and Gates (minus Betterment Cost to
Transitron)
Cost of Transitron Property (See Siting)
Cost of Railroad Right -Of -Way
100,000
TOTAL
$1,198,000
Novanber 14, 1985
In addition, maintenance costs and inspection fees for the crossing will run
approximately $15 to $20 Thousand per year.
The cost of the Railroad Right -of -Way is not known.
Several points of access from Ash Street were briefly discussed, but considered too
controversial to be seriously considered with one exception. That exception was a proposed
right -of -way off Ash Street across and between the south end of land currently owned by
Lux at 238 Ash Street and land currently owned by Shurman at 246 Ash Street. This right -
of-way would run in an easterly direction to the end of the Lux property and turn southerly
about 80 feet across land now owned by Babcock and then across land owned by Paulson to
the Biggio property (see Exhibit B). This right -of -way would be on industrial zoned property.
If this Is seriously considered and not negotiated, the Task Force would recommend taking
by eminent domain. Costs associated with this as an access option are as follows:
Roadway Construction (with full curbing
but no sidewalks, due to lack of
proper width).
$ 52,000
Electrical
60,000
Water Main Construction
20,000
Sewer Main Construction
20,000
Gas Main Construction
11,000
Right -of -Way Costs
175,000
TOTAL
$339,000
Consideration was given to the portion of Biggio property fronting on Ash Street.
Because of the sharp grade at the rear of the house lot, this idea was rejected.
The Task Force did not really consider the Ash Street access as an ideal access.
Among other things would be traffic problems created at the junction of Ash and Main
Streets.
The third consideration was determining a foot print for siting the DPW facilities on
the property (see Exhibts A do C). Two separate siting plans were made by the DPW. The
first was with office space, and the second without. The first plan would involve taking
approximately 4.32 acres of Transitron land. It would also involve relocating the wetland
vegetate area to a storm water storage area consisting of about an acre next to the railroad
tracks at the northeast side of the Biggio property. In looking at Exhibit A, the arrows by
the shop areas, maintenance and heated vehicle storage indicate door bays. The area
outlined in a dotted line and stating Bordering Vegetated Wetlands would be an outdoor
storage area for pipe, sand, etc. The buildings are located to act as a shield to obscure this
I
6ri t
0
J
n
Adjourned Subsequent Tom Meeting November 14, 1985 J1
'
unsightly yard area from Transitron, keeping in mind future development of the Transitron
property. There is really little room to place the DPW buildings in another formation. The
site topography with the steep embankment on the west side (see dotted line edge of
embankment) has the rear of the heated vehicle storage building acting as a retaining wall
against the embankment. To the east are relocated wetlands. In the second siting by
eliminating the office building and, therefore, the need for office parking space, some land
Is gained, but not much.
Borings were taken by the Task Force at four points, basically one at the proposed salt
storage, cold storage, shop area, and vehicle storage. It would appear that a normal
foundation design could be utilized at this site.
.. Cost of development for the Biggio / Transitron site are estimated as follows:
Clear and grub 7 acres at $1,000 $ 7,000
Strip and remove loam 12,000 c.y. at $3.50 42,000
Excavate and remove surplus 20,000 c.y.
at $3.75 75,000
Relocate wetland
Excavate and dispose 1,500 c.y. at $3.50 5,250
Replace loam 1,500 c.y. at $1.25 1,875
Vegetation L.S. 15,000
Compensatory Area
Excavate and dispose 700 c.y. at $3.50 2,450
Fine grade 20,000 s.f. at $.05 1,000
Control structure L.S. 6,500
TOTAL
$156,075
Finally, full cost options for acquiring, preparing and developing access to this site
were compared.
Option No. 1 With Rail Crossing
Cost of acquiring Blggio land without
house and
Cost of acquiring Transitron land
$ 900,000
Cost of Access with Rail Crossing
1,198,000
Cost of land development
156,075
TOTAL
$2,254,075
Option No. 2 Access from Ash Street
Cost of acquiring Biggio land without
house and
Cost of acquiring Transitron land
$ 900,000
Cost of access from Ash Street
338,000
Cost of land development
156,075
TOTAL
$1,394,075
GENERAL TIRE
DESCRIPTION
The General Tire Plant is a large rambling light manufacturing plant with buildings
having a total area of about 260,000 square feet. The land is zoned Industrial and access is
from a road leading to the plant from John Street near Boston Stove. The southerly line of
the lot abutts the railroad tracks; the easterly side Boston Stove; the northerly side John
Street and Bolton Street; and the northwesterly side Cerretani's Supermarket.
The facility is made up of many separate buildings of different design and construction
and obviously was developed over a long period of time. The major amount of floor space is
+ four feet above grade, and the design criteria is for light diversified manufacturing.
Column spacings vary from building to building, as do elevations. The buildings at the south
q(rCt 7
Adjourned Subsequent Tcwn Meeting November 14, 1985
end are of fairly "modern" construction: steel columns, structural steel, metal deck,
concrete floors and sprinklers. Column spacing varies from 24' x NY, 16' x 181, to 16' x 161.
Walls are generally 6" and 8" concrete block raised to the metal deck. Windows are quite
closely spaced.
DEVELOPMENT POSSIBILITIES
The plant has recently been bought by Damon Industries of Watertown, MA, a
manufacturing company making metal fastenings. It is the company's intention to use
1009000 sq. ft. of the 260,000 sq. ft. available. The company is renovating the building
through industrial revenue bonds and a U.D.A.G. grant. Some of the remaining space has
already been leased. Members of the Task Force spoke with the owner, Mr. George Danis,
who offered as the only space available for a DPW facility an area in the northeast corner of
the lot along with approximately 1.8 acres of yard. (See Exhibit D). Although no serious
discussions were held with Mr. Danis, he indicated that portion of the plant would rent for
about $3.42 per sq. ft. Given the amount of space needed, this would be approximately
$200,000 per year. A great deal of renovation would be needed before the space could be
used. Some of the required work is as follows:
1. Garage door openings made (none exist) and overhead doors installed.
2. Ramps into the building would have to be constructed, and these would only be allowed
in the small yard area, cutting more space for outside storage.
3. Truck, garage and shop areas would have to be separated by two (2) hour fire walls and
doors necessitating new interior footings.
4. Major sprinkler, heating and window modifications are necessary, and a complete
ventilation system would have to be installed.
S. Office partitioning would have to be made, along with wiring, etc.
If all of the above were accomplished, there would still be a major obstacle which is
the columns. Their spacing would make it very difficult for vehicle maneuvering. In fact,
more space than normal would be needed for any maneuvering.
CONCLUSION I
When first considering this building, the Task Force had in mind a ten year lease. It
was felt that this would immediately solve the time problem of the DPW move and would
allow time needed to explore other possibilities. It was also felt that within the ten year
period the Town's financial picture would have Improved considerably with an increased tax
base resulting from the landfill development.
It became apparant that this option would be too costly. Estimated renovations could
run as high as One Million Dollars and this done on property we would not own. In addition,
even with the renovations there would be the column problems, as well as outside storage
space.
JOHN STREET SITE
Much has been written and discussed concerning this site, and It is not the intention of
this report to be redundant in reviewing the possibility. For its deliberation the Task Force
looked at this site for comparative purposes of the site only and the ramifications of its use
In the proposed development of the Town's industrial land. For comparative analysis the
Task Force used a site preparation cost figure of One Million Dollars for this site.
THE REVENUE CONSIDERATIONS
The Task Force felt from the beginning of its deliberations that not only must a site be
feasible from a cost and utilization standpoint, but also that it not impede the revenue
potential of an expanded tax base for the Town through Industrial development. The Town
faces a financial crisis with very little light at the end of a long tunnel. On one side the
Town is tightly restricted in its ability to raise revenue, and on the other side a series of
rising costs and lost revenue over which It has no control. Liability insurance, health
insurance, pensions, water and sewer rates, architectural barriers, mandates, environmental
mandates, Fair Labor Standards Act mandates, are all costs over which we have no control
and are rising faster each year than the Town is allowed to increase revenue under
Proposition 2%. To add to the problem is the potential loss of Federal Revenue Sharing Funds
and cost of living Increases to employees. The so called "Doom and Gloom" report of the
Finance Committee (see Exhibit E) is If anything optimistic. Nor will the current projected
sale of land in itself answer the problem (see Exhibit F). In addition the Town faces other
building problems. The Central Fire Station is not structually sound to house proposed new
equipment. The sale of the Community Center means the cost of new quarters for the Town
offices housed there.
I &�e
Adjourned Subsequent 4bam Meeting November 14, 1985 373
The Town has only three means to meet these problems: override of Proposition 214
which has already been rejected, large cuts in service the Town already has rejected, small
cuts such as the elimination of the dog officer, or increasing its tax base. In regards to the
latter, the Town has eliminated most residential expansion through zoning and conservation
which leaves industrial development. It is for these reasons the Task Force spent a good
deal of its time relating the DPW location and its Impact on the industrial zoned area at
John Street.
FINANCIAL SIGNIFICANCE OF THE LANDFILL
The landfill is a vital resource for the future financial stability of the Town of
Reading. Its importance is seen in two ways: in the financial gains that it can yield in its
own right and in the effect that the landfill will have on enhancing the development
potential of our entire 90 acre industrial area. Be assured on two points - first, there IS a
demand for additional first -class office park and hotel development along the Route T28
belt, as the Planning Board's consultant showed; and second, there are a number of well-
known developers who have expressed serious interest in developing the landfill.
The Task Force, with the assistance of the Industrial Development Commission, has
prepared some estimates of the land sales and tax revenues which the Town can expect to
realize over the next ten years from development of the landfill (see Exhibit G). Three
different development scenarios are portrayed here, the top two with the DPW on the
landfill, and the bottom one, without the DPW there. Scenario IA represents the most likely
type of development one can expect next to the DPW: average - quality motel and R&D
facilities. Scenario 1H represents a far less likely outcome, with the assumption that a
first -class hotel Is built next to the DPW and that top- quallty office buildings occupy the
remainIng landfill. Scenario 2 represents the most likely type of development if the DPW is
moved off the landfill. In this scenario, first -class office space shares the front of the
landfill with a quality hotel, with further office development of similar quality being built
on the rear of the landfill In three years.
A comparision of land sales revenues for these scenarios shows values of $1.9 Million
from Scenario IA, $4.4 Million from Scenario 1H, and $7.8 Million from Scenario 2. The
first revenues, which result from sale of the front dump land along John Street, are
Predicted to occur in FY 88, Under Scenario IA these revenues are $1.2 Million, while under
Scenario 2 they are $3.6 Million.
This is a difference of $4.4 Million in land sales revenues two years down the road.
When land sale revenues from the back of the landfill and tax revenues from both front
and rear are added, the difference between Scenarios IA and 2 widens to $16 Million over a
10 year period and to $39 Million over a 20 year period.
SUMMARY AND CONCLUSIONS
After reviewing all of these studies, the Task Force reached the following conclusions:
GENERAL TIRE PROPERTY
The Task Force rejected this as an option. The potential modification cost of a Million
Dollars, plus the fact that with modifications there is not adequate yard space and the
column problem made the site impractical.
BIGGIO PROPERTY
The possibilities of this as an option are dependent upon obtaining permission for a rail
crossing and permission to relocate the wetlands. The prospects of obtaining a rail crossing
are not good. The environmental process for receiving permission to relocate the wetlands
is a fragile one. At any one of the steps that have to be taken for this process, problems can
occur.
The site as proposed does not offer many options for modifications or expansion due to
the topography and wetlands. This should be taken into consideration if future plans for
expansion are considered.
It should also be noted the Task Force felt that TASC would hardly be enthusiastic at
the prospect of a fleet of trucks crossing their property every day. TASC has been rapidly
expanding and has indicated they might want to build a third building. They have already
rented the new office space at Boston Stove.
"l �a l
Adjourned aftegtmt 4bam Meeting November 14, 1985
Last but not least, this option is expensive. The rail crossing option would add $1.2
Million for site cost over the $�1 MillIon site preparation figure at John Street. The Ash
Street option would add approximtely $200,000 for site costs over the site preparation at
John Street. Some members of the Task Force felt that in spite of the additional cost this
was a good investment, if based against the possible $9 Million extra the John Street site
would produce without the DPW facility. The Ash Street costs do not include any costs
which might arise for legal expenses arising from litigation on the takings.
If the Ash Street option was taken, the traffic problems at the junction of Ash and
Main Streets would still persist. i
RECOMMENDATIONS
During the review process a feeling developed that the Town had lost control Every
option seemed to rest on the decisions of outside influences. Cost of land acquisitions,
permits, right -of -ways, time restraints all seemed to be being determined by others. It
became apparent that it is extremely difficult to bargain or negotiate with tight time and
financial restraints. In its final deliberating the Task Force felt it was time for the Town to
take back the initiative and to have the parties bargaining with us and not us with them.
The Task Force felt the best way to accompish this and to solve many problems at the same
time was to send out the R.F.P: s (Request For Proposals) to national and international
development companies offering them the opportunity to present to the Town their best plan
to develop our entire industrial area. Attached to the R.F.P. would be a condition of linkage
where it would be up to the developer to determine how the DPW facilities would be part of
his plan. The Task Force recognizes that neither it, nor the Town, are experts in this field.
The developers have the experience, money, and political know how necessary for the
project. Let's use It This is not the first time the Town has used linkage. The sale of the
Community Center included the Developer accommodating the Elderly Drop -In Center. The
Adams -Gentile property swap involved accommodating low income housing. The Task Force
feels with the right R.F.P., developer Initiative will provide several solutions to the DPW
question. One such scenario might Include a four story office building with a garage on the
first floor to house the DPW facilities. In this scenario site costs could be reduced to the
Town, but there are many other alternatives.
Fortunately 80% of such an R.F.P. has been done by our Industrial Development
Committee with all information concerning the site. Such an R.F.P could be sent out in
December with replies due back by the end of February and negotiations taking place with a
recommendation to the Annual Town Meeting.
If this recommendation is followed through, other benefits to the Town will accrue. A
timetable of development will be realized enabling the Finance Committee and the Town to
know the time of revenue projections and be able to plan.
Even if there is some delay in the TASC timetable, the cost involved is certainly not
greater than the alternatives we have been studying. It should also be considered that TASC
itself has much to gain from a well thought out and planned development.
The vote of the Task Force was unanimous to send out the R.F.P.'s and the follow
through. The Task Force also voted to proceed with the two hearing processes that have
been requested for the rail crossing as outlined in the Biggio option.
y §(6-0
Respectfully submitted,
TASK FORCE COMMITTEE
Board of Selectmen
John W. Agnew, Jr., Chairman
Paul C. Dustin
John H. Russell
Charles A. Darby
Board of Public Works
Douglass L. Barker
Robert P. Griffin
Anthony V. Fletcher
Conservation Commission
Camille V. Anthony
Charles T. Costello
Planning Board
Maureen Rich
Michael F. Slezak
Industrial Development Comm.
Daniel A. Ensminger
Donald C. Stroeble
Curt E. NItzsche
State Representative
Geoffrey C. Beckwith
Finance Committee
Donald C. Allen
Brian J. McMenamin
y §(6-0
0
J
� 1�
Novenber 14, 1985 375
ARTICLE I. The following Five Year Plan prepared by the FinCom, was presented
by Philip B. Pacino as part of the study being made by the "Task Force" on the
the Department of Public Works. relocation of
Mr. Moderator:
The FinCom as part of the study being made by the Task Fora on relocating the DPW
has prepared a Five Year Plan relating to the sale of real estate funds.
SALE OF REAL ESTATE FUNDS
Year
Worst
Case
FY 1986
Presently available $1,666,500
FY 1987
Community Center sale 1,117, 000
FY 1988
Bear Hill sale
1,117,000
John Street Landfill sale-
1,200,000
front section only
FY 1989
FY 1990
FY 1991
John Street Landfill sale -
rear section only
TOTAL JZLM3 500
Probable
Ben
Case
Case
$1,666,500
$ 1,666,500
1,117,000
1,117,000
1,200,000
1,800,000
1,170,000 3,600,000
700,000* 2,100,000*
S 833 300 $12,283,500
The FinCom prepared 3 possible scenarios. The first is the worst case. This would be
if no additional property is sold. The second is the probable case. This would be what the
FinCom could conservatively expect to happen given certain assumptions. The third case is
what we could expect to happen if everything worked perfectly.
For FY86, presently available is what the Town has on hand from the sale of the TASC
property, a portion of the landfill site sold to McManus and the sale of the Depot, less the
funds used to fund the current operational budget.
For FY87, the Community Center sale is the amount set forth in the present P do S
Agreement on the property.
For FY88, the Bear Hill sale figures are based, under the probable case, on two
buildings of 60 units each possibly being built and, under the best case, on three buildings of
60 units each. A neighbor to this property, Summit Towers, built three buildings on their
property. The Bear Hill property has a similar acreage to the Summit Tower property.
However, FInCom, not being architects, is unsure three buildings will fit on the Bear Hill
property-
The John Street landfill sale - front section only figures are calculated with the DPW
garage on the landfill site under the probable case and with the DPW garage not on the
landfill site under the best case.
For FY90, the John Street landfill sale - rear section only is calculated on the same
assumptions as the front section. The probable case has the DPW garage on the landfill.
The best case has the DPW not on the landfill. The FinCom has asterisked this sale due to
the possible problems relating to possible DEQE requirements. If required this would
certainly have an effect on the sale involving both timing and price.
I want to thank the assessors, the members of the IDC and Ben Nichols of the Land
Bank Committee for their assistance in preparing this Five Year Plan.
On motion of Paul C. Dustin it was voted to lay Article 1 on the table.
ARTICLES 11 do 12. On motion of Paul C- Dustin It was voted to take Article 11 and
12 from the table.
11. ARTICLE 11. On motion of Maureen Rich it was voted to Indefinitely postone Article
q X11) I
Adjourned Subsequent Town Meeting November 14, 1985
ARTICLE 12. On motion of Maureen Rich it was voted to indefinitely postpone
Article 12.
ARTICLE 33. On motion of Paul C. Dustin it was voted that Article 33 be taken up
out of order.
ARTICLE 33. On motion of Daniel A. Ensminger it was voted that the sum of Six
Thousand ($6,000) Dollars be transferred from the Overlay Reserve and appropriated for the
purpose of marketing the John Street Industrial Area with provisions for the location of a
new Department of Public Works facility. Said sum to be expended under the direction of
the Industrial Development Commission, with the concurrence of the Task Force for the
relocation of the Department of Public Works.
On motion of Michael A. Pacillo it was voted that this meeting stand adjourned to
meet at 7:30 P.M. on Monday, November 18th, 1985, in the Memorial High School
auditorium.
Meeting adjourned at 10:10 P.M.
126 Town Meeting Members were present.
A true copy. Attest:
Lawrence Drew
Town Clerk
c.
Cpl
3
q &`p2,
0
REPORT OF THE TASK FORCE
ON
RELOCATION OF THE DEPARTMENT OF PUBLIC WORKS
November 14, 1985
Board of Selectmen
Board of Public Works
Conservation Commission
Planning Board
Industrial Development Commission
State Representative
Finance Committee
TASK FORCE
John W. Agnew, Jr.,Chairman
Paul C. Dustin
John H. Russell
Charles A. Darby
Douglass L. Barker
Robert P .` Griffin
Anthony V. Fletcher
Camille V. Anthony:
Charles T. Costello
Maureen Rich
Michael F. Slezak
Daniel A. Ensminger
Donald C. Stroeble
Curt E. Nitzsche
Geoffrey C. Beckwith
Donald C. Allen
Brian J. McManamin
q -/ 03
TOWN C L E R K
READING, MASSACHUSETTS 01867
MUNICIPAL
BUILDING
IAwrenoe Drew
617 - 942.0500 Town CIWk
ADJOURNED SPECIAL TOWN MEETING
October 3, 1985
ARTICLE 2. On motion of Elizabeth W. Klepeis as amended
by John W. Price, it was voted that Town Meeting instruct the
Board of Selectmen to establish a Task Force consisting of a
representative or representatives of the Board of Selectmen, Board
of Public Works, the Planning Board, the Conservation Commission,
the Industrial Development Commission and the Representative of
the General Court. The Finance Committee shall appoint a liaison to
this Task Force. The Board of Selectmen shall Chair said Task Force
and each above- mentioned Board or Commission shall have one vote
(regardless of the number of representatives serving). The Task
Force shall . be charged with reviewing the land -currently zoned for
industry located o I f Ash Street known as the Biggio property, and any
or all contiguous, property for the purpose of establishing a site for
t-he Reading Board of Public Works facility. Said Task Force shall
report back its findings to the November Town Meeting. This motion,
as amended, was voted in the affirmative.
A true copy. Attest: -
Lawrence Drew
Town Clerk
-1- q 61 b [
PREFACE
In doing this study and report certain premises were determined by
the Task Force.
Although the Task Force realizes there has been controversy regarding
the need for all the facilities as requested by the B.P.W., they did not
feel any determination along these lines was in their charge from Town
Meeting. Indeed they did not feel they had the knowledge or time to make
any such decisions.
All costs of land acquisition, right -of -way, or other costs that would
have to be negotiated and that are given in this report are only estimates.
The estimates are based on information for similar costs in other projects,
and were obtained from engineers, realtors, etc., who are knowledgeable in
the field. The Task Force felt it had no authority to enter negotiations
with anyone.
The-Task force briefly considered sites in other locations in Town
that have already been considered. It did so,however, not as a possible
option for a full permanent site, but only if perhaps some small part of
the DPW functions might be located away from the main facility. No con-
clusions were drawn.
When I took the job as Chairman of the Task Force, I must admit I
was somewhat apprehensive as the members initially seemed almost diametri-
cally opposed in their philosophies regarding a solution to the problem.
I was delighted to find.that everyone did their best, exploring with equal
effort all possibilities. The Town has a right to be thankful they have
such citizens, and I am grateful to them and honored to have served
with them.
John W. Agnew, Jr.
Task Force Chairman
-2- L, (� t uS
RTn nTn RTTp
npGf RTPTTnm
The Biggio land consists of approximately 5.01 acres of land with .6
acres as a developed house lot with a 175 foot frontage on Ash Street and the
remainder undeveloped. From its Ash Street frontage the northwest property
line abutts residential property running in a northeasterly direction for
about 165 feet. At this point the line turns about 90° running northwesterly
along the rear of the abutting residential property for about 160 feet.
Making an opposite 90° turn, it again runs northeasterly for about 650 feet
abutting industrial properties and ends at the railroad tracks. The rear
property line at the northeast of the lot abutts the railroad tracks for
about 350 feet, making another approximate 90° turn to the southwest back to
Ash Street. This property line abutts Transition industrial land for about
665 feet, and then residential property to Ash Street for about 245 feet.
The front portion consisting of .6 acres is a developed house lot with
a residential house. At the rear of this lot the topography of the land
drops from about 117 feet to about 85 feet. Fortunately, however, the major
part of this drop is in the first 50 feet. A borderline vegetated wetlands
consisting of about an acre runs through the center of the rear portion of
the land with the wettest part abutting the railroad tracks. Currently the
only access to the property is from the Ash Street frontage.
THE STUDY
The Task Force approached this property as a possible site from four
different concerns: cost of development, access to the property, environ-
mental concerns, and potential for siting-the proposed DPW facility on the
property.
ENVIRONMENTAL CONCERNS
Wetlands - The wetland area on this site is approximately one acre in size
(see exhibit A). The wetland area receives runoff from the upland watershed
of the northern side of Ash Street. A defined channel running through the
-3- i] &IptD
wetland basin directs the water flow toward the railroad tracks. The wetland
area is extremely flat and water moves through the site slowly. The site also
has been disturbed by human activity. In some sections, the topsoil has been
removed and the natural vegetation resultingly altered. The State law defines
the boundaries of wetlands by the existing vegetation. Predominant wetland
plants on the site include:
Buckthorn Arrowwood
Sensitive Fern Purple Loosestrife
Swamp Maple Tussock Sedge
Black Alder Swamp White Oak
Joe -Pye Weed -American Elm
Wetland Implications - Due to the wetland and floodplain conditions on this
site, it would be necessary to relocate the wetlands to a site on the property
abutting the railroad. Three different types of permits would be required.
1. Army Corps of Engineers, 404 Permit issued under the Federal Clean Water
Act (application delay period = 60 -90 days). This permit would be for
the filling of a wetland area and would involve an assessment of the
potential impacts of this proposed activity on the quality of the ad-
joining and downstream water.
2. Water Quality Certificate. This is a State permit issued by the Depart-
ment of Environmental Quality Engineering (DEQE). This permit is required
prior to the issuance of the 404 Permit referred to above and the applica-
tion delay period is 90 days.
3. State Wetlands Protection Act (application delay period = 90 -120 days).
This proposed project calls for the alteration of more than the allowable
maximum of wetlands under the State Regulations (max. = 5000sq. ft.).
Therefore, a variance from the limitations of this specific regulation
would be required. This request for a variance would be directed to the
Commissioner of the DEQE for his approval. The request for a variance
should include the following information:
A) a description of alternatives explored that would allow the
project to proceed in compliance with the regulation(s), and an
explanation why each is unreasonable;
B) a description of the mitigating measures to be used to contribute
to the protection of the wetland interests identified in the Wetland
Protection Act; and
C) evidence that an overriding public interest is associated with
the project which justifies waiver of the regulation.
-4- . q &101
Significant Interests - The wetland area of the Biggio property is presumed
to be significant to groundwater supply, to flood control, to storm damage
prevention, and to the prevention of pollution. The site must be studied to
determine the actual wetland value of these specific interests. A request for
a variance, as described above, should demonstrate that the subject site does
not provide the wetland value that is presumed as a part of the Regulations.
Also, the request for a variance must provide a replicated wetland area that
will function as well or better than the original.
Runoff Problems - The Biggio property presently is wooded and offers signi-
ficant percolation for stormwater runoff. The proposed DPW facility, however,
would require the paving and roofing of major areas of the site. This
inevitable increase in stormwater runoff (per unit time) would be required to
be detained in a pond -like basin. It is estimated that somewhere between one -
half and three quarters of an acre would be. required for this utility.
What The Regulations Mean - Environmentally, the Biggio property has signi-
ficant problems for its potential use as a DPW facility. From the outset, an
alteration of the quantity of wetlands proposed is outside the allowable
tolerances of the State Wetlands Protection Act. Thus, a variance must be
requested from the State. Variances are given sparingly. The variance re-
quest will only be considered if the Biggio property is a politically acceptable
solution to the Town's siting of its DPW facility. Other permits which are
necessary quite possibly present less problems than the variance procedure.
It goes without saying, that any attempt to apply for permits and variances
would require the unanimous cooperation of Town government and the Public.
Summation - The Biggio property presents serious environmental constraints.
The fact that the site preparation work for this site is outside the limits
of the State permit process casts serious doubt as to the-feasibility of the
project. Once the means of access to this site is settled, the next major
hurdle will be the request to alter more than six times the allowable maxi-
mum of wetland area. The process for this permitting will require a period
of four months and will demand enlightened preparation and political lobbying.
ACCESS TO THE PROPERTY
The Task Force-examined the access problem from two points. First, an
access road from John Street with a right -of -way over the railroad tracks;
and second, from a righ -of -way off Ash Street.
-5- C ( �
From a practical viewpoint the only site for a road from John Street to the
rail tracks would be along the property line of Boston Stove and the new TASC
land. This is a distance of about 950 feet. It would require a negotiated
sale from TASC for the land.
There were two approaches to crossing the tracks: the first by a bridge,
and the second a grade crossing. Different types of bridge construction were
examined from a pier to a sloped fill section, as well as the amount of land needed
for a bridge siting, and vehicle maneuverability getting off and on at the
.Biggio side. Estimated costs ran from one to three and one half million
dollars. In addition, the bridge siting and access used up acres of land.
Although the B$M and MBTA favored a bridge over other types of crossing, the
Task Force rejected this option as too costly and not practical.
The second approach was a grade crossing which meant crossing four tracks
at the location considered. A rubberized crossing with siganls and gates was
proposed. Through the efforts of Representative Geoff Beckwith we met with
appropriate State Officials to discuss the possibilites of a crossing, and
to determine what steps and procedures are necessary to gain State approval.
Meetings were held with Tom Hubbard from the Governor's Economic Development
Office; Eugene Sullivan, Jr., MBTA Director of Railroad Operations; and
Daniel Breen, MBTA Assistant Chief Engineering Officer.
As a result of these meetings it was learned that two public hearings are
necessary. The first is before the Middlesex County Commissioners, at which
time the Town and the MBTA present their case for the Commissioner's approval.
This has been scheduled for December 3, 1985. The second is before the Mass.
Dept. of Public Utilities. Prior to this hearing the Town must request and
pay for a study of costs to construct a grade crossing which must be done by
the MBTA. The cost for this will be $1500. It should be pointed out that if
a crossing is approved the MBTA will handle all construction, although the
Town will pay for it. It should also be pointed out that the MBTA and the B$M
are very reluctant to. approve any grade crossings, including this one; and that
only rarely are these approved. Nevertheless, the Task Force feels there is
a possibility for an approval.
Once across the track the crossing would end on land now owned by Transi-
tion. It should be noted that in September of this year Transitron had no
permanent industrial access to their property. At that time the Reading Board
of Appeals allowed a variance to them to cross residentially zoned property
on Ash Street as a permanent access. This is currently being contested in
14 I C)q
-6-
Court by the residents of Ash Street. The amount of land needed for this
crossing is more or less academic, as at this location part of the Transitron
land will be needed to site the DPW facility. This will be taken up later in
this report relating to siting.
It should also be pointed out that the cost of a crossing can be treated
as a betterment with part of this being charged to Transitron.
The Task Force spent a good deal of time trying to determine the cost of
a grade crossing access as discussed. Although some discussions were held
with the principals regarding the Biggio and Transitron land, there were no
formal negotiations started or made. No meetings were held with TASC. As a
result, any cost figures here are only estimates made from material gathered
from realtors, engineers, etc. It should also be kept in. mind that all work
must be done under law at the prevailing wage rate, at State and Federal speci-
fications, and by MBTA and B$M work crews.
An estimated cost is as follows.
Cost of Road Construction from John Street
$103,000
to Tracks
Cost of Right -of -Way from John Street
240,000
to Tracks
Cost of Utilities
105,000
Water - 16,000
Sewer - 20,000
Gas - 9,000
Electric - 60,000
Cost of Crossing - Rubberized with Signals
650,000
and Gates (Minus Betterment Cost.to
Transitron)
Cost of Transitron Property (See Siting)
Cost of Railroad Right -of -Way
100,000
TOTAL
$1,198,000
In addition, maintenance costs and inspection fees for the crossing will
run approximately 15 to 20 thousand dollars per year.
The cost of the railroad right -of -way is not known.
Several points of access from Ash'Street were briefly discussed, but con-
sidered too controversial to be seriously considered with one exception. That
exception was a proposed right -of -way off Ash Street across and between the south
end of land currently owned by Lux at 238 Ash Street, and land currently owned
by Shurman at 246 Ash Street. This right -of -way would run in an easterly
-7- q &110
direction to the end of the Lux property and turn southerly about 80 ft. across
land now owned by Babcock, and then across land owned by Paulson to the Biggio
property (see exhibit B). This right -of=way would be on industrial zoned
property. If this is seriously considered and not negotiated, the Task Force
would recommend taking by eminent domain. Costs associated with this as an
access option are as follows.
Roadway Construction (With full curbing but
no sidewalls, due to lack of proper width.) $52,000
Electrical 60,000
Water Main Construction 20,000
Sewer Main Construction 20,000
Gas Main Construction 11,000
Right -of -Way Costs 175,000
TOTAL $338,000
Consideration was given to the portion of Biggio property fronting on
Ash Street. Because of the sharp grade at the rear of the house lot, this
idea was rejected.
The Task Force did not really consider the Ash Street access as a ideal
access. Among other things would be traffic problems created at the junction
of Ash and Main Streets.
The third consideration was determining a foot print for siting the.DPW
facilities on the property. (See exhibits A & C.) Two separate siting plans
were made by the DPW. The first was with office space, and the second without.
The first plan would involve taking approximately 4.32 acres of Transitron
land. It would also involve relocating the wetland vegetate area to a storm
water storage area consisting of about an acre next to the railroad tracks at
the northeast side of the Biggio property. In looking at exhibit A, the
arrows by the shop areas, maintenance and heated vehicle storage indicate
door bays. The area outlined in a dotted line and stating Bordering Vege-
tated Wetlands would be an outdoor storage area for pipe, sand, etc. The
buildings are located to act as a shield to obscure this unsightly yard area
from Transitron, keeping in mind future development of the Transitron property.
There is really little room to place the DPW buildings in another formation.
The site topography with the steep embankment on the west side (see dotted
line edge of embankment) has the rear of the heated vehicle storage building
acting as a retaining wall against the embankment. To the east are relocated
-8- q
i cjc
Relocated'u
?
Storm w j. ey at ;
4 I � 4 I
7
\Wetiandsi
Pp-nderga Sto,ago I
A�e
a
Area
Cold S
hore.ge
E
\ ,; mp Oy8e Parkin
iii e 8, f e I d�t
W-TWiT
e
ce Parking
0 n
Salt BB -0 de r i n g
R-9. d
A
--liege late d
G 0
I �F Shop.
Areas
00 %
OIv
0
Heated Vechicle
Of i i OS
ca, Storage
G a I a n t e eao 19910
C-1
G c.
e.7
3abcock-
ca S.t
0
6
'S
fan S -11 e n
Evans
14 i 1T Durj'(i.n
Up is S n e
-9-
Lj
IND.
G
o?:�- O
Generai re
• Mu iclpal �
✓w� Light Dept.
/ �\ ' • '�
1• Lux
Lux ice• ,.' ;ems;` " \.� ��
O ender as�
Be
fo
at
30 10
71 Bigoo
Tra!W
4.
® �j ° I
z.
i
ACCESS_ OPTION Ilb
(MEW LUX) � • � �a % �
.m
jeldt
r
t
r
1
Bgrin9 J
ggetated
wetlands
• Q
'-
r i 1'
C
seine
idsor
Milano
�X1t�0�T" c soi
7i!
l
i
A\rpand0.
Shen
on
4,
1'/
\�
of
70 /0O
o rea\
. OQ,
i
Babcock
ogliano r
ahoney
ampie;---
29a Evans
uf1ru
wetlands. In the second siting by eliminating the office building and, there-
fore, the need for office parking spac6 some land is gained, but not much.
Borings were taken by the Task Force at four points, basically one at the
proposed salt storage, cold storage, shop area, and vehicle storage. It would
appear that a normal foundation design could be utilized at this site.
Costs of development for the Biggio / Transitron site are estimated as
follows.
Clear and Grub 7 Acres @ $1000
Strip and Remove Loam 12,000 c.y.@ $3.50
Excavate and Remove Surplus 20,000 c.y.@ $3.75
Relocate Wetland
Excavate and Dispose 1500 c.y. @ $3.50
Replace Loam 1500 c.y. @ $1.25
Vegetation L.S.
Compensatory Area
Excavate and Dispose 700 c.y. @ $3.50
Fine Grade 20,000 s.f. @ .05
Control Structure L.S.
TOTAL
$7,000
42,000
75,000
5,250
1,875
15,000
2,450
1,000
6,500
$156,075
Finally, full cost options for acquiring, preparing and developing access
to this site were compared.
Option No. 1 With Rail Crossing
Cost of Acquiring Biggio Land
Without House &
Cost of Acquiring Transitron Land $900,000
Cost of Access With Rail Crossing 1,198,000
Cost of Land Development 156,075
TOTAL $2,254,075
Option No. 2 Access From Ash Street
Cost of Acquiring Biggio Land
Without House &
Cost of Acquiring Transitron Land 900,000
Cost of Access from Ash Street 338,000
Cost of Land Development 156,075
TOTAL $1,394,075
-12- (4 G 11 _(
GENERAL TIRE
np CCR T ATTnM
The General Tire Plant is a large rambling light manufacturing plant with
buildings having a total area of about 260,000 square feet. The land is zoned
industrial and access is from a road leading to the plant from John Street
near Boston Stove. The southerly line of the lot abutts the railroad tracks,
the easterly side Boston Stove, the northerly side John Street and Bolton
Street, and the northwesterly side Cerrentani's Supermarket.
The facility is made up of many separate buildings of different design
and construction and obviously was developed over a long period to time.
The major amount of floor space is ;L four feet above grade, and the design
criteria is for light diversified manufacturing. Column spacings vary from
building to building, as do. elevations. The buildings at the south end are
of fairly "modern" construction: steel columns, structural steel, metal
deck, concrete floors, and sprinklers. Column spacing varies from 24' x 301,
16' x 181, to 16' x 161. Walls are generally 6" and 8" concrete block
raised to the metal deck. Windows are quite closely spaced.
DEVELOPMENT POSSIBILITIES
The plant has recently been bought by Damon Industries of Watertown,
Mass., a manufacturing company making metal fastenings. It is the company's
intention to use 100,000 sq. ft. of the 260,000 sq. ft. available. The
company is renovating the building through industrial revenue bonds and a
U.D.A.G. grant. Some of the remaining space has already been leased.
Members of the Task Force spoke with the owner, Mr. George Danis, who
offered as the only space available for a DPW-facility an area in the
northeast corner of the lot along with approximately 1.8 acres of yard.
See exhibit D. Although no serious discussions were held with Mr. Danis,
he indicated that portion of the plant would rent for about $5.42 per sq.
ft. Given the amount of space needed, this would be aproximately $200,000
per year. A great deal of renovation would be needed before the space could
be used. Some of the required work is as follows.
-13- q o ( to
1. Garage door openings made (none exist) and overhead doors installed.
2. Ramps into the building would haveito be constructed, and these would
only be allowed in the small yard area, cutting more space for outside
storage.
3. Truck, garage and shop areas would have to be separated by two (2) hour
fire walls and doors necessitating new interior footings.
4. Major sprinkler, heating and window modifications are necessary,
and a complete ventilation system would have to be installed.
S. Office partitioning would have to be made, along with wiring, etc.
If all of the above were accomplished, there would still be a major
obstacle which is the columns. Their spacing would make it very difficult
for vehicle maneuvering. In fact, more space than normal would be needed
for any maneuvering.
CONCLUSION
When first considering this building, the Task Force had in mind a ten
year lease. It was felt that this would immediately solve the time problem
of the DPW move, and would allow time needed to explore other possibilities.
It was also felt that within the ten year period the Town's financial picture
would have improved considerably with an increased tax base resulting from
the landfill development.
It became apparent that this option would be too costly. Estimated
renovations could run as high as one (1) million dollars, and this done on
property we would not own. In addition, even with the renovations there
would be the column problems, as well as outside storage space.
-14-
Cq 6ll�
y.✓ v,.r ;
strJ, y
nw,.�.,t� s +•,JA:•..sra . • } L, svarn,�a�,i -
• t Ir7 trra. — •
KA-•••sr s � • •q r.,.tT � L I
O w,r . r 1 .u+,+ I
00o •
V•
,.....t ,
r-- �' aua►ri
A7T••. ---------- ,�-_ -_ -_ I..:.j..�r.- �t�..Y•�N111 ANIIt �V li �j
^� r • ,rTA ,711Paa•� ,t1y O Ul
vp
Jtwrs Vftl Mj . • ••rw I ' • A . r'i
' - Ml,lbO�' fAYJAWT1,.�lI �• t • 1��- ''''��5. - _--- •_- ___ -...
. i ffD • '
1
1
I33U .1 =0M [9Z Q � � � i •�•(� �
N- PC1l -'yi30 32+? j 9NIiCG'ddM
JOHN STREET SITE
Much has been written and discussed concerning this site, and it is
not the.intention of this report to be 'redundant in reviewing the possibility.
For its deliberation the Task Force looked at this site for comparative purposes
of the site only, and the ramifications of its use in the proposed development
of the Towns industtial land. For comparative analysis the Task Force used
a site preparation cost figure of 1 million dollars for this site,
-16-
q,(Iq
THE REVENUE CONSIDERATIONS
The Task Force felt from the beginning of its deliberations that not
only must a site be feasible from a cost and utiliziation standpoint, but
also that it not impede the revenue potential of an expanded tax base for
the Town through industrial development. The Town faces a financial crises
with very little light at the end of a long tunnel. On one side the Town
is tightly restricted in its ability to raise revenue and on the other side
a series of rising costs and lost revenue over which it has no control.
Liability insurance, health insurance, pensions, water and sewer rates, architec-
tual barriers, mandates, environmental mandates, Fair Labor Standards Act
mandates are all costs over which we have----no control and are rising faster
each year than the Town is allowed to increase revenue under Proposition 2]s.
To add to the problem is the potential loss of Federal Revenue Sharing Funds
and cost of living increases to employees. The so called "Doom and Gloom"
report of the Finance Committee (see exhibit E) is if.--an�.tbing optomistic.
Nor will the current projected sale of land in itself answer the problem
(see exhibit F). In addition the Town faces other building problems. The
Central Fire Station is not structually sound to house proposed new equipment.
The sale of the Community Center means the cost of new quarters for the Town
Offices housed there.
The Town has only three means to meet these problems. Overide of
Proposition 211 which has already been rejected, large cuts in service -the
Town already has rejected small cuts such as the elimination of the dog officer
or increasing its tax base. In regards to the latter the Town has eliminated
most residential expansion through zoning and conservation which leaves
industrial development. It is for these reasons the Task Force spent a good
deal of its time relating the DPW location and its impact on the industrial
zoned area at John Street.
q & 1-2-D
-17-
I
00
I
Prior Year Budget
Pension
Group Insurance
Casualty Insurance
-1111ti1I1u1 1'111 ati11 11111W
PY87
26,792,394
250,000
100,000
200,000
FY88
27,859,768
250,000
100,000
Fxtfl 4 ri_ U.
FyU9
29,527,912
250,000
100,000
iH't,� I fit+i� � 11,' } +1 j l►1i
!"Y90
30,780,713
250,000
100,000
1?Y91
31,729,154
250,000
100,000
Debt Service Decrease
(238,000)
(65,000)
(74,000)
(232,000)
(357,500)
New Debt Service
590,000
270,000
New Debt Service Decrease
(260,000)
(44,000)
(44,000)
Salary Increase
755,375
793,144
832,801
874,441
918,163
27,859,768
2,5 ,9
30, 0,713
31,729,154
32,555,817
Other Appropriations
1,900,000
1,900,000
1,900,000
1,900,000
1,900,000
29,759,768
31,427,912
32,780,713
33,629,154
34,495,817
Less Receipts &Revenues
12,300,000
12'1'100,000.
12.;100,000
12,100,000
12,100,000
To be raised from levy
17,459,769
19,327,912
21,680,713
21,529,154
22,395,817
Levy limit
Prior Year levy
15,693,497
16,235,834
16,811,730
17,572,023
18,361,324
2h thereon
392,337
405,896
420,293
439,301
459,033
New construction
150,000
170,000
340,000
350,000
460,000
16,235,834
16,811,730
17,572,023
18,361,324
19,2.80,357
Surplus (Deficit)
(1,223,935)
(2,5161182)
(3,1031690)
(3,167,830)
(3;115;460)
Sale of Real Estate funds
590;000
834,000
790,000
746,000
1.223,935)
1,926,182
(2,274,690)
,377,830
(2,369,460)
C''
EXHIBIT F
SALE OF REAL ESTATE FUNDS
FY 1990
FY 1991 John St. Landfill
sale - rear section
only 700,000 2,100,000
TOTAL 2,783,500 5,853,500 12,283,500
-19- ��
WORST
PROBABLE
BEST
YEAR
CASE
CASE
CASE
FY 1986
Presently available
1,666,500
1,666,500
1,666,500
FY 1987
Community Center
Sale
1,117,000
1,117,000
1,117,000
FY 1988
Bear Hill sale
1,200,000
1,800,000
FY 1988
-John St. Landfill
sale - front section
1,170,000
5,600,000
only
FY 1990
FY 1991 John St. Landfill
sale - rear section
only 700,000 2,100,000
TOTAL 2,783,500 5,853,500 12,283,500
-19- ��
FINANCIAL SIGNIFICANCE OF THE LANDFILL
The landfill is a vital resource for the future financial stability of
the Town of Reading. Its importance is seen in two ways: in the financial
gains that it can yield in its own right, and in the effect that the landfill
will have on enhancing the development and redevelopment potential of our
entire 90 acre industrial area. Be assured on two points first, there IS a
demand for additional first -class office park and hotel development along the
Route 128 belt, as the Planning Board's consultant showed; and second, there
are a number of well -known developers who have expressed serious interest in
developing the landfill.
The Task Force, with the assistance of the Industrial Development Commission,
has prepared some estimates of the land sales and tax revenues which the Town can '
expect to realize over the next ten years from development of the landfill.(see
exhibit G). Three different development scenarios are portrayed here, the top two
with the DPW on the landfill, and the bottom one, without the DPW there. Scenario
1A represents the most likely type of development one can expect next to the DPW:
average- quality motel and R &D facilities. Scenario 1H represents a far less
likely outcome, with the assumption that a first -class hotel is built next to the
DPW and that top - quality office buildings occupy the remaining landfill. Scenario 2
represents the most likely type of development if the DPW is moved off the landfill.
In this scenario, first -class office space shares the front of the landfill with
a quality hotel, with further office development of similar quality being built
on the rear of the landfill in three years.
A comparison of land sales revenues for these scenarios shows values of
$1.9 million from Scenario 1A, $4.4 million from Scenario 1H, and $7.8 million
from Scenario 2. The first revenues, which result from sale of the front dump
land along John Street, are predicted to occur in FY 88. Under Scenario 1A
these revenues are $1.2 million, while under Scenario 2 they are $5.6 million.
-20-
This is a difference of $4.4 million in land sales revenues two years down
the road. i
When land sale revenues from the back of the landfill and tax revenues
from both front and rear are added, the difference between Scenarios 1A and 2
widens to $16 million over a 10 year period and to $39 million over a 20 year
period.
q( l Zq
-21-
i
N
N
N
EXHIBIT G
REVENUES FROM LANDFILL DEVELOPMENT
(In Millions of 1985 Dollars)
Development Land Sale 10 Year Tax 20 Year Tax Total 10 Year Total 20 Year
Scenario Revenues Revenues Revenues Revenues Revenues
Scenario 1A
DPW on landfill '
Average - quality
hotel and RED
on remainder
$1.2
0.7
$1.9
(FY'88)
(FY'
91)
$5.5
',
$18.9
$7.4
$20.8
Scenario 1H
$2.4
(FY'88)
$9.9
$33.5
$14.3
$37.9
f DPW on landfill
$2.0
(FY
91)
High - quality %$4.4
i
and office
ark on remaindhotel
e
Scenario 2 $5.6
(FY'88)
$15.6
$52.2
$23.4
$60.0
DPW at another. 2.2
FY'915
site 7.8
i
High - quality
hotel and office::
park on entire
landfill
* Optimistic scenario, less likely than 1A
SUMMARY AND CONCLUSIONS
After reviewing all of these studies, the Task Force reached the fol-
lowing conclusions.
GENERAL TIRE PROPERTY
The Task Force rejected this as an option. The potential modification
cost of a million dollars, plus the fact that with modifications there is
not adequate yard space and the column problem made the site impractical.
BIGGIO PROPERTY
The possibilities of this as an option is dependent upon obtaining per-
mission for a rail crossing.and permission to relocate the wetlands. The
prospects of obtaining a rail crossing are not good. The environmental
process for receiving permission to relocate the wetlands is a fragile one.
At any one of the steps that have to be taken for this process, problems
can occur.
The site as proposed does not offer many options for modifications or
expansion due to the topography and wetlands. This should be taken into
consideration if future plans for expansion are considered.
It should also be noted the Task Force felt that TASC would hardly be
enthusiastic at the prospect of a fleet of trucks crossing their property
every day. TASC has been rapidly expanding, and has indicated they might
want to build a third building. They have already rented the new office
space at Boston Stove.
Last but not least, this option is expensive. The rail crossing option
would add 1.2 million dollars for site cost over the 1 million dollar site
preparation figure at John Street. The Ash Street option would add approx-
imately $200,000 for site costs over the site preparation at John Street.
Some members of the Task Force felt that in spite of the additional cost.
this was a good investment, if based against the possible nine million
dollars extra the John Street site would produce without the DPW facility.
The Ash Street costs do not include any costs which might arise for legal
expenses arising from litigation on the takings.
-23- L4 &/762
If the Ash Street option was taken, the traffic problems at the junction
of Ash and Main Street would still persist.
i
-24-
L, &121
RBCOMME14DATIONS
During the review process a feeling developed that the Town had lost
control. Every option seemo-d to rest on the decisions of outside influences.
Cost of land acquisitions, permits, right --of -ways, time restraints all seemed
to be being determined by others. It became apparent that it is extremely
difficult to bargain or negotiate with tight time and financial restraints.
In its final deliberating the Task Force felt it was time for the Town to
take back the initiative and to have the parties bargaining with us and not us
with them. The Task Force felt the best way to accomplish this, and to solve
many problems at the same time was to send out R.F.P.s (request for proposals)
to national and international development companies offering them the opportunity
to present to the Town their best plan to develop our entire industrial area.
Attached to the R.F.P. would be a condition of linkage where it would be up to
the developer to determine how the DPW facilities would be part of his plan.
The Task Force recognizes that neither it, nor the Town are experts in this
field. The developers have the experience, money, and political know how
necessary for the project. Lets use it! This is not the first time the Town
has used linkage. The sale of the Community Center included the Developer
accomodating the Elderly Drop In Center. The Adams - Gentile property swap
involved accommodating low income housing. The Task Force feels with the right
R.F.P.,developer initiative. will provide several solutions to the DPW question.
One such scenario might include a four story office building with a garage on the
first floor to house the DPW facilities. In this scenario site costs could be
reduced to the Town, but there are many other alternatives.
Fortunately 80% of such an R.F.P. has been done by our Industrial
Development Committee with all information concerning the site. Such an
R.F.P. could be sent out in December with replies due back by the end of
February and negotiations taking place with a recommendation to the Annual
Town Meeting.
-25-
If this recommendation is followed through, other benefits to the Town
will accrue. A timetable of developureiit will be realized enabling the Finance
Committee and the Town to know the time of revenue projections and be able to
plan.
Even if there is some delay in the TASC timetable,the cost involved is
certainly not greater than the alternatives we have been studying. It should
also be considered that TASC itself has much to gain from a well thought out
and planned development.
The vote of the Task Force was unanimous to send out the R.F.P.'s and
the follow through. The Task Force also voted to proceed with the two hearing
processes that have been requested for the rail crossing as outlined in the
Biggio option.
y�'(zq
-26-
TOWN OF REAnTNG
BOARD OF PL BL-IC WORKS
REPORT TO SPECIAL- TOWN MEETING
SEPTEMBER 23, 198S
X130
SUBJECT
Letter from Board of Pub
General Overview of John
General Overview of Nike
Letter from Town Counsel
Facility Information:
TABLE OF CONTENTS
PAGE
lic Works 1
Street 2
Site 4
on Public Bidding 7
Space Requirements g
Design & Costs 10
Facility Relocation Committee Report Update 11
Time Table Schemes 14
Motion Under Article 6 15
Motion Under Article 7 15
,� � � 31
TOWN OF READING
MASSACHUSETTS
OFFICE OF
BOARD OF PUBLIC WORKS
MUNICIPAL BUILDING
READING. MASS. 01887
Dear Town Meeting Members:
DOUGLASS L. BARKER. Chairman
BARRY E. HANWON. Secretary
ARTHUR POLYCHRON'ES
ROBERT P. GRIFFIN
J. R. BOUCHER
A. V. FLETCHER. P. E.. Superintendent
During the past seven months (since February Town Meeting), the
Board of Public Works has conducted further review and analyses of
the process necessary to relocate the John Street facility displaced
by the sale to TASC.
The Board of Public Works continues to favor the plan previously
approved by the April 1984 Town Meeting of moving to the landfill
site.
Attached, you will find a series of information pages, some
updated from the Facility Relocation Committee Report, which we hope
will answer any questions you may have.
Please feel free to contact any member of the Board and discuss
this matter in more detail.
Respectfully submitted,
h Chairman
Secretary
JOHN STREET OVERVIEW;
Since our last report, work has continued on the John Street site. The
sewer line has been completed and the drainage ditch has been relocated.
Work continues in the areas outside of the facility site to meet D.E.O.E.
requirements for the closure of the sanitary landfill according to the
approved plan. Delivery of the ash used for cover is complete, and the
loaming and seeding will be done in the fall, pending the availability of
loam stock.
Since the final bids were received, additional thought has been
devoted to the design and the cost of the facility. We can expect to
spend additional money to reopen the process and to meet expected
inflation increases of + 5%. In addition, the Board now believes that we
must reverse one of the compromises originally agreed upon to lower the
final price. The Board now feels that reducing the final bid price by
eliminating the structural floors in the main vehicle storage shed
sacrificed quality and created an unwanted risk factor. Assuming that the
facility is still to be built as planned on the John Street site, the
Board now feels that the structural floors should be reinstated to assure
the structural integrity of the facility. As an adjustment against the
added cost, the welding bay has been eliminated.
Elimination of the welding bay - Savings $68,000
Add Structural Floors - Cost $100,000
(For the final breakdown of costs please see Facility Design & Cost
schedule - Page 10)
-2-
q& X33
One idea has been whether the facility could be relocated to the
rear portion of the dump site where the debris from the front portion has
been deposited. The Board does not consider this to be a viable option.
The general attitude of the Solid Waste Division of D.E.Q.E. has been to
reject grant permits for construction on new or "young" landfills. In
addition, the costs for constructing on this portion of the landfill will
be prohibitive. Site assessment alone could cost approximately $100,000.
Time delays of upward to two years can be anticipated in order to assure
compliance with all current laws and regulations pertaining to the
protection of the environment. In the unlikely event that a permit was
eventually obtained, an extensive boring and solid waste anlaysis would be
required at an expenditure of approximately $100,000 and a delay of two to
three months can be anticipated. When this proposal was reviewed by our
consultants, they concurred that an additional expenditure of $1,000,000
would be a realistic projection.
—3—
NIKE SITE OVERVIEW:
The parcel is located on Haverhill Street adjacent to property number 321
and is accessed by a narrow road approximately 400 feet long. The property
is owned by the Town of Reading. This site contains 24.4 acres of land, 5
acres of which is delineated wet land. Due to the shape of the site,
facility construction would effectively block out development on the
additional acreage. The wet land area is mainly confined to the north end
of the property and the site is large enough so that construction of a
facility could take place without violating the provisions of the Wet
Lands Protection Act.
Existing buildings:
Formerly used for missile storage and launching, the site contains grade
level, simply constructed block buildings used for barracks, offices,
vehicle storage and maintenance. Three existing sub surface launching pits
have been stripped and the pad doors have been welded shut. Buildings can
be easily and cheaply demolished, but the launching pits, which are full
of water, would have to be pumped dry and filled with acceptable fill
material. Demolition costs to remove existing buildings in the missile
storage area and to fill the pits is estimated to be approximately
$50,000.
Development Concerns:
Past experience with the site indicates no unusual sub surface conditions
that would result in extraordinary construction costs; however, the narrow
access road would not be acceptable for Public Works trucks entering
Haverhill Street. A land taking of some size, either the whole
—4—
abutting property or a portion thereof would be necessary. Cost of
eminent domain taking is approximately $150,000, but present owners have
expressed an unwillingness to sell.
Citizens Concerns:
Traffic safety: The site is located in a highly residential area and
is in close proximity to an elementary school, parks and a church.
Haverhill Street is already heavily travelled as an access road from the
128 Wakefield area to North Reading. In addition, the site is located on a
short radius curve and visibility is limited; a costly arrangement of
traffic signals and flashing approach signs will be required. Haverhill
Street traffic is heavy in the morning and evening hours, a time when
Public Works crews are in full operation.
Operational Noise: The noise levels will be higher than the relatively
quiet ambient background is at present. The site is 400 feet from the
street and the facility would be located an additional 200 feet easterly.
Environmental Issues: Though the Wet Land Protection Act does not impair
the possibility of construction, the concerns for preservation of this
site as the only currently identified future water source have great
impact in the decision making process. There is a strong public concern
that the Cedar Swamp -Clare Meadow area is a source of potable water. The
only way to substantiate this perception is to do a ground water study
that would include test wells and quite possibly seismic analysis.
&t36
-S-
Conclusion; Though the site may be implementabl.e, ci.ti =en concerns and the
potential of the site as a future water source will have a negative effect
on the selection process. The least that should be done, if consideration
of this site is demanded by Town Meeting, is to perform a complete
hydrological survey. The cost would be about '100,000 and require a year
or year and one half to complete. Additional costs for assessment of
highest and best use are undetermined.
q � 37
—6—
TYLER & REYNOLDS
PROFESSIONAL CORPORATION
COUNSELLORS AT LAW
ONE BOSTON PLACE
BOSTON, MASSACHUSETTS 02108
TELEPHONE 617-523-6550
August 9, 1°
Mr. Anthony V. Fletcher
Superintendent
Board of Public Works
Town of Reading
16 Lowell Street
Reading, MA 01867
Re: Public Bidding
Dear Tony: ,
. --- ...__... --.1
RECEIVED
BOARD OF MUM WORKS
' I2 C C,
�QTOWN OF READING..
You have asked my advice as to the propriety of putting a
public works contract out to bid prior to Town Meeting
appropriating the funds for such project. I have discussed the
matter with the Department of Labor and Industries; and it is
their position that it is totally inappropriate to take such
action even under the Awarding Authority's reservation of right
to reject all bids and that it could subject the Awarding
Authority to claims for reimbursement of bidders' costs and
expenses incurred in preparing their bids.
If you have any further questions with regard to this matter,
please do not hesistate to contact me at any time.
H TC /c f
dz
Very t ly yours,
H Theodore Cohen
q �(3s
Q
MEMORANDUM
TO: Board of Public Works
FROM: A.V. Fletcher, P.E., Superintendent
DATE: July 26, 1985
RE: John Street Facility Location; Space Requirement
There has been comment circulated that the Board of Public Works
should and could build a facility on a piece of property not exceeding
five acres.
The facility proposed for John Street will be located on a site of
8.2 acres. The drainage ditch that traverses the site is two acres in
size, and effectively cuts off approximately I acre along the frontage
line, leaving a net of 5.7 acres for actual use. The facility proposed
contains 50,000 square feet, reducing available storage area to 4.5
acres. Minimum parking requirements and paved areas for vehicle routing
and fuel storage requires 11 acres, leaving a total of 3 acres for
planned storage use.
Sand and salt storage and area mixing requires a minimum of I acre
reducing final storage area to 21 acres. The Town nursery and loam stock
pile require an area of one acre, leaving an area of 1'j acres to handle
pipe, curbing, cast iron, lumber, pea stone, and gravel storage without
consideration for areas for vehicle passage to load and unload materials.
Use of the proposed John Street site will be very restricted and
really should contain two additional acres. Doubters need only look
at the five acres that the Department is trying to operate from at the
present time and most of our storage operation is not on site but has
been moved across the street. Imagine the present site after a snowfall!
Operations currently restricted to the five acres provided on the TASC
site have been severely curtailed, and that is with the storage operation
moved across the street.
A great number of towns and cities were contacted relative to
building size and area used. These figures were included as part of
the Facility Committee Report. In evaluating each community the
following must be taken into consideration:
a. Size of community
b. Services rendered
C. Functions under DPW
d. Sewered or unsewered community
e. Water Treatment (Plant or direct MDC)
f. Satellite storage areas
g. Plowing (private, town, or combination)
I feel confident that there is no community providing our level of
operations with less than 7 - 8 acres.
q & 139
M11
Memorandum
July 26, 1985
Page 2
There has also been discussion that the Department of Public
Works should be utilizing Town owned land behind the Texaco Station
on John Street. Since all the acreage in this parcel is in wetlands,
and there is no possibility of developing compensatory wetland area,
these three (3) acres can not be considered for any Public Works
use other than for snow dumping.
There is little doubt that the Department will have to utilize
space somewhere on the Water Treatment Plant property on Strout Avenue.
No consideration will be given to a site smaller than that net area of
the John Street site!
AVF:cmk
-9-
q � (qD
9/23/85 S.T.M.
MOTION UNDER ARTICLE 6
MOVED: THAT THE TOWN VOTE TO REAFFIRM THE VOTE TAKEN UNDER ARTICLE
14 OF THE WARRANT FOR THE APRIL 26, 1984 SPECIAL TOWN
MEETING WHEREBY THE CARE, CUSTODY, MANAGEMENT AND CONTROL
OF A PORTION OF THE TOWN OF READING LANDFILL WAS TRANSFERRED
TO THE BOARD OF PUBLIC WORKS FOR USE AS A SITE FOR THE
BOARD OF PUBLIC WORKS GARAGE AND RELATED FACILITIES.
BOARD OF PUBLIC WORKS
MOTION UNDER ARTICLE 7
MOVED: THAT THE SUM OF THREE MILLION SEVEN HUNDRED THOUSAND DOLLARS
($3,700,000.00) BE RAISED AND APPROPRIATED FOR THE CONSTRUC-
TION OF A BOARD OF PUBLIC WORKS GARAGE AND RELATED .FACILITIES
INCLUDING DESIGN, ENGINEERING, CONSTRUCTION, FURNISHINGS
AND ALL OTHER ASSOCIATED COSTS, AND TO MEET SAID APPROPRIATION
THE SUM OF THREE MILLION SEVEN HUNDRED THOUSAND DOLLARS
($3,700,000.00) BE RAISED AND APPROPRIATED BY BORROWING,
AND THAT THE TOWN TREASURER WITH THE APPROVAL OF THE
SELECTMEN, BE AND SHE HEREBY IS, AUTHORIZED TO BORROW SAID
THREE MILLION, SEVEN HUNDRED THOUSAND DOLLARS ($3,700,000.00)
AND TO ISSUE AT ONE TIME OR FROM TIME TO TIME, BONDS OR
NOTES OF THE TOWN FOR SAID THREE MILLION, SEVEN HUNDRED
THOUSAND DOLLARS ($3,700,000.00) PAYABLE IN ACCORDANCE WITH
CHAPTER 44 OF THE GENERAL LAWS SO THAT EACH SUCH ISSUE SHALL
BE PAID IN NOT MORE THAN TEN YEARS (10) FROM ITS DATE OR AT
SUCH EARLIER TIME AS THE TREASURER AND SELECTMEN MAY DETER-
MINE AND SAID BONDS OR NOTES SHALL BE SIGNED BY THE TREASURER
AND COUNTERSIGNED BY THE SELECTMEN, AND THAT THE BOARD OF
PUBLIC WORKS BE, AND IT HEREBY IS, AUTHORIZED TO PROCEED
WITH SAID IMPROVEMENTS AND ENTER INTO ALL CONTRACTS AND
AGREEMENTS WITH RESPECT THERETO AND TO DO ALL OTHER ACTS
AND THINGS NECESSARY OR PROPER FOR CARRYING OUT THE PROVISIONS
OF THIS VOTE.
BOARD OF PUBLIC WORKS
(DRAFT MOTIONS, SUBJECT TO APPROVAL FROM TOWN COUNSEL)
q (�'1q1
-15-
REPORT ON THE DUBITZKY PROPERTY
SPECIAL TOWN MEETING
SEPTEMBER 23, 1985
On motion of Mr. Philip D. LeBlanc at the Special Town Meeting
held June 24, 1985, the Board of Public Works was instructed to review
the Dubutizky property on Salem Street as a potential site for the new
Department of Public Works facility.
The following analysis of the property was completed by the DPW
staff, and reviewed and accepted by the Board. This information was
sent to Mr. LeBlanc on August 7, 1985, with copies to the Board of
Selectmen, Town Moderator, Planning Board, Industrial Development
Commission, Conservation Commission and Board of Health.
AREA:
The attached map shows the location of the subject property at the
intersection of Salem and Torre Streets, formerly the site of a super-
market and flea market. The property consists of two parcels as
discussed below:
a. The 6.01 acre parcel is zoned S -10 and more than half of this
parcel is within the Wetland Zone or within the 100 foot buf-
fer zone included in the wetlands protection act. There is
little chance that waivers can be obtained to fill the wet-
lands as the area acts as a large retention pond for a major
drainage system. Review of old topological maps and data
from excavations for water and sewer systems in the immediate
area clearly indicate that this parcel was filled in over
peat bogs. Only an extensive and expensive boring study can
. q �,IqZ
determine the actual subsurface conditions, but it is reason-
able to assume that subsurface ground conditions are of major
concern to construction. The approximate cost of such a site
investigation will be $30,000.
b. The 3.38 acre parcel is zoned for business and contains
structures previously housing commercial enterprises. This
parcel also borders the wetland zone, and though filling of
wetland in not required, subsurface conditions are suspect
for the same reasons given above.
Note that neither parcel can be used for the Public Works facility
on its own. When combined, the two parcels contain less than 7 acres
of useable land. Both parcels are privately owned and, if they are to
be used for the Public Works facility, would have to be purchased or
taken by eminent domain proceedings. The appraised value of the land
a year ago was approximately $2,000,000, and it is estimated that land
values in Reading increased from 12 to 20 percent since then.
EXISTING BUILDINGS:
The smaller parcel contains structures previously used for light
commercial activities, most recently as a supermarket and as a flea
market. Though original construction plans are not available for
review, there is nothing to suggest that the buildings have structural
foundations in order to support the loads developed by heavy vehicles.
Structural steel, which can be seen, is light and appears to have been
designed for simple rood loading. Exterior walls are "curtain" walls
and do not lend themselves to modification for the installation of
multiple openings with overhead doors. Existing heating and cooling
systems are clearly designed to treat large open areas and are not
& I Ll
easily adapted to space requirements of a public works facility.
In order to adapt these structures for vehicle storage and repair,
the entire structure would have to be rebuilt to conform with the
state building codes for that use, and would also have to conform to
the requirements for energy efficiency. Costs for demollition of the
structures is estimated to be between $50,000 and $75,000 depending on
a location for disposal of the materials. There is value in recovery
of the structural steel and joists, but the value will not cover the
costs of demolition.
LAND AVAILABILITY:
The property is privately owned and there is the possibility of
long term leases in effect. It has not been determined if the pre-
vious lease holder, Gallahue's Market, gave up the original lease.
The BPW has been recently advised that a new 5 -year lease has been
executed for this property. A letter was sent to Mr. Dubitzky on July
2, 1985, asking if the subject property was for sale. A reply was
received from his attorney on July 12, 1985, stating that "The owners
of the property are not interested in selling the property for use as
a garage".
CITIZEN CONCERNS:
The Facility Relocation Committee held open meetings concerning
various potential sites, and documented the concerns of citizens. The
following concerns pertained to the Dubitsky property:
a. Traffic safety - the property is located on a sever curve,
thereby making access difficult. Construction of a public
works facilility at this location would add approximately 500
truck mover per day. This number could be equal to those
� (' I L4
Ne
� `k i
GD� .-.r - -, - • .. .. _ � .558 ,50
. J
\
i
BUS, g ,
• o
� o
•o �
C'`
q
DUBITZRY PROPERTY
RECAPITULATION
On motion made by Mr. Philip LeBlanc, the Board of Public Works
was instructed to review the Dubitzky property for use as a site for
the Public Works Facility.
On July 2, 1985 a letter was sent to Mr. Dubitzky, asking if the
property was for sale. A reply was received on July 12, 1985 from
Aviva D. Neuman, of Squadron, Ellenoff, Plesent & Lehrer, a law firm
representing Mr. Dubitzky. The reply was in the negative.
The attached analysis of the property was completed by staff,
and reviewed and accepted by the Board. This information was sent
to the maker of the motion with the feeling of the Board that no
further action should be taken regarding this property.
u is q
In accordance with the instructional motion filed at the last Town Meeting
a review of the Dubitzky property follows;
AREA; See attached map.
(a) The 6.01 acre parcel is zoned S -10 and approximately 2
acres of this parcel is within the Wetland Zone area. In addition,
approximately 2 acres is within the 100 foot buffer zone included in the
latest wet lands protection act. In effect, only three (3) acres of this
parcel is useable. There is little, or no chance that waivers can be
obtained to fill the wet lands as the area acts as a large retention pond
for a major drain system. Review of old topo maps, and support from
excavations for water and sewer systems in the immediate area clearly
indicate that this parcel was filled in over peat bogs. Only extensive and
expensive boring investigation can determine the actual subsurface
conditions, but it is reasonable to assume that subsurface ground
conditions are of major concern to construction.
(b) The 3.38 acre parcel is zoned for business and contains
structures previously housing commercial enterprises. This parcel also
borders the Wet Land zoned area and though filling of wet land is not
required, sub surface conditions are suspect for the same reasons given
above.
Note that neither parcel can be adopted for use for a Public
Works facility on its own and when combined, the two parcels contain
approximately 7 acres of useable land, less that amount of buffer required
by Wet Land requlations. This amount of land is not acceptable for the
Towns use for a public works facility.
Both parcels are privately owned and if these parcels are to
be used for the construction of a public works facility they would have 1
to be purchased or taken by eminent domain proceedings.
EXISTING BUILDINGS:
The 3.38 acre parcel contains structures previously used for light
commercial activities, most recently as a grocery store and a flea market.
Though original construction plans are not available for review there is
nothing to suggest that the buildings have structural foundations in order
to support the loads developed by heavy vehicles. Structural steel, which
can be seen, is light and appears to have been designed for simple roof
loading. Exterior walls are "curtain" walls and do not lend themselves to
modification to construct multiple openings for overhead doors. Existing
heating and cooling systems are clearly designed to treat large open areas
and are not easily adopted to space requirements of a public works
facility.
In order to adapt these structures for vehicle storage and
repair, the entire structure would have to be rebuilt to conform with the
Massachusetts building codes for that use, and would also have to conform
to the requirements for energy efficiency. In addition it is clear that
the concrete floors are not structural, and there is no evidence that pile
supports were used. My opinion is that the buildings would have to be
demolished if these parcels are to be used for construction. Costs for
demolition of the structures is estimated to be between $50,000 and
$75,000 depending on a location for disposal for the materials. There is
value in recovery of the structural steel and bar joists , but the value
will not cover the costs of demolition. If the judgement that the
buildings are not convertible is to be researched, evaluation by a
consultant in the discipline would cost in the area of $10,000.
� � I � q
CITIZEN CONCERNS:
The Facility Relocation Committee held open meetings concerning
various parcels under consideration for construction of a new facility and
documented the concerns of citizens. The following concerns pertaining to
the Dubitzky property are as follows:
Traffic safety: The two parcels are located on a severe curve ,
thereby making entrance and exit to the parcels very difficult.
Construction of a public works facility at this location would add
approzimately 500 truck moves a day. This number could be equal to those
moves created by a shopping center of this size, but public works moves
would be heaviest during those hours that Salem Street has heavy traffic
to serve industry and commercial facilities in North Reading, Wilmington
and Burlington... early morning and late afternoon.
Operational Noise:- There would be an impact to the surrounding
residential area's during the day but the impact would be greatest during
night activities, particularly during sanding and snow removal operations.
Environmental Issues: Due to periodic flooding in the area,
residents are concerned about additional runoff created by paved area's
necessary for operations. In addition to residential concerns it appears
doubtful that permits could be obtained to fill in wet lands or to alter
drainage patterns.
General Neighborhood Concerns: Negative effect on property values
in the immediate area.
LA
DEVELOPMENT CONCERNS:
The following items need to be addressed to evaluate development
of the parcels:
Land Availability: The parcels are privately held and there is the
possibility of long term leases in effect. The professsional appraised
value of the land twelve months ago was approximately $2,000,000 and
values in the Reading area have been noted to have risen from 12 to 20
percent in the past year. When questioned during committee activity the
owner has been quoted as saying that "anything is for sale at the right
price."
Subsurface Conditions: The parcels lie in the same drainage area
as the land fill, and only investigation by borings and soils analysis can
confirm actual conditions. Value of a site investigation study is
approximately '30,000.
Existing Leases: It has not been determined if the previous
lease holder, Gallahue's Market , gave up the original lease or retained
the lease and is now attempting to sub lease. The department has been made
aware recently that a new five year lease has been executed for this
property. The owner of the parcels has been sent a letter requesting the
status of the properties, and if there is interest in selling. It would
appear however that recent execution of a lease precludes selling.
Conclusion: Given the size and nature of the parcels, site
problems , probable aquisition costs, existing leases , and local
concerns, the sites should be eliminated from consideration for
construction of the new facility.
MEMORANDUM
TO: Public Works Facility Relocation Committee
FROM: Frank H. Baggs
DATE: January 12, 1984
RE: Minutes of Meeting, January 11, 1984
Attending: (Members) - C. Arthur, F. Robie, P. Dustin, F. Baggs,
R. Sullivan, R. Tulikangas, D. Barker, E. McIntire, Jr.,
and W. Bergeron.
(Guest) - Marvin Cohen (TASC)
• Chairman Doug Barker called meeting to order at 7:30 P.M.
• Minutes of last meeting were distributed. After review, they were
accepted with no additions or deletions.
• Doug Barker made three appointments:
1. Richard Sullivan and Robert Tulikangas to develop a questionnaire
for sending to other Town D.P.W. operations inquiring about their
organization.
2. Francis Robie to determine what procedures would be necessary if
a site were chosen involving an Environmental Impact Study.
3. Charles Arthur, Edward McIntire and William Bergeron to look at
Causeway Road site of Route 129 and 5 - 6 acres of Camp Curtis
Guild site mentioned by Ken Latham in his letter to Doug Barker.
• Chairman Barker mentioned that the computer printout of all 4 acre or
better sites was not available. We had been preempted by an item of
higher priority for time on the Town Computer. Instead, for this
meeting, Bill Bergeron had some Land Bank Committee information
available to begin our site search.
Bill Bergeron then passed out copies of a package of information. It
contained:
1. Public Works outside storage space requirements.
2. Land Bank Committee list of prospective lots of Town -owned land
suitable for Public Works.
3. Land Bank Committee information on available land in Reading for
housing.
Bill then went over each section:
• Section 1 -
Bill went over D.P.W. space requirements item by item. To summarize:
u ��, I
-2-
Building Space -- 1.08 Acres
Outside Storage - 5.06 of
Snow Dumping -- 4.00 it
10 Acres Total
Paul Dustin requested detailed information on D.P.W. Property other
than the.John Street site. Paul said that this would give the Committee
a more complete picture.
Section 2 -
Bill started to discuss the 8 lots of Town owned land from the Land
Bank Committee list. This was the start of the Committee's site
search. The Committee used its 4 acre minimum criteria.
1. 2 Acre section of dump site, Northerly end
Rejected: Environmental concern as formed dump site, too
small (2 acres), prime industrial land; however, possibility
as snow dump site.
2. Nike Site, Haverhill Street
Possibility: 12 Acres of land, access to main road, built in
buffer zone *, problem with environmental impact to Ipswich
River Watershed.
3. Nike Site, Bare Hill
Rejected: 6 acres of land, but limited access, terrain problem,
close to Summit Tower Property, and prime residential property.
4. Gravel Pit, Strout Avenue
Possibility: Enough acreage
5. Higgins Lot, entered from Birch Meadow Drive
Rejected: Headwaters of Aberjona River, Wetlands
6. Batchelder Field, Franklin Street
Rejected: Difficulty of access, prime residential property
7. School Site, Fox Run Lane -- Dividence Road
Rejected: Difficulty of access, not near main road, however,
good size property
8. Conservation Land, upper Pearl Street
Rejected: Flood Plain,. potential well field
Committee decided that Nike Site, Haverhill Street and Gravel Pit, Strout
Avenue worth a closer inspection.
*Bill Bergeron mentioned that any site chosen next to a residential area
would need a 100 foot Buffer Zone around it. on a 4 acre site, this woul.
add 3.22 acres of Buffer Zone. Paul Dustin asked how the Town is bound
by such a zoning restriction.
4 2
-3-
Section 3 -
Bill then went over the different plats of land in Reading to pick
out and discuss those 4 acres in size or better.
Plat 22, Lots 3 -9 and 4, Spence Farm
Possibility: 7 acres
Plat 14, Lot 17 -2
Rejected: Difficult access and terrain
Plat 23, Lot 17 -7
Rejected: Being developed for other use
Plat 36, Lot 1 -8 -10 and 15
Rejected: Not contiguous
Plat 58, Lot 4, 7, 8, Longwood Poultry Farm
Possibility: 18 acres
Plat 68, Lot 1 -3, Adams Property
Possibility: 20 acres, has house and greenhouses
Plat 80, Lot 30
Possibility: 12.5 acres, balance has house and barns
Plat 92, Lot 14.,'Dubinsky property on Salem Street
Possibility: 4 acres
Plat 96, Lot 12, Off West Street
Possibility: 5 acres, balance has two houses and one garage
Plat 128, Lot 1 -4, Girl Scouts
Rejected: In process of being sold
Plat 180, Lot 2
Rejected: No access, residential
Plat 181, Lot 6 -2 -1
Possibility:- 21 Acres
Plat 183, Lot 7- 2 -3 -5, Sherman Property
Rejected: Flood Plain
Plat 193, Lot 3
Rejected: Being developed
Plat 206, Lot 1 -4, Fox Run Lane, School Site
Rejected: Previously
Plat 210, Lot 1, Dr. Lester Property
Possibility: 6.5 Acres
q g 1�'3
-4-
Plat 213, Lot 3, McDonald Farm
Possibility: 4 Acres
Plat 222, Lot 1 -2 -3
Rejected: Being Developed
Plat 223, Lot 9
Rejected: Being developed
Plat 226, Lot 8
Rejected: Being developed
Plat 232, Lot 1 -3
Rejected: Flood Plain
Plat 234, Lot 1
Rejected: Being developed
Plat 235, Lot 1 -2 -4 -5
Rejected: Being developed
Plat 236, Lot 18B, 17B -14
Rejected: Being developed
Plat 245, Lot 2
Rejected: Being developed
Committee chosen sites worth a closer inspection:
Plat 22, Spence Farm
Plat 58, Longwood Poultry Farm
Plat 68, Adams Property
Plat 80
Plat 92
Plat 96
Plat 181
Plat 210
Plat 213
• Idle General. Tire Property rejected because of cost and prime industrial
land.
• Chairman Barker reminded members of Saturday's D.P.W. Tour
• Meeting adjourned at 9:30 P.M.
g615�
MEMORANDUM
TO: Public Works Facility Relocation Committee and the Board of Public
Works Municipal Space Building Committee
FROM: Gail F. Wood, Chairman of the Board of Public Works
DATE: January 25, 1984
After a lengthy discussion on the needs of the new Public Works
Facility including a discussion of the merits of housing operations,
engineering and administrative functions under one roof, the Board of
Public Works wishes to impart the following information to both the Public
Works Facility Relocation Committee and the Municipal Space Building
Committee:
1. The Board has recently voted to hire a new Superintendent, Mr. Anthony
Fletcher, who will start on February 27. Mr. Fletcher has been
spending some time in Reading learning about the Department he will
run but has not yet had sufficient time to map out any change in
direction of the Board of Public Works he may wish to recommend.
2. The Board has unanimously agreed that a central location to house all
of the existing Public Works operations currently located at the John
Street site is important - any fractionalization may require duplica-
tion of personnel and /or equipment. This may result in a lack of
productivity rather than the increase in productivity that is an
acceptable goal. (SEE SHEET 1A)
3. The Board has unanimously agreed that the Assistant Superintendent of
Operations will spend more time at the operational headquarters, this
however, is an internal matter and should not either add or decrease
space needed at either the new facility or Town Hall as he now has a
desk at both places which we would expect to continue and an alloca-
tion of time spent at each place to be at the discretion of the
Department Head.
4. An inventory of the current facilities and a workup of additional
space needed at the new facility has been prepared and enclosed. The
Board wishes to remind you that plans for this additional space at the
current facility had already been made because of the present needs.
It had been thoroughly discussed and planned for well over six months
as part of our capital planning and has been "in the works" for a much
longer time.
5. The Board would like to strongly recommend (a) secure storage for the
inactive files for the Board of Public Works, (b) the discussion of
incorporating the Civil Defense function and secure storage for
other departments and (c) the building of additional space that could
accomodate a future central maintenance for all Town vehicles. The
first is much needed space that would help solve the general space
crunch that Reading government, including the Board of Public Works,
has experienced over the last few years largely due to the necessity
of keeping copies of the volumes of paper produced in its activities.
The second would find a home for the Civil Defense function, put it in
a facility that would in all likelihood be open in time of emergency
and if any funding were available to increase qualification, the
secure storage would have the same benefit for other departments as
� ��SS
it would for our own. The last recommendation should not add
extensively to the present building costs but the lack of planning
could be quite costly to the Town at a later time.
b. The question of whether the Hoard of Public Works should move its
entire function to the new facility can not be considered as a
separate entity. The centralization of the Board of Public Works in
this manner causes the decentralization of Town Government as a whole
which is a point that the Town has been moving to in order to create
a more efficient and productive service to the people of the Town.
If it could be located in an area within walking distance of the Town
Hall complex this would seem to be a logical move. However, we must
consider that a practical impossibility at this present time.
The move could put a strain on'the financial and personnel welfare of
the Government that would seem to make it a likelihood that should
not be considered. (SEE SHEET 2A)
Presently a memo is being circulated within the other Departments of
the Government that should help us to understand better the relation-
ship of the Board of Public Works to them, particularly the financial
branch. The Board would like you to plan for the expansion and
inclusion of their Adminstrative, Office and Engineering functions if
in the future the Town is willing to pay for the increased space by
virtue of adding additional personnel and equipment and the citizens
are willing to accept the idea of going to satellite locations to meet
their different needs. The additional cost and inconvenience however
is not something that the Board of Public Works sees that the Town is
ready to accept at this time.
7. Movement of all or any of the functions to Strout Avenue Treatment
Plant Facilities -
The Board is adamently against moving to the Strout Avenue site. It'
was fully discussed. The possibility of endangering the well field in
a situation that the citizens of Reading can control is out of the
question from the Water Commissioners viewpoint. The operation of the
Treatment Plant is regarded as a specialization in nature. Water and
sewer maintenance operations are in actuality maintenance operations
and should be included in a maintenance facility. (SEE SHEET 1A).
q C I e60
SHEET 1A
MEMORANDUM
TO: Public Works Facility Relocation Committee
FROM: Board of Public Works Municipal Space Building Committee
DATE: January 10, 1984
I. A new central location to house all of the existing Public Works
operations currently located at the John Street site in one
location is important for the following reasons;
1. Centralization of our maintenance functions provides control
over the entire operation. (Better coordination of the services
provided by the Department with personnel and equipment).
2. Allows Supervisors to cover for each other during times of
vacation or sick leave (Three supervisors will be working
out of the new facility).
3. Storage of equipment allows interdivision use of all equipment
easily. (Water, Sewer, Highway, Forestry & Parks Divisions
coordinate the use of equipment).
4. Storage of materials allows ease of access and control over
inventory, loading and unloading. (Gravel, stone, sand, loam,
etc.).
5. Allows personnel to be allocated between divisions as required.
(Transporting personnel would not be necessary).
6. Allows one person to maintain records, answer phones, receive
shipments, and visitors. (Dispatcher - Clerk).
7. Reduces the duplication of space, manpower and storage require-
ments. (Additional locations may require an additional Dis-
patcher -Clerk and require more office and material storage
areas).
8. Provides better opportunity for supervisors to manage equipment
and personnel. (coordination of effort).
9. Would probably allow a larger buffer area between residential
areas and operations, but would require a smaller percentage of
the overall site;
i.e., a 4 acre site may require an additional 3.2 acres to
maintain a 100 foot buffer zone 80.5X of site, a 10 acre site may
require an additional 4.89 acres to maintain a 100 foot buffer
zone 48.9Y. of site.
9 &15?
1
SHEET 2A
Comments from Treasurer /Data Processing Coordinator, Beth Klepeis, at
Board of Public Works Meeting of January 17, 1984 regarding relocation of
the Department of Public Works from the Town Hall;
Three years ago we started with the Computer Study Committee. The
Committee thought long and hard. The Board of Public Works
representatives did decide, with the support of the Board, that they did
want to be part of the central computer system. When we set this up it
was with the idea that this would be a user- friendly language.
The Department of Public Works functions are very much integrated into the
central computer system. Right now there is a lot of dependency on tote
Computer Coordinator and her Assistant. The people from the central
office are up here (at the D.P.W.) all day long.
If you wanted to move somewhere else you would have to hire someone full
time to oversee your computer operations. We don't have the capability
(manpower) to do your functions.
If you wanted to buy duplicate computer equipment it would cost
approximately $40,000.00. It would still not be feasible for you to be
apart from the central offices. This move for us would be very expensive
and very impractical.
From a Treasurer's standpoint, I deal with the Superintendent of Public
Works very frequently. There is much Department interaction. Your
funding and bonding would be integrated with us. During audits, the DPW
input would be needed. For you to move to another location would really
put us back a big step.
Chairman Wood asked if we were going to move the entire Department, from a
financial standpoint, what types of things would it take?
Mrs. Klepeis replied we would need someone trained as a computer
"troubleshooter" to go with you.
Mrs. Wood asked for your general billing would you need at least a high
speed printer?
Mrs. Klepeis replied yes, but for your operation to move does not seem
feasible to me. The logistics would be very difficult. The.bill roll
function is also done by you and is not a function of our office. We
would need to hire at least one more person in my office to take care of
your Payroll and Bill Roll functions.
Mr. Griffin asked if we did set up our own computer system, are we talking
$40,000 - $507000?
Mrs. Klepeis replied yes, just for the hardware, and the entire move would
be fairly expensive. I don't think adding another layer of computer
coordinating would be optimum at this time.
I think we should force Town Government to give us optimum space to have a
centralized government.
Chairman Wood stated the Tax Collector has also spoken similarly to Mrs.
Klepeis.
PUBLIC WORKS FACILITIES INVENTORY
I - Public Works John Street Site
Old Garage
n
Water Division . .............................. ......1,488
ft2
SewerDivision .. ............ ..........................1,596
ft2
RadioRoom ..................... ..................::........297
ft2
Toilet........................ ............................264
ft2
BoilerRoom ..................... ..........................*.286
ft
MeterRoom .................... ............................297
ft2
Supervisor's Office ........... ............................216
ft
Storage#1 ..................... ............................472
ft
Storage #2 ..................... ............................487
ft2
Sign Shop ...................... ............................543
ft2
Hallway......................................................
838
ft2
Highway Division .........................................
.1,579
ft
Park Division ...........................................
.2,064
ft2
Forestry Division .............. ..........................1,574
ft
Park Division Storage .......... ............................858
ft
Repair shop office ............. ............................259
ft2
Repair shop .... ............................... ...........2,493
ft
Repair shop (oil storage) ...... .............................89
ft2
Mezzanine - Repair shop ........ ............................368
ft2
Hallway (between repair & welding shop) .................
.77
ft
16,145
ft2
Cold Storage Building (between Garage and access road to incinerator)
TOTAL..... .3,200 ft2
(vehicle storage)
NEW PUBLIC WORKS GARAGE ................ .....................10,873 ft2
INCINERATOR
REFUSE RECEIVING BUILDING ....... ... ........................4,200 ft2
(vehicle storage)
SALT STORAGE BUILDING ................ ..........................3,360 ft2
John Street Space Existing ....... 37,778 ft2
Park and Recreation Storage at-Bear Hill Nike Site ............1,200 ft2
Public Works Administration and Engineering Offices in
Town Hall Existing Areas 2,213 ft
(Excludes Hallways and Bathrooms)
Total Building Area - John Street ... .........................37,778 ft2
Bear Hill Nike Site ................ ..........................1,200 ft2
TownHall ................... ............................... .2,213 ft2
Existing Total Building Areas ...... .........................41,191 ft2
-2-
Current Additional Space Needs:
7,500
s.f.
Cut Tree Storage
2,500
John Street Site - Areas requiring
expansion:
2,500
s.f.
Water Pipe Storage
1.
Vehicles are jammed into center
isle of equipment storage
28,800
s.f.
2
24,000
building now. Additional space
is required.
+
5,000
ft
2.
Meter room requires more room
Salt, Sand & Mixing Area
+
200
ft
3.
Maintenance Garage Addition
Manholes,-Etc.
+2,400
s.f.
ft
4.
Office Space for Supervisors
Roadways and Driveways
+
900
ft2
5.
Parks Addition required for increased work and equipment
Employee Parking - Existing John Street Facility
12,000
2
TOTAL
with new agreement from School
Department
+
1,000
ft
Subtotal
9,500
ft
Bear Hill Nike Site
1. No planned expansion but existing space could be made
available to other departments if relocation of all.
functions is to one location.
Town Hall Office Areas
Additional Space for Office and Storage 1,000 ft
Additional Space for Hallways and Bathrooms 700 ft
Subtotal 1,700 ft
John Street Existing and Planned Building Space 50,691 ft
Nike Site Bear Hill Existing and Proposed 1,200 ft
Town Hall Offices Existing and Proposed 3,913 ft2
Total Future 55,804 ft
Public Works Outside Storage Space Requirements (Excluding Snow Dump Area)
Nursery Area
7,500
s.f.
Cut Tree Storage
2,500
s.f.
Wood Chip Storage
2,500
s.f.
Water Pipe Storage
8,000
s.f.
Gravel, Stone, Pavement Area
28,800
s.f.
Loam Stock and Shredder Operation
24,000
s.f.
Drain Manholes & Pipe Storage
5,400
s.f.
Snow Plow Storage
1,750
s.f.
Salt, Sand & Mixing Area
24,000
s.f.
Old Materials,'Drain Pipe, Curbing,
Manholes,-Etc.
12,500
s.f.
Grass Areas
24,.000
s.f.
Roadways and Driveways
62,600
s.f.
Gas Storage & Pumping'Facilities
4,800
s.f.
Employee Parking - Existing John Street Facility
12,000
s.f.
TOTAL
223,950
s.f.
Total Building Space 55,804 ft = 1.28 Acres
Total Outside Storage223,950 ft = 5.14 Acres
Total Useable Area ti 6.42 Acres
Snow Dump Area 4.00 Acres v
Total 10.42 Acres
MFMnV AMnTTM
TO: Public Works Facility Relocation Committee
FROM: Frank H. Baggs
DATE: February 18, 1984
RE: Minutes of Meeting, February 15, 1984
Attending: (Members) - C. Arthur, F. Baggs, D. Barker, P. Dustin, F. Robie,
R. Sullivan, R. Tulikangas
(Associate Member - Non - Voting) - W. Bergeron, E. McIntire, Jr.
(Guests) - M. Cohen (TASC), Fin. Comm. Rep., Reading Chronicle,
and interested citizens
Chairman Barker called meeting to order at 7:30 P.M.
Minutes of last meeting approved with no corrections
Doug Barker reported on a letter received from Allen Kline, son -in -law
of Aaron Dubitzky. Mr. Kline was responding to a letter from the
Committee about the Dubitzky property off Salem Street. In the letter,
Mr. Kline indicated that the family was willing to discuss sale.
• Joan Nickerson, from the League of Women Voters, read a letter to the
Committee from the League. The League urged the Committee to reject
the Haverhill Street Nike Site for D.P.W. consideration. They saw it
as a threat to Town future water needs.
• A Mr. O'Brien, representing a group of Haverhill Street residents,
gave a presentation in opposition to the proposed Haverhill Street
Nike Site.
Key Points:
1. Safety - entrance to Nike Site at busy part of Haverhill Street;
being near school, church, and several homes. Also, entrance is
not far from curve in road adding to safety concern.
2. Environment - letter from Conservation Commission advising of
close proximity of Nike Site to potential Town water supply.
The potential for pollution jeopardizes a freshwater supply
used all the way to the sea.
3. zoning - Town zoning by -laws protect residential areas. Haverhill
Street area in question is S -40 (40,000 ft residential), not
compatible with a D.P.W.
Supporting the presentation was a petition signed by 400 residents.
4 &1(01
-2-
Committee member Charlie Arthur presented information from the Town
Planning Board relative to site selection.
(1) Analysis by Planning Board of five remaining sites plus
adding two more; Dooley property on Main Street and Eric's
Greenhouse property on Main Street.
(2) A comparative analysis between area town D.P.W. sites
Continued Site Review
1. Landfill —dump site off John Street
Plus Side: 35 to 37 acres of town owned land not in anyone's
back yard. Also, no environmental concerns because site no
worse than present site and new facility would only be an
improvement.
Negative side: A landfill site with all inherent ground settling
problems. Not sure Town could build on property right away.
Also, landfill site has always been earmarked as future industrial
development property.
2. Adams- Gentile property off Salem Street
Plus side: 13.84 acres of non - wetland available for.sale.
Neighborhood concern appears only to be with proposed access
road and associated increase of traffic.
Negative side: Lack of suitable access with no obvious possibilities
However, owner does have option on possible access route.
Site Review Data Sheets
The Site Review Data Sheets passed out by Doug Barker were then
looked at. Committee filled in data with best information available.
Chairman Barker put forward a list of considerations for any site
considered:
1. Cost of acquisition
2. Time to make available
3. Site preparation expense
4. Abuttors
5. Site Drainage patterns
6. Proximity to water
7. Current assessment
8. Proximity to snow dump
9. Access to various areas of Town
10. Safety
��1�Z
-3-
Doug Barker reported a phone call from the Lester family indicating
a letter was coming. This letter would tell the Committee that the
Lester property on Main Street was not for sale.
• March 14th was set as the date for a Public Hearing
The date of April 2 was set for the Committee report to Town Meeting
Meeting adjourned at 9:50 P.M.
4 &1G3
MEMORANDUM
TO: B.P.W. Facility Relocation Committee
FROM: D.L. Barker, Chairman
DATE: February 27, 1984
RE: Agenda for Meeting - Wednesday, February 29, 1984
The next meeting of the Committee is scheduled for Wednesday,
February 29, 1984 at 7:30 P.M. in Room 16, Municipal Building. The
agenda will be as follows:
1. Meet at 7:30 P.M.
2. Approve minutes of previous meeting
3. Reading of correspondence to Committee (if any)
4. Meet with Industrial Development Committee
5. Report of progress from Environmental Subcommittee
6. Work on refinements of site matrix
7. Other Business
a) Firm up details of tour - March 3 at 9:30 a.m.
8. Adjourn by 9:30 P.M.
DLB:cmb
D.L. Barker, Chairman
B.P.W. - Facility Relocation
Committee
� &I0
MEMORANDUM
TO: Public Works Facility Relocation Committee
FROM: Frank H. Baggs
DATE: February 25, 1984
RE: Minutes of Meeting - February 22, 1984 ,
Attending: (Members) - C. Arthur, F. Baggs, D. Barker, P. Dustin,
F. Robie, R. Sullivan, R. Tulikangas
(Associate Member - Non - voting) - W. Bergeron
(Guest) - M. Cohen (TASC), Fin. Comm. Rep., Reading Chronicle,
and interested citizens
• Chairman Barker called meeting to order at 7:30 P.M.
Minutes of last meeting approved with one correction. Doug Barker's
correspondence with Aaron Dubitsky'.s son -in -law, Allen Kline was by
phone not letter.
General Site Discussion:
a) South Main Street - Dooley property
After brief discussion, committee unanimously rejected site.
b) Dr. Lester's property off Main Street
Doug Barker reported a phone conversation with Mrs. Lester in
which she indicated that they did not wish to sell. In view of
this, the Committee rejected site.
c) Dubitzky Property - Off Salem Street
Chairman Barker described his interest in this site. He said
that if you include the entire property, part with Gallahue's and
Flea Market building, it amounted to 9h acres, 7h acres of which
usable non - wetland. Also, that Mr. Dubitzky was willing to talk
about sale. Another point was that the property had large frontage
on Salem Street providing easy accessibility.
Other Committee members questioned whether the Town could get fair
value for Gallahue's - Flea Market building plot, or whether neighboring
citizens would be opposed to the site. It was decided that Mr. Dubitzky
would have to be contacted about his - selling price. A public hearing
would possibly answer the other question.
One citizen questioned why the Committee was looking for a 6 acre site
minimum. She noted that Malden had recently built a new D.P.W. on
four acres. Bill Bergeron answered that the D.P.W. did indeed need
six acres and that four acres more was needed for snow dump.
,I &q
Memorandum
February 25, 1984
Page 2
d) Adams /Gentile Property - Set in from Pleasant Street and
Manning Street
Committee Member Frank Baggs described his interest in the site.
The property contains 14 acres of usable land, owners willing to
sell, owner's having option to purchase access route to Salem
Street, and property adjacent to Town Dump - Landfill creating
possibility of access route to John Street.
Other members cautioned about possible selling price, and also
that owner's land option access route to Salem Street was right
against neighbors yards. The Committee needed more information
about this site.
Mr. Gentile pointed out a possible access route around neighborhood
towards Dubitzky property. This route would access Salem Street
and not be in anyone's back yard.
e) Landfill - John Street Dump Site
Two objections raised:
1. Buildability on ground still settling
2. Future use of property for industrial development
Site discussion ended with.arrival of Town Counsel, Ted Cohen.
• Ted Cohen discussion (main points):
a) Zoning By -Laws - Town's requirements
Mr. Cohen said that the Town is exempt from Zoning By -Laws. One
Haverhill Street resident, Mr. O'Brien, took exception to this
opinion.
b) Wetland Act - Town's requirements
Mr. Cohen said that Town was not exempt from Wetlands Act (Town
By -Law 131 -40). That the Town would have to approach the
Conservation Commission about any question. The Conservation
Commission would render any decision on the matter.
c) Eminent Domain - General review of procedure. Town Counsel said
that the Town had the extraordinary power to take the land of
others for public purpose. A two -third vote of Town Meeting
would be needed to approve any such action. A Letter of Notice
would follow (Order of Taking). Fair market evaluation would
take place to reach an agreed upon amount. Appeal was only
possible for the agreed upon price.
Memorandum
February 25, 1984
Page 3
d) Procedure for discussing possible acquisition of private site(s):
Mr. Cohen said that Committee could enter into preliminary
discussions. However, only Town Meeting could authorize actual
agreement.
• Committee decided to make a tour of possible sites, Saturday,
March 3, 1984 at 9:30 A.M.
• Committee unanimously voted to go into Executive Session to consider
the purchase and value of Real Property. Vote of Record:
C. Arthur, F. Baggs, D. Barker, P. Dustin, R. Sullivan, F. Robie and
R. Tulikangas all voting in affirmative.
Citizen present, Mrs. Adams, wanted to be on record as opposing
Committee's action.
• Committee came out of Executive Session at 10:10 P.M., adjourned for
the evening.
q (, / ('0 (0
B.P.W.- F.R.C. Public Hearing March 14, 1984 Page 1
A meeting of the BPW - Facility Relocation Committee convened at
7:35 P.M. in the Reading Memorial High School Lecture Hall. Present were
Chairman Douglass L. Barker, Secretary Frank H. Baggs, Jr., Committee
Members Charles R. Arthur Jr., Francis B. Robie, Paul C. Dustin, Richard
L. Sullivan, Robert J: Tulikangas and Randy Harrison. Also present were
DPW Superintendent Anthony V. Fletcher, Assistant Superintendents William
R. Bergeron and Edward D. McIntire, Jr., Marvin Cohen of TASC and Mark
Pillsbury of the Daily Times and Chronicle.
Mr. Baggs read the Notice of Public Hearing at 7:35 P.M.. The
purpose of this Hearing will be to gather public input and comment
relative to sites currently under discussion; (1) area near and including
Gallahue's Market off Salem Street, (2) Adams - Gentile property off Salem
Street, (3) Landfill off John Street and (4) Nike Site off Haverhill
Street.
Chairman Barker welcomed everyone to the Hearing and introduced
the Committee Members. There were approximately 154 residents present.
Chairman Barker explained the first order of business would be
statements by Town Boards, Commissions and Committees.
Chairman Gail Wood of the Board of Public Works stated in many
respects the people here are angry. Given time and money, anything can be
engineered. If we are to learn from the past, both right and wrong, we
must look forward and backward at the same time so that when we move
forward we make the right decision. The Board of Public Works unanimously
opposed the selling of the DPW site at the November Town Meeting. When
this passed at Town Meeting, however, the Board was forced to look at
alternative sites.
The landfill site was rejected for economic reasons. & 11
l9
Q.P.W.- F.R.C. Public Hearing March 14, 1984 Page 2
She stated the Nike Site looked like the answer to a dream, as it
may well appear. However, the Board of Public Works implores you to not
recommend the Nike Site.
She stated two well fields were established in years back, one
off Lowell Street and one near the North Reading line. The Great Cedar
Swamp was also investigated as a watershed area.
The revay well field has been closed due to sodium
contamination. The current water problems should alert the citizens to
the fragility of a water supply. Look at Bedford's well contamination
problems. Anyone that thinks the MDC is a great salvation to our water
problems is greatly misinformed. The MDC does not want Reading as one of
its customers. They can not now supply enough water to the customers they
have.
As Water Commissioners, the BPW asks that this Committee not
mortgage the water future of the children and grandchildren of this Town,
but to plan ahead with foresight, and not recommend the Nike Site as a
location for a DPW facility, and please keep the Cedar Swamp area clean in
case it is needed as a well field and water resource in the future. Thank
you.
Kenneth Messina, Chairman of the Planning Board, read a letter
from the Planning Board. He stated the Board, by unanimous vote, endorses
the following sites in order of preference;
(1) Dubitzky Property off Salem Street (only the undeveloped
portion);
(2) Lester property off Main Street;
(3) Strout Avenue Town -owned land. I� &[ (, 9
VI
B.P.W.- F.R.C. Public Hearing March 14, .1984 Page 3
He stated the Planning Board does not recommend the landfill
site, the Nike Site or the Adams - Gentile site because of the negative
impact on neighbors. The Board would prefer the current residential S -10
Zoning.
Dan Ensminger, TASC employee and Chairman of the Industrial
Development Commission stated his Commission has investigated the
potential of Town -owned land for industrial use. As we see it, Reading is
poised for substantial reconstruction and industrial growth. The economic
and development potential available to Reading is the envy of many
surrounding Towns.
He stated the IDC has initiated two studies of the John Street
property, one by the MAPC and one by Whitman & Howard.
He stated the Kennedy Library and U. Mass Campus in Boston were
both built on landfills. Reading's landfill will close on July 1, 19841
all dumping will cease at that time.
Mr. Ensminger showed a viewgraph of the existing landfill. A one
year moratorium period is required by the State DEGE.
He stated although additional study is needed, our belief is that
the John Street Landfill should be suitable for industrial or commercial
use in the future. The Town of Reading holds the keys to its own economic
future. He stated tax revenues are estimated to amount to $500,000 per
year, this is in addition to the $400,000 per year projected from TASC.
For these reasons, we are against the use of the landfill for the DPW
site. However, the IDC urges the Committee to act as we must act and to
take the concerns of the whole Town into consideration. For example,. the
parcels smaller than six acres should be investigated.
l�
B.P.W.- F.R.C. Public Hearing March 14, 1984 Page 4
Chairman Barker read a letter from the Board of Health, stating
that due to time constraints they have not reviewed the four sites under
consideration, but will at another time offer their views to the
Committee.
Jim Ballantine of the Hazardous Waste Committee stated the H.W.C.
did a survey of the facility at John Street and came up with a listing of
materials stored and used. He stated there are 12 underground storage
tanks, 250 gallons of chemicals are used in sewerage cleaning, 400 gallons
of chemicals are used by the Forestry Department (the most potentially
injurious) and 1100 gallons of oils and grease. In the incinerator area
poles and wooden materials are treated with chemicals.
He stated the Hazardous Waste Committee believes there are three
mechanisms by which a Public Works Facility could impact the environment;
1. Leakage from underground storage tanks;
2. Accidental spills of these materials during loading and
handling; and
3. Disaster or "Act of God" (explosion or fire).
Mr. Ballantine stated based upon the Hazardous Waste Committee's
observations, the Nike Site is much too close to the current and potential
water suply to be considered to be a viable relocation alternative. We
would recommend against relocation in the Nike Site area.
Mr. Frank Robie of the Conservation Commission stated the Nike
Site is town -owned and previously used. The missile firing areas are now
flooded with water. The entire area is above the flood plain and the soil
is extremely good for construction purposes.
1,
B.P.W.- F.R.C. Public Hearing March 14, 1984 Page 5
The next agenda item was the discussion of the Dubitzky Property
off Salem Street by Committee Member Richard Sullivan and the DPW.
Mr. Sullivan explained the location of the property. The usable
area is about seven acres. The present use is commercial with significant
open land beside it. The impact on the neighborhood would be property
valuations and noise of operations.
Superintendent Fletcher stated Ted McIntire, Assistant
Superintendent will make a presentation relating to extraordinary costs
developed by the Department of Public Works for each site. He stated
there are no land aquisition costs involved here. There are no legal fees
addressed and no environmental concerns addressed.
Mr. McIntire stated due to the fact this land abuts Salem Street,
the utilities are readily available. He stated demolition of the two
buildings would cost approximately $25,000, and fill $20,000 for a total
of $45, 000.00.
Mr. Reggie Peters of 62 Bay State Road asked do you have any idea
what the cost of the aquisition of that land will be.
Chairman Barker replied the appraisers are working on this now
and we hope to have that answer this Spring.
Mr. Kenneth Messina of the Planning Board stated I want to make
it clear we did not advocate taking of the Gallahue's buildings at all.
Janet Allen of 45 Johanna Drive presented the Board with a
petition relating to the Dubitzky property and the Gentile property signed
by abuttors of both properties in protest of relocating the DPW facility
to either of these sites. Chairman Barker read the petition for the
record.
B.P.W.- F.R:C. Public Hearing March 14, 1984 Page 6
Mr. Bill Andrews of 228 Pleasant Street stated he has asked
realtors if a DPW site in his neighborhood would devaluate his property
and the answer was "yes ".
Carol A. Glowacki of 36 Johanna Drive stated there are two houses
missing on either side of the street on the overhead projection of the
area. Have any studies been done regarding the wetlands? What do you mean
by "unknown" soils?
Mr. McIntire stated there have been no borings done on the
Dubitzky property to my knowledge. We know there is peat located at the
sewer and water main lines. The impact on the sewer and water services
would be that the DPW facility would be on the same system it is on now,
and would therefore not increase the flows.
Superintendent Fletcher stated there has been no study or
environmental concerns addressed.
Charlie Costello, Administrator of the Reading Conservation
Commission, stated in reference to the question about the wetland impacts
- this area would come under the jurisdiction of the Wetlands Protection
Act.
Richard Allen of 45 Johanna Drive stated at present the sewer
line is overtaxed, it overflows now. Would the sewer problem be corrected
before the new facility is put in there.
Chairman Barker stated the time frame for the new sewer pumping
station is 1986, which is about the same time this building should be
finished.
Superintendent Fletcher again repeated we are not at this time
addressing any of the environmental concerns. J -72.,
l�
B.P.W.- F.R.G. Public Hearing March 14, 1984 Page 7
Chairman Barker stated it should be made clear to you the Board
of Public Works was not in favor of moving. The majority of Town Meeting
members voted for us to move.
Committee Member Charles Arthur next discussed the Adams - Gentile
property off Salem Street. He stated some of the citizens concerns are
traffic volume and congestion on Salem Street and surrounding streets,
another major concern is the proximity to wetlands. Existing soils at
this time are unknown. The topography is flat and the land is clear. We
would need main extensions to this site.
Assistant Superintendent McIntire stated there are two possible
alternatives to this site;
Scheme A - Purchase of Entire Area
Land /House Taking (Road) $100,000
Road Construction 78,000
Drain Construction 31500
Demolition & Prep 50,000
Utilities 5,000
Estimate $236,500
Scheme B - Partial Site Aquisition
Land Taking $70,000
Road Construction 71,500
Cut /Fill 59,000
Culvert /Drain Construction 30,000
Demolition and Prep 20,000 (� 3
Utilities 5,000
B.P.W.- F.R.C. Public Hearing March 14, 1984 Page 8
Mr. Neil Caddigan of Arrow Circle asked how do you relate the
landfill area, or in this case, the Adams /Gentile property to the UMass
Boston Campus being built on a landfill. There are no abuttors to UMass
or the Kennedy Library. What is the comparison?
Dan Ensminger of the I.D.C. replied I was just illustrating the
point that it has been done.
Reggie Peters of Bay State Road stated I think the Industrial
Committee did a good job by recommending that this land be sold. This
money should, however, be spent on presently town -owned land.
Chairman Gail Wood of the BPW stated the Board of Public Works
was very much opposed to a new site being built at the Strout Avenue
town -owned land site.
Martha Carriere of Salem Street stated the petitions submitted to
the Committee were for both the Dubitzky property and the Adams - Gentile
property off Salem Street. She stated the traffic volume on Salem Street
is very high. There have been 25 reported accidents on Salem Street in
the last year, according to the Reading Police Department.
Louis Meier of Belmont Street stated that one of the biggest
drawbacks to locating the new site off Salem Street is the Little League
Park on Pleasant Street, because of the safety factor involving the
children.
Bob Tulikangas, Committee Member, next discussed the John Street
Landfill Site. He stated the present use of the site is a sanitary
landfill. He stated its potential for buffers as rated by the Committee
is excellent. Whitman & Howard has done an environmental impact study on
the landfill. The 'existing soils are poor and unstable and the existing
q �i -7 -.5'
B.P.W.- F.R.C. Public Hearing starch 14, 1984 Page 9
topography is variable. The utility requirements are such that main
extensions would be required on piles. He stated the Volvo building on
John Street has problems with settling because the building is on piles.
Mr. Thompson, a Town Meeting Member, stated as a Town Meeting
Member, I am sorry I voted the way I did. I personally feel the more we
research this, the existing John Street site would be the most practical.
Mr. Earle Kaufman of Boston Stove stated I want to state it is
not my purpose to try to advocate a specific site. My purpose is really
to bring to the Committee's attention some relevant facts. We (Boston
Stove) have been more than 2 1/2 years trying to begin our development at
John Street.
Committee Member Frank Robie next discussed the hike Site on
Haverhill Street. The Department of Public Works estimated the
extraordinary costs at this site to be $64,000.00.
He stated the Committee's largest concern is the fact that the
area is a possible future well site; and is in the Ipswich River
Watershed.
Sally Hoyt,. Chairman of the Conservation Commission, stated the
Conservation Commission is unanimously opposed to the Nike Site for the
relocation of the Department of Public Works. She read a very lengthy
report on the opposition of her commission to the Nike Site. She stated
the Conservation Commission feels the new facility should be located in
the vicinity of the present landfill and DPW Site on John Street.
Joanne Nickerson of the League of Women Voters read a letter from
the League stating their opposition to the Nike Site.
Michael Pacillo of 38 Cross Street recommended a Court Injunction
for stopping the sale of land to TASC.
qo�
B.P.W.- F.R.C. Public Hearing March 14, 1984 Page 10
At 10:00 P.M. Chairman Barker read a petition to support the
present location of the DPW facility signed by 31 residents.
Bill Brown, Town Meeting Member from Precinct 8, stated I think a
simple Article at a Special Town Meeting to rescind the motion taken at
the Fall Town Meeting could be undertaken to stop the sale of this. He
stated he would be willing to present an Article. Let's go back to Town
Meeting and do it all over again. I would be willing to sit through this
again. I certainly think this should be done.
Brenda A. Stinson of 293 Haverhill Street presented the Committee
with a petition signed by 400 people against the relocation of the DPW
site to the Nike Site property.
Mr. Barry Hampson of 37 Joseph Way stated as a point of
information, those petitions should be able to be signed by anyone here
tonight. He stated I am a member of the Board of Public Works and a
resident of Precinct 8. He stated I am speaking to you as a concerned
citizen. He stated I would like the BPW Facility Relocation Committee to
consider a fifth alternative. I request this Committee evaluate the real
cost of keeping the Department of Public Works at the present site. He
stated I am in favor of selling part of the parcel to TASC or someone
else.
Mr. Hampson stated, based on a proposal from the American Realty
Development Corporation for part of the parcel, I don't think the presence
of an upgraded DPW Facility would be detrimental to any private industry.
He showed overhead projections of his conception of the expenses
and income involved in selling part or all of the existing parcel to TASC
or someone else, or staying where we are. He stated we would gain +1.6
million dollars by staying exactly where we are. () ��
B.P.W.- F.R.C. Public Hearing March 14, 1984 Page 11
Jim O'Hare of Precinct 4, and a Town Meeting Member, stated I
think it is very important that we stay with facts and they do not get
distorted. The truth is that TASC's bid was $1.2 million dollars or fair
market value.
Jim Ballantine of the Hazardous Waste Committee stated we need a
good deal of planning. It is very important to get a lot of public input
to make certain we have done our planning. We should also think about
what a facility is going to look like. He stated I think it is quite
possible to design and install a facility on certain portions of the
landfill which are stable.
Superintendent Fletcher stated to address your concern about the
design of the facility if we are forced to do this, the present facility
is 50 years old. A new garage could be the best looking building on the
block. New buildings are designed in terms of the highest technology in
terms of hazardous wastes, heat, light and power. There also has to be a
concern about the quality of ground this building goes on. If the public
were to choose to stay on John Street, you must certainly consider a good
amount of money to bring the existing building up to par.
Mr. Bill Andrews of 228 Pleasant Street stated my thoughts on
this are to keep the facility where it is now.
Michael Pacillo of 38 Cross Street stated I agree we should look
down the road as to what is best for this Town. I think we should sell
part of the land to AROC and stay where we are.
Louis Meier of Belmont Street asked the longer we wait how much
more is it going to cost us?
Assistant Superintendent McIntire stated it could increase 10 -15% Q
per year. 4 ( ( V
B.P.W.- F.R.C. Public Hearing March 14, 1984 'Page 12
Earle Kaufman of Boston Stove stated I may be accused of being
one who wants TASC next to us. He suggested the Committee make a thorough
evaluation of the long term factors. I 'think you have to take a 20 and 30
year approach to this.
Morton Nickerson of 299 Pearl Street stated all of the tax
dollars are not positive dollars for the Town. It is quite possible it
will cost the Town more to keep industry in Town.
Martha Carrierre of Salem Street stated when people purchase
property they do so knowing what they have next door.
Chairman Barker stated thank you for coming. The Committee has
tried to listen intently. He thanked the Department of Public Works for
preparation of information, research and viewgraphs.
The meeting adjourned at 11;02 P.M.
Respectfully submitted,
Secretary
q &1-7�
rKUr.c(C/ %
6,7_,
l+-^rr tt--r
l�e.Si6.J4r /GJ
/ulujV
RtiA
W.tT I.4 .,11,
AR4,A
/Jr T
rCX,,) / /n14i
t 7-1e- r /t5
__.___
A✓�c.fsrc,rr
__....... -.
V✓ic�,r.o�
^
1 u/L/ZF.l f
CNIeRKI.1 !
�XrSrI�$
S/TE
�..n rrR. /�
Zo-�iG
u�N•L.
la< M
f
FiAa
/�/LItr9
LR1.►D
�o.J J 6
Or.JrJw�
/�dAcA�rcr
AQtiA
L /+>tIr4r/a//S
*JD
PoG>°l"Wx
NrC D J 6S
LrM.TATI�JS
C'aMMGw/
>r.?oc.r R ✓6ava
J.}TG2 DcPT,.
f%A2 ro�tS
9G . / 3 Acr2F v`Z
6.2.
/►4rrcc +s
.rQ✓Art,4 dL/E
LoT Hr4s
O✓,�,'rQ 7DD'
-S - oZ a
7-o W n1
�//4ie /LD
SutRe.,gJerJ6+Itt
P120�OQTy ✓
/� /�
r`/CiG E S Fyooa,�tA /a
Ac�ES
op Q)Z AJD
Oa 49 :✓c
F/PDJra66 -
oa 6R0 ✓L Sr
--
t
/CLOODfcgl
O/C
RF-4
7-t*A -+4113
WIr / .l EAP -6
MdP,�,rY
Is i- *&Gcty
RRjLA
cMlr+4rJs
tir4vc,eNltc ST.
AJ1KC. 5/T�
RAT /7o
[ors 12 tS
PLgr j.fj
o� y• y� y3� Ae2,erS
FLOOhPc,4r.J
%9• a�
r.
Wq >�,e .as
SE$Jt.Q /S
,gccESS ✓+A
A 30.0'
��,y0
bI AJ(o
%Wnl
wh s AnrY
6E.J-
�
uW -nwu.♦
toyer
q /g r1c,C
Exsr.,
✓
[ors / f�
�GkS O.BB �4c4cs
Sr9./D,•IC�
/�jGIQ�$
R ✓arLg6LE eu
/216HTOFWAY
;
OF
Lg-jb
Fcgr+A
e.Ht cow ALA
+S APA2oX.
me
3a.•_ , ,
J:
G.,l
HArecrJ.ct S!r
Te NA✓� ,pa 3T
r
/" G 00 D �eAI.J
/ �.f�J4 D r ^rG
SwAMPY /,wRe•.e�
EAbT a [S
Uaat,�
✓ANUS
ftar yb
/-/ Z 7 0.0
H• A7
reN..r sRU�,e
/.IC &...0 Ac
Access ro
Sofia S -fvzar
//JOUST•
ply'j
✓rRruALCY
a 4614
Por�JTrj
cvA naa ✓
A�}Gleres
5
[OTS H $
ACRES
Aclecs
SO..Tw i%#P.tla
r A /s
er A ao.o•
_
vF
q,i� sw
Za.�t JPeda
As
Nsa r4s
Ryr SS
t�
.te r"+
wrArL /er,
,p
/'F.AD/rJr.
�_`
/,A,JD
/F uSGa
S.J..a �NnP
s.JOw
DwMP
✓
/e 7S y 7r E 8'
1
3/. let Q.0
3(.72
IaArKrt Arse
- r4F -Xre 13
t, or NAS
o✓ee- /°o'
�A�D
GJ,I1,,gM
Gg:sj KALLY
co «to
u�rr
rk,*r Fro
Lor3O
9crets ACrz�S
'Ic,e,)cS
a/AILAdIJc to
LJLSrsr,
Xeo•snea&E-
?
°
--d20 .
�T.
N ttY�D'
Woea
�y+sTTW0b
P1-14 r y�
as WEST S%
�\�
A,67- ;q
�, ! /• Col
ACR, cs
[/. 4i3
'°rck •'a.,0
c,� c.►at�
`.or /44s
Sy8 6,ee.1
1, gup
$,�
S' -� o
#
/9 i� 1e o ^�
MOSTLY i�AT
MM u w IfH
A6w rs
$.,s. 8' ra
5
/4 G P-fS
6J4e re A N D
AG >Q ES
oa
sAt,e.� S T
o,J s4lxm sr•
/.Soo
w r� /4+� D
k
D N B r T'Z ICY
SaIA/• & _Shc<
sj.+�
ra j D gResr a
PLAT(�8
�orS (:3
�D.18
AC/ZG
(o•3y
/q� -reES
/3.8L1
arise raao
JCL is
q ✓14/u4 t oa
/,or dwTs
T+fE E/JD of
4443>
/Y, 800
s-/0
Lor J
ADaM3
/riosrtr /CLAr
/ArD wrrH
wooaeo
35 -.VA 0-%
[,A JD /s
C4Rac.Jr�y
MAX
SEwGR7Q
S
GJ/ErLgJ D
Acr2�S
sn+r a
.J O• s*Nr
P"- .,,,I
SLOG
R67.1900
GJ$TLr9rJD
loT3
LoJ
4eWAS
WEtL
3NtP4,etb
Pete
py,gT9lo
9. 6,1
0.O
8.%LI
whTLiQ A.J�
e13fIA /s
� ✓6,e�oo'
/Aa''
S-o� 0
6cNrIC�E
C/-AA.E,JG�E
gekaE,tr.Jb,
6t,JTLG
BNFfdQ
?
I o I- /a
.9CQ��
/}c12J�S
A. C��S
A✓.slcAdc,G as
/ceaa)
8y 70o
LicaGr
19
IiJG�/i�► M.
st oPla6 [a�+
mosrcr
�o.sE R[p,.
,4erch ro
�,
W6sr, sr.
oN WC.srs7-
Y7 76o
E.J os
woeaeD ,
SY Rc+eeS
PG rq T , g,
/
8l �O
a O
7. q%
W *mse ANC
/a.A�tiID.L
l.lawD
S-oio
J'oH� t�.
(rst+eAcLY
orort,jNr4r
✓
L, or ? jM
AGteG.S
4C /Z /.-s
9 G eES
tw" rS
f
a r ges t-Ts
sy /QtEY
TYAC2R/tAD /
94"
wJ
0IAWb 6 A
LJeTL r.JD
STR F.fir
°
WET }A.1p
FA /reC H /L�
L.,oODI,R^I�
P)irc,c. L-r TV
N FFc.G
/0's-0
0.0
/ 0. S O
WATLr2 AAA
4or N4s
4+91uD:
D9vrD F.
/RR°��opp`S,.FFt,P
Q
,Ctrs (F y
14r-P -ES
AG2/LS
5
Sc1J E,e , s
A ✓Arcd6c.COr:
X50 +'
4T"t. a.J
47 700
Lb
S-'oZ0
/,IZY6S
lSi4an� WrTN
,t}C12e
FB 4aKLIJ ST
QNKNJ Sr
3 boo
`Me•�t
T�/Aa
$eiA
P4/4Ta /0,
9,Y8
/.yS
c9•03
CIJ,97VI, ,eASD
SorN
l•grJD
s-aa
eD /-►,CRA.6f-49
4A Li-
/oo'BNFiiR
7*4NK
✓
/d
/,07 - /
AGIe. -s
gcie& -S
G12.ES �4
✓N/cA6a,C as
rle^4kur4 Aa)
oa
F2AaKt1.�
73, 000
/.3LDG
j
S
�
MA v,61 A.
WooA[D Ler
o/rTp 3amK
o.1 j 31DKs
RLD�tCS
sgwgL MA
Au a
44 ErLAa 1>
Mgla cS'TE(.LT3
Mgl.1 •WZ"rs
(a I, 900
i�Zr( -i1 xib
4JES7"G2
Lew A4s.FS Ar1D
semx 141cy JAIS
A,QKA ro
q..T Nc,e,-
SswTN /9!1
So.
/
PLAT a/3
Lot 3
S. 8
/1G2
/. a 1
AG&�S
y. a
43*rErt 40b
s wte- IS
AiArcAdcEo.J
car F,e4J*m
004 ,8o7'H
/,4,jh.
�cI/oDo
3 - o'ZO
.1�
MAaGA2.cr
6Earcys+�� /K
A ✓D WrrH
/oo',6u.FFEa
L/rJ
FLOOpP/ IA
/gc.,eiccs
eel 0�ItIJ A.1D
HAi ►MCC s
•/►tu.+AN.D
Fie #.i
M9 ✓L2 /31tf 573
3L b.�
t
M.
MACDeJ,atp
pMK E.e4�
R6DHCeSDIS
049Z+
PLAr b 2j
LOTs. 1 / /&, L� 41
(0.83
G- 3 3
O. SO
,
47hT,e+t AND
ZAF*IX t IS
AoT- Nl�s
Op 1--f /ei•o'
SSC000
FLOoD }
c�
J -/ 0
%O Lj ICJ
ArPEAS
VI Qrt, *0 Y
cEc3
loo' Cu prsx
ACRES
/9C►e,�S
ACEf-S 1411141t+dt
-co
F�Co.Jri4GF
z
OF
W /,a 0)
N 3 srLu
PNCCS
rAT.'e<
c/
TLIQ l,r
TtM nE ST;
N 77Ga �E Sr
(J eri AdD -
��jj
/�.E 14D //J6
SWAMPY
I'*0A
3 ro
10
/4/ ,jr. L>
y[ ryr //
No t,sr ^+o.
T ` 7!
°� %
h+ H
WAT6.4 LS
A ✓hrLAb L!� a.a
zi HAS
ySD'
-s O
CO A,4
6'er►6,eALCY
BuFFCQ
/ rc oFlc 3
gctsty"e
AQs16.1cb.
/iC►Qfs
/2 S'
AC gE
�Gi2E S
Cr4ustuav Ra
;7&17 c,�
oa L,.rAy
__
t
Low
of
r l4NDwrrN
K NI6ys,e
Zo/Jc
NrGt>a.GO
79TH Cb.JSr•
P/42r o;-
ICLeopgArll
�.
0
,2aAa
PR-oT. 4o7-
FL60;, -4 ,,J
M ASS•
Fluxp AR AS
4� "Jr_ ru
T ooc
�ilcei�L c5
T O`iS O
for /
4 G/r'!L,$
/4C&AS
0.0
AG2ES
srewict Is
SENrE.Q +S
A ✓alLAdlL ea
N/4S /000 /
__
S - 7 O
C OF
M oiTf y�6A
°4 As
A& T- ax
/ �i
ci- a 0d PLA'.J
-M4
✓6e yl t, 1. Wjq4
reWr4SE oy
VveWll t 3r.
FLGb D )IZ /rJ
M /F SS _ S,&JA.N
P y
REDu c�T
g'e� hiMOrn
S"'gMP
TIN
G
I ti U .arc /
Dxsci2iPrio
, �,-, ,
DEs,c,j*rio.J
7 0�-,4 -L
,Q2 ca
AK a
,
Ftoo9�ca „J
AktGyq
nlG7'
A�6A
, �
FXtsil
tnFiL.TiE$
✓A.u96Ic.
f
X/,r,TArID.JS
,,.� ,��,
dot Tiea
/ �
rps
Cwke�,�r
2o.ci.J6
Cu�2 ,1r
Ov)nJ2R
Ex,s r,.4 6
SiT�E
7aPdG��OHJyA✓AttA6,u
is - -.cite
Zoa�
;
onwx,e
/dFetrsrC.
CaMMti.
)PC,icG FA2M
yL
Burn46 nor
PcATo?oZ
<ors ��3 Lf I9
/p, O
9
AC,2>;S
D. U
t2ES
/O. �%O
4c2.ES
w,�nr.t.4v�
Ewcie is
v *#dA4&L4. &#A
WCST 55
fors ygJE
OVER.
Feo�rTaat '
o.d w r Y-.
L�4,JD
/ 98 000
.StaG'
` 300
s —°? �
bona 3
}
W,w.SPG.lccjS+
4Dn `/c 9
.W,c.�oe.Y
S�oAl its
�
oPC�1 L.A+tD
oa' NF6LL
oa s secs
RLDLAe- _c
A ro
tS.
H�er�
on
REVIEW OF POTENTIAL PUBLIC WORKS FACILITY LOCATIONS 2/10/84
AARON DUBITZKY
NIKE SITE LANDFILL SITE ADAMS- GENTILE (A) ALL LAND (B)VACANT LAND LESTER
ITEMS OF CONCERN HAVERHILL_STREET JOHN STREET OFF SALEM STREET SALEM STREET SALEM STREET MAIN ST.
1. Land Area Total
.24.4 Ac
35Ac
24AC
9.5 Ac
6.1 Ac
9.5 Ac
2. Usable Land Area
19.2 Ac
24AC
14Ac
7.8 Ac
4.4 Ac
8.0 Ac
3. Usable Land Shape
Good
Good
Good
Fair
Fair
Fair - Good
4. Potential for Buffers
Very Good
Excellent
Excellent
Fair - Good
Fair - Good
Good
5. Present Zoning
5 -40
Industrial
S -10
5 -10 & Bus.
5 -10
S -20
G Neighborhood Type
Residential.
Industrial
Residential
Res. & Business
Residential
Residential
7. Existing Access
Haverhill St.
John Street
Pleasant St.- SmithA
? Salem Street
Salem Street
Main 6 Frankl
8. Addition Access Req'd.
Yes
No
Yes
No
No
No
9. Access Roadway Type
Ch. 90
Ch. 90
Ch. 90
Ch. 90
Ch. 90
Ch. 90
10. Existing Traffic
6,000 t
6,000 ±
7,200 ±
7,200 ±
7,200 ±
17,900 +
11. Proposed Traffic
Would Add
Would add
Would add
Would Add
Would Add
12. Existing Water
Mai Ext. R uired
Ma 'd
Ex '
13. Existing Sewer
Sewer Ext. Req'd.
Tchhan
Main q'd.
Main Ext. Req'd.
ervice Ext. Req'
. Service Ext. Req
d. Main Ext.
14. Existing Drain
Drain Ext. Re 'd.
Main 'd.
Main Ext. Re 'd.
ervice Ext. Rea'
Service Ext. Re
'd. .Main Ext.
15. Existing Gas
No
Yes q'd)
Yes (Ext. Req'd)
Yes
Yes
No
16. Existing Electric
Yes
Yes
Yes
Yes
Yes
Yes
17. Existing Soils
No apparent problem
Dump Fill
No apparent problem
Buildings and?
Unknown
Unknown Ledge
18. Existing Topography
Flat
Variable
Flat
Flat
Flat
Hilly
19. Existing Water Supply
No
No
No
No
No
No
20. Potential Water Supply
Yes, high
No
No
No
No
No
21. Existing Use
Municipal
Dump
Commercial
Vacant & Business
Vacant
Residence
22. Location from Center
o f Tower
2.5 miles
_
2.0 miles
1.8 miles
1.9 miles
1.9 miles
1.7 miles
23. Site Value
?
?Potentially high
?
?
?
?
_Existing -
24. Other
i
I
_
oC�
COMPARATIVE ANALYSIS OF SITES FOR RELOCATION OF BPW GARAGE
2/14/84 - READING PLANNING BOARD
- ::SCRIPTION ASSESSED VALUE ENVIRONMENTAL ISSUES NEIGHBORHOOD TRAFFIC ANC
SriOCATION IMPACTS SAFETY
sITSKY PROPERTY
2 parcels of land has
There is a small brook which tuns
Area currently has busi-
Salem Street
ALEM STREET AND TORRE ST.
current assessed value
along the rear of this property.
nesses to the east and
is a major road
Brook,-originates from Lake
west /to the rear of the
and connects well
.1 A next to Gallahues
Map 92, Lot 14 6.1A
Quannopowitt and flows to the
property there is a deve-
with other major
arket and an additional
$82,500
Saugus River. Disturbance of the
lopment of higher priced
roadways within
/4 A off Torre Street.
brook could have adverse impacts
'homes, which is screened
the Town and from
: :rviced by major roadway
Map 79, Lot 176
on water supplies for communities
by a natural buffer. A
the Center. there
,ito center of'Town; has
13,861 sq ft $24,600
downstream. Lot seems to be
new water & sewer line hat
are some traffic
rtary and access ramps
adequate in size for BPW function
been installed in this
problems on this
Rt. 95.
but must consider placing activi-
area. Traffic would be
road when 95 gets.
ties away from brook.
using major roadways from
clogged. Salem St
all parts of town to react
becomes access b
this site.-
Rt 93 and joins 95
at Willow /West Sts
Work shifts are
somewhat different
:NTILE -ADAMS PROPERTY
2 parcels of land that
Farrelli land is high and dry and
Area of Salem Street is
Salem Street is a
>LEASANT STREET
contain greenhouses
has connector of dry:.land to 10 +A
currently residential.
ajor roadway in
and /or vacant are:
parcel of land owned by Gentile /
Access over small residen-
Town. This portion
)proximately 6.5 A of
268 Pleasant Street
Adams. Area.has had many problems
tial streets would have.
is in residential are;
ind currently house the
Map 68, Lot 3 5.82A
with drainage and sewer discharge.
major impact on neighbor-
and has curve toits
•eenhouses and rest is
$ 201,000
Portion of property that could
hood.
W, creating site
:cant. Entire parcel as
266 Pleasant Street
be used for BPW activities is
distance problem.
-oposed for development
Map 68, Lot 10
adequate, but is surrounded by
Stop lights at Pearl
•eviously contains 23.5A
10,869 sq ft $76,000
wetlands. This area is known to
Street would have to
land; 1/2 of which is
have iepeated water problems esp.
be moved after school
!tlands. Farrelli land
during heavy rains, etc.
closing and installed
A house on Salem Street
closer to BPW access
,s to provide access from
for safety.
,at road. Other accesses
n be obtained over 'all
!sidential streets,
COMPARATIVE ANALYSIS OF bi =Sb r'VA "J VldfTlVq ve am %X^— ar. 2/14/84 - READING PLANNING BOARD''
.vtmtar_ %W�r verc
DESCRIPTION
b LOCATION
ASSESSED VALUE
ENVIRONMENTAL ISSUES
... ...........
NEIGHBORHOOD
.. IMPACTS
TRAFFIC AND
SAFETY
'STER PROPERTY
1 parcel of land
Large lot with some Wetlands.
Primarily in a residen-
Main Street is a
)RTH MAIN STREET
Map 210, Lot 1 w 110 A
tial area but has business
major state road
properties close by. A
and could easily
,ere is a 10A parcel of
$ 137,900
major roadway would provid
a handle the traffic
,nd directly off Main
adequate access for-BPW
associated with a
:reet with adequate access
use. Has adequate access
BPW garage. A stoF
f this road. Large lot
into property. (There is
light at Main and
th wooded buffer from
some current activity.for
Franklin wouldFro-
.rrounding properties..
sale and reuse of this
vide good traffic
land.
flow. Only major
problem is distance
from center of Dwn.
Proximity to water
treatment plant and
gravel pit by way c
Franklin Street, wh
has recently been
widened and repaved
OOLEY PROPERTY
2 parcels df land
Area has•brook and wetlands..'
Land is on State major
2iis portion oftein
9 MAIN STREET and
259 Main Street
Periodic flooding during high
roadway. Close proximity
Street would have
7 MAIN STREET
.;14,850 sq-ft =$ 105,000
water table. Some flooding df. ,
to center of Town. Hag
some problem with
neighboring properties during
adequate access to property
traffic exiting fr
tire parce of land is
267 Main -Street'
these times.
Residential properties to
site and heading 14
prox. 4.5- A. Has good'
3.9 A of'land- $'160,400
rear,
also turing traffi
cess off Main Street.
from N entering si
rrently is being business
Traffic signals.to
ed.
be installed at Ma
South Sts wouldlei
traffic flows in t
regard. Road caul
r`
easily handle BPW
functions and traf
Close to center of
Town.
r
-Z
SCRIPTION
LOCATION
?IC's GREENHOUSES
\IN STREET
;:P= oximately �5 A of
.nd still remain in
;enson control: Flori
,siness and supply.hou
properties. :Good
.cess to-land off Main
.reet with good site
.stance and stop signs
S to control traffic
Ow.
:E SITE
/ERHILL STREET
- A of land. Currently
,n-owned and operated.
:ses Police annex and
noting range. Doea not
•e adequate access off
-erhill Street.
l�
COMPARATIVE ANALYSIS OF SITES FOR RELOCATION OF DPW GARAGE
2/14/84 - READING PLANNING BOARD •
ASSESSED.VALUE
2 parcels of lands
1090.Main Street
Map 158, Lot 10
2.06A - $ 298,700
2.5 Forest Street
Map 158, Lot 28
3.49A - $99,900.
This land abuts MainSt
property. Real estate
activity on these
properties. All of the
land may not be avail-
able. Some land w /fr
on Main St has been sol
for 2 house lots.
ENVIRONMENTAL ISSUES
NEIGHBORHOOD
IMPACTS
Igo wetland's on property Primarily residential
neighborhood. Currently
operates.florist business
-and usea other building
for supplies.. Major
road with good site dis-
tince and traffic signals
to,control traffic flow.
Area does not seem to
have natural buf -fer from
surrounding residential
properties.
did not determine as Land ib surrounded by wetlands.
land values. for'Town Conservation Commission has many
owned.property.are concerns about pollution'of
assessed very high in area - :presently abuts Lynnfield•
order to keep Town'-s wellfields, who.have.severe water
total assessment high. . problems. Potential bite for
future welifields for Town..
Area is residential. .A
school and church are
in,the immediate vicinity
Road is major roadway but
has site distance problem
to,S because of curve in
road: Access to and from
property would have to be
dbtained, perhaps by takii
of residential property ti
TRAFFIC AW)
SAFETY
Good access off
Main Street. Has
good traffic flow
because of traffic.
signals just S at
Main /Forest Sts.
No problem with
entering or turning
traffic. Close to
center of Town and
within good distanc,2
to other DPW facil-
ities; water treat-
ment plant and
gravel pit
laverhill Street is
a well - travelled
roadway. It is a
major street within
Town. Service to
this site from other
than Salem Street
would be over resi-
.,dential streets.
Franklin Street frog
Main to Haverhill _.
too narrow and cur-.-:
Not close to center
of Town or other 5F,
facilities. Rush
hour traffic could
be problem, but
difference in work
shifts would lessen
impact.
COMPARATIVE ANALYSIS OF SITES -FOR RELOCATION OF BPW GARAGE . " +T "1V"WAW ti!t'1l k
2/14/84 READING PLANNING BOARD
' IN
TIAL•ANALYSIS
DESCRIPTION
ASSESSED VALUE
ENVIRONMENTAL.ISSUES
NEIGHBORHOOD
TRAFFIC AND
s LOCATION
IMPACTS
SAFETY
yP SITE
Town owned land
Land in this region has to be
Currently IND zoned.
Good access on
FIN STREET
carefully evaluated because of.
Impact of development of
major street.
its former use as a landfill.
this land on future use
Good site d.s-
rrent landfill has some
Gases and -leachate are probable
as high -cost, high
tance. Good
nd available for develop-
in such an area. There is a
tech, etc. development
access to center
it and storage (e.g.-
ring around the dump. Also this
must be thoroughly evalu
of Town. No
Kt to Exxon Station on
land is in the National Flood
ated. To move across
real change on
in Street).
Insurance Flood Protection area.
the street to a parcel
impacts of traffic
of land whose potential
safety and /or,flow
for development and $
return to the Town is as
great or greater than the
site currently being use
could proved to be only
"temporary ". Assessment
of compatible use must
be made with future
potential development
1.