Loading...
HomeMy WebLinkAbout2011-03-17 Zoning Board of Appeals Minutesbt~~l ~~~KK Town of Reading ZONING BOARD OF APPEALS Minutes of March 17, 2011 Members Present: Clark Petschek, Chairman John Jarema Robert Redfern Damase Caouette Jeffrey Perkins John Miles Members Absent: Kristin Cataldo RECEIVED TOWN CLERK RE~~DI dG, MASS. 2011 APR I I P 3: 12, A meeting of the Zoning Board of Appeals was held in the Selectmen's Meeting Room of the Town Hall, 16 Lowell Street, Reading, Massachusetts, at 7:00 P.M. Also in attendance was Glen Redmond, Commissioner of Buildings. Case # 10-16 A Continuation of a Public Hearing on the petition of Gibraltar Pools Corporation (James Yoshizawa) who seeks a Variance under Section 4.8 / 4.8.6.1.9 / 4.8.6.1.10 of the zoning bylaws in order to install an above-ground pool on the property located at 64 Dividence Road in Reading, MA. This property is located in an Aquifer Protection District. The proposed pool increases the lot coverage from 22.73% to 26.07%0. Maximum lot coverage of 20% is allowed if an acceptable recharge system is installed. Jack Sullivan of Sullivan Engineering presented a revised plot of land including two proposed recharge systems to bring the installation into compliance with the requirements for effective lot coverage. He also addressed the criteria for the granting of a Variance. A,memo from the Town Engineer was submitted recommending any relief from the zoning regulations should include the requirements stated in his memo. Letter from two abutters were submitted stating their approval of the proposed pool. On a motion by Damase Caouette, seconded by Robert Redfern, the Zoning Board of Appeals moved to grant the Applicant a Variance from Section 4.8.6.1 of the zoning bylaws in order to permit the installation of an above-ground pool on the property conditioned upon the following: 1. During installation of the proposed recharge system, should the underlying soils be determined to differ than those indicated in the soil test pits, the system shall be redesigned and submitted to the Engineering Division for review and approval. 2. An as-built of the completed recharge system shall be submitted to the Engineering Division. ZBA Meeting March 17, 2011 3. , The contractor shall be required to obtain a "Jackie's Law" excavation permit prior to any excavations. 4. The owner shall arrange an inspection of the recharge chambers yearly to verify proper operation. Copies of system inspections shall be submitted to the Engineering Division yearly by January 15tH 5. In the event the system is found to be functioning improperly, the applicable components of the recharge system shall be repaired or replaced within 90 days. All repair or replacement work shall be inspected by the Engineering Division. Vote was 5-0-0 (Petschek, Caouette, Redfern, Jarema, Perkins). Minutes On a motion by Jeffrey Perkins, seconded by John Jarema, the Zoning Board of Appeals moved to approve the minutes of February 17, 2011 with changes. The vote was 6-0-0 (Redfern, Perkins, Petschek, Miles, Caouette, Jarema). On a motion by Damase Caouette, seconded by Jeffrey Perkins, the Zoning Board of Appeals moved to approve the minutes of March 3, 2011. The vote was 6-0-0 (Redfern, Perkins, Petschek, Miles, Caouette, Jarema). Adjournment On a motion by Jeffrey Perkins, seconded by Robert Redfern, the Zoning Board of Appeals moved to adjourn the meeting. The vote was 6-0-0 (Redfern, Perkins, Petschek, Jarema, Miles, Caouette). ZBA Meeting March 17, 2011 2