HomeMy WebLinkAbout1998-10-15 Business Park Advisory Committee MinutesREADING BUSINESS PARK ADVISORY COMMITTEE MINUTES
October 15, 1998; 7:15 p.m., Reading Municipal Light Department
Conference Room
Committee members present: Bob Lelacheur, Don Stroeble, George
Hines, Dick McDonald, Bob Nordstrand, David Nugent, Neil Sullivan,
Mike Flammia, John Coote.
Staff present: Lisa Smith (Grubb & Ellis), Jack Kerrigan (Grubb & Ellis),
Mike McGonigle (Grubb & Ellis), Assistant Town Manager Russell Dean,
Town Manager Peter Hechenbleikner.
Others present: Sharon Wilke, Mark Dickinson, Michael Hass, James
Gray, Bill O'Brien, Bill Roache, John Kelley, Ed Shaw, Fred Van
Magness, Carl Pendexter, Paul Feely, Camille Anthony, Anthony
Tambone, William Butler, Bill Blackham, Doug Walker, Mark Zaruillo,
Brian Lawler, Raymond Talkington, John Amato, Frederick Zell, David
Valletta, Kevin MacNeill, Christopher Murray, Joseph Nigro, Dan
Goodenow, Nick Mucci, Alan Perrault, Brandon J. Fagan, Pete Pederson,
Bill Locke.
The meeting was called to order by George Hines at 7:15 p.m.
Chairman Hines outlined the meeting. There would be four interviews
with four developers: Dickinson Development, Corporex, 3JMA LLC, and
Locke/Cashman /Thurmo. Interviews were to be 20 minutes for
presentation, 25 minutes for question and answer for a total of 45
minutes per interview. Interviewees, as had been prior practice, were
asked to respect the other developers by not sitting in on their interviews.
Dickinson Development
Mark Dickinson presented principals associated with the project.
Dickinson noted the following: there is an 80% commitment from
tenants, 18 million in revenue to be realized by Town (over 10 year
period), comparatively low water use, over 1000 jobs of mixed wages, and
the project is extremely viable. Closure and capping to be done by
August 1999.
Committee Questions
Q: Assuming permits are issued, how soon can Dickinson "close deal?"
A: As soon as negotiations are completed with Town.
Q: Why does Dickinson feel a Notice of Project Change filing with DEP is
necessary?
A: The hotel is permitted, however mixed use constitutes enough change
to warrant a signoff from MEPA.
Q: What will ownership structure be?
A: For Staybridge piece, Staybridge would own. For Applebee's piece,
Dickinson would own. Office building may be a few months behind.
A concern was expressed regarding whether the office piece of the project
would get built. Dickinson said foundation of the office building would
be in place during construction.
Q: Are there examples of similar mixed uses?
A: Dedham, South Shore Plaza. Assembly Square in Somerville (Sony
Theatres).
Q: What type of tenants would be sought for office building?
A: High tech start up computer companies, Developer (main offices),
service units, goal to be competitive on office space.
Premium on foundation; will build foundation with intent to build office
park.
Q: Cinema size? Is this maximum parking for Showcase?
A: Calculated at 1 parking space per 3 seats - ideal is 1,100 parking
spaces.
Dickinson mentioned that materials to be delivered to site came straight
out of the due diligence report but were not absolutely required.
Once permits are firmed up closing can be done in two weeks.
Cash flow - 2 million once l s' COO is given, 1 million once COO given on
office building
Town can impose deadlines to ensure payment.
Cinema will be similar to Randolph - state of the art "stadium" seating.
Q: Is 1 million the cap on site improvements?
A: This is the estimate.
Concern expressed about Town not receiving the 2 million payment if
1,000,000 is exceeded in site improvement costs.
Concern about office building - commitment on 1,000,000 payment
contingent upon COO issued for office building.
Q: What is transition process on landfill closure and capping?
A: Will be some transition on agreements, minimal additional costs
wrapping up the transition.
Corporexx
• Represented that Corporex could do the three projects at once;
• Two internal hotel management companies ("Do it Yourself.")
• Concept of "high touch."
• 3/4/5,000 initiation fee on sports club, dues are lower.
• Traditional developer - "Own and Operate."
• Ground lease - annual rent of $100,000
• Q: Will lease be subordinated? A: No.
• No tax concessions have been requested - owner leasing will pay taxes
on the property.
• Q: Does "old fashioned" approach limit ability to build? Answer yes.
Investment in product.
• Sell industrial portfolios - leaving industrial development market for 5
Seasons/Hotel area
• Represented "Very Large" asset capitalization
• Amesbury landfill - residential experience
• Lynn Classical High School - on construction landfill
• Many persons have engineering disciplines - cites San Francisco
example
• Office building would be two towers; can do both at one time or one at
a time - function of market conditions
• Problems siting on landfill? A: No. No different than other public
buildings. Cannot penetrate cover - do not anticipate any problems.
• Commit to 2/3 plus office building. Every building commenced
concurrently.
• Last project was Four Seasons/ Exchange Place
• Northeast experience: 1988, 1989 office buildings
• Billerica - Homewood Suites development of 150 rooms
• Sports Club: 80% of members come from 5 mile radius
• Q: Schedule. How soon closing? How soon revenues realized from
project? A: Revenues controlled by permitting on property. Town
controlling permitting. Do we control closure process? Intent is to
close and cap but work closely with the Town.
3JMA LLC
CBA - Financial, Environmental
Senior Housing - PRD - eliminate hazardous waste
Eliminate risk and liability
Mixed use commercial/ residential
Heavy emphasis on quality of life
Dan Goodenow - Cape Ann Design
110 units - townhomes
"Greenbelt" plus office space on approach toward town
By removing landfill, no concern of monitoring or monitoring of
groundwater.
Beautify Town; environmental benefits.
Take away site versus capping
Buffers, greenspace, community friendly
Project of this magnitude that has been completed.
Valletta - Swamp Pond project in Walpole. Revere Airport, etc., Weston.
Maynard, MA - Old Digital building
Financing
Private equity (principals)
Pension Fund Investments
Typical investor is "university."
When is commercial portion due?
Q: Landfill mining - How much would be removed?
A: 50 - 70% is dirt; the rest is MSW; 30% to other landfill (total 50%
removed)
Q: More costly than capping?
A: Slightly, but benefit is landfill is gone.
Q: Timing of mining?
A: 1100 to 2000 yards per day; 300,000/2-4,000, 6 to 8 months to
completely remove landfill; 3 year sellout period on development.
Bulk of refuse in back of site - perform site preparation in front - move
things (ash) to the back.
Will build commercial component if economy is strong.
Office building a function of the economy
Serious investment in property - timeline of movement - surety bond.
Approach to landfill/ transition
Town finishing CSA - in closure analysis will put in place alternatives
(such as landfill mining) in final reports to DEP.
Get rid of environmental "time bomb." Office component a question.
Q:(Intention?) l/ 1/99 - What do we do with our consultants? 3JMA
LLC will take over permitting process from Town and deal with the DEP.
Locke/ Cashman/ Thurmo
Committee Questions
Q: Why office?
A: Long term with visibility of site - benefit to go office. Site will attract
users.
Office buildings get built when tenants are found.
Q: Why only offering $1 for landfill?
A: Market value. Burlington - Newton corridor paying $35/40 per
square foot range for office space. Zuckerman paid $50 per square foot.
Locke/Cashman /Thurmo believes to make project work need to operate
and offer in the $25 per square foot range.
Cap for $5 million and then sell to Marriott for 2 to 2.5 million.
All off-site improvements will be borne by Locke/Cashman /Thurmo per
the due diligence report.
July '99 relieving Town of capping process - "shovel in ground."
2003 - Selling
Transition Plan
Transfer
Site investigation - assumption of contracts may be explored
Lending - direct connections to consultants
2 - 3 months for design.
Consultants are released - Locke/Cashman /Thurmo
Meet at 7:15 p.m. on 10/21/1998
Hour blocks
October 28, 1998 as next date.
Meeting adjourned at 11:15 p.m.
Russell J. Dean, Asst. Town Manager