HomeMy WebLinkAbout1993-01-26 ad Hoc School Building Committee MinutesSCHOOL BUILDING COMMITTEE MEETING MINUTES JANUARY 26, 1993 The meeting was called to order at 7:10 PM. Those in attendance were: M. Cowell, R. D'Antona, D. Farnham, R. Graham, R. Grasso, J. Lupi, B. Poock, R. Sanstad, D. Williams and Architect D. Finney. David Finney presented the cost estimates for the elementary school projects (attached). After considerable discussion, it was felt that the significant cost growth required further definition and clarification. Of particular concern is the MEP portion of the Joshua Eaton project. Mr. Finney will provide the committee with additional detail at the February 16th meeting. In the interim, R. Sanstad agreed to set-up a meeting with Fire Chief Don Wood regarding the potential requirement for a full sprinkler system in both schools at a cost in excess of $225K. (Note: Following the SBC meeting, D. Farnham and R. Sanstad met the Fire Chief in the corridor of Town Hall and initiated discussion on the subject. It was agreed that only the new construction would require the sprinklers (already planned) and that the attic area of Eaton would have sprinklers installed. This will result in a significant savings to the project.) R. Sanstad will set-up a meeting with the Town Manager and Treasurer to review the bonding options and strategy. R. D'Antona and R. Graham will also participate in this meeting. In addition, R. D'Antona will communicate the new cost information to M. Cummings and Dr. Munnelly. It is important to note that these costs are considered preliminary and have not yet been fully analyzed. They do, however, provide us with enough information that we can now begin our planning process. Joe Lupi presented the results of his sub-committee on screening the submitted proposals for the Parker project. They have narrowed the final list of architects down to six candidates (attached list). The sub-committee will contact these six and schedule them in for the full committee to interview. It is planned that three will come in on February 2nd and three on February 9th. After all interviews are completed, the full committee will make the final selection. The committee agreed to invite Jack Delaney, Principal of Parker Middle School, to participate in the interview process. The meeting was adjourned at 10:00 PM. M January 26, 1993 To Reading School Building Committee: The following firms are recommended for further consideration on the Parker School Project: 1) TAMS Consultants, Inc. 38 Chauncy Street Boston, Ma. 02111 2) Keys Associates one Moody Street Waltham, Ma. 02154 3) DiNisco Kritsch and Associates 87 Summer Street Boston, Ma. 02110 4) The Design Partnership of Cambridge 88 Sherman Street Cambridge, Ma. 02140 5) Symmes, Maini and McKee Associates 1000 Mass. Ave. Cambridge, Ma. 02138 6) Earl R. Flansburgh and Associates 77 N. Washington Street Boston, Ma. 02114 Joe Lupi David Williams Margaret Cowell Bob Grasso rch. & Struct. posts Reading Elementary Schools 1/25/92 Birch Meadow School B. Essential A. Bask Costs for Renovation Area-SF Unit Cost Growth Costs C. Combined Costs New Construction: 1 Arch & Struct 8,100$66 $534,600 $534,600 Entry Stairs, rails & 2 canopy $28,600 $28,600 Renovation 1 Demolition for renovation $36,800 $36,800 2 Remove VAT at renov areas $4,000 $4,000 3 Rough Construction $30,700 $30,700 interior ramp $3,200 Partitions $12,600 Doors & Frames $14,900 4 Kitchen Equip-rework existing $10,000 $10,000 Finish (renov. areas only) 1 Vinyl Tile Flooring $5,300 $5,300 2 Resilient base $1,000 $3,000 $4,000 4 Interior paint $6,000 $6,000 5 Ceilings $5;600 $5,600 6 Casework &specialties $7,000 $7,000 Windows 1 Reglaze plastic windows 1520$12.50 $19,000 $19,000 4 Paint windows & trim $10,800 $10,800 5 Replace Exterior Doors $36,600 $36,600 Exterior 1 Roof penetrations $4,000 $4,000 Flashing & sealing at new 2 construction $7,000 $7,000 3 re-point masonry (partial) $1,000 $1,000 4 Expansion joint $4,000 $4,000 Handicapped Accessibility 1 Corridor door hardware $11,200 $11,200 2 Interior paired doors $11,200 $11,200 3 Toilet access. & parts. $3,900 $3,900 Toilet room doors & 4 frames $4,800 $4,800 OTALS $747,500 $33,800 $781,300 9205ESTi3.XLS Page 1 Reading Elementary Schools Mech, Elec & Plumbing Costs Birch Meadow School 1/25/93 S. Other A. Basic Costs for Renovation Growth Costs C. Combined Costs New Construction Heating & Ventilating $80,000 $80,000 Plumbing $32,000 $32,000 Electrical $48,000 $48,000 Fire Protection $20,000 $20,000 Total New Const. $180,000 $180,000 Renovation Heating & Ventilating $50,000 $50,000 Plumbing $20,000 $20,000 Electrical $100,000 $100,000 Fire Protection $115,000 $115,000 replace oil tank $30,000 $30,000 new water service $10,000 $10,000 Total Renovation $325,000 $325,000 - --..TOTAL M/E/P/FP $505,000 $505,000 S. Other Landscape Costs A. Bask Costs Renovation (note 1) costs C. Fulf Renovation Costs Clear/grub/Site Prep $6,500 $6,500 Paving & Earthwork $0 $40,000 $40,000 Curbs $6,000 $6,000 Bike racks Planting $10,000 $10,000 Lighting $7,500 $7,500 Site drainage $12,500 $12,500 Loam & Seed $0 $7,500 $7,500 Sidewalks (includes paved play) $0 $10,500 $10,500 Ledge (allowance $60,000 $0 $60,000 Total Site Cost $79,000 $81,500 $160,500 Note 1: This reduced scope is carried over from the 1989 estimate. Work: - Replacement of corridor ceilings - Removal & replacement of Vinyl Asbestos the (except at altered areas). - New kitchen equipment - Removal of contaminated soil at Oil tank, if required - Asbestos removal (except selected VAT) - Roof repair - Painting of ceilings - Repair of classroom cabinets 9205ESTB.XLS Page 2 Cost Est. Summary Reading Elementary Schools 1/25/92 Birch Meadow School A. Basic Costs for Growth C. Full Renovation Costs Construction Costs Arch & Struct Costs $747,500 $781,300 M/E/P/FP Costs $505,000 $505,000 Site Costs $79,000 $160,500 TOTAL RAW COSTS $1,331,500 $1,446,800 G.C. OH&P (15%) $199,725 $217,020 Contingency (12%) $159,780 $173,616 TOTAL CONST. COST $1,691,005 $1,837,436 Indirect Costs Site Exploration Survey $5,000 $5,000 Borings $2,000 $2,000 Design Costs Arch/Eng. $188,000 $204,000 Food Service Cons. $3,000 $3,000 Fum & Equip Cons. $4,000 $4,000 Bidding Bid Sets $6,000 $7,000 Bond counsel $10,000 $10,000 Construction Clerk (pt time, 15 mo) $30,000 $30,000 Furniture & Equipment (new Const only) $40,000 $50,000 TOTAL PROJECT COSTS Birch Meadow School $1,979,005 $2,152,436 9205ESTB.XLS Page 3 Arch. & Struct. Costs 1/25/92 New Construction: 1 Arch & Struct Entry Stairs, rails & 2 canopy Renovation 1 Demolition for renovation Demolition windows & 2 glass block Remove VAT at renov 3 areas 4 Rough Construction Built-up floors Partitions Doors & Frames 5 Crawl space vents & vapor barrier floor insul meth ventilation crawl space stnxx. attic vents 6 KAchen Equip Finish (renov. areas only) 1 Vinyl Tile Flooring 2 Resilient base 3 Acoust ceilings 4 Interior paint 5 CT wainscote Windows 1 Replace Metal windows replace glass block w/ Kal- 2 wall Wood windows-add 3 storms 4 Paint windows & trim Replace ext louvers & 5 enlarge m.o"s Exterior 1 Roof penetrations Flashing & sealing at 2 new construction 3 re-point masonry 4 cupola paint, caulk, repair flashing E siding Structural repairs Handicapped Corridor door Accessibility 1 hardware 2 New exterior doors 3 New int, door pairs TOTALS Area-SF Unit Cost 12,300$70 1070 $36 $14,000 $1,000 Reading Elementary Schools Joshua Eaton School B. Essential A. Bask Costs for Renovation C. Combined Growth costs costs $35,000 $57,300 $7,000 $5,000 $10,900 $2,000 $11,700 $15,600 $1,300 $33,900 $19,900 $8,300 $8,000 $4,000 $15,000 $861,000 $35,000 $57,300 $7,000 $8,400 $67,500 $66,200 $5,000 $10,900 $2,000 $11,700 $15,600 $1,300 $38,520 $33,900 $19,900 $8,300 $11,000 $8,000 $4,000 $15,000 $15,000 $18,100 $10,500 $3,900 $1,197,400 $137,620 $1,335,020 9205ESTA.XLS Page 1 Mech, Elec & Plumbing Costs 1/25/93 New Construction Renovation TOTAL M/E/P/FP Landscape Costs Total Site Heating & Ventilating Plumbing Electrical Fire Protection Total New Const. Heating & Ventilating Plumbing Electrical Fire Protection TotalRenovation Site Prep Paving & Earthwork Building Edge Curbs (conc. on one side of drive) Bike racks Planting Lighting Site drainage Loam & Seed Relocate play equip Courtyard Sidewalks (includes paved play) $99,350 $165,850 Note 1: This provides only 1 coat asphalt over existing paving for drives, parking & bus bop. This includes new paving requested by the Fire Chief. Items not in Project Scope of Work: - Replacement of condor ceilings - Removal & replacement of Vinyl Asbestos tile (except at altered areas). - New kitchen equipment - Oil tank removal & replacement - Asbestos removal (except in crawispace and selected VAT) - Roof repair Reading Elementary Schools Joshua Eaton School e. other A. Basle Costs for Renovation C. Combined Growth costs costs $123,000 $123,000 $49,200 $49,200 $73,800 $73,800 $30,750 $30,750 <$i£I`> $276,750 << $453,000 $188,000 $188,000 $302,000 ?3t<= ><< $113,000 $1,056,000 $1,332,750 $1,332,750 S. Other Renovation C. Full Renovation A. Basle Costs Costs Costs $8,500 $8,500 (note 1) $0 $50,000 $50,000 $15,000 $15,000 $4,000 $4,000 $0 $1,600 $1,600 $0 $15,000 $15,000 $0 $15,000 $15,000 $24,000 $24,000 $0 $9,000 $9,000 $5,000 $5,000 $10,000 $10,000 $0 $8,750 $8,750 9205ESTA.Xt_S Page 2 t Cost Est. Summary Reading Elementary Schools 1/25/92 Joshua Eaton School A. Bask Costs for C. Full Renovation Growth Costs Construction Costs Arch & Strict Costs $1,197,400 $1,335,020 M/E/P/FP Costs $1,332,750 $1,332,750 Site Costs $66,500 $165,850 TOTAL RAW COSTS $2,596,650 $2,833,620 G.C. OH&P (15%) $389,498 $425,043 Contingency (12%) $311,598 $340,034 TOTAL CONST. COST $3,297,746 $3,598,697 Asbestos Removal Related Costs (crawlspace) Pipe insulation <>*C $67,000 contaminated soil $47,500 Re-locate 2 temp. classrooms $29,000 $29,000 Indirect Costs Site Exploration Survey $5,000 $5,000 Borings $2,000 $2,000 Design Costs Arch/Eng. $334,200 $357,500 Asbestos Cons. $11,000 $11,000 Food Service Cons. $3,000 $3,000 Fum & Equip Cons. $5,500 $5,500 Bidding Bid Sets $7,000 $7,000 Bond counsel $10,000 $10,000 Construction Clerk (pt time, 15 mo) $30,000 $30,000 Furniture & Equipment (new Const only) $53,000 $53,000 TOTAL PROJECT COSTS Joshua Eaton School $3,901,946 $4,226,197 TOTAL PROJECT COSTS Birch Meadow School $1,971,005 $2,116,766 TOTAL PROJECT COSTS both schools $5,872,95. $6,342,963 9205ESTA, LS Page 3