The meeting was called to order at 7:05 PM.
Those in attendance were: R. D'Antona, D. Farnham, R. Graham, R. Grasso, J.
Lupi, P. O'Leary, B. Poock, R. Sanstad and D. Williams.
Presentations from three architectural firms for the Parker Project were
received. Those firms presenting were:
- Keyes Associates
-Design Partnership of Cambridge
- Earl R. Flansburgh + Associates
The presentations included a question and answer period and were very
informative.
In preparation for the vote selecting the architect, several actions were
identified. These included:
- D. Williams to check the candidates references and report back to
the full committee prior to the vote on February 23;
- J. Lupi to confirm with Town Counsel that we are properly
following all legal procedures; .
- all Committee members to read and familiarize themselves with
the evaluation and selection criteria distributed by D. Farnham.
R. Graham gave a report of progress in his task of writing the warrant
article for Town Meeting. He reported that in a meeting with the Town
Manager, the issue of whether the elementary school project should be
split into two projects was discussed. It was the consensus of the full
committee that the project should be presented as one, and not split as
two separate and distinct projects. This would be on the condition that
all legal requirements are met. If it became a legal issue, then it would
be presented to Town Meeting as two separate projects. To conclude this
action, Russ was asked to set up another planning session with the Town
Manager and Town Treasurer.
The meeting was adjourned at 10:35 PM.