Loading...
HomeMy WebLinkAbout1998-09-24 ad Hoc School Building Committee MinutesREADING SCHOOL BUILDING COMMITTEE MINUTES SEPTEMBER 24, 1998 A MEETING OF THE SCHOOL BUILDING COMMITTEE WAS HELD ON SEPTEMBER 24 1998 AT THE SUPERINTENDENTS CONFERENCE ROOM. THE MEETING WAS CALLED TO ORDER AT 7:46PM. PRESENT WERE ROGER SANSTED, JOE LUPI, JEFF STRUBLE, TIM TWOMEY RICH RADVILLE, JOE FINNEGAN AND RUSS GRAHAM. MEMBERS OF THE SCHOOL SIZE AND ENROLLMENT COMMITTEE HAD BEEN INVITED, AND THREE MEMBERS OF THAT COMMITTEE WERE PRESENT. EARLFLANSBURGH AND ASSOCIATES PRESENTED THREE SEPARATE OPTIONS FOR ANALYSIS BY THE COMMITTEE. OPTION A CALLS FOR SIGNIFICANT ADDITIONS TO THREE OF THE FOUR PRESENT ELEMENTARY SCHOOLS IN READING. THIS WOULD BRING THE BARROWS SCHOOL TO AN ENROLLMENT OF 550 WITH THE ADDITION OF TWO KINDERGARTDEN ROOMS, NINE REGULAR CLASSROOMS, ONE SPED ROOM AND A NEW GYM. IT ALSO CALLS FOR RENOVATION TO 40,500 SQUARE FEET OF THE SCHOOL FOR A TOTAL SQUARE FOOTAGE OF 67,350. THE EATON SCHOOL WOULD HAVE 618 STUDENTS WITH ONE NEW KINDERGARDEN, FIVE REGULAR CLASSROOMS, ONE SPED ROOM, A NEW LIBRARY AND A NEW KITCHEN. IT WOULD ALSO CALL FOR RENOVATION TO 48,000 SQUARE FEET OF BUILDING AND WOULD BE A SCHOOL OF 73,800 SQUARE FEET. THE KILLAM SCHOOL WOULD ADD A NEW KINDERGARDEN, FIVE REGULAR CLASSROOMS ONE SPED ROOM AND A NEW GYM. IN ADDITION, 62,000 SQUARE FEET WOULD BE RENOVATED CREATING A BUILDING OF 81,350 SQUARE FEET HOUSING 666 STUDENTS. THE TOTAL COST OF THIS OPTION WOULD BE 23.5 MILLION DOLLARS WITH - A NET TO READING (ASSUMING REIMBURSEMENT BY THE STATE OF TWO THIRDS) OF 7.8 MILLION DOLLARS. OPTION B AS PRESENTED CALLES FOR AN ADDITION TO THE BARROWS SCHOOL OF TWO NEW KINDERGARDENS, FOUR NEW REGULAR CLASSROOMS, A NEW GYM AND RENOVATION TO 40,500 SQUARE FEET OF SPACE. IN ADDITION TO THIS A NEW SCHOOL WOULD BE BUILT FOR 424 STUDENTS ON LAND COMMONLY REFERRED TO AS THE DIVIDENCE ROAD SITE WHICH IS ALREADY OWNED BY THE TOWN OF READING AND SPECIFICALLY DESIGNATED FOR SCHOOL AND RECREATIONAL PURPOSES. THE TOTAL COST OF THE BARROWS ADDITION AND RENOVATION WOULD BE 6.4 MILLION DOLLARS AND THE COST OF THE NEW SCHOOL WOULD BE 8.8 MILLION DOLLARS MAKING THE TOTAL COST OF OPTION B 15.2 MILLION WITH A NET COST TO READING OF 5 MILLION DOLLARS. IF KILLAM PROBLEMS WERE ADRESSED THEN IT WOULD COST ANOTHER MINIMUM OF 1.7 MILLION AND A MAXIMUM OF 5.9 MILLION. OPTION C WOULD CALL FOR THE BUILDING OF A LARGER NEW SCHOOL AT THE DIVIDENCE ROAD SITE HOUSING 552 STUDENTS. THE TOTAL COST OF THIS OPTION WOULD BE 11.5 MILLION WITH JUST THE NEW SCHOOL NET TO READING OF 3.8 MILLION, BUT THE SCENARIO WOULD ALSO HAVE TO CALL FOR SIGNIFICANT RENOVATIONS TO THE OTHER ELEMENTARY SCHOOLS AT A MINIMUM COST OF 2.3 MILLION AND A MAXIMUM COST OF 10.4 MILLION. IT IS BELIEVED THAT SBAB WOULD INSIST ON THESE RENOVATIONS SINCE THEY WOULD EXPECT A TOTAL ANSWER TO THE ELEMENTARY PROBLEM TO BE THE RESULT OF THIS ENDEAVOR. TIM TWOMEY WONDERED IF ANY OF THE OPTIONS COULD DO ANYTHING TO ADRESS THE BALANCE WITHIN CLASSROOMS AT VARIOUS GRADE LEVELS. SID BOWEN THOUGHT THAT MIGHT BE VERY DIFFICULT TO DO UNDER ANY OPTION, BUT HE WOULD TAKE ANOTHER LOOK AT IT. IT WAS POINTED OUT THAT THE DIVIDENCE ROAD SITE WAS, IN THE OPINION OF THE ARCHITECT, A SUPERB SITE FOR A NEW SCHOOL. THE CHAIR POINTED OUT THAT OPTION B WITHOUT KILLAM SOLVED THE xOLLMf9NZCRUNCH AND WOULD BE ACCEPTABLE TO SBAB. CONSIDERING THE FINANCIAL IMPLICATIONS OF ALL OF THE OPTIONS, IT / WAS DEEMED IMPERATIVE THAT THE COMMITTEE MEET WITH BETH KLEPEIS, DIRECTOR OF FONANCE, AS SOON AS POSSIBLE. ON MOTION OF JOE LUPI, SECONDED BY TIM TWOMEY, THE COMMITTEE F, J VOTED TO ADJOURN AT 9:46PM. 0