HomeMy WebLinkAbout1990-09-12 Conservation Commission Minutes3
} r ht " READING CONSERVATION COMMISSION
READING, MASSACHUSETTS
Minutes of 9 h~T90
Meeting No. 22
PRESENT: C. Anthony, Chmn.; H. Hulse; J. Nickerson; M.C. Proctor; J. Lachmayr;
J. Biller, Assoc. Member; J. Keigley, Assoc. Member; D. Nadeau,
Administrator
ABSENT: E. Loschi; R. Longley;
7:02 PM Meeting called to order.
7:06 PM Discussion of the minutes of 8/22/90. Minor corrections were made.
H. Hulse moved to accept the minutes of 8/22/90 as amended.
Seconded.
VOTED 3-0-2
7:08 PM Preliminary discussion of the Order of Conditions for the "Kurchian
Woods" subdivision (DEP #270-222, RWB #1990-23). Questions were
raised about the spacing of the inlet and outlet and the crushed
stone arc proposed by Mr. Bergeron of Hayes Engineering. Don Nadeau
discussed the reasoning based on Board of Health regulations, road
elevations, and related factors.
7:10 PM Preliminary discussion of the Order of Conditions for the "Old
Orchard Road" subdivision (DEP #270-221, RWB #1990-22).
7:13 PM Discussion of a request from the Young Women's Club for a speaker for
their meeting on 4/21/91. The Commission will supply a speaker. J.
Lachmayr has tentatively volunteered.
7:16 PM There will be a special Conservation Commission meeting on 9/19/90 to
discuss the new regulations and bylaw.
7:19 PM Preliminary discussion of the Certificate of Compliance for Mrs.
Ebrecht, 45 Sanborn Lane (DEP #270-189, RWB #1988-11). Mrs. Ebrecht
was in attendence. The administrator has not had time to inspect the
site. Further discussion at 9:00 PM.
7:24 PM Continued discussion of the Order of Conditions for the "Old Orchard
Road" subdivision (DEP #270-221, RWB #1990-22). Discussion of
changes and inserts proposed by the applicant as modified and agreed
to by Don Nadeau. Don explained the modified changes and the fact
that much of the language proposed to be deleted by the applicant was
acutally retained. J. Lachmayr raised the question of whether the
modified haybale line was documented and whether there should be an
additional haybale line at the inlet. The administrator indicated
that he had the authority to make sure that the haybales are placed
as required by the -Commission- before -any -work could proceed
FINAL CORRECTED MINUTES 9/12/90
Page 2
7:51 PM J. Nickerson moved to accept the Order of Conditions as amended for
the "Old Orchard Road" subdivision under Chapter 131§40 (DEP
#270-221) and Article 5§7 (RVB #1990-22).
VOTED 4-0-1
7:56 PM Discussion of the drainage problems on Pasture Rd. Mr. Yonika of the
Eastern Engineering Collaborative made the presentation for the
Franklin Street Property Preservation Group. He explained that there
are several problems in the area. The one on the agenda was the
accumulation of vegetation and sediment in a drainage pipe and ditch
designed to carry runoff to an adjacent wetlands area behind
Blueberry Lane. This system no longer functions properly and needs
to be cleaned and repaired. Mr. Yonika began a discussion of the
other concerns of the neighbors in the area. C. Anthony stopped the
discussion to clarify that only problems with the existing drainage
system were on the agenda. These drainage problems are a separate
issue from whether the development of the Margossian property has
added increased peak flow rates and will cause other drainage
problems. The Margossian matter was a subject of litigation and is
not on the agenda.
Mr. Yonika discussed the fact that other recent problems in the area
have a direct effect on the clogged drainage system. He asked the
Commission if the pipe/ditch system may be cleaned. The question was
raised as to whether a drainage easement was formally given to the
town or if the system was on private property. Mr. Yonika indicated
that he believed that there was an easement, but that this would be
investigated. The question of jurisdiction was raised. Don
discussed some aspects of town policy on the maintenance of such
drainage systems. Mr. Yonika emphasized that the pipe appears to
have been designed for surface water, not groundwater, and the design
may have been inadequate even before recent activity in the area
(which he suggests may make the situation worse).
A site visit will be held on 9/15/90 at 8:30 AM at 27 Pasture Road
(the Martone property) to view the clogged existing drainage pipe and
ditch system in regards to allowing cleaning operations.
8:35 PM A Public Meeting was opened for a proposed deck at 258 Lowell St. for
Daniel Beckman (RWB #1990-29). Mr. Beckman described the proposed
deck.
8:45 PM H. Hulse moved that a negative determination be issued for the
proposed deck at 258 Lowell St. (Beckman, RWB #1990-29) as described
on the submitted plans.
VOTED 5-0-0
8:47 PM Public Hearing opened under Chapter 131§40 and Article 5§7 (DEP
#270-xxx, RWB #1990-26) on work done at 41 A Street by Herbert and
Sheila Monto. A presentation was made by an attorney, Mr. Perkins,
on behalf of the Monto family. Grading on-the side yard adjacent to -
the BVW (within the buffer zone) was done without permission from the
FINAL CORRECTED MINUTES 9/12/90
Page 3
Commission. An effort was made to level off an existing lawn area.
The residents were ignorant of the requirements of the applicable
laws. The lawn was graded and replaced, and maple trees were
_ planted. It appears that no work was done within the wetlands. Only
the existing lawn area was disturbed, no damage was done to the area,
and the new lawn has been stabilized. Mr. Perkins agreed to follow
up on the DEP file number.
9:04 PM H. Hulse moved to close the Public Hearing for 41 A Street (DEP
#270-226, RWB #1990-26) for the Monto family.
VOTED 5-0-0
9:08 PM Discussion of a Certificate of Compliance for 45 Sanborn Lane (Mrs.
Ebrecht, DEP #270-189, RWB #1988-11). The statement submitted by the
RPE hired by Mrs. Ebrecht is incomplete since he was not present when
some of the original work was done to certify compliance with certain
conditions. Full certification would require digging up some of the
work. The evidence available on the "as-built" plans indicates full
or substantial compliance.
9:20 PM J. Nickerson moved to issue the Certificate of Compliance for 45
Sanborn Lane (DEP #270-189, RWB #1988-11).
VOTED 4-0-1
9:22 PM Request for Extension for Greenhouse Acres, Fafard Companies (DEP
#270-162, RWB #1987-3). The presentation was made by two Fafard
representatives. They explained that the delay in finishing the
remaining buildings and related improvements was due to-current
market conditions. They discussed the fact that one reason the two
interior detention areas were not finished was that Mark Boyajian (a
previous Conservation Administrator) had suggested combining them
into one detention area of a slightly different design. Don Nadeau
and the Commisssion agreed in principle with this change. The
Administrator required certain repairs on the siltation fences and
areas around the unbuilt detention areas. The Fafard representatives
agreed to make the repairs immediately. H. Hulse suggested that the
extension be made to expire on 4/5/91 so that it would expire at the
same time as the Order of Conditions under the state regulations.
9:48 PM H. Hulse moved to grant an extension of the Order of Conditions under
Article 5§7 (RWB #1987-3) to expire on 4/5/91.
VOTED 5-0-0
9:52 PM Public Meeting for Imagination Station, Birch Meadow Drive (Friends
of the Playground) opened. Presentation by Ms. Debbie McCulley. The
area (existing parking lot adjacent to the river and town playing
fields) will have the blacktop removed and replaced with crushed
stone. A substantial fence will retain the stone. The playground
will be further from the bank than the existing parking lot.
10:03 PM H. Hulse moved that the Public Meeting be closed.
FINAL CORRECTED MINUTES 9/12/90
Page 4
VOTED 5-0-0
10:07 PM H. Hulse moved that a negative determination with conditions be
issued for the Imagination Station project on Birch Meadow Drive (RWB
#1990-27). The conditions should include: 1) a haybale line be
established prior to blacktop removal, 2) all activity be kept 15'
from the top of the embankment.
VOTED 5-0-0
10:11 PM Discussion of the proposed Order of Conditions for the "Kurchian
Woods" subdivision. (DEP #270-222, RWB #1990-23). The location of
lot 1 was discussed. The proposed limit of activity is only 10' from
the BVW, and the house itself is only 261-27' from the BVW. Several
ammendments were made to various findings and conditions for both
Chapter 131§40 and Article 5§7 sections of the Order. An extended
discussion was held on the merits of allowing exceptions to the
normal "no-activity zone".
11:12 PM H. Hulse moved that the Order of Conditions as amended for the
"Kurchian Woods" subdivision be approved and issued under Chapter
131§40 (DEP #270-222).
VOTED 5-0-0
11:13 PM H. Hulse moved that the Order of Conditions as amended for the
"Kurchian Woods" subdivision be approved and issued under Article 5§7
(RWB #1990-23).
VOTED 4-0-1
11:19 PM Discussion of the amended Order of Conditions for Lot 5, 168 West
Street (DEP #270-207, RWB #1989-35). Discussion of the builder
flagrantly violating the original Order of Conditions, the current
location and elevation of the house as built, and the problems
created. Discussion of the applicability of a fine or some other
penalty for such open disregard of the requirements of the
Commission.
11:24 PM H. Hulse moved that the amended Order of Conditions dated 9/14/90 for
Lot 5, 168 West St. under Chapter 131§40 (DEP #270-207) be approved
and issued.
VOTED 3-0-2
11:25 PM H. Hulse moved that the amended Order of Conditions dated 9/14/90 for
Lot 5, 168 West St. under Article 5§7 (RWB #1989-35) be approved and
issued.
VOTED 3-0-2
11:28 PM Discussion of a Request for Extension for lot 33, Pearl Street (RWB
-1990-03) The extension is not needed for five months. I.t is too
premature to consider.
FINAL CORRECTED MINUTES 9/12/90
Page 5
11:34 PM
r
Discussion of the proposed Street Sweeping Task Force. Only DPW
director Tony Fletcher has responded to the letter of C. Anthony. No
other town officials or boards have replied in any manner.
11:36 PM The Conservation Commission directs the Administrator to explore with
Town Counsel the necessary procedures and options for levying a fine
or other punishment on the developer of lot 5, 168 West Street for his
serious and flagrant disregard of the Order of Conditions as
originally issued.
11:40 PM Preliminary discussion of the proposed new wetlands bylaw and
regulations.
11:43 PM The town engineering department has finished a survey of 16 Margaret
Road. Mr. Fulgoni is correct in that he will lose several trees if
he complies with the Order of Conditions as written. The original
plans and part of the Order of Conditions are flawed in terms of
elevations and other details. The Order of Conditions should be
changed to correct the elevations. Don Nadeau recommended amending
the Order of Conditions. The Commission agreed.
11:46 PM C. Proctor moved to adjourn. Seconded.
VOTED 5-0-0
Respectfully submitted
J. Biller
Assoc. Member
FINAL CORRECTED MINUTES 9/12/90