Loading...
HomeMy WebLinkAbout1995-02-01 Conservation Commission Minutes1 t - _ READING CONSERVATION COMMISSIOl~, Minutes of February 1, 1995 4 S(~CC'~PM\n]inl1lC~.~fI1) deetixf6'No. 04 PRESENT: Chair James Biller, Vice-Chair Steve Chapman, Josh Drexler, Nancy Eaton, Harold Hulse and Conservation Ad- ministrator Donald Nadeau ABSENT: M. Clifton Proctor, Associate Leo Kenney. 7:15 PM The meeting was called to order. Administratcr/subcommittee reports: Open Space Task Force update. Lot 2 Varney Circle bond allocation: the Commission agreed to the incremental release of bond money for trees as the trees are accepted. If failed trees are replaced, the species need to be approved by the Commission prior to planting. PublicMeetina - 119 VanNorden Rd./end Fairchild Dr: RGB# 1995-02 Jack Rivers presented a revised plan dated 1-18-95. The Commission site visits of 1-14-95 and 1-29-95 were put on record. The parties agreed to a wetland line and to continue the meeting to receive 12 new plans with the revisions. Motion made and seconded to continue the public meeting for 119 Van Norden Rd./end Fairchild Dr. RGB# 1995-02 to 7:30 p.m. on 2-15-95. VOTED 5-0-0 Continued Public Meeting - 51 Mill Street RGB# 1995-03 Bill Dufresne, Bill Barrett and botanist Leah Basbanes, M.A. presented a new site plan and agreed with the 1-29-95 Commission site visit delineation on record, except for flag #15 and the isolated area at Mill Street. They agreed to provide documentation in those areas and a surveyor/engineer-stamped revised plan for a con- tinued meeting. Motion made and seconded to continue the public meeting - 51 Mill Street RGB# 1995-03 with concurrence to 8:00 p.m. on 2-15-95. VOTED 5-0-0 Cert. of Compliance - rear 317 Haverhill Street Nike missile pads DEP# 270-257, RGB# 1993-25 The as-built plan was found to be not accurate or proper. No motion was made. 8:54 PM A recess was called. 9:17 PM The meeting resumed. RGB Extension - Nugent Lane DEP# 270-248, RGB# 1992-24 motion maae ana seconaea to issue KGB Extension Permit Nugent Lane RGB# 1992-24 to 12-31-95. VOTED 5-0-0 Status - Greenhouse Acres DEP# 270-162, RGB# 1987-3 Bob McNeil, Russell Tanzer, Sterling [Walls] and the attorney were present. Sterling submitted many documents and plans, including BVW analysis revised 2-1-95, and stated that all walls were corrected except behind Building 14, which was almost done, pending con- crete facility production. He stated that net site impervious area exceeded the approved plan by 2,172 sq.ft.: 560 sq.ft. to inner detention area, remainder overland to perimeter, plus 1,446 sq.ft. increase from work done before by The Fafard Companies: 260 sq.ft. to inner basin. S. Chapman directed that stones and debris at the base of the retaining wall behind Building 18 be removed.. Motion made and seconded to allow Certificates of Occupancy on all units except all Building 2 units, pending completion of construction of wetlands work. VOTED 5-0-0 The draft Enforcement Order was not signed. 10:50 PM Motion made and seconded to adjourn. VOTED 5-0-0 Respectfully submitted, Donald J. Nadeau Conservation Administrator