Loading...
HomeMy WebLinkAbout2007-05-17 ad Hoc - Northern Area Greenway Task Force MinutesTown of Reading I E D Ad Hoc Northern Area Greenway Task Form''' R Town Hall Conference Room `ri \ May 17, 2007 Minutes 2C03 uU111 21 A 61: 42 Attendance: Dave Williams, Will Finch, Mark Rumizen, Joan Hoyt, Brant Ballantyne, Charles Donnelly Moran Absent: Frank Driscoll, Fred Alexander Also present: Kim Honetschlager, GIS Coordinator, Bob Weggel, Heather Clish, Gary Gresh The meeting was called to order at 7:35 PM. Minutes from the May 1 meeting were amended and approved 4-0 Issues discussed: • Peter H. stated to Dave W. that the NAG Committee has been extended to Dec. 31 o Report in the fall o Grants; if we identify, then NAG not expected to write proposal, should hand-off to appropriate committee o Standards; Peter H. understands, not trying to force his opinion o How does this project move forward, hand off to other town dept or form new committee? ■ Doesn't like to have too many committees, but may need one for a project this size ■ Town now has possession of log cabin ■ Peter H. upbeat about project, have his full support • Any one had a chance to solidify thoughts about our May 1 discussion • DCR grant handout: application due • Nat'l Park Service grant application handed out by Kim • Heather inspected Wood End School area o Got info on helical boardwalk o Spoke to Larry Wheelock, NY/NJ Trail Conference ■ Mile-long boardwalk, used hydraulic driver, State of NJ purchased one ■ Drove the piles to 600 psi ■ State contracted out design ■ Piers 10 ft length, laser level, gas powered saw to get level to put girders on ■ 80% work done by volunteers ■ Driver on plywood float ■ Helical design because better for wetland habitat, duability ■ Use composite girders just need to replace decking ■ $100 per ft w/o volunteer labor o Peter Jensen, Trail Designer ■ Should go 6 ft width • Rails, curve? ■ $150-$200 per ft ■ Use 15% of build cost for design? Use $40K for engineer design - Need soil samples, boring rig out in marsh, higher cost - Est $510K for 2800 ft by 6 ft wide boardwalk • Where does boardwalk start/end? Concern with high water causing boardwalk to float away - ~ o Need railing if 48 inches off ground (land) Or 30 inches? • Typical flood line for river? o Town has data from FEMA, photos o Build low and just not use when flooded • How do we move forward to examine feasibility of building boardwalk? o Do feasibility assessment first? Not full design, give town an idea o Review idea with Nat'l Park Service RTCA ■ They will provide a person to assist to move project forward ■ Talk to someone in Boston office ■ Like to see organized group • Concern with emergency access? • NJ mile-long boardwalk o 40 ft suspension bridge o On Appalachian trail, no side access • RTCA is very short-staffed a Only take on 2 or 3 projects per year o Looking for community value o Tie to Ipswich River is of value, gives residents access to river o Might have a broad perspective on how this project compares with others relative to ability to get funding • Heather to contact RTCA for feasibility assessment of NW Passage • Other aspects of NAG o Avoid Rt 28 crossing o Log Cabin to Haverhill St o Make use of volunteer groups o Log cabin has parking o Cut trail into Bare. Meadow, turn right towards kiosk, then on to major trail ■ Wet spots in trail; - ADA accessible? - Bog bridging? - Turnpiking, throw down stones/pea stone - Make part of it accessible? Keep as natural as possible - Accessible to tucks with stone thru Pearl St gate • Put together plan • Shift trail to avoid wet areas • FORR working on bike path at Memorial Pk o Public works will provide free labor o MDCR more willing to provide materials • What is town doing with lot after they take down house? o Get them to pave it for parking? • Trails assessment needed o Trail log; work recommended on a trail o AMC form, specify feet, other details o Should we walk the trail to develop trail plan/log? o Meet Saturday, May 26 9:OOAM at Pearl St parking lot • Present plan of one NAG trail to BOS o Leave spur trails for another time • Town Day coming up in June o Have a presence, maps, talk about ideas o Need BOS approval of plan before we solicit volunteers Next meeting will be Thursday May 31 at 7:30 p.m. The meeting adjourned at 9:00 PM. Voted 5-0. _ Respectfully submitted, . ark Rumiz