Loading...
HomeMy WebLinkAbout2025-08-06 Reading Center for Active Living Committee Packet Town of Reading Meeting Posting with Agenda This Agenda has been prepared in advance and represents a listing of topics that the chair reasonably anticipates will be discussed at the meeting. However the agenda does not necessarily include all matters which may be taken up at this meeting. Page | 1 2018-07-16 LAG Board - Committee - Commission - Council: Permanent Building Committee Date: 2025-08-06 Time: 6:00 PM Building: Pleasant Street Senior Center Location: Great Room Address: 49 Pleasant Street Agenda: Purpose: Permanent Building Committee Meeting for ReCAL Meeting Called By: Genevieve Wood on Behalf of Patrick Tompkins Notices and agendas are to be posted 48 hours in advance of the meetings excluding Saturdays, Sundays and Legal Holidays. Please keep in mind the Town Clerk’s hours of operation and make necessary arrangements to be sure your posting is made in an adequate amount of time. A listing of topics that the chair reasonably anticipates will be discussed at the meeting must be on the agenda. All Meeting Postings must be submitted in typed format; handwritten notices will not be accepted. Topics of Discussion: Item No. Item 1 Call to Order 2 Public Comment 3 Approval of Minutes - Vote a. 7/02/25 4 Invoice Approvals - Vote a. Turner & Townsend Heery - $45,465 b. BH+A Basic Services - $210,000 5 Turner & Townsend Heery a. Budget Update b. Schedule Update 6 BH+A Design Update a. Design Development Submission 7/17/25 – Cost Estimate b. Building/Site Design Changes - Update 7 COA Open Design Comments a. Response to Final Open Design Issues* 8 Other Updates a. Operational Plan b. Financial Update c. Drawing Review 9 Next Meeting a. Wednesday September 03, 2025 @ 6:00 pm Location TBD Town of Reading Meeting Posting with Agenda This Agenda has been prepared in advance and represents a listing of topics that the chair reasonably anticipates will be discussed at the meeting. However the agenda does not necessarily include all matters which may be taken up at this meeting. Page | 2 10 Adjournment *Vote if Required END OF DOCUMENT Community Services Department is inviting you to a scheduled Zoom meeting. Join Zoom Meeting https://us06web.zoom.us/j/84286166969?pwd=S8wNQ7tuhRsEPA7t6c6mnsG2UlFRnE.1 Meeting ID: 842 8616 6969 Passcode: 305643 --- One tap mobile +16465588656,,84286166969#,,,,*305643# US (New York) +16465189805,,84286166969#,,,,*305643# US (New York) --- Dial by your location • +1 646 558 8656 US (New York) • +1 646 518 9805 US (New York) Meeting ID: 842 8616 6969 Passcode: 305643 Reading Center for Active Living Permanent Building Committee Meeting Minutes P a g e | 1 Date and Time: July 02, 2025, 6pm Location: Permanent Building Committee Purpose: Design / Construction / Closeout Phase Meeting Number 002 Recorded By: Nina Zeytoonian and Mark Stafford Attendees Name Company Patrick Thompkins Reading Permanent Building Committee - Chair (PBC) Nancy Twomey Reading Permanent Building Committee (PBC) Ari Greenburg Reading Permanent Building Committee (PBC) Nancy Ziemiak Reading Permanent Building Committee (PBC) John Coote Reading Permanent Building Committee (PBC) Kirk McCormick Reading Permanent Building Committee (PBC) Jayne Wellman Town of Reading (TOR) Jenna Wood Town of Reading (TOR) Chris Kowaleski Town of Reading (TOR) Kevin Cabuzzi Town of Reading (TOR) Joel Bargmann Bargmann Hendrie + Archetype, Inc. (BH+A - Designer) Chuck Adam Turner & Townsend Heery (TTH - Owners Project Manager) Mark Stafford Turner & Townsend Heery (OPM - Owners Project Manager) Nina Zeytoonian Turner & Townsend Heery (OPM - Owners Project Manager) Item No. Discussion Action by 1 Call to Order - Meeting was called to order at 6:07pm NA 2 Public Comment - None 3 Approval of Minutes - PBC voted unanimously to approve the 05/28/2025 Meeting Minutes. Kirk McCormick’s name misspelled, corrected. NA 4 Invoice Approvals: • Turner & Townsend Heery: Final invoice for Feasibility Study o $11,030. PBC voted unanimously to approve TTH invoice. • BH+A: invoices: o Basic services – $60,000 PBC voted unanimously to approve. o Consultant services (geotechnical and survey) – $11,400 PBC voted unanimously to approve 5 Turner & Townsend Heery: • Budget Update: o Project remains on budget with less than 1% cost incurred. o Budget tracking spreadsheet will be updated at each PBC meeting. • Schedule Update: o Design Development (DD) set is on track for completion by July 17. o CPDC drawings due July 7 o Conservation Commission guidelines due July 9 o Trail design revised to include a full loop of stone dust trail in the buffer zone. TTH Reading Center for Active Living Permanent Building Committee Meeting Minutes P a g e | 2 o Wetlands boardwalk portion deferred until future funding is available. o HVAC System Design - PBC/Facilities expressed concerns about VRF based on previous issues with Daikin systems. o PBC decided to rule out geothermal due to several concerns with cost and maintenance. o Additional review of VRF vs. air-to-water to be conducted. • Design Process & Stakeholder input: o PBC emphasized avoiding backtracking on schematic design decisions. o Concerns raised about unresolved design items from the Council on Aging (COA). o Agreement to review COA’s spreadsheet of unresolved items and categorize them into “Yes,” “No,” and “Maybe” buckets. COA to submit revised spreadsheet. o Commitment to transparency and documentation of decisions. o Finalize outstanding design issues before July 17 DD submission. 6 BH+A Design Update: • Move Fitness Room to Second Floor - PBC voted unanimously to approve. o Supported by staff and stakeholders for better aesthetics and supervision. o Estimated structural cost - $5,000 • Add Movable Partition to First Floor Room - PBC voted unanimously to reject. o Estimated cost range - $100,000 (coiling door) –$125,000 (overhead door) o Concerns over cost, storage impact, and necessity. PBC 7 Establishment of Working Groups: o Continue the Sustainability Working Group. PBC voted unanimously to approve. o Create a new Finance/Change Orders Working Group. PBC voted unanimously to approve. o Sunset the Stakeholder Design Group. PBC vote 6 yes, 1 no. Approved. o Handle Communications as needed without a formal group. PBC voted unanimously to approve. 8 Set Future Project Meeting Dates: First Wednesday of the month - upcoming – 8/6/25, 9/3/25 - October meeting to be moved from October 1st to October 8th. Location TBD. 9 Next Meeting: o Wednesday August 6th, 2025, 6pm at the Pleasant St. Center. 10 Adjournment: PBC motioned to adjourn at 7:57pm The above summarizes Turner & Townsend Heery interpretation of items discussed and decisions reached during this meeting. Additions or corrections must be submitted in writing to the author within three days of receipt; otherwise, the minutes will stand as written Turner & Townsend Heery, LLC July 24, 2025 Ms. Jayne Wellman, MPA, MCPPO Assistant Town Manager 16 Lowell St Reading, MA 01867 781.942.6637 (o) 781.970.2537 (m) SENT VIA ELECTRONIC MAIL 300 Brickstone Square, Suite 201 Andover, MA 01810 617-823-3265 www.turnerandtownsend.com www.heery.com For the attention of Recipient name Dear Ms. Wellman, Re: Reading Center for Active Living Turner & Townsend Heery Invoice # PJIN0044283 Period June 2025/July 2025 Please find attached Turner & Townsend Heery invoice for Owner’s Project Management Services during the Design Development Phase for the period stated above in the amount of Forty-Five Thousand Four Hundred Sixty-Five Dollars and Zero Cents ($45,465.00). Thank you for the opportunity to serve the Town of Reading. If you have any question, or require additional information, please contact me. Sincerely, Mark A. Stafford Mark A. Stafford Senior Project Manager Turner & Townsend Heery, Inc. C: File Turner & Townsend Heery 3550 Lenox Road NE, Suite 2300 Atlanta, GA 30326 Ms. Jayne Wellman, MPA, MCPPO Assistant Town Manager 16 Lowell St Reading, MA 01867 Project Name READING CENTER FOR ACTIVE LIVING OWNERS PROJECT MANAGEMENT SERVICES (OPM) Period June 2025-July 2025 No. PHASE SCHEDULED VALUE WORK COMPLETED TOTAL COMPLETED BALANCE TO FINISH PERCENT COMPLETE PREVIOUS THIS APPLICATION PERIOD 1 Feasibility Study/Schematic Design $94,500.00 $0.00 $0.00 $94,500.00 $0.00 100% 2 Design Development $68,198.00 $0.00 $45,465.00 $45,465.00 $22,733.00 67% 3 Construction Documents $72,138.00 4 Contractor Prequalification $36,026.00 5 Bidding Phase $39,749.00 6 Construction Phase $533,889.00 7 Closeout Phase $55,857.00 8 Cost Estimates $40,000.00 9 TOTALS $940,357.00 $0.00 $45,465.00 $139,965.00 $800,392.00 14.88% INVOICE PAYMENT DUE $45,465.00 • For services June & July 2025 Contact: MARK A. STAFFORD @ mark.stafford@turntown.com , 781-733-7310 with invoice questions. INVOICE Invoice Number IP216245 Date July 24, 2025 Project Number HII-2408100 June 1st, 2025 through July 31st, 2025 Turner & Townsend Heery, LLC July 24, 2025 Ms. Jayne Wellman, MPA, MCPPO Assistant Town Manager 16 Lowell St Reading, MA 01867 781.942.6637 (o) 781.970.2537 (m) SENT VIA ELECTRONIC MAIL 300 Brickstone Square, Suite 201 Andover, MA 01810 617-823-3265 www.turnerandtownsend.com www.heery.com For the attention of Recipient name Dear Ms. Wellman, Re: Reading Center for Active Living BH+ A Invoice # 27578 Budget Item 0300-700 Period June/July 2025 Please find attached BH+A invoice for Basic Services for the period stated above in the amount of Two-Hundred and Ten Thousand Dollars and Zero Cents ($210,000.00). We have reviewed the invoice for the scope of work and cost that was completed and recommend payment. If you have any question, or require additional information, please contact me. Sincerely, Mark A. Stafford Mark A. Stafford Senior Project Manager Turner & Townsend Heery, Inc. C: File Mark Stafford, Project Manager Turner & Townsend Heery Town of Reading 16 Lowell Street Reading, MA 01867 July 10, 2025 Project No:03513.10 Invoice No:27578 BARGMANN HENDRIE + ARCHETYPE, INC. 9 Channel Center Street, Suite 300 Boston, MA 02210 617-350-0450 www.bhplus.com Project 03513.10 Reading CAL Amendment #1 (DD - CA) EMAIL Invoices to Mark Stafford (mark.stafford@turntown.com); cc Jenna Wood Professional Services from June 1, 2025 to June 30, 2025 Fee Fee by Phase FEE Percent Complete Total Earned Current Invoicing Design Development 600,000.00 45.00 270,000.00 210,000.00 Construction Documents 600,000.00 0.00 0.00 0.00 Bidding 9,000.00 0.00 0.00 0.00 Construction Administration 550,000.00 0.00 0.00 0.00 Audio Visual & Technology Design 28,000.00 0.00 0.00 0.00 Furniture, Fixtures, & Equipment 45,000.00 0.00 0.00 0.00 Total Fee 1,832,000.00 270,000.00 210,000.00 Previous Fee Billing 60,000.00 Total Fee Invoiced 210,000.00 $210,000.00Current Invoice Total Billings to Date Current Prior Total Fee 210,000.00 60,000.00 270,000.00 Totals 210,000.00 60,000.00 270,000.00 Outstanding Invoices Number Date Balance 27564 6/18/2025 60,000.00 Total 60,000.00 If you have billing questions, please contact Fred Raffensperger (617-456-2242). a b c d e f g h i j No.Cost Category Base Contract Descriptions Budget Committed Funds Un-Committed Budget (d-e) Approved Invoices To Date Remaining Balance of Committed Funds Comments 1 100-000 Administration 2 100-100 Legal / Recording Fees 5,000.00$ -$ 5,000.00$ -$ -$ 3 -$ 4 -$ 5 -$ 6 7 100-200 Advertising / Bid Hosting / Printing 10,000.00$ -$ 10,000.00$ -$ -$ 8 -$ 9 -$ 10 -$ 11 12 100-300 Owner's Insurance (Builders Risk)-$ -$ -$ -$ -$ 13 -$ 14 -$ 15 -$ 16 17 100 Total Administration Total 15,000.00$ -$ 15,000.00$ -$ -$ 18 19 200-000 Owner's Project Manager (OPM) 20 200-100 Design Development Phase 68,198.00$ 68,198.00$ -$ 45,465.00$ 22,733.00$ 21 45,465.00$ 45,465.00$ Invoice # PJIN0044283 - 7/24/25 22 -$ 23 -$ 24 -$ 25 26 200-200 Contract Document Phase 72,138.00$ 72,138.00$ -$ -$ 72,138.00$ 27 -$ 28 -$ 29 -$ 30 -$ 31 32 200-300 Contractors Prequalification Phase 36,026.00$ 36,026.00$ -$ -$ 36,026.00$ 33 -$ 34 -$ 35 -$ 36 -$ 37 38 200-400 Bid & Award Phase 39,749.00$ 39,749.00$ -$ -$ 39,749.00$ 39 -$ 40 -$ 41 -$ 42 -$ 43 44 200-500 Construction Phase 533,889.00$ 533,889.00$ -$ -$ 533,889.00$ 45 -$ 46 -$ 47 -$ Reading Center for Active Living Project Budget As of July 30, 2025 Page 1 of 5 a b c d e f g h i j No.Cost Category Base Contract Descriptions Budget Committed Funds Un-Committed Budget (d-e) Approved Invoices To Date Remaining Balance of Committed Funds Comments Reading Center for Active Living Project Budget As of July 30, 2025 48 -$ 49 50 200-600 Closeout Phase 55,857.00$ 55,857.00$ -$ -$ 55,857.00$ 51 -$ 52 -$ 53 -$ 54 -$ 55 56 200-700 Cost Estimates 40,000.00$ 40,000.00$ -$ -$ 40,000.00$ 57 -$ 58 -$ 59 -$ 60 -$ 61 62 200-800 Additional Services -$ -$ -$ -$ -$ 63 -$ 64 -$ 65 -$ 66 -$ 67 68 200 Total OPM Total 845,857.00$ 845,857.00$ -$ 45,465.00$ 800,392.00$ 69 70 300-000 Architect & Engineer (A&E) BASIC SERVICES 71 72 300-100 Design Development 600,000.00$ 600,000.00$ -$ 270,000.00$ 330,000.00$ 73 60,000.00$ 60,000.00$ Invoice # 27564 - June 18, 2025 74 210,000.00$ 210,000.00$ Invoice # 27578 - July 10, 2025 75 -$ 76 -$ 77 78 300-200 Construction Documents 600,000.00$ 600,000.00$ -$ -$ 600,000.00$ 79 -$ 80 -$ 81 -$ 82 -$ 83 84 300-300 Bidding 9,000.00$ 9,000.00$ -$ -$ 9,000.00$ 85 -$ 86 -$ 87 -$ 88 -$ 89 90 300-400 Construction Administration 550,000.00$ 550,000.00$ -$ -$ 550,000.00$ 91 -$ 92 -$ 93 -$ 94 -$ Page 2 of 5 a b c d e f g h i j No.Cost Category Base Contract Descriptions Budget Committed Funds Un-Committed Budget (d-e) Approved Invoices To Date Remaining Balance of Committed Funds Comments Reading Center for Active Living Project Budget As of July 30, 2025 95 96 300-500 Audio Visual &Technology Design 28,000.00$ 28,000.00$ -$ 28,000.00$ 97 -$ 98 99 100 101 -$ 102 300-600 Furniture, Fixtures & Equipment Design 45,000.00$ 45,000.00$ -$ 45,000.00$ 103 -$ 104 105 106 107 108 300-700 A&E Reimbursable Services 84,000.00$ 84,000.00$ -$ 11,400.00$ 72,600.00$ 109 Geotechnical Engineering 9,000.00$ 1,650.00$ Invoice # 274565 - June 18,2025 110 Survey & Street Acceptance Plan 15,000.00$ 9,750.00$ Invoice # 274565 - June 18,2025 111 Wetlands Consultant (ConCom)15,000.00$ -$ 112 Arborist Tree Survey (ConCom)5,000.00$ -$ Not Required Contract Amendment 113 Traffic Impact Analysis 10,000.00$ -$ 114 Energy Model & Life Cycle Assessment 20,000.00$ -$ 115 Printing Allowance 10,000.00$ -$ 116 117 118 300-800 A&E - Additional Services -$ -$ -$ -$ -$ 119 -$ 120 -$ 121 122 300 Total Architect and Engineer Total 1,916,000.00$ 1,916,000.00$ -$ 281,400.00$ 1,634,600.00$ 123 124 400-000 "Other" Engineering 125 400-100 Materials Testing and Inspectional Services 70,000.00$ -$ 70,000.00$ -$ -$ 126 -$ 127 -$ 128 -$ 129 -$ 130 131 400-200 Hazardous Material (Testing & Monitoring)-$ -$ -$ -$ -$ 132 -$ 133 -$ 134 -$ 135 -$ 136 137 400-300 Building Commissioning 50,000.00$ -$ 50,000.00$ -$ -$ 138 -$ 139 -$ 140 -$ 141 -$ Page 3 of 5 a b c d e f g h i j No.Cost Category Base Contract Descriptions Budget Committed Funds Un-Committed Budget (d-e) Approved Invoices To Date Remaining Balance of Committed Funds Comments Reading Center for Active Living Project Budget As of July 30, 2025 142 143 400-400 Structural Peer Review 15,000.00$ -$ 15,000.00$ -$ -$ 144 -$ 145 -$ 146 -$ 147 -$ 148 149 400 Total "Other" Engineering Total 135,000.00$ -$ 135,000.00$ -$ -$ 150 151 500-000 Construction Contract 152 500-100 Estimated Construction Cost at SD Phase 21,947,967.00$ -$ 21,947,967.00$ -$ -$ 153 Estimated Construction Cost 17,773,000.00$ 154 General Conditions 1,777,300.00$ 155 General Requirements 355,460.00$ 156 Bonds & Insurance 400,000.00$ 157 Escalation 1,144,207.00$ -$ 158 Profit 498,000.00$ -$ 159 160 500-200 Estimated Construction Contingency at SD Phase 1,097,398.00$ -$ 1,097,398.00$ -$ -$ 161 -$ 162 -$ 163 -$ 164 -$ 165 166 500 Total Construction Contract Total 23,045,365.00$ -$ 23,045,365.00$ -$ -$ 167 168 600-000 Furnishings & Technology 169 170 600-100 Furniture 500,000.00$ -$ 500,000.00$ -$ -$ 171 -$ 172 -$ 173 -$ 174 -$ 175 176 600-200 Technology (Telephone & Data)300,000.00$ -$ 300,000.00$ -$ -$ 177 -$ 178 -$ 179 -$ 180 -$ 181 182 600-300 Audio Visual -$ -$ -$ -$ -$ 183 -$ 184 -$ 185 -$ 186 -$ 187 188 600-400 Computer Equipment -$ -$ -$ -$ -$ Page 4 of 5 a b c d e f g h i j No.Cost Category Base Contract Descriptions Budget Committed Funds Un-Committed Budget (d-e) Approved Invoices To Date Remaining Balance of Committed Funds Comments Reading Center for Active Living Project Budget As of July 30, 2025 189 -$ 190 -$ 191 -$ 192 -$ 193 194 600-500 Security / Access Control Systems -$ -$ -$ -$ -$ 195 -$ 196 -$ 197 -$ 198 -$ 199 200 600 Total Furnishings Fixtures and Equipment (FF&E) Total 800,000.00$ -$ 800,000.00$ -$ -$ 201 202 700-000 Other Project Costs 95,000.00$ -$ 95,000.00$ -$ -$ 203 700-100 Utility Company (REL)80,000.00$ -$ -$ 204 Moving & Relocation 15,000.00$ -$ -$ 205 -$ -$ 206 -$ -$ 207 208 700 Total Other Project Total 95,000.00$ -$ 95,000.00$ -$ -$ 209 210 800-000 Owner's Contingency 1,047,778.00$ -$ 1,047,778.00$ -$ -$ 211 -$ -$ -$ 212 -$ -$ -$ 213 -$ -$ -$ 214 -$ -$ -$ 215 -$ -$ 216 217 800 Total Owner Contingency Total 1,047,778.00$ -$ 1,047,778.00$ -$ -$ 218 219 PROJECT TOTALS 27,900,000.00$ 2,761,857.00$ 25,138,143.00$ 326,865.00$ 2,434,992.00$ 220 Percentage to Budget 10%90%1%9% Page 5 of 5 ID Task Name Duration Start Finish1RECAL Project2Design Development75 days5/19/258/29/253Design Development (DD)44 days5/19/257/17/254Drawings Review period10 days7/17/257/30/255Cost Estimate Development9 days7/18/257/30/256DD Cost Estimate & Reconciliation22 days7/31/258/29/257Town DD Site Plan Review & Approval65 days7/9/2510/7/258Conservation Commission Meeting - Plans Submission1 day7/9/257/9/259Conservation Commission Meeting - Initial Meeting1 day7/23/257/23/2510CPDC - Abutter Notice1 day7/23/257/23/2511PBC Meeting1 day8/6/258/6/2512Community Planning & Development Commission Meeting - Initial Meeting1 day8/11/258/11/2513Conservation Commission Meeting - Follow-up Meeting1 day8/13/258/13/2514Conservation Commission Meeting - Follow-up Meeting (if required)1 day8/27/258/27/2515PBC Meeting1 day9/3/259/3/2516Community Planning & Development Commission Meeting - Follow-up Meeting1 day9/8/259/8/2517Community Planning & Development Commission Meeting - Follow-up Meeting (If Required)1 day10/7/2510/7/2518Construction Documents87 days7/17/2511/14/2519Prepare 60% Documents50 days7/17/259/24/2520Drawings Review period10 days9/18/2510/1/2521Cost Estimate Development22 days9/18/2510/17/2522PBC Meeting1 day10/8/2510/8/252360% CD Cost Estimate & Reconcilliation5 days10/20/2510/24/2524Prepare 100% CDs / Ready for Bid Package6 days10/27/2511/3/2525Drawings Review Period10 days11/3/2511/14/2526Bid & Award20 days11/4/2512/1/2527Prepare, Advertise and Issue Final Bid Package20 days11/4/2512/1/2528Filed Sub Bids22 days11/4/2512/3/2529PBC Meeting1 day11/5/2511/5/2530PBC Meeting1 day12/3/2512/3/2531General Bids13 days12/4/2512/22/2532Construction436 days1/1/269/2/2733Construction Begins1 day1/1/261/1/2634Certificate of Opccupancy1 day6/1/276/1/2735Move In - Soft Start45 days7/1/279/1/2736Full Operation1 day9/2/279/2/274/276/158/39/2111/912/282/154/52025Reading Center for Active LivingReCAL Master Project ScheduleDate: 8/6/25Page 1 of 2 ID Task Name Duration1RECAL Project2Design Development75 days3Design Development (DD)44 days4Drawings Review period10 days5Cost Estimate Development9 days6DD Cost Estimate & Reconciliation22 days7Town DD Site Plan Review & Approval65 days8Conservation Commission Meeting - Plans Submission1 day9Conservation Commission Meeting - Initial Meeting1 day10CPDC - Abutter Notice1 day11PBC Meeting1 day12Community Planning & Development Commission Meeting - Initial Meeting1 day13Conservation Commission Meeting - Follow-up Meeting1 day14Conservation Commission Meeting - Follow-up Meeting (if required)1 day15PBC Meeting1 day16Community Planning & Development Commission Meeting - Follow-up Meeting1 day17Community Planning & Development Commission Meeting - Follow-up Meeting (If Required)1 day18Construction Documents87 days19Prepare 60% Documents50 days20Drawings Review period10 days21Cost Estimate Development22 days22PBC Meeting1 day2360% CD Cost Estimate & Reconcilliation5 days24Prepare 100% CDs / Ready for Bid Package6 days25Drawings Review Period10 days26Bid & Award20 days27Prepare, Advertise and Issue Final Bid Package20 days28Filed Sub Bids22 days29PBC Meeting1 day30PBC Meeting1 day31General Bids13 days32Construction436 days33Construction Begins1 day34Certificate of Opccupancy1 day35Move In - Soft Start45 days36Full Operation1 day5/247/128/3010/1812/61/243/145/26/208/820262027Reading Center for Active LivingReCAL Master Project ScheduleDate: 8/6/25Page 2 of 2 ReCAL Architectural and Engineering Update Permanent Building Committee August 6, 2025 SD Budget DD Budget Construction Cost Estimate $21,947,967 $20,642,125 Construction Contingency $1,097,389 same Construction Contract Total $23,045,365 same Owner Contingency $1,047,778 same PRELIMINARY Construction Cost Comparisons Pre reconciliation and comparison with TTH’s estimate Construction cost includes audio visual Furniture, fixtures and equipment are in owner’s budget Foundation System simplified based on phase 2 geotechnical investigations Escalation is reduced and incorporated into the DD cost estimate Design Contingency is reduced and the scope now incorporated into DD cost estimate A 5% Design Contingency remains in the cost estimate until construction documents are completed There are unknown foreign trade factors that may impact the CD estimate and thus, the additional contingency is warranted Major Cost Factors SD Budget DD estimate Construction Cost Estimate -$1,080,553 Contingency -$108,000 Total Project Cost $1,500,000 $1,304,553 PRELIMINARY Pickleball Construction Cost Add Lights Add Pickleball Court Add Contingency for either option $208,266 $53,474 10% Con Com & CPDC Update Site Plan Modification First Floor Plan Road alignment Kitchen Electric Room & Exit Revision Updated Kitchen Plan Revisions based on comments from July 28 review Air lock and delivery vestibule Walk-in cooler Coffee 38’ Second Floor Plan Roof Plan for Solar Panels Axon Solar Panels Projected building energy cost $41,546 Projected energy cost with a roof top PV system $25,431 Potential Savings $16,115 Cost of installing the roof top PV system $417,960 Payback 25.9 Years Electricity Consumed (KWH) Electricity Generated (KWH) Purchased Elecrtricity (KWH) Energy Cost ($0.17/kwh) Energy Cost Savings Incremental Cost Payback (Years) Base Building 244,388 -244,388 41,546$ --- 100 KW Solar Array -94,795 149,593 25,431$ 16,115$ 417,960$ 25.9 Geothermal Projected building energy cost $41,546 Projected building energy cost with a Geothermal system $40,738 Potential savings $ 808 Cost of installing the Geothermal system $1,057,000 Electricity Consumed (KWH) Electricity Generated (KWH) Purchased Elecrtricity (KWH) Energy Cost ($0.17/kwh) Energy Cost Savings Incremental Cost Payback (Years) Base Building 244,388 -244,388 41,546$ --- Geo-Thermal 239,633 -239,633 40,738$ 808$ 1,238,393$ 1,532 Geo + 100 KW Solar Array -94,795 144,838 24,622$ 16,924$ 1,656,353$ 97.9 Geothermal •Geothermal is eligible for a 30% rebate on the total system cost for municipalities (new tax bill). •Geothermal cost adds $1,057,000 to the system cost of $1,914,351 •30% Rebate would be $891,476 ($2,971,587 x 30%) Signage Option 1 (required for CPDC hearing) Signage Option 2 Signage Reference Image Signage Option 3 Signage Option 4