HomeMy WebLinkAbout2024-01-08 Community Planning and Development Commission MinutesTown of Reading .
i Meeting Minutes
f ;
Board -Committee -Commission -Council: i024 FEB 14 12 4
Community Planning and Development Commission
Date: 2024-1-8 Time: 7:00 PM
Building: Town Hall Location: Hybrid Meeting - Zoom and Select
Board Meeting Room
Address: 16 Lowell Street Session: Open Session
Purpose: Hybrid Meeting Version: Final
Attendees: Members In person: Tony D'Arezzo, Vice Chair; Hillary Mateev; Tom
Armstrong; Mark Wetzel; Heather Clish; John Weston, Chair
Others Present in person: Community Development Director Andrew
MacNichol, Senior Planner Mary Benedetto, Chris Latham, Scott Thornton,
Carlton Quinn, Chris Alphen, Greg Elliot, Mike Farrell, Lynn Farrell, Ken
Reardon, Linda McKenzie, Aram Boornazian, Tom DeCroteau, Laura
Richards, John Richards, Chris Murphy, Ray Gagnon, Marie Gagnon, Debbie
Riberio, Maureen Hart, Doreen Cronin, Dan Cronin, Andrea Farina, Elena
Farina, Sri Narayan, loan Guidi, Katelyn Lloyd, Patricia McCarthy, Elisha
Willis, Angela Bina, Dave Talbot, Jack Sullivan
Remote Participants; Jason Adams, Dan Allen, Saverio Fulciniti, Janine
Sciuto, John, Len Joseph, Eric Jones, Support, Fang Yu, Jackie McCarthy,
Nancy Docktor, Angela, Matt Haskell, ArtFX, Bill Cowie, Karen Cowie,
Connor Ennis, Aaron Parry, Iphone, Daniel
Minutes Respectfully Submitted By: Mary Benedetto
Topics of Discussion:
MEETING HELD IN THE SELECT BOARD ROOM AND REMOTELY VIA ZOOM
Mr. D'Arezzo called the meeting to order at 7:06 PM, as Mr. Weston had not yet arrived.
Mr. MacNichol gave an overview of the hybrid meeting procedures.
Continued Public Hearing, Definitive Subdivision Application
0 Annette Lane, Peter Seibold
Mr. Armstrong made a motion to continue the public hearing for the Definitive
Subdivision Application for 0 Annette Lane to February 12, 2024. Ms. Clish
seconded the motion, and it was approved 5-0-0 (Armstrong, Clish, D'Arezzo,
Mateev, Wetzel).
Sian Permit Application
5 Harnden St. Dollar Tree
Mr. Matt Haskell from ArtFX signs presented on Zoom and covered the proposed signs and
lighting.
Mr. Armstrong asked if the signs met all specifications. Mr. MacNichol indicated that they do
meet all requirements.
Town of Reading
0 Meeting Minutes
Mr. Wetzel asked about the timing on the signage lighting, Mr. Haskell indicated the sign
lighting would be on from 1 hour prior to opening and turn off 1 hour after closure and that
those timings were standard Dollar Tree policy. He stated that if it was an issue they could
work with Dollar Tree to meet the Town's needs.
Mr. D'Arezzo asked about a shadow shown on the rendering and Mr. Haskell clarified that
the signs would not be internally illuminated, only externally lit by the goosenecks. Mr.
D'Arezzo asked why 8 goosenecks were being proposed and the applicant indicated that the
number was based on the size of the signage and that they would be lower lumen than if
there were fewer goosenecks proposed.
Mr. D'Arezzo opened it up for public comment and there was none.
Mr. MacNichol reviewed the Certificate of Appropriateness with the members. Mr. Armstrong
noted that the condition needed updated for the lighting to be on after the close of business.
Ms. Clfsh made a motion to approve the Certificate of Appropriateness for 5
Hamden St Dollar Tree, as amended. Ms. Mateev seconded the motion, and it was
approved 5-0-0 (Armstrong, Clish, D'Arezzo, Mateev, Wetzel).
Public Hearina. Definitive subdivision Application
0 Harold Ave. Zero Harold Ave LLC
Mr. Wetzel read the public notice into the record.
Mr. lack Sullivan presented on behalf of the applicant with Attorney Mr. Chris Alphen. He
provided an overview of the site and reviewed the submitted plan sheets. He explained that
they will be splitting the lot into two parcels, with the rear parcel remaining separated with
some intention to possibly donate it to the Town as a conservation site as it is unbuildable.
He brought up that the applicant team had gone through multiple CRT meetings with staff
and that the Fire Department had indicated that if there was more than one house they
would require a cul-de-sac, so the decision was made to move forward with just one house
on the site. The waivers being requested are thus all related to the fact that no roadway is
being constructed for the project, just a driveway.
Mr. Wetzel kicked -off the Commission discussion, asking if the roadway was a 30ft right of
way with a 20ft paved portion and that as it was a private way, what that meant for them
and the applicant. Mr. MacNichol indicated that when a subdivision is being permitted off of
a private way, the applicant has to prove rights of access, and he provided some
background into the previous proposal that had been submitted some years ago and the still
open proof of access questions for the site. Mr. MacNichol indicated that Town Counsel is
currently reviewing what the applicant has provided for their proof of access to the private
way and that a memo will be forthcoming in a few weeks.
The applicant's attorney, Mr. Alphen, spoke in person about the title, the locus, and the
rights of access to the road. He asked for the opportunity to speak directly to Town Counsel
to resolve any issues. He reviewed the memos that had been submitted with the
application, the summary of which was that they believed that the locus has always had
access to the private roadway. He argued that they had submitted enough information to
prove they had rights to access.
Mr. Armstrong asked if the problem would be solved if they didn't have to subdivide. Mr.
Alphen indicated that for questions in front of CPDC it wouldn't change it. Mr. MacNichol
Town of Reading
40
Meeting Minutes
indicated that whether or not the access is solved, the subdivision is still required to prove
the frontage for the house; they need to extend the street to get the required frontage.
Ms. Clish asked staff if the Commission could approve a subdivision proposal if they aren't
sure they have rights of access. Mr. MacNichol indicated that this is a local issue, so they
could entertain a waiver for the access, or they could look at it and approve it if they
believed there wasn't a detrimental impact. Mr. Armstrong Indicated that he would be very
hesitant to approve if Town Counsel did not make it very clear that there was access. Ms.
Clish seconded that she felt they should not provide comments without Town Counsel. (Mr.
Weston arrived at 7:32pm.)
Mr. MacNichol brought up the issue of the Definitive Proof Plan not meeting the required
standard, although the applicant had requested to waive it. Mr. Sullivan spoke and said that
the standard cul-de-sac is for sight lines, but this is a one -lot subdivision on a one -lot road
which is why they felt it was appropriate to ask for the waiver.
Mr. D'Arezzo asked if this application would go in front of Conservation and Mr. MacNichol
confirmed that they would, and this application with CPDC would stay open until the
Conservation Commission approves.
Mr. Armstrong asked about the construction and the drainage design requiring significant
maintenance. Mr. Sullivan indicated that maintenance is a normal part of any site design,
and if the trench around the house isn't maintained then the basement garage would flood,
which is why it would be in the O&M. He indicated that the driveway maintenance obviously
will fall to the future owner. Mr. D'Arezzo asked some follow-up questions about the
drainage on the driveway and Mr. Sullivan covered which direction they anticipated the
water to drain in their design. Mr. Armstrong asked If the existing private road has a signed
agreement as to the ongoing maintenance of the road. Mr. Alphen clarified that he didn't
find anything, but that it doesn't mean it doesn't exist, his focus thus far had been on title
research.
Mr. Sullivan indicated that the last two houses on the road been developed under a PRD, so
they might have an agreement. Mr. Armstrong asked if the applicant would have any issues
with joining an existing road agreement and the applicant indicated they would have no
issue.
Mr. D'Arezzo opened it up for public comment.
Mr. Aram Boornazian, 9 Harold Ave, spoke in person and brought up some issues about the
site, including the existing wetlands, and brought up a point in the Subdivision guidelines
that an area not more than 6ft above the nearest wetland should be deemed unsuitable to
build, on page 8 of the subdivision regulations.
Mr. Len Joseph, also an attorney for the developer, spoke from Zoom and discussed his title
research. He pointed out that Harold Ave Is not currently a taxable parcel and he didn't
believe the road was ever deeded out.
Mr. Bill Cowie, 110 Van Norden Road, spoke from Zoom, he is the abutter just to the east
on the map. His concern is the stream coming off Van Norden Rd and that the entire area is
just a big wet area, and they at times get water into their cellar, so they will want to see
where that water is going and make sure it has an opportunity to subside before going back
and Into the wetlands. He asked if he should bring up those concerns to Conservation, and
Mr. D'Arezzo replied affirmatively.
Town of Reading
Meeting Minutes
Mr. Wetzel did indicate that there is a stormwater report, but that the Town Engineer has
not commented yet due to the other questions on the application.
Ms. Janine Sciuto, 45 Colburn Rd, right behind the project, spoke from Zoom asked how far
back the project will be going Into Colburn Rd, and how much of the landscape and trees
they will be taking down. Mr. Sullivan indicated that the proposed house is far from Colburn
Rd, that there will be 2 acres in between the house and the houses on Colburn Rd.
Ms. Fang Yu, 27 Harold Ave, spoke from Zoom and asked about the application being called
0 Harold Ave, and why in the Assessor databases it is listed as 0 Van Norden Rd and asked
why it is called one thing vs. another. Mr. D'Arezzo indicated that the number 0 is used to
indicated a property that doesn't currently have a number, not that it will ultimately be
called 0 Harold Ave.
Ms. Karen Cowie, 110 Van Norden Road, spoke from Zoom, and stated that although it is at
the end of the street Harold Ave the project will be clearly seen by 110 Van Norden.
Mr. D'Arezzo asked if they needed to vote to allow them to speak to Town Counsel and Mr.
MacNichol clarified that it wasn't required to vote for that.
Mr. Wetzel made a motion to continue the public hearing for the Definitive
Subdivision Application for O Harold Ave to February 12, 2024. Mr. Armstrong
seconded the motion, and it was approved 5-0-0 (Armstrong, Clish, D'Arezzo,
Mateev, Wetzel).
Continued Public Hearina, Site Plan Review Aoolication
413 Main St. McDonald's c/o Bohler
Mr. Dan Allen from Bohler Engineering presented on Zoom on behalf of the applicant. Mr.
Jason Adams from McMahon was on Zoom as well to answer any questions specifically
about the newly supplied traffic counts. Mr. Allen reviewed the changes from the last
meeting Including changing the fence material as requested, reducing the height of the
lights in the rear of the lot, changing the lighting at the request of the Conservation
Commission, and some additional analysis on traffic. He indicated that the site can handling
a doubling of traffic onsite and reviewed the newly provided stacking plan. He discussed the
proposed Decision condition that staff had presented and that McDonald's is amenable to
the condition proposed regarding future traffic.
Ms. Clish asked about traffic, inquiring if they expected cars to go through the drive-through
faster given the dual order -points. Mr. Allen indicated that there will be improvements to
the queuing time but that overall, they don't foresee the additional order point as a driver of
additional traffic. Ms. Clish stated that her concerns aren't with entering, but with the
potential backing up of the traffic on Main St due to cars coming out of the drive-through
onto Main St faster. Mr. Adams spoke from Zoom, again reviewing what they have seen at
the site in terms of traffic counts under the existing conditions and proposed. Ms. Clish then
asked to clarify what that does to the traffic backing up onto Main St if you have a car
coming out every 30 seconds instead of 60 seconds. Mr. Adams clarified that it is about 1
vehicle exiting every minute today under peak conditions, but it takes them 30 seconds to
exit the site. He stated that those exiting vehicles will be metered by the drive-through and
will still come out at a measured pace, even if they can order slightly faster. Ms. Clish asked
if the purpose of the second drive-through is to service customers faster. Mr. Adams
clarified that it is to better serve customers on-site as under existing conditions they cannot
serve all the vehicles that want to be served on site, so under the proposed experience they
can do more stacking on-site. Ms. Clish asked if the side-by-side drive-through was really
orR -
Town of Reading
Meeting Minutes
necessary. Mr. Adams stated that the dual drive-through is the new industry standard to be
able to better organize the kitchen. Ms. Clish argued that the second drive-through might
not be necessary. Mr. Allen indicated that the second order point allows the kitchen to keep
cars moving, so people don't get backed up behind a large order and it improves the
customer experience. Mr. Allen clarified that drive-through and sales data is considered
proprietary and they won't make specific site information available because it is considered
proprietary.
Mr. Weston spoke about his own research into quick -service restaurant data. His main
points of inquiry being to try to determine (1) if the proposed changes will result in
additional traffic to the site and (2) if that additional quicker processing time would lead to
more conflicts, on Main St or on Ash/Bolton St. He stated that at peak times, currently
traffic is usually queued up on Main St already, down towards Bagel World, so if you can get
through McDonald's drive-through a minute quicker it's not going to influence your decision
to go to McDonald's because of the existing quite bad traffic in the surrounding area. He
summarized that what the applicant won't say is that their order times currently are slower
than other fast casual restaurants like Burger King and others so that what they won't say is
that they are just trying to get back to normal processing times as compared to their
competitors. Mr. Weston reiterated this his concern isn't Main St, but the opening up of the
Ash St intersection, because right now there isn't anyone exiting there. Mr. Weston
indicated that the issue is actually on the Town side, not McDonald's side. Mr. Wetzel agreed
that the whole Main/Ash/Bolton intersection is an issue and that at some point the Town has
to make the decision about how to improve it and it comes back to the Town to decide how
and when they want to change the intersection. Mr. MacNichol brought up the efficiency of
exiting the site and concerns with queuing, which was the thought process that staff worked
on in designing the potential Decision condition.
Mr. Weston brought up his concern about the loading and that he saw an 18 -wheeler there
on-site at 6pm on a Friday night. Mr. Armstrong brought up the conditions related to the
loading spaces on page 10, number 32. He would like the loading zone to be required to be
coned off for use. Mr. Allen clarified that if the loading zone was removed they would
technically have enough spaces to meet zoning needs but that they would prefer to keep
them operationally. The members discussed that under existing conditions the lot is quite
open so if the truck is blocking off spaces it isn't an issue for cars to get around. Ms. Clish
asked how the truck would get into the proposed loading zone. Mr. D'Arezzo asked where
the truck is unloading into and Mr. Allen indicated it would be through the back door.
Mr. D'Arezzo asked about the queuing onto Main St and asked again to clarify the distance
between the pull-up window and Main St. Mr. Allen indicated that the distance in between
the pull forward window and Main St Is 30 ft. Mr. D'Arezzo indicated that the pull -forward
window isn't enough for the required stacking out onto Main St. Mr. D'Arezzo asked where
employees would exit from in order to bring food out to someone in the pull forward spaces.
He stated that the issue for him was that the drive-through does not having 54 ft of
stacking capacity exiting out onto the road. Mr. Allen indicated that the second window
towards the exit is a not the primary pick-up window.
Mr. Armstrong asked about the landscaping and the proposed changes along Bolton St. Mr.
Allen covered the landscaping changes proposed and the shrubs being proposed along
Bolton St in response to prior comments. Mr. Armstrong stated that he wanted to reduce
the view of the parking lot from the road. Mr. Armstrong asked about the fence proposed
between McDonald's and Chase Bank to the north and the Commission members debated if
a fence was even needed at the site. Ms. Clish asked why force people to climb a fence from
Chase Bank over to McDonald's. Mr. Weston argued that kids are going to cut through the
parking lot from the bank and he would prefer not to have a fence. The members decided
Town of Reading
0 Meeting Minutes
that no fence was better than the proposed fence. The Commission members discussed
other fences in the area like the Dunkin across the street and their guardrail fence. Mr. Allen
clarified that they would be fine with no fence, and the Commission members agreed that
they would prefer no fence in the front, only near the rear with the dumpster and the
applicant agreed to those changes.
Mr. Armstrong asked about some items during construction, and he asked about sheet C-
904 and the directional signage shown. Mr. Allen clarified that those directional signs would
be at the entrances and exits and those ones are allowed to be slightly larger than the rest
of the directional signage allowed on-site.
Mr. Weston opened up the hearing up for public comment.
Mr. Dave Talbot, 75 Linden St, reminded CPDC that over 100 people had signed a petition
to oppose this type of development. Mr. Talbot reiterated that no traffic counts have been
supplied. Mr. Talbot brought up slides to cover his points comparing this to the North
Reading McDonald's location and his own traffic counts from the North Reading location. He
asked CPDC members to reject the application and use their creative thinking to find a way
to deny the application.
Ms. Nancy Docktor, 371 Pearl St, spoke from Zoom. She indicated she was confused on the
drive-through design and asked if employees will walk out through exiting cars in the drive
aisle to deliver food to the pull forward spaces and Mr. Allen confirmed yes. Ms. Docktor
asked if the on-site lights would operate the same as Dollar Tree and Mr. Allen confirmed
yes. Ms. Docktor asked if in the future we could ask for more money from McDonald's for
the intersection. Mr. Weston indicated that the issue in the future is that we don't know
what the desired fix for this would be in the future.
Ms. Clish asked what recourse they would have if this does cause a bunch of traffic. Mr.
Armstrong discussed that it is a difficult intersection and asked about the possibility of
putting boxes in front of the exit. Mr. Armstrong spoke about the improvements to the
building and perhaps about a report back period. Mr. Weston spoke that the loading zone
should be addressed in the conditions, that if the Police note an issue with the loading zone
that it should be able to be retroactively addressed. Mr. Wetzel stated that the real issue
with the application is that the process has identified a lot of problems, but that there aren't
clear solutions.
Mr. MacNichol spoke that Staff interpreted the drive-through from the primary pick-up
window. Ms. Clish asked to clarify if the pull -forward window would be used. Mr. Allen
indicated that it is their prototype but it isn't used always. It's a secondary point. Mr.
Weston asked about waiving the drive-through length stacking as the Commission members
made clear they didn't share Staff's view. There was a discussion about if there was a
condition needed about removing the second window and figuring out how to waive the
drive-through windows.
Mr. Talbot spoke again in person about the North Reading site and asked that the CPDC
request additional funds than the mentioned $25,000.
Ms. Andrea Farina, 1 Pinevale Ave, spoke in person, she said that she wasn't sure who
decides what in town and that we should leverage this development to improve the
intersection. She said that she wanted to second that the Main/Ash/Bolton intersection
should be addressed.
Town of Reading
0 Meeting Minutes
Mr. Wetzel asked about if the Town had an idea of how much any of the Green International
concepts would cost and Mr. MacNichol indicated that at that time those plans weren't
completed to that level to have cost estimates because a preferred option has never been
chosen.
Mr. Weston asked for any final public comment and moved to closed the public comment
period.
Ms. Clish made a motion to close the public hearing on the Site Plan Review for
413 Main St. Ms. Mateev seconded the motion, and it was approved 5-0-0 (Clish,
D'Arezzo, Mateev, Weston, Wetzel).
Mr. MacNichol reviewed the draft Decision with the Commission members. Mr. Armstrong
asked about the language on deliveries and changed it to "will" schedule in relation to
delivery times. Mr. Armstrong asked if there should be language about the fencing in the
landscaping section and Mr. MacNichol indicated he preferred to address it in the conditions.
It was added on Page 9 as a condition. Mr. D'Arezzo brought up that the signage still
doesn't meet requirements and Mr. Weston asked a sentence be added to clarify the
Commissions intentions on the signage they were approving, irrespective of what is shown
on the plans.
There was a discussion amongst the Commission members about the proposed condition
language on traffic impacts. Mr. Weston wanted the applicant to pay the percentage of the
improvements that are based on the utilization of the intersection - thinking primarily about
Bolton/Ash St. There was a discussion around how to quantify future changes with traffic
counts and changes. They discussed future vehicle utilization of the site and how it would
show operational issues and what that would look like. The members discussed many
wording options for the potential condition. Their intention was for future payments into any
proposed improvements to be based on McDonald's proportional share of the traffic
utilization to/from the site. They left the final wording of the condition to Staff and the
applicant team, who would have to get approval from McDonald's corporate.
Mr. D'Arezzo made a motion to grant the Special Permit for a not illuminated
monument sign in Business -B. Ms. Clish seconded the motion, and it was approved
5-0-0 (Clish, D'Arezzo, Mateev, Weston, Wetzel).
Mr. D'Arezzo made a motion to approve the waiver request from section 9.1.1.7 to
provide two loading spaces on site. Mr. D'Arezzo made a motion to request the
waiver be amended from two spaces dawn to one space, requiring them to have a
permanent loading space. There was no second, the amended motion failed. The
original motion for two spaces was seconded by Ms. Clish. It was approved 4-1-0
(Clish, Mateev, Weston, and Wetzel in favor, D'Arezzo opposing).
Mr. D'Arezzo made a motion to approve the Decision for the Site Plan Review
Application for 413 Main St, as amended. Mr. Wetzel seconded the motion, and it
was approved 5-0-0 (Clish, D'Arezzo, Mateev, Weston, Wetzel).
Continued Public Hearing, Site Plan Review Application, Special Permit,
Stormwater Permit
2S2-262 Main St / 10 Pinevale Ave, BLVD Reading LLC
Mr. Chris Latham was in person to present on behalf of the applicant with Mr. Carlton Quinn.
Mr. Latham reviewed the overview of the properties, existing conditions, and the
application. He reviewed the proposed changes from the prior meeting and discussed the
Town of Reading
F g
Meeting Minutes
proposed changes summarized in the slides. Mr. Carlton Quinn with Allen @ Major
Associates then reviewed the revised plans, including changes to the parking layout, the
removal of all items from the 100ft wetland buffer shown and the change of the Pinevale
Ave drive into an "exit only".
Mr. Weston started off the Commission's discussion by noting the large amount of public
comment from the last meeting and set expectations for the public on the discussion for this
meeting.
Mr. D'Arezzo asked if the new plans had been commented on by the Fire Department and
staff clarified that the new plans hadn't been formally commented on by any staff due to
their late submittal, but that the Fire Department had previously noted that they were
conceptually fine with an 18ft drive aisle in the parking lot as long as the turning
movements still worked.
Mr. Weston asked about the engineering memo comments and Mr. Carlton Quinn indicated
that he had spoken to Town Engineer Ryan Percival and anticipated being able to work
through all the concerns with no issues.
Mr. Wetzel asked about the building being made 8ft smaller, noting that the 8ft was taken
from the south side instead of the side nearest the direct abutter. Mr. Quinn indicated that
was because of the ask for more landscaping in the parking lot. Mr. Wetzel stated he would
prefer to see more of a buffer between the neighbor rather than more trees in the parking
lot. He also asked about the patio for the commercial building and why it was removed, as
he considered it a desirable amenity for a restaurant. He asked why the South Main St
Design guidelines ask for more landscaping towards the street and their design instead has
almost no landscaping between the building and the street. Mr. Wetzel asked about the
input from MassDOT and Mr. Quinn Indicated that would happen after they have an
approved plan from the CPDC. Mr. Wetzel asked about the proposed potential pocket park
on Star Road and it requiring the approval of the direct abutters who own the paper street.
Ms. Clish asked about the location of the building on the site and why the building was being
chosen to be sited so close to the direct neighbor. Mr. Quinn indicated that moving the
building elsewhere on site to the south meant that the curb cut on Main St would be
significantly closer to Pinevale and the design would end up with dead-end parking behind
the building. Mr. Quinn asked about the prior site plan approval for the site and its design.
Mr. Latham clarified that moving the building is an issue with entrances/exits being too
close to the intersections on Main St and the Town's Engineers citing it as an issue. Mr.
Quinn argued that moving the building to the south makes the vehicular traffic Flow on site
worse, the decision to move it just needs to be weighed against the other options. Ms. Clish
asked to hear more about the options for moving the building away from the home. Mr.
Weston seconded that request.
Mr. Weston clarified that from his perspective, this is a unique review for CPDC as a special
permit as unlike the McDonald's application there is more specific criteria that will need to
be met. Mr. Weston argued that this site is not just part of the Main St neighborhood, but it
is also part of the Pinevale neighborhood and that Is where he is going to evaluate the
Special Permit criteria both by its relation to the Main St neighborhood as well as the
Pinevale neighborhood.
Mr. Armstrong asked about the excavations and soil being removed and if the excavation of
all that material wouldn't impact the wetlands behind the site. Mr. Quinn indicated they are
currently in front of the Conservation Commission and any impacts would be discussed with
them. Mr. Armstrong surmised that lowering the site improves the overall height of the
Town of Reading
0 Meeting Minutes
building but wondered if any of that soil could be used for berms between the neighbors.
Mr. Armstrong stated that he preferred the new revised parking lot layout versus the
original presented. He asked where mail delivery was and the applicant team stated it will
be in the rear of the building within the main resident lobby. Mr. Armstrong said he wasn't
sure the rideshare parking is in the right spot. He questioned the location of the trash
dumpster and if there would be in -building trash chutes or anything like that. Mr. Armstrong
was interested in the resident thoughts about the removal of soil, the elevation height of the
building, and the proposal for a pocket park. Mr. Armstrong indicated he would prefer them
to come to a joint parking agreement with the commercial neighbor to the southern side to
share parking. Mr. Armstrong asked about visitor parking and Mr. Quinn indicated there is
no reserved parking on site, it is all first come first serve.
Mr. Weston asked about the viability of the commercial spaces and the sizes proposed, he
pointed out the access and size of the third proposed commercial space, and the viability of
those commercial spaces being so far away from the parking and being so far away from
Main St. He viewed it as a bad spot for retail and wasn't sure the developer would have
success in filling the spaces.
Ms. Clish brought up that she wanted more thought as to it fitting in with the neighborhood.
Ms. Clish had noted the item from South Main St Design guidelines relating to the fourth -
floor setbacks, and indicated that she would like to see it stepped back on the fourth floor.
Ms. Mateev highlighted the design guidelines for the DSGD and indicated she would like to
see a design more in step with those, clarifying that the changes in the facade are so
minimal that they don't respond to the buildings on either side.
Ms. Benedetto asked about the Commission if the members would be interested in providing
parking waivers when considering the parking lot design. Mr. Wetzel indicated he thought
the building was too large for the site and noted the questions about parking on Pinevale
Ave due to its narrow exiting condition. Ms. Clish stressed that the building and units and
commercial spaces are too large for the site and for the required parking spaces. She
believed there is no place for overflow parking, so the parking needs should be reduced so
there are extra spaces. Mr. Quinn clarified that it sounded like they meant they wanted a
higher parking ratio and Ms. Clish stated no. Mr. Quinn followed up because in asking for
overflow spaces the only way to achieve those would be through a higher parking ratio. Mr.
Armstrong indicated that if the site had a shared parking agreement then it meant that he
would be fine with reducing parking requirements on site. He seconded that he would
consider the division of commercial spaces to be unfavorable to future tenants. Mr. Wetzel
brought up that the parking lot to the south Isn't anything special but that if they could open
it up that way they could close the Pinevale exit. Ms. Clish asked for more Information about
the retail spaces and tenants and stated that she wasn't inclined to offer more advice.
Mr. Weston opened it up for public comment, but asked residents to be respectful of the
time being 11pm.
Mr. Dan Cronin, 55 Pinevale Ave, spoked in person and proposed moving the building down
to the south in the lot and putting together the shared parking arrangement with the next
parking lot. He brought up all the concerns going out at Pinevale Ave and residents being
"trapped" on the street behind others trying to exit onto Pinevale. He asked how the
applicant was planning on addressing these concerns.
Ms. Debbie Riberio, 15 Pinevale Ave, spoke in person stating that the egress off of Pinevale
Ave was offensive.
Town of Reading
0 Meeting Minutes
Ms. Joan Guidi, 54 Pinevale Ave, spoke in person stating that the counter proposal is an
insult to the neighborhood and that it isn't fair. She is opposed to the proposal to tear down
10 Pinevale Ave. She stated that it is a money grab.
Ms. Laura Richards, 50 Pinevale Ave, spoke in person and had provided slides in which she
covered the issues she had noted in the transportation impact assessment provided by the
applicant. She cited current traffic issues with their street and the construction impacts, and
her concerns with the walkability of their street.
Mr. Chris Murphy, 19 Pinevale Ave, spoke in person and made a comparison between this
site and the buildings in downtown.
Mr. Tom DeCroteau, 20 Pinevale Ave, spoke in person about the water Flow, and that the
area already has Flooded basements and yards during storms and the water shouldn't go
back into the wetland but out to Main St.
Mr. Ken Reardon, 25 Pinevale Ave, spoke in person on the proposed InFlltration system,
asking for clarification on where the discharge system would be discharging the water. Mr.
Quinn indicated it would be discharged into the ground onsite and that they had completed
the test pits to determine that the soils are appropriate and Mr. Wetzel asked a few follow-
up questions about it. Mr. Reardon noted that the current pitch of the lots drain out to Main
St. and cited that many neighbors run sump pumps year round. He cited statistics about the
rainwater and how much water will be onsite and reiterated the neighborhood concerns. He
asked about the charging stations and if they count as parking spots and how their usage is
done. He asked why in the downtown zone parking lots are allowed to provide only 25%
compact spaces, with other sections of town being allowed up to 30% compact spaces.
Mr. Mike Farrell, 2 Pinevale Ave, spoke in person about his concerns as the owner of the
directly abutting building closest to the proposed building. He is concerned about the
shadows, rooftop amenity space, and concerns for the space. He submitted a written letter
as public comment.
Ms. Clish made a motion to continue the public hearing for the Site Plan Review
Application, Special Permit, and Stormwater Permit for 252-262 Main St / 10
Pinevale Ave to February 12, 2024. Mr. D Arezzo seconded the motion and It was
approved 5-0-0. (Clish, DArezzo, Mateev, Weston, Wetzel).
Other Business
MBTA Communities zoning — Mr. MacNichol presented some smaller versions of the
existing concept, as requested at the 12/22 hearing.
Mr. Wetzel brought up that people kept asking why it couldn't be in other areas and though
the Commission members understood the majority of why, this was going to be the primary
question to answer though the hearings.
Ms. Benedetto asked the members if they would be amenable to adding a maximum lot size
into the proposed MR district and the members indicated they were all amenable to the idea
if it was possible, as it would reduce concerns about the combining of lots to create large
lots with high unit counts.
Mr. Weston and Ms. Clish expressed preference for 1.5 parking spaces/unit, as brought up
at the first hearing.
10
Town of Reading
OI'R b
Meeting Minutes
Adlournment
Ms. Clish made a motion to adjourn at 11:4S PM, Ms. Mateev seconded and it was
approved 5-0-0 (Clish, D'Arezzo, Mateev, Weston, Wetzel).
Documents Reviewed at the Meeting:
0 Annette Lane Continuance Request
5 Hamden St Sign Permit Application
o Sign Renderings
o Draft Certificate of Appropriateness dated 1/8/24
0 Harold Ave
o Site Plans, dated 11/4/23
• 413 Main St, McDonald's
o Landscape Plan, Lighting Plan, Stacking Plan, dated 12/15/23
o Slides, submitted by resident Dave Talbot
o Draft Decision, dated 1/8/24
• 258 Main St, Strada
o Presentation slides, by applicant
o Plans, dated 1/3/24
o Presentation slides, by Ms. Laura Richards
MBTA Communities Zoning Amendments
o Slide with smaller map versions
11