HomeMy WebLinkAbout2021-12-20 RMLD Citizens Advisory Board Minutesg
Town of Reading
43 Meeting Minutes
o..oa'e
RECc'IVED
TOWN CLERK
READING, MA.
OV -1
2022 MAY 26 PM 12; 29
Board - Committee - Commission - Council:
RMLD Citizens Advisory Board
Date: 2021-12-20
Building:
Address:
Purpose: General Business
Time: 6:00 PM
Location:
Session: Open Session
Version:
Attendees: Members - Present:
Mr. Jason Small, Chair (North Reading); Mr. Vivek Soni, Vice Chair
(Reading); Mr. Dennis Kelley (Wilmington)
Members - Not Present:
Mr, George Hooper, Secretary (Wilmington); Lynnfeld Position Vacant
Others Present:
Staff: Ms. Coleen O'Brien, Mr. Hamid laffari, Ms. Wendy Markiewicz,
Ms. Erica Morse, Mr. Gregory Phipps, Ms. Janet Walsh
Mr. Philip Pacino, RMLD Board of Commissioners
Minutes Respectfully Submitted By: Mr. Jason Small, Chair!`
Topics of Discussion:
PER GOVERNOR BAKER'S MARCH 10, 2020, ORDER SUSPENDING CERTAIN PROVISIONS OF
THE OPEN MEETING LAW, G.L. c. 30A, §20 AND THE JUNE 16, 2021, ACT EXTENDING
CERTAIN COVID-19 MEASURES, THIS MEETING WAS HELD REMOTELY VIA ZOOM.
1. Call Meeting to Order - J. Small, Chair
Chair Small called the meeting of the Citizens' Advisory Board to order at 6:00 PM and
noted the meeting was being audio recorded. Chair Small asked all members present to
state their names.
2. Approval of Minutes - J. Small, Chair
Materials: Draft Minutes from February 24, 2021, April 22, 2021, July 19, 2021, August
12, 2021, and September 23, 2021.,
Mr. Kelley made a motion that the Citizens' Advisory Board approve the minutes of the
February 24, 2021, April 22, 2021, July 19, 2021, August 12, 2021, and September 23,
2021, meetings as written, seconded by Mr. Soni. Motion carried 3:0:1 (3 in favor, 0
opposed, 1 absent) by roll call vote of those present: Mr. Kelley, aye; Mr. Soni, aye;
Chair Small, aye. Mr. Hooper was not present.
3. General Manager's Update - C. O'Brien, General Manager
Ms. O'Brien reported that the 2022 historical calendars are now available. An Electric
Vehicle Charging Strategies Webinar is scheduled for February 1st at 7:00 PM and will
provide education on electric vehicles and RMLD rebates to promote electrification.
Page 1 1
Planning is underway for the Renewable Choice program launch, High School Art Contest
kickoff, and the Elementary Art Contest awards ceremony.
Ms. O'Brien reported that ENE has received the Vineyard Wind bid award; negotiations
with Vineyard Wind will occur between now and April. ENE will determine how the output
will be allocated amongst its members. The RMLD looks forward to being part of future
wind opportunities as they continue to be built south of Massachusetts and then possibly
all the way up the east coast. More Information will be provided as it becomes available.
An email regarding the award was sent to the CAB earlier in the day. -
Ms. O'Brien provided an overview of recent legislative meetings that were set up and
attended by ENE. Discussions Included Green Communities and the omnibus bills
pending this session. Ms. O'Brien encouraged to allow for each community to apply for
Green Communities Individually.
Ms. O'Brien reported that the RMLD was not able to move forward with an Innovate
Mass grant with the Wilmington Housing Authority on thermal storage heat pump
technology at this time. Taunton Municipal Light will be moving forward with an
application and RMILD will follow their progress for lessons learned and then consider
moving forward with Wilmington on the next round. The difference between Taunton and
Wilmington is that Taunton Housing Authority currently uses (fossil fuel) oil burners,
which are at the end of their useful life. The units are maintained by the Housing
Authority so there is immediate value if they were to get a grant to eliminate fossil fuel.
The Wilmington Housing Authority (2D units) uses resistive heat, and it is not very costly
to maintain for the Housing Authority but is expensive for the customer to run. Ms.
O'Brien noted one of the bilis coming out includes funding to help all housing authorities
in Massachusetts with heat pump upgrades.
Ms. O'Brien reported the ARPA (American Rescue Plan Act) health and economic
stimulus package (in response to COVID) will provide some funding for electrification.
Discussion ensued regarding the various grant and funding opportunities potentially
available through the State.
Ms. O'Brien reported that staff will be releasing the construction bid for the five Level II
EV chargers. As directed by the AG's office, the bid will list the Reading sites and the
Wilmington sites as alternates. This will allow contractors to bid on both and the award
will be determined based on whether Wilmington has signed their license agreement.
4. Integrated Resources Report - G. Phipps, Director of Integrated Resources
Materials: Decarbonization Strategy of RMLD Power Supply (Presentation Slides)
Mr. Phipps began review of the presentation slides, Decarbonization Strategy of
RMLD Power Supply, with a review of the 2021 YTD Power Supply Costs (Slide 3)
noting the slide being presented has been updated from what was included the packet.
The data is the same, but the RMLD budget line (purple) was added. Mr. Phipps noted
the total purchase power (on the left side) is the sum of energy, capacity, and
transmission (reported in dollars). The RMLD budget line (purple), is straight -lined
across (the annual budget divide by 12). The inputs for the ENE forecast look at the
seasonality associated with power supply costs. Capacity and transmission, and much of
energy are driven by established rates, and in the case of energy, longer term contracts,
and usage equivalents. The variability of usage equivalents is driven primarily by
weather, specifically MWHs for energy usage and MW peaks in the case of capacity and
transmission. The RMLD team dampens these seasonal changes via the fuel and PPCT
monthly rates.
The snapshot presented is as of October 2021 YTD, with total purchase power just under
$lm below (RMLD) budget. The key driver Is that energy is higher ($824k) than budget,
which is driven by higher usage due to weather. Capacity and transmission are lower
P., 12
than budget. It is expected the total of all three will come in below budget by the end of
the year.
Mr. Soni asked relative to energy costs, If the forward contracts have kept RMLD prices
(costs) relatively lower; spot prices would have actually been much higher (for natural
gas). Mr. Phipps said that was correct. On average somewhere between 10-20% of
energy (depending on the time of year) Is the open position, which is market-driven
pricing. The resultant 80-90% is contract prices so there is less variability. What is
shown is (primarily) a usage driven change.
Mr. Phipps then reviewed Decarbonization Context and Implications (Slide 4), noting the
Climate Law, put into place in 2021, is going to result in an increase to the regional load
and most likely the RMLD load, which is forecasted to grow 60-70% by 2050. In that
same time period, the Climate Law's focus on non -carbon generation is going to phase
out the majority of the natural gas generations that are in place right now; those natural
gas generators represent (on average) about half of the current power supply in the 1SO
New England region.
Mr. Phipps outlined the challenges of acquiring hydro, wind, and solar generation
projects. Staff is contracting as much hydro as possible but, in terms of the regional
area, there are no new hydro facilities being built. RMLD is trying to position itself to
contract existing (hydro) contracts as they expire. Hydro will offer some new
incremental regional supply additions, but nothing substantial. Significant solar and wind
generation assets need to be built but they will face delays and limits. Regardless, RMLD
will aggressively go after these projects. Mr. Phipps reviewed some of the current
initiatives underway including the Broadleaf Project and the Seabrook solar project. In
summary, demand is going up and identified supply is going down, which puts upward
pressure on both price and availability. Looking forward, it will be prudent for RMLD to
contract a larger portion of Its forecasted purchases further out than we had in the past.
Mr. Phipps then reviewed (Slide 5) Characterization of Non -Carbon Gen Assets. The blue
line on the chart on the left shows the seasonality of RMLD load with a peak in the
summer. The actual (regional) output for solar, wind and hydro are shown in the colored
areas. Wind and solar are very good generators from a non -carbon perspective, but they
are intermittent. Hydro output is seasonal; the maximum output is tied to higher
springtime runoff flow (March, April, and May). Into August and September, when the
RMLD load Is high, the rivers tend to dry up and output reduces. Wind, like hydro, is
strongest in the winter and lowest in August. Solar is a bit stronger in the summer, but
not as strong in the winter (fewer daylight hours).
Mr. Phipps then reviewed the daily generation (chart on the right-hand side). The blue
line represents RMLD's daily load, and the orange line is the actual (2020) output of all
the solar generators in New England. Most of the generation Is in the middle of the
afternoon, and our load (or need) is late afternoon/early evening. In summary, solar,
hydro and wind are all seasonal. They are all intermittent and they are all valuable to
the RMLD portfolio, but RMLD cannot build its entire portfolio just on those assets; a
carefully crafted mix is required.
Moving to Slide 6 (RMLD Decarbonization Transition), Mr. Phipps noted the data is
carried out through 2049. The supply to be acquired (load) is the top of the stacked
bars and represents the load growth that is anticipated (driven by electrification). In
2021 RMLD will end up roughly around 6591k MWH sales versus 651k MWH sales in 2020
or about a 1.2% growth between 2020 and 2021. The RMLD annualized target (the dark
line) represents certificate retirements. RMLD will need to add to its portfolio as we get
out past 2025 all the way to 2049.
To the extent possible, within the context of availability as discussed earlier, wind, solar
and hydro generation need to support the majority of that growth, but RMLD will also
Page 13
need to add nuclear. Specifically, the proposed plan is to Increase nuclear to nearly 40%
of total supply mix. The intention is to fill what used to be called "base load" to allow a
reliable, steady, support of power when the intermittent sources are not producing
energy. Battery storage will also fit into the portfolio. The graph is a snapshot of how
staff is thinking about the RMLD decarbonization strategy going forward and the
importance of nuclear as part of that strategy.
Mr. Phipps stated there are only two remaining nuclear sites - one in Seabrook, New
Hampshire, and the other in Milford, Connecticut (Millstone with two reactors). One of
the Millstone reactors is licensed through 2035, and the second is licensed through
2046. The Seabrook license extends to 2049. RMLD will pursue a balance of Millstone
and Seabrook so that the risk, in terms of supply, is spread across those three reactors.
Mr. Phipps asked if there were any questions.
Mr. Kelley noted that (per the chart) the further you go out (in time) hydro and wind
(contracts) are less and less. Mr. Phipps respond that was correct. RMLD is going to try
where possible to keep hydro at somewhere around 20%, but there is a lot of
competition for hydro since the Climate Law passed. RMLD is well positioned to take
existing (hydro) contracts and extend those out, and to increase hydro. However, it will
not be much more than what it is in 2024/2025 In terms of capacity because additional
hydro facilities are not being built in any noteworthy quantity. Most of the supply growth
is going to be in solar and wind. At the end of the day, RMLD will have to replace more
than half of the natural gas supply In the portfolio right now (shown in purple "mixed").
The only choices are nuclear, wind, solar and hydro, until someone creates something
new and different.
Mr. Phipps then reviewed the current proposal as outlined on Slide 7 (Power Supply -
Nuclear). RMLD would like to increase nuclear sourced energy between 2025 and 2049
up to 40%; RMLD's nuclear (supply) currently peaks out around 36% in 2035-2040.
Incremental volume is roughly 60k megawatt hours or 9% (moving from -27% up to
-36%). RMLD does not want to fill the portfolio until 2025 given what is already in
place, which is why the proposal gives steps in 2026, 2030, 2036, and 2040, basically
extending existing contracts that would be expiring at that point in time. Because of the
requirement to be non -carbon compliant (100% by 2050), future contracts need to have
EFECs. Currently, there is one LOI (letter of Intent) with Seabrook on the table, and staff
is working on a second LOI with Millstone. In both cases, pricing is going to be roughly
10-12% higher than average 2022 prices, which is good, but also keeps the relative
upward pressure down. Mr. Phipps asked if there were any questions.
Mr. Soni asked for confirmation that Policy 30 did not set limits on the amount of nuclear
(in the portfolio). Mr. Phipps confirmed it did not. Mr. Soni asked about the logic for the
40% limit; hypothetically, could it go up to 60% if possible. Mr, Phipps responded that
the 40% is really about risk management and leaving options open for any future new
technology. There are currently three reactors; they all have great track records in
terms of being reliable base -load power, but we want to make sure, from a sourcing
perspective, that RMLD does not put too many eggs in one basket; the life cycle of these
three reactors currently expires in 2049.
Discussion ensued about the risk and benefits of being limited to 40% and whether the
motion should be changed to allow more than 40%. Ms. O'Brien noted the motion is a
recommendation by the General Manager, and she would not recommend going above
40%. The RMLD should stay with the strategic plan that was put together. Staff can
come back and ask again but based on 40 -years' experience for portfolio building, RMLD
should not put more eggs in one basket. Staff can see what happens, but that is a
perfect portfolio for base. RMLD wants to balance the Seabrook with the Millstone.
Chair Small stated if there are no further questions, he would entertain a motion
Page 14
Mr. Soni made a motion that the Citizens' Advisory Board recommend that the Board of
Commissioners vote to accept the General Manager's recommendation to add additional
supply contracts from Seabrook and/or Millstone nuclear facilities such that total nuclear
does not exceed 40% of RMLD's annual power supply portfolio, seconded by Mr. Kelley.
Motion carried 3:0:1 (3 in favor, 0 opposed, 1 absent) by roll call vote of those
present: Mr. Soni, aye; Mr. Kelley, aye; Chair Small, aye. Mr. Hooper was not present.
Mr. Phipps then presented Information regard Battery Storage (Slide 8) as part of the
RMLD portfolio. Staff will be presenting a proposal in January or February for additional
battery storage within the RMLD network. Mr. Phipps reviewed the economic, reliability
and resiliency benefits of battery storage. The chart (lower left) represents actual output
from one day in September when the battery (at Station 3) was turned on. The blue line
is the generator, and you can see the (corresponding) load drop. This is very good from
an economic perspective in terms of peak management as well as shifting power. Staff
has prepared a roadmap for placing batteries within the network and will come back to
the CAB with a more detail proposal.
5. Scheduling - J. Small, Chair
• January CAB Meeting - pending confirmation of January Board of Commissioners
meeting date.
• Coverage for January Commissioners Meeting - Mr. Soni will tentatively cover,
pending confirmation of date for Board of Commissioners meeting.
6. Adjournment - J. Small, Chair
Mr. Kelley made a motion to adjourn the Cltizens' Advisory Board meeting, seconded by
Mr. Soni. Motion carried 3:0:1 (3 in favor, 0 opposed, 1 absent) by roll call vote of
those present: Mr. Kelley, aye; Mr. Soni, aye; Chair Small, aye. Mr. Hooper was not
present.
The meeting adjourned at 6:45 PM...
As approved on May 23, 2022.
Page 15