HomeMy WebLinkAbout2020-10-28 Recreation Committee Minutes - Birch Meadow Working Group TOIAIP! CLERK
2,111 NOV -2 PM 2 46 ACTIVITAS
landscape archdecfure civil englneenng
MEETING NOTES
Subject: Working Group Meeting
Project: Town of Reading-Birch Meadow Master Plan
Project No. 20009.00
Issue Date: 2 November 2020
Meeting Date: 28 October 2020
Prepared By: Stephen Crisafulli, Landscape Architect
Attendees: Genevieve Fiorente, Recreation Kevin Bohmiller, Community Services
Ryan Percival, Reading Engineering Mike Wondolowski, Reading Little League
Mark Novak, Activitas Stephen Crisafulli , Activitas
GENERAL
4.0.01 The following Meeting Notes are compiled from a scheduled master plan
meeting with the Master Plan Working Group,Town of Reading (TOR) and
Activitas (ACT),for the Birch Meadow Master Plan Project.
4.0.02 The items and comments are not listed in order of the discussion, but are grouped
by topic for easier reference and interpretation.
DISCUSSION
ITEM NO. I ACTION ITEM(New Items In ifolics)
BY/DUE
4.I DESIGN UPDATES
4.1.01 Activitas reviewed with the Working Group the updated preferred master
plan design and noted the following changes:
• Flipped the location of the pickleball courts and playground per
earlier discussions.
• Rotated the basketball courts for optimal solar orientation.
• Added discus to the Stadium-Activitas will shift to norther"D"
area to minimize conflicts at the hack finish line.
• Removed the javelin from between Turf 11 and the softball fields-
Activitas has reached out to Tom Zayo for clarification on how
javelin is laid out at the Stadium and update the plan accordingly.
4.1.02 Activitas has also added conceptual pedestrian and parking lot lighting
throughout most of the site.
4.2 COST OPINIONS
activuas com 70 Milton street I Dedham. Massachvsetfs 1 02026-2915 17811 326-2600
Meeting Notes
28 October 2020
Town of Reading-Bi2h Meadow Master Plan
Working Group Meeting
Page 2 of 3
ITEM NO. ACTION ITEM IN..Ill In Bdics)
BT/DUE
4,2,01 Activitas has started pulling together detailed cost estimates and noted
that they will be broken up into different phases to assist in developing a
project prioritization list. Acfivitas and the Working Group will review in
more detail at the next meeting to discuss prioritization.
4.2.02 It was noted that athletic lighting should be carried on all fields and
broken out as a separate line item.
4.3 NEXT STEPS
4,3.01 The Working Group has nailed down a target date of Wednesday,
November 18th to hold a virtual public presentation. Acfivitas discussed
successful ways they have held such meetings with other municipalities
throughout the pandemic. The suggested agenda is as follows:
• Give brief overview of where we have been, where we are now,
and where we are going
• Only the preferred master plan option will be presented, however,
we will discuss the different options and feedback that led to the
preferred master plan.
• Walk the public through the preferred master plan option.
• Discussion on projected costs and project prioritization
• Open the webinar up for public comments and questions, limiting
each person to roughly 30 seconds in an effort to maintain order
and stay on schedule.
4.3.02 Acfivitas noted that a live chat bar will be available throughout the
entirety of the presentation and that they would have someone from their
office dedicated to answering questions via chat.
4.3.03 it was noted that the Select Board is still inquiring about progress and
status of the master plan project. In addition to a project update
memorandum submitted to the Town on October 191h,Activitas
suggested setting up an informal virtual meeting to update the Select
Board prior to the public presentation. The Town will touch base with the
Select Board and follow up with the Working Group.
4.3.03 The Town noted that considerations for the Capital Improvement Plan
should be submitted by the end of January. They also noted that at least
two public meetings with the Select Board should be anticipated. The
working group will target some dates in December to get in front of the
Select Board.
NEXT MEETING
4.4 The next meeting will be on Monday, November 2nd at 1 lam and will be
held virtually via GoToMeeting.
act—las.cam 70 Milton Street I DedhamMassachusetts 1 02026-2915 (781) 326-2600
Meeting Notes
28 October 2020
Town of Reading-Birch Meadow Master Plan
Working Grand Meeting
Page 3 of 3
ITEM NO. ( ACTION I ITEM(New Hemi in ItWlcsJ
Bl DUE
The preceding meeting notes represent our understanding of the information exchanged. Please
notify us of any misunderstandings or required interpretations, within five days, as we will proceed
on the basis that these items are agreed to by all parties.
Respectfully,
ACTIVITAS
c=L-
Stephen CrISGfUIII, RLA
Landscape Architect
sro0activitas.com
activRas.cam 70 Milton Street I Dedham. Massachusetts 1 02026-2915 D8)) 326-2600