Loading...
HomeMy WebLinkAbout2019-11-21 RMLD Board of Commissioners Minutes f< EUEIvtu TOWN CLERK : Town of Reading R{ F. riin r; 'dA Meeting minutes 2021 JAN 13 AM 5: 31 Board -Committee- Commission-Council: RMLD Board of Commissioners Date: 2019-11-21 Time: 07:30 PM Building: Reading Municipal Light Building Location: Winfred Spurr Audio Visual Room Address: 230 Ash Street Session: Open Session Purpose: General Business Version: Final Attendees: Members- Present: David Talbot, Chair; John Stempeck, Vice Chair; David Hennessy, Commissioner; Thomas O'Rourke, Commissioner; Philip B. Pacino, Commissioner Members- Not Present: Others Present: RMLD Staff: Coleen O'Brien, General Manager; Hamid Jaffari, Director of Engineering and Operations; Charles Underhill, Director of Integrated Resources; Wendy Markiewicz, Director of Business, Finance and Utility Technology; Janet Walsh, Director of Human Resources; Zachary Barton, Senior Power Supply Analyst; Tracy Schultz, Executive Assistant Jason Small, Citizens' Advisory Board Karen Herrick, Financial Committee Uaison Minutes Respeetfully Submitted By: Philip B. Paclno, Secretary Pro Tem Topio of Discusslors: Call Meeting 10 Order Chair Talbot called the meeting to order and read RMLD's Code of Conduct. Chair Talbot announced that the meeting Is being videotaped at the RMLD office at 230 Ash Sheet, for distribution to the community television stations in North Reading, Lynnfield, and Wilmington. Chair Talbot asked Mr. O'Rourke to serve as Board Secretary.' Chair Talbot welcomed new RMLD employee Ms.Walsh to the meeting. Public Comment There was no public comment. General Manger's Report Update on Town Payment study and Dec.2 Presentation Ms. O'Bden stated that the Board will meet on December 2 and will have Energy New England present the results of the study on the payment to the Town of Reading. The May 2018 authored previously by Ms. O'Brien had been previously posted on RMLD web58e on the Board of Commbsioners webpage. The Energy New England study will be posted on the RMLD website and will be marked"Draft." P".l t Approval of Board Minutes Chair Talbot asked that Ms. Schultz add additional detail to the June 20m minutes regarding a Portion of the solar presentation. Mr. Pacino made o motion, seconded by Mr. Hennessy that the Board approve the meeting minutes of May 7, 2019, May 23. 2019,and June 20, 2019 as corrected. on the recommendation of the General Manger. Motion Carried:5:0:0. Mr. Pacino emphasized that the purpose of the minutes is to summarize, not to quote. The minutes are not supposed to be a transcript. CY 2020 Capitol Budget Mr. Joffad began by discussing variances between the actual CY2019 budget and the estimated CY2019 budget including building upgrades for the deck and the failure of the backup generator.three padmount switchgears and transformers carried over from FY2018 due to delays in manufacturing and delivery. Routine construction was higher than anticipated due to pole hits. Insurance companies will reimburse RMLD, but the funds gar into "Other Income." Overhead and underground maintenance was more expensive due to unexpected failures. Getaway improvements cost more because asbestos was found in the manholes during construction. Mr.Jaffa6 then discussed the big-Ticket items on the CY2020 budget.This included a security upgrade for $300,000 far high definition cameras, facial recognition software, and finger scanning capabilities. Rolling stock replacement includes $75,000 far a forklift,$25,000 for a new pole trailer. $75,000 for a hybrid SUV, $275.000 heavy-duty vehicle with trade-in. and $200,000 for an underground utility truck. The budget includes $70,000 for four public electric vehicle chargers and$129,000 for seven chargers at Analog.Mr. JaNari then discussed software and licensing, which includes the cost of transferring servers to the Cloud. $570,000 is being allocated to purchase land in Wilmington for a new substation.Software is needed to integrate two metering systems and will cost $150,000. $2.78 million is needed for the AMI mesh network expansion. $173,000 is allocated far meters for new construction, $602000 far transformers (maintenance and new construction) and $165,000 for underground maintenance at Deborah Drive. 54 padmount and 96 overhead transformers are scheduled to be replaced as part of the maintenance program. Mr. Jottari then reviewed the cost of unexpected maintenance. Chair Talbot mentioned the RMLD Ash Street site, and whether moving the headquarters would be feasible. Mr. Pacino staled that the Town has no current plan: everything is a concept. Mr. O'Rourke asked if RMLD owns the property. Ms. MarkiewIcz replied that it appears RMLD owns the building,but the land ownership is unclear but can be further researched. Mr. Pacino stated that the Board would hove to vote to release the property before the Town could do anything. Vice Chair Stempeck made a motion. seconded by Mr. Hennessy, that the RMLD Board of Commissioners approve the Calendar Year 2020 Capital Budget in the amount of$11,513,482 as presented,an the recommendation of the General Manager. Mr.Pacino noted that on October 23,2019 the CAB voted to recommend the budget 3:0:1 (3 in favor,0 opposed, 1 absent). Motion Cantu 5:0:0. CY 2020 Operating Budget Ms.Markiewicz discussed the actual and projected fixed and semi-variable costs. Fixed costs are contracts that are already locked in, such as purchase power (70.31 percent of the total Feed cost), depreciation expense ($4.7 million and 5.15 percent of the budget), the voluntary payment to the Town of Reading 1$2.4 million and 2.7 percent of the budget, the Town payments ($1.6 million and 1.76 percent of the budget),and loss on disposal of assets($100,000). Ms. Markiewicz then discussed the semi-variable costs, including total lobes x$8.7 million and 6.2 percent of the budget with a capital portion of almost $2 million), overtime ($1 million with a capital portion of $176.000 and less than one percent of the budget, employee benefits and pension ($4.4 million and 3.99 percent of the budget, other operating and maintenance expenses ($1.6 million and 1.8 percent of the total budget,conservation expenses($958.000 Perm 12 CY 2020 Operating"gat and about one percent), tree trimming costs ($899,000 and less thou one percent), outside contract services ($361,000 and 0.39 percent), legal expenses ($498,000 and half a percent). property insurance ($437,000), software and hardware maintenance ($394,0170), fraM(armers and hazardous material )$210.000). training and tuition ($266,000)• vehicle expenses ($333,000 with$225.000 of that going to copilot projects), rent expense ($212,000), bad debt )$105,000 is reserved), injuries and damages insurance ($70.000). RMLB and CAB ($30.000) and office supplies ($20,000). Overall the budget decreased 1.8 percent mainly due to the $2.2 million decrease in power supply. RMLD If not asking far a rale increase. Choir Talbot asked for an explanation regarding the power supply savings. Mr. Underhill stated that power supply portfolio contracis are being replaced as they expire. The price has dropped. and the market is stable, and cost is low. A significant portion of the portfolio (70 percent) will be expiring within three yeors. RMLD will have flexibility and opportunities to expand the non-carbon component of its portfolio. RMLD is waiting for direction from the legislature for targets, responsibilities, and obligations.Ms.O'Brien stated she will hove Mr. Underhill give a presentation at a future meeting regarding the Clean Energy Standards Act. Mr. Underhill stated that power costs are a pass through. Ms. O'Brien staled while there is no rate increase there will be tate adjustments as residential rates are phased in over three years. The allocation of responsibility for costs for different rate classes is being adjusted. The 2017 Cost of Service Study determined that there needed to be a realignment of costs. An updated study will be done in 2020. Mr. .Stempeck made a motion, seconded by Mr. Hennessy, that the RMLD Board of Commissioners approve the Calendor Year 2020 Operating Budget with a Net Income of $4,479,987 as presented,on the recommendation of the General Manager. Motion Corded:5:0:0. Mr. Pacino noted that on October 23, 2019 the CAB voted to recommend 3:0:1 (3 in favor, 0 opposed, 1 absent). Gerteral Manager Committee Chair Talbot stated that the General Manager Committee met and mode its recommendation on the 71n of November regarding Ms. O'Brien's performance from July of 2018 to the end of June 2019. a. Updated GM Performance Review Process Mr. Hennessey exploined that Ms. O'Brien's review has been performed annually and involves a quantitative approach with a 100-point scale. Present trends in Human Resources have shifted to o more qualitative approach with more frequent feedback. Mr. Hennessy recommended moving away from the number system and having quarterly feedback sessions. Performance goals on the current evaluation form will be retained as part of the process, The Board would have qualitative performance discussions with the GM in Executive Session In April,July.October, and January of each year. The January performance discussion would be for the fourth quarter as well as a roll up summary of the previous year. Key annual priorities will be put forth by the Commissioners after consultation with the GM each December. Under the new procedures the annual compensation discussion will be delinked with performance guidance conversations. The annual compensation discussion and decision would be based on four factors: (q comparison to statewide GM salary benchmarks, (2) the financial health of the RMLD. (3) the results of the GM performance evaluation process,and (4) other economic foctm determined by the Commission. Mr. Pacino asked that the sheet Mr. Hennessy distributed to the Board be included as a part of the minutes. Mr. O'Rourke added that the god is to move away from a once-a-year meeting where the employee is told what the employee did or did not do and to be forward thinking and focus on capabilities,results, and development. Mr.Stempeck agreed with changing the process going forward but stated the need to be cognizant of General Manager's contract. Ms. O'Brien stated she still has a review for the end of the year covering the six-month period from July to January. Mr. Hennessy stated the new system would start in January 2020. Chair Talbot asked for feedback and an action item for the late December meeting Mr. Stempeck reiterated that the old evaluation process wig be used through the period ending December 31,2019. P.,e 13 Is. PrWlmkwy Discussion of Cy 2020 goals Chair Talbot asked the Commissioners to assemble a list of three or four priorities for the year starting January 1, 2020. C. CammMee's Nov.7 Recommendation:Review of General Manager for the period July 1, 2018 to June 30.2019 Mr.Stempeck made a motion,seconded by Mr. Hennessy,that the Board approve the General Manager Review Sub-Committee's recommendation that effective July I. 2019, the General Manager, Ms. O'Brien, receive a salary Increase of four percent, in addition to a$4,000 bonus, paid out as Ms.O'Brien chooses as ICMA,cash,or a combination of the two. Motion Carded:5:09. d. CommRlee's Recommendallon to Disband CommMee Mr. Pacino mode a motion, seconded by Mr. Stempeck, that the Commission accept the recommendation of the General Manager's Review Sub-Committee to disband that committee from this day forward. Motion Carried:5:01.0. Procurement Requeds RegrsMng Board Approval IPP 2019.26 Three Phase Pod Mounted Transformers Mr. Jaffori explained this equipment is for the transformer replacement program. Invitations for proposals were sent to 12 vendors and only one responded correctly. Mr. Pacino made a motion, seconded by Mr. Stempeck, that proposal IFP 2019-24 far Twee Phase Pod Mounted Transformers be awarded to: WESCO Distribution, Inc., for $174,625.00, purxsant to M.G.L.c. 164 Section 56D,on the recommendation of the General Manager. Mallon Carded:5:0:0. IPB 2019.26 Construction and Installation of New Stand-by Generals with ATS Mr. Jaffori explained that this is construction to put the generator on the pad and Installing the automatic transfer switch. The invitation to bid was sent to 19 vendors and three responded without exceptions. Mr. Pacino made a motion, seconded by Mr. Hennessy, that IFB 2019-26 for Construction and Installation of New Stand-by Generator with ATS be awarded to: Spada Company, Inc.. for $130,6117.00, pursuant to M.G.L.,Chapter 149/Chopler 30 Section 39M,as the lowest responsible and eligible bidder,on the recommendation of the General Manager. Motion Carded.,599. General Discussion Meeting dotes were discussed. Mr.Pacino stated with the Commission's permission that he will serve as Board Secretary for this meeting and all subsequent meetings thru the next Town Election. Adjournment At 9:01 p.m., Mr. Pocino made a motion, seconded by Mr. Stempeck, that the Commission go into Executive Session to discuss confidential,compelfiively-sernitive ar proprietary Information in relation to making, selling. or distributing electric paver and energy: consider complaints brought against a public officer.employee,staff member or individual; discuss purchase of red property;and discuss strategy with respect to collective bargaining and return to Regular Session for the sole purpose of adjournment. At 10:22 p.m. the Commission returned to regular session far the sole purpose of adjournment. Upon taking no further action, a motion was made by Mr. Pacino and seconded by Mr. Stempeck that the Commission adjourn the regular session. Motion Carried 5:0:0 Page 14 A hue cop LD Boord of Commissioners minutes ,. 'Opp d b 'ID of the Commllslon. i B.Pocino.Secretary Pro Tem RM Board of Commissionea Paye 15 SIGN-IN SHEET FOR THE Town Of Reading Municipal Light Department _t Data: l i-2 1 -7-019 NAME (Please print) ADDRESS TOWN Town of Reading 5 Meeting Posting with Agenda 3e •,,,uc Board - committee- commission - council: RMLD Board of Commissioners Date: 2019-11-21 Time: 7:30 PM Building: Reading Municipal Light Building Location: Winfred Spurr Audio Visual Room Address: 230 Ash Street Agenda: Purpose: General Business Meeting Called By: David Talbot, Chair Notices and agendas are to be posted 48 hours in advance of the meetings excluding Saturdays, Sundays and Legal Holidays. Please keep in mind the Town Clerk's hours of operation and make necessary arrangements to be sure your posting is made In an adequate amount of time. A listing of topics that the chair reasonably anticipates will be discussed at the meeting must be on the agenda. All Me ethe Postings must be submitte l in typed format; henewHnen notices will not be accalptee. Topics of Discussion: *Execufive Session scheduled for 8:30 p.m. may occur later. READING MUNICIPAL LIGHT DEPARTMENT BOARD OF COMMISSIONERS MEETING 490 Ash Sheet Reading,MA 01867 November 21,2019 7:30 p.m. Regular Session 8:90 p.m. Executive Session- 1. Call Meeting to Order 2. Opening Remarks 3. Introductions 4. Public Comment • Public Comment • Citizens' Advisory Board • Liaisons to RMLD Board 5. General Manager's Report • Update on Town Payment study and Dec.2 presentation 6. Approval of Board Minutes lAttachment 1) -ACTION DEM May 7,2019,May 23,2019,and June 20,2019 Suaaested Mofion: Move that the Board approve the meeting minutes of May 7,2019,May 23,2019,June 20,2019 on the recommendation of the General Manger. ms AgelMe hall even preparee In advance and repceaents a Ilstlng of topics that the chair reaaombh anudpate will be cleaved at the meeting.Mowever the agenda does no moecamy Inc ade all members whldi may be taken up at this meeang. Fame I t % Town of Reading Meeting Posting with Agenda '•,Ara,. 7. CY 2019 Capital Budget*-Mr.Jaffari-(Attachment 2)-ACTION ITEM Suggested Motion:Move that the RMLD Board of Commissioners approve the Calendar Year 2020 Capital Budget in the amount of$11,513,482 as presented,on the recommendation of the General Manager. *On October 23,2019 the CAB voted to recommend 3:0:1 (3 in favor,0 opposed, 1 absent). 8. CY 2019 Operating Budget*-Ms.Markiewicz-(Attachment 3)-ACTION ITEM Suggested Motion: Move that the RMLD Board of Commissioners approve the Calendar Year 2020 Operating Budget with a Net Income of$4,479,987 as presented,on the recommendation of the General Manager. *On October 23,2019 the CAB voted to recommend 3:0:1 (3 in favor,0 opposed, I absent). 9. General Manager Committee-Mr.Talbot a. Updated GM Performance Review Process-Mr. Hennessey b. Preliminary Discussion of CY 2020 goals c. Committee's Recommendation to Disband Committee d. Committee's Nov. 7 Recommendation:Review of General Manager for the period July 1, 2018 to June 30,2019-ACTION ITEM Suggested Motion:Move that the Board approve the General Manager Committee's recommendation that effective July 1, 2019,Ms.O'Brien receive a salary increase of four percent,in addition to a$4,000 bonus, paid out as Ms.O'Brien chooses as ICMA, cash,or a combination of the two. 10. RMLD Procurement Requests Requiring Board Approval-Mr.Jaffod-(Attachment 4)- ACTION ITEMS IFP 2019-24 Three Phase Pad Mounted Transformers Suaaested Motion: Move that proposal IFP 2019-24 for Three Phase Pad Mounted Transformers be awarded to: WESCO Distribution, Inc., for $174,625.00, pursuant to M.G.L.c. 164 Section 56D,on the recommendation of the General Manager. IF8 2019-26 Construction and Installation of New Stand-by Generator with ATS Suaaested Motion: Move that IFB 2019-26 for Construction and Installation of New Standby Generator with ATS be awarded to: Sparks Company, Inc., for $130,687.00, pursuant to M.G.L., Chapter 149/Chapter 30 Section 39M,as the lowest responsible and eligible bidder,on the recommendation of the General Manager. 11.General Discussion RMLD Board Meetlnas Monday,December 2,2019 Thursday, December 19,2019 CAB Meeting December. Mr.Stempeck BOARD MATERIAL AVAILABLE BUT NOT DISCUSSED Account Payable/Payroll Questions This Agenda has peen prspared In advance and rtpesents a Ilsong of boom mar me chair reasonably antlapates will be dlacuasM at the mating.However the agenda does not necessarily Include ell matters whim may tat taken up at this meal Page 12 Town of Reading 0Meeting Posting with Agenda i a,IM 12.Executive Session-ACTION REAS suaaested Motion; Move that the Board go into Executive Session to discuss confidential, competitively-sensitive or proprietary Information in relation to making, selling, or distributing electric power and energy; consider complaints brought against a public officer, employee, staff member or individual; discuss purchase of real property;and discuss strategy with respect to collective bargaining and return to Regular Session for the sole purpose of adjournment. Executive Session is scheduled for 8:30 p.m. but may begin earlier or later. 13.Adjournment-ACTION ITEM Move to adjourn Regular Session. This aperda has been preowed In advance am resraerns a Ibeing or taplo tut to chair reassembly amitlpata will be disa¢etl alt meeal However the islands does not mosssaHly Imude all matters whichmaybe taken up at this meeLtp. Pape 13 READING MUNICIPAL LIGHT DEPARTMENT BOARD OF COMMISSIONERS REGULAR SESSION THURSDAY, NOVEMBER 21 , 2019 APPROVAL OF BOARD MINUTES MAY 7, 2019, MAY 23, 2019 AND JUNE 20, 2019 ATTACHMENT 1 wwoi Town of Reading � Meeting Minutes Board-Committee- Commission -Council: RMLD Board of Commissioners Date: 2019-05-07 Time: 06:00 PM Building: Reading Municipal Light Building Location: Winfred Spurr Audio Visual Room Address: 230 Ash Street Session: Open Session Purpose: General Business Version: Final Attendees: Members- Present: David Talbot, Chair; John Stempeck, Vice Chair; David Hennessy, Commissioner; Thomas O'Rourke, Commissioner; Philip B. Pacino, Commissioner Members - Not Present: others Present: RMLD Staff: Coleen O'Brien, General Manager; Hamid Jaffarl, Charles Underhill, Assistant Director of Integrated Resources; Tracy Schultz, Executive Assistant. Financial Committee Uaison:karen Herrick- Minutes Respectfully Submitted By: David Hennessy, Secretary Pro Tem Topics of Discussion: Call Meeting to Order Chair Talbot called the meeting to order and read RMLD's Code of Conduct. Chair Talbot announced that the meeting is being videotaped at the RMLD office at 230 Ash Street, for distribution to the community television static ns in North Reading,Lynnfield,and Wilmington. Public Comment Chair Talbot asked Mr. Hennessy to serve as Board Secretary. There was no Citizens' Advisory Board member in attendance and no public comment. Discuss and schedule a color power workshop far nonproM/public-sector entities, private commercial property owners,and other Interested parties. Chair Talbot explained that it is the intention of the board to schedule a special board meeting that will provide information to the public about solar power. Topics and the submission of questions by the public prior to the meeting were discussed. Chair Talbot thanked Ms. O'Brien and the Depadment for their hard work.June 20 was decided as the workshop date. Explanation and discussion of PILOT payment research plan and schedule Ms, O'Brien gave an update and stated that RMLD hired an independent party to look at the study she had performed. They're updating it and it's expected to be done by late spring. Ms. O'Brien stated she will send the results (without deliberation) to the Commissioners and then give a presentation.The timing of the presentation was discussed and when the document becomes Page I 1 Explanation and discussion of PILOT payment research plan and schedule public. Ms. O'Brien explained it will Initially be a draft and once it's determined that the document fulfils its intended scope a finalized version will be made public. Update on 20•Year Agreement Chair Talbot explained that the 20-Year Agreement is up for renewal next year. Ms. O'Brien explained that the agreement is renewed every ten years and that she doesn't anticipate any changes.Chair Pocino described the last renewal.The timetable was discussed. Explanation and clarification on RMLD electric vehicle charging Incentives and policy Chair Talbot thanked Ms. O'Brien and Mr. Underhill for working on a comprehensive electric vehicle program, including rebate and incentive policies. Chair Talbot explained that there are simple chargers available for homeowners. Mr. Underhill explained his department is developing a program to work with customers. Integrated Resources is looking of charger locations and dynamically pursuing other opportunities.A scope of work to look of electric vehicles has been developed. Fleet electric vehicles, public access chargers, and a collaboration with Volta, and the different levels of chargers were discussed. Ms. O'Brien summarized the program components. General Discussion Ms. Herrick stated she has been doing research on Green Communities and she spoke to the Municipal Area Planning representative,who stated the legislature discussing making it easier for municipals to get involved. Mr. Underhill explained that the executive director of Green Communities lives in Lynnfield: RMLD is having discussions about possible opportunities. Ms. O'Brien reiterated that RMLD does not pay into Green Communities and needs to evaluate potential partnerships. Future meeting dates were discussed. Adjournment At 8:32 p.m., Mr. Pacino made a motion, seconded by Mr. Hennessy, that the Board go into Executive Session to consider the purchase of real estate and return to Regular Session for the sole purpose of adjournment. A true copy of the RMLD Board of Commissioners minutes as approved by a majority of the Commission. David Hennessy,Secretary Pro Tem RMLD Board of Commissioners Pape 12 Town of Reading 0 Meeting Minutes Board -Committee-Commission- Council: RMLD Board of Commissioners Date: 2019-05-23 Time: 07:30 PM Building: Reading Municipal Light Building Location: Winfred Spurr Audio Visual Room Address: 230 Ash Street Session: Open Session Purpose: General Business Version: Final Attendees: Members- Present: David Talbot, Chair; John Stempeck,Vice Chair; David Hennessy, Commissioner; Thomas O'Rourke, Commissioner; Philip B. Pacino, Commissioner Members - Not Present: others Present: RMLD Staff: Coleen O'Brien, General Manager; Hamid Jaffari, Director of Engineering and Operations; Charles Underhill, Assistant Director of Integrated Resources; Wendy Markiewicz, Director of Business, Finance and Utility Technology; Tracy Schultz, Executive Assistant Melanson Heath &P.C.: Zackary Fentross, CPA Town of Reading: Karen Herrick, Finance Committee Minutes Respectfully Submitted By: Philip B. Pacino, Secretary Pro Tem Topics of Discussion: Call Meeting to Order Chair Talbot called the meeting to order and read RMLD's Code of Conduct. Chair Talbot announced that the meeting is being videotaped at the RMLD office at 230 Ash Street, for distribution to the community television stations in North Reading, Lynnfield, and Wilmington. Public Comment Chair Talbot asked Mr.Pacino to serve as Board Secretary.There was no Citizens'Advisory Board member in attendance and no public comment. Prmentaitcn of the 2018 Audit Mr. Fentress, from Melanson& Heath, introduced himself and explained his firm conducted a six- month audit for the period ending December 31, 2018 due to RMLD's moving from a fiscal year to a calendar year. Mr. Fentress stated that the Department has positive operating results and is in a strong financial position and has a well-funded Other Post-Employment Benefits (OPEB) trust fund. The audit did not result in a management letter. The Department received a clean opinion, which is the best opinion that can be received from an independent auditing fine. It's the same opinion that the Department has received in prior years. Mr. Fentross then discussed the Statement of Net Position.The asset and liability figures from December 31 to June 30 are, for the most part, comparable. One difference was receivables net of uncollectible, which decreased$1.6 million from June 30,2018.The reason for this is the calculation of the Page I s PrexnloRon of the 2018 Audit Department's unbilled receivables. July bills include a lot of AC use so the revenues that the Department receives in July are typically higher than the revenues received in January. There was a corresponding reduction In the estimation of receivables. Moving forward that figure will be more comparable from year to year. Mr. Fentross then discussed net pension liobifty,stating that it has a balance of about$10.781,000.This represents the Department's portion of the total unfunded liability of the Rending Contributory Retirement System. The Deportment's portion of that total unfunded liability is about 29 percent. The contributory retirement system is about 79 Percent funded.The average in the Commonwealth Is 70 percent W Reading is above average in its funding. Mr. Fentross reminded the Commissioners that the Department has set aside some funds to help fund the liability. The pension trust has a balance of $5,878,000. According to accounting standards, that cannot reduce the liability that's presented, because It's not in the control of the contributory retirement system. However, considering the funds set aside, the Department's true liability is about $4.9 million. Mr. Fentross then discussed the Net OPEB liability, which has a balance of$7,374,000.When the Department moved from a June 30 year end to a December 31 year end, the actuaries produced new reports. and there was on increase of $215,000. Mr. Fentross then moved on to the Statement of Revenues, Expenses and Changes in Net Position.The figures presented are only for a six-month period. However,as part of the audit, the auditors doubled the six-month figures and then compared them to 12-month periods: Fiscal Year 18 and Fiscal Year 17 were comparable. Mr. Fentross then stated that the change in net position has a balance of $4,891,000. The Department had strong operating results and that figure reflects that. The Department of Public Utilities staled that eight percent rate of return is okay for a six-month period, and the Department is below eight percent. The Statement of Fiduciary Net Position is where the OPEB trust fund is presented. It has a balance of$3.561,000. These are the assets that hove been set aside to fund the other post-employment benefits. In 20181he total OPEB liability was$10.705.000. However, the Deportment hos put aside$3,561,000 towards funding that liability, which leoves a total unfunded liability of $7,144,000. It is about 33 percent funded, which is a strong position for the Deportment to be in. When comparing the OPEB liability to towns, towns we generally well below ten percent funded. Other light departments are anywhere between 25 to 40 percent,so to be at 33 percent is a strong position for the Department. Mr. Fentross concluded by stating that the Department hod positive operating results, has a welf-funded OPEB trust fund,and there was no management letter. Report of the Audit Committee Mr. Pacino stated that the Town and the Board's Audit Committees met and heard the same presentation from Mr. Fentross earlier in the evening. Both committees voted to recommend that the Commission accept the audit as presented. Mr. Pacino asked Mr. Fentross if he thinks the new lease standard will have any effect on RMLD. Mr. Fentross explained that the leases are currently presented in a note disclosure. Governmental Accounting Standards Board Statement number 87 is not going to come into effect until 2020.Mr.Fentross stated that the auditors will be working with management.Mr. Pacino then asked about key audit matters,and whether that is something that the Board should consider. Mr. Pacino explained that it would be a separate paragraph in the opinion letter reporting anything that's risky. Mr. Fentross staled that he is unaware of that, but as for as anything risky, there was nothing In the audit that would warrant that disclosure. If there was something that could be improved or if the Department was engaged in a risky transaction, that would have been addressed in a management letter. Mr. O'Rourke asked Mr. Fentross to talk about cash on hand. Mr. Fentross explained that the industry standard is to have three months of operating cash on hand. RMLD has about 2.6 months,which is a little lower, but as of June 30,2018 the ratio was at 2.3 months:the Deportment is trending in the right direction. Ms. Herrick asked if there were industry standards far the different accounts listed, such as depreciation and rate stabilization. Chair Talbot clarified that Ms. Herrick was asking if there were standards and where RMLD fits. Chair Talbot then asked Mr. Fentross if he represents other light plants. Mr. Fentross replied that he audits six municipal light plants a year and that as far as restricted cash, he is unaware of any industry standards, Mr. Fentross added that compared to the other light departments that he has looked at, RMLD's cash position is better. Mr. Fentross stated he could not compare RMLD to other departments byline item at the r+9e 12 Report of the Audit Committee current time but could do an analysis. Ms. O'Brien stated that she can write an explanation of how the amounts are established.Ms.O'Brien explained that it's difficult to compare to other municipals because they don't have the same types of transactions. Chair Talbot suggested that Ms.Herrick email Ms. O'Brien clarifying her question. Mr. Pacino made a motion,seconded by Mr. Hennessy,that the Board of Commissioners accept the Audit Report from Melonson Heath, Fiscal Period ending December 31, 2018 as presented, on the recommendation of the General Manager, Motion Canted:5:0:0. General Manager's Report Ms. O'Brien requested that the Board allow her to attend the NEPPA conference in New Hampshire. Mr. Stempeck made a motion, seconded by Mr. Pacino, that the Board approve Ms. O'Bren's travel to, and attendance at,the NEPPA conference to take place from August 18 to August 21, in Bretton Woods, NH. Motion Coaled:5:0:0. Integrated Resources Division a. Power Supply Report-March 2019 Mr. Underhill stated that RMLD is tracking very well against budget and performing better than what was budgeted.Market power supply costs,capacity,and transmission were discussed. Is. Solar Workshop Update The solar workshop is scheduled for June 20m at 7:00 p.m. c. Solar Rebates Mr.Underhill explained that the state achieved a supplemental appropriation for solar programs that is budgeted at a quarter million.This significantly increases public Investment in solar.Energy New England will be helping RMLD in the rebate process. Ms.O'Brien explained that it applies to projects that have a maximum of 25 kWh,with the rebate not to exceed up to 50 percent of cost.Chair Talbot asked if the program makes solar more affordable.He was answered in the affirmative.Ms.O'Brien stated the maximum rebate per customer is$2.000 and is only available until the funds run out.That means a maximum of 30 customers are eligible. Chair Talbot asked who is eligible.Mr.Underhill replied that the program is for residential and small commercial customers.Mr.Stempeck asked for name of the program.Mr.Underhill replied that it is the MLP Solar Program. Engineering and Operations Report Mr. Jaffan reviewed major construction projects, maintenance, and reliability. Grid modernization is ahead of schedule and the BESS battery is online and running. Mr. Jaffar reviewed area upgrade projects including Gloria Lane in Lynnfield. Lynnfield has 28 pending pole transfers and one pull pole.Reading has 30 pending pole transfers and five pull poles.North Reading has three transfers and 16 pull poles, while Wilmington has 10 transfers and one pull pole. Reliability is great and RMLD is well below the national and regional averages. Mr. Jaffon reviewed outages and stated that the tree trimming program is working. Capital spending year- to-date is$12 million. Determination of Uniqueness at Property Mr. Jaffarl explained that Board is voting to waive advertising for the Wilmington substation site. The notice will still go into Central Register. The Letter of Intent is signed, and an environmental assessment is being conducted.The Purchase and Sales has contingencies for permitting. Mr.Stempeck made a motion,seconded by Mr. Pacino, that the RMLD Board of Commissioners approve the Determination of Uniqueness of property and waive the publication requirements of M.G.L. Chapter 30B § 16, with respect to the acquisition of land located off Andover Bypass Street (Route 125) in Wilmington, MA 01887, and identified on the Town of Wilmington Assessor's Map in Book 891,Page 15, on the recommendation of the General Manager. Motion Carried:5:0:0. Pace 13 General Discussion Mr.Underhill stated that he had misspoke In a previous meeting:Volta has Level chargers,not Level I. Meeting dates were discussed. Adjournment At 8:32 p.m., Mr. Pacino made a motion, seconded by Mr. Hennessy, that the Board go into Executive Session to consider the purchase of real estate and return to Regular Session for the sole purpose of adjournment. A true copy of the WILD Board of Commissioners minutes as approved by a majority of the Commission. Philip B.Pacino,Secretary Pro Tem RMLD Board of Commissioners veye 14 Town of Reading 05 r Meeting Minutes Q Boent -committee- Commission - Council: RMLD Board of Commissioners Date: 2019-06-20 Time: 07:00 PM Building: Reading Municipal Ught Building Location: Winfred Spurr Audio Visual Room Address: 230 Ash Street Session: Open Session Purpose: General Business Version: Final Attendees: Members- Present: David Talbot, Chair; John Stempeck, Vice Chair; David Hennessy, Commissioner; Thomas O'Rourke, Commissioner; Philip B. Pacino, Commissioner Members- Not Present: Othem Pment: RMLD Staff: Coleen O'Brien, General Manager; Hamld Jaffari, Director of Engineering and Operations; Charles Underhill, Assistant Director of Integrated Resources; Wendy Markiewicz, Director of Business, Finance and Utility Technology; Tracy Schultz, Executive Assistant Citizens' Advisory Board: Vivek Soni Town of Reading: Karen Herrick, Finance Committee; Mark Dockser, Select Board; Vanessa Alvarado, Select Board. Bob and Kathy Bythrow; Janice Conyers; Geoffrey Coram; Daniel Covey; Nicholas DaSilva; Miyoung Diedrich; Ellis John; Andrew Hlkade; David Kopelman; Norman Kozlowski; Bruce MacKenzie; Gordon McIntosh; Rachel Nadolny; Mirahel Nazzaro; Robert Rainville; John Sana; Ethan Sawyer; Michael Shapiro; Lisa Supple; Jaykiran Teralya; Robert Underwood; Jonathan Wlsco; Ernest Wronka; Ken young; Jim Grier; Joe Malek; Christopher Crane; Kim Rose; David Williams; John Rogers; David and Gayle Smith; Denise McCarthy; Michael Rosa; Celeste Krache; Niew Nguyen; Lam Tran; Peter Kracke. Minutes Respectfully Submitted By: John Stempeck, Secretary Pro Tem Topics of Discussion: Call Meeting to Order Chair Talbot called the meeting to order and read RMLD's Code of Conduct. Chair Talbot announced that the meeting is being videotaped at the RMLD office at 230 Ash Street, for distribution to the community television stations in North Reading, Lynnfield,and Wilmington. Public Comment Chair Talbot asked Mr.Pacino to serve as Board Secretary.There was no Citizens' Advisory Board member in attendance and no public comment. page I I Sola Workshop-presentation and public dialogue(main boardroom) a. Introduction and Purpose at Workshop Chair Talbot explained that the purpose of the meeting is to engage with the public regarding solar generation. Is. Presentation 1.Solar Economics and Impacts Mr. Underhill discussed solar economics, including fitting solar to the load profile, distribution options, the cost per watt and federal, state, and RMLD incentives. Solar impacts, including weather, capacity and transmission peaks, phantom load, and system efficiency were reviewed,as well as the effects of shade, panel location and panel orientation. Solar goals and objectives. 2.System Examples Mr.Underhill explained the components of a solar system. 3.RMLD Solar Goals and Objectives Mr. Underhill discussed providing ratepayers with opportunities, meeting legislative objectives, developing sustainable rates,and minimizing adverse consequences. C. Current RMLD and other Sola Programs RMLD's current offerings were reviewed,Including Solar Choice. d. Public Dialogue and GLA Period Mr. Dockser of Reading asked how to move forward with determining solar potential for municipalities. Mr. Underhill explained that town buildings would be examined to determine suitable rooftops for solar installation. RMLD could assist with behind4he-meter generation by developing a lease structure. If the towns express interest, RMLD would put together a proposal. The larger the scale and the more communities that participate, the more likely RMLD is to find suitable sites. Mr. Dockser asked how communities would communicate their interest. Chair Talbot stated the Select Board could let the RMLD Board know. Ms. Alvarado of Reading clarified that there are no current solar installations on municipal buildings In any of the four communities. Chair Talbot affirmed. Ms. Alvarado asked what an ideal solar installation would look like and the number of kilowatt hours that RMLD would like to see coming from municipal installments.Mr.Underhill explained an optimal site would be a two-story building with a fiat roof and no surrounding trees. Ms. O'Brien asked if the MLP incentive was based on location. Mr. Underhill explained that the incentive is paid based on the sae of the project. The location determines whether the project passes a minimum requirement threshold. Mr. Coram added that if the installation is done in a shaded area, while you would get the rebate for the installation, the payback time would be longer than seven years because of less power generation. Mr. Underhill affirmed. Mr. Sawyer of Wilmington asked for clarification on what is considered a municipal property and whether a project could be done on a leased property. Mr. Underhill replied that it could If the landlord was amenable. Mr.Soni asked about the fifteen percent limit on each feeder. Mr. Underhill explained that was established by the Department of Energy as a conservative estimate as to how much solar a distribution system can handle. Mr. Jaffan explained that a persite system Impact study is performed to determine how much current the system can handle before it is negatively impacted. Ms. Conyers from Reading asked what the first step is. Mr. Underhill explained residents can contact installers if they are planning on buying the solar system. Then, residents should go on the Energy New England website and begin the application process for the system rebate. The system site will then be evaluated for feasibility. Mr. Covey of North Reading stated that he has solar on his home and he has been in the solar industry for about a decade. Mr.Covey clarified that RMLD does not have net metering and Instead has live bi-directional metering and stated that he hopes RMLD transitions to the former. Mr. Covey stated that the payback period would be eleven years according to his calculations. Mr. Underhill explained that the six-and-c-half- year period he referenced includes RMLD's buyback energy rate, which is the market energy offset price at four cents a kilowatt hour. Mr. Underhill stated that net metering-same in and same out- is not sustainable. Mr. Underhill stated that RMLD doesn't make a profit but needs to maintain its electric system. Chair Talbot asked for future clarification about how RMLD stands with other municipals and its solar.Mr. Underhill stated that he can pull that information and that he knows other municipals don't offer an installation incentive. nage 12 d. Public Dialogue and OLA Period Mr.Stempeck added that RMLD has rates that are much lower than National Grid or Eversource. Mr.Grier of North Reading asked where RMLD is at with storage. Chair Talbot mentioned RMLD's grant for a grid battery. Mr. Underhill stated that there are no economically functional batteries at this point.Mr. Underhill mentioned the Tesla Wall and Mr.Stempeck stated that he had looked into it a few years ago and was given a quote of$37,000 for the battery packs.A citizen (name undecipherable( stated that, per his cell search,a power wall costs$7,800 per waft and it stores 4 kilowatts and you install two or three. That price includes installation. Mr. Underhill asked how many hours of storage that provides.The citizen was unsure and asked if the rebate applies to a power wall. Mr. Underhill explained its only for the solar system. Mr. Hikode stated that he works for Revision Energy in North Andover and stated that one Power Woll is thirteen and a halt kilowatt hours of usable storage.The average household uses between 21 and 27 kilowatt hours per day.The Power Wall has five kilowatts of continuous output for 2.7 hours. Mr. Rogers of Reading presented slides that he had prepared for the meeting (unsolicited). The slides addressed residential solar adoption rates and homeowner savings. Mr. Sawyer of Wilmington stated that he is a tax preparer and that most of his clients who have solar lease it due to the high purchase price. Mr. Sawyer stated that he believes RMLD has such low solar penetration because customers only have the option to buy. Mr. Underhill explained that RMLD has a Solar Choice option far people who don't have large upfront resources available. A citizen from North Reading asked about maintenance of the solar panels. Mr. Underhill explained that if the panels are behind the meter, they are the customer's responsibility. Mr. MacKenzie of Reading asked if rooftop solar can power a furnace or a refrigerator if the power goes out. Mr. MacKenzie stated that he had looked into if years ago and there was no reasonably priced equipment to disconnect the house from the grid. Mr. Underhill stated that a solar system will not stay on in the event of on outage due to safety...Mr. Kikode stated that the Tesla energy gateway will isolate from the grid and allow the solar array to power your battery. It works the some way a generator relay works so it isolates the grid to prevent backfeeding. Mr. Underhill stated that's applicable with the introduction of a battery system: that's more than just a solar system. Mr, Conlon from Dracut stated he is a solar installer and an electrician. Mr. Conlon stated that the most important piece of maintenance for solar is keeping trees cut back to prevent shade and defer squirrels. Mr. Conlon stated that there are systems that will function when the power goes down.There's a type of inverter that allows 2,000 watts when the sun is shining.Mr. Kracke from Reading asked for an explanation what the issues are with phantom loads. Mr.Underhill stated that the system needs to be sized according to how much electric is needed:solar behind the meter is Invisible. Chair Talbot thanked the crowd for their attendance and participation. Report on CRizens Advisory Board Meeting an June 19,2019 Mr.O'Rourke stated that Mr.Jaffcd gave an update on engineering projects. Approval of Board Minutes March 21,2019 Mr. Pacino made a motion, seconded by Mr. Stempeck that the Board approve the meeting minutes of March 21,2019,on the recommendation of the General Manger. Motion Carried:5:0:0. Small Business Energy Tax Exemption-Mr.Underhill Mc Underhill reminded small businesses that they are responsible for submitting for an energy exemption through the Massachusetts Department of Revenue. RMLD Procurement Requesh Requiring Board Approval IFP 2019-15 ABB OVR-3 15kV Reclosea Mr.Jaffori explained that invitations for proposals were sent to 12 vendors:three responded. vey=13 RMLD Procurement Requests Requiring Board Approval IFP 2019-15 ABB OVII 15kV Reclosers Mr. Pacino made a motion, seconded by Mr.O'Rourke,that proposal IFP 2019-15 for ABB OVR-3 15kV Reclosers be awarded to: Stuart C. Irby Company for a total of $74,700.00, pursuant to M.G.L.c. 164 Section 56D,an the recommendation of the General Manager. Motion Canted:5:0b. IFP 2019-16 Stand-by Generator and ATS Mr.Joliet stated that invitations for bids were sent to 22 vendors:three responded.Two met the requirements but the lowest bidder took exceptions. Mr. Pacino made a motion, seconded by Mr. Stempeck,that proposal IFP 2019-16 for Stand-by Generator and ATS be awarded to: Power Product Systems LLC for $87,000.00, pursuant to M.G.L.c. 164,Section 56D,on the recommendation of the General Manager. Motion Carried:5:0:0. Genewl Discussion Future meeting dates were discussed. BOARD MATERIAL AVAILABLE BUT NOT DISCUSSED Account Payable/Payroll Questions Executive Session At 9:28 p.m., Mr. Pacino made a motion, seconded by Mr. Stempeck, that the Board go into Executive Session to consider the purchase of real property, to discuss confidential, competitively-sensitive and proprietary information in relation to making, selling, or distributing electric power and energy, and to discuss strategy with respect to collective bargaining and return to Regular Session for the sole purpose of adjournment. A true copy of the RMLD Board of Commissioners minutes as approved by a majority of the Commission. John Stempeck,Secretary Pro Tem RMLD Board of Commissioners Page 14 CY 2020 CAPITAL BUDGET ATTCHMENT 2 READING MUNICIPAL LIGHT DEPARTMENT 2020 BUDGET September 30, 2019 TABLE OF CONTENTS page e RMLD Mission Statement 5 RMLD System Profile 7-8 Planned Programs 11-13 FACILITIES MANAGEMENT X Building Upgrades pang Project! X Office Upgrades 17 095 X Security Upgrades—AllSkes 19 098 X Rolling Stock Replacement(wtrailers,fork trucks) 21 119 23 118 INTEGRATED RESOURCES X Electric Vehicle Supply Equipment(ME) Page# Prolecce 29 099 INFORMA71ON TECHNOLOGY X Hardware Upgrades Preee Project It 33 127 Software and Licensing 35 128 SYSTEM X Marion Street Line Extension,W Pap Prolene 39 120 % Pad-mountSwRchgear Upgrade at Industrial Parks 41 102 X New Wilmington Substation 43 105 tt MA-125 Pok Line Installation for New Wilmington Substation 47 124 X Grid Modernization&Optimization 49 103 X AMI Mesh Network Expansion&Meter Replacement 57 112 X Meters 59 117 hp# Pmlrtt# X Force Account(MassDOT): Main&Hopkins,R 61 214 % 3w15 Getaway Improvements 63 125 X Transformers and Capacitors Purchase(Stack and Projects) 65 116 % Secondary and Main ReplacementProgram-Ail Towns 67 458 % 13.8kV Upgrade(Step-down Area,etc.)-AII Towns 69 107 % UG Facilities Upgrades(URDs,Manholes,ett.)-All Towns 71 106 X Aged/Overloaded Transformer Replacement Program-AII Towns 73 668 X Pole Replacement Program 75 175 X Substation Equipment Upgrade 77 111 X Communication Equipment(Fiber Optic) 79 126 X Power/Lab and Tool Equipment 81 115 X Service Connections(Commercial and Residential) 83 various % Routine Construction 85 various 2020 OPERATING BUDGET Page# X Six Year Plan 89 % Statement of Budgeted Revenues and Expenses 91 X Fixed and Semi-Variable Costs 93 2020 POWER SUPPLY Page# X Bulk Power Cost Projections 97 % Description of RMLD's Power Supplye 99-107 READING MUNICIPAL LIGHT DEPARTMENT Mission Statement RMLD is committed to providing excellent customer service, including competitively priced electricity through due diligence of power supply, risk management,system reliability,safety,and overall business efficiency. Vision Statement RMLD has transitioned from a reactive to a proactive approach in all aspects of the utility business to ensure efficiency, safety,and competitive rates. The Be Efficient— Get Greener—Go Paperless, Peak Performance,and Shred the Peak, campaigns, have been integrated into a core business and include sustained procedural changes in the areas of long-term planning, technology road mapping,talent managing,customer communication,system maintenance and power supply portfolio balancing. 2020 Budget September 30,2019 Page 5 SYSTEM PROFILE (based on CY38) SERVICE TERRITORY 51 square miles serving Reading,North Reading,Wilmington,and part of LynnBeld TOTAL OPERATING REVENUES $99,598,462 POWER PURCHASED 700,331,299 kWh NUMBER OF CUSTOMERS/ 29,881 ACTIVE METERS ANNUAL PEAR DEMAND 163,635 kW on August 29,2018,at 3:00 m ANNUAL SALES 679,293,226 kWh $152,132,400(Gross) 'PLANTVALUE $78,483,314(Net) RIPPLY VOLTAGE 115 Kv Station 4: (3)60 MVATransformers (2)35 MVA Transformers—feeds Station 5 SUPPLYCAPACITY 250 MVA Connected,190 MVA Firm Station 3: (2)60 MVA Transformers 120 MVA Connected,60 MVA Firm 13,800 volt wye DISTRIBUTION SYSTEM VOLTAGE 4,160 volt wye OVERHEAD PRIMARY LINES All 341 miles UNDERGROUND PRIMARY LINES All 146 miles DISTRIBUTION TRANSFORMERS 4,071 transformers-312 MVA Capacity STATION TRANSFORMER CAPACITY 370 MVA CapacitY UTIUTY POLES 18,033 poles Ownership: 50%Verizon,50%RMLD Custodial By Town: North Reading —RMLD LynnSeld—Verizon Reading • east of Main Street—Verizon • west of Main Street,east of West Street,south of Prescott Street—Verizon • westofWeat Street—RMLD • west of Mein Street,north of Prescott Street—RMLD Wilmington • all poles with 35 W sub-transmission circuits,and Concord Street—RMLD • all other locations in Wilmin ton—Verizon 2020 Budget September 30,2019 Page 7 APPLICATION SOFTWARE ChargePolnt Cloud Services LexisNeais CMARS ManagerPlus Constant Contact Mllsoft- WindMil/UghtTable EFI(Energy Federation) NEPOOL GIS eRequester Office 365 E3 ESRI PoleForeman eTrack Replicon Facility Dude SagUne Filezilla SharePoint Forecasting SpryMoblle Futuro SpryPoint Great Plains/Cogsdale Survalent)OMS) Home Energy Audits Tangent AMP Hootsuite VMware ISO-NE Windows 10 Key Accounts Windows Server 2016,2012 CONTACT INFORMATION Address: 230 Ash Street Reading,MA 01867 Telephone: 781-942-6598 Fax: 781-942-2409 Website: Id.com CFRce Hours 8:00 am-4:30 pm Monday throw hFrida KEY PERSONNEL General Manager Coleen O'Brien email: cobrient®rmld cam Director of Business,Finance and Technology Wendy Markiewicz email: wmarkiewiailmmid.com Director of Engineering and Operations Hamid Jaffari email: hiaffarldi)rmldcom Director of Human Resources Janet Walsh email: IwalshOrmld.com Director of Integrated Resources Charles Underhill email: cunderhilhOrmld.com GOVERNINGBODY David Hennessy Thomas O'Rourke Philip B. Pacino John Stempeck David Talbot Number of Em loyees 67 Year Founded 1894 2020 Budget September 30,2019 Page 8 S „ Y 2020 CAPITAL fr. PLANNED PROGRAMS � � ' � | � � d • § ! ! l ; R � ' • ; !, . ; !; ,• ! . ; ƒ � | ) ¢ ! !, I ! | , | . •. , l ;! !l ,. , \ . • - | � | � { | � ! .. . . . . . . . . . : . , , . „ , , , , . . . , . . . . . , , . . . , I B � § � � ' | � � • � ) . . ! | ,! ! .. ! ! ! ! � ! ! ! !,| .• | ! ! ! , ! ! | ! : �; .. . ! � � , - | , l• • .! ! | §! • " n \ §� §� � �| §p § - . ` - - - *I , rl LLL , . . . . . 77TI � | | § i � \ ) n \ R Al ; R H § • { ap . . . l . ! ] H ! NON POP , . . . . . a , ! l . n . . . . . . . . . . . . . . . . . . . . . . . . . . . ! ! , . , . .' . . , . , . • ! . ;!. ! ! !`, , , • Nil § . , . em . ,m , • H ! , , . mm m „ • ; , | . ` all ! .| ., . am - ! .. , .. -.liml , . .! . . . , : i .� !• .,; 941 1 1 • ' .- . . . . . . . . | � , . . . . . . . . . . a a CAPITAL PROJECT'S ' Fad Page # Project # x Building Upgrades 17 095 x Office Upgrades 19 098 x Security Upgrades -All Sites 21 119 s Rolling Stock Replacement 19 118 (vehicles, trailers, fork trucks) CAPITAL PROJECT SUMMARY Project Name: Building Upgrades Project M 095 Project Schedule: Annual Project Manager. Paul McGonagle, Facilities Manager Reason for Expenditure: Annual allotment for repairs and upgrades to RMLD buildings. Brief Description/Scope: Station 4 is having difficulty with high temperatures that are negatively impacting sensitive electronic equipment. In CY20, an equipment cooling system will be installed to cool the building. Also in CY20, shelving racks for transformer storage will be purchased and installed at Station 3. This project will reduce the amount of space leased at the Barbas Warehouse. Barriers: None anticipated at this time. Change in Scope of Work from Prior Fiscal Year: Not applicable. Status Update: The lobby insulation project will be complete by the and of CY19. OSHA remediation continues. The deck replacement project is the largest item identified for remediation and is scheduled for completion by the end of CY19. 2020 Budget September 30,2019 Page 17 CAPITAL PROIECr COST SHEET PROD MME: mny •— m EOIEDULL nn IABOR MAIERIAER/DINER IdTOM1I V N Ynb E AM nide" Thee 0.VNm. e�evm YFSWVIMX IMI[ VMIIYtt WW R)f/M1 MYO IV•4we f Meh meeln fo fa fo d«m®IM mnm fss,® fo fo So s�n mYw mmbmr.mea fsSOAw tl tl 4 i' tl k 3a 4 M fo So fo � 10 W � tl oeen..e rmYww 6w 4 uew-uY1nNMuuY So So Y w so w O f m w 5o m umemewemmmme sr .,wl m.M � � k � y m 4 5o w so w m tl y m ue.ywwn.fwmaw ffm 4m wn meMnne ucenlam mun new So f° $0 tgl^niln: fE4 wM mele nen W k tl N m � 4 tl 4 fmbTed: f 4f mein � tl fe ID b tl W So Sa W b fY Hamm a`Im Me"ep'' 4 Sfm Neln f° f° wm wW wed RRRf Sa W D ':+:� !. '=,if,•'� tit 1diLM 2020 Budget September 30, 2019 Page 18 CAPITAL PROJECT SUMMARY Project Name: Office Upgrades-230 Ash Street Project#: 098 Project Schedule: Annual Project Manager: Paul McGonagle, Facilities Manager Reason for Expenditure: Annual allotment for general office upgrades at 230 Ash Street. Brief Description/Scope: In CY20, the following office upgrades will be made: • create an additional office in the Tech Services area; • create a conference room in the Facilities area to accommodate both Facilities and Tech Services; • AV Room and the General Manager's Conference Room will be painted, and the carpet replaced; • new camera and projection system will be installed in the AV Room;and • create an additional office for the Assistant Materials Manager. Barriers: None anticipated at this time. Change in Scope of Work from Prior Fiscal Year: Not applicable. Status Update: In CY19, upgrades were completed in Integrated Resource Division (IRD)to accommodate increased staffing. Upgrades included new cubicles, relocation of break room, and reconfiguration of storage room. Additionally, the Facilities area was rearranged to create a more productive working area. 2020 Budget September 30,2019 Page 19 CAPITAL PROJECT COST SXEET YREUUM oM FROIEC MME: 2TMUnCn LABOR SMMIALSJOTUER ulniW Paunx. x fa saW sbWM Y' DWMON unn IInx M.b uxtl nITM nm a.mmn P.auwxomn fans SWf 5 ar-,mxMmn..n w nms.mn.mm.. sn,mo so u m„Ix.m mmambPmn SPs,o9 So Sa fo uw,n,tl ne,Wal So Sa fo �ml lummn�ipnln�m SA.m So so So rxrn,xYrnnrmmma.nm flf.an w so a x.n wwn.wmn.omn sm.Om o..a.+f.nv.ver fva os.wnwn..w 5p so m � m m � unMm+MGnnan $6F16 fl So Sn ID � m W So fn So unw.aw.xE+axnn'. nos Svn Igwl,nn m mmmnaunnnn.. so w uy,wxf: Sn so so sa w tt so � so m sn+ni.s Sn Sn Sv M So � .nnnnxm.. p w vain tritl nw KAP So 2020 Budget September 30, 2019 Page 20 CAPITAL PROJECT SUMMARY Project Name: Security System Upgrades—All Sites Project#: 119 Project Schedule: Annual Project Manager: Paul McGonagle, Facilities Manager Reason for Expenditure: Annual allotment for security upgrades. In CY20, security Is will be the responsibility of the IT Department. IT will design a comprehensive security upgrade system to replace the 2017 security system at the Ash Street campus and Substations. Brief Description/Scope: Access control and surveillance systems upgrades over the next year: • Design and install a Comprehensive Security System. • Replace existing cameras with wire-less cameras. • Install a Finger-Scanning Access System to allow employee access to the building and dock-in their time to improve time card reporting. • Install a Facial Recognition System to verify employee prior to granting access the building. • Perform a physical security assessment by a Security Consultant Access control and surveillance systems upgrades over the next five(5)years: • Add security fencing to server room • Repair and replace system equipment as needed annually • Repair/replace site lighting as needed annually • Re-key buildings and sensitive areas as needed Barriers: None anticipated at this time. Change in Scope of Work from Prior Fiscal Year: Not applicable. Status Update: Repaired 200 feet of perimeter fence at Station 4. 2020 Budget September 30,2019 Page 21 CAPITAL PROIECr COST SHEET PWIEUMIME: UlldWUmJ -Mxzw HMFDUUF: nm LABOR MpTERMWOTHEP WOR e 04 •nl VnXa Pr�w sur mel ve+e. sw w.a' s..xF awnX.. °".,. ozsaviwx unn unn ixw um. tmu nas .M Xxu u..r.... xMAE z.�:w.�wnm.F.wF H S4 k � SF'WM1Snbm $3lO.W] � 30 b Po PFXW I'ab.tls SW3 Lnw gF�uxtnw F.eeF � � m F F m Ytlerw:J 4nbm s401fi pw wYenwF N 3X F SD SD � 50 f0 � Yn 4FxM,YVnMYon: Ems sW wXnslnXwn 50 F m sN�: 1tr� ms sss uN�Mnln X[uf So So SX ,m�w.tl: ME mE s: so w w So b So So so w so m ftllW Ynb 4wW�. $IOi sl% M.Inbm � � PoIIw OetW vna $3Rl 54 W Se 2020 Budget September 30,2019 Page 22 CAPITAL PROJECT SUMMARY Project Name: Rolling Stock Replacement Project m 118 Project Schedule: Annual Project Manager: Paul McGonagle, Facilities Manager Reason for Expenditure: Replace vehicles based on the new electrification plan and an eight to len-year cycle to reduce maintenance costs and improve reliability. Vehicles removed from the fleet will be traded-In to the dealer providing the new vehicle. Brief Description/Scope: Specifications, bids, and purchase orders will be completed for CY20 delivery of the following: • one new forklift for Station 3 shelving storage area • one new pole trailer to replace a discarded trailer • one new hybrid SUV with trade-in of one gas pick-up truck • one new heavy-duty vehicle with trade-in of one heavy-duty vehicle Barriers: None anticipated at this time. Change in Scope of Work from Prior Fiscal Year: Increase(Decrease) Not applicable. Status Update: • The forklift was received in August 2019. • The underground utility truck will be ordered by the end of the year, but is not expected to be delivered until 2020. 2020 Budget September 30,2019 Page 23 - -- ---�--�M -== ------ = LiIIiekWuN Vahktea � I Lbt AMWAanW'.' 5 VID�B Y. B411eegr wperembe VMldeType evv LVID wee % 2fM5 7/15/19 L%,1% QW1.24 ParglnreFlsy Fm FAM FU TB•adr/36 I 2008 1/15/19 128,882 St.%7,68 E..&.e ag P.m Escape TmdeA I� N.(36) = X X X Enpinccring TBD S75,6W.W G New(1) 2020 X X X Bnginren TBD 595,WO.W f .Rem OMW trine Trucks , I AInege Avwal VMkle Y. B� Cmeme 1Ba4Vae>mee wpvlewt ' V."try" CY 19 CYSD i� m• wb Mckw Camlme- P� 32 2W1 7/15/19 MAII %.B94.00 Ise %'Bucket Trurk Tead 5 2005 7/15/19 62.8x3 812,666.W lire 47 bigger TradaM N.w(34) = X X X U. UhBIy Mkle UlityV k p�o,OW.W New(5) 2020 X % % LW VMggm 123,BWa0 Fed,Lift A,.P".a Vekkle Y. IAMHbc Cmeae bMlauenow Oep� VM Type- c(19 CYN DID IAM Nam Cmb100s• pmeW FC-1 1999 f/15/l9 )725 0 Stuck/Ise/ Yak Fmk iraddRPl Sbeaa Truck (R�) 2019 X X X SiaBan / Fmkltuck W,5W.W -7;7 (M 4) 2010 X X X Stitlone/ Fmk Truck 115,BWA0 Trailer rA � VMbbType (MM CYN m9 wM Ham New 2020 X X X Lire Pole Troller P25.OW.W -B) FYTaeale: SUMMA cY 19 C 20 2020 Budget September 30,2019 Page 25 x CAPITAL PROJECTS A,n Integrated 9'. i� v 1, Page # Project# x Electrical Vehicle Supply 29 099 Equipment (EVSE) CAPITAL PROJECT SUMMARY Project Name: Electric Vehicle Supply Equipment(EVSE) Project#: 099 Project Schedule: On-going Project Manager: David Doskocil, EV Program Coordinator Reason for Expenditure: The goal of the EVSE project is to establish the plug-in electric vehicle infrastructure within RMLD's service territory. The program will provide a highly visible pathway for customers who desire to support the effort to reduce carbon emissions in both the transportation and energy sectors while offsetting declining electricity sales. Brief Description/Scope: RMLD will work with each town within its service territory to determine the level of interest and best location for the installation of a highly visible dual port charger in parking areas owned by the town. In addition, RMLD plans to install seven dual port charging stations at a large industrial customer's site. RMLD will own all these charging stations. Barriers: Although coordination with towns may take some time, we do not anticipate any economic barriers. Change in Scope of Work from Prior Fiscal Year: RMLD has increased the number of charging stations to be installed. Status Update: Additional help has been retained to develop and implement RMLD's EV program. Considerable effort has been spent organizing and formalizing the EVSE program and preparing for the expansion of EV's in RMLD's territory as part of RMLD's Electrification effort. 2020 Budget September 30,2019 Page 29 CAKFAL PROJECT COST SHEET PROJELTr E: EleRriul VeF[IPSuprMEOupmeOr lEVif) SCHEDULE: C20 USOR M15TERINS/mHEN Yuw)eul Per Unln p.nrtu.krw sveMb SUPVM w— P li Irtll onNis w DEIQIPIICN Vii[ rMr RPle Urib T1)IAt IYOUrwGwa ESrW 54E5y `5n x�maw�WxrMFwb WrcFinaM lvuN WtlkNAaglry Pa[M 51.s00 $b.[6 b lntlWlry rwuYetl oM1wn. raprMrolk[MNWtlktlerP n. m� S... P %O.OW nNu aM IvuP tv egglnP urb eawryneelwewwr.rornn.Fw. nrn n,soo ) ussao Pnlq Obbe MOY.. BWIJMxnnwrwle IM x 1*1 53.)55 SO 5w npalwbnMWplmary mNuroq Mm uYe.nrmHrbw.elWviaa S4 pq d,IM(i.w.na MSwmMnlry O.wOnnr 54Pv % Saxo u0aetl[ry ueia u Inbnel»vCarynrxab Ev 5W.M5 mrtlrywupue.bPl DnnnH[enevlr 51Dn Sl tmwiem-uitrelelneab % % uneomgr.n..mr %.EPc S z.enomm[nFFwwb Gnuaemr.lurt l $6MSW 5510 So 50 rPkaoarwm.5gmlw= 5105 $xox SugMtlmelllneertn t5 SS.1E4% 50 50 ergry.uR: $55 u+ranMun amPmavreHnlh+igl SS.svw So 50 5Nw*etle Wrngln Mun reegia.s.wlwrMga. 5106 Sl% mroen 5a % Ma pdn wwk SSU) 30 r,�p1 03 2020 Budget September 30,2019 Page 30 CAPITAL PROJECTS Information ` 4 t . Page # Project# a Hardware Upgrades 33 127 x Software Upgrades 35 128 CAPITAL PROJECT SUMMARY Project Name: Hardware Upgrades Project#: 127 Project Schedule: Annual Project Manager: Mark Uvanni, IT Manager Reason for Expenditure: Each year RMLD must replace failed or obsolete computers and related equipment,as well as purchase equipment for new users. Additionally, miscellaneous new hardware may be purchased at the request of various operating units. This item Includes these purchases as well as more speck items outlined below. Brief Descriptionl5cope: In addition to the standard purchases described above, we anticipate the following: • Replace old/obsolete user workstations with small form factor Windows 10 PCs. • New EMC data domain to replace five-year cid DD160. The current data domain (DD160)will be used as a backup. • New firewall(s)for SCADA domain to replace current firewall with 'mainstream" brand with more robust security features. • Replace aging HP ESXi Servers in VMware Cluster#2. Current hardware is seven years old and will not accept the current firmware to allow update to ESXi 0.7. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. 2020 Budget September 30,2019 Page 33 CAPITAL PROJECT COST SHEET vRaFcr xRMF: xe,e..nuaneM SMFOSSSE: cno LABOR SW teY1 MATFR r o5uny Swnw.wrry LXLS/OSXER V.Itle rt AY eM. M1Yie OniMee dr ne. rW Mp yax 1W°' OM[OmKKI MX Vnk Me YMM 1pr,LL HNnov-�t.W Yneb. $SRM $MtlE $ b So M naXaw.n..X.wn Sw aoo So So b ran.dmn Swna...arcs ..a fmn 50 5&mo So b b w0un0y an onniMn ...h SMoa 5 SiS.mo » M So rx...Mmrzvu. rn Ss.mJ M SO 50 mnpwt XV[w Oun. rOi U0. 514cro M b M 5540m O.vinerfaebevv fmp nev-�ReY.Y n.SY 65. b b b b b b b b $p b b eMeYOeeM rae.:Yr b }we r .h Ywese $RMM b b b b b Sp $p $0 b b b uerpn:d.meeeYoe b wp M.Y de 5505 m5.,waerua e.wa m So SryM.nc 5° ab MlWn $M b b So b 50 Yi4.Tedi $p �nb Ylse $M Sl b M b b b b b b b m $0 a0nld 5�eraryY b uil:MMb. 5505 $ b b M 50 Pola 0eb6 wxk $$AST $p 2020 Budget September 30,2019 Page 34 CAPITAL PROJECT SUMMARY Project Name: Software and Licensing Project#: 128 Project Schedule: Annual Project Manager: Mark Uvanni, IT Manager Reason for Expenditure: Each year RMLD must renew existing software licenses and purchase new software, either to update existing users or for new users. Additionally, new software may be added at the request of various operating units. This item includes these licenses and ad hoc purchases as well as more specific items (outlined below). Brief DescrlptioniScope: In addition to the standard software and licensing and ad hoc purchases described above,we anticipate the following projects: • Great Plains/Cogsdale ERP System., Migrate Great Plains Dynamics and Cogsdale Utility Billing software to Microsoft Azure(Cloud)in order to remove all required hardware from on-premise to cloud.This will keep the system "future proof*and relieve the burden of RMLD IT staff with regards to OS and RDM's updated patches, administration, etc. • Yukon AMI Metering System: Migrate Yukon (Cooper-Eaton)metering system (application server and database servers)to Cooper-Eaton's data center.The system is growing too large for RMLD's hardware to house and it is not cost- effective to keep upgrading. • Customer Relationship Management(CRM):Cloud-based CRM software that is fully integrated with Great PlainslCogsdale. We are performing a pilot program (2019)with key accounts only. • Office 36&SharePoint Online Update:Office 365 and related security settings, which are extensive, are being'adjusted'and suited for RMLD's environment. SharePoint is being re-designed to better fit within our business model and also to take advantage of many new features of Office 365 and SharePoint overall. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: The Work Order Management System, originally budgeted for CY19-20($75k per year), has been moved out to CY21. Status Update: Not applicable. 2020 Budget September 30,2019 Page 35 CAPITAL PROJECT COST SHEET PRONCTNAME: KHME: mo LABOR b4w1aY MATEMAW MER Ya udY kY�.Y.Y.w1 MW, WyF t'alkY 118.1 .YM Ts WRlln Ib••a Yd OFSOYIgX UYI LyYt klb IFIU 1pT/iL YMW 1Y Rev Na1o�-unYr4Yrb ENa m m m mYnapRe xm Fw„n Smo,mo m m m >imFmYmm� ww.a 400m s+am m m m 1Jvn W l.YbrA1 m[bq peby Sy, lA Sy(W m 5o m bYtlmmIY M�MYYt pyv .W, jm.tPo m m m MYwldalun uoae. walla m2YF m;am a..1YM blbamr ar as-r nbY w.F fmno 5 m m p m m p m m p m m p urYFwMsalea„ fY,YM mY.W m m p m m p m m p m m p Y�IIt f� mm deka auY a... m m m urs c W MemYem EM m m p m m p m m p .YY YF W 1NFYs1 � m m m p m m m p m m m p iltlnlalfwlm M�XYe W XF YIw1 $1W m m m m PaY:oauu .M SE.Yn M v l:, 2020 Budget September 30,2019 Page 36 f CAPITAL PROJECTS Sys Peyer Pmjod# % Marion Street Line Extension 39 120 • Ped-mourn Switchgear Upgrade M Industrial Parks 41 102 X New Wilmington Substation 43 105 % MA-125 Pole Line Installation for New Wilmington Substation 47 124 X Grid Modernization 8 Optimization 49 103 III AMI Mesh Network Expansion 8 Meter Replacement 57 112 • Meters 59 117 • Face Account(MassDOT): Main&Hopkins,R 61 214 % 3W15 Getaway Improvements 63 125 R Transformers and Capacitor:Purchase(Stock and Projects) 65 116 % Secondary and Mein Replacement Program-All Towns 67 456 % 13.SkV Upgrade(Step-down Area,etc.)-All Towns 69 107 X UG Facilities Upgrades(URDs,Manholes,etc.)-All Towns 71 106 K Aged/Overloaded Transformer Replacement Program-All Towns 73 668 • Pole Replacement Program-R/NR 75 175 % Substation Equipment Upgrade 77 111 M Communication Equipment(Fiber Optic) 79 126 • Power/Lab and Too[Equipment 81 115 ■ Service Connections(Commercial and Residential) 83 various S Routine Construction 85 various CAPITAL PROJECT SUMMARY Project Name: Marion Street Line Extension, W Project#: 120 Phase I and Phase II Project Schedule: CY20 Project Manager: Vaughan Bryan, Distribution Engineer Reason for Expenditure: A 25-lot subdivision was added at the end of Eleanor Drive. There is another 16 plus apes at the back of this subdivision that could potentially be developed in the future. In 2019(Phase 1) RMLD will complete construction to upgrade(to three-phase)the existing line which feeds Eleanor Drive. Phase 2 of this project(scheduled for 2020)will create a redundant feed to this area in order to support future development in the area behind Eleanor Drive. Brief Description/Scope; This area is a Verizon set area. Verizon will set and frame 29 poles. RMLD crews will run 3,000 feet of overhead three-phase spacer cable, and upgrade existing overhead transformers. To upgrade the underground portion, pews will install approximately 2,300 feet of underground cable, make terminations, splices, and elbows. Existing underground transformers, secondary mains, and service cables will be upgraded as necessary. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Increase(Decrease) Not applicable. Status Update From Prior Fiscal Year: Phase 1 of this project is scheduled for completion by the end of the year. 2020 Budget September 30,2019 Page 39 CAPITAL PROJECT COST SHEET PRMEaMME: aNimslv[Iirc BVmbn,w lPl1e9e 111 WHEWSE: Mo WOR MAMMWOl35m IaMierY •IYVnN uuul v.Yn. ra eWyt eewfe f+e+ as oewmox unx unxRm uw3 roru nxRou.o.W Sa laeelnee�uilraYFnsY Ypat mwaN WllnanrerWw 3 St;6]f W SLM v/3N IMwEM real SS 6fD SlolW nMrPaunow mtltwx N.r YeYmxeuen SfaN Se mio lace SSm 350o SLSm Sm.rxar..lnel.mwN.a axm.ry Sequa SM353 Statim Ymhnaaxw °am mlm Sxm.m 5 LM S1xJ1 Laq.mmna5amnnaneum.e. fy,p5 So ¢)m u4W'nmam°'lnrubmer I SSmm SLfm vm�MW uK.aMlnuMMmaeryla an �y,�wy�„y HWe So SSSID a mWNrwnn Wr ye SNGm SUm wnawYquuplmarvane ST.Ssi 59 Sl.M) IewllauwelnrMn urgle Sw. ID SU °aY^eae L°'a1e4d" 081. 55 x.rcne.n..Frm YelmF. m � wrwnn.eumlemmelnre..n proxe Sisn St.iw barblarawun fll H 15 nvapuruwPYCM 51R1P Smt SJ#t Si, k 50 rllY�ramsmutlaaN bT $LY Lm S41U 5o So µ.umWrvuro tN bn 59+3 SLW uawrm.emlm.nn Syyf 33 m-nwmxr..Y uewywnf rmembaeen fU.933 Sa® m F m m m m m m m m F m m MeofmwmafwHem: f1m Slat nbinxaa Suprrhlmdllnaoena )1 HAm 511 m IMIX.1L: SN HS �IIweYYua SrpxeV,vnWIFLralbs[Y m.Me S1tFY M m amhW mYm m m m m u m w m m SM>LM: 5H9 S16 SSI SpN,eFwaMnmwnm natlq $IAm SP $9% m S9 50 m � So Sn Sn m iMdaslelm Ymge: S SiW mtrc e.Nwnnaw.a.Yanln kv m wlmoeme ..ef S3Hn 4. N.Sla 2020 Budget September 30,2019 Page 40 CAPITAL PROJECT SUMMARY Project Name: Pad-mount Switchgear Upgrade at Project#: 102 Industrial Parks Project Schedule: FY18-CY23 Project Manager: Peter Price, Senior Distribution Engineer Reason for Expenditure: Increase distribution system protection in the underground industrial parks in Wilmington and North Reading as well as the three-phase underground distribution areas in Reading, i.e., River Park Drive, Jonspin Road, Haven Street, Woburn Street, Industrial Way, etc. Brief Description/Scope: Purchase new units to replace live front pad-mounted switchgear. New units will be dead front with provisions for remotelsupervisor control. There are currently 29 units systemwide. In CY20 we will replace two units received in 2019, and purchase and replace five additional units. Barriers: Delivery of three switchgear ordered in FY18 was significantly delayed, which has pushed back the installation schedule for all switchgear. Change in Scope of Work From Prior Fiscal Year. increase(Decrease) Two of the five switches received in CY19, will be installed in CY20. This will result in a carryover of funds to accommodate the installation of these switches. Status Update From Prior Fiscal Year: Installation has been completed on six switchgear: • Jonspin Road, Wilmington: Switch-1 (FY18), Switch-2 and Switch-3 in (CY19) • River Park Drive, North Reading: Switch-2 in (FY18) • Conoord Sheet, North Reading: Switch-2 and Switch-3 in(FY18) Five switches were recently received, and we anticipate the installation of three of these switchgear by the end of 2019. 2020 Budget September 30,2019 Page 41 CAPITAL PROJECT COST SHEET MOMMME: umsMNYYen11t{ntlnnlnauN.ITN KMEMAE: cvia Lam S.uTEnwWoT51En ueaY.al .WunA ur.l v.nlrx Ya ,,,.w smwr NF,�.I. ozscmrrox ul,x uouwi. ux4 ]aru exou..an fEd31 S4MY x...,r,...,.n,wN..w ze m sn}m sLSm „anMMmuW, .. ux.soo usvm qqo lWnwmMne�r I.mX ztme F,bel 4apu4Bnmin,Mu.n uP. .o,ma..mu.w, tn.m m stmx w.l�r.m.o. vam uLam baMIM.NbIJee O,Faenlw P yqy, ] 53 Lau SYpnwurcMMa:a.wl..rvwl.. m m].xm S2491 vxin,wmM•,I W, m m m vx rvo4enrpouq ,m Ro xaa ti0.mx °'a"'°f^1°id4r 5f0.Mc t xuWus-u,xrWFuw] m m m m m m 22 6 m m m m m m mxaa=ua.ax,dr %, 5s aNwF Ypxw�mvw WrlMla $1].lA $elx m wMuoeNUNr me�enwminmN St]p9 Sux m nml sYN.WY�.e Mew.WmnoeM sszna sxfz 3° IYMarW,l m m m m m m m m m u.arnNNusur..w.: Stas Sin wz,.nNnn.r syvnvb.e�un.ar.a m %.Sm L.w3 3° M Wn MY Ses rY,mu rw mP...nY�.eo'a.c®aFWp anon.qe mefllb,wt wMrmunr4 $.xm m..m m m m m m m m m m S T. M ss ,wFYnx u.sez m sysx m m m so E^ m m m m w.na eWxnNwn: ua su5 nYFl,on u,.,pW Ymu,Y✓M¢Irv.vs nlrva fsau m PolxaowYr .M SW] 30. m m . 4 Y 2020 Budget September 30, 2019 Page 42 CAPITAL PROJECT SUMMARY Project Name: New Wilmington Substation Project#: 105 Project Schedule: FY17-CY22 ProjectManager: Emmanuel Agouddis, Senior Distribution Engineer Reason for Expenditure: Substation 5 has reached the end of its useful life. The transformer and switchgear need major upgrades/repairs to keep substation operational. The New Wilmington Substation will be a replacement for Substation 5,while also providing added benefits to RMLD. Brief Descrlption/Scope: Install anew 115kV/13.8 kV substation in Wilmington in the Ballardvale area. The new substation will include two(2)60 MVA transformers and 15kV switchgear with eight(8)(or more as needed)feeder breaker positions. It shall also provide backup and load relief for both Substation 3 and Substation 4. Barriers: Availability of land. Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update From Prior Fiscal Year: RMLD continues to explore options for location of the new substation. RMLD is still in pursuit of land on MA-125 in Wilmington, MA. 2020 Budget September 30,2019 Page 43 ---���mo®.� --�© � � : � i CAPITAL PROJECT SUMMARY Project Name: MA-125 New Pole Line for New Wilmington Substation Project#: 124 Project Schedule: CY20-22 Project Manager: Emmanuel Agouddis, Senior Distribution Engineer Reason for Expenditure: To consWct a pole line to Interconnect the proposed Wilmington substation to RMLD's existing distribution system. The new pole line shall go from the proposed Wilmington substation, west to Ballardvale Street, and east to Andover Street. This shall include design, labor, and materials for all overhead line construction for this purpose. Brief Description/Scope: The aforementioned reason for expenditure covers an estimated 3,000 foot pole line that shall span MA-125 from Ballardvale Street to Andover Street.An esdmated 30 poles shall be required. This pole line shall be used for riser pole getaways from the proposed Wilmington substation, and shall interconnect the new substation to RMLD's existing overhead distribution system. Budgeted costs in CY20 are associated with design, permitting, and approvals. This Project shall exclude design, labor, and materials for underground getaways, ducts banks, cables, isolation disconnects and associated work at riser poles that shall be included in "New Wilmington Substation' budget line item. Barriers: This project shall coincide with the proposed Wilmington substation. If the location of the substation is moved, this capital project shall be revisited/repriodtized accordingly. Change in Scope of Work From Prior Fiscal Year: Increase(Decrease) Not applicable. Status Update From Prior Fiscal Year: The time-line for this project has been pushed to CY20-22. 2020 Budget September 30,2019 Page 47 CAPM PROJECT CAST SHEET M.F] PoI.uRIIWN lm %IOIFR XMIE: x MWI I mMnl Sr11FW1E: ctto WOR M11RMus/UIXEX LmraN 6YLM Mm.W uwl w Y ra IY mjyp ryA pAUlln 4�ww.wAu RYWAMN UNI UN[YO UM 1[IML rmuAaEm m m m m m m m m m m Se prNxn6Eo46N )maw-V nYI6nAb snlAlsi'am aw.lx ma.sm Seam ss Gx,vielm mY Ymm fu,LW Lvxmlmenaq nmYwem SO fU.m] S,.m IMmx6 A,im,MlUmw f6i9m Y.]m I.mn�n.rsl�6ou,Nlewn�lawY SRum uolw a;atlwvLenn Seism 5ao.m M, Pv aWa Su.am LF�,6NvtluFm'el sss Yism mo,W uW,SYaL,pareW bM um s4PP Sli]M, NI S144Y m.]A Mmx,IwLL wwbm � SI6.40m SL6tID n.mse�wnmw., m m smewn6mv Y.mmuwn. ma szswm %We u.e.EIw.66olY.r. m m m m m m m m m m m m u.ox�mfvn6xne J]m 5 ,YMlwn M t]0 S1L610 m m Lp,nlYvn NYm v.w GYYwiK SM .Mnmm,m,wnew,le.m,. sA, m m y6fmmnW mb A.emrt,mwwwm�n am mam m f' m m m s.6.Ye� 4 YTA m SL.6i m s.Xem6m.Y�w+..mu., m m m m Stlxiy NSR�LYeAA f Ssm yx, Xmla xtlmumn %PA m vlh GMtY M S]R] ML SRMU m m dm p,W.1p519YM0 M tlY61YM®POYW YN QL SAM]m1ROM Msa 2020 Budget September 30,2019 Page 48 CAPITAL PROJECT SUMMARY Project Name: Grid Modernization&Optimization Project#: 103 Project Schedule: On-going Project Manager: Hamid Jsftari, Director of Engineering&Operations Peter Price, Senior Distribution Engineer Brian Smith, Senior Distribution Engineer Reason for Expenditure: In compliance with DPU/OSHA Order DPU 12-76B, increase system reliability, modemizeloptimize system operation and functionality, decrease system losses and expenses for labor and truck rolls related to outage management. Brief Descrlption/Scope: Continue implementation of grid modemizationloptimization road map including installa0on and integration of smart switches, IntelliRupters, and capacitor banks and controls. Integration of outage management system (OMS)with Crew Management and Power Factor CorrectionNVR modules will take place in CY20. Cyber security, simulator,fiber rationale connection, fault detection, economic dispatch, and overall system integration, including GIS and AMI. Barriers: Technology/software integration; merging old technology with new emerging technology. Change in Scope of Work From Prior Fiscal Year: In 2020, RMLD will purchase meter data management(MDM)software that performs long- term data storage and management for the vast quantkies of data delivered by a smart metering system. MDM's also incorporate meter data analytics,the analysis of data emitted by electric smart meters that record consumption of electric energy. It will also integrate multiple data sources(i.e.,the Itron and Yukon systems, billing systems and GIS,as needed)and cleans up the data via EEV(Energy Efficiency Verification). Status Update: Six Scada-Mate switches and three Intellirupters were received in 2019; of those, five Scada-Mate and two Intellirupters should be installed by the end of the year, leaving one of each as a spare. This will bring the total number in the field to 16 Scada-Mate Switches, and four Intellirupters. The outage management system (OMS), customer portal and outage dashboard, and WebSury have been installed and are operational internally. Integration of outage management system (OMS)with the IVR system to optimize outage restoration process is expected to be complete by the end of the year. 2020 Budget September 30,2019 Page 49 CAPITAL PROJECT COST SHEET Rne une.wioAon s quwmmn VROIER aLME: sna.i]ro sw4Aw ���, np WLR ben rmm 11MlFRNLi/OINFR ImNN Ms,W w.IW wpt E� vm:bs 4u TFF ow,un. m.zv t> twnuw o... ociasAmx unrc uutm ww roru z....mF-.nm m.Nn SE.m wro5 �woswaN4 wFrN.m m:,um . faa v Au Nmro asw4A wd, :e]zm s.m,Rm bqe saa�nonWNFahwnNm, � sN,eu so u.wa �w.,..mn.F.m4 rv,M1 , vM1rPFnry.Fem4:Y.2 M1minalhnm bM.n..mc wi6A 21W.6 a k.Oli U St 50 wm Wow w. ixim . slq�sa rn:M mwP�nwroNnzasrwFn Szns b 4® rgryy,ym ry, ;tW,w zi SWt6 mm�wwnns SZLzs m Sz]Sv w.a nFF asNYlvatab mM H� M•b J 50 Jp SD b ¢ m b y N N H SO b }0 m YYmFeN14.bCN wnF SwF J4aM � b N k ¢ So H SO N b y � W hF.tew3wnnMen rw wln bon Szm Swz swnann muw rnF Szz,sM So SD N:t,w nlss !M µf smnmw,wuwwwannb.•4 fl]N A So mwn wino n.L wyn,aqF nwn4 wwvA mwnwbuw ss]u So So w to m So h Sa FY W: wt,m.4AsmJi (mOq.ggnmmFL nnmYWnI:L nF $5]9 � $1]N 50 m k m m So b So b IwYM,afMaMuym; Mon.. HRl 4m mnnW nT.mbn amXnbnhL rt. li k]w h PoIb 4tW wM y,tb b �]3U a_ 2020 Budget September 30,2019 Pape 50 CAPITAL PROJECT COST SHEET 4,le Mmmw.aw iannmlrauon R EU115E: mm PMERXYMB IIID IABUR MRTEMRLS/OTHER IyeiAl •NVrA Wn3M vWMe R W �Vb SmYb, MSOVFl]JN VnM VnN Me Vnb ]U]]L ur nm. P.Yw. mN.$ Y xanm.Wt In maY %Pe m $fm ,n llnuys.alnti, Mi m4fMi 3 Seyvo InmeinMapnalxM M}wpY.'natW M9.n Yr,Wimau. 3 Sm.54 m 521F. 5'yY.nmamm.OnW4Pna. R,Mrb $i - l mmi rcMr.MMYnewbnMnn.F. nnTrPFw'.aLmNM1.M. $u $0 m nMRupv Fmm.MIRnmLbnY 51}Q.m 55.135 m m m m O,vineYfaMM Um m }o,ow-nY1,YFweb m m m m m m m m m m m m m m m m m m 4Fe.e+.ecaFm xMe s WN $P m m m m m m m m m m m m m m 00 m W.y..nWrsw.a+Yn: sm5 mQ sMwew Mlwmm�. m.im m m eYM..w: >a xs M.Yb.., wl.ranmw�nW.WF,a.,xo,.,n m.Mn m se gepn,mWilMnrtlen,Fe.rm.wNa, 515u m m noWbnumnuikatlm m se m m m m sY+W*eW: m sx u WNmY nnny MgnmmYR mmminpnPS.m. N SS.m $o h3aa m m m so m m m m m ]YeMYIfeSbeMYye,'. w SUN W[ YMe Gvmd,.PWmmFt nmm6WMry.m. 546Y m hylas yMM ypY $REQ] LO xlf$ m m 2020 Budget September 30,2019 Page 51 1 1 1 1 �x� �� �;!k*�,?z « - .rad ,...:.vsll MEN � 1 1 1 1 CAPITAL PROJECT COST SHEET Gntl MWernlueeni W[ImliYbn XHEDUU: CM PPDIERHPME: MWN '1 -I' LABOR MRIENIPWOTHO {lpp iaOl 3✓UnN Mm�w earl VeM[M Mol frNIM fbYM WNne Owr�w OEKAIIIIDM IMYI UIM Ya YNU IOTLL W PMDNe4w[ $Efll .r 1man M- 4mlm>Ymrnnrlen3nrb[ 53eP4 f0 30 So n Lariu umm.utl w w w waw w w � M W p fo So LL G+mutlfmVmr> 9p130 N nw�ma wean web N So w w w M w w So w w N w M b lbwlaW<minm SIEw 1nea �w4rab.wb So w w w 5p N M w w w w w N w M � w w IW OpnYbn.WnMYn, 3 5314 w w w lntl�+ Nf rp b bue .mmr.ne a.wkb k, rw Steps[ w LL w*einrgnnnn w w N w M So w w w Wb.iw. Sf NI unMrxb bvr w 50 w w w w w w $0 N N w ibbkM sarku RYnelef N SIM LAM nuInMO � w naW �� � MIa MWe N w Ty, 4 y _ 2020 Budget September 30,2019 Page 55 CAPITAL PROJECT COST SHEET �m M W n.mnnon a awe m iFnw PNOIFR lUMF: ow MatluY:Ea�.m.FYmr mr.FuoMvx SOIFWIF: Mo WlM Y munm I,.n,e,Un,,.nu MATERINLVOINEP W Suynr SInYF veMe. Me ornYme nSiar •M MOW OSS UMCMIgN IM4 IInM Me IMS TITN ?nw aYm. YwM SS M.OB b b b verrn[brfmm�bnMMUY 59u.M b W '"OnnF^aN^Snm¢n•IYnw. 50 nrve..man.mkw•m ninntl Ssom b b b !o b Sp b b So b b tMMW mnoaSu b Ymnem.,Fllra Nm�F rl4MY U Su b 5p Su b b b b b b b So b b UnGmWN<ulrbar b b b ieonvw-w H W b b m b w b b SO 5p b b p b b So b b IYw opFYbnfupYFtls, Ip NnnYnwn fIM Srpr b b [ntlnwrW: 50 t u4n rq W eN wM n5'.'v.Ma.M Sum Lm br PWn HynLLn 11> $11AN jp b b b 50 b b Seb lak b b b rYSF 1yu5 $N b b b b b b b b YnISI Nvv'Im YFP b 50 Sp b .FFFM F, J b b b b w RLb awb wxF #.Sxr rp 2020 Budget September 30, 2019 Page 56 CAPITAL PROJECT SUMMARY Project Name: AMI Mesh Network Expansion and Project#: 112 Meter Replacement Project Schedule: Annual Project Manager: Nick DTechniel Services Manager Reason for Expenditure: The RMLD has-28,600 non-AMI meters that are not capable of providing end-014ine voltage. RMLD's AMI mesh network must be expanded by adding gateways, relays, and new meters, in order to provide end of the line voltage, and give RMLD the ability to monitor voltage, current, demand, power factor and power quality. Replacement meters will have remote disconnect, end-of-line voltage capability, and time-of-use (TOU) rate programmability from RMLD's office at Ash Street. Of these-28,000 non-AMI meters,there are 3,600 commercial, industrial and TOU meters that are not capable of communicating with the RMLD Outage Management System. Customers with these meters are not able to receive outage and restoration notification. These(3,600) meters will be prioritized for replacement in 2020. Beginning in CY21, the RMLD is proposing to implement a five-year plan to replace the remaining 25,000 residential meters. Brief Description/Scope: In 2020, the RMLD will use a contractor to replace the-3,600 commercial, industrial and time-of-use meters incapable of communicating with the Outage Management System. These new meters will have remote disconnect, end-cf-line voltage capability, and TOU rate programmability from RMLD's office at Ash Street. Additional gateways and relays will be installed to strengthen and expand the mesh network. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) Replacement of the non-OMS commercial, industrial, and TOU meters from a six-year replacement plan to replacement of all 3,600 meters in one year utilizing a contractor. Adding the replacement of-25,000 residential meters from CY21 to CY25. Status Update From Prior Fiscal Year: Two hundred and fifty retro-fit meters, 150 commerdal meters, 200 residential meters, 35 relays and two gateways have been installed (as of September 27,2019). 2020 Budget September 30,2019 Page 57 CAPITAL PROJECT COST SHEET Wl Rwh h.twk adandon and MOIECT IMME: RSaei MOWmmtPvnm 5[XFWI£: c10 LAWR Lewr.M MAIERMLS/MER $aIRRR ...I —ann saw Va4M1 •N Tr 1M1� Mon ,yyt hOQV110t1 Unh URI[AM1 Mb 111TH W W INVOw lvnnew-vn[MFw4 FAMF 54 OnRW fonfb b�ax.uiN,NFM1W 5 b WJgiwatsbnAl M1 b bwwawuhwhwN FFAs M � b W � N Wv Nvmun LpvMtlmi inR H.M Hun F10 SIM wwwhm nun.m., m so sR anf,.. NAv. SM S�SnTN. Inls. 56 $M m 50 s0 � MnlelfmYu lSwyvr n nwn SIm Iml'<OwrW SSOAIR Mptivun 9Wmxn1 M1d S5. a 5 sa so In'°II"°n or^°" m voam sm,000 So $0 m.rw m.un.m, ww vn vu $u udd aom.m ....NX. t4 SO OV AaV.Umf mebn N� $5fa. $.a tR 50 aN txo Sc[ nni.WnJnGv, M hxpp 1 tfx,wJ 50 So m Xim t, SO dn"..Uvna., {b x M¢Au6 IwLL ]O MA4 2020 Budget September 30,2019 Page 58 CAPITAL PROJECT SUMMARY Project Name: Meters Project#: 117 Project Schedule: Annual Project Manager: NickD'Techni�I Services Manager Reason for Expenditure: Purchase of meters and metering equipment for new construction, upgrades, and failures. Brief DescriptioniScope: Four hundred residential meters as well as forty-eight primary meters, and miscellaneous hardware will be purchased for stock. Barriers: Nona anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. 2020 Budget September 30,2019 Page 59 �...� ----�© ���� i � � : � • ., CAPITAL PROJECT SUMMARY Project Name: Force Account- Massachusetts Department Project#: 214 of Transportation: Main and Hopkins, R Project Schedule: CY20 Project Manager: Peter Price, Senior Distribution Engineer Reason for Expenditure: MassDOT has plans to improve the traffic Now at the intersection of Main Street and Hopkins Street in Reading. They plan to widen Main Street and install traffic signals. Brief Description/Scope: This project will require the RMLD to relocate/replace eleven(11)poles, and petition and Install four(4)poles along Main Street and Hopkins Sheet. Barriers: Verizon set area. Verizon will petition the pole relocations. MassDOT will need to secure easements as needed for poles, anchors, and guys at several locations. Project also Involves the relocation of the underground service to the restaurant at 107 Main Street. Change in Scope of Work from Prior Fiscal Year: Increase(Decrease) Not applicable. Status Update From Prior Fiscal Year: The MassDOT pushed this project back from CY19 and it is now scheduled for CY20. 2020 Budget September 30,2019 Page 61 CAPITAL PROJECT COST SHEET w'n 0lkpkb3Cu�R IYy 4ROIECTXRME: wbom Fw¢Imrm fr4Yn 5[HEWIE: nm I GR raurN �m5ed IMnRIAWMER MivnY�vpl br:Yn $yrXIR bM1Wr AM M1m O.a1Ynr Yore [N OESwTOX Ui UI[Rw Mb 1pTN wmu.o... x,:.nn....:kmn..N lama lseE RMN roeMnm llpnngwbAb .vn'wbm Mbsuyr. $iSR 5]3.T1 $IWO ruraLYbvW4MinMM R" 5}m NFm PoY unbiyw�tivrvbmnrvuvev�•n 1 $13A}3 H.N9 S}.}m L[mLrybrbb Mr p'M $m 5M 54 m wh iiD $>.DD N So 34 Slm.m u Sum m $a 30 -brwn bwrn rt Pr 31mm Stm N 5o b SD � O.vM1rrYfobvbr b::upq.�l}rb MwY (10.524 f m N b SD m m p � m � � b b m m b N m uwom:rScam,rw Manaw.vlrMAnrb !R Wnb WMminwmrm U4 bM ImrpmSo..r S4.Ma 53m :W4 Mrtlgn mnnbyminrba, r[A S3mm $Sm b 50 m So So � m $p b So b m YM 40emW3MrMwv vilrMrinM1m3 fl! fIM SprrMbn Mllvmb f4 Sp m Nnb� [ d !r3 {25 roY3n«..n Mn m:r.wmbra ovY P[M:Mr:IryRmnnuWnrbnr. Sm}1] $4 nRMRbrnMmryy44,WRbS4 b b � m m b 3wIwT�:: bk bM1yr fM f2] vnnrM @mrmnnl SLY3 54 $Sd m So So So 90 S4 M So m bWd2alu 33v4n f f}W W m m b ntr4Wb xw S2.Sx} vn SM33o 2020 Budget September 30,2019 Pape 62 CAPITAL PROJECT SUMMARY Project Name: 3W15 Getaway Improvements Project#: 125 Project Schedule: CY20 Project Manager: Emmanuel Agouridis, Senior Distribution Engineer Reason for Expenditure: The objective of this project is to have the 3W15 circuit separated from the existing dud bank at Station 3.The high-level plan is to run it out of Station 3 in a separate dud bank and ultimately to Chestnut Street overhead via the existing overhead lines currently being utilized by the 3W15. This will improve the ratings of the 3W 15 circuit drastically, while also improving the rating of the remaining circuits in the dud bank due to reduced heating and inherent thermal relief. Brief DeseriptionlScope: Perform Work to complete conduit system from Station 3 to new riser pole location. Install new riser pole. Install new underground cable from Station 3 to new riser. Perform all overhead line work to be the new 3W15 riser to the existing overhead distribution located two poles away.After all new construction is in place, cutover from existing feed to new feed. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. 2020 Budget September 30,2019 Page 63 CAPITAL PROJECT COST SHEET VROIEAT HNME: twu rWNn.rinpK]pWnx s EouFF: cm UB00. •aunty PPw Pti.Wa MAIFRMLE/OMFx ]enyP SaPW[ Pas reP wvrNr. .. OFSOVre>x YPI[ IM Mn IMx llifu PxrnrhwOPa x+roP.-WrrpwY FRBF SFAS s M•u.�:manb::nbnr..w. .Sm:lKac SSAK m ym ss-mul Ph. SavmI Sus rnMSWsswA.Mpnµ.apvl seAv Se Hm lsw.s%u.psuh ya y.m S. b N m .asz :Pn.N Ton Stn Nu 50 54 SY PMrPp NNxn PrM $L1WJp 1 $LIN mYSuq[rywJnw,Wb.lm,: Sm,sµ N SL]N b WPekMUM.OaPM 50.W .b $9]0 N aN.P.erea.m Po SIASS 1::w:m�uMmPp�P[ PbrPkm:mu9'.::Iw.POuw SlgSlo SUN N tluMSwu wNWxp:xgPan S10.5m .eul SU® Su N M N m Som [P:PhoW Mnaav )mah..wrr N.Pt IPNNw]IS. 7km sswml.,]Saeru len SvuS Su.em ePPamP:w:e1PKa Part t Sa.uP SSm ,wwmh nn U. sum m Sa dm Smu Snu N So Spm• yu SSyI So So S.wenmmr,urw P,pe SNN1N tmaoP SO Sa M:n.tluc[YW nuMYh AH S%a.N SPO aP..Yo::PSPPwPP: wmal,a.. blas Am sm.wPpnaunm... a Hm m So �� SFF MS MPnYIn Pn:n D[tlPrnYnbP::eNrYPavnmm[ p ¢,Sy SO N M]M SSsu b N lMMiK P:.M1:M...M.uem SUm Sa N N N N SwrimN SH W swwK...h.w..N:P vss m sw w Tar.. � >•SP w sP. � m m m m r.rrPp.xa Purr• wnulnn SSa Sr sWYFIK:..h.Pa.aaeen SW SD M,N OPIYp .w 51� Sp N m 2020 Budget September 30,2019 Page 64 CAPITAL PROJECT SUMMARY Project Name: Transformers and Capacitors Project#: 116 Project Schedule: Annual Project Manager: D Vauhan Bryan, stnbution Engineer Reason for Expenditure: All transformers and capacitors for planned and ad hoc projects are purchased under this project. Brief Description/Scope: Transformer and capacitor bids will be prepared, and units purchased as outlined on the Cost Sheet. These transformers and capacitors will be used for new construction, as well as reliability projects Including Secondary and Main Replacement, 13.8kV Upgrade(Step- down Areas), Underground Facilities Upgrades, and Aged/Overloaded Transformer Replacement. Barriers: None anticipated at this time Change in Scope of Work From Prior Fiscal Year: The Department will formalize Its reliability project for Aged/Overloaded Transformer Replacements,with a target of 150 aged/overloaded transformers replaced annually beginning in 2020. Status Update: Not applicable. \ 2020 Budget September 30,2019 Page 65 CAPITAL PROJECT COST SHEET PROIE MME: mmom.mane U.P SdalUa:: mo LABOR .xum WPB MAT AWOT YPr��Wmp aval/n 1bryP Yxxla lYu bwru,a }.s�� aW Mxxu..ow. u4auPbx uxl um Aax uxe mru Ln�new.�Y,q Ymu4 J[BE ]M1ea'Mau PYmmiRmmbm� m 50 b WuaYmnna,eLUNa,aM �"PM ] pwy,� b.au 1] 31Wim b b So SWW'^e m+uvanmPSmm.. .mmaa P. SI.W] C�maMutlxtlwaxmL. nNerm� $150.]4 iP<Mn N4mwMOmMnan b m b ememaammmeW mxm.x fou 56M4 uMam..w..nmsY.a.m.n so m b wow.awe.mx.mw.,x mama]a. uam sm.aoo k b m b �]mWa,avMup„y .+mPa• d,,,W„� su.soo su.sm o.uutiPm. >W nM.PYmYYwxu m b b b m b b b IWrm.tlraOam b } NI h J5M1 b 50 b b b Sa m So YUOPnYs.YyPMIM1P b mEUYYWan EIM EMi wanwxmxume.P b b � b Inlet JEE {6 SO $p b m b m b b YNwisk $� wt I $r6 $0 }Y $f b b ]NIpMx MtltYSYyP: b b SU pG 3119 b b m b Pe4l0.Yi 'aaY 1W1 jp 2020 Budget September 30,2019 Page 66 CAPITAL PROJECT SUMMARY Project Name: Secondary and Main Replacement Program Project S: 458 Project Schedule: Annual Project Leo Keefe, General Line Foreman Manager: All Engineers Reason for Expenditure: rade and improve system This preventive maintenance Pro 9rem is intended to upgrade reliability and address aging infrastructure. Brief DeacriptionfScoPs: ram identifies aging infrastructure and addresses a variety of work to include This prop upgrades as needed. Pole replacements, P secondary upgrades and seryice drop P9 cable replacement and transformer upgrades will be done in conjunction with the sprees) Upgrade(Step-down down area conversions. The North Main StreetlLowell Street area in Lynnfield con e targeted for upgrade in CY20 in conjunction with the 13.8kV —Project 107. Barriers: setting The area targeted for CY20 is in Verizon's set territory and could result in pole delays. Change in Scope of Work from Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update from Prior Fiscal Year: omas Road(Putney, Bancroft. and The Gerry Road (Drury [load)area in Lynnfield;and Th Atherton)area in Lynnfield are currently being upgraded as part of 13.8 kV(Step-down) Upgrades. Secondary and Mains in these areas will be replaced as needed as Part of this upgrade. These areas are expected to be completed by the end of 2019. 2020 Budget September 30,2019 Page 67 CAPITAL PROJECT COST SHEET u�rvN wx,woNnmMNynm: _ $N°N�w4!IISty4µ�MnAb f'MwfdT NOME: auai lnip {Ra�RMn4)�:a sv.Ewu: mo LABOR Raum Ye.,rw MAr RMLi/Ma, ^M �� YnYN • gl+eY MRNuaoNa 'Y" �� oa..4 "' m.m.aY � RfsranNgN •a n� ,•'.mmwo,l„ SReM u:a aw M° YnM rorM 65 516M w Y�m4Na[Y U.Ow 3K,yvNNOY M mna N$ wdY: w Yam smem wqW aM, w SIAA m4n0�✓wn.bwbh m"wm.R iS Uinv �' � Sows �nnNMmen w SLIP IHIdyb.,iM srvSynlnb�yp Sw,Sn $o w.m am.. w U.Tn +::.:,ew.MmYwb Si6Me fi w w m w M6M w m w w w ���SivYM: w Sy w w UM ft w w SGIO 5^Nwm.: w N MgnmMN.yaE¢:mu:N w b��n�n^'mW�MyOn:ayy, wt wyY° w $0 w w w w WaimY w w w �aYMvs w R w m w w m w f«,rasnl,.wa�n w w n w sm sm w w w So w b hya pa4 YwF SiML E,1 S4M NOM:Oaa'mnv�btlapgyy�p�ya�Y��lid 2020 Budge September 30,2019 Page 68 CAPITAL PROJECT SUMMARY Project Name: 13.BkV Upgrades(Step-down Areas, etc.) Project#: 107 All Towns Project Schedule: Annual Project Manager. All Engineers Reason for Expenditure: There are 32 step-down areas left in the RMLD service territory that can be converted. These areas on the RMLD distribution system were originally fed from 4.16 kV distribution circuits.When RMLD began moving load over to the 13.8kV distribution circuits, most areas were converted but some areas were re-fed with pole-mount, step- down transformers. Most of the distribution system in these areas are 30+years old and In need of upgrade before they can be converted. Brief Description/Scope: Replace poles, primary cable, and overhead transformers, as needed, in the various step-down areas. Convert areas to 13.8kV and remove step-down transformers. The secondary cable and service upgrades will be done in conjunction with Project 458. Barriers: Some areas are Verizon set areas. Change In Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Conversions have been completed in the Essex Street(Jordan Road)area in Lynnfield; and on McDonald Dews in Wilmington (in 2019). Step-down conversions in the Gerry Road (Drury Road)area in Lynnfield; and Thomas Road(Putney, Bancroft, and Atherton)area in Lynnfield are currently underway and are expected to be completed by the end of 2019. 2020 Budget September 30,2019 Page 69 CAPRAL PROJECT COST SHEET Ll VUR MRNRYwNMq MG RROIERFLME: 1Lnn MYn R,xylwVll R]slN�LvnnflNE S(NFOUIE: CVxO TABOR .a WIN MURALS/MER uYl $GYM $N.IRR VMIW nw YL Nlm OMbS .Y 4i5CAY1gN WN WR R.M Jnh T(ITY IMID WWNpq D,mew-im[,gN MRR INbmp INWa uImJeW3,�.,wy PT, eNN p'naryrtl4]vY v.Y MP.eaN SkOM f0 53.5 mW VouM ref42 fpy 5]OtV b.5ty x..nx.o3vaMRI.oW.3nmrvoFN u],Mx fo s5.m ]ro.w�cenm.ry mox wn fxm NgeerW ISxlaWwn eeuylnN x 554]$e SSS.m &,yp $mlldwRNMS.ea'aNlx glue u HAW 614m fµ]A $PUF[wYmry bm $on f31v5 Me.n Ye we,nm..r.�.plmSrvoW f 5])p1l $p $f,® N RMIe�Sge]W bisNaw-uY[$YSYewY f JO 50 $p fD $p N WRNONYRSsbO �ItmeN f0 5p M1 b b P JSNp,54w5yyA5s: YMrMeleFm $$M1 f5W M1YI�IFo W.NFSS LRf mN.wfM�meNNnem.Na $L].sa b NMYJMYeery e]c $0 b P M tl uiN,W Nnm fN SL .NR.N r+YWMNeawvrvW n f)ss m 5>• so w m w w eFIep5ENI5pN SLm ui1rLNRUS NpwYwVvnNNM.eY.meE sxv Sa PoIW MYM1 vnSF $xAx) MN fKf50 ID b NOiE:TiNWmmbtlgpryY.y YlprthWLn$pgp}tl116 2020 Budget September 30, 2019 Page 70 CAPITAL PROJECT SUMMARY Project Name: Underground Facilities Upgrades Project 9: 106 (URDs, Manholes, etc.) Project Schedule: Annual Project Manager: Vaughan Bryan, Distribution Engineer Reason for Expenditure: There are 210+/-underground residential subdivisions in the RMLD service territory, of which, 60 +/-are over 25 years old. These subdivisions are in need of new primary cable and transformers. Some of the URDs are in step-down areas and need to be upgraded before they can be converted to 7,970 volts. Most of the existing transformers are live-front units.The new padmounl transformers will be dead-front units,which will improve reliability by eliminating the possibility of animal contacts within the pad transformer. The new transformers will be placed on box-pads that will raise the transformers out of the mulch beds preventing premature rusting and corrosion of the transformers. Manholes in the underground areas are also aging and may now repairs. Brief Description/Scope: Replace primary and neutral cables, and padmount transformers as needed in the various URDs. The precast transformer pads will be replaced with fiberglass box pads as needed for elevation requirements. Certain areas will be targeted each year. Additionally, in 2020 RMLD will inspect(and photograph)approximately 300 manholes for deterioration. Approximately thirty manholes deemed in need of repair from previous inspections are scheduled for repair in CY20. Barriers: None anticipated at this time. Change in scope of Work From Prior Fiscal Year: RMLD will schedule repairs for 30 manholes identified through the inspection program. Status Update: Area upgrades completed In 2019(to date)include: Lynnfield: Woodwinds Estate, Friendship Lane, Morgan Road. • North Reading: Gloria Lane • Reading: Gazebo Circle, Bay State Road Extension, Lafayette Road • Wilmington: Andover Street, Ohio Street, Great Neck Drive, Cushing Drive, Earles Row. 2020 Budget September 30,2019 Page 71 GPrrAL PROJECT COST SHEET u.a.wrm,Re 15tlIXb uwnaR. 4RURCTHRME: pIROyMVIMe K1 XNEWIE: Cr30 LIBOR veurm MFlFill<WOSIIER alVnb ytirWuq .MW STtllt VbY1R Tm. IYnR 4,.,yk t.n�Y eN tRuuMow WWIIOM L1YL W[Wv URN lOr4 •+R...Ilrnwu..l. $R.d SR.aeR �Su. Nqw MpmlmmHv.50lMN Ny)]f �SIaNN nulnluva 1e 3V Sfpp 4cu uavo W.mnwl M1wt Sf.w Li,fm N49w $t.n.MMMW Man.WMIRM SHAG N N.416 Yly:.alawr.bmivNn].4R Nro, b SASw nmN,u,nni.uiux.mu.tvn $Hiro 5e St.a emm.euwa. SSSono m 54mo RSIMNM[awRty x�m..-wt MYRwY N N N N N N $$+wl�ewltm amwu...n4nt.b..w MMR MMID VRa Rmwp.aY ww.MYNv.Sm YMau5o5Re mllaRlntle wMmn,am,n,h Sf6AM N.aq ro PSW nMLRewn RMgJNa,YwNn. $i w Mbv.OaWaLLu. 545]5 N $nR RMLO nwi Mp 1nmNlly: noYnmRn5Mm5atR NWRfvsc]5 51M5 So un4eM5V5n SywMNm ulxrr M:... SMs SSm $wRrA:bnlunmw H$ $N,Hu M N Ry�RY untnrYn MR MS $MYMIn c.Wuin RRMb Rum,RM m NiMzb b w MIPSnnMMmrlW.npemnp $5 wRXVMR,dv.M.,M.VRNMnMAIi >w Sicmeb N RnMSwRmm mnwlrm $MSpro Npm rta N N N MwnJ NnYbISS $M M6 MI ruSRURMSRnean.NR.n N.Nsff N Nb M M M N N N N rwe+M.I�Sby., b RinwYMwR SSM MnWwSM 5 1N5.51 54 b So Mw0.d4 wef SxAi> Y M.fto xmR: rmenvamnWa.sal5o.55aMe.55M+55e 2020 Budget September 30,2019 page 72 CAPITAL PROJECT SUMMARY Project Name: ed/Overloaded Transformer Project#: 668 Replacement Program Project Schedule: On-going Project Manager: Vaughan Distribution Engineer Reason for Expenditure: Since 2014,the RMLD has replaced 390 overhead and 160 pad-mound transformers system wide. These transformer have been replaced as part of one of RMI-Ds Reliability Programs (i.e.,URD Upgrades,Stepdown Upgrades, Secondary and Main Upgrades)or Routine Construction. Starting in 2020 RMLD will expedite its Aged/Overloaded Transformer Replacement Program in order to reduce the percentage of aged/overloaded transformers on the system. RMLD plane to replace 120-150 aged or overloaded transformer annually. The chart below shows the current number of transformers 25-years or older system wide: AGED TRANSFORMERS SYSTEM-WIDE 25-YEARS OR %OF TRANSFORMERS TOTAL OLDER 25-YEARS OR OLDER OVER-HEAD Single-Phase 2712 1092 40.27% Three-Phase 310 149 48.06% PAD-MOUNT Single-Phase 798 216 27.07% Three-Phase 251 57 22.71% TOTAL 4071 1514 37.19% As of5eptember24,2019 Brief DescdptiordScope: All transformers over 25 years old have been prioritized for replacement based on age, physical condition, and load. Additionally, the transformer lead management program will further Identify transformers that need replacement. Any transformer lya eut which s not project. RMLD of an ea upgrade for the reliability programs noted above, a re crews,augmented by contract crews, will replace these transformers. Barriers: None anticipated at this time. Change In Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. 2020 Budget September 30,2019 Page 73 CAPITAL PROJECT CAST SHEET NMIPmnnee4inm5wmRr H101RCTXMIF: gRphwm swrRuu:: ov LABOR p MlMa �iaM MATERLAWMER M+mrWwy HnIpX �� WIOY Owa ep411rAm iin M4R �� ppgN11LN IMI IMIRW 44 URAL �mmnHw 56,y{ �n Repro ll.ea.plvnp5"wm �pwbmrnrvabn Ww. k SU,nR S$}v Wwm,remuneagwNmmeaWa, Isarw,e IN wL. ems" 55.wt Hs.yJ RwYn Ygtlp�mm Ssinwne vaMermrra mxm+w Sa,ai 54 Hdax Rr4an11aeMls MnmwN nambne,aryawnmya H $39.ID9 Hprp wM.aN NNwnMam�waua, $1PW 5%vp wn041[meetlw Swnvw.mRminwb 5 { waanYryia.gewHmwN .enWnvnrvagmayR H SSaSAM 533.1 So XRMRwNRmpeM H H So w H ReWae gnrslwpNma,nl emb,..xwanmwe H So p H Rapxe4ryYd,anptlno,m bp,NnmvagNmatle SS;SH $I.1H H H 5p wp.aw{ww,M„ H xRnwLrRnRI SIOf SUH wawowm Hs,H9,H mm RMNmwR H {x mmm nAsmman W4awpexyn H533fp 5tp,aa.N wuRea pSupeM H W 5p H pMRrid: L xl Uen ym,way,x mmrnnN SH]934o SfFAW 55}65 uuwnnaM eXRe,n H MamiNv H % H H SSL ammmxbleppMlbc nnW vnuema M„LNMua SUIS.P SS.W 53 $s,sU HNmYm�v SW S M/vwxaOnmNrNabbn vAa. Sa SE.p65T H priT pHyp .wRy 53}Za LSA Qypa 2020 Budget September 30,2019 Page 74 CAPITAL PROJECT SUMMARY Project Name: Pole Replacement Program, R, NR Project S: 175 Project Schedule: Annual Project Manager: Leo Keefe, General Line Foreman Reason for Expenditure: In 2014 RMLD initiated a Pole Inspection Program. Ten percent of RMLD-owned poles (Reading and North Reading)are inspected annually by an outside contractor using various technology including resistorgraph technology. The Pole Inspection Program provides RMLD with verifiable data on pole condition. Testing (through 2018), has identified 502 poles that were recommended for replacement. Annual testing takes place each year in the fall. The chart below shows the decline in the number of poles identified as'failed"over the past five years. eoo 6W wo em sm fID 0 IDN ID6 3016 IDll ]OL X of rules Impeeted ■d of Poles Felled Brief Description/Scope; RMLD will replace 50 poles per year that are identified as part of the Pole Inspection Program. This project includes salting poles, transfers,and replacement of secondary services as needed. Barriers: None anticipated at this time. Change In Scope of Work From Prior Fiscal Year: Increase(Decrease) Not applicable. Status Update From Prior Fiscal Year: Since the inception of the Pole Inspection Program a total of 268 poles have been replaced, and 240 transfers have been completed(as of September 2019). 2020 Budget September 30,2019 Page 75 ---M==----� CAPITALPROJECT SUMMARY project Name: Substation Equipment Upgrade Project fF: 111 Nick l Project Schedule: Annual Project Manager: Technical Services Manager Reason for Expenditure: United Power Group and RMersonnel have Identified substation equipment that P This item is an amount reserved annually for needs to be replaced or upgraded upgrade of equipment as necessary. Brief DescriPtionlScoPe: the hydratw n oil monitoring unit on the o transformers In CY20 the WILD will replace at Station 3. Barriers: Availability of replacement Paris. Change in Scope of Work From Prior Fiscal Year: Increase(Decrease) nla Status Update From Prior Fiscal Year: By the end of 2019, wa will replace the 11 5k grounding equipment for Station 3 an 4. Page 77 2020 Budget September 30,2019 Nome CAPITAL PROJECT SUMMARY Project Name: Communication Equipment(for Fiber Optic) Project#: 126 Project Schedule: Annual Project Manager: Peter Price, Senior Distribution Engineer Brian Smith, Senior Distribution Engineer Reason for Expenditure: As the RMLD expands its use of the fiber optic network to establish communication with metering equipment, recloser controls, capacitor bank controls and other distribution equipment,the Department will create fiber nodes at various locations along the fiber optic network. Each node will require an enclosure, a fiber optic interface, a power supply, cabling,fiber optic cable, and the termination of the fiber optic cable. Brief Description/Scope: Purchase materials and procure fiber optic cable splicers as needed. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Status Update: Nodes were anticipated, but not required in FY19 because we were able to expand the communication system by using SpeedNet radios to communicate with the Scads- Mate switches. As distribution automation equipment is installed further away from the fiber optic loop, the Department will need to expand the fiber optic network to establish communications with the devices that are planned for installation in FY20 and beyond. 2020 Budget September 30,2019 Page 79 CAPITAL PROIECr COST SHEET RRWFR NMIE: cunmunbNon YWmmmdlFlbvamwl SCNFWIF: Mo IASOR arn.awi 37'.- oFscNmoxuix R.M M. roru uxuun.o.e a.rn M...mxm.b..b KeR fob m m m u.m°Mxssoq nw..rm,mwnd m..Mdwn 4.mm sumo m m m Mmxomnm,e,b-m m.m mm m m m ,.wn r.�+�.,°emuroebi�r" Ma msm. 'a nsm b b m MyYOYe>x ron $IM IY(OJ 510.0.tl b m m nen.uam••wd�m..radn eM Stmao .Npm a.ere! N,maw.�llMFwM b b b m m m b m m m m m U�rW fabY KiM m m m m m m m m b m b m VnegermMapMNbe Mi TeYRwr Ssm SIOt sm.m,wn erun.oMM b b m CLOILU uMnbM bFF b b m m m m b b m tMYs1Mk wa bnM.. fw m m b m m m m m nIeYN.4v Yny. m m b !d Mb4Wb wtl, Son i0 NRs 2020 Budget September 30,2019 Page 80 CAPITAL PROJECT SUMMARY Project Name: Power/Lab and Tool Equipment Project S: 115 Project Schedule: Annual Project Manager: nla Reason for Expenditure: This is an amount reserved annually for purchase of powerllab and tool equipment. Brief Description/Scope: Refer to the project cost sheet for planned purchases for CY20. Barriers: None anticipated at this time. Change In Scope of Work From Prior Fiscal Year. Increase(Decrease) Not applicable. Status Update From Prior Fiscal Year: Not applicable. 2020 Budget September 30,2019 Page 81 CAVRAL PROJECT COST SHEET PIIOIFLT NRMF: RwrjUh..T.,"ulpriem LABOR W.ieM M.RTaSMLx/OTRFR w.Yn sxyN v.Ftle m nN. R..N.N b.w Ra oFswnpx u.e u:ew bw TOnLL •MN W Own a..-rnwm..a 54MR SRMe ... m m m xmx NwlnwawMm: .a. m.om 5 SSaao m m m rN.wmeNNwnry.axpw. wen 53pm mam m m m WafmubNNn Nyb Wl ulymnl S.sYN $qOm m m m bolM1,e'spupiNlvmpN. SmyN o.alaYMar }mmoNNrna Mv.N Swvo m m m m m m m m m m m m ua.m=.am.x.m LeN Nab 34Mf m m m m m m m m W gwYw.yPWec m uMMNMun SSN mwaxwauw.�.m. m m NiY..w,p m roam SM So m m m m m m bxwTrk ..e N m m m m m m m m NYbIS..xw Y.qN: r N m® m m m m roRa o.ar Naa Sx,Fn m 2020 Budget September 30,2019 Page 82 CAPITAL PROJECT SUMMARY ProProjectPro Name: service Connections �#: various (Commercial and Residential) Project Schedule: Annual Project Manager: Leo Keefe, General Line Foreman Reason for Expenditure: Installation of new and upgraded services for both residential and commercialfindustrlal customers in the service territory. Brief Description/Scope: This item includes new service connections, upgrades, and service replacements for residential, commercial,and industrial customers.This represents the time and materials associated With the replacement of an existing or installation of a new overhead service drop and the connection of an underground service, etc. This does not include the time and materiels associated with pole replacements/installations, transformer replacementsfinstallations, primary or secondary cable replacements/ installations, etc.These aspects of a project are captured under Routine Construction. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year Not applicable. Status Update: Not applicable. 2020 Budget September 30,2019 Page 83 CAPmAL PROJECr COST SHEET s.rnr.mmcllmu PROIFCTRMIE: ��mmaelXg R.UyIUnR SOIEWIE: cfm U1BOR MA)ERMLS/oI o •pnpu rIpNYXm�� meq, hYWt VW0. )IIIX Ongw Imti Fp orwmrhw un uwwm :FnY roru bew .WpRY�ab In Wlir�'mtugNtlXMe �Yxu X�ppnmFXYF3W lnY v SYOf Sn $L.XO Ymtl,M1lup'Mmb`yGm�Muy 1)hU^ Su,wn $U SU 50 �ApVU-K�npmwlnbmd k b 5o wme Jwnw Ex 5)f.mo wmh�lmiem S° btivs-mY,WYwLL, M gp W 5p b � � b UMXpunnuptlp !o bllXnpev�mXrY lnwN SEfM hn 50 m � m YnMpYtlYymWs: tlhYYYhs, uYs um Im plW ep, � Y R�rlry � unh F {tl $M Sn So StlIvfXY $9 o.h,W In hXn S! JEh $0 p p k SD fo � f,tlnW EXXm,M�Xpe b Y,W Yhplm uM $iM SU W 50 k MIIV FaY4 XveY S)A)) jp 2020 Budget September 30,2019 page 84 CAPITAL PROJECT SUMMARY Project Name: Routine Construction Project#: various Project Schedule: Annual Project Manager: various Reason for Expenditure: Routine Construction covers routine activity as well as capital construction projects that develop during the year including, but not limited to items shown below. Brief Description/Scope: Overhead and underground system upgrades • Miscellaneous projects Pole damage Station upgrades • Porcelain cutout replacements • Street Light Connections—new equipment installation • Pole setting(transfers • Underground subdivisions(new construction) Barriers: None anticipated at this time. Change In Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. 2020 Budget September 30,2019 Page 85 Ion Eli®=mo I ..�..N now Now MOSS CY 2020 OPERATING BUDGET ATTACHMENT 3 77 gi 2020 OPERATING BUQ Page # M Six Year Plan 89 39 Statement of Budgeted 91 Revenues and Expenses 3$ Fixed and Semi-Variable Costs 93 ] | \�|7 , . \"`) / ; " 1111 . ! • � §!!• • ! I- ; I1 ! • !� ! ,. � . ..- |! !| • ,! | ]| | §§, §§ | :(p | � | § |illi| | ! | kill!! ' | ill | | ,!� • gil| '.Ii . H , , • �„ || , |||| |�| � |- ��� ' � � | |! ,|!� roe„a Re.41m.MwmcnwtlY Mua{YI LIlh0.Wtlnnl SYMwr,l d 824400E xewnme ntl FaPomee me m 8- rnB cne crm mm .oec mn eepa Ycnu mIBGET •SRWL BOWET IBgB BUWEi WWFT Owetlnp Rwnuu WeRwnm 5 E],H6,1% $ 14,]%,W6 $ 2),)61,143 $ 27,%6,.l $ H,%q]% Fu Re 33,3%,1% 3£%;938 30,326,893 27,730,367 H•%;578 PurtlleW Pwv Cagtr}lrmmWm 37,877,303 20.242,495 37,7%�02 3.1.158 37,Tfi. fv W01euwY 8385% /42A35 833,8% 827,.9 ULM Enpv Grwvtlm Rerulu fi%,924 346,618 ULM 675,W5 658,693 NW6 I;3000.1 1463) 1 Tey[peretlnp llem,uw %,13,198 50,463443 96,139A491 9],]1;Sn 952.8131 F>rylue PmwFwemu: 91i PuwuW Powr-Putl AMA% 35,59]024 39,13.1893 28055,455 26,925,55] `6 P"TwJR^°"Ly W' a, ,3. 1;530,]82 22,)89,83] 32,18713 22,457,14] SN ILMum Pwer.irsvmhvn U.%3.9e3 ].W).1% 11.96)055 1,3001% 35252472 iew Puwlaw Pwm )11.06)A99 1,)i].3% 66,LL3.]BS 63.514.3W ".Min MaYgmEManbanu Syvem. 5m 9ummvlm aq Fryllaw5p 1,0)5,]51 4%,121 ;%3,9% 1,U3{,M2 ;127A69 .19YIbNCYYtlRmnGmebe S0;142 290,42) 48L9. 474,622 .61641 SSP S... 501.3. 358533 522A55 75,169 543,19 W9 Ow GevYraN 24AIS 145,717 30,%3 ]8M MUM %S AwrupnYry 43,98 15ABSJ 50,M 76,%5 73,1U XB MCYr(avel 312933 fiL.3 2113/3 1511420 ]Q/9E 595 Me'wIW MwnpMmmtl wxQ 226,6. 242,%1 432,8)3 5MA93 M 73322 193,255 9%,537 96;%) 1=,3% %3 MelnYarea IW -TWT4lnmew a%,K$ 6..333 B%.51 ]9.19H Mm SN Mmr,yYnuaiur,w-IlnBspnna WM 35,920 52)A2) 3NA39 1125% m5 Wnumnm dOm TYeM1vmw 3W,073 %,NS 4WA% IN". 22iA39 W um Grra LmeTmeymr 23.1844 2833W 3"8 569168 Teal(ymtlrgeM Valnlmme Ewanwe 3599,3. 2,536,14 5,83.1.6 5,369A11 6,01,2. omwx 66m�mawnwr P.,w: %21Mer ReWn9 31,7{1 3,501 1,IW ]/ b]LUYmwCdMSm .11 2;340 ;11.51 .],W3 ],156•]93 1,113%6 ;.3A79 lo�96 U,muBLe l[mup 1%,77 %,.8 ]05..24 LIS,W2 "7, n B1B IMpnYl Pae[uvw 495,751 3%.W3 $G,SW 443.)37 6/J ]9 00 Mmq Lwswd 9)5,4]2 5%,68 9%,11 7W37W5,711 955165 .1 gtlminluwMne Gemnl9Ywr 1378,19E 851,81 2058263 3,.8)11 ;192'3 M 0Tw9u{ybs M,WO 4,591 .M 6AW A.OW 9D OUYJt SeMu.lpx .).W] 4M,.7 53E.9W /16AW 4%AW BM dWmyMewLMreY MAN SlAn 38.51. 355A6/ %L3% ma0.mlM 5ervFnEuuytlm 2NA93 81,1]3 2{3.893 180.221 M.1975 924 ecp'M lwuerm 426,2W 17.2% 426,. 3.,689 437AW 026 Legnvq 0n,pee 47,4/9 33,fi. m" 57,333 43,522 BM 6rptrp PmwvmYGMh 3113,%0 9W,W7 3.58],615 3,MLH0 3,666,56) vn mmmmsv Gney fi'Pnee 435,659 8911% 493,477 5W,6V 3]),286 bt Rw Emnee MM 58193 2U2 zn9 212.GA %9 Valval araee 311)W 141A42 311,3. 3.,9% M. 939 Vwvtle Eamres-Gpul(Sennv 12",4401 (11,.3) (253,362) 1125781325,11) 836 MYnmuere e(GmelRwl 335,143 105,574 395,.0 439.6" ( 845 M+Inbvmol B,vwry6 G,ws 891195 11525 937,8. 95),3% 9.,880 rom 4un16Mnnepw Fipmues ]1,950,]]) /1",.3 12,3 ,0)3 1;8..61 12259"7 IXRrOpelYp Eamrsw: W74mnaun {,518.] 2,7;917 ksuA 4.520. 4.7340. 408 Vtlumry PrymnYb Twe 2569,]89 )6])05 TOYl�mppamm 0' 1A 6..5.79 2939.682 6../.BEO 60936% 33716. gsewB Fm"Y 5.599.143 9438,189 SI.A% 4A985% SY5492 xen Opmeary R«muu I fi+Pmuq, 4181nywtlnmma 250,WJ 274,217 145,0. 13528 amm atp Glerlrmrb BW,0.tl 405,433 850,.4 ;032.252 swB 436 VeMYn PRO1 Pexlrlw RrNnv 12.430.5%1 1;240.253) 12,4385%1 ]2,4385.1 ]1,430,516) 4m yem0YyxN (1G,GGG1 159.0611 11WAW1 I1W,Wo) 11WWo1 U11nhrMcpme 1140.1 1.19> %WO H.'SI lS.OW) 11 oy Xan Omm2np Rearuw lEgawm) ]5445%1 635)5If 1 Nx mm*e S 4053,232 5 4,810.4% 5 3,5H582 5 37.12 5 447981 2020 Budget September 30,2019 page 91 |! ■. .. . .. . . � � , .. . . .. . MP | | ;=4! _ . | �;■;,. .. |;,l,;;l:,l;>!l• ;RU H � |r§,!<!_! l ,,,! !§;!l •,. I ,, � ; | .,. _•- > ..1 .;.. ,,• ,� Z | ;,.=1. . . . rl,,§=,ll,. ,I,,r|..•. ;! ! " l � • ��. |!�l�!lip 2424 POWER SUPPLY 1 Page # • Bulk Power Cost Projections 97 • Description of RMLD's Power Supply 99-107 n � a d a m a p:aRWF1B_ aBB B69HR��gOE�AWaiCPFoveaBpEe ��p R 9ASape8a8eF Se y IBSYBxB:P R6' BiYB:Oa CaepBfaft R'p»_ 88SR {:C p:C aC8 ,98B8W pp OR @ _ SinA N xi c°9i$$g$?iS$? e$A A iacYeiF :a „a :s : :s . . .=aseE:p :s i$ 880PpFFg: w ai68ct:PiaR8iRP`pG Bj6_ P_ jA • „ " . t ;$ a �ABH-^•AR � R $�FC.N�6Q6�9 P@R@p .�:� �"® G _ e .R �C6a^^^ BAHRFCE8:8RaG:9G8 S 8 - i �� •»^ YGa-ReY1F e_R:09CCC p � S p O fd �AaRa6P :d GYE^6pBCpF9SAi9ip •+±:a B ;B p ^^^^•• - N Ely ( IkYAR Y; z :$4! P4SS A•-_ _,F !GCCCRC FCCCCCC:CFCCFCCCFFCC R'FC F [GFFRCCCC �i BFFiA a AB 8 a9 A C :[ eCH 99 @ ....... = ......... B9O � �=E6RiF CR['v Yj11 t5 f Pt s Aid a S a � a98 3g�€s 7 e m a m 0 N O N Description of RMLD's Power Supply Stony Brook Intermediate Unit The Stony Brook Intermediate Unit is a 354-megawatt, combined-cycle power plant that entered commercial operation in 1981. The unit's three gas turbines generate electricity using either No. 2 oil or natural gas, with additional electricity produced using a single steam turbine in the combined-cycle process. MMWEC completed construction of a natural gas pipeline to serve the Intermediate Unit in September 2002, The RMLD has a Life of Unit(LOU)entitlement for 14.453% of the unit or approximately 51 MWs. RMLD has paid off the debt service associated with this project. Quick Facts—Stonybrook Intermediate Unit Location Ludlow, Massachusetts On-Line Date 1981 Fuel No. 2 oil/natural gas Principal Owner/Operator MMWEC Total Capacity 354 megawatts Stony Brook Peaking Unit The Stony Brook Peaking Unit is a 172-megawatt peaking plant that entered commercial operation in 1982. The unit's two turbines generate electricity using No. 2 oil. The RMLD has a Life of Unit (LOU)entitlement for 19.516% of the unit which is equivalent to approximately 33 MWs. The RMLD has paid off the debt service associated with this project. 2020 Budget September 30,2019 Page 99 Quids Facts-Stonybrook Peaking Unit Location Ludlow, Massachusetts On-Line Date 1982 Fuel No. 2 oil Principal Owner/Operator MMWEC Total Capacity 172 megawatts Braintree Electric Light Department-Watson Unit The simple-cycle gas fired plant is powered by the first two Rolls-Royce Trent 80 gas turbines built for the U.S. power generation market-known as Watson Units#1 and#2. The units entered commercial operation on June 23, 2009. Both Watson Units are bid into the ISO New England markety system daily and are dispatched based on their bid price. The units two turbines generate electricity using natural gas, with No. 2 oil as backup fuel. The RMLD has a 20 year entitlement for 10%of the unit which is equivalent to about 10 MWs. Quick Fads-Watson Unit Location Braintree, Massachusetts On-Line Date 2009 Fuel Natural gasMo.2 oil Principal Owner/Operator GELD Total Capacity 100 megawatts Seabrook Station Seabrook Station is a 1,244-megawatt nuclear generating plant located in Seabrook, New Hampshire. M operating license for Seabrook was Issued in 1988, but the plant did not begin commercial operation until 1990. The principal owner and operator of Seabrook Station is NextEra Energy Resources LLC, a subsidiary of Florida based FPL 2020 Budget September 30,2019 Page 100 Group, Inc. NextEra owns 88.2%of Seabrook Station. The other owners are MMWEC (11.590%)and two Massachusetts municipal utilities, the Taunton Municipal Lighting Plant(0.13%)and Hudson Light& Power Department(0.08%). On March 12, 2019, NextEra received an extension of its Seabrook operating license from the current license expiration of 2030 out to March 15, 2050. RMLD signed 3 different projects to finance Seabrook, Mix 1, Project 4, and Project 5. The debt service associated with these projects will be paid-off in 2014, 2017&2018 respectively. The RMLD has a Life of Unit(LOU)for 0.635%or approximately 8 MWs of the unit. Quick Facts-Seabrook Station Location Seabrook, New Hampshire On-Line Date 1990 Fuel Nuclear-Pressurized Water Reactor Principal Owner/Operator NextEra Energy Resources, LLC Total Capacity 1,244 megawatts Millstone Unit 3 Millstone Unit 3 is a 1,237-megawatt nuclear generating plant located in Waterford, Connecticut. Millstone Unit 3,which began operation in 1986, is the newest and largest of the Millstone Station's three nuclear units,one of which is retired from service. The principal owner and operator of Millstone Station is Dominion Nuclear Connecticut, Inc., a subsidiary of Virginia-based Dominion Resources, Inc. Dominion Connecticut owns 93.4% of Millstone Unit 3. The Nuclear Regulatory Commission (NRC)on November 28, 2005 approved Dominion Nuclear Connecticut's request for a 20-year operating license extension for Millstone's Unit 3 reactor. The license now expires in November, 2045. RMLD signed two different projects to finance Millstone#3, Mix 1 and Project 3. The debt service associated with these projects will be paid off in 2014&2018 respectively. The RMLD has a LOU agreement for 0.404%of the units which equates to approximately 4.6 MWs. 2020 Budget September 30,2019 Page 101 Quick Facts—Millstone Station Location Waterford, Connecticut On-Line Date 1986 Fuel Nuclear—Pressurized Water Reactor Principal Owner/Operator Dominion Nuclear Connecticut, Inc. Total Capacity 1,237 megawatts New York Power Authority(NYPA) The RMLD receives inexpensive hydroelectric power from the NYPA. RMLD receives capacity,and energy from this contract. The Massachusetts Department of Public Utilities(DPU)has appointed MMWEC as the administrator of this contract. The current contract expires in 2025. Hydro-Quebec Interconnection The Hydro-Quebac Interconnection is an approximate 2000 Mw, direct current electric transmission line connecting central New England with the Canadian utility Hydro Quebec. Construction of the U.S. portion of the interconnection,which stretches from Groton/Ayer, in Massachusetts to the Canadian border in northern Vermont,was a pint effort of many New England utitilies. The RMLD receives approximately 4.5 Ms of capacity from this contract. Exelon: Block Purchase In May, 2015 the RMLD signed a system power contract with Exelon that is effective from January 1, 2016 through December 31, 2019. The RMLD receives energy only from this contract. The amount of energy purchased Fluctuates on a monthly basis for both the on-peak and off-peak periods. RMLD secured fixed pricing for this contract. NextEra: Block Purchase In June, 2016 the RMLD signed a system power contract with NextEra that is effective from January 1, 2019 through December 31, 2020. The RMLD receives energy only 2020 Budget September 30,2019 Page 102 from this contract. The amount of energy purchased fluctuates on a monthly basis for both the on-peak and off-peak periods. RMLD secured fixed pricing for this contract. NextEra: TFA In December, 2017 the RMLD signed a master agreement as well as a Transaction Facilitation Agreement with NextEra that enables RMLD to leverage NextEra's trade floor. RMLD approved a Risk Management Strategy that secures transactions based on price and time triggers. The Risk Management Strategy will permit RMLD to take advantage of price opportunities consistently over the next several years and beyond. This strategy will allow RMLD to secure monthly quantities that are below the four year average versus locking in annual quantities. Additionally, the strategy of utilizing time Viggers will smooth out variations in the market over time.The TFA has prompted RMLD to purchase on-peak and off-peak energy blocks out to the year 2023. Under the TFA, RMLD secured around 107,000 MWHs for 2020, 40,000 MWhs for 2021, 31,000 MWhs for 2022 and 20,000 MWhs for 2023. NextEra: Load Following Pilot In February, 2019 the RMLD signed a Pilot transaction for Physical Load Following that provides a layered purchasing strategy to meet monthly on-peek and off-peak needs by combining both fixed and irttennentent resource supplies.This hedging strategy takes into account the uncertainty in wholesale pricing and consumption volumes of RMLD and provides a price stable premium for nearly 80-90% of RMLD's load.The pilot contract started on March 1, 2019 and expires December 31, 2019. Eagle Creek Energy Holdings In March, 2011 the RMLD signed purchase power agreements with Swift River Hydra LLC for the output of four hydro systems located in Massachusetts that are effective from February 1, 2011 through January 31, 2028. The Swift River Trading Company is the lead market participant for and represents these hydroelectric generators with a total nameplate capacity of approximately 7 Mws and average annual generation of 25,000 megawatt-hours per year. These facilities include the Woronoce Hydro facility in Russell, MA, Pepperell Hydro in Pepperell, MA; Indian River Power Supply in Russell, MA; and Turners Falls Hydro in Turners Falls, MA. Each of these facilities is owned by a special purpose entity, e.g., 2020 Budget September 30,2019 Page 103 the Woronoco facility is owned by Woronoco Hydro LLC. In 2016, Swift River Trading Company assigned the projects to Eagle Creek Energy Holdings. The four facilities are now managed by the Eagle Creek Energy Holdings as the lead market participant for each of the facilities. RMLD is the only buyer. • Pepperell Hydro: 15 year term beginning on February 1, 2011 and ending January 31, 2026. RMLD is purchasing all of the products produced by or attributable to the facility. The facility has a nameplate capacity of 1.9 MWs. The products include, but are not limited to, Energy, Installed Capacity, Ancillary Services, Renewable Energy Certificates and Environmental Attributes(to the extent not included in the RECs). The contract price for these products is $100/MWh for the first year, escalated 2.25%thereafter. • Woronoco Hydro: 15 year term beginning on February 1, 2011 and ending January 31, 2026. RMLD is purchasing all of the products produced by or attributable to the facility. The facility has a nameplate capacity of 2.7 Mws. The products include, but are not limited to, Energy, Installed Capacity, Ancillary Services, Renewable Energy Certificates and Environmental Attributes (to the extent not included in the RECs). The contract price for these products is $100/Mwh for the first year, escalated 2.25%thereafter. The facility is not currently qualified for FCM. Until the Seller qualifies the facility for FCM the contract price Is reduced by$5.00/MWh. • Turners Falls Hydro: 15 year tens beginning on February 1, 2011 and ending January 31, 2026. RMLD Is purchasing all of the products produced by or attributable to the facility. The facility has a nameplate capacity of 1 Mw. The products include, but are not limited to, Energy, Installed Capacity, Ancillary Services, Renewable Energy Certificates and Environmental Attributes(to the extent not included in the RECs). The contract price for these products is $100/MWh for the first year, escalated 2.25%thereafter. The facility is not currently qualified for FCM. Until the Seller qualifies the facility for FCM the contract price is reduced by$5.00/MWh. • Indian River Hydro: 15 year tern beginning on February 1, 2011 and ending January 31, 2026. RMLD is purchasing all of the products produced by or attributable to the facility. The facility,has a nameplate capacity of 1.4 Mws. The products include, but are not limited to, Energy, Installed Capacity,Ancillary Services, Renewable Energy Certificates and Environmental Attributes (to the extent not included in the RECs). The contract price for these products is $100/MWh for the first year, escalated 2.25%thereafter. The facility is not 2020 Budget September 30,2019 Page 104 currently qualified for FCM. Until the Seller qualifies the facility for FCM the contract price is reduced by$5.00/MWh. Collins Hydro In August, 2013 the RMLD signed a purchase power agreements with Swift River Hydro LLC.for the output of Collins Hydro located in between Ludlow and Wilbraham Massachusetts. The contract with Swift River Hydro is effective from September 1, 2013 through August 31, 2028. The RMLD receives enery only from this contract. The average annual generation is approximately 5,667 megawatt-hours per year. Pioneer Hydro In August, 2013 the RMLD signed a purchase power agreements with Were River Power Inc.for the output of Pioneer Hydro located In Ware, Massachusetts. The contract for Pioneer Hydro is effective from September 1, 2013 through August 31, 2028. The RMLD receives enery only from this contract. The average annual generation is approximately 4,480 megawatt-hours per year. Hoisery Mills Hydro In March,2014 the RMLD signed a purchase power agreements with Silver Street Hydro Inc.for the output of Hosiery Mills located in Hillsborough, New Hampshire. The contract for Hosiery Mills Hydro is effective from March 1, 2014 through February 28, 2034. The RMLD receives enery only from this contract. The average annual generation is approximately 2,046 megawatt-hours per year. Aspinook Hydro In August, 2016 the RMLD signed a purchase power agreements with Aspinock Hydro Inc.for the output of Aspinook Hydro located in Connecticut. The contract is effective from August, 2016 through August, 2017. The RMLD receives enery only from this contract. The average annual generation is approximately 9,300 megawatt-hours per year. 2020 Budget September 30,2019 Page 105 Saddleback Ridge Wind In December, 2013 the RMLD signed a purchase power agreement with Saddleback Ridge Wind, LLC for the output of Saddleback Ridge Wind located In Carthage, Maine. The contract for Saddleback Ridge Wind is effective from January 1, 2015 through December 31, 2035. The RMLD receives enery plus all attributes this contract. The average annual generation is estimated to be approximately 15,820 megawatt-hours per year. Jericho Wind In November, 2014 the RMLD signed a purchase power agreements with Jericho Power, LLC for the output of Jericho Wind located in Berlin, New Hampshire. The contract for Jericho Wind is for 20 years. The project went Commercial December, 2015. The RMLD receives energy plus all attributes from this contract. The average annual generation is estimated to be approximately 10,788 megawatt-hours per year. One Burlington-Solar In March,2015 the RMLD signed a purchase power agreement with CREECA Energy LLC for the output of 2,000 kW AC solar array located at One Burlington Ave., Wilmington, Massachusetts. The solar array went on-line in November, 2015. The term of the contract for One Burlington is effective for ten years. The average annual generation is estimated to be approximately 3,450 megawatt-hours per year. Altus Power—Community Solar In March, 2016 the RMLD signed a purchase power agreement with ECA Solar LLC for the output of 1,000 kW AC solar array located at 326 Ballardvale Street,Wilmington, Massachusetts. The solar array went on4ine in June, 2017. In May, 2017 the contract was assigned to Altus Power America, Inc DBA WL MA Solar LLC. The term of the contract for WL MA Solar LLC is effective for twenty years. The average annual generation is estimated to be approximately 1,700 megawatt-hours per year. RMLD has developed a Community Shared Solar program called Solar Choice. This project is RMLD's first Solar Choice project and is fully subscribed by 500 residential customers. 2020 Budget September 30,2019 Page 106 Kearsage—Community Solar In October, 2017 the RMLD signed a purchase power agreement with Kearsage Wilmington LLC for the output of 1,800 kW AC solar array located at 40-50 Fordham Road,Wilmington, Massachusetts. The solar array went on-line in February, 2018. The term of the contract for Kearsage Wilmington LLC is effective for twenty years. The average annual generation is estimated to be approximately 2,376 megawatt-hours per year. This project is RMLD's second Solar Choice project and is fully subscribed by 617 residentiallcommercial customers. Battery Energy Storage System—NextEra In December, 2017(RMLD)was recently awarded a$1 million grant for the installation of an energy storage unit at its North Reading substation. The grant is funded by the Masssachusetts Department of Energy Resources(DOER). RMLD's project consists of a 5-megawatt Lithium Ion Battery unit with 10 MWhs of storage capacity at its North Reading substation to reduce peak demand, thereby lowering future transmission and capacity costs related to the purchase of wholesale electricity. The battery unit will be co-located with RMLD's new 2.5-megawatt Distributed Generator. RMLD is negotiating a Battery Energy Storage System (BESS)Agreement with NextEra. BESS was placed in service on June 1, 2019. Firsti-ight Hydro In March. 2019 the RMLD signed a purchase power agreement with FirstLighl Power Resources Management, LLC. for the 10.3% of the output of the Shegaug Hydroelectric Station and 7.3% of the output of the Stevenson Hydroelectric Station. The contract for Firstlight Hydro is effective from May, 2019 through December, 2023. The average annual generation is approximately 12,000 MWhs per year on-peak and 8,000 MWhs per year off-peak. 2020 Budget September 30,2019 Page 107 RMLD PROCUREMENT REQUESTS REQUIRING BOARD APPROVAL ATTACHMENT 4 id. Mnnicil Light RM D 0 suW ... .. MAsAsuat P.O.Box ler Reding MAOItW)a250 November 12,2019 Town of Reading Municipal Light Board Subject HP 2019-24 Three Phase Pad Mounted Transformne Program he M.G.L.c.164§56D,on Ocluber 16,20 19,an invitation for proposals was placed ae a legal notice in the Middlesex East vection ofthe Daily Three Chronicle requesting sealedproposW forTluee Phase Pad Mounted Transformers.On October 16,2019,the imitation was posted on the RMLD website and bulletin board. An invitation for proposals was sent he the following twelve companies: E.L.Flowers&As aciates Gmyber Electric Company,W. Haego Power Equipment Sala,Inc. PanAmerice Supply,bar. Power Sales Crop,her. PowerTech Associates-UPSC Prim Vendor,Inc. Robinson Salm,W. Shamrock Power Seim LLC Stuart C.Irby Company WESCO Distribution,Inc. Yale Electric Supply Company Scaled proposals were received firm four compardc : Stunt C. Irby Company,Greyba Electric Company, Inc., Howard Industries,Inc.,c/o Power Seim Group,Inc.,and WESCO Distribution,Etc. The mal d proposals wen publicly opened and read aloud m 11:00 azn.,October 30,2019,in the Town ofRcmkug Municipal Light Departments Audio Visual Spurr Room,270 Ash Stme4 Reeding,Massachusetts. The proposals were reviewed,analyzed,and evaluated by aefand recommended to the General Manager. Move that propose IFP 2019-24 for Three Phase Pad Mounted Tramformm be awarded to; WESCO Distribution,Inc.,far$174,625A0u, Pentagon to M.G.L. c. 164 § 56D, on the moommenciation of the General Menage+. 'See attached analysis. The 2019 Capital Budget armum for these items is 5254,901.00 Y ugh Fd/ mid lafari Coleen rfen File:Bi&FYl9-CY1912019-UThroe PhaePd Mounted T.e .ansa Pegs 1mf2 Analysis-Thtaro Phan Pad Hllounlad Tmaformam FB 2019-24 BILL tl5tfa6. SpaaNka0cn Pro, sero YmeacNnr V*Wb Of UMI Cwt f 7wa/NW Con AgIRMIRIMPants WESCO Dlatrtbuuon,lee Mem 1500 Wa 3O OF 450Y277 ERMCO 12-14 Wwkv $9.205.00 3 $27.785.0 $27.795.00 yp Ham 2750 We 3O OF 4WMY ERMCO 12-14 weelm $12,SW.0 5 554,900.0 SKNO.00 m Sem 31000 Wa 30 OF 4BOY277 ERMCO 12-UW $15,142.00 4 550,555.00 $WASLOD yea Item 4500 Wa 3O OF 20RYM20 mmoo 12-14 WBtlw $10,551.0 2 $21,352.00 $21352.0 yp $I 174, S. OrwAw Electra Compoy,Ina.-nawppa Wm San 1500 We 3O OF 480Y277 GE 3 $0.00 ro lam 2750 Wa 3O OF 450Yr7 GE 5 $am ro Ilan 31ODD M 30 OF 480Y277 GE 4 $0.00 no Sem4500kVe30DF2115Y7120 GE 2 $0.00 ro swan C.Irby Company-nmwppmM Korn 1 500 Ws 3O OF 450Y277 WEG 3 $0.00 NO Rom 2 750 We 30 OF 480Y2T7 WEG 5 50.0 ro hem 31000 We 3O OF 4WY277 WEG 4 $0.00 ro PAM 4500 kVa 3O OF 20RYI120 WEG 2 WOO ro Howvd IndLV&IM Inc.,do Power Salm Orwp,1ne -non-tavpensiw Iam 1500 kW 3B OF 48OY277 Hlaeard 3 $D.00 ro Iam 2750 Wa 3O OF 450Y277 Howard 5 50.0 ro Mem 31000 Wo 30 DF 450Y277 Hews 4 $0.0 ro Rom 4500 kW 3O 0E 209YI120 Howled 2 60.00 ro Ilan d i duY im Inc.,do Po-or Baan OmM Inc-Am mh--nom-WP—h* hem 1500 Wa 30 OF 480Y277 Hwaad 3 $0.00 ro Ram 2750 We 3O OF 480YIM Howell 5 $0.00 ro hem 31000 Wa 30 OF 450Y277 Hwa? 4 $D.00 ro hem4500kV83ODF20BY1120 Hawed 2 $0.00 ro iw 20IM4 r.e a A. ,, 1..2.. RMLD ) '�":o. ... P.O.Bu SUN P.O.Bus 150 Reeding,MAOIg6]-025U 111th CMI)%U599 wick www.neU. November 15,2019 Town of Rending Municipal light Board Subject: IFB 2019-26 Construction and Installation of New Stand-by Generator with ATS Pumiced to M.G.L.,c. 149/c.30 § 39M,on October 23, 2019,an invitation for bid was placed ea a legal notice in the Middlesex Plat Section of the Daily Times Chronicle, published in the Central Register, posted on COMMBUYS, the RMLD website, and the RMLD bulletin board requesting sealed bids for Construction and Installation of New Stand-by Generator with A'I'S. An invitation for bid was went to the following nineteen companies: All-Pro Electric,Inc. Brite-Lite Electrical Co.,Inc. Carlton Electrical Co.,Inc. Commonwealth Construction& CmatructCmmcc4 Inc. Dagle Electrical Construction Corp. Utilities,Inc. Deltek Edward Paige Corp. ElecComm Corp. Elm Electrical,Inc. Herta Electric Company Mass Bay Electrical Corp. McDonald Electrical prime Vendor,Inc. Pmjectdog,Inc. Corporation Sparks Company,Inc. Wayne J.Griffin Electric,Inc. Weston&Sampson Eagmeen,Inc. Your Electrical Solution,Inc. Sealed bids were received from three companies: McDonald Electrical Corporation, Sparks Company, Inc., and Your Electrical Solution,Inc. The seated bids were publicly opened and road aloud at 11:00 a.m. on Novemmber 13, 2019, in the Town of Reading Municipal Light Deparmmnib General Manager's Conference Room,230 Ash Street,Reading,Manachurom. The bide were reviewed,analyzed,and evaluated by suffered recommended to the General Manager. Move that 11-B 2019-26 for Construction and Installation of New Shed-by Generator with ATS be awarded m: Sparks Company,Inc.,for$130,697.101,pursuant to M.G.L.,c. 149/c.30§39M,as the lowest responsible and eligible bidder,on the recommendation of the General Manager. 'Sec attached analysis. The Construction and Installation of New Shod-by Generator with ATS will be paid with Capital funds. This is a non. budgeted bear. P,44 McGonagle I amid affa Coleco O'13rien - c-(� Page 1 of2 Colw&wdw wW Insbtl/sbon a7Mhw SdnM-by GonwWw WMh ATS WB 2010-26 Resooiwles SosciScatlon Blddw Total Ptta mR Ulrements McDo ltl EkcWAI Coryomtlon $231,874.00 Yes Yes 8pertw Compnry,1n 5130,087.00 Yr Yes Yom Ebchicel SaBNon,U¢. $133,000.00 Yes Vee nervi. e.wzotz BOARD MATERIAL AVAILABLE BUT NOT DISCUSSED Run; Tracy SaudR Sub}S PV erq Puyidl Quemaruu Nr 11-21-19 BoeN Book pure; MOMry,Nmienber 10,301911:30:00 MI Good afternoon: AP: On October 181h there were no Commissioner questions. On October 251h there were no Commissioner questions. On November IN there were no Commissioner questions. On November 81h there were no Commissioner questions. On November 151f there were no Commissioner questions. Payroll: On October 15th there were no Commissioner questions. On October 281h there was a Commissioner question regarding an employee's amount of overtime pay. On November 12th there were no Commissioner questions. This e-mail will be included in the 11-21-19 Board Book. Tracy Schultz Executive Assistant Reading Municipal light Department 230 Ash Street. Reading. MA.0186 Tel: 781.942.6489