HomeMy WebLinkAbout2020-09-18 Birch Meadow Working Group Minutes ACTIVITAS landscape architecture civil engineering MEETING NOTES "a Subject: Working Group Meeting a "rt O x Project: Town of Reading-Birch Meadow Master Plan Cn %' Rt Project No. 20009.00 N Z r, CD Issue Date: 10 October 2020 Meeting Date: 18 September 2020 2 TTI TF W s=7J C' Prepared By: Mark Novak, Design Principal IJ 3'T` Attendees: Genevieve Horente, Recreation Kevin Bohmiller, Community Services Richard Hand, Recreation Committee Martha Moore, Conservation Co Chuck Tirone,Conservation Agent Tom Zaya,Athletics Ryan Percival, Reading Engineering Mark Novak, Activitas GENERAL 3.0.01 The following Meeting Notes are compiled from a scheduled master plan meeting with the Master Plan Working Group,Town of Reading (TOR) and Activitas (ACT), for the Birch Meadow Master Plan Project. 3.0.02 The Items and comments are not listed in order of the discussion, but are grouped by topic for easier reference and interpretation. DISCUSSION ITEM NO. ACTION ITEM(New Items In Haller) BY/DUE 3.1 PROCESS TO DATE RECAP 3.1.01 Activitas discussed the steps taken during the design process (including public engagement/user group interviews) that informed the updated designs for the various master plan options. 3.1.02 Activitas re-visited the primary amenity requests from the public engagement process: • More lighting • More passive recreation (trails/walkways) • Restrooms/concession building More turf 3.1.03 Activitas acknowledged and addressed the concerns related to Costine Field raised by the Conservation Agent and some of his commission members. acnvl tos.aom 70 Milton Street I Dedham. Massachusetts 1 02026-2915 17811 3262600 Meeting Notes 10 October 2020 Town of Reading—Birch Meadow Master Pion Working Group Meeting Page 2of3 ITEM NO. ACTION ITEM(New Items in Xollcs) 6Y/DUE 3.2 WETLAND DELINEATION 3.2.01 Activitas retained Epsilon Associates to perform a resource area delineation at Castine Field and the Aberjona River. Activitas reviewed the findings of the delineation and associated report 3.2.02 with the Working Group. A copy of the Delineation Summary was provided to the Town. 3.2.03 The Town of Reading Engfneering Department picked up the flogging and provided the information for inclusion in future site plans. 3.3 DESIGN UPDATES 3.3.01 Activitas reviewed with the Working Group the existing conceptual master plan design and associated resource area impacts. Activitas also presented updated conceptual master plan options which avoid impacts to the existing resource areas. 3.3.02 Activitas reviewed changes in circulation and field layout in order to maintain sufficient buffers adjacent to the resource areas. 3.3.03 Activitas reviewed options for the restroom/concession building and some operational opportunities and challenges associated with each. The various options for the building included the following: #I -True restroom and concessions building #2-Outdoor pavilion structure for informal concessions with storage and restrooms is #3-Restroom and storage structure and food truck program (no concessions) The Working Group collectively thought that #2 would work best from an operational point of view but would also be nice if the park could comfortably accommodate food trucks. Two conceptual design options were presented. Although the Working Group liked both concepts, they collectively felt that Option #1 was a more viable master pion concept.Activitas to continue to refine Option #1,provide cost estimates for the proposed components and prepare a recommended project priorftization list. 3.4 NEXT STEPS .ah"tas.corn 70 Milton Street I Dedham, Massachusetts 1 02026-2915 (181) 326-2600 Meefing Notes 10 October 2020 Town of Reading—Birch Meadow Master Pon Working Group Meeting Page 3 of 3 ITEM NO. ACTON ITEM(New items In Italics) 6Y/DUE 3.4.01 Activitas to make necessary revisions to Option IT 1 and prepare Opinions of Probable Project Costs and a priontization list for each of the elements within the site plan. 3.4.02 A public presentation in early November was discussed with the Working Group. A final presentation to the Reading Select Board would follow. NEXT MEETING 3.5 TBD The preceding meeting notes represent our understanding of the information exchanged. Please notify us of any misunderstandings or required interpretations, within five days, as we will proceed on the basis that these items are agreed to by all parties. Respectfully, ACTIVITAS Mark Design Principal mjn@octivitas.com a ctivltos.com 70 Milton Street I Dedham, Massachusetts 1 02026-2915 17811 326-2600