Loading...
HomeMy WebLinkAbout1979-04-30 Board of Public Works Minutes April 30, 1979 ' Meeting of the Board of Public Works convened in Room 16, Municipal Building at 7:30 P. M. Present were Chairman Price, Secretary Cowell , Board Members Testa and DeHart and Wood, Superintendent Louanis, Assistant Super- intendent Bergeron and William Redford of the Engineering Division. Jose Canto represented the Finance Committee. No action was taken on the minutes of the previous meeting. Superintendent Louanis reported that legal counsel for Mr. William Winkler had requested the meeting scheduled at 7:45 P.M. be postponed for two weeks. The Board agreed to place this item on the Agenda for the meetingofMay 14th et 7:00 P. M. Mr. Price read letter from Jo-Ann Caratelli , Chairman of the Reading Camp Fire Girls requesting the use of the facilities at Memorial Park on Sunday, June 3, 1979 from 12:00 Noon until 5:00 P.M. when they wish to hold a family picnic. Following a discussion it was moved, seconded and voted to grant permission subject to the ' standard restrictions: no alcoholic beverages allowed on the pre- mises, the area properly policed, the area clean and litter-free at the conclusion of the event and liability insurance procured. Read letter from William Webb, Clerk of the Church of the Good Shepherd requesting the use of Memorial Park between the hours of 10:00 A.M. and 4:30 P.M. on June 17th (rain date June 24th) in order that the parishioners of the church may hold a picnic. It was moved, seconded and voted to grant permission for the use of the park on the 17th of June (rain date June 24th) sub- ject to the standard restrictions. Chairman Price read letter from former Chairman Dustin thank- ing the Board for a pleasant evening on April 20th: appended hereto. The Engineering Division submitted the following table summarizing work being accomplished under the Roadway Reconstruc- tion Program: Rds. being Re- Drain Construc- Overlay Con- Reconstruction constructed tion 79-5 tract 79-4 Contract 79-3 ' Grove Street $ 24,840.50 $ 18,360.00 $ 25,484.00 Hopkins Street 9,894.00 14,388.00 Chute Street 3,570.00 5,655.00 Totals $ 24,840.50 $ 31 ,824.00 $ 45,527.00 Bell and Flynn, Inc. was the only bidder on Contract 79-3 (Asphalt Pavement Reclamation) . The Engineering Division re- ported they have satisfactorily completed a number of roadway ' reclamation contracts in Eastern Massachusetts and one for the Town of Reading. It was moved, seconded and voted to award Contract 79-3 to Bell and Flynn, Inc. in the amount of $45,527. subject to the provision that they procure a proper performance bond. Bids were received on April 19, 1979 on Applying Bitumin- ous Concrete - Contract 79-4 as follows: Essex Bituminous Concrete Corp. . . . . . . . . . . $ 125,280.00 Heffron Asphalt. . . . . . . . . . . . . . . . . . . . . . . . . . 121 ,800.00 Sarao Brothers. . . . . . . . . . . . . . . . . . . . . . . . . . . 118, 320.00 Trimount. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 118,610.00 James Walsh Sons, Inc. . . . . . . . . . . . . . . . . . . . 127,600.00 It was moved, seconded and voted to award Contract 79-4 to Sarao Brothers, Inc. in the amounnt of $118, 320 subject to the approval of Town Meeting of Roadway Reconstruction Program FY-80, Overlay Program FY-80 and Street Acceptance Program FY-80 C Street. Bids were received on Applying Bituminous Chip Seal Contract 79-1 as follows: ' Bell and Flynn, Inc. . . . . . . . . . . . . . . . $ 38,618.72 Able Bituminous Contractors, Inc. . . . . . . . . 45,942.96 The apparent low bidder Bell and Flynn submitted a bid with the condition that a price escalator be applied to the contract de- pendent upon the actual price of oil at the time of construction. The Engineering Division recommended the Board consider Bell and Flynn' s work history, the 15.9% difference in bid prices and the short contract life and award the contract to Bell and Flynn with the provision that additional costs incurred by the contractor be- cause of oil price increases be considered as an extra item to be negotiated at the end of the contract. It was moved, seconded and voted to award Contract 79-1 to Bell and Flynn, Inc. in the amount of $38,618.72 subject to the provisions that they provide a proper performance bond and that any additional costs incurred because of oil prices be discussed at the end of the contract. Bids were received on Cement Concrete Pipe on April 5, 1979: copy of bid result attached. Only two companies bid on all the , items and it was moved, seconded and voted to award the contract to the low bidder Scituate Concrete Pipe Corporation in the amount of $11 ,928. Minutes - continued April 30, 1979 Bids were received on April 5, 1979 for Manhole Frames and Covers, Catch Basin Frames and Grates. Bid results appended here- to. It was moved, seconded and voted to award the contract for this material to the low bidder Neenah Foundry Company, Neenah, Wisconsin in the amount of $8,684. Bids were received on April 5, 1979 for Asbestos Cement Pipe. Bid results attached hereto. It was moved, seconded and voted to award the contract to the low bidder, T. E. Toomey Company, Inc. in the amount of $1 ,030. Bids .were received on April 19, 1979 on Copper Tubing and Curb Boxes. Bid results appended hereto. It was moved, seconded and voted to award the contract to the low bidder bidding on all items, Municipal Services in the amount of $15, 185. Bids were received on April 26, 1979 on Inspection Cleaning and Sealing Sanitary Sewer Mains - Contract 79-7 as follows: Penetryn Systems, Inc. . . . . . . . . . . . . . . . . . . . . . $ 7, 115.00 Eastern Pipe Service. . . . . . . . . . . . . . . . . . . . . . . . 9, 191-.70 ' N. E. Pi-pe Cleaning. . . . . . . . . . . . . . . . . . . . . . . . . 13,847.50 The Engineering Division reported that Penetryn has performed satisfactorily on several contracts in Reading in the past and investigation indicates the company has maintained its good quality of workmanship. It was moved, seconded and voted to award the contract to Penetryn Systems, Inc. in the amount of $7, 115.00 subject to the provision that they furnish a proper performance bond. Read letter from Gerald W. McCall reporting ..that an analyses of drinking water samples collected from the tap in the Reading Town Hall indicates a sodium level of 180. mg/l . Superintendent Louanis stated he was going to try to obtain a clarification of this number given on the letter from the Commonwealth of Massa- chusetts and if the figure is correct it will be necessary to send out notices June 23, 1979. The Board agreed to meet as follows: May 7, 14 and 21 prior to attending Town Meeting on each -evening. ' Superintendent Louanis indicated that Mr. Lilley of 471 Frank- lin Street (opposite Van Norden Road) has requested permission to tie into the Town ' s drainage system on Franklin Street as every spring he has water in his front yard. He has indicated a willing- ness to sign a waiver of claim from damages in favor of the Town if he is granted permission to tie into the drainage system. The Superintendent stated that a second such request has been received from Jack Rivers for a connection to the drainage system on River- side Drive in order to alleviate a build-up of water in the street as in the winter it creates an icing situation. The homeowner has agreed to sign a Waiver of Claim from Damages. It was moved, seconded and voted to allow Mr. Lilley to connect to the Town' s drainage system on Franklin as outlined in the sketch submitted and the work must meet with the approval of the Engineering Division. It was moved, seconded and voted to grant permission for the connection to the Towns drainage system at Lot 29, Riverside Drive work to meet with the approval of the Engineering Division. Mr. Price read letter from Eugene R. Nigro, Chairman of the Reading School Committee suggesting the formation of subcommittees to discuss the possibility of .the School Committee applying its budgeted funds in a "contract" with the Board of Public Works. Mr. Cowell , suggested we respond positively thanking Mr. Nigro for his letter and suggest the department heads, or members of the staff meet to discuss existing problems and then graduate to a more formal action. The Board read letter from Municipal Leasing Company which was accepted as a point of information. It was requested the word- ing for Article 9 - Equipment read "purchase or lease" . Mrs. Wood agreed to be a committee of one to investigate the pros and cons of leasing. Mr. Bergeron presented a review of the Reading Municipal In- cinerator Facility and or Site Reuse, copy attached herewith and a summary of the Gordian Associates, Inc. report. After hearing both reports and considerable discussion it was moved, seconded and voted to present a motion under Article 44 at the Annual Town Meet- ing authorizing the Board of Public Works to negotiate a twenty year contract with operator of the solid waste facility to be established in the Town of North Andover. The Superintendent was instructed to study alternatives including the following possi- ' bilities: reuse of the municipal incinerator: the possibility of a long term contract with a commercial hauler: evaluation of N.E. S.W.C. and S.E.S.W.C. and Titan. J Minutes - continued April 30, 1979 The Board signed the Pay Roll for the period ending April 27th and the Bill Roll dated May 4, 1979. Meeting adjourned at 11 : 15 P. M. Res ly submitted, Secre ary // Paul C.Dustin 3 Orchard Park Drive - Reading,Massachusetts 01867 dD �� CEMENT CONCREIPE Bid Date%-79 l--Flared inlet-outlet Total 1 . 2. 3. 4. 5. 6. 7. 8. 9. 10. 11 . Vendor Bid 12" 15" 18" 21" 24" 12" 15" 18" 21" 24" 30" $ R. C. Pipe R. C. Pipe class V Class V 800' 2501 1501 0 0 10 ea 2 ea. ea. 2 ea. ea. a Field Concrete 11-it 4.97 6. 18 7.60 9.91 12. 13 158. 174. 186. 248. 248. 293. Pipe Co. Inc. 13,822 3,976. ,545. 1 , 140. 495.50 606.50 1 ,580. 348. 930. 496. 1240. 1465. Johns-Manville 5-item 4.69 6.90 10. 12 13.39 17.75 Sales Corp. 8,552. 3,752. 1 ,725. 1 ,.518. 669.50 887.50 Note: Asbestos-cemeni storm Irain pipe - al ernate bid N. E. Concrete 0 item 3.68 4.99 6.42 8.28 10.46 140. 160. 180. N.A. 235. 300. Pipe Corp. 19386-!9,944 1 ,247.5 963.00 414.00 523.00 1 ,400. 320. 900. --- 1 , 175. 1 , 500. Scituate Concrete i Items 3.68 4.80 6. 12 7.98 10. 12 150. 168. 194. 240. 240. 295. Pipe Corp. 1 ,928. 2,944. 1 ,200. 918. 399. 506. 1 ,500. 336. 970. 480.' 1 ,200. 1 ,475. FY-79 Bids3.02 3.95 5.20 6.98 8.50 The apparent low bidder i Scitua a Conc ete Pipi Corp. 1 Bid Dat f: 05-79 i BID DFIR Re: MANHOLE FRAMES & COVERS - CATCH BASIN FRAMES & GRATES Firm 12 M.H.Frames & 55 M.H.Frames & 16 C.B.Frames Total Remarks Covers-Marked"D' Covers-Marked "S" and Grates E. L. LeBaron $105.00 $105.00 $154.50 Del . 2-3 wks ARO Brockton, Ma. $1 ,260. $5,775.00 $2,472 $ 9,507 Net 30 days Neenah Foundry Co. $100.00 $100.00 $124.00 Del approx 45 dys ARO Neenah, Wisconsin $1 ,200. $5,500.00 $1 ,984 $8,684. Minimum releases of $5,000 or more C.A.Turner $107.00 $107.00 No bid $7, 169 Min. Order 6 units Leicester, Ma. for 2 item.Price firm for accept ance up to 4-20-79 an until mfg. next inc. FY-79 Low Bid $ 91 .00 $ 91 .00 $124.00 The apparent low bidder is Neenah Foundry Co. �i ,;-ct Bid dates-05-79 BID DATA l ASBESTOS CEMENT PIPE FIRM 1 ,000' - 4" A. C. Pipe Total - remarks HILCO SUPPLY INC. $ 1 .34 per ft. for 13' lengths $1 ,340. Price firm for 90 days from date of bid T. E. Toomey Co. Inc. $1 .03 per ft. for 101 lengths $1 ,030.00 FY-79 Bid .821 per foot The apparent low bidder is T. C.Toomey Co. j Bid Date:- , ^•9-79 _.SD COPPER TUBING AND CURB _KS Copper Tubing Type "K" Curb Boxes irm 3/4" 1 " 2" t2,47 e Tops onl Total Remarks Tubing Boxes17,non, 15n , 1001 r;O George A. Caldwell Co. .98' 1 . 28' 3. 12' 5e No bid 11 ,760.00 192.00 312.00 0 $12, 264.00 Prices firm for 30 dys 2,497. 50 after bid date.Orders $14,761 . 50 must be placed & re- leased within that tirr Eureka Cement Lined .94' 1 . 23 ' 2.98 ' 19. 65 da. 9.80ea 11 ,762.50 Prices firm for 10 dys Pipe Co. 11 , 280 184. 50 298.00 2,947. 50 490.00 3,437. 50 after bid escalating 15, 200.-- prices will be added to quoted price Municipal Services .98 ' 1 . 28 ' 3. 13' 16.60e 8.6oEa 12, 265 Prices firm til 6-19-7 11 ,760. 192.00 313.00 2,490 430. 2,920 then prices will be 15, 185. acc' d' g to mfg. inc. H.R. Prescott & Sons, Inc. 1 . 16' 1 . 53' 3.70 ' 19.60ei 9.76e3 14,519. 50 = 17,947, 50 13,920 229. 50 70.00 2.940.00 488. 428.00 Public Works Spply. Inc 1 .20 ' 1 .60' 3.90' 17.60 a 8.75e3 15,030 Box prices firm 60 dys 14,400. 240.00 390.00 2,640.00 437. 50 ,0 0 Bid on all or nothing basis-del .all at once. Ti-Sales .986' 1 . 288' 3. 138' 19.40ei 10.50e3 12,339 Price firm duration of 11 ,832. 193. 20 313.80 2,910.00 525.00 3,435 current price list for copper tubing-then 15,774.-- price calculated based' p7% disc.on mfg.pub. list price in effect C order time-del . 1-2 wks Curb box price firm 180 dys subj. to mfg pub.price thereafter not tc exceed 10% Water Works Supply , 12,240. 201 . 326.00 2,700. 449.50 3, 149.50 Remarks see next page 15,916.50 --I r-1,9 u,� Water Works Supply Remarks: Copper prices firm within 5 business dys & release for del . as soon as available. Price instability reason for no firm 1 year price. Box prices firm for award within 30 dys & released for immediate del . after that any price in- crease or decrease from mfg shat ' be for the Town of Reading acct. The apparent low bidder for copper tubing is Eureka The apparent low bidder for Curb Boxes and Tops is Municipal Services