HomeMy WebLinkAbout1978-10-02 Board of Public Works Minutes October 2, 1978
® Meeting of the Board of Public Works convened in Room 16,
Municipal Building at 7: 30 P. M.
Present were Chairman Dustin, Secretary Price, Board Mem-
bers Russell , Cowell and Testa and Superintendent Louanis. The
Finance Committee was represented by Jose Canto and Gail Wood.
It was moved, seconded an voted to accept the minutes of
the previous meeting as written.
Meeting adjourned temporarily and reconvened at 7:40 P. M.
following a meeting as the Board of Survey.
The Board met with Bernard Murphy and John Brownlee of the
First National (Old Colony) Bank. Mr. Dustin introduced the
members of the Board and requested that the Superintendent out-
line the status of the Bank' s project. The Superintendent stated
the engineering plans are complete, the foundation in and the
building underway. Mr. Brownlee indicated on a plan the available
parking spaces, the proposed driveway onto Ash Street, the loca-
tion of the drive-up-windows and driveway at the southerly
side of the building with exit onto Main Street and proposed 10'
wide driveway off Main Street at the northerly side of the building
and entrance to the bank at the northeast corner of the building.
The building sets back approximately 12' from the street line.
The Board discussed the anticipated increase in traffic at an
already busy area and expressed concern regarding the congestion
that could be created by traffic entering and leaving the Bank' s
site. The Board had no objection to the Ash Street entrance.
Following a very lengthy discussion Mr. Price moved to grant the
Old Colony Bank a curb cut to accommodate the drive-up-windows
at the southerly side of the bank, the curb cut on Ash Street and
deny the curb cut for the proposed north driveway on Main Street.
It was seconded. Mr. Brownlee requested that the Board grant all
curb cuts or deny the entire plana Mr. Cowell stated he was
opposed to the motion as we have granted other businesses curb
cuts and did not feel it proper to deny the bank as the proposed
plan is better than some. A six month trial period was suggested.
The discussion continued at length. The Chairman called for a
vote: 3 in favor, Mr. Cowell and Mr. Dustin opposed.
Meeting adjourned at 8:45 P. M. and the Board met as the
Board of Survey reconvening at 9:40 P. M.
As a full Board was present, and as agreed earlier, the
matter of providing sewer house connections by Town forces to
homeowners experiencing problems because of malfunctioning septic
systems was brought up for discussion. Letters from John A.
Rainone of 12 Landers Road, Raymond R. DeRosa of 8 Reading Terrace
and Donn R. Howard of 84 Cross Street were reviewed. Each of the
aforementioned homeowners indicate that the cost of a house connec-
tion by a licensed drain layer exceeds their available resources
at this time. Mr. Testa indicated that when he voted against the
issue earlier he was not aware that these applicants were on the
list. A general discussion ensued. Mr. Price moved, it was
seconded, to instruct the Superintendent to add the names of Raymond
DeRosa and Donn Howard to the list of property owners whose homes
are to be connected to the main sewer this construction season:
and, to verify the situation at the property on Landers Road
owned by John A. Rainone and if the situation is as reported to
have the connection to the main sewer made as soon as possible.
Mr. Russell stated he felt that if the Board votes the motion
it will be setting a dangerous precedent as for a long time appli-
cations for sewer house connections by Town forces have been accepted
and the work has been done in the order in which the applications
have been received. The Chairman called for the vote which was
4 in favor and 1 opposed.
The Board reviewed proposed letter from the Chairman to the
Board of Selectmen together with the Final Report of Identified
Reductions. The Board requested a few minor changes in the letter
and requested the word "individual " be deleted from Item No. 3 of
the proposed reductions in services. (copy of each attached) .
The Superintendent advised the Board that the Agreement be-
tween the Town and the Union is now in hand, and the new wage
rates are in effect. It was accepted as a point of information.
Mr. Dustin requested the Board give him some direction re-
garding the Board' s position concerning Articles 5 and 6 for the
Special Town Meeting to be held October 5, 1978. After consider-
able discussion of the possible various actions that might be
taken under the Article it was agreed Mr. Russell would speak against I
the motion to rescind the action taken by the May Town Meeting
under Article 5 since he had presented the original Park Con-
struction Article at the May Town Meeting, being prepared to a-
mend the Article if necessary to reduce the amount to be rescinded
by $2,634.00 already contracted for the tennis court resurfacing.
Mr. Dustin will make the motion under Article 6 in the event that
Article 5 carry and Mr. Dustin will present Article 6 for $5,500
to provide additional park equipment at Sturges Park in the
estimated amount of $2,500 and $3,000 for engineering assistance
for the development of Pinevale Park.
It was moved, seconded and voted to meet as follows:
October 5, 10, 16, 23, 26 and 30
November 6, 13, 20 and 27
December 4, 11 and 18
Following a review of the Petition for Joint Pole Relocation
of pole 54/58 it was moved, seconded and voted to grant permission
to the N. E. Telephone and Telegraph Company and the Town of Read-
ing Municipal Light Department to move the pole approximately
twelve feet northerly on Main Street.
The Chairman reported to the Board that he and the Superin-
tendent met with the Finance Committee Capital Budget Subcommittee
on September 28th and presented the Board' s Capital Outlay Program
for Fiscal 1980-1984 as attached hereto. The Capital Plan follows
the plan submitted in 1977 except for the fact that the sewer house
connection account has been estimated higher than the previous
submittal to complete the applications on hand and the equipment
replacement was added to the program as requested by the Capital
Budget Committee. Also, the Water Department ' s expansion program
has been upgraded to reflect costs presented to the Board in the
consultant' s study of the water system. This was accepted as a
point of information.
The Board signed Bill Rolls 13 and 13-A dated October 6th
and the Pay Roll for the period ending September 29, 1978.
Meeting adjourned at 10:30 P. M.
IP ctf 1 fitted,
CA
ecretar �
October 3, 1978
Frank A. Smith, Jr. , Chairman
Board of Selectmen
Torn Hall
Reading, Massachusetts 01867
Dear Frank:
At our meeting of October 2, 1978, the Board of Public
Works voted to submit the attached list of potential service
reductions to the Selectmen as we have been directed. In
addition, the Board suggested that, as Chairman, I send these
along to you with a letter outlining the concerns we have re-
garding some of the specific items.
It is easy to take a stance that all our services are
essential and therefore should not be cut. This is perhaps
true in some cases but in other areas where this is not the case,
the Board of Public Works is providing a service that people
have required. These latter services, should they be reduced,
are likely to cause a hardship on the people involved, and for
this reason the Board feels strongly that this point should be
understood and emphasized. There is little in the Public Works
area that can be eliminated; it can only be transferred back to
the citizen or deferred into the future.
Here then is a listing of the identified service reduc-
tions. I have also given a short description of the direct
effect that each one will have.
1 . Line item 127/128 - Highway Maintenance
Will stretch the program out from 20 to 40 years.
2. Line item 139 — Park Maintenance
Will reduce the park upkeep and as ' repairs become increas—
ingly necessary it will limit any new facilities.
3. Line items 141/142 Forestry
Would eliminate the planting of new trees and the resultant
Town beautification. There may be an increased safety hazard
due to weak trees not being removed.
Frank A. Smith, Jr. , Chairman October 3, 1978
- 2 -
4. Line item 143 - Sewer Maintenance
Discontinue town cleaning home sewer services and require
the home owner to contract for this himself. As this is
generally done on an emergency basis this could present a
health hazard if commercial assistance were riot immediately
available.
S. Line items 145/146 - Sewer House Connection
We are presently phasing this out as an identified cost
saving. The effect here would be to cease immediately.
The hardship here would be to those homeowners who have
waited.
6. Line items 147/148 - Snow and Ice
This would eliminate the clearing of sidewalks .in the Town
both for school children as well as the downtown business
area and create a definite unsafe condition. This is a
difficult task to perform but the Board feels it should be
improved rather than curtailed. We recognize however that
proper enforcement of the sidewalk bylaw would require each
citizen to clear his own sidewalks.
7. Line items 149/150 Water Department
This would largely eliminate the laying of new water ser-
vices, cleaning and maintenance of emkrgency household
water services. The citizen would have to call in a com-
petent service firm to do the work and without further
contaminating the water system.
8. Line item 155 - Landfill operation
This would reduce the number of hours that the dump is
open. This should not be a hardship but rather an incon-
venience.
9. Line item 157 - Equipment replacement
This would defer the purchase of snow Plowing equipment
and the effect would be to reduce the Board of Public Work' s
ability to respond to a heavy snowfall .
10. Line item 158 - Park Construction
This account is perhaps the most flexible service the Board
of Public Works provides but if this is curtailed for too
long the quality and number of our recreational facilities
will be effected.
I hope these comments have served to further explain what
will be involved should such a service'reduction or similar
proposition be directed by Town Meeting. It is clear that at least
as far as Public Works is concerned there will be direct service
curtailments.
Very truly yours,
Chairman
PCD/be
OCT 21979
- REPORT OF IDENTIFIED REDUCTIONS
Town Agency: Board of Public Works
Article 12 Appropriation Total : $ 2,355,745
10% Reduction Target: $ 235,574
1 . Function/Service to be reduced: Describe fully including
any ea count re uction, changes from full time to part
time help, etc.
A. Dollar reduction this service:
B. Source of reduction: Line item #127 $ 12,800
Line item #128 42,339
C. Risk assessment (Explain fully if medium or high) :
This is the Highway Maintenance Program and has been iden-
tified as a $12,800 cut in the salary and $42,339 cut in
expense accounts. The area in the Highway Maintenance
Account that would be cut is the Road Reconstruction Pro-
gram and would have the effect of stretching out this
program to over 40 years. The reason for choosing this
area is that if it is not possible for the Town to fund
a well thought out program then it would be better to
use the dollars for the areatest number of miles of roads
that could be maintained in some reasonable fashion.
Although the Highway Reconstruction Program is an integral
part of the miles per dollar of roads reconstructed, it is
a small number compared to the miles of roads than can be
temporarily maintained. The effect of this type of thing
on this highway budget will , of course, result in a less
efficient operation.
l
OCT 21978
REPORT OF IDENTIFIED REDUCTIONS
Town Agency: Board of Public Works
Article 12 Appropriation Total : $ 2,355,745
10% Reduction Target: $ 235,574
2. Function/Service to be reduced: Describe fully including
any head count reduction, from full time to part
time help, etc.
A. Dollar reduction this service:
B. Source of reduction: Line item #139 $ 3.700.
C. Risk assessment (Explain fully if medium or high) :
This is for the maintenance of the Parks and Playgrounds
and has been identified as a $3,700 cut in salaries which
would reduce the summer help completely. The effect of
this would reduce the overall maintenance level of the
parks and playgrounds which many people already feel is
inadequate. However, it is not an absolute essential
program and people using the facilities could help reduce
expenditures by a more reasonable approach to their
activities and policing of the area.
REPORT OF IDENTIFIED REDUCTIONS
Town Agency: Board of Public Works
Article 12 Appropriation Total : $ 2,355,745
10% Reduction Target: $ 235,574
3. Function/Service to be reduced: Describe fully including
any aa
count re uction�ges from full time to part
time help, etc.
A. Dollar reduction this service:
B. Source of reduction: Line item # 141 $ 4,000.
Line item # 142 $ 2.000.
C. Risk assessment (Explain fully if medium or high) :
This is the Forestry Division and $4,000 has been identi-
fied for a cut in salaries. This would reduce the summer
help in this area. A $2,000 reduction in expenses would
eliminate the purchase of trees and shrubs completely.
The effect of this on the Forestry Division would be to
reduce services provided homeowners and cease removing
elm trees with dutch elm disease from private property
and replace new trees on private property.
REPORT OF IDENTIFIED REDUCTIONS OCT 21978
Town Agency: Board of Public Works
Article 12 Appropriation Total : $ 2,355.745
10% Reduction Target: $ 235,574
4. Function/Service to be reduced: Describe fully including
any head count reduction, changes from full time to part
time help, etc.
A. Dollar reduction this service:
B. Source of reduction: line item #143 $ 6.783
C. Risk assessment (Explain fully if medium or high) :
This would result in a reduction in the Sewer Mainten-
ance Salary Account and in individual service to home
owners for plugged sewer lines. The effect of this
would mean a home owner would have to hire a private
contractor to rod out his sewer line.
OCT 21978
REPORT OF IDENTIFIED REDUCTIONS
f Town Agency: Board of Public Works
Article 12 Appropriation Total : S 2,355,745
10% Reduction Target: S 235,574
5. Function/Service to be reduced: Describe fully including
any ea count reduction, changes from full time to part
time help, etc.
A. Dollar reduction this service:
B. Source of reduction: Line item #145 $ 38,286
Line item #146 9,000
C. Risk assessment . (Explain fully if medium or high)
This is the sewer house connection account and in keeping
with the Board's policy of identifying this as a service
that could easily be provided by a private contractor has
been identified as a total reduction both for salary and
expense. This would result in the reduction of two per-
manent people on the staff and would require the home-
owner to make arrangements with a private contractor to
remedy his situation.
l
REPORT OF IDENTIFIED REDUCTIONS OCT 21478
Town Agency: Board of Public Works
Article 12 Appropriation Total : $ 2,355,745
10% Reduction Target: $ 235,574
6. Function/Service to be reduced: Describe fully including
any head count reduction, changes from full time to part
time help, etc.
A. Dollar reduction this service:
B. Source of reduction: Line item # 147 $ 14.400
Line item # 148 $ 9.600
C. Risk Assessment (Explain fully if medium or high) :
Snow and Ice Salaries and Expenses - It is difficult to
estimate the cost saving to be realized by discontinuing
of the sidewalk plowing particularly in a very severe
winter with heavy snow and ice conditions. However, a
normal storm would cost the Town approximately $3,000 per
storm and assuming we have eight plowable storms in the
year it would be a $24,000 cost saving to the Town. This
would mean that the Town would not plow any sidewalks
pith r in the business or school districts This, of
course, would be very unsatisfactory to the citizens
of the Town of Reading.
OCT 21978
REPORT OF IDENTIFIED REDUCTIONS
I Town Agency: Board of Public Works
Article 12 Appropriation Total : $ 2,355.745
10% Reduction Target:
7. Function/Service to be reduced: Describe fully including
any neao count reauction, cFanges from full time to part
time help, etc.
A. Dollar reduction this service:
B. Source of reduction: Line item # 149 $ 44,000
C. Line item # 150 $ 20,690
C. Risk assessment: (Explain fully if medium or high)
This is the Water Salary and Expense Account and a
$44,000 reduction in Salaries and a $20,690 reduction
�► in expenses. This, of course, would result in some
curtailment of services to our customers. The area most
likely to be the least destructive would be in the area
of service pipe construction which is usually laying
new water services from the main to new houses constructed
in a subdivision. This could be done by a private con-
tractor at the expense of the developer. The second
area of reduced service is service pipe maintenance
which would not completely reduce this activity but
would reduce it to a strictly repair type of operation
such as rodding clogged services and putting on repair
clamps. When it became necessary for replacement of the
service the home owner would be required to hire a private
contractor to make replacement at his own expense.
.v
OCT 21978
REPORT OF IDENTIFIED REDUCTIONS
Town Agency: Board of Public Works
Article 12 Appropriation Total : $ 2,355,745
10% Reduction Target: $ 235,574
8 . Function/Service to be reduced: Describe fully including
any meaaccountre uction� cianges from full time to part
time help, etc.
A. Dollar reduction this service:
B. Source of reduction: Line item #155 $ 3, 100
C. Risk Assessment (Explain fully if medium or high) :
It is possible to reduce this by three thousand one
hundred dollars by several methods, one of which would
be to curtail the dump hours on the weekend by 50%. We
could still have the same number of days for the citizens
to use the area for recycling, but instead of opening at
8:00 A.M. we could open at 1 :00 P.M. and close at 5:00
P.M. Another alternative would be to open the dump for
a half day during the work week which would save approximatel
the same amount of money but would curtail the hours of
opening for the commercial people and rubbish haulers.
Or, a combination of both of these could be worked out.
OCT 21978
REPORT OF IDENTIFIED REDUCTIONS
Town Agency: Board of Public Works
Article 12 Appropriation Total: S 2,355.745
10% Reduction Target: $ 235,574
g. Function/Service to be 'reduced: _ Describe fully including
any Flea count reon, from full time to part
time help, etc. -
A. Dollar reduction this service:
B. Source of reduction: Cine item # 157 $ 5:078
C. ' Risk assessment (Explain fully if medium or high) :
This is the Equipment Replacement Account and can be
cut by $5,078 which would result in the curtailment
of the purchase of snow plowing equipment.
/.
w --
r
i
OCT 21978
REPORT OF IDENTIFIED REDUCTIONS
Town Agency: Board of Public Yorks
Article 12 Appropriation Total : $ 2,355,745
10% Reduction Target: $ 235,574
10. Function/Service to be reduced: Describe fully including
any ea count re uction�ges from full time to part
time help, etc.
A. Dollar reduction this service:
B. Source of reduction: Line item # 158 $ 20.000
C. Risk assessment: (Explain fully if medium or high) :
Park Construction has been identified as a $20,000 re-
duction as the least essential construction program of
the Department.
opk
TOWN POSSIBLE
MTG. VOTE REDUCTION
Salaries 1 , 170,105 127,069 = 10.86 %
Expense . . . . . . . . . . . . . . . . . . . . . . .. . . . . . 1 , 185,640 108,707 = 9.16 %
Total 2,355,745 235,776 = 10 %
r
t
OCT 21g7R
Proposed Capital Outlay Plan
3� 1980 to 1984
Estimated Appropriations, in Thousands of Dollars
Projects Funded by Tax Levy FY80 FY81 FY82 FY83 FY84
Roadway Reconstruction 200 200 200 200 200
Storm Drain Construction 40 140 150 150 150
Street Betterments 20 20 20 20 20
Sewer House Connection 35 25 15
Sidewalk Construction 10 10 10 10 10
Park and Playgrounds 30 40 40 50 50
Equipment replacement 145 145 135 145 211
Proiects Funded by Public Enterprise Rates
Water
Upgrade 8 test existing sources
of Supply 100*
Groundwater investigation
program 100
I Treatment Plant Redesign 100* 100*
Treatment Plant Reconstruction,
High Pressure System for Loth-
rop Road and New Water Mains 3000+
* Increase water rate about 15%
+ To be Bonded and/or State and Federal Funding
NOTE: Salt Storage Building funded by State except for floor and
lighting
r