HomeMy WebLinkAbout1978-06-26 Board of Public Works Minutes June 26, 1978
Meeting of the Board of Public Works opened at 7: 30 P. M. in
Room 16, Municipal Building.
Present were Chairman Dustin, Board Members Russell , Cowell
and Testa. Also present were Finance Committee Members Jose Canto
and Theresa Bond, Town Meeting Members Virginia Adams, Gail Wood and
Henry Adams and William Pacino of the Reading Chronicle.
Minutes of the meeting of June 19th were accepted with correc-
tion.
It was moved, seconded and voted that a Tentative Fee Schedule
to be effective August 1st, 1978 be published in the Reading Chron-
icle and that the public be notified that the Board of Public Works
will be meeting on July 17th to finalize the schedule and hear any
comments from the public at that time.
The Board met with Mr. David Blake, Vice-President of Weston
and Sampson, Inc. at 8:00 P.M. Mr. Blake reviewed three letters
(copies attached) written by his firm. A lengthy discussion en-
sued and Superintendent Louanis stated he felt it was proper for
the Board to approve the overrun on the Contracts statina such ac-
tion would be in the best interests of the Town and recommended the
Board make this the upset limit. It was then moved, seconded and
voted the 1976 Contract for Sewer Construction Inspection for Street
Sewers and Engineering Services with the Board as submitted by Weston
and Sampson, Inc. to the State and Federal agencies be amended under
the section Cost of Services, as follows:
1 . In the first paragraph, second line: delete $57,000 and
substitute $90,000. as the upset limit.
2. In the first paragraph, third line: delete 11260" and sub-
stitute 1141011.
It was then moved, seconded and voted the June 1976 Contract
Sewer Construction Inspection Willow Street Interceptor Engineering
Services with the Board as submitted to the State and Federal agencies
by, Weston and Sampson, Inc. be amended under the section Cost of
Services, as follows:
1 . In the first paragraph, second line: delete $57,000 and sub-
stitute $75,000 as the upset limit.
2. In the first paragraph, third line: delete 260 and substitute
330. (construction crew days) .
The Board expressed its displeasure and deep concern as to the
inequity of one man per construction crew. It was moved, seconded
and voted to request the Superintendent to draft a letter to Mr.
McMahon of the Water Pollution Control to be presented by Weston ,
and Sampson, Inc. and authorize the Chairman to sign the letter
stating that the Board of Public Works recommends the state con-
sider adopting a uniform policy across the State relative to inspec-
tion services for contracts such as the one the Town of Reading has
with Weston and Sampson, Inc. Mr. Blake aqreed to present the
letter at a meeting with E.P.A.
Mr. Cowell moved, it was seconded and voted to rescind the
bid award made on June 12 for liquid chlorine and sodium hypochlorite
to New England Chemical .
Bids were received during April , May and June and contracts
were awarded to the low bidder in each instance, as follows:
Liquid Chlorine Fields Point Chemical $ _17.95/100#
Sodium Hypochlorite N. E. Chemical .41/gal .
Ferric Chloride Fields Point Chemical 10.89/100 gal .
Caustic Soda E. & F. King & Co. Inc. 7.645/100#
CoperTubing Municipal Services
" 685'
1 11 .
,
1 " " .88'
100 Curb Boxes Municipal Ser. 15.75
25 Tops 11 7.85
Manholes "D" & "S" Neenah Foundry Co. 91 .00 set
Catch Basins 11 124.00 set
Asbestos Cement Pipe - T. E.Toomey Co. Inc. .82' ($2,870. )
Cement Conc.. Brick Reading Lumber Co. 120.00 per M.
Clay Sewer Brick " 165.00 per M
Portland Cement " 3.40 per bag
Mortar Cement " 2.80 per bag
12" Cem. Conc. Pipe Scituate Conc. Pipe 3.02 '
15" 11 II II 11 11 11 3.95 '
1811 11 II II 11 11 11 5. 20
2111 11 II II 11 11 II 6 98:
2411 11 II n II 11 II 8:501
3/4" Curb Cocks Ti-Sales 9.80 ea.
3/4" Corporations " " 5.40 ea.
Washed cement J. J. Cronin 2. 75 P
Concrete sand " " " 3. 25 D
Gravel Borrow " " " 3.00 P
Crusher Run " " " 3. 50 D
Gravel Borrow " " " 2.65 P
Bank Run " " " 3. 15 D
Crushed Gravel z" " 11 114.00 P
Stone 3/4" 11 11 11 3.60 P ,
11 11511 II II 11 3.45 P
" 2" 11 11 114.50 D
113/4" 11 11 11 4. 10 D
Minutes - continues June 26, 1978
Stone 11-2" J. J. Cronin Co. S 3.95 D
Gravel Borrow " " " 2. 10 P
Unclassified " " " 2.70 D
Clay Washings " " " 1 .00 P
" " " " " 1 .75 D
Regular Water Meters Gammon 28.50 ea
Meters with outside readers Gammon 40.50 ea.
It was moved, seconded and voted to reject the bid for bituminous
materials in the best interest of the Town and to rebid the materials
on individual items.
The Board reviewed and accepted as a point of information the
schedule of proposed salary increases and approved the Superinten-
dent ' s salary at S582.00 per week.
Mr. Bastolla was unable to attend the meeting this evening in
order to discuss the proposed curb cut on Haven Street.
The Board signed the followina:
Pay Roll for period ending June 23, 1978
Bill Roll dated June 30, 1978
Sewer House Connection Commitment letter
Letter to C. F. Mistretta, State Highway Engineer re: State
Aid Highways.
It was moved, seconded and voted to install sewers in Breton
Circle, Border Road, West Street and South Street from West Street
to Lot #14 and #15. It was agreed to discuss on the 17th of July
the other three houses on South Street, i .e. #25, #40 and #46.
Meeting adjourned at 11 : 15 P.M.
R s ectffuuullllly submitted,
ecretary
WESTON & I ENGINEERS, INC.
SAM PSO N BOSTON,
MASS. 02110
m
ENVIRONMENTAL CONSULTANTS
wvw aawiu
mY.1,lCOM
wurwwow
+ewwa.rr1ew
June 26, 1978
Board of Public Works
Town of Reading
Town Hall
Reading, Massachusetts 01867
Attn: Mr. Paul Dustin
Chairman
Re: Sewer Construction Inspection
Street Sewers
Engineering Services
Gentlemen:
The Agreement for providing Construction Inspection Services
for the contract involving the street sewers and the ejector
stations established compensation for a specific scope of services
at a fixed price of $57,000 for a construction contract period
of approximately 260 construction crew work days. The Agreement
also notes that, if upon completion of not more than 85 percent
of the construction crew effort, it becomes evident that the
Contractor will not complete the construction with the remaining
projected effort, the Engineer may request an Amendment to the
Agreement for additional caapensation. The additional compensa-
tion would be at the same initial rates and would be subject to
acceptance by your Board and approval of the Massachusetts
Division of Water Pollution Control and the U.S . Envirommntal
Protection Agency.
In November 1977, it was noted by this office that the
construction crew day criteria would be exceeded and a meeting
with your Board was set for December 19, 1977. At that meting
certain data was presented and a request for an amendment to
the Agreement was made by the writer, while using incorrect
data, which subsequently made some of the information presented
incorrect. Presented below is data which substantiates our
request for an Amendment to the Street Sewer Agreement.
r
1
WESTON BSAMPSON
Board of Public Works Page 2
Town of Reading
Town Hall
Reading, Massachusetts
June 26, 1978
Construction Crew Days
June - Jan. - Estimated to
Dec. 1977 June 1978 Completion
Total 300 92 18
Cumulative 300 392 410
Estimated cost per construction crew day:
$57, 000 = $219.23
260
Therefore, to complete the project in a total of 410
construction crew days, the total estimated engineering fee
would be $90,000. If the project is completed requiring
fewer than the projected 410 construction crew days, Weston
and Sampson Engineers will be compensated on a pro rated
r basis. If more days are required the maximum fee will not
exceed a total of $90,000. The increase is due to the use
of more construction crews by the contractor than originally
anticipated when preparing the construction services agreement
in June 1976 to accompany the Construction Grant Application
dated June 30, 1976.
Our June, 1976 Contract with the Board as submitted to the
State and Federal agencies should be amended under the section
Cost of Services. The amendment would include the following:
1. In the first paragraph, second line; delete "$57,000"
and substitute "$90,000" .
2. In the first paragraph, third line; delete "260" and
substitute "410" .
If you have any questions about this matter, please contact
this office.
Very truly yours,
WESTON & ,SAMPSON ENGINEERS, INC,
David K. Blake
Vice President
DKB/ds
v
I
WESTON & I ENGINEERS, INC.
10 HIGH STREET
.. SAMPSON BOSTON, MASS. 02110 «*�•�
ronx,»ron
ENVIRONMENTAL CONSULTANTS u0,.�a
0ww0 ti4x.
anv.x»caa
wvww�ru»xs
w IAM
eenusa arwrrtan
June 26, 1978
Board of Public Works
Town of Reading
Town Ball
Reading, Massachusetts 01867
Attn: Mr. Paul Dustin
Chairman
Re: Sewer Construction Inspection
Willow Street Interceptor
Engineering Services
Gentlemen:
The Agreement for providing Construction Inspection Services
for the contract involving the Willow Street Interceptor established
compensation for a specific scope of services at a fixed price of
X59,000 for a construction contract period of approximately 260
construction crew work days. The Agreement also notes that, if
upon completion of not more than 85 percent of the construction
crew effort, it becomes evident that the Contractor will not
complete the construction with the remaining projected effort, the
Engineer may request an Amendment to the Agreement for additional
compensation. The additional compensation would be at the same initial
rates and would be subject to acceptance by your Board and approval
of the Massachusetts Division of Water Pollution Control and the U.S .
Environmental Protection Agency.
On April 13, 1978, your Board was notified that the construction
crew day criteria would be exceeded. Presented Below is data which
substantiates our request for an Amendment to the Willow Street
Interceptor Agreement.
Construction Crew Days
June - Jan. - Estimated to
Dec. 1977 June 1978 Completion
t Total 40
Cumulative 290 330
< WESTON 6 SAMPSON
• Board of Public Works page 2
Town of Reading
�+ Town Hall
Reading, Massachusetts 01867
June 26, 1978
Estimated cost per construction crew day:
$59,200 = $227.69
260
Therefore, to complete the project in an estimated total of
330 construction crew days, the total estimated engineering fee
would be $75,000. If the project is completed requiring fewer
than the projected 410 construction crew days, Weston & Sampson
Engineers will be compensated on a pro rated basis. If more
days are required the maximum fee will not exceed a total of
$75,000. The increase is due to the use of more construction
crews by the contractor than originally anticipated when preparing
the construction services agreement in June 1976 to accompany the
Construction Grant Application dated June 30, 1976.
our June, 1976 Contract with the Board as submitted to the
State and Federal agencies should be amended under the section
Cost of Services. The amendment would include the following:
' 1. In the first paragraph, second line; delete"$57,000'
and substitute 1175,000" .
2. In the first paragraph, third line; delete "260" and
substitute "330" .
if you have any questions about this matter, please contact
this office.
Very truly yours,
WESTON & SAMPSON ENGINEERS, INC.
David~K./ Bl�e��2✓ L\
Vice President
DKB/ds
op�-
r
r`
R
Division of Water Pollution Control
110 Tremont Street
Boston, MA 02108
Attn: Mr. Thomas G. McMahan, Director
Re: Project No. C250401-01
Reading, Massachusetts
Gentlemen:
Attached is a letter from our sewer consultants, Weston
and Sampson Engineers, Inc., requesting an amendment to their
construction services contracts. At a meeting of the Board
of Public Works on June 26, 1978 it was voted to approve the
requested amendment. We request that our grant for the
above noted project be amended accordingly.
Very truly yours
r
E. Roger Louaniq,
Superintendent
r
WESTON & I ENGINEERS, INC.
mL iem maua
10
EET
SAMPSON BOSTON.
MASS.
BOSTON, MASS. 02110 Raaf
Pory
LEOaa.fT
ENVIRONMENTAL CONSULTANTS o. o R. uK.
lTfvEw M..COIIR
wl W.Y�ryRRW�
.aaOCl.i[
June 26, 1978 MCHAROG STA"T°
Board of Public Works
Town of Reading
Town Ball
Reading, Massachusetts 01867
Attn: Mr. Paul Dustin
Chairman
Re: Sewer Construction
Inspection Contract
Engineering Services
Gentlemen:
In accordance with your request, we have reviewed the
sewer construction progress for both the Street Sewer and Willow
Street interceptor contracts in detail. As of this date the
status is as follows:
Street Sewer Contract: All sewers have been installed
and except for the force mains, have been tested and found
to be acceptable by this office. The two pumping station have
some electrical work remaining as well as the site work. The
testing of the Stations must also be done. Project clean-up
and the paving on West and Grove Streets must be completed.
Willow Street Inter ce for Contract: The Contractor is
presently locatedat approximate y Station 101+50 on Willow Street
or opposite House No. 84, the Congdon Residence. All pipe laying
except for the actual connection to the sewer in front of the
Willow Street Pumping Station will be completed by June 30, 1978.
The first week of July will be spent building manhole tables and
testing the sewer along Willow Street after which the connection
to the live sewer will be made and the Station removed from
service. Demolition of the station, clean-up, loaming, seeding
and paving will then be accomplished.
In response to our request for an additional compensation
amendment to our agreements with the Town of Reading for these
projects, the Board indicated that Weston6 Sampson should make
a request for only one additional compensation amendment. If
the project requires fewer construction crew days than estimated,
WESTON & MAPSON
Hoard of Public Works
Town of Reading
June 26, 1978 2/
the Town will compensate Weston & Sampson Engineers, Inc. clay
for those days worked. If the contract requires more days than
estimated the Town only compensates Weston & Sampson Engineers,
Inc. for the construction crew days presented below.
Street Sewer Contract: The total number of Construction
crew days used t roug June, 1978 is 392. It is estimated that
a maximum of 410 construction crew days will be required to
complete the entire project including all of the required paper
work associated with the grant program. At the assigned cost of
$219.23 per construction crew day, the total estimated cost for
inspection services is $89,884.30 or $90,000.
Willow Street Interceptor Contract: The total number of
construct o�w 3ays used rough a month of June, 1978 is
290. It is estimated that a total of 330 construction crew
days will be required to complete this contract. At the assigned
rate of $227.69 per construction crew day, the total estimated
cost for inspection services is $75,137. 70 or $75,000.
Since there are state and federal monies associated with
this project, a letter must be sent to the Division of Water
Pollution Control requesting such an amendment. A suggested
letter of request is attached.
If you have any questions about this data, please contact
this office.
Very truly yours,
WESTON & PAMPSON ENGINEERS, INC.
!1 / J
David `K. Blake
Vice President
DKB/mvw
Attach. "- - --
June 26, 1978
Addendum to the Hoard of Public Works Minutes of June 26, 1978
Read letter from Symes Associates, Inc, requesting a release of the
bond on Parkview Road and stating that the sewer pipe work is complete
and they are in process of patching the roadway. Assistant Superinten-
dent Bergeron recommended a $15,500 release of the existing $35,000 bond
on this development as work progress has been satisfactory. It was
moved, seconded and voted to release $15,500 of the bond and contingent
upon application of a binder coat satisfactory to the Superintendent the
no-sell-restriction be removed.
Read letter from Philip R. Bernat Trustee of Ber-Tann Realty Trust
requesting a release of selling restrictions and a partial release of
his bond on the South Street development. It was moved, seconded and
voted upon satisfactory recommendation by Mr. Bergeron to lift the no-sell-
restriction and to reduce the existing bond of $3,900 by $3,000 leaving
$900 in force.
ectfully submitted,
ecret ry
1