eting of the Board of Public Works convened in Room 16,
al Building at 7:30 P. M.
esent were Chairman Dustin, Secretary Price, Board Mem-
lood and Russell , Superintendent Louanis, Assistant Super-
nt-Engineering Bergeron, Assistant Engineer Redford and
Committee Members Carl Beaulieu and Jose A. Canto.
inutes of the meeting of December 5, 1977 were accepted
rrection.
ere was a short discussion pertaining to matters that
ected to come to the Board's attention for disposition
near future and it was determined to schedule meetings
ary 9, 16, 23 and 30, 1978.
ad Notice of Public Hearing regarding the extension of
the main sanitary sewer in Line Road at 7:45 P. M. Mr. Dustin
opened the Hearing with a short presentation relative to the
proposed sewer extension covering the items of sewer frontage
assessment, sewer house connection, sewer rental charges and
the methods of payment available to the home owner. The Board
answered the questions posed by the abutters and it was moved,
seconded and voted to close the Hearing. It was then moved,
seconded and voted to assess betterments for the sewer main
installed in Line Road.
The Board reviewed the 1978-79 Sewer Program Questionnaire
results, as follows:
In favor . . . . . . . . . . . . . . . . . . . 60
Opposed . . . . . . . . . . . . . . . . . . . . 43
Non-cormnital . . . . . . . . . . . . . . . 14
No reply . . . . . . . . . . . . . . . . . . . 73
Sewer available . . . . . . . . . . . . 12
Connected . . . . . . . . . . . . . . . . . ...24
Sent out . . . . . . . . . .. . . .22
After considerable discussion of the results of the ques-
tionnaire the Board instructed the Superintendent to prepare a
sewer construction program based upon an expenditure of $250,000.
per construction season in keeping with the Capital Budget Plan
voted at the Special Town Meeting in November.
*
Mr. Price, Mr. Cowell and Mr. Dustin volunteered to accept
the appointment to a subcommittee to review present Solid Waste
Disposal procedure. (*appointed)
Mr. Russell , Mr. Blood and Mr. Dustin volunteered to accept
an appointment to a subcommittee to review scenic road by-law
needs in relation to department policy.
The Board received a request signed by over forty residents
to plow both sidewalks on Dana Road and the sidewalk on one side
of the street on Colonial Drive and on Beaver Road. The Superin-
tendent reminded the Board that a cut-back in sidewalk plowing
had been made in 1976 as it was not possible to complete the
schedule in a proper fashion at that time with the equipment
available. A small group of parents of elementary school child-
ren was present and expressed concern over the safety of young
children walking in the street since three school busses and
other vehicuTar traffic use the route as a cut-through from
Main Street to the Killam School located on Charles Street.
Following a lengthy discussion, it was moved and seconded to
direct the Superintendent to schedule sidewalk plowing on the
north side of Dana Road on to Colonial Drive and Beaver Road
as far as Rustic Lane as children who live beyond this point are
bussed. The vote 3-1 in favor.
Mr. Blood requested a copy of the Rewrite of the Zoning
By-Law by the Planning Board. The Board requested that Mr. Dustin
invite Maureen O'Brien, Chairman of the Planning Board to appear
before the Board of Public Works on January 16, 1978 in order
that she point outwhere -HerBoard had in fact made suggested
changes in the By-Law,
Mr. Blood retired front the meetfng.
The meeting adjourned temporarily in order that the Board
could meet as the Board 'of Survey and reconvened at 9:35 P.M.
Mrs . Morris, 9 Osborne Avenue, who was scheduled to appear
before the concerning a high water bill was not present. It
was moved, seconded and voted to table the matter until confirma-
tion that the meter is, or is not, working properly is available
to the Board.
It was moved, seconded and voted to accept a three way agree—
ment in the sum of thirty—five thousand ($35,000. ) dollars held
by the Atlantic Savings Bank, 385 Broadway, Revere, Ma. 02151 as
surety to cover the completion of the work remaining on Lots 35A,
36, 37, 38, 39A, 40, 41 , 42, 43A, 52A, 54A, 56A, 58B, 60A, 62B,
64A and 66A abutting a roadway known as Parkview Road, Reading.
It was also moved, seconded and voted to release the same lots
for building purposes only, and to so notify the Building inspec—
tor.
It was moved, seconded and voted to table discussion of
an Article for May Town Meeting relative to N.E.S.W.C.
Mr. David Blake of Weston and Sampson, Inc. appeared before
the Board to update the Board on the progress of the contractors
working on the Interceptor Sewer and the Street Sewer Program.
Although progress on the Interceptor Sewer has not been what was
anticipated, it now appears that the program will be completed
fairly close to the completion date with a possible overrun of
several days. The Street Sewer Contract has been progressing
reasonably well and should finish within the construction schedule
except for the sewer which will serve the end of Hancock Street.
Because of construction crew days, it appears that Weston and
Sampson, Inc. will have an engineering overrun of $70,000. After
considerable discussion of this matter the Board instructed Mr.
Blake to cane up with a complete cost breakdown of the overrun
and to report to the Board on January 16, 1978.
Carl Beaulieu of the Finance Committee reported to the Board
that the Finance Committee had come up with a target budget figure
for the Board of Public Works, see attached sheet. It was
accepted as a point of information.
The Board signed the Pay Roll for the period ending December
16, 1977 and the Bill Roll dated December 23, 1977.
Meeting adjourned at 11 .30 P. M.
Respectfully
/ecftt(uullly submitted,
o
Secretary
BPW: Recommended Target Figure by Finance Committee
FY-1978 FY-1979
D.P.W. Salaries 858
D.P.W. Expense 488
1 ,346
Incinerator 216
Storm Drain Const. 25
House Connections 55
Highway Maintenance 70
980 + 6% 1 ,039
Incinerator 216 +11% 240
Equipment Replacement 53 + 6% 56
Snow and Ice 148 + 6% 157
Park Const. 12 25
Street Acceptance 8 15
Sewer House Connection 55 45
Roadway Maint. 200
Storm Drain Const. 25 35
Subtotal $ 1 ,812
Recommended: $1 ,600,000 Target w/o incinerator or Water Dept.