Loading...
HomeMy WebLinkAbout1959-11-23 Board of Public Works Minutes 135 November 23 , 1959 The meeting of the Board of Public Works opened at 7:30 P. M. .� Chairman Zanni, Secretary Harrison, Board Members Donahue , Florence and Leonard and Superintendent Welch were present. Records of previous meeting were read and approved . Conferred with Mr. Joseph Griecci and Mr, Anthony Griecci representing the Griecci Construction Company, the second low bidders on the Garage Extension, at 7 :30 P. M . to determine whether or not they would be interested in the contract at their original bid price. Mr. Joseph Griecci stated that they would send a letter in a day or two stating whether or not they would be willing to accept the contract at their bid price. They wish to check whether or not ' the sub bids are still available and valid and if some of the quotations on which they based their bid still hold good . No agreementyverbal or otheswise.was made pending receipt of the letter from Griecci Construction Company. Conferred with Mr. George Bogren of Weston and Sampson, Consulting Engineers, at 8:00 P . M . relative to the status of the design for the proposed remodeling of the Filter Plant. The discussion was lengthy and detailed and included various phases of design, costs, time, etc. Received a letter fYom Recreation Committee requesting a meeting with the Board of Public Works to discuss Park and Playground facilities. It was moved, seconded and voted to meet with the Recreation LCommittee on the evening of November 30, 1959 at 9:00 P . M . The meeting was adjourned at 9:50 P . M . Repectf4lly ubmitted: tvt: ,-� Secretary