Loading...
HomeMy WebLinkAbout1959-05-04 Board of Public Works Minutes 67 May 4, 1959 ' The regular meeting of the Hoard of Public Works opened on Monday evening, May 4, 1959 at 7: 30 P.M. Chairman Zanni, Secretary Harrison, Messrs. Donahue, Florence , Leonard and Superintendent Welch were present. The records of the previous two meetings were read and approved. Signed Orders of Taking (3) for proposed drain easement southerly from Cross St. through lands of Carl H. & Elvira M. Ceder and Lila G. Merrill. This easement is a widening of an already existing easement and is for the purpose of replacing the present pipe with twin pipes. Read note from Superintendent stating that Harry Evans , an employee of the Dept. , has affirmed that he will dis- continue blasting for the Dept. as soon as Dept. gets a license for another employee . Superintendent stated that he has notified Mr. Evans that when he specifically refuses to blast his salary will be reduced from $90.00 per week to $86.00 per week. It was moved, seconded and voted to submit the subject matter to the Personnel Study Sub Committee. Mr. Harrison submitted his resignation as a member of the Personnel Study Sub Committee because of the pressure of work on the Junior High School Committee. Mr. Florence was then appointed to the Personnel Study Sub Committee. 68 Considered note from Superintendent stating that developers of Marla Lane and Cherry Lane Drive have left raw , earth banks in developments and suggesting they be recalled to correct conditions. It was moved, seconded and voted to recall the developers as above noted to correct conditions. Read note from Superintendent about ball playing in center field at Washington St. Park. Superintendent stated that (a) he has notified High School Team to cease play- ing ball in center field and' (b) that preparations are being made to add six feet of fence to the existing six foot fence. Temporarily adjourned at 8:00 P.''i• to meet as Board of Survey. The meeting reconvened at 8: 20 P.M. ' Read note from Superintendent that arrangements have been made for the Board to visit the Billerica Filter Plant on Wednesday, May 6, 1959, at 7:30 P.M. The Chemist and operator of the plant will conduct the Board on a tour of it. The Board was adjourned at 8:40 P.M. Respectfully submitted: III , Se�etary i