HomeMy WebLinkAbout1980-06-09 Board of Public Works Minutes June 9, 1980
Meeting of the Board of Public Works convened in Room 16,
Municipal Building at 7:30 P . M.
Present were Chairman Cowell, Secretary Wood, Board Mem-
bers DeHart , Fallon, Barker , Superintendent Louanis and Assis-
tant Superintendent Bergeron .
It was moved, seconded and voted 5:0 to accept the minutes
of the meeting of June 2, 1980 as amended.
It was moved to accept the minutes of the Executive Session
and hold them under executive privilege until July 1, 1980 when
at the discretion of the Board they may be removed from execu-
tive privilege . This was seconded and voted 5: 0 .
Superintendent Louanis reported Addison and Wesley and Tasc
have been concerned for some time about traffic entering Route
28 from South Street. These organizations have been working
with the Chief of Police and the Board of Selectmen in an
effort to resolve the problem. The Superintendent felt the
' Board should be aware of the ground work underway , traffic
counts , surveys, etc . , before the issue of the installation of
traffic signals at the corner of South and Main Street appears
in the local newspaper . When questioned , the Superintendent
stated he felt the lights at this location would be a major
improvement . It was moved , seconded and voted 5:0 to accept the
report as a point of information .
Chairman Cowell requested the Board to direct their atten-
tion to Salary Reduction Options I through IV as proposed by
the Superintendent totalling $65 ,426 as mandated by the Finance
Committee together with backup information describing the areas
to be affected by the proposed cuts (copy appended hereto) .
Following a review of the entire report the Chairman took a vote
on each item, as follows:
It was moved, seconded and voted 5:0 to make a zero cut in the
Administration Account .
It was moved , seconded and votedto reduce the Highway Mainten-
ance Salary Account by R21 000 as follows:
Temporary Patch - Move to reduce by $5 000 seconded, voted 5:0
Chip Sael. etc. - Move to reduce by 3,000 - no second
Move to reduce by zero - seconded , voted 3:2
Bit . Conc. Overlay - Move to reduce by $1 .800 - seconded and
voted 3:2
Street Sweeping - Move to reduce by $10.000 - seconded and ,
voted 4:1
General - Move to reduce by zero - no second.
Move to reduce by $4, 200 seconded for
discussion . Mr. Fallon suggested follow-
ing Superintendent ' s recommendation of
a zero reduction . Mr. DeHart moved to
reduce the account by $1 ,200 - it was
seconded and voted 2:3 . The Chairman
then asked for a vote on the original
motion of $4, 200 - vote . 3: 2 - motion carried .
Sidewalk Maint . Move to reduce by $5.000, seconded and
voted , 5:0.
Parking Lot Maint . Move to reduce by $5, 100, seconded and
voted, 5 :0.
Storm Drain Maint , Move to reduce by zero - seconded and
voted, 5:0 .
Drain Construction Move to reduce by $10,500 (see Option I )
it was seconded and voted 4: 1.
Equipment Maint. Mrs. Wood moved to reduce by $5,400, it was
seconded. Mr . Fallon moved to reduce the
account by $2,700 suggesting that mainten-
ance of plows, installation and repairs to
plow equipment could be properly charged
to Snow and Ice - it was seconded . Mr . ,
Barker moved a zero reduction - it was
seconded. Chairman Cowell polled the Board
as follows:
Zero reduction 2: 3 - motion lost
$2, 700 - vote 5:0 - motion carried.
Park-Playground Move to reduce by $9,000 - seconded.
Mr. Fallon moved to reduce by $5,000 and
continue maintenance of equipment, fences
and diamonds once a week but cease to
maintain school fields, the depot area, War
Memorial , Donegan Park , move voting booths
and assist in the preparation and cleanup
of the annual recreation carnival . It was
seconded. Chairman Cowell asked for a vote :
Reduce by $5 000 - voted 5:0.
Forestry Move to re uute by $5,000 - seconded. Mr.
Fallon moved to reduce by $2,800 - seconded :
Chairman Cowell asked for a vote:
$2,800 reduction - vote 3: 2 motion carried.
Sewer Maintenance Moved to reduce by $2,570 - seconded and
voted .
Sewer House Conn. Moved to reduce this account by $6 ,274 - it
was seconded .
Mr . DeHart moved to reduce the account by
$8 ,850 - it was seconded. ,
Mr. Fallon moved to reduce the account by
$7,356 - it was seconded
Mr . Cowell polled the Board on the three
motions as follows:
$6, 274 1:4 the motion last
$7, 356 2: 3 the motion lost
. - $8 ,850 2: 3 the motion lost
Mrs. Wood moved to reconsider the vote
concerning the Forestry Division - it was
seconded and voted 1:4 - motion lost.
Mr . Fallon moved to reconsider .the vote on
Sewer House Connections - it was seconded
and voted 5:0
Mr. Fallon moved to reduce Sewer House
Connections $7, 356 - it was seconded. Mrs.
Wood moved to reduce Sewer House Connections by
$8,850. It was seconded .
Chairman Cowell polled the Board on reducing
Sewer House Connections as follows:
7,356 vote 1:4 - motion lost
$8 ,850 vote 4: 1 - motion carried
Street Sweeping: It was moved , seconded and voted to recon-
sider Street Sweeping under the Highway Main-
tenance budget 5:0 .
It was moved , seconded and votedtoreduce this
account by $8 .506 rather than $10,000 as pre-
viously voted - the vote 5:0. This alters the
total Hiahwav Maintenance Salary reduction to
read $19.506 rather than $21,000 as originally
voted .
The Board signed the following:
Pay Roll for the period ending June 6 , 1960
Bill Roll dated June 13, 1980
Contract 80-6B Stone Chip Seal - Bell and Flynn , Inc.
Contract 60-6A Stone Chip Seal - Able Bituminous
The Chairman informed the Board he had two subcommittees which
he wished to form: one to deal with personnel to investigate the
concerns of the non-union employees . Mr . Fallon and Mr. Barker
accepted the appointment to this committee. The Chairman inform-
ed the Board he asked Mr . DeHart to serve on the Personnel Committee
but Mr . DeHart had declined on the grounds that a conflict might
develop since he is employed by another municipality . The second
' subcommittee will deal with the Park and Playground Long Range
Planning to develop a construction program that had not been
forthcoming from the Ad Hoc Committee . Mrs. Wood and Mr. DeHart
accepted appointments to this committee .
The Board reviewed bids for Franklin Street Drain Construc-
tion Contract 80-10 . Bids ranged from a low of $27,391 to a high '
of $53,475 . The Engineering Division investigated the low bidder,
Main Line Construction and found their references were in good
order and recommended the award be made to the low bidder. It
was moved , seconded and voted to award the contract to Main Line
Construction in the amount of $27, 391 subject to their ability
to furnish proper payment and performance bonds. The vote 5:0.
Bids were received on June 4, 1980 at 3:30 P . M. for brass
as follows:
George A. Caldwell Company . . . . . . . . . . . . $ 5 ,530.00
Eureka Cement Lined Pipe Co. , Inc . . . . . . 4,415.00
Hilco Supply , Inc. . . . . . . . . . . . . . . . . . . . . . 5,919 .00
Ti-Sales , Inc. . . . . . . . . . . . . . . . . . . . . . . . . . 4,878 .00
It was moved , seconded and voted to award the contract for brass
goods to Ti-Sales , Inc, the only bidder on all items, in the amount
of $4,878 .00•
The Board reviewed letter from Barden and Remington concern-
ing a request for additional compensation because of unforseen
costs to their company and requesting an opportunity to arrive ,
at a break even point for the balance of the contract. It was
agreed the Superintendent write the company a letter informing
them the Board sympathizes with their position. However, the
Town of Reading goes through the bidding process for the purpose
of obtaining firm prices for the financial year in order that the
Town will be able to live with its authorized budget.
The Board reviewed Town Counsel' s bill for April 1980. It
was moved , seconded and voted 5:0 to approve the bill in the
amount of $751.50.
It was moved, seconded and voted 5:0 to table action on two
letters re : Sanborn Lane Subdivision . tt
It was moved, seconded and voted 5 :0 totable /a he'Pu4es and
Regulations of the Sanitary Landfill Area.
The Board reviewed letter from Anthony DePalma regarding
final payment on the state and federally funded sewer main con-
struction program. It was accepted as a point of information . ,
C. Jiustino, Inc. requested permission to be licensed
as a Drain Layer for the Town of Reading. It was moved , seconded
and voted 5:0 to approve C. Jiustino of Hyde Park as a Licensed /I
Drain Layer subject to their ability to provide a proper street
opening bond and pay the neceasary license fee.
Meeting adjourned at 10 :45 P . M.
Respectfully submitted,
/QST
Secretary
May 1980
Salary Reduction Options
Function I II III IV*
Administration 0 0 0 0
Engineering 3,400 0 3,400 3,400
Highway Maintenance-Total 18, 150 23,800 30,000 16,450
(Temp.Patch) (2, 150) (2,000) (5,000) (5,000)
(Chip Seal E Cross Sec) (0) (10,000) (91000) (3,000)
(Bit.Conc.Overlay) (1 ,800) ( 1 ,800) ( 1 ,800) (1 ,800)
(Street Sweeping) ( 10,000) (10,000) ( 10,000) (6,650)
(General ) (4, 200) (0) (4, 200) (0)
Sidewalk Maintenance 0 5,000 5,000 5,000
Parking Lot Maintenance 5, 100 5, 100 5, 100 5, 100
Storm Drain Maintenance 0 0 4,226 0
Drain Construction 10,500 7,200 12,300 7,200
Equipment Maintenance 0 0 5,400 0
Parks and Playgrounds 9,000 9,000 0 9,000
Forestry 5,000 5,000 0 5,000
Sewer Maintenance 5,426 5,426 0 5,426
Sewer House Connection 8,850 4,900 0 8,850
Traffic Control Signs 0 0 0 0
Totals. . . . . . . . . . . . . . 65,426 65,426 65,426 65,426
*Recommended
' ENGINEERING
Cut of $3,400.00 - This will result in a decrease of overtime
for t e ngineering ivision . Assistance to other Departments will
be eliminated except on an overtime basis if they have budgeted
money . An engineering student , to aid the Division in the inspec-
tion of a substantial amount of contract work , will not be hired
� for the summer months.
TEMPORARY PATCH
Cuts of $2, 150.00 end 2 000.00 - This cut will reflect a de-
crease in effort to patch pot holes. Requests will be investigated,
however , patching will be done on a next day basis except in extreme
emergencies.
. Cut of $5,000.00 - Patching will be done from a prepared list.
Requests will be investigated and if necessary a flashing construc-
tionhorse will be placed at the problem area as a warning to motor-
Jists. This is a substantial decrease in effort, but is a more
efficient method . However, it could also leave the Town more vul-
nerable for law suits.
CHIP SEAL & CROSS SECTION IMPROVEMENT .
Cuts of $9,000.00 & $10.000.00 - It will not be possible to do
a substantial amount of preparation work on roadways requiring stone
chip seal. Patching of service and mein utility trenches and struc-
ture adjusting would be eliminated to a large degree. This reduction
will result in loss of surface life and therefore increase costs in
the future. Buried structures also could result in lost time during
emergency conditions.
Cut of $3,000.00 - This reduction will result in the elimination
of some preparation work on stone chip seal roadways such as utility
trench patching and structure adjusting .
BITUMINOUS CONCRETE OVERLAY
Cut of $1 800.00 - This cut will mean that Town forces will
not per orm wor in his area. Structure adjustment and patching
will be performed by private contract which will result in a further
reduction of this program. . The requested level of effort was already
a 300% reduction from FY-80.
STREET SWEEPING
Cut of $10,000.00 - This substantial cut will eliminate spring
street sweeping by Town forces. The Town will have to be swept by
private contractor . Sweeping of the business area will be limited
to once a week and removal of debris from the sidewalks will be reduced.
Ma. sweeping of cemeteries or school areas will be done during regular
working .hours. They may be swept on an overtime basis if these Depart-
ments have accounts that the labor can be charged to directly. A re-
duction in street sweeping will inevitably result in higher drain
maintenance costs and an increase in flooding potential.
Cut of $6,650.00 - This cut will substantially reduce spring
street sweeping by [own forces to a point where the business area
and major roadways of high traffic volume and intense sanding occur
will be swept . The remaining roadways of the Town will be swept
once by private contractor in the spring. There will be a reduction
in sweeping of the business area and removal of debris from sidewalks.
Sweeping of cemetery and school areas will be done only if these
Departments have accounts that the labor can be charged to directly and
onovertime basis only. A reduction in street sweeping will inevi-
tably result in higher drain maintenance costs and an increase in
flooding .
HIGHWAY GENERAL
Cut of $4, 200.00 - The blocking up and weatherproofing of windows
at theHighway Garage, to aid in trying to meet a 20o reduction in
energy costs, will not be done.
SIDEWALK MAINTENANCE
Cut of $5,000.00 - Town forces will no longer remove curbing,
construct driveway aprons, or loam and seed sidewalk areas.
PARKING LOT .MAINTENANCE
Cut of $5,100.00 - Preparation work for the future overlay of
Parking Area #2 will not be done. Work eliminated is the proposed
addition of drain lines and catch basins plus permanent patching of
deteriorated pavement areas.
STORM DRAIN MAINTENANCE
Cut of $4,226.00 - A cut in this area would eliminate all
planned maintenance of culvert inlets and outlets. Lack of scheduled
maintenance will result in higher future costs, as has been proven
in the past .
DRAIN CONSTRUCTION -
Cut of $12,300.00 - This cut would eliminate planned construc-
tion . on Franklin Street (Pasture Road to William Road) and on Mark
Avenue. . However, the construction on Franklin Street has been com-
pleted. due to the fa,yiR�rable conditions and efficiency of the Drain
Construction crew on^'tfroject on Franklin Street (Grove Street to
Meedowbrook Lane) .
Cut of $10,500.00 - This cut would eliminate planned construc-
tion on Franklin Street (Pasture Road to William Road) and on Weston
Road (at Longfellow Road) .
Cut of $7,200.00 - This cut would eliminate planned construc-
tion on Franklin Street (Pasture Road to William Road) .
EQUIPMENT MAINTENANCE
Cut off40000 - The level of effort in this area as re-
queste by to he Board of Public Works is necessary for the proper
maintenance of the equipment . A cut in this area would necessitate
charging an equal portion of labor for maintenance to the Snow and
Ice appropriation.
PARKS AND PLAYGROUNDS
Cut of $9,000.00 - A reduction in this area will limit the
functions of the Parks Division to turf management , the maintenance
of playground equipment and .fences, and the maintenance of ball
diamonds once per week. We will no longer be able to line ball
fields, maintain the fields at Joshua Eaton, prepare Washington
Park and Birch Meadow Varsity Fields just prior to scheduled games,
maintain the Depot area, the War Memorial or Donegan Park, move
voting booths or assist in the preparation and clean-up of the
annual recreation carnival.
FORESTRY
Cut of $5,000.00 - This cut will result in the elimination of
Dutch Elm Tree removal on private propertyand the installation and
removal of Christmas lights except an an overtime basis. There will
also be a reduction of one employee in this area. Trimming, removal,
spraying and planting of trees will not be .done on property other
than that under the jurisdiction of the Board of Public Works.
SEWER MAINTENANCE
Cut of $5,426.00 - This will eliminate the rodding or replace-
ment of sewer services whether it be on a planned or emergency
basis.
SEWER HOUSE CONNECTIONS
Cut of $8 ,850.00 - Eliminate this program completely . Use expense
money for loam, seed and bituminous concrete to maintain existing
trenches.
Cut of $4,900.00 - Construct five (5) new services only.
General Statement
In order to provide services, complete projects, and perform
all construction and maintenance functions, it will be . necessary
to concentrate all efforts during the regularly scheduled week
on only Public Works and Water Department related work. Assistance
to other Departments will no longer take place. Many of these fun-
ctions performed for other Departments have been mentioned in the
previously listed functions, but there are more . It is an unfor-
tunate and unpleasant situation, but in order to perform the functions
of the Department, it is necessary. .
If other Departments in the Town of Reading have budgeted money
to pay Public Works' labor costs directly, work for them may be
scheduled on an overtime basis.
DOUGLAS A COWELL, CMfV .
OFFICE OF GAIL F. WOOD, Sendery
TOWN OF READING DON B. DeHART
JOHN L FALCON, M.
` BOARD OF PUBLIC WORKS DOUGLAS$ L. BARKER
ee �� MUNICIPAL BUILDING E. ROGER LOUAIMS, Sup rift n t
�O .�u.F �u READING. MASS. 01067
MASSACHUSETTS
COMMONWEALTH OF MASSACHUSETTS
Middlesex, as.
The undersigned, Board of Public Works of the
Town of Reading, in compliance with the provisions of
the General Laws, Chapter 60, as amended by Chapter 63
of the Acta of 1933, hereby certify that the lista here-
with contain the names of persons against whom we have
made betterment assessments together with the location
of the land benefited by the improvement and the nature
and amount of such betterment assessment.
Sewer House Connections $ 240.00
Such list is certified to you for the purpose
i of committing the same to the Tex Collector, as provided
by low.
WITNESS our hands this twenty-third day of
June 1980 A. D.
airsan
i — Secretary
See Commitment Sheet for List