HomeMy WebLinkAbout1942-04-13 Board of Public Works Minutes 190
Reading, Mass. , April 13, 1942
® The regular meeting of the Board of Public Works opened at
7:30 P.M.
Messrs. Davis, Brophy, Lindsay, Lothrop, Tear, and Superintendent
Welch were present.
Records of previous meeting read and approved.
Hearing at 8:00 P.M. on proposed storm drain easement running
from the southerly side line of Pilgrim Road to the culvert under the
B. & M. R.R. approximately 32.5 ft, southerly from the southerly side line
of Pilgrim Road within the limits of the so-called Bradford (Private)
Road.
The following persons were present:
Mr. Robert Lyle - Against
Mr. VJm. Morrison - In favor
Mr. Daniel Medio _ n n
Mr. Harry Clifford If If
It was voted to make the Taking as described above.
Signed Order of Taking for the above drainage easement.
Hearing at 8:30 P.M. on proposed storm drain easement abutting
Memorial Park on the east side running from the skating rink dam to
Salem Street and having a width of 10 ft. This easement is through
lands of Ruth I. Rideout and Wm. Harvey Kelch.
The following persons were present:
Mr. Harvey Kelch - In favor.
It was voted to make the Taking as described above.
Hearing at 8:45 P.M, on the proposed extension of the main
sewer in Harrison St, 6om the present end of the sewer at Orange St.
1 northerly to a point opposite the northerly side line of the property of
1 �
Charles Roxbee, a distance of approximately 90 ft.
Nobody attended the hearing.
It was voted to make the extension. -
It was voted not to hold a meeting on April 20, 1942.
It was voted to make certain basic salary changes in the payroll
of the regular employees.
Board adjourned 10:00 P.M.
Respectfully Submitted:
(Signed) Edward A. Brophy
Superintendent