Loading...
HomeMy WebLinkAbout1923-07-20 Board of Public Works Minutes (Copied from Progress 3eport) l 13 July 20, 1923. All Present but Mr. White. The following matters were taken up and decisions made; In regard to putting in Mr. Charleton's sewer connection on Howard St., means an extension of the main and on account of having to extend the whole main which would be necessary and proper at this time it is the wish of the Board that nothing be done at the present time. Supt, was instructed to install two inlets at the junction of Pleasant and John Ste. to carry the surface water across John St. and from thence out into the gutter, preventing same from running on Mr. Briggs private property. A general discussion of the building lines of Heading Square was taken up and Supt. was asked to have the large meeting room ready for the hearing on Monday evening. Sept. brought up the subject of building out the shoulders on the road before permanent construction began and he was instructed to do this. Mr. Goodwin of Salem St. Fair Grounds appeared before the Board to ascertain further whether water ser- vices could be lead into the different houses that are now built. He went into some length, discussing the dif- ficulty of obtaining clear water and the Board instructed the Supt. to go down there and estimate the cost of laying all mains and connections to the various houses. Mr. Pratt of Summer Ave. appeared before the Board in relation to the surface water running down Ellis Avenue and going on his property. It was explained to him that no surface water drainage system was as yet installed in the Town and those drains that are there now are not adequate to take care of the general rain conditions. He was informed at the present time nothing could be done. Supt, was instructed to get the assessed valuation of property on Salem St. Fair Urounds. Supt. asked if it was all right to take the last week in Sept. and the first week in October for a vacation and the same was granted. Meeting adjourned at 10:00 P.M.