Loading...
HomeMy WebLinkAbout1959-09-08 Board of Survey Minutes September 8, 1959 The Meeting of the Board of Survey was held at 10:15 P.M. -Those present were Chm. Zanni, Sec. Harrison, Mears. Donahue, Florence, Leonard and Superintendent Welch. A note from the Superintendent was read suggesting a new method of requiring developers to accomplish roadway and public utility work. It is as follows: I have given much thought to the bonding of work In developments by developers. The acceptance of commercial bonds without time limits seems ineffective . The acceptance of checks in lieu of bonds is also ineffective. Both methods are cumbersome and slow. Enforcement is difficult and laden with detailed work. The Board of Survey will shortly have to decide on two • developments - Avalon Rd, and Causeway Rd . Consideration should be given to the method of getting the work done. I therefor suggest that the following be required of the developers: 1. Before the plan is signed the follow1 ng work shall be accomplished: excavation, drainage, water mAins, sewers if re- quired, gravel borrow in roadway and sidewalks, one coat of oil in travelled way. In other words, all work completed except bituminous concrete sidewalks and travelled ways, curbing and curb inlets, loamed tree lawns, bound points and driveway aprons before the plan is signed . 2. A commercial bond in the amount stipulated by the Town and bearing a specific completion date shall be filed with the iTown covering the uncompleted items mentioned above before the plan is signed. G3. A conditional approval shall be given the developer after the final hearing providing he agrees to the two above described conditions . 4. A copy of this arrangement, if approved, shall be given the Board of health and the Building Co� missionor, so that they will not inadvertently issue any permits . 5. The above would apply to either one or Tore streets. Supsrintendant An extended discussion took place. It was moved , seconded and voted to lay this matter on the table for consideration at a future meeting. Read note from Superintendent relative to the actual work accomplished by developers to date in functioning develop- ments. Report listed all developments and the status of the work in each instance. Report was made with relation to letter sent by Board in July 1959 requiring each developer to be under way by Sept. 1, 1959. No action taken. The meeting of the Board of Survey adjourned at 10:45 P.M . Respectfully submitted, ecret i