HomeMy WebLinkAbout1956-01-16 Board of Survey Minutes January 16, 1956
The meeting of the Board of Survey opened at 8 :00 P. M.
Present were Chairman Kilgore, Messrs. 'Lanni, Johnson,
Donahue and Superintendent Putnam.
Minutes of previous meeting held December 19, 1955 read and
approved.
Hearing held at 6 :00 P. M . on proposed change of grade on
Henzie Street, from Grove Street Easterly 604.78 feet to a dead end .
Henzie Street, part public, part private way, was approved for lines
and grades by the Board of Survey on June 8, 1926, but was actually
constructed at a lower elevation than the established grade, and
houses, lawns, drives and walks have been installed to the grade at
which the street was constructed.
Present at the hearing were the following listed abutting
property owners, who expressed their opinions on the proposed grade
change as noted: (HENZIE STREET)
Mr. Carlton Roderick 9 Henzie Street, Reading, Mass. Yes
Mrs. Carlton Roderick 9 Henzie Street, Reading, Mass. Yes
Mr. John J. Meehan 75 Grove Street, Reading, Mass. Yes
Mrs. John J. Meehan 75 Grove Street, Reading, Mass. Yes
Mr. Wm. W. Deyarmond 18 Henzie Street, Reading, Mass. Yes
Mr. Geo. L. Gordon 12 Henzie Street, Reading, Mass. Yes
James E. Howard 71 Grove Street, Reading, Mass. Yes
John C. Daly 91 Boardman Ave. Melrose, Mass. Yes
Pauline R. Howard 71 Grove Street, Reading, Mass. Yes
Moved, seconded and voted to effect grade dhange on Henzie
Street as shown on B. P. W. Plan A-17-81 dated January 16, 1956.
Preliminary hearing held at 8 :30 P. M. on proposed layout
of Marla Lane, which runs from Forest Street Easterly of Grove Street
in a Northerly direction a distance of 466 feet, more or less, to a
turn around. Present were the developer, Mr. Robert Burette, and
1
Realtor Urban McNally.
As some 460 lineal feet of storm drain is necessary in
Forest Street to properly drain this proposed street, the developer
and the Board discussed the situation at some length. The final
proposed as decided by the Board was as follows, regarding the drain
to be installed in Forest Street:
Developer to excavate drain trench, purchase pipe, and cold
patch trench. Town to lay drain pipe, back fill trench,
install two manholes, and ultimately final-patch trench.
Developer Surette agreed to confirm this by letter to Board.
Board adjourned at 9:00 P. M .
Respectfully submitted:
cretary