Loading...
HomeMy WebLinkAbout1983-09-01 Board of Survey Minutes Board of Survey Meeting of September 1,, 19x3 Page 1 A meeting of the Board of Survey convened in Room 16, Municipal Building at 7: 45 P.M. Present were Chairman Wood, Secretary Barker, Board Memhers Polychrones, Griffin and Hampson and Assistant Superintendent Edward D. McIntire, Jr. The Board met with Attorney D. Bradley Latham and William Jones of Dana Perkins Engineering Associates regarding Pine Grove Estates Subdivision off Haverhill Street. The petitioner, Stoneham Savings Bank, is making a formal request that the Board waive the roadway length limitation to allow the major roadway in the subdivision to be extended by approximately 150 feet, subject to the approval by the Board of the definitive plan showing the final road layout. Mr. Jones stated there has been some modification to the plan and it is now required to fill 3400 square feet of the Flood Plain. The road is now 1,050 feet long. He stated they would accept the provision that the road can not be extended further without looping the water main, and that would be included on the Definitive Plan. It was moved, seconded and voted 3:0:2 (Mr. Barker and Mr. Polychrones abstaining) that the Board of Survey waive the roadway length limitation to allow the major roadway in the subdivision to be extended by approximately 150 feet total length. The Board met. with Ernest r,. Babcock, developer of Hanscom Avenue Extension, at 7:51 P.M. The proposed development of Hanscom Avenue Extension has been submitted at various times since 1966. The Board of Survey approved a plan to construct the street in December 1977. The owner then filed with the Conservation Commission and their modifications required a change resulting in the elimination of one lot and the installation of a cul-de-sac whirh was approved by the Board Board of Survey Meeting of September 1, 1983 Page 2 of Survey on September 24, 1979. There were then further complications with the Conservation Commission that resulted in an eventual appeal to the State. The results of that appeal were not issued until November 9, 1980. Therefore, due to the time of the year, no work was started until 1981. The present plan with all the modifications was signed by the Board on July 13, 1981. The water main was then installed that year along with the piped drainage., In August and September of 1981 and the Spring of 1982, gravel was hauled in and approved and in July 1982 the binder layer of pavement was installed on the roadway. The work in 1983 has consisted only of shaping part of the drainage swale.s. The developer has asked for and received a number of extensions. The delays in the construction have been due to both a late issuance of the Orders of Conditions by the Conservation Commission and the slow rate of progress exhibited by the Developer. The latest time for completion expired on September 24, 1982. A certificate of deposit, in the amount of $34,000.00 issued by Bank of Boston Middlesex, has been offered by the developer as surety for the completion of the work on this subdivision. The developer also requests an extension of time from the Board as the previous extension of time has elapsed. Mr. Babcock stated he is asking for an extension of one year. He ' stated he obtained an extension from the Conservation Commission until August of 1984. This Fall he will continue on with the sidewalks and rough grade of the lots. He will not put in hot top or curbing or sidewalks. He stated there should be four foundations in before the first frost. Board of Survey Meeting of September 1, 1983. Page 3 ' Assistant Superintendent McIntire stated there was a recommendation by the Department for the completion by March of 1984 because of a lack of progress on this job. The Department would like to see some progress on this subdivision. It will be a fact that the planting season will probably not be ideal and may require a further extension of time from March 11 1984. There is also work required on a lot at the beginning of the subdivision on the left hand side. The residents have seen a partially completed subdivision for seven years now. Mr. McIntire stated he would like to see the base course of sidewalks down on the entire area. Mr. McIntire stated there is no record of the. approved Plan or the Covenant Agreement ever being recorded. Until those items are ' recorded, there is no way any Release of Restrictions could be signed. Mr. Babcock asked could you release them with the clause that when they are recorded they will be released? Chairman Wood replied no, all of the work must be done before I would release it. Mr. Babcock asked would you release the four lots on the plan that is recorded? Mr. McIntire replied the Covenant Agreement may also be different from the existing requirements and he would not recommend this. Chairman Wood stated we can put you on the Agenda for the 12th of September if everything is recorded by then. I don't think we are looking favorably towards a whole year extension. We are looking for some ' progress on this Subdivision. Mr. Babcock asked if the Registry of Deeds will accept a duplicate, may I get copies from you? Chairman Wood replied first find out if they will accept the duplicate, then call the Department and we will assist you. Board of Survey Meeting of September 1, 1983 Page 4 ' Mr. Barker stated I would like you to understand that I want to see progress down there. It is my personal opinion that if you grade gravel, if will just settle over the Winter and I would like to see a binder course on the sidewalk and a written agreement regarding the stone wall. I think you should leave here with a strong feeling that. March 1, 1984 is going to be the first. extension. The matter was tabled until September 12, 1983. The meeting adjourned at 8:24 P.M. Respectfully submitted, Secretary