Loading...
HomeMy WebLinkAbout1980-01-28 Board of Survey Minutes January28, 1980 ' Meeting of the Board of Survey convened in Room 16, Munici- pal Building at 7:30 P. M. Present were Acting Chairman Cowell , Board Members DeHart, Wood and Fallon, Clerk of the Board Louanis, Assistant Superin- tendent of the Department of Public Works McIntire, Finance Committee Member Linscott and Town Meeting Member Douglas Barker. It was moved, seconded and voted to approve the minutes of the previous meeting. The Board reviewed and accepted as a point of information the Engineering Division ' s report on the status of subdivisions (copy attached) . Read letter from Vincent C. Fantasia, Trustee of Terrace Realty Trust requesting an extension until August 1 , 1980 on the project known as Chapel Hill Estate. Clerk of the Board Louanis stated he did not object to the extension of the bond provided the amount of the bond were increased by approximately $12,000. ' The increase is required as the cost of the work anticipated by the Engineering Division has escalated due to the inflation. Mr. Louanis stated the roadway has been paved but there are several lots not yet built upon. Acting Chairman Cowell suggested a letter be written to Mr. Fantasia advising him the Board would be willing to meet with him on February 1 th to discuss the extension of the bond and reminding him we are still waiting for him to make neces- sary repairs to a hydrant in the area. Meeting adjourned at 7:45 P.M. Res ectfully submitted, Secret y STATUS OF SUBDIVISIONS SHORT FORM NAME OWNER COMP. DATE BOND/STATUS Benton Circle Parkwood Const. Co. 10-22-81 S 72,700.00 Chapel Hill Estates Terrace Trust 12-19-79 S 55,800.00 Cumberland Rd. Ext. Riverside Homes 08-14-81 $ 43,300.00 Eastway Extension Harwill Realty Tr. 11-22-80 $ 65,700.00 (2) Hanscom Ave. Ext. Ernest G. Babcock None Definitive Hopkins Farm Crescent Pk. Rlty. 08-13-79 $ 7,400.00 Mile Post Road Parkwood Const. Co. 08-13-79 $ 3,600.00 Riverside Dr. #1 Riverside Homes Inc 05-05-79 $ 500.00 Riverside Dr. #2 " " " 10-23-80 $ 800.00 9-22 Sunnyside Ave. Ext. " " " None Preliminary Latham Lane Brandt Deva Corp. 09-07-81 $ 48,000.00 Longfellow Road Chimo Dev. Corp. - Released Harvest Road John C. Parsons None Private way Pine Grove Estates Comm. Serv. Dev. Inc -_' Future Franklin St.northerly Symes Assoc. " Tabled by Board Warren Avenue Ext. Rivers Dev. Corp. it " " " Oak Knoll Charles Gillis Optn." Preliminary Criterion Street Donald F. Johnston 06-08-81 $15, 180.00 Submitted by: William McCauley Engineering Division STATUS OFSUBDIVISIONS JANUARY1980 NAME AND STATUS OWNER, COMP.DATE, BOND WORK REMAINING REMARKS BENTON CIR. E AURELE CIR. Parkwood Const. Co. Sidewalks, Tree Lawns, All work at or ahead Roadway Binder Grade 10/22/81 trees, bounds, complete of schedule. 35% complete $72,700.00 roadway, Margaret Rd. and landscaping. CHAPEL HILL ESTATES Terrace Trust Curbing, wall , bounds, Completion date has Subdivision Binder Gr. 12/19/79 trees, tree lawns, com- been extended several 50% complete $55,800.00 plete sidewalks, repair times. Inflation has damaged areas, repair diminished bond value. hydrant. Cumberland Ave. Ext. Riverside Homes, Inc. Sidewalks, tree lawns, All work at or Roadway binder grade 8/14/81 bounds, complete road- ahead of schedule 35% complete $43,300.00 way, lot grading EASTWAY EXTENSION Harwill Realty Trust Cul-de-sac- portion, cul All work at or behind Partial roadway binder 11/22/80 vert, sewer main, road- schedule 20% complete $65,700.00 way, sidewalks, tree lawns, trees, bounds, etc. HANSCOM AVENUE EXT. Ernest G. Babcock All construction work The site is turning Definitive plan approved No date From clearing and grubb- into a bit of an eye 0% complete No bond ing to completion sore Hopkins Farm Crescent Park Realty Tr. Replace driveway apron Work remaining is to Construction completed 8/13/79 repair some tree lawns replace unsatisfactory 99% complete $7,400.00 replant trees, infra- work red sunken trench #80 Haystack Road. Milepost Road Parkwood Const. Co. Repair broken piece of All drainage for Construction completed 8-13-79 curbing E replant failed Milepost Road & Hopkins 99% complete $3,600.00 tree lawn. Plant trees, Farm should be thoroughl provide as-built plans cleaned before release. RIVERSIDE DRIVE Portion #1 Riverside Homes, Inc. None Holding for trees and Construction complete 5-5-79 grass 99% complete $500.00 STATUS OF SUBDIVISIONS JANUARY 1980 NAME AND STATUS OWNER, COMP.DATE, BOND WORK REMAINING REMARKS RIVERSIDE DRIVE PORTION #2 Riverside Homes, Inc. None Holding for trees and Construction completed 10723/80 grass. 99% complete $800.00 SUNNYSIDE AVENUE EXTENSION Riverside Homes, Inc. * '' None - no work started None Definitive plan No date 0% complete No bond LATHAM LANE Brandt development Corp. Sidewalks, tree lawns, All work at or Roadway binder grade 9-7-81 trees, bounds, complete ahead of schedule 350/ complete $48,000.00 roadway, grading, etc. Longfellow Road, etc. Chimo Development Corp. None None Construction completed No date Released Released HARVEST ROAD John C. Parsons Roadway, tree lawns Private way under Utilities installed No date some drainage Divisions inspection 20% completed No bond 3/4 homes built or started at this time. PINE GROVE ESTATES Community Services Dev. Inc. None - no work started Board tabled plan Progress plan submitted No date as unacceptable 0% complete No bond FRANKLIN ST. Northerly Symes Associates None - no work started Tabled Preliminary plan submitted No date 0% complete No bond WARREN AVENUE EXT. Rivers Development Corp. None - No work started Tabled Preliminary Plan sub. No date % complete o% No bond OAK KNOLL Option: Charles Gillis None - no work started Board has not reviewed Preliminary plan sub. No date preliminary plan 0/ complete No bond CRITERION STREET Donald F. Johnston S/w, curbing, tree lawns Poor cross sation to be Rd/wRd/wy binder grade O% com. 6-8-81 $1 180.00 trees-bounds-com . rdw . corrected/levelling tours