The Board reviewed and accepted as a point of information
the Engineering Division ' s report on the status of subdivisions
(copy attached) .
Read letter from Vincent C. Fantasia, Trustee of Terrace
Realty Trust requesting an extension until August 1 , 1980 on the
project known as Chapel Hill Estate. Clerk of the Board Louanis
stated he did not object to the extension of the bond provided
the amount of the bond were increased by approximately $12,000.
' The increase is required as the cost of the work anticipated by
the Engineering Division has escalated due to the inflation.
Mr. Louanis stated the roadway has been paved but there are several
lots not yet built upon. Acting Chairman Cowell suggested a letter
be written to Mr. Fantasia advising him the Board would be willing
to meet with him on February 1 th to discuss the extension of the
bond and reminding him we are still waiting for him to make neces-
sary repairs to a hydrant in the area.
Meeting adjourned at 7:45 P.M.
Res ectfully submitted,
Secret y
STATUS OF SUBDIVISIONS
SHORT FORM
NAME OWNER COMP. DATE BOND/STATUS
Benton Circle Parkwood Const. Co. 10-22-81 S 72,700.00
Chapel Hill Estates Terrace Trust 12-19-79 S 55,800.00
Cumberland Rd. Ext. Riverside Homes 08-14-81 $ 43,300.00
Eastway Extension Harwill Realty Tr. 11-22-80 $ 65,700.00 (2)
Hanscom Ave. Ext. Ernest G. Babcock None Definitive
Hopkins Farm Crescent Pk. Rlty. 08-13-79 $ 7,400.00
Mile Post Road Parkwood Const. Co. 08-13-79 $ 3,600.00
Riverside Dr. #1 Riverside Homes Inc 05-05-79 $ 500.00
Riverside Dr. #2 " " " 10-23-80 $ 800.00 9-22
Sunnyside Ave. Ext. " " " None Preliminary
Latham Lane Brandt Deva Corp. 09-07-81 $ 48,000.00
Longfellow Road Chimo Dev. Corp. - Released
Harvest Road John C. Parsons None Private way
Pine Grove Estates Comm. Serv. Dev. Inc -_' Future
Franklin St.northerly Symes Assoc. " Tabled by Board
Warren Avenue Ext. Rivers Dev. Corp. it " " "
Oak Knoll Charles Gillis Optn." Preliminary
Criterion Street Donald F. Johnston 06-08-81 $15, 180.00
Submitted by: William McCauley
Engineering Division
STATUS OFSUBDIVISIONS JANUARY1980
NAME AND STATUS OWNER, COMP.DATE, BOND WORK REMAINING REMARKS
BENTON CIR. E AURELE CIR. Parkwood Const. Co. Sidewalks, Tree Lawns, All work at or ahead
Roadway Binder Grade 10/22/81 trees, bounds, complete of schedule.
35% complete $72,700.00 roadway, Margaret Rd.
and landscaping.
CHAPEL HILL ESTATES Terrace Trust Curbing, wall , bounds, Completion date has
Subdivision Binder Gr. 12/19/79 trees, tree lawns, com- been extended several
50% complete $55,800.00 plete sidewalks, repair times. Inflation has
damaged areas, repair diminished bond value.
hydrant.
Cumberland Ave. Ext. Riverside Homes, Inc. Sidewalks, tree lawns, All work at or
Roadway binder grade 8/14/81 bounds, complete road- ahead of schedule
35% complete $43,300.00 way, lot grading
EASTWAY EXTENSION Harwill Realty Trust Cul-de-sac- portion, cul All work at or behind
Partial roadway binder 11/22/80 vert, sewer main, road- schedule
20% complete $65,700.00 way, sidewalks, tree
lawns, trees, bounds,
etc.
HANSCOM AVENUE EXT. Ernest G. Babcock All construction work The site is turning
Definitive plan approved No date From clearing and grubb- into a bit of an eye
0% complete No bond ing to completion sore
Hopkins Farm Crescent Park Realty Tr. Replace driveway apron Work remaining is to
Construction completed 8/13/79 repair some tree lawns replace unsatisfactory
99% complete $7,400.00 replant trees, infra- work
red sunken trench #80
Haystack Road.
Milepost Road Parkwood Const. Co. Repair broken piece of All drainage for
Construction completed 8-13-79 curbing E replant failed Milepost Road & Hopkins
99% complete $3,600.00 tree lawn. Plant trees, Farm should be thoroughl
provide as-built plans cleaned before release.
RIVERSIDE DRIVE Portion #1 Riverside Homes, Inc. None Holding for trees and
Construction complete 5-5-79 grass
99% complete $500.00
STATUS OF SUBDIVISIONS JANUARY 1980
NAME AND STATUS OWNER, COMP.DATE, BOND WORK REMAINING REMARKS
RIVERSIDE DRIVE PORTION #2 Riverside Homes, Inc. None Holding for trees and
Construction completed 10723/80 grass.
99% complete $800.00
SUNNYSIDE AVENUE EXTENSION Riverside Homes, Inc. * '' None - no work started None
Definitive plan No date
0% complete No bond
LATHAM LANE Brandt development Corp. Sidewalks, tree lawns, All work at or
Roadway binder grade 9-7-81 trees, bounds, complete ahead of schedule
350/ complete $48,000.00 roadway, grading, etc.
Longfellow Road, etc. Chimo Development Corp. None None
Construction completed No date
Released Released
HARVEST ROAD John C. Parsons Roadway, tree lawns Private way under
Utilities installed No date some drainage Divisions inspection
20% completed No bond 3/4 homes built or
started at this time.
PINE GROVE ESTATES Community Services Dev. Inc. None - no work started Board tabled plan
Progress plan submitted No date as unacceptable
0% complete No bond
FRANKLIN ST. Northerly Symes Associates None - no work started Tabled
Preliminary plan submitted No date
0% complete No bond
WARREN AVENUE EXT. Rivers Development Corp. None - No work started Tabled
Preliminary Plan sub. No date
% complete o% No bond
OAK KNOLL Option: Charles Gillis None - no work started Board has not reviewed
Preliminary plan sub. No date preliminary plan
0/ complete No bond
CRITERION STREET Donald F. Johnston S/w, curbing, tree lawns Poor cross sation to be
Rd/wRd/wy binder grade O% com. 6-8-81 $1 180.00 trees-bounds-com . rdw . corrected/levelling tours