Loading...
HomeMy WebLinkAbout1978-12-11 Board of Survey Minutes December 11 , 1978 ' Meeting of the Board of Survey convened in Room 16, Munici- pal Building at 8:00 P. M. Present were Chairman Dustin, Secretary Price, Board Members Russell , Cowell and Testa, Clerk of the Board E. Roger Louanis, Developer John Rivers, Attorney 0. Bradley Latham and Peter Ogren from the firm of Hayes Engineering, Inc. Secretary Price read Notice of Public Hearing regarding final plan of Sunnyside Avenue Extension. The Chairman opened the meeting by requesting the developer to present the plan to the Board and the citizens attending the Hearing. The Developer, John Rivers was represented by Attorney 0. Bradley Latham and Peter Ogren of Hayes Engineering who presented the Plan outlining the Extension of Sunnyside Avenue to a dead end and ending in a cul - de-sac with five buildable lots and the back lot which was not buildable and would remain in common ownership with one of the buildable lots until it was disposed of as possible conservation land. The builder presented technical data requested by the ' Engineering Division regarding the design of the Subdivision in- cluding drainage computation and technical details supporting the proposed design. In respect to the list of deficiencies presented to the Engineer, Mr. Price moved, it was seconded and voted to postpone the Hearing until the Notice of the Public Hearing for Cumberland Road Extension was read and that both hearings be continued jointly since they abut one another. Mr. Price read Notice of Public Hearing regarding the Final Plan of Cumberland Road Extension. The Chairman opened the hearing announcing that both subdivisions were now being heard jointly and asked the engineer to present the Plan of Cumberland Road Extension. Con- siderable discussion ensued regarding the nonbuildable lot which showed on both subdivision plans concerning what disposition the owner planned for the lot and how it would be legally handled with the subdivision. Board members asked questions regarding drainage and sewer design all of which had been submitted for the ' first time to the Engineering Division at this Hearing and had not been properly reviewed by the Engineering Division. Mr. Berberian of Summer Avenue brought to the Board' s attention his concern for drainage and run off on Summer Avenue across his lot and wanted to be assured that the proposed Subdivision of Cumberland Road Extension would not create a water problem for him. Mrs. Stone and Mr. Nazarro of 21 Melbourne Avenue expressed concern of the ' adaquacy of the drainage system to handle the drainage and runoff from the proposed extension of Cumberland Road. After consider- able discussion of the drainage problem it was agreed that Hayes Engineering would meet with members of the Public Works Engineering Division and the citizens on December 14, 1978 at 2:00 P.M. to view the problem in the field. The Chairman apprised the Board of the fact that the Board had not scheduled a meeting until January 8, 1979 and they would have to act on the subdivision before January 3, 1979 to stay within the legal time limit required by the Sub- division Control Law. It was suggested that the developer should request an extension of time to January 17, 1979 to allow the Board sufficient time to act on the plan. The developer indicated that he was agreeable to the extension of time and he would present a letter to the Board requesting the extension on December 12, 1978. Mr. Price moved, it was seconded and voted that the Hearing for both subdivisions be closed. It was moved, seconded and voted to ' postpone action on this until a date no later than January 17, 1979 with the understanding that the developer or his counsel will be requesting such an extension. It was moved that in preparation for future action by the Board the Board meet with the Builders Engin- eer and interested abutters Saturday, December 16th at 2:00 P.M. and that they have recommendations for the Board at the next meet- ing January 8, 1979. It was seconded and voted. The Board signed a Release from the Covenant Agreement re: Countryside Lane Extension. Meeting adjourned at 9:35 P. M. R s e tffullllly / fitted, ecretary