HomeMy WebLinkAbout1978-01-16 Board of Survey Minutes January 16, 1978
' Meeting of the Board of Survey opened in Room 16, Municipal
Building at 9:25 P. M.
Present were Chairman Dustin, Board Members Russell and
Cowell , Superintendent Louanis and Finance Committee Members
Carl Beaulieu and Jose Canto.
Minutes of the previous meeting were accepted as written.
Read letter from Ralph P. Ciardiello, Trustee of Crestwood
Realty Trust requesting a release of bond held for the completion
of Lisa Lane, together with a memorandum from Asst. Superintendent
Bergeron outlining the remaining work to complete the subdivision.
Following a discussion it was moved, seconded and voted to reduce
the $3900.00 bond by $2900.00, retaining $1000.00 to cover the
remaining work and to extend the completion date for the sub—
division to June 30, 1978.
Read letter from Sydney M. Hodson, Jr. requesting that
' inasmuch as Dana Realty, Inc. has now been dissolved that the
Board of Survey take the bond with accrued interest and complete
the remaining work on Colonial Drive Extension. The Engineering
Division estimate indicates that the cost to complete Colonial
Drive Extension will be approximately $4,823.00. The bond with
accrued interest is $5,032.26. It was therefore moved, seconded
and voted to take the bond and complete the work.
The Board reviewed letter of January 3d, 1978 from the Office
of Latham and Latham regarding an application for permit from
Reading Board of Appeals to permit building for human occupancy
on three lots on Haverhill Street owned by Evelyn H. Belzer.
Following a lengthy discussion it was moved, seconded and voted
to recommend to the Board of Appeals that the issuance of a var—
iance of proposed lots 2, 4, and 5 for building purposes subject
to the restriction and stipulation that minimum cellar elevations
be set at 90' contour level U.S.G.S. datum.
' Meeting adjourned at 9:55 P. M.
R pectfully submitted,
ecretary