HomeMy WebLinkAbout2018-10-18 RMLD Board of Commissioners Minutes RECEIVED
Town of Reading TOWN CLERK
Meeting Minutes READING, MA.
0,: fa
"""°"`� 2819 JUN 26 AM 10: 08
Board - Committee - Commission - Council:
RMLD Board of Commissioners
Date: 2018-10-18 Time: 06:30 PM
Building: Reading Municipal Light Building Location: Winfred Spurr Audio Visual Room
Address: 230 Ash Street Session: Open Session
Purpose: General Business Version: Final
Attendees: Members- Present:
David Hennessy, Chair; David Talbot, Vice Chair; Tom O'Rourke,
Commissioner; Philip B. Patina, Commissioner; Jahn Stempeck,
Commissioner
Members- Not Present:
Others Present:
RMLD Staff: Coleen O'Brien, General Manager; Hamid Jaffari, Director of
Engineering and Operations; Jane Parenteau, Director of Integrated
Resources; Wendy Markiewicz, Director of Business, Finance, and
Technology; Tracy Schultz, Executive Assistant
Citizens' Advisory Board:
Jason Small, Vice Chair
Minutes Respectfully Submitted By: David Talbot, Secretary Pro Tem
Topics of Discussion:
Call Meeting to Order
Chair Hennessy called the meeting to order and Chair Hennessy read RMLD's Code of Conduct.
Chair Hennessy announced that the meeting is being videotaped at the RMLD office of 230 Ash
Street, for distribution to the community television stations in North Reading, Lynnfield, and
Wilmington.
Pudic Comment
Chair Hennessy welcomed Mr. Small. There was no public comment. Chair Hennessy noted that
Ms. Parenteau would be leaving the RMLD and wished her well in her new position. The Board
applauded and echoed Chair Hennessy's sentiments.
Chair Hennessy noted that Mr.Pacino would be arriving late.
Approval of Board Minutes(Attachment 1)
Mr. Stempeck made a motion, seconded by Mc O'Rourke, to approve the July 19, 2018 and
September 20,2018 minutes,on the recommendation of the General Manager.
Motion Carded:4.0i
Page I 1
Report on Citizens'Advisory Board Meeting on October 9,2010-Mr.Stempeck
Mr.Stempeck stated that the CAB meeting was a great meeting with excellent questions.The
CAB approved the capital and operating budgets.There was a discussion on the best way to
present the budgets.Mr.Small had nothing to add.
Verizon and AT&T 5G-Mr.Slempeck
Mr.Stempeck explained that he read a newspaper article regarding cell carriers wanting to put
miniature 5G cell towers on pole tops and stated that RMLD could charge a fee.
Ms.O'Brien explained that if wireless is ultimately classified as a utility then a set fee will be state-
mandoted. The fee will be split with Verizon because they own half of each pole. There's also
the question of who works on the cell equipment: that high up near electrical lines requires a
rated worker. There's the issue of multiple caniers. Mr. Talbot asked for a report on carrier
requests at the next meeting. Ms. O'Brien answered that there have been no carrier requests.
Mr.Jaffari added that there are concerns with operational radio safety.
The discussion on the payment to the Town of Reading was tabled until Mr. Paclno s arrival.
CY 2019 Caphal Budget-Mr.Jaflarl-(Attachment 2)
Mr. Jaffan explained that he would be presenting highlights of the Calendar Year 2019 Capital
Budget. Mr. Jaffari reviewed projects including LED upgrades, the parking lot upgrade at 230
Ash Street, building upgrades, and the installation of electric vehicle chargers. Mr. Jaffari also
reviewed the battery storage unit at Station 3, grid optimization and software integration, and
the outage management system and IVR. Mr. Stempeck, referring to gas explosions that
recently occurred in another town, asked if RMLD can shut off power in specific locations. Mr.
Jaffari explained that RMLD currently cannot but will be able to once Intellirupter switches are
installed. It's a 15-year project due to the equipment cost, The switches are being installed in
key locations.
Mr. Jaffari discussed costs associated with the new Wilmington substation and stated that RMLD
is in negotiations with National Grid for land and should have letter ofintent by October 31. Mr.
Jaffari explained that RMLD will be reimbursed by the state for the Massachusetts Deportment of
Transportation Main Street widening. The next three projects are new and are an underground
line extension on Marion Street, d 5W5 Andover Street upgrade in Wilmington, and fiber line
extensions to Substation 4. Notional Grid is trying to connect their SCADA and RMLD is in the
middle. It is cheaper than what National Grid had quoted.This is per NERC and is ISO mandated
so RMLD is obligated to do this, It will increase overall area reliability. Mr. Jaffari stated that the
next three projects involve the getaways for Station 4.The conduits are filled with cables and the
heat builds up. RMLD engineers are moving two lines from underground to overhead. This will
increase distribution capacity by 20 megawatts and is a great savings. Mr. Jaffari reviewed the
AMI mesh network expansion, meter replacements,and equipment upgrades.
Mr. Stempeck asked if RMLD could offer the service of testing poles for Verizon. Ms. O'Brien
stated the RMLD can test poles in Verizon's custodial area but cannot charge Verizon for
maintenance that they should be doing as it's a Verizon union issue.
Mr.Talbot asked whether the parking lot upgrade is necessary. Mr. Stempeck stated that it had
been previously discussed. Ms. O'Brien stated that more spaces and another EV charger are
being added. Mr.Talbot stated that he wants to see the building plans.
Mr. Stempeck made a motion, seconded by Mr. O'Rourke, that the RMLD Board of
Commissioners approve the Calendar Year 2019 Capital Budget in the amount of$7,804,373 as
presented,on the recommendation of the General Manager.
Motion Carried:4:0:0.
CY 2019 Operating Budget-Ms.Markiewicz-(Attachment 3)
Ms. Markiewicz explained that fixed costs comprise 80.7 percent of the CY 19 Operating Budget.
71.44 percent is power supply. Fixed cost decreased by about 4.2 percent from FY 19 to CY 19
Page 1 2
CY 2019 Operating Budget-Ms.Markiewicz-(Attachment 3)
due mainly to a reduction in fuel costs. Semi-variable costs represent about 19.3 percent of the
overall operating budget, which is a 2.6 percent increase. The overall operating budget is
projected to decrease by 2.94 percent from FY19 to CY19. Fixed costs are comprised of power
supply which is 77.44 percent of budget, depreciation expense of a rate of three percent which
is $4,524,000 and 4.83 percent of the budget, the payment to the Town of Reading at $2.48
million and 2.65 percent of the budget, payments to the other towns which are based on two
percent of net plant which are$1.6 million and 1.68 percent of budget,and disposal of losses on
equipment which is about $100,000. Semi-variable costs are comprised of labor which is 7.12
percent of budget, employee benefits and pension which are 3.83 percent of budget,
operating and maintenance expenses which are 2.76 percent of the budget, conservation
expenses which are 1.05 percent of budget, overtime which is 1.06 percent, and free trimming
which is almost one percent. All other expenses are less than one percent of the budget. Chair
Hennessy asked if the percentage of employee benefits and pension was continually going up.
Ms. Markiewicz explained health insurance has been going up and pension costs are going up
about$400,000 per year.` Based on actuarial reports, the Town of Reading is targeting a specific
time to be fully funded. Ms. Markiewicz stated that the actuarial reports show a greater rate of
return on investment than what the Town has been receiving. RMLD has spoken with the Town
about how to better invest funds. Ms. Markiewicz discussed the budgeted net income
compared to the budgeted rate of return for the Six-Year Plan and explained that RMLD is
staying close to eight percent to fund capital projects. As projects are completed the rate of
return will be brought down to six percent. Ms. Markiewicz then reviewed the budgeted kWh
sold compared to the budgeted rate of return and stated that RMLD is projecting that sales will
drop one percent each year. As sales decrease the rate of return decreases. Ms. Markiewicz
then explained the sources of capital funds from CY19 through CY24.
Ms. Markiewicz then reviewed the FY18 financials and explained that there hasn't been a
presentation on FY18 yet because RMLD and the auditors are waiting for the actuarial report
based on the new GASB OPEB. However, the FY18 actual numbers should not change. FY18
actual came in at$5.2 million. Real net income was $4.5 million but because of OPEB there was
a $700,000 decrease in expenses. The rate of return came in under eight percent and RMLD
come in under budget.
Returning to the CY 19 budget, Ms. Markiewicz stated that it has total operating revenues of$96
million reduced by $3 million from FY19. Purchase power, capacity, transmission, fuel and fuel
are$66.8 million.The bottom line number is anticipated to come in at$3.5 million, which is what
the Commission is being asked to vote on. Ms. Markiewicz stated that RMLD will not be raising
rates to make net income.
Mr. O'Rourke expressed concerns regarding declining sales.
Mr.Pacino arrived at the meeting.
Mr.Talbot asked about the increase in pension. Ms. Markiewicz explained that was due to OPEB
being underfunded. Mr.Talbot asked about the change in labor costs. Ms.Markiewicz explained
that a portion of labor comes from capital and a portion comes from operating. The FY19
Budget had anticipated a higher cost of capital projects. Mr.Talbot asked about legal fees and
suggested that the Board should set policies as an oversight for legal expenses. Mc Stempeck
pointed out that legal had written a white paper f6r RMLD's benefit. Mr. Talbot asked what the
Town of Reading spends. Mr. Pacino replied that RMLD can't be compared to the Town and Mr.
Stempeck stated that he is all for hiring competent attorneys. Ms. O'Brien stated that RMLD
doesn't have anyone on retainer: RMLD needs specialists in labor, power supply, FERC counsel,
and counsel for insurance claims, purchasing, and policies. Mr. O'Rourke suggested a
spreadsheet showing what has been spent on legal over the last five years. Ms. O'Brien stated
that RMLD used to pay $780 an hour for labor and now pays less than half of that. Ms. O'Brien
indicated that a spreadsheet would be generated.
Page 1 3
CY 7019 Operating Budget-Ms.Markiewicz-(Attachment 3)
Mr. O'Rourke suggested, in the future, approving the budgets after both presentations were
complete.
Mr. Stempeck made a motion, seconded by Mr. O'Rourke, that the RMLD Board of
Commissioners approve the Calendar Year 2019 Operating Budget with a Net Income of
$3,529,582 as presented, on the recommendation of the General Manager.
Motion Carried:4:0:1.
Mr.Pacino abstained due to his missing the budget presentation.
`Pension costs are going up$100,000 a year with the intent of increasing assets and lessening
liability.$400,000 included OPEB.
Integrated Resources Division-Ms. Parenteau
Power Supply Report-August 7018(Attachment 4)
Ms. Parenteau thanked the Board for their support. Ms. Parenteau discussed the ISO coincident
peak with RMLD's load from 2016 through 2018. ISO system peak coincident with RMLD's load. In
2016 the ISO's peak was 25,596 megawatts. If was higher this year: preliminary reporting shows
that ISO peaked at 25,763 megawatts on August 29 at 6 p.m. RMLD's load 159.643 compared to
163.058 in 2016. In 2018 RMLD's generator was online so there was a 2.3-megawatt reduction.
Regarding Mr. Talbot's question of how much Shred the Peak gets involved, when ratios from
2016 and 2018 (with the 2.3 subtracted) are compared, there is a significant decrease in RMLD's
peak. Customers have taken an active interest and are working with RMLD to reduce use. Ms.
Porenteou stated that her group did a great job in educating customers. Ms. Parenteau then
discussed day ahead and real time pricing on August 12, 2016, June 17, 2017, and August 29,
2018 (ISO peak days).
Engineering and Operations Report-July and August 7018-Mr.Jaffari(Attachment 5)
Mr. Jaffari stated that yeartodate routine capital construction totals $310,295. Year-to-date
capital spending is $910,325 with $6,660,164 remaining. Mr. Jaffari reviewed the progress being
made on routine maintenance programs. Mr. Jaffari stated that Lynnfield has 19 transfers North
Reading nine transfers 44 poles to remove Reading 27 transfers 18 poles to remove Wilmington
28 transfers four poles to be removed. Reliability is well under the national and regional
averages. SAIDI is a little higher this year due to falling frees. Overall outages are going down
which shows that RMLD is on the right track with its maintenance programs.
RMLD Procurement Requests Requiring Board Approval-Mr.Jotiarl(Attachment 6)
IFP 2019.03 Cooper Power Systems Meters and Equipment for the AMI Mesh Network System
Expansion and Migration
Mr.Jaftori explained that this will strengthen the mesh network. Mr. Pacino asked how much was
budgeted for this project. Mr. Jaffari checked the budget and replied $300,000. Mr. Pacino
requested that the budgeted amount always be included with the bid requests.
Mr.Stempeck made a motion,seconded by Mr. Mr.O'Rourke, that IFP 2019.03 for Cooper Power
Systems Meters and Equipment for the AMI Mesh Network System Expansion and Migration be
awarded to: Cannon Technologies, Inc., an affiliate of Eaton Corporation plc dba Eaton for
$274,380.00, pursuant to M.G.L. Chapter 164 § 56D, on the recommendation of the General
Manager.
Motion Carried:5:0:0.
Sub-Committee on the Payment to the Town of Reading-Mr.Pacino
Mr. Stempeck stated that he has some comments and explained that Ms. O'Brien did a study
analyzing the payment to the Town of Reading that included different metrics and variables to
be considered along with RMLD's charter.The study is tied to six-year strategic plan and found a
convergence due to decreasing kilowatt hour sales and the increasing payment to the Town.
The worst case would lead to a shortage of net income and no way to build up capital reserves.
Ms. Markiewicz, Ms. O'Brien, and Mr. Jaffari hove put together two to three scenarios with
projections for the future.The study also contains financial analysis on revenue, costs,
Page 1 4
Sub-Commetee on the Payment to the Town of Reading-Mr.Pacing,
repercussions and assumptions. Mr. Stempeck stated he would like to propose that the study
and scenarios be submitted to the Sub-Committee so that the Sub-Committee has a chance to
get grounded in what the financials really mean and can understand the background of the
study. There is a Sub-Committee meeting on Tuesday, October 23 and the financial implications
can be discussed and then Mr.Stempeck and Mr.Pacino can return to the Board.Mr.Stempeck
stated that 's has to be made sure that RMLD has enough capital for the maintenance of the
system and that a consensus will hopefully develop among members of the Sub-Committee. Mr.
Pacino pointed out some corrections to the study that Mr.O'Rourke brought to his attention and
stated that he agrees with everything Mr. Stempeck said except that he would like to see the
payment to the Town stay the same for two years to give the Town time for economic
development.That will be worked out by the Sub-Committee.
Mr. O'Rourke reminded everyone that the payments to date were based on a number picked in
1997,which was the CPI,that goes up regardless of the performance of the utility.That's why it's
unsustainable: it keeps going up even when revenues are flat. Mr. O'Rourke explained tho. 'he
RMLD began this process because the Town wanted the payment to increase.Mr. Pocino staled
that even though the result is opposite of what was intended it is something that should have
been being looked at. Mc O'Rourke recognized Ms. O'Brien for her work on the study. Mr.
Pacino stated that he thought the payment should be reviewed every three years: five years is
too long. Mr.Talbot pointed out that, as has been previously discussed and as he understands it,
among municipal electrics. RMLD is making the largest PILOT payment in the state.
General Discussion
Meeting dates were discussed.
Adjournment
At 852 p.m., Mr. Pacino made a motion, seconded by Mr. O'Rourke, that the Board go into
Executive Session to consider the purchase of real property and return to Regular Session for the
sole purpose of adjournment.
A true copy of the RMLD Board of Commissioners minutes
as cpproveo by a majority of the Commission
David Talbot,Secretary m Tem
RMLD Board of Commissioners
Page 1 5
READING MUNICIPAL
LIGHT DEPARTMENT
BOARD OF COMMISSIONERS
REGULAR SESSION
THURSDAY, OCTOBER 18, 2018
APPROVAL OF BOARD MINUTES
JULY 19, 2018 AND SEPTEMBER 20, 2018
ATTACHMENT 1
0O,N. A
}L. Town of Reading
Yu Meeting Minutes
� aa.a�'o
Board - Committee - Commission - Council:
RMLD Board of Commissioners
Date: 2018-07-19 Time: 07:30 PM
Building: Reading Municipal Light Building Location: Winfred Spurr Audio Visual Room
Address: 230 Ash Street Session: Open Session
Purpose: General Business Version: Final
Attendees: Members - Present:
David Hennessy, Chair
David Talbot, Vice Chair
Tom O'Rourke, Commissioner
Philip B. Pacino, Commissioner
Members - Not Present:
John Stempeck, Commissioner
Others Present:
RMLD Staff:
Coleen O'Brien, General Manager
Hamid Jaffari, Director of Engineering and Operations
Jane Parenteau, Director of Integrated Resources
Wendy Markiewicz, Director of Business, Finance, and Technology
Tracy Schultz, Executive Assistant
Citizens' Advisory Board:
George Hooper, Chair
Minutes Respectfully Submitted By: Philip B. Pacino, Secretary Pro Tem
Topics of Discussion:
Call Meeting to Order
Chair Hennessy called the meeting to order and Chair Hennessy read RMLD's Code of Conduct.
Chair Hennessy announced that the meeting is being videotaped at the RMLD office at 230 Ash
Street, for distribution to the community television stations in North Reading Lynnfield, and
Wilmington.
Public Comment
Chair Hennessy welcomed Mr. Hooper,who had no comments.There was no public comment.
Approval of Board Minutes(Attachment 1)
Mr. Pacino made a motion, seconded by Mr. O'Rourke, to approve the May 8. 2018 and May 9,
2018 minutes, on the recommendation of the General Manager.
Motion Carried:4:0:0.
Report of the Chair-Chair Hennessy
Meeting of the Sub-Committee on the Payment to the Town of Reading
Due to Mr.Stempeck's absence, the Board decided to table this item until the September
meeting.
Page 1 1
General Manager's Report-Ms.O'Brien
Review of Board Policies
It was agreed upon that policies with no changes that are up for their three-year review will be
distributed to the Board and voted on.
Ms. O'Brien explained that the changes to Policy No. 2 Surplus were due to a recommendation
from staff. Previously, surplus offers were extended to the towns for 30 days and then posted to
local newspapers for 30 days. 60 days to sit on surplus was too long. The change to the bid
shortens the timeframe.There was discussion about the process for offering surplus to the Towns.
Mr. Hooper stated that RMLD's process is standard.
Mr. Pacino made a motion, seconded by Mr. O'Rourke, that the Board approve the changes to
Policy No.2 Surplus, on the recommendation of the General Manager.
Motion Carried:4:0:0.
Ms. O'Brien explained that Policy No. 14 was called Unique Employee Situation and stated that if
the General Manager gives the okay, employees can donate sick time to other employees. Ms.
O'Brien explained that the policy now states that it can only be used for serious illness. The
employee must be in good standing. It is not used often and is prorated based upon the position
of the employee donating hours.
Mr. Hooper stated that this is standard practice. Mr. Hennessy thanked Mr. Hooper for his
comments.
Mr. Pacino made a motion,seconded by Mr. O'Rourke, that the Board approve the changes to
Policy No. 14 Voluntary Use of Sick Time, on the recommendation of the General Manager.
Motion Carried:4:0:0.
Ms. O'Brien explained that Policy No. 30 Sustainable Energy had said "RMLD will strive to reach
15 percent by June 30, 2013, 20 percent by 2020. 25 percent by 2025" and has now been
changed to "the RMLD met 16 percent by 2017, will strive to meet 20 percent by 2020, 25
percent by 2025." It was changed to identify what had been done.
Mr. O'Rourke asked if battery storage was included. Ms. O'Brien answered that the policy says,
"sustainable generating sources" and battery storage doesn't generate.
Mr. Talbot asked if the word "strive" could be changed to make the language more concrete.
Ms. O'Brien explained that the word strive is used because RMLD only gets involved in low-risk
sustainable energy that is available at a competitive price, since sustainable means more
expensive.
Mr. Talbot suggested increasing the target numbers and asked if the definition of sustainable still
pertains if the Renewable Energy Certificates jRECsj have been sold. There was ensuing
discussion about RECs and the definition of "renewable" and "sustainable." It was decided to
table the vote on the policy changes pending further clarification.
Ms. O'Brien then presented three requests to dissolve policies. The first, Policy No. 10 RMLD Credit
Card/Petty Cash, is covered under a Town policy. Ms. O'Men explained that the policy will be
dissolved and replaced with an Accounting Operating Procedure. Policy No. 24 Total Quality
Management is a program that was instituted in the 1990's to get employees to join working
groups. RMLD has working groups and is in the process of continuous improvement.The policy is
out of date. Policy No. 28 Severance was in case RMLD ceased to do business because it's said,
acquired, merged, or bought out. Ms. O'Brien stated she is requesting it be dissolved because
RMLD won't be sold. Ms. Parenteou explained that the policy was in response to the 1999
deregulation.
Page 1 2
General Managers Report-Ms. O'Brien
Review of Board Poficies
Mr. Pacino made a motion, seconded by Mr. O'Rourke, that the Board dissolve Policy No. 10
RMLD Credit Card/Petty Cash, Policy No. 24 Total Quality Management, and Policy No. 28
Severance Pay,on the recommendation of the General Manager.
Motion Carried:4:0:0.
Integrated Resources Division-Ms. Parenteau
Community Engagement
Ms. Porenteou announced that on Sunday July 15 RMLD hosted a Ride and Drive event at the
Wilmington Farmers' Market and thanked Mr. Hooper for letting RMLD use the parking lot. There
were 22 test drives. Five vehicles were available to drive and nine EV owners acted as
ambassadors and answered questions. Ms. Parenteau thanked the RMLD employees who
organized the event.
Ms. Parenteau stated that through the EV pilot program, RMLD has processed]5 rebates; seven
in June and eight in July for a total of$19,000.
Mr. O'Rourke asked about the installation of charging stations. Ms. Parenteau answered that
RMLD needs to meet with the Towns to figure out potential locations. RMLD developing a
business model for the EV program.
Power Supply Report-May 2018(Attachment 2)
Ms. Parenteau reported on May Purchased Power beginning with a breakdown of May 2018
energy by resources. 27.6 percent was purchased from the spot market, 37 percent was system
contracts, 13.13 percent was generated through hydro, wind was about 2.2 percent, solar was
1.64 percent, nuclear was 17.69 percent, and oil and natural gas comprised 0.07 percent.
However, it should be noted that the spot market relies on some oil and natural gas. Ms.
Parenteau then compared May 2018 to May 2017, fuel type and cost per kWh. Solar contracts
are being negotiated but the SREC market is being phased out and costs ore Increasing.
Municipals will have limited access to the new market. Mr. Pacino remarked that he had a
negative number on all. Ms. Parenteau stated that Solar Choice Phase 1 was supposed to have
customers paying $5 for the first 12 months and then receiving a $2-$4 credit in month 13.The$5
charge was reduced to $1.00 in January and the actual credit is $9, beginning in July 2018. It
was a very successful program. -
The Commissioners asked about a third project. Ms. Parenteau explained that costs are high but
RMLD is looking at options.
Financial Report-May 2018-Ms. Markiewicz-(Attachment 3)
Ms. Markiewicz announced that Accounting is in the process of closing the Fiscal Year as of June
301h.The audit is scheduled for the week of August 6th. Mr. O'Rourke asked about the transition to
a calendar year. Ms. Markiewicz explained there will either be a six or 18-month audit and that
she is waiting to hear back from the auditor regarding what a municipal should do. Ms.
Markiewicz stated that she would be reporting on May, the eleventh month of Fiscal Year 2018.
Ms. Markiewicz discussed the breakdown of cash, stating 33 percent is for operations. Ms.
Markiewicz then compared base revenue against operating expenses to show how much
money is coming in versus what is being spent. Compared to the budget, base revenue is down
one percent. RMLD was under budget in May by$443,000. Some of the costs from the storms in
March have been absorbed. RMLD has spent$19.9 million and had budgeted for$20.3 million so
RMLD is currently about two percent under budget.
Engineering and Operations Report-May 2018-Mr.Jattari(Attachment 4)
Mr. Jaffar! stated that the total spending on routine capital construction for the month of May
was$86.526, bringing the year-to-date total to$1,291,588.Total capital spending in the month of
May was $817,986, bringing the year-to-date total to $5,825,883, leaving $1,859,638 remaining in
the budget. Mr. Jaffari announced that progress is being made on routine maintenance.56 tree
Page 1 3
Engineering and Operations Report-May 2018-Mr.Jaffari(Attachment 4)
spans were cut in May, bringing the year-to date to 973 spans. Infrared scanning showed a hof
spot at Station 3: it was repaired.Three underground subdivision upgrades were completed, and
many more are in progress. Lynnfield has 20 pending pole transfers and one pending pole
removal. North Reading has 10 pending pole transfers and 49 pending pole removals. Reading
has 27 pending pole transfers and 55 pending pole removals. Wilmington has 36 pending Pole
transfers and four pending pole removals. There Is o lot of construction and upgrades. The
causes of outages are all going down. Maintenance plans are working. Mr. Jaffari announced
that the outage management system is completed, and a customer portal will soon be
available.
RMLD Procurement Requests Requiring Board Approval-Mr. Jaffari(Attachment 5)
IFP 2018-42 5&C Scada-Mate CX Switches-Five-Year Blanket Contract
Mr.Jotted explained that four to eight of these smart switches are installed a year, depending on
what the what budget permits. They complement the smart system and are placed in key
locations on the feeders. They isolate faults.
Mr. Pacino made a motion,seconded by Mr. O'Rourke, that IFP 2018-42 for S&C Scada-Mate CX
Switches be awarded to E.L. Flowers & Associates, on the recommendation of the General
Manager, and pursuant to Chapter 164 Section 56D, at a unit price of $26,990.00 per switch in
the first year. Switches purchased in years 2-5 are subject to a price escalation of not more than
2.5 percent per year.Software licenses are$2,500 per switch with no escalation.
Motion Carred: 4:0:0.
IFP 2018-43 S&C IntelliRupter PulseClosers-Five-Year Blanket Contract
Mr. Jaffari explained these are the some type of switches as the previous bid, except if is more
advanced and provides more information.These are placed in the middle of every feeder.
Mr. Pacino made a motion, seconded by Mr. O'Rourke, that IFP 2018-43 for S&C IntelliRupter
PulseClosers be awarded to E.L. Flowers & Associates, on the recommendation of the General
Manager, and pursuant to Chapter 164 Section 56D,of a unit price of$34,560.00 per PulseCloser
in the first year. PulseClosers purchased in years 2-5 are subject to a price escalation of not more
than 2.5 percent per year.Software licenses are$2,500 per PulseCloser with no escalation.
Motion Carred:4:0:0.
General Discussion
Meeting dates were discussed.
Adjournment
At 8:52 p.m., Mr. Pacino made a motion,seconded by Mr. O'Rourke,that the Board go into
Executive Session to consider the purchase of real property and return to Regular Session for the
sole purpose of adjournment.
A true copy of the RMLD Board of Commissioners minutes
as approved by a majority of the Commission.
Philip B. Pacino,Secretary Pro Tem
RMLD Board of Commissioners
Page 14
� ora
iT,
Town of Reading
3 a Meeting Minutes
Board - Committee - Commission - Council:
RMLD Board of Commissioners
Date: 2018-09-20 Time: 07:30 PM
Building: Reading Municipal Light Building Location: Winfred Spurr Audio Visual Room
Address: 230 Ash Street Session: Open Session
Purpose: General Business Version: Draft
Attendees: Members - Present:
David Talbot, Vice Chair
John Stempeck, Commissioner
Tom O'Rourke, Commissioner
Philip B. Pacino, Commissioner
Members - Not Present:
David Hennessy, Chair
Others Present:
RMLD Staff:
Coleen O'Brien, General Manager
Hamid Jaffari, Director of Engineering and Operations
Jane Parenteau, Director of Integrated Resources
Wendy Markiewicz, Director of Business, Finance, and Technology
Tracy Schultz, Executive Assistant
Citizens' Advisory Board:
Dennis Kelley, Chair
Select Board Liasion:
Vanessa Alvarado
Minutes Respectfully Submitted By: John Stempeck, Secretary Pro Tem
Topics of Discussion:
Call Meeting to Order
Vice Chair Talbot called the meeting to order and announced that the meeting is being
videotaped at the RMLD office at 230 Ash Street, for distribution to the community television
stations in North Reading, Lynnfield, and Wilmington. Vice Chair Talbot read RMLD's Code of
Conduct. Chair Hennessy
Public Comment
Vice Chair Talbot welcomed Ms. Alvarado, who had no comments. Vice Chair Talbot
welcomed Mr. Kelley, who reported that at the CAB meeting the previous evening, there was a
reorganization and the upcoming budget meeting was discussed. There was no public
comment.
Approval of Board Minutes(Attachment 1)
Mr. Pacino made a motion, seconded by Mr. Stempeck, to approve the June 21, 2018 minutes,
on the recommendation of the General Manager.
Motion Carried:4:0:0.
Page I 1
Report of the Chair-Vice Chair Talbot
Meeting of the Sub-Committee on the Payment to the Town of Reading
Vice Chair Talbot deferred to Mr. Pacino, who stated that the Sub-Committee needs to
schedule another meeting. Mr. Pacino stated that he himself has been considering freezing the
payment for the next two or three years and then base the payment amount to reflect kWh
sales.
Ms. Alvarado asked if the report on RMLD's financial long-term outlook has been released.
Ms. O'Brien explained to save money on an outside study, Ms. O'Brien prepared a report on
RMLD's projected sales and distributed if to the Board.
Releasing the study to the Select Board was discussed. Ms. O'Brien expressed concern because
the Board Members have yet to provide feedback on the study.
Mr. O'Rourke stated that releasing the study before the Board discussed its contents may cause
more confusion if the board were to ultimately make a different recommendation.
Vice Chair Talbot suggested puffing the study on next month's Agenda.
Ms. O'Brien also wanted to make it clear that the study includes recommendations but is not a
proposal to the Town.
Mr.Stempeck suggested stamping the study "Draft."
Vice Chair Talbot commented that RMLD pays the largest Town payment of any Massachusetts
municipal and that the money for the payment is coming from ratepayers. Vice Chair Talbot
stated he would like to find ways for the Town and RMLD to save money by collaborating. Ms.
Alvarado was receptive to that idea.
Mr. Pacino stated that he wants to make it clear that freezing the payment is his idea and not a
proposal.
It was agreed that Ms. Schultz would contact the sub-committee members to schedule a
meeting as soon as possible.
General Manager's Report-Ms. O'Brien
Review of the General Manager
Mr. Stempeck made a motion, seconded by Mr. Encino, that the Board approve the General
Manager Committee's recommendation that effective July 1, 2018, Ms. O'Brien receive a salary
increase of four-and-a-half percent, in addition to a $6,000 bonus, paid out as Ms. O'Brien
chooses as ICMA, cosh,or a combination of the two.
Motion Carried:4:0:0.
Review of Board Policies
Vice Chair Talbot stated his wish to hold off voting on the change to Policy No. 30, stating he
wants the policy to perhaps have more information on the topic of sustainable and renewable.
This would require a separate meeting to address.
Integrated Resources Division-Ms. Parenteau
Community Engagement
Ms. Parenteau announced that RMLD's Ride and Drive event, held in collaboration with
Wakefield and Danvers, was a success. On Sunday, September 16 an estimated 75 to 100
customers attended and there were over 35 test drives. There will be a Tech Talk on Smart
Homes of the Reading Public Library on September 27 at 7 p.m. RMLD's Public Power Week
Open House will be on October 11 from 3 to 6 p.m.Wilmington is holding an open house for new
and existing residents on October 15 at 6 p.m.at the Wilmington Library. Elementary School Art
Page 1 2
Integrated Resources Division-Ms. Parenteau
Community Engagement
Contest materials are being distributed. The award ceremonies will fake place in February. The
historical calendar is in the works.
Mr. Pacino asked about the EV rebate program. Ms. Parenteau replied that 31 rebates have
been issued. 30 was the target. Update next month. Starting to analyze residential load off-peak
charging.
Power Supply Report-May 2018(Attachment 2)
Ms. Parenteau reported on June and July Purchased Power. Three years of energy costs and
costs per kWh from 2016 to 2018. Energy costs went from$32.4 million in FY 16 to$31.5 million in FY
17. The estimated cost for FY 18 is $30.1 million. Liquid natural gas prices ore at an all-time low
and sales are going down. The average cost has gone from over 4.5 cents per kWh to 4.45
cents, which is a pass-through to customers. Transmission costs are going up an average of five
percent each year. FY 16 $12.3 million 5.6 percent increase in FY 17 to $13 million and in FY 2018
5.1 percent increase to $13.7 million. Those costs are primarily for regional network service and
ore socialized throughout New England. Capacity costs for FY 2016 were $18.7 million and then
increased by 6.9 percent in 2017 to just under $20 million. FY 2018 capacity costs were $25.4
million, which is a 27 percent increase. This is seen on customer bills as PPCT. RMLD makes no
return from that charge. Ms. Parenteau then discussed kWh sales by class. declining trend, going
down an average of one percent per year.
Mr. Kelley asked if the CAB could get a breakdown of use by town. Ms. Parenteau answered in
the affirmative.
Engineering and Operations Report-June 2018-Mr.Joll(Attachment 4)
Mr. Jaffari stated that the total spending on routine capital construction for the month of June
was$68,523 bringing the year-to-date total to $1,360,110. Total capitol spending in the month of
June was$687,683, bringing the year-to-date total to$6,513,565, leaving$1,171,956 remaining in
the budget. Mr. Jaffari announced that progress is being made on routine maintenance. The
rote of pole failure is decreasing. Infrared scanning showed no hot spots at the substations.
Porcelain cutout replacement is 91 percent completed. Three underground subdivision
upgrades were completed, and many more are in progress. Lynnfield has 19 pending pole
transfers. North Reading has 9 pending pole transfers and 44 pending pole removals. Reading
has 27 pending pole transfers and 18 pending pole removals. Wilmington has 28 pending Pole
transfers and four pending pole removals. Reliability is improving. The larger-than-usual squirrel
population is leading to more animal-caused outages. RMLD has squirrel guards but they don't
always deter animals from making contact.
Due to recent gas explosions in the Boston area, Mr. Pacino asked about RMLD's readiness in the
event of an emergency. Mr. Jaffari explained that RMLD has on emergency management plan
and has contractors to assist if needed.
RMLD Procurement Requests Requiring Board Approval-Mr.Jail(Attachment 5)
IFB 2019-01: 115kV Pole Replacement Project
Mr. Jaffari explained that there are two lines feeding Station 4. Some of the poles on both lines
were determined to be at the end of their life. Lost year one line was taken care of. This is
preventive maintenance.The bid invitation was sent to 17 companies;five responded.
Mr. Pacino made a motion, seconded by Mr. Stempeck, that bid 2019-01 for: 115kV Pole
Replacement Project be awarded to:Mass Bay Electrical Corporation for$120,585.00, pursuant to
M.G.L. c. 30, Section 39M, as the lowest responsible and eligible bidder on the recommendation
of the General Manager.
Motion Carried:4:0:0.
Page 1 3
General Discussion
Ms. O'Brien announced that RMLD had a self-audit in preparation for the need to be OSHA-
compliant by February 2019. Ms. O'Brien explained that she asked the auditor to be extremely
thorough and that the RMLD fared well. In a verbal assessment by the auditor.The auditor has to
prepare a final report and then a presentation on the results will be forthcoming.
Meeting dates were discussed,and Ms. O'Brien stated that the CAB agreed to change the
Budget presentation form two nights to one night.The Board agreed to some.
Adjournment
At 9:05 p.m., Mr. Racine made a motion,seconded by Mr.O'Rourke, that the Board adjourn.
A true copy of the RMLD Board of Commissioners minutes
as approved by a majority of the Commission.
John Sfempeck,Secretary Pro Tem
RMLD Board of Commissioners
Page 1 4
CY 2019 CAPITAL BUDGET
ATTACHMENT 2
READING MUNICIPAL LIGHT
DEPARTMENT
CY19
BUDGET
September 28, 2018
TABLE OF CONTENTS
Page#
RMLD Mission &Vision Statement 4
RMLD System Profile 4-5
Planned Programs 7-9
FACILITIES MANAGEMENT
Continuing Projects Page# Project#
X RMLD Lighting(LED)Upgrade Program 11 104
X Parking Lot Upgrade-230 Ash Street 13 140
Annual Projects Page# Project#
X Building Upgrades 15 095
X Office Upgrades-230 Ash Street 17 098
X Security Upgrades—All Sites 19 119
39 Rolling Stock Replacement(vehicles,trailers,fork trucks) 21 118
INTEGRATED RESOURCES
Continuing Projects Page# Project#
9 Electric Vehicle Supply Equipment(EVSE) 25 099
X Demand Management: Battery Storage Unit—Station 3 27 101
INFORMATION TECHNOLOGY
Annual Projects Page# Project#
% Hardware Upgrades 29 127
% Software and Licensing 31 128
SYSTEM
Continuing Projects Page# Project#
86 Pad-mount Switchgear Upgrade at Industrial Parks 34 102
N Grid Modernization&Optimization 36 103
X New Wilmington Substation 43 105
X Force Account: (Mass DOT): Main&Hopkins, R 45 TBD
96 4W5/4W32 Getaway Improvements—Station 4 46 122
H 4W6 Getaway Replacement—Station 4 48 132
9 4W16 Getaway Replacement—Station 4 50 135
New Projects Page# Projen#
* MA-125 Pole Line Installation for New Wilmington Substation 52 124
* Underground Line Extension, Marion Street, W 54 120
* 5W5 Andover Access Road Upgrade, W 56 121
* 211-503 and 211-504 Fiber Line Extension to Station 4 58 130
Annual Projects Page# Project#
39 AMI Mesh Network Expansion&Meter Replacement 60 112
N Communication Equipment(Fiber Optic) 62 126
X Substation Equipment Upgrade 64 111
X Power/Lab and Tool Equipment 66 115
X Meters 68 117
86 Transformers and Capacitors 70 116
86 Pole Replacement Program 72 175
H Secondary and Main Replacement Program 74 458
9 13.8kV Upgrade(Step-down Areas,etc.)—AII Towns 77 107
• UG Facilities Upgrades(URDs,Manholes,etc.) —AII Towns 80 106
• Service Connections(Commercial and Residential) 84 Various
H Routine Construction 86 Various
Page It
X Six year Plan 89
H Statement of Budgeted Revenues and Expenses 90
3C Fixed and Semi-Variable Costs 91
N Purchase Power Expense Summary 92
9 Description of RMLD's Power Supply 93-101
Reading Municipal Light Department
Mission Statement
RMLD is committed to providing excellent customer service,including competitively priced electricity
through due diligence of power supply,risk management,system reliability,safety,and overall
business efficiency.
Vision Statement
RMLD has transitioned from a reactive to a proactive approach in all aspects of the utility business to
ensure efficiency,safety,and competitive rates. The Be Efficient—Get Greener—Go Paperless,Peak
Performance,and Shred the Peak,campaigns have been integrated into a core business and include
sustained procedural changes in the areas of long-term planning,technology road mapping,talent
managing,customer communication,system maintenance and power supply portfolio balancing.
SYSTEM PROFILE
(based on FY18)
SERVICE TERRITORY 51 square miles serving Reading,North Reading,Wilmington,
and part of Lynnfield
TOTAL OPERATING REVENUES $97,206,743
POWER PURCHASED 674,894,793 kWh
NUMBER OF CUSTOMERS/ 29,775
ACTIVE METERS
ANNUAL PEAK DEMAND 145,294 kW on July 19,2017, at 5:00 pm
ANNUAL SALES 665,031,434 kWh
PLANT VALUE $150,085,144(Gross)
$78,275,207(Net)
SUPPLY VOLTAGE 115 kV
Station 4:
(3)60 MVATransformers
(2)35 MVA Transformers—feeds Station 5
SUPPLY CAPACITY 250 MVA Connected, 190 MVA Firm
Station 3:
(2)60 MVA Transformers
120 MVA Connected,60 MVA Firm
DISTRIBUTION SYSTEM VOLTAGE 13,800 volt wye
4,160 volt wye
OVERHEAD PRIMARY LINES All 336 miles
UNDERGROUND PRIMARY LINES All 144 miles
DISTRIBUTION TRANSFORMERS 4,026 transformers-310 MVA Capacity
STATION TRANSFORMER CAPACITY 370MVACapacity
CY19 Budget 4 September 28,2018
UTILITY POLES 17,914 poles
Ownership: 50%Verizon,50%RMLD
Custodial By Town:
North Reading —RMLD
Lynnfield—Verizon
Reading
• east of Main Street—Verizon
• west of Main Street,east of West Street,south of
Prescott Street—Verizon
• west of West Street—RMLD
• west of Main Street, north of Prescott Street—RMLD
Wilmington
• all poles with 35 kV sub-transmission circuits, and
Concord Street—RMLD
• all other locations in Wilmington—Verizon
APPLICATION SOFTWARE
Great Plains/Cogsdale
Windows Server 2016,2012,2008,
Microsoft SOL
Office 365 E3
ESRI GIS
VMware
Windows 7,8,8.1, 10
Share Point
WindMil
LightTable
PoleForeman
SpryMobile
Survalent
Futura
CONTACT INFORMATION
Address: 230 Ash Street
Reading, MA 01867
Telephone: 781-942-6598
Fax: 781-942-2409
Website: www.rmld.com
Office Hours 8:00 am -4:30 pm Monday through Friday
KEY PERSONNEL
General Manager Colleen O'Brien email: cotanen@rmld.com
Director of Business, Finance& Wendy Markiewicz email: wmarkiewicz@rmld.com
Technology
Director of Engineering and Operations Hamid Jaffari email: hiaffari@rmld.com
GOVERNING BODY
David Hennessy
Thomas O'Rourke
Philip B. Pacino
John Stempeck
David Talbot
Number of Employees 74
Year Founded 1894
9/28/2018
CY19 Budget 5 September 28,2018
PLANNED
PROGRAMS
CVI9 Bodger 6 September 28,2018
` 1 } - \ - � � • �} ){
s - • \! ! � J_, ! | | ) //\
lSg9
_
: - - ! ` ! | ! |
- . il , , -
} } } \ \
y _ - -
C
` o x b P _ _ _ � E
3 _
_ - '% _ -
E C - < '
3 3 € : _
S � _ _ S _ _ p % _ _
_ � _ e .
2 _ a � __ � k' _ - E 3
` e fr _ _ _ _
z _ _ - _ - - - _ - -
_ _ _ _ _ a_ _ _ _ _
" _ _ _ _ q - _ _ _ -_ _ _ _
_ - "•� "• a a' e e e � ' _ -
- ss ea - - - - _ ' - : a - _ _
`[ - .. z E _ - e E _- _ _
q _ ° % a
-%9 _ _
L
9 _
f � E
is
_ _ 9 _ - _ _ o
°� � L _ _
{ L
f E M - e _ -
z 3 L
'a ,^', a
s 9g "s = a
C'�
.i � : _ _ _
"CiSW
• ., n _ a e e e .. ., _ .. m
e _ _
E _ � _ _
G _ -
£ _ _
N o U• _ _ _ _
s - _ k A _ - _
3 ] L 3 3 3 3
. a'� a 'a= 'sY se a� ay a;qa ga = s s
- 's
s s s � a � � -
A 9 i Y
I |
|! �
!! !
! ) !
| |) !
\( !
) , !!
!! !i
-
"
MAI
i| �| 01 .
!i ,!
/� � • )) )
FACILITIES
PROJECTS
C,iV NudNct
11 tIpLlla3P.,f19
CAPITAL PROJECT SUMMARY
Project Name: RMLD Lighting (LED) Upgrade Program Project#: 104
Project Schedule: CY19 Project Manager: Paul McGonagle,
Facilities Manager
Reason for Expenditure:
Upgrade the existing lighting at 230 Ash Street, 218 Ash Street, and the substations
with new LED fixtures. Energy use will be reduced when switching to LED. This will
include interior and exterior light fixtures at the Ash Street campus, including all office
spaces, the garage and bay area, and all lighting at the substations.
Brief Description/Scope:
An electrical designer has performed an energy audit specific to the lighting. In CY19
an electrical designer will develop specifications, and an electrical contractor will
perform the installation of LED light fixtures at the Ash Street office building, garage,
and campus site lighting. Also included as part of this project, all lighting at the
substations will be upgraded to LED.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year:
The scope includes the installation of new fixtures by an electrical contractor.
Status Update:
Not applicable.
CY19 Budge[ 11 September 28,2018
CAPITAL PROJECT COST SHEET
PROJECT NAME: RMLD lughing(LED)Upgrade Program SCHEDULE: CY19
RMLD LABOR
Mno,Taal MATERIALS/CONTRACTORS
Iol unxs mµwe�Lavuryvl @hale
nnnm saraleh lem,..�u� aof
OEM/IASg nma une Ovmlme ,ql DEURIMIDN wit unit Rale unrcs TOTAL
une wmonn m:
xmancn- uhtretemw lts $fi.ass $6.MT
W se so Enameenng 5 e,000
so 5o sa 1n1.alabol. Elennaan 5 sx.aoo
5o So sa Maaenals 5 i.,DDo
5o So so 5
0
SD o s
So 50 0 5
wa DPeraRnns wpeMSlon: SEag SxOg $2
onn remmxoars
0 o so $
EiNineM�N:
mtn m n SM 5Tg fz
$
0 o so
s
..ft Anmmt
enn naars # f
5o e o
sel 5e a
TerAnlolY .Menaar, Sial $9e Sx f
unn rneln nwrs
0 o a
Polis Detalls weer $2,427 5
PRNE AL•:
CY19 Budget 12 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Parking Lot Upgrade - Ash Street Project#: 140
Project Schedule: CY19 Project Manager: Paul McGonagle,
Facilities Manager
Reason for Expenditure:
In FY18, an engineering firm was hired to engineer and design the reconfiguration of the
existing customer parking lot at 230 Ash Street. The design includes relocated parking
spaces, new drainage fixtures, landscaping, and additional connections for future EV
stations.
Brief Description/Scope:
An engineering firm will develop construction drawings and bid documents for the
construction of the parking lot, and installation of conduit and wiring to accommodate
future installation of additional charging stations, landscaping, line striping, and signage.
A contractor will then be hired to perform the parking lot construction.
Barriers:
Unforeseen schedule changes. Interruption of the right-of-way adjacent to the parking lot.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
Not applicable.
CYI9 Rudga 13 September 28,2078
CAPITAL PROJECT COST SHEET
PROJECT NAME: Parking Lot Upgrades SCHEDULE: CY19
RMLD LABOR
tabortbtal MATERIALS/CONTRACTORS
a of Undid lua.rm rneu udnl veM1l Is
Stnlglit HpIEM1[ IhW unlnr RM
"Ths,"5R O* Tme Overtime r .nal DESCRIPTION Wil Laughter Units TOTAL
Ural Popartment: $gp55 X. hh$93
3mantaew unhrate Inweeks
I$,
5a $a d,,Firm to Gerelop
Cmumens ab $9$1. la $( ntractorb deri reroni the
So SoCustomer Parking tot.Intal newob $voaaa is 5 33a,a0d
hm nages aphaltcw bang.Prpng.and limm Ng$a So $I 5
So 50 Ss 5
50 So $a
o So Sa
We Operatlw$upeMGom
uni In hours Stas, $La3
Supervisor of Une crews So So 51 5
Englneering:
m a STg
$o $a 5
$d $o 5
So 0 51 5
SenlorTecb:
unit rate In hours $3
So 0 0
5o $o $o
$0 Sp $a
TeTnhalSurkes Manager: $l0k $M
unit ran In bwa
o $0 51
Sa d Ss
Pollee Details week St 3] 30 5 728
LT.. TBO TBT
CY19 Budget 14 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Building Upgrades Project#: 095
Project Schedule: Annual Project Manager: Paul McGonagle,
Facilities Manager
Reason for Expenditure:
Annual allotment for repairs and upgrades to RMLD buildings.
Brief Description/Scope:
In CY19 we are allocating funds to address and remediate any issues identified as part
of the recent consultant audit related to OSHA compliance.
Additionally, we plan to insulate and seal the exterior wall and vestibule ceiling above
the main entrance of the building.
Barriers:
None anticipated at this time.
Change in Scope of Work from Prior Fiscal Year:
Not applicable.
Status Update:
Not applicable.
CY19 Rudgct 15 Sgte.her 28,2018
CAPITAL PROJECT COST SHEET
PROJECTNAME: gulldMg Upgrades SCHEDULE: M9
RMLDLABOR
gator IDtel MATERIALS/CONTRACTORS
•or Unm I amnn.b—e., v.U.
shaMnl $4ayhe Ihy,nn,,, xor
rtEm/Tnsg nese oT Tree ovenlme ,a,el DESCRIPTION Unn Unk Rape Unts TOTAL
Una Dewrtmenp
2-re—ew- gra....gra.mreab $g.ass SAW $s:
Contrasmnoinsnllinsulation in looby
$n $0 $O an
HVACywnn en ergy read ana new lob $35.W0 30 $ 35.W0
HVRC
analysis
so s0 sp o ammors—Remednnon $ sp.app
$a $o so $
50 5p $p $
5p 5p o $
Une Oparatlwn$up .Aaa: $106 $1N
end sides hopes
5upervi9on o/Dne yews $0 $0 $
EnglneednL
$W $Tg
Sp $p $
Sr $0
s0 W
end end 1.n[e In hopes M $E
0 $n $0
p $p $p
0 " p
nNmte igen¢n nuna{er:
610.1 59g
unit gin Tours
u
0 6 $
$p $p $
Polio Ce ak week $3427 $
MAL: T IN Sol
CY19 Budget 16 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Office Upgrades—230 Ash Street Project#: 098
Project Schedule: Annual Project Manager: Paul McGonagle,
Facilities Manager
Reason for Expenditure:
Annual allotment for general office upgrades at 230 Ash Street.
Brief Description/Scope:
In CY19 we will relocate the Purchasing Department to the Facilities area. Design and
construct new Purchasing offices. Reconfigure the Facilities department. Design and
construct a Facilities conference room.
Upgrades will include modification to the walls, ceilings, flooring, electrical, sprinkler
and HVAC. Office cubicle furniture will be purchased to accommodate new employees.
Additionally, we will remodel the Customer Service area.
Barriers:
Unforeseen schedule changes.
Change in Scope of Work From Prior Fiscal Year:
Not applicable.
Status Update:
Not applicable.
CYI9 Rudga 17 September 28,2018
CAPITAL PROJECT COST SHEET
PRO2ECTNAME: Oaceup8re0es-230A,hsheet SCHEDULE: U19
RMLD LABOR
nbnr tons MATERIALS/fANTMCTORS
9umnits t-en.,.."un-I-
Straight pam.nw. aor
intra. SI luser Or hare orenime .. ,aul DESCRIPTION Unit Urethrae Units TOTAL
LLe Cepanmant $BASS $6,26) wa$93
2man vew-unit rate In weeks
$0 $0 $1 Customer Se Mtt Area Re motel job $20,000 30 $ 20.0
$0 $0 $0 Pwcher.neTral,ses Remodol lob Stre 00 30 $ ej
Sc, $0 0
$0 50 So
50 50 So
0 0 0 L
Line OPemlMs wperWlon: $186 $103
unit rau In hours
suce�risoo of In,erewr 50 50 Si $
G.0ru MnB: $80 $]8
unl n N
$0 $0 $1 $
$o So
$0 $0
SenIM T<U: $90 $21
unit AU In hours
Se o 50
$0 S0 S0
50 50 So
TeNnlerl Servkn ManaBen
unit Me In horn $101 $98
50 50
S. 0 $1
Poli[e Cenils week $2027 $
IIO1EC7DLRJ
CY19 Budget 18 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Security System Upgrades—All Sites Project#: 119
Project Schedule: Annual Project Manager: Paul McGonagle,
Facilities Manager
Reason for Expenditure:
The original access control system was installed in 1994 and was replaced in 2016 with
a new open-source software system to provide more flexibility to adapt to the changing
needs of the RMLD. Funds should be available to continually update equipment and
perform maintenance and repair work on both the access control and the surveillance
systems at the Ash Street campus and substations.
Brief Description/Scope:
Access control and surveillance systems upgrades over the next year:
• Install additional cameras at substations.
• Repair damage fencing and gates at station 4.
• Install additional DVR's to accommodate new cameras.
• Repair/replace exterior doors at the 230 Ash Street Campus.
Access control and surveillance systems upgrades over the next five (5) years:
• Add security fencing to server room
• Repair and replace card readers as needed annually
• Upgrade a portion of high-definition cameras annually as needed
• Upgrade cabling
• Repair/replace site lighting
• Re-key buildings and sensitive areas annually as needed
Barriers:
None anticipated at this time.
Change in Scope of Work from Prior Fiscal Year:
Not applicable.
Status Update:
Not applicable.
CY19 Budget 19 September 28,2018
CAPITAL PROJECT COST SHEET
PROJEQNAME: Sourity Uplindes-A11SUes SCHEDULE: CY19
RMLD LABOR
MATERIALS/CONTRACTORS
IaseaiWl
XOIUnItt Iunbrm rubwaale. Ural
Sual9M 5n 0, nass"ita Xal
UEM/tA$X rest OT Time ouMlmenul OESCRIPTON Unit Unit Rate Units TOTAL
xm Unal Oepan unerese-mlr rate lnwMs tive 111 $6,26] 0.$9
Install Andsional Camera,and DVR'sat
$0
SC $, Substa[Ions.Felual—al s4n.nG. $ se.
Repair/Relateest doorsat2MAsb
eei Carl
$o $a 50 $
$o $a $0 5
D a SO
$o $o SO s
D
Uneope.sSupervblm: 5M $10 $x
unitraemxana
so $o se
Enlriearlry:
Unit Me FM1mn $]B $] $
a O o $
$
Senio Ter: $bx $80 $x $
unit rM In burrs
$0 $0
$o $o %SD
Technical XMrss Murnai $.a $9E $3 $
UQ rate In Iwun
$O $a 0
[e Delad, week $2,427 S
CY19 Budget 20 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Rolling Stock Replacement Project#: 118
Project Schedule: Annual Project Manager: Paul McGonagle,
Facilities Manager
Reason for Expenditure:
Replace vehicles based on an eight to ten-year cycle to reduce maintenance costs and
improve reliability. Vehicles removed from the fleet will be traded-in to the dealer
providing the new vehicle.
Brief Description/Scope:
Specifications, bids, and purchase orders will be completed for CY19 delivery of the
following:
one (1) new forklift with trade-in of one (1) 1999 Yale forklift
one (1) new pick-up truck with trade-in of one (1) 2009 Ford F150
one (1) new underground utility vehicle with trade-in of one (1) Ford E350
Barriers:
None anticipated at this time.
Change in Scope of Work from Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update:
Long lead-time for bid and purchase of rolling stock does not allow for the receipt of any
of the items budgeted for FY19 by the end of December 2018. Therefore, all planned
purchases for FY19, will be received in CY19.
CYI9 Budga 21 September 28,2018
CAPITAL PROJECT COST SHEET
Rolling Stock Rapla[ement
PROJECT NAME: benines,trailers,fork trucks) SCHEDULE: Curs
RMLD LABOR
talW TpNI MATERIALS/CONTRACTORS
e of What rynk"..6arminl
.pp
kvelSalgM _.pp. Nof
RFM/pSR r, T
rOr mpplrtlmp rnal pE$CRIpTION UnitUnR Rate Unit TOTAL
U.Oegrtman: Si $6,E67 wean$9
2- mit rate In anew
$0 $0 $0 PoAat each $]5,W] 10 $ 75.000
50 Sh $0 pyM1t duly pick-up truck each
$o Sa $o Ungergmuntl oenN vehicle each $200.000 10 $ aLOAOo
$o $a 50
$0 so Sc
0
Line Operation auperMkn:
unit raw w was Sr06 $1m $x
$0 50 $0 $
knWn—Ir,
unitme M Four SW $>8 $t S
$0 $0 $0
w n
unitNl rapIn lgYrk $
0 a 0 $
o p 0
TeNnlolSnN[n Mutation: Skok M $1 $
un¢rm In hors
0 501 50 $
Pollee Oetalls week I $
WE F
CY19 Budget 22 September 28,2018
y v} � S Wore
F
lfek 1 +,•k �{ a 1,'1
Cusroox
7 zom 2/13/18 126,673 $1,927.12 Strrke Ford Rx:ape Trad
47 2009 2/13/18 138,168 $2,031,24 Engineering Ford F-150 PU Trailers(!
28 2807 2/1,1/18 44,394 51,302.27 Line Ford&35() TradeQSB
New(54J 2018 X X X "ice r
S
Electric Service All Liectric Velucle $30,000.00
New(5b) 2018 X X x Engineering Pick or Truck $501000.00
New(58) W18 x x x Line Underground $200,00000
utility Vehicle
aey Duhr.Lina Trucks ;.
Menge Annul d
Vehkle Lad CmTeM 54Wn eneaee 1#'
IDs YM Wage Mitow CaK200$• Department VehMeType pY
Date Pro" + 0
9 2010 2/13/19 124,457 $10,363.61 Line Inter-40'Bucket Trade/55
New(55) 2018 X X X Line Intel-40Bucket $2W,WO.W
Fork Ltft
IDYM Doti, "am Pfinttte $ e O d.. Vehkle Type FYI&
Fr-1 1999 3110/17 772.5 0 Stock/Line/ Yale Fork Trad
Station Tuck
(No 5J 2018 x x X Stock Station e Fork Buck X $75,000.00
FYTotale: e23r111Wf1n 5125.(Nt1.W
FY 18 CY 19
CYI9 Budget 23 September 28,2018
INTEGRATED
RESOURCES
DIVISION
PROJECTS
CY19 Budget 24 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Electric Vehicle Supply Equipment (EVSE) Project#: 099
Project Schedule: CY19 Project Manager: Jane Parenteau, Director of
Integrated Resources
Reason for Expenditure:
RMLD will plan to install EVSEs in each of the four towns in the service territory. This
will increase RMLD's kWh sales.
Brief Description/Scope:
Each EVSE is a dual charger. RMLD will work with each town to determine interest in
locating units within the town and the appropriate location. RMLD will plan to install two
EVSE chargers per year.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year:
RMLD has increased the number of charging stations to be installed to two per year.
Status Update:
In FY18 RMLD installed the first EVSE at the RMLD offices located at 230 Ash
Street, Reading.
CY19 Budge[ 25 September 28,2018
CAPITAL PROJECT COST SHEET
PROIECTNAME: Electrical vehicle Supply Equipment lEVSEI SCHEDULE: CY19
RMLD LABOR
MATERIALS/CONTRACTORS
E rtaYl
RM UnItl 1rartht uw mi¢1 VMM!
.al Tity.[ IMwunl¢ BOt
REM/)0.51[ True Or PmeOYertlme ..¢I DESOIIYTON IUni[ Uni[Rale Units TOTAL
Une parva. S6A55 $6.)6) •ankle 59
imuM[meln wcetr
$O SO One EVe SErIern ^omtall in RMN each S30CW 10 $ ari
SO j0 SO $
SO $0 SD 5
$0 $0 50 $
SO 50 $0 $
50 50 50
IMe OpenBma SpeMflon: $106 $E03 $)
Ynlbate In M1Wn
S0 SO 50
En,lbram : SBo $78 S1
uniat ce in hal $
0 $0 So
:nlwft in SR $80 $3
uf
nit rah n hours
$0 SO $0
$0 $0 0
Technical Slnkts Manager: $101 $98 $) $
YNl ntl In youth,
0 0 0 $
Pdk:DNails week $i,an $
CY19 Budget 26 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Battery Storage Unit- Station 3, NR Project#: 101
Project Schedule: FY19-CY19 Project Manager: Tom 011ila, Integrated
Resources Engineer
Reason for Expenditure:
RMLD has been awarded a three-year, $1m grant from Mass Department of Energy
Resources (DOER) to install a 5 MW (10 MWh) grid scale energy storage system at the
North Reading substation to provide peak shaving services. The goal for commercial
operation date is no later than June 30, 2019. Project contracts, license agreements,
system impact study, etc., are now underway or in negotiations. A revised amount of
$20,000 has been allocated to the Capital Budget for RMLD capital expenses related to
interconnection costs associated with this project.
Brief Description/Scope:
RMLD is still in the conceptual design stages of the project. However, at this point, it is
understood that RMLD will need to install infrastructure that will allow the battery unit to
connect to the RMLD distribution system. It appears the interconnection will be directly
connected into RMLD's substation. However, in addition to this interconnection, this
project may also include additional infrastructure for the battery station service, which
may be fed overhead by a pole line nearby Station 3. The $20,000 accounts for worst-
case scenario for these potential capitals costs as RMLD works with Nextera to finalize
the design. These costs may ultimately be reimbursed by Nextera.
Barriers:
Finalizing energy storage agreement.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
Not applicable.
CY19 Budget 27 Septemhc,28,2018
INFORMATION
TECHNOLOGIES
PROJECTS
CYI9 Budget 28 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Hardware Upgrades Project#: 127
Project Schedule: Annual Project Manager: Mark Uvanni, IT Manager
Reason for Expenditure:
This is an amount annually reserved for failed and/or obsolete computer and related
equipment. This budget item is also used for unforeseen purchases, which may be
necessary.
Brief Description/Scope:
In addition to the standard hardware purchases described above, we anticipate
network updates to the wireless mesh.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year:
Not applicable.
Status Update:
Not applicable.
CY19 Budget 29 September 28,2018
CAPITAL PROJECT COST SHEET
PROIECTNAME: earawareupyaees SCHEDULE: CY19
RMLD LABOR
MATERIALS/CONTRACTORS
LaMrTObt
siMUnlis N^n.m.u.r unM1
SvvXtla 'U."t VMltlie .01
rtFMRP58In. OT Time Orertlme rml OFHRIPTON Unit Unk Race Units TOTAL
LlroMparOrxne
2man[rew unXntelnveeFs 4,455 $6,16) $91
$0 $0 W Generalhartlwarepum M1vses $ 70,M
$0 $0 $0 Neaworkuplates to Wreless mesh $ s.OW
$o $0 0
0 $0 0
Y $0 $0
0 6
We OeratlsupeMsbn: $UX $1W $1
unit ratt
e In hours
50 50 $0 $
6n01tea1N. 580 $T8 52 5
unX bte In lwurs
0 $0 0
Yn $t11 $W $1 $
unit raft n tlWrs
% 0 %
% 0 $0
TeTnIWl Rruktl Menep: $a. $98 $1 $
uMl pb lnYWra
$0 $0 $0
Peke OMils Imek 2421
CYI9 Budget 30 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Software and Licensing Project#: 128
Project Schedule: Annual Project Manager: Mark Uvanni, IT Manager
Reason for Expenditure:
Each year RMLD must renew existing software licenses and purchase new software,
either to update existing users or for new users. Additionally, new software may be
added at the request of various operating units. This item includes these ad hoc
purchases as well as more specific items (outlined below) which are anticipated at this
time.
Brief Description/Scope:
In addition to the standard software and licensing purchases described above, we
anticipate the following:
• Custom programing/development for GIS/GPS, OMS, fixed network, AMI, IVR
and continued CIS integration.
• Substation asset management software to track and trend RMLD's substation
assets testing and maintenance. This software could also provide mobile
deployment of tablets to upload test results.
• Work Order Management System. This will be fully integrated with our existing
ERP software and to ESRI GIS. This will be a two-year project, with
$75,000 budgeted each year (CY19 and CY20).
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year:
n/a
Status Update:
n/a
CY19 Budget 31 September 28,2018
CAPITAL PROJECT COST SHEET
PRMECTNAME: xRwareandolensing SCHEDULE: CY19
RMLD LABOR
Wlmr Tobl MATERIALS/CONTRACTORS
Nmumts
Straight
.me,.m„I ve6me
eelgM Ikaw vpea Nol
rtEmA.A Oi rime OvnUme rml DESCRIPTION Unit Onil Rale Unit TOTRI
Line OeWIMW1: %ASS $6,167 wnkk S9
linen crew-unll rab In v W Y
$0 $0 $0 Gene alsoXw re pu rtM1a ses $ SO."
$0 $O W Custom p,ognmminodevelopmen[ $ M.
W $0 W SUENation Asset ManagementWXware $ 80.0.tl
Work Om Ir Management$,stem
W $0 $015 ;%1.11,$Ils Y19 anC$7%CY10) $ ]SOLO
W $P 0
$o $0 0 $
LIneOWretlans5 pe lm: $1% Sim $1
unX ran In were
supsrvlsmo or one news $o W $o $
Entlnening:
unit rants $� $]g j1 $
Pole tore n,sosAi,[ n $o W $o $
drawing;swhemg u0,r
$
x Tem: w M $2 S
.W bte In Iwuri
$G $G W $
$0 $o W
Temmelxml�Manym: rim $9g 51 $
unX nn MM1wn
W o W $
Poli[e CenAi weeM $]p1] $
M. MUM
CY19 Budget 32 September 28,2018
SYSTEM
PROJECTS
CYI9 Budget 33 Septe.b,28,2018
CAPITAL PROJECT SUMMARY
Project Name: Pad-mount Switchgear Upgrade at Project#: 102
Industrial Parks
Project Schedule: FY18-CY23 Project Manager: Peter Price,
Senior Distribution Engineer
Reason for Expenditure:
Increase distribution system protection in the underground industrial parks in
Wilmington and North Reading as well as the three-phase underground distribution
areas in Reading, i.e., River Park Drive, Jonspin Road, Haven Street, Woburn Street,
Industrial Way, etc.
Brief Description/Scope:
Purchase new units to replace live front pad-mounted switchgear. New units will be
dead front with provisions for remote/supervisor control. There are currently 29 units
systemwide. In CY19 we are planning to purchase and replace (5) units.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
In FY18 the Department replaced a total of four(4) switches:
. Switch-1 on Jonspin Road, Wilmington
. Switch-2 on River Park Drive, North Reading
. Switch-2 and Switch-3 on Concord Street, North Reading
CY19 B.dga 34 September 2S,2015
CAPITAL PROJECT COST SHEET
PROJECT NAME: Pad mount Switchgear Upgrades at ndustrial parks SCHEDULE: C119
RMLD LABOR
MATERIALS/CONTRACTORS
Labor Total
Morum. b•nrmaal.mnl venae
sti walgm la—.on. Nal
dral SR muse OT TMe IMnlme ..n1.6,.al DESCRIPPON unit disk A.. iiiUnits TOTAL
one Dep
pammC $61.55 $6267 59i
grindstone-unrc rate m weeks
poll—pee-m000t arcurs ar z $a $12,534 $S,gJo r'serp'bmoumee:witcnee each $63sOJ s $ 31zsa0
12'2204,2'ECOapoaubmird
Make up[M iesantl L6elhmn 2 $12,910 $0 $'"' 'botlle;LO e1.,miscellaneous each $30J 12 $ 3,60J
clumands So 12 primary obles
Splice out line and load aide primary tables 2 $o $12,534 $l.ew Splices for line and load side primases each $250 lx $ 3.MU
$0 50 $o primwy cable for piece ow tint $20 low $ 20.WJ
So So Sit%caki....closer So abryat cad for calls Sts'. s $ ch'.,
Se So So e swRch5
ung roadbeds wperMslm: $206 $am
unit rare In ham
Inuiannoosarsaf tone caws w 24 51.231 $2,465 $
Engineering: w $28 $
-11 race In
Prepare switching order.ccandepte
outages,Pad modnmatirea,order w 46 $r?" $1233 $
materials,eta.
$ex $e0 $21 s
uN2 ntt In Mus
$a $o $o $
$a $a $a
Tetlmia15wlm Ma-i 5202 $9a
side ante In xwn $
0 0 5
Polite Dmpla —ek 1 $2,422 $
F"WTOTAIL:
i Rudge[ 35 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Grid Modernization & Optimization Project#: 103
Project Schedule: On-going Project Manager: Hamid Jaffari, Director of
Engineering & Operations
Peter Price, Senior Distribution
Engineer
Brian Smith, Senior Distribution
Engineer
Reason for Expenditure:
In compliance with DPU/OSHA Order DPU 12-76B, increase system reliability,
modernize/optimize system operation and functionality, decrease system losses and
expenses for labor and truck rolls related to outage management.
Brief Description/Scope:
Continue implementation of grid modernization/optimization road map including
installation and integration of smart switches, IntelliRupters, and capacitor banks and
controls. Installation and integration of outage management system (OMS) with an IVR
system to optimize outage restoration process. Cyber security, simulator, fiber rationale
connection, fault detection, economic dispatch, and overall system integration, including
GIS and AMI.
Barriers:
Technology/software integration, merging old technology with new emerging
technology.
Change in Scope of Work From Prior Fiscal Year:
Not applicable.
Status Update:
A total of twelve SCADA-Mate switches and two IntelliRupters have been installed. The
outage management system (OMS), customer portal and outage dashboard, and
WebSury have been installed and are operational internally. Testing and system
adjustments are ongoing.
CYI9 Budget 36 September 28,2018
CAPITAL PROJECT COST SHEET
Grid Modernization 6 optimization
PROJECT NAME: stand Mate Switches SCHEDULE: Li
BUILD LABOR
MATERIALS/CONTRACTORS
ubw)ntal
MWmI[s ,m.eumvnut vMlee
IoIesI SValab'
lu�unm. of
rtEM/)0.SIt Or Time Owrtlme onrl DESCRIPTION saw Unit Rab Unlb TOTAL
Nne OepaRnNnt: $g,g55 $g,M) x$93
2-span craw-unit raw In weeb
Install Scoop Mate Switches and controls 1 $SASS $0 $9305[add one CR Switch each $36.990 a $ 3W,96p
Replace pole,InAnll by pass disconnects. 55'pole,x-arms,owns,loci, w,h
ani@I on,sec,etc. ] $65,18] $0 $6,4JO ini mcell
isanus eohartlwart,Hc. wRCM1 $3'0]0 G $ -1
$b $o So 6801 Gane/hnellReam ocense each Sura a $ 10.000
switch
$0 50 St S&C repeaters/md'me eat 531x0 13 $ 3(1
lwell twice(3)oepente../rad'ms per be $3"13 50 5369
wan.
$0 5o 0 5
LMOpnenauSup aWlan: $ia $303
btu rate In nwre
Sup—son of Line crews 10 $16.93s $0 5
utgtn°edtU' Sgo $)e $
me In nars
$33oa
Pole Foreman,aonstucfion tln40 60 I $wings,etc.
prepare switching o rtleq order materiab, 60 Ss's.80 $0 $ -
SGblimcommunicanon
Senl.wph- papa $b $3 $
unit rata In hoes
Conhds,goandamin8 commissioning,etc
0 Se $0
Technical YMrea Marl $101 $98 $
unn rah In M1ours
Conbolb programming,commhigning,etc 33 5333] $0 $ -
pa.ce0etails week $1,437 4.0 $ 9.710
biftEOTCYALL- > 3
CY19 Budget 37 September 28,2018
CAPITAL PROJECT COST SHEET
Grid Fnoeemlaatlon and optimization
PROJELTNAME: Ime0'I pidd ld SCHEDULE: cy19
RMLD LABOR
MATERIALS/CONTRACTORS
beargal
00 units IUMrm,labuNul
SnnpM 'valent wb.tcrapt
IiEM/lA51I m nme ommme „nI DESCRIPTION unitunid Rate until
une cepanmlm:
dmanoew-umra4lnereeFa $6' $6,M Read)
Install lowild,roer dzvel 1 $6,055 $0 $92Imettitupternarph each $34.560 3 $ 69,120
Pence polglnstall as pass mdr.rr.'.' $0 3 $ 55'pole,cno hnnathersedripf,
trtransfermF ser,ev 19.M6 $E 1W anchors,micellaneous falls,Hc. each $E,6U0 3 $ <.WJ
$0 $0 $0 Inorthrupter fnense/Intel6Team[sense each $2,501 3 $
$0 $,, 0
$0 $0 $0
50 $0 50
U-Cpnatlwn S9erel.: $]C6 $1m
wit raw In Muri
;$1,923
Fnglnenlnt: $r8INt raft In Iwurs $
Vole Fo,emary corsrmcton d,mnts,edc 34 $0 $Prepare switching orderscadermaterials, 14 50 $
enables aommunlotch
senlb rem:hand n4ln Murs
Consort,programming,com erneopn&bc. W $0 $1.344 $
TemNOI Se Mw Manger: $9g $
uMn4ln M n
'muni;hr=ming,........ i,p,
PoMe 0e4lls weeF $3121 20 4855
v tMAl 777z, 221
CY19 Budget 38 September 28,2018
CAPITAL PROJECT COST SHEET
Gritl zation8 Optimization
P0.01ECT NAME: CapOank ankAutAutomation SCHEDULE: CY19
RMLO LABOR
Tabor Totel MATERIALS/CONTRACTORS
x
of units pnn rats we..Inl yebiaie
..to lypw uninr see
mEM/tASM OT TmeOrertlme ,ml DESCRIPTION Unit Unu Rate Units TOTAL
une Depenment $6,4M $fi.z6l Mkle$gz
)...ow
e .unR me In week
$0 $0 $06gC g00 QG...troller ea[M1 $].100 W $ 13,2w
$0 $0 $e PFN SlW radia ea[M1 Sit. 60 $ o'ere
So So $o m:alyoeos: per S4. 60 5 Spon
So 50 50 5
So $0 5D $
50 eeeeeeee0 o
Line Opentione$upeMsbn:
unk nR In les— SSO6 $L03
$D So
EnpMeering: $80 St. S
una In noses
funnttling to Eaton System anJ 5CP0A 140 $11,53) Sr $
[Aing
AnbrTKM1:
unit rate In FWR $gt Sg0 $E S
Controls,prognmminp[ommissoning, 191 515,1]] $0 $4,031 $
It
$0 $0 0
T.u.,.1$mleea scent,
soft rale.hn $1 is $9g $
�sntmlt,programming,oc—s onne 144 $14$66 $0 $ -
alla[
Poli¢Details rek 161) $
CY19 Budget 39 September 28,2018
CAPITAL PROJECT COST SHEET
Grit Motlernixation&OptiminGan
PROJECTNAME: $pfcware lntegrallo, SCHEDULE: Cy19
WILD LABOR
MATERIALS/CONTRACTORS
IaborTMal
xnmmu Iwwml venlQ
Straight
x m
REM/TASII OT Time penlme n nyl DFXRI9TION Unit Unil Rale Units TOTAL
IMe CeWalnienh. $6.a5$ $6.26) n $92
iman--Ynk Me In weeb
$0 $0 $,t tn,ms M1om ventlorforintegration of $10.W0 1 $ lO.OW
ald—ous OeNas
$0 5o So 5
$0 9 a
se $e X
59l $a o
sel Sa 6
Ilne Opnatbns 5uparvl4M: $306 $103
unl1 n1e 1n M1wxs
$a $6 $
.0ntti.,I $60 $36 $
un1 In R
work with ve d-for nitware Integra Ilan 24 51.923 $0 $
xft t.In su 560 u $
nnnte In M1enn
wort with—do,hr mkwa re mto,ton 24 $1,972 $r $5. $
$0 0 0
Tednlnl SeM[es Mamger: 53M $56 $
unl1 n1e 1n M1am
50 50 $
PoIIa Retells wttk $24P $
awl 'L, 1 11 101INKI
CY19 Budget 40 September 28,2018
CAPITAL PROJECT COST SHEET
Gne Mooe,niaation 10.....aaunn
PROIECTNAME: IVRlntegratio. SCHEDULE: FY/M9
RMLD LABOR
MATERIALS/CONTRACTORS
ub ,Tom
a orumo da,..w a.ns.aa, VdINe
sbal{nt MnlgM1t Ie M,ork- ael
TrAokT i, l,me Oi Time Overtimemel DESCRIPTION Unit Unit Rage UnitsTOTAL
Une Ce0a2nent $6A5$ $6,M) Rode 59fo
8man<rew-uNt Me b weeb
Sr $0 $O IVR Syrtem h MM, 1
SO $p So IVR Syee—rugntion with Survalent earn su're. 1 $ 39
Illre ua
no mmmi..on.ngl
$0 SL O
$0 Sn se S
2$D
$0 $0 $
UneOPeMbnsSupeMsbn:unit rate In nounEnSln..V 518 $
ural rat hinrt
uWork with new ve & an d Survalent for 160 $0 $
,,lett me8nsenmrTem: $80 $L1ono nM mownTeenniul$enkea Mmagn:unit nMMryWn D
Polis Deuils wuk 53.31 $
RMSTIMATEDSPENDING $3&WO
efe.ESTIMATED YUm. $51.819
CY19 Budget 41 September 28,2018
CAPITAL PROJECT COST SHEET
Gri:I Matlaniaation&Ootmiaation
PROIECTNAME: OMS Oew Management SCHEDULE: [n9
RM LD LABOR
t.ber Tnni MATERIALS/CONTRACTORS
PaIU n X[ Imn nor rYMrvnwl VeM1i[le
Srnyl:r StnyF iYml unF� p0$
rtEWASx 9maOn Mme rw� DEHRIVNON Unit Unt,An. Units TOTAL
paA
Ann YanMN $S.KS
iman[mu-unR nce In weelu
$0 $0 $U OMS-Crew Management mMuk $C],O.T t $ 0].Wo
so So So
$o $0 So
$o So b 5
So So $D 5
So
0 0
Una IMNwn SupenXiM: Sa% S5$
Mx Mre in nMn
Sol So
.'otuln, SM St. S
wad wlm new...d,, m S—ienv for teo stz 5o s
proiett lmgratwn '
s
unX nF In M1mn
SD
So $a
T.gniui3pnkn M.rn{er: $DE $M S
unXrMFM1Wn
$0 $0 $
IU Maih wn4 3C3] $
CY19 Rudget 42 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: New Wilmington Substation Project#: 105
Project Schedule: FY17-CY21 Project Manager: Manole Agouridis,
Distribution Engineer
Reason for Expenditure:
Substation 5 has reached the end of its useful life. The transformer and switchgear need
major upgrades /repairs to keep substation operational. The new Wilmington substation
will be a replacement for Substation 5, while also providing added benefits to RMLD.
Brief Description/Scope:
Install anew 115kV/ 13.8 kV substation in Wilmington in the Ballardvale area. The new
substation will include two (2) 60 MVA transformers and 15kV switchgear with eight (8) (or
more as needed) feeder breaker positions. It shall also provide backup and load relief for
both Substation 3 and Substation 4.
Barriers:
Availability of land.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
RMLD continues to explore options for location of the new substation.
CY19 Budget 43 September 28,2018
CAPITAL PROJECT COST SHEET
PROIECTNAME: Nw Wllmarkson$ubstelOn SCHEDULE: Cy19
BUILD LABOR
aIle Tpal MATERIALS/CONTIUCtORS
a Munksk Nraese—...... veM1ltle
soestra $ve ak' Vma..l Nof
.Mt. Tlme Time Overllme nnl DESCRIPTION Unit Unit RaR Il nils TOTAL
U:ationatlmene. $6u$ Hi rcae$9
LlnM ow-unh nle In veYa
$0 Se 50 $
So SO 0
$0 $0 0
$0 $0 0
se Se Se
0
One OPeMlons$ugervlaon: $a% $2M
u:ttnaeblwts
supery nelUne $0 50 $
E:Iglnening:
anon In
Prolecl mana ge mentaM assotlatetl IMlrea wa[s[o lntluae: ISO
englneemlg task$. 168 $t3.a60 $0I,,".onnelli.,5yam lm pa R SWtly $S0. 0 $ W.
see Conantwl Oeslgn
50 $O $
5. So
HNw TpA: Stat Sal
un.Me In h-. $M
So So So $
So oSo $
So So $s
Tach..$mlen Manage: link $9g
..it nie to nine
Project Management 55',60 $0 $
St Sa
olio Ceuib week $i,RT $
CY19 Budget 44 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Force Account - Massachusetts Department Project#: TBD
of Transportation: Main and Hopkins, R
Project Schedule: CY19 Project Manager: Peter Price,
Senior Distribution Engineer
Reason for Expenditure:
The Massachusetts Department of Transportation has notified RMLD of a project that may
be planned for CY19. We are reserving an amount in the Capital Budget for this project.
Brief Description/Scope:
MassDOT has plans to improve the traffic Flow at the intersection of Main Street and
Hopkins Street in Reading. This plan includes the widening of Main Street and the
installation of traffic signals. This project will require the RMLD to relocate up to 12 poles
and petition and install up to 3 guy poles along Main Street and Hopkins Street. This
project may require the installation of laminated poles.
Barriers:
Verizon set area. Some poles will need to be petitioned. MassDOT will need to secure
easements as needed for poles, anchors and guys at several locations. Project also
involves the relocation of the UG service to the restaurant at 107 Main Street.
Change in Scope of Work from Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
Not applicable.
CY19 Budget 45 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name 4W5/4W12 Getaway Improvements Project#: 122
Project Schedule: FY19 -CY19 Project Manager: Manole Agouridis,
Distribution Engineer
Reason for Expenditure:
The RMLD considered combining two (2) different projects into one larger project. The first of
the two projects was to investigate and ultimately move forward with improvements to
accommodate added load at Analog. The second project was an underground getaway
maintenance project that would ultimately result in the replacement of underground getaway
cables per RMLD's underground maintenance program. The objective of this project is to
have the 4W5 and 4W12 circuits be separated from the existing south side duct bank and run
them from Station 4 to West Street overhead via the existing pole line currently being utilized
by the 4W12. This will improve the ratings of the 4W5 and 4W12 circuits drastically, while also
improving the rating of the remaining six (6) circuits in the south side duct bank due to reduced
heating.
Brief Description/Scope:
Install a cable tray system and associated hardware at Station 4. Install two (2) riser poles
within the property at Station 4, this will include the associated feeds from Station 4. Upgrade
the pole line from Station 4 to West Street, including upgrade of up to ten (10) poles, installing
four (4) new poles, and running a new circuit an estimated 1,250 feet in length. Perform all
overhead line work to be the new riser poles to the existing overhead distribution on West
Street. Also remove some Town of Reading public shade trees to accommodate a section of
the new overhead line.
Barriers:
The RMLD is currently requesting approval from the Town of Reading to remove four (4) public
shade trees. The result of this may have an effect on the scope and feasibility of the project.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
This project replaces the 4W5 Getaway Replacement project, which was budgeted for FY19 at
a cost of$151,894. The expanded scope of this project adds $107,903 to the project.
Status Update From Prior Fiscal Year:
Not applicable.
CY19 Budget 46 September 28,2018
CAPITAL PROJECT COST SHEET
PROIER NAME: 4w5/e10111Ge arvarommovements SCHEDULE: Iii
RMLD LABOR
MATERIALS/CONTRACTORS
Uxv Tonal
♦oiunns maks[•I• mel
water[ strakMryyeNNxlsle
aoE
"NAT"$tl Time Or 9me I Ouerttme awl DESCRIPTION Unk Unit Rile i TOTAL
Lure Department:
aurin r
csea...tnttlnweeb $fiA55 $6,MJ $9E
New table Installationload-mg up reels. $6,055 $0 5820 fill.cable,)SO MCM I/C,rtrand foot offal 12000 $ "316
bg e,came tbkl4 EPR
Terminating and Still and wrapping 1 56,455 50 $910 Intents....a vontravbrbadin week $ZOSa 10 $ 14,107
cable labefm etc
Remon-I and scrap of old table 1 S6,a55 $0 $920 "melons each $71 110 $ Gue
Set(4)55class 1 Poles 2 $12.910 $0 SLAT class one able, doer S. 100 $ "'t.
IS all feendas EmIXrtfi m1 red.
Frame(14)ponesfar loin 141 circa[, 3 $12,910 50 $1,B40 xvNwre primvryconnectvrs'ek pa .Is $add 140 5 b'.
tulatars,sm)
et up peopattr install $11910 S. $1,PA0 1.1 messenger wire foot $123 15000 $ Lid",
P,11,n andlnsYll 556 5119ID S. 91,840 Is,556N i,a., fee four $1 al 45 0 $ 9.090
$0 Se $D E.caoanbm mrtomor 5 45om
We OWns wpervklobi $106 $109
unit rale In xWrs
Su r not use news 80 $0462 $0 $
EnglnaMg: $NB $
full ra.Nxm
labor.postal on For ume111, 55,1 00 $
PoleForemary and e.1
Switching remew and...- rt 32 $2,a $0
.-1.1 Able I'll,and At Sl?05 $o outside Engineering euros $ f".
procurement
fenlorrM: $B2 $W $21 $
...rate In Isom:
Inarrin,crid uune back 16 51415 $O 5336 5
table troy work 40 $3,287 $0 SW undo round control ..a.,, week $7,054 ]0 5 7.0.
50 $o $o tablet. m erialt each SIGGA, 1D $ 2D are
rHAnlal Setulm Manaar: $102 $9B $
unit rate mhours
Ovenlgma work In substation,saints,ng 54.M6 $0 5
readar
Polio...'. week $2427 I.0 $ 2@7
PRO 1a1WAL• 59797
Fr29lu Mau D$PENDING $142,41
U19 ESTIMATED SPENDING $Ila JN
C'M Budget 47 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: 4W6 Getaway Replacement, W Project#: 132
Project Schedule: CY19 Project Manager: Manole Agouridis, Distribution Engineer
Reason for Expenditure:
To upgrade 1,635 circuit feet of underground cable from Station 4 to West Street. The cable is
being replaced to add capacity and replace the existing getaway, which is nearing the end of
its useful life.
Brief Description/Scope:
The 4W6 getaway has five (5) sections of underground cable. It is assumed this project will
only focus on replacing the existing 500 CU cable with 750 CU cable.
Barriers:
Potential unforeseen issues with existing duct bank, conduit, and/or manholes that need to be
addressed.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
Not applicable.
CYI9 Budget 48 September 28,2018
CAPITAL PROJECT COST SHEET
PROJECTNAME: al Getaway Replacement,w SCHEDULE: CY19
WILD LABOR
MATERIALS/CONTRACTORS
UEOROUI
XbOults (who-Wwunml spi
Snaigbt StrNgM limes"go, pof
REM 45N mors, OT Rme OreTmew Urr+rq OEHNPTION Unk Unit Rale Units TOTAL
Uns MastMastercard; 56A55 $kE6) S9
3.man idew-unit rate In weeks
Prepping nor new cablelht,llatian lox tling 3 $II,910 $0 $g ga0 Inky order 750 MCM 1/C strand loot $14 a3 49050 $ ID,)M
trailers,pumping down manhole;end. shield,EPR
Newcable mstailation 11hugai ) $13910 $C $l,ga0 $
Trunno agand ad ng,and wrapping ) 511,910 SO $l,.O ncb,mund co.mattm assist week 57,051 1.3 $ 8.x64
,able,la hebn&etc.
$0 $0 $b Cold spring splice or term dson,and point $1 0E0 69 $ 63E0
cord a,
Existing cable removal,and snapping cable 3 $13.910 $0 $1840 $ -
SO 0 0 $
Line Oprnatlons$uparvlsbn: $SM $103
ban race In burs
Supervision of Gnecrews 53 $5,U6 50 $
EngneMal $80 578 $
unit rah In Inas
Protect management,write.review and 40 $9,105 50 $ -
adminnhrsvichlK Creahworkorder
$
Santa TeEr: $gE Seo Sx $
unit rah in hours
Switching cook out and back:cable
a $657 50 $1. $
Testing and commissioning of new 6 $65) $0 $l6gTeTnIOl Sellas Manager: $1% $9a $
wilt rah In Murs
dh ight of work In bud ia6 $8W $0 $
review
PoI2e 0ehill week 4343) 0.5 llld
:rot :. ssi
CY19 Budget 49 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: 4W16 Getaway Replacement, W Project#: 135
Project Schedule: CY19 Project Manager: Manole Agouridis, Distribution Engineer
Reason for Expenditure:
Upgrade 2,250 circuit feet of underground cable from Station 4 to Causeway Road/Lowell
Street. The cable is being replaced to add capacity and replace the existing overloaded
getaway, which is nearing the end of its useful life.
Brief Description/Scope:
The 4W16 getaway has six(6) sections of underground cable. It is assumed this project will
only focus on replacing the existing 500 CU cable with 750 CU cable.
Barriers:
Potential unforeseen issues with existing duct bank, conduit, and/or manholes that need to be
addressed.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
Not applicable.
CY19 Budget 50 September 28,2018
CAPITAL PROJECT COST SHEET
PROIECNAME: 4w16Getaway Neplacemei SCHEDULE: CY19
RMLD LABOR
MATERIALS/CONTRACORS
Lab«Total
p of UnlY Ium emeYbrunml Vehl.
9nlght
using"
govar.nhe of
mM/10.A Oi Throb
e OMNT! IW DISIWPTION awaUnit UnRRah Units TOTAL
pW
Llne ertirl Sadw 56267 $920
2man crew-onN rah In weeb
Perini rnewrahlemfigiveon loading 25 $16,138 $0 $23pe 15kV cable,)W MCM 1/C,strand feet $14.43 67500 $ iii
tranders,pumping down manholes,ek. s6ie11,'pg
Newable-lailmen-pArglna'able 25 $16,138 $0 523N $
Terminaringantl splla'ing,and wrapping 25 $16,13" $0 $]3M 0ntlergroind mnnetmessbt week $7,11 11 $ 9,815
oblplabehngelc.
50 50 SO COItl sM1rink sella or termination,antl point $],W2 JO $ ].6M
in-dive
Ending cable removal and scrapping table 25 $16.138 $0 $13CU
50 mr $0 $
Use oPeraCun SupvNslon: ON $103
alit rah in bora
sue rwrorsot Land neve 6a S6,n0 50 $
Englnei $g0 $78 $
-11 In ressirs
Protect management,wme,revrew and 40 51205 $0 5
administenwticbing. Create wotk order
.1ca TeN: 582 580 $2 $
unrc mem bhp
Swndiing to bit oN antl back 8 %17 $0 $168 $
Tdo ing a no core ma—n Ng of new cable. " $6 6"
9 $0 $I
$0 $0 $0
Technical ServKn Menages: $101 $98 $
-it raft In balls
Oversight of warks"i' rstar,swi[[M1ing
I review Pollee Dehils week 5242l 20 $ 4,8.55
4: fSl P 9P ". x. a
1PROUCT TOTAL: mum
CY19 Budget 51 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: MA-125 New Pole Line Installation for Project#: 124
New Wilmington Substation
Project Schedule: FY19-CY20 Project Manager: Manole Agouridis, Distribution Engineer
Reason for Expenditure:
To construct a pole line to interconnect the proposed Wilmington substation to RMLD's existing
distribution system. The new pole line shall go from the proposed Wilmington substation, west
to Ballardvale Street, and east to Andover Street. This shall include design, labor, and
materials for all overhead line construction for this purpose.
Brief Description/Scope:
The aforementioned reason for expenditure covers an estimated 3,000 foot pole line that shall
span MA-125 from Ballardvale Street to Andover Street. An estimated 30 poles shall be
required. This pole line shall be used for riser pole getaways from the proposed Wilmington
substation, and shall interconnect the new substation to RMLD's existing overhead distribution
system. Budgeted costs in FY19 and CY19 are associated with design, permitting, and
approvals. This project shall exclude design, labor, and materials for underground getaways,
ducts banks, cables, isolation disconnects and associated work at riser poles which shall be
included in "New Wilmington Substation' budget line item.
Barriers:
This project shall coincide with the proposed Wilmington substation. If the location of the
substation is moved, this capital project shall be revisited/reprioritized accordingly.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
Not applicable.
CY19 Budget 52 September 28,2018
CAPITAL PROJECT COST SHEET
MA-315 poll Line 111talldli.,for
PRO$ECTNAME: New Wilmngbon Sub4ffiinn SCHEDULE: M9-Cy10
RMLD LABOR
Labor TOol MATERIALS/CONTRACTORS
x of Unns lunlr meelrea unlnl
..to s[ral�t "ass,thus he «a
rtLM/TASC that Time OvMlme ..p .ul DESCRIPTION assUnk Unk Rate Unkssesse TOTAL
assauna wassa
Depakment: $6,455 $G.M peap
.am. unkntemweeke
Set 130155CLI PoIe, 6 $38,731 $0 $552055'closs l Poles —1, $BW 30 $ 24,OW
15 its Hendra brackets,miscellaneous
Fume 1301 pole,for M.,(4)s,,cuns 6 $38,731 $0 $5,520 hard,mr-n ...tor,(sper perpole $8W 30 $ 2Q ON
jusulators,sts)-fcursfurvms
Set upfOr l3.Wo'ipacer install 0 51ts.2 $0 $2,360 0052 messenger wire loot $123 1,,,. 5 1416D
PUII-in antllmtall Is,vois f s56 8 slf.., $0 $2,3W 15kV,556 PL,pacer Male but $202 36,OW $ 71,T20
Te m Made Mare switches 2 $12910 W $I,eaO Move mate Switches for Lie switches to eacM1 fc,unks 6 5 161400
backup
$0 $0 $o 5otla.MatellntelllTeam License eacM1 $25W 6 $ cle.
$o So So $
So $0 So
INC Opfled—Superebfom ui $103
an.eeN hours
su perviaion of om s— 120 $lzfisa $o $
Englweed, $Tg
.. Nl
prep,he construction sk—ants a ntl Ilk' $I'.. W $
Polestar,Met,
Shav ng,review and oversight W $4,807 $0 $
50 $0
xnle Tech: $V $g0 $z
unit eb In hook
swiLrning asneeded ae S". $o $?no5
$o $o So 5
$O $o $a $
,kohnlpl Sarvkes Mogen $101 $"
unN In IrWA
Swi¢Fing review and oversight M $4,855 $0 $
$0 $0 $
PoIIaDeNM1s week $1417
MECtMAL'
utit TMAlFDsRNpNG
gn9 E5Tgagat ipEN01N0 5000
CPEO ESTIMATEDSPENDING $813,464
CY19 Budget 53 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Underground Line Extension Project#: 120
Marian Street, W
Project Schedule: CY19 Project Manager: Vaughan Bryan,
Distribution Engineer
Reason for Expenditure:
The current underground line is a single phase line that serves Marion Street and Eleanor
Drive. A 25-lot subdivision is being added to the end of Eleanor Drive with a another 16
plus acres that could possibly be developed at the back of this subdivision. With the
increase in load, the existing single-phase line will not be able to service the area.
Brief Description/Scope:
Install a 3 phase line to meet the demand of existing and potential load growth. Install
approximately 2,050 feet of underground electrical cable, make terminations, splice,
elbows, and test. Install 200 feet of overhead spacer cable, transfer and frame poles.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
Not applicable.
CY19 Budget 54 September 28,2018
CAPITAL PROJECE COST SHEET
PROIECTNAME: underground L,ne E.tension,Marionso-eepw SCHEDULE: CY19
RMLD LABOR
Labor Tonl MATERIALS/CONTRACTORS
na unm m—e•n.es..nl .Lame
dalgM Strall OVMImus
unit' p01
rtEM/LA$Y. OT ma e rwq DESCRIMON Unit Unit Rate UnItS NTAL
We..'artual
2naancev-unrcrnlnxMe Sil SSM7 $9:
Rope dna pull in[Mee phase once rg ro once
came L $6,.55 $0 5920 151W F MU Ups cable root $2M toted $ La,O]0
Spho chow;r,set nd terminations 3 $19,366 $11 $3160.—n.2 CU neural fort $10] 2,333.0 $ 2,333
hsall overhead cables and transfer poles 1 $6,455 $0 $920 Miscellaneous unaeBrouna splice
terminations,neer,bareware point $$,dace. 1a $ s.w0
$n $o Mieceu....us....head barewme a oe
anare
paint $3.6W 1.0 $ 3.6W
50 $0 $o Unaegmuna c.nmdor assn[ week $7r054 4.3 $ 28,569
o a
one Operation.SpeMpon: $206 $203
seat are In hours
$.per.inon of In.erewe 6t, %,7 o $n $
fn�rwhi $g0 $18
unit Ruder he bmn
Ranches,acbeduling,n.tec,pia n y e¢ 32 $y564 $0 $
$o % $
$0 $0 $
Ynlp Tetll:
unit ale M M1wxs $82 w $i
'thel elbmv and hrmibal Robot, 16 $1,315 $01 sten $
$o oI $o
T00in1®14rvlm ManigY: $102 $9B
urn l In house
Assist with test,oe a n a its eco1, $40$ $0 $
$o $0
Pollee Dabila week 52pP $
W—Ml go
CY19 Budget 55 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: 5W5 Andover Access Road Upgrade, W Project#: 121
Project Schedule: CY19 Project Manager: Manole Agouridis, Distribution Engineer
Reason for Expenditure:
This project calls to replace existing open wire primary cable with a 556 AL spacer cable
system to improve reliability on the 5W5 circuit. This area has a high density of trees, and has
been problematic in the past.
Brief Description/Scope:
Upgrade approximately 1,000 feet of open wire primary cable to 556 AL spacer cable. Poles
shall be upgraded as needed. This is a section between Andover Street and Salem Street that
runs parallel to 1-93 for approximately eight (8) pole spans. This road is referred to as Andover
Access Road.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
Not applicable.
CY19 Budget 56 September 28,2018
CAPITAL PROJECT COST SHEET
PROJECTNAME: Andover Access Road Upgrade SCHEDULE: Cet9
RMLD LABOR
MATERIAIS/CONTRACTORS
cals.Total
9 of Units Iunluan tlNv uxul yeRdd.
n'ar Stdidd Pse.mlc. 9M
IIEM/TASM Rme6+enime nli xxd DESCRIPTION Unit Unit Rate Units TOTAL
Une OepvlmenL %A's $6,267 ms$93
2-man crew-unit rate In weeks
rereeeeeaea
set(4)55class I poles ) $12,910 $0 $1.800 55'-,551 poles each $800 t $ 3,
Fremeand lra n sten V Nles for one 111 15 kV Xendnx braked,mlxellaneous
wt x 51x.910 $0 SLgaO lour,pnmarvoes ...gpa= a, per pole $300 7c 5c"c1,x00
Im.rA emJ-o.elll=hart
sans l "'OW'mesenger 3 $13,910 $0 $1,8000.05amefter erwhe loot $115 of., $ 1,23.
Pullinand lnreal1,.1556 2 $1).910 $0 $1,800 I'll,556 PL spa=n cable loot $3A2 30000 $ sure
a $0 0
Une Operated,Sartor bn: 5206 $203
unit raft In noun
$uparaorn of o.,crews 20 53!16 $0 5
gnQrleerks, mo $78
poll.1.In eftes
Prepare construNon do,smenrs and a0 $3,205 50 $
.,6o5Aa
Sw.Icbme,tech,,and,werslgnt 12 5961 $O 5
$0 So 5
mbr TeE:
..it nR In hand, Sm $80 $3
Swllcbing as n1arl 8 $657 $O $168 $
$0 $0 $O $
$0 $0 $
Technical session Manal
wat rare In hours $IOk $9B
Switching,retie,and w....ght v 50 $
$0 0 $
solid,evil week $2027 4DI$ 9,710
T AL:
CY19 Budget 57 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: 211-503 and 211-504 Fiber Extension Project#: 130
Project Schedule: CY19 Project Manager: Nick D'Alleva,
Technical Services Manager
Reason for Expenditure:
NSTAR is replacing existing static wires with optical ground wire (OPGW) to provide a
means for diverse fiber communications on the NSTAR system. This project will address
the need for fiber to support Northeast Power Coordinating Council (NPCC) Directory 1,
high speed, relay protection upgrades required on three terminal lines (211-503 and 211-
504) between National Grid's Tewksbury Station #17 and Reading Station#494. This will
also enable RMLD to migrate its remote terminal unit (RTU) communications.
Brief Description/Scope:
NSTAR to install 1.4 miles of OPGW static wire and RMLD to install 0.5 miles of OPGW
static wire, multiplexer communication equipment, and fiber termination equipment.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
Not applicable.
CY19 Budget 58 September 28,2018
CAPITAL PROJECT COST SHEET
PROIECTNAME: 314503 and 311504 Fiber Extension SCHEDULE: CY39
RMLD LABOR
MATERIALS/CONTRACSORS
js�b.
m TOaal
a OF UnionOm,.mal veM1ltle
royM li,wrunm, NOF
mea RSR s7fine Overtime ,ml DESCRIPTION Unit Unit Rate Unlu To.
nine Debarment:
zmancren untrartMveeb So SoP, innolin sourcermnee' Sau.000 zo 5 au.Doo So $0 Fiber mux earn 51o,om 1.0 5 .,om5o SO Dbnnaiilmino andvnmio.<nnaa .am 550,000 10 5 rd'.
diriii
So $d 5
0$0OPerataw,SuppMsion: SINunN rete In boom
5. a mol un.or—, $0 5
Entlneed. $1a
unit rate In noun
So 5
50 $
$. 5
serac leech- W $zumvpae m M1Oun
Eder noriaticn 50 Sasso $
o $.
W '0
$0
Tpolnl.IHM[as Man.": $ado!
$e$
une gMin FOYrs
50 $0
0 0 $
$
Man Cemb fine.ieeE $2Az3 5
CY19 Rudget 59 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: AMI Mesh Network Expansion and Project#: 112
Meter Replacement
Project Schedule: Annual Project Manager: Nick D'Alleva,
Technical Services Manager
Reason for Expenditure:
In order to expand RMLD's AMI mesh network, additional relays, retrofit kits, and
meters need to be purchased and installed. These new/retrofit meters will give the
RMLD the ability to monitor voltage, current, demand, power factor and power quality.
They will also provide end-of-the-line voltage, as well as power outage and power
restoration notification to RMLD's outage management system.
Brief Description/Scope:
Purchase and install meters and retrofit kits that are compatible with the AMI Mesh
Network.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Status Update From Prior Fiscal Year:
CY19 Budget 60 September 28,2018
CAPITAL PROJECT COST SHEET
AMI Mesh Network EapanSion and
PROJECT NAME: Meter Replacement SCHEDULE: b19
RMLD LABOR
MATERIALS/CONTRACTORS
.a."cal
pot Unh 1•alI.....un....ml VeMtle
.,& SlralgM Ila—an. Mot
REM AGI OI time OyertlmenDESCRIWION Ifni Unit Rate Units TOTAL
Une DapM
ereM: %ASS $6,367 1'kto$93
3man erew-vae rma m weeks
50 Sn cm ek.,c.1,— 3 $SN M.0 $ 35,M
o So $0 $
o So Sn $
So So $0 $
50 50 $0 $
50 50 atte0 5
Urte Opeca ent!tmaMsbn:
unit rah In lwurs $316 $l03
0 $0 $
DIYMNkIF
unXnhlnRwn $w $7B $
O $n
MeterTaT. $so Sa8 $3
unknoolo Rahe $
Inxhll relays and meters to expand AMI 500 $24,980 $0 $10,500 Relays each $300 40 $ 1Z.
Met NeMork
Ml RetmOts each $100 350 $ ca'.
commercial meters catch 57W 3W 5 Nm.
Gateways each 55,ro] 3 $ 10'M
51 le- ease meters each 123 350 $ 30.SN
Technical Senecas Manager: $101 5" $
unlM1We In M1wrs
Orcrsi
I'm
relay,
o 120 $II,138 50 $
PoIIa Oetailx week 1 $3427 5
Taft c -x. ..o.. _
JIM
TOTAL:
CY19 Budget 61 8eptem6et 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Communication Equipment (for Fiber Optic) Project#: 126
Project Schedule: Annual Project Manager: Peter Price, Senior Distribution
Engineer
Brian Smith, Senior Distribution
Engineer
Reason for Expenditure:
As the RMLD expands its use of the fiber optic network to establish communication with
metering equipment, recloser controls, capacitor bank controls and other distribution
equipment, the Department will create fiber nodes at various locations along the fiber
optic network. Each node will require an enclosure, a fiber optic interface, a power
supply, cabling, fiber optic cable, and the termination of the fiber optic cable.
Brief Description/Scope:
Purchase materials and procure fiber optic cable splicers as needed.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year:
Status Update:
The Department has expanded the Fiber Optic Network at existing fiber nodes for use
with the distribution automation projects.
CY19 Budget 62 September 28,2018
CAPITAL PROJECT COST SHEET
PROIECTNAME: Communication EQU,pme0lFiberopt,cl SCHEDULE: Cr19
RMUD LABOR
Labor TotalMATERIALS/CONTRILCTORS
Ref unha rvnunrt aeL..vnml behind
SbaryM SbaIBM Iueo...w. pati
ffEM/rr6R OT True Oeartime .rel DESCRITIOX Unit Unit Rate Units TOTAL
Une Depa2nrde S6,R5 $6,M) r kle S9
Em unit raft In weeks
$D 50 Aement R5900,9 ISR ma.aIld N[M1 $LSn) lx $ 18,0]0
anent,toren
50 5o $O fineru vac bat=h wren so It dam $5 n 5 3W
50 50 �1.1de-mount fiber.11k cable..Ioture earn 5xsoo S 5 ;s[O
with Penn panel ane UPs
So SD $u OSS rider.,I.oble n X $1 1. 5 to,"
$0 $o So Cornead,: r'meroptic cable spunne ear 51b90 S
em Un,
o a a
une Dpenllme wpeMSlm:
unit raMMbrands SED6 S1N
$D 50
broaftern: M $79
unit arms M1waa $
n
SU
SMI. nMXrah In M1oura Sex $eB $x $
0 0 $0
$0 U 0
TMNOI SeM[a Malug.:
unit rah In h— SMx 5n S
0 0
Polis Debila week $xpx] EO 5 OB55
x 1§
CY19 Budget 63 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Substation Equipment Upgrade Project#: 111
Project Schedule: Annual Project Manager: Nick D'Alleva,
Technical Services Manager
Reason for Expenditure:
United Power Group and RMLD personnel have identified equipment that needs to be
replaced or upgraded as a result of their condition assessment of our substation
equipment.
Brief Description/Scope:
The existing grounding equipment is old and in disrepair. RMLD will purchase 115kV
personal grounding equipment to be utilized at Station 3 and Station 4. We will also
purchase additional grounding equipment for Station 3 in order to utilize the existing
grounding carts, which are used to safely ground distribution circuits and substation
equipment for maintenance activities.
Barriers:
Availability of replacement parts.
Change in Scope From Prior Fiscal Year:
None.
Status Update:
Not applicable.
CYI9 Budge[ 64 September 28,2018
CAPITAL PROJECT COST SHEET
PROJECT NAME: Substation Equipment Upgrade SCHEDULE: CY19
WILD LABOR
Labor Total MATERIALS/CONTRACTORS
pMVniti Iu..—'Wsvn., VMltle
SbneM 5baI8M1t Ibew vnv. NOI
mEM/IASR an Tme Ovenlme rwl DESCRIPTON Unit Unit Uni. TOTRI
IMe DeWNmme
x-encativ dare In weeFs $6,455 $6,r�T $9
$0 $0 $0
50 0 $0 5
$0 $0 $0
$o $0 $0 5
50 $D 50 $
0 0 0
Une Dpwa6aniwperriddo : $S06 5103
unnratexbwun
$0 $0
EntlMalnB: $g0 $78 $
unit MCFM1wn
$0 50 5
Senlw Tach: $M $80 $x $
-prate In M1oun
neral,epuipment iW $rr,3V $p 5x 3C0 115kV grounding equipment for earh sWied, t $ 5ii
Spnon 3 and rimi O.
$0 $0 $0
TMN®I Simi Manager: $101 $98 $
-Unrem hatera
0 $D
pmme Demb weN Sx.an $
.. . u.
CY19 Budge[ 65 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Power/Lab and Tool Equipment Project#: 115
Project Schedule: Annual Project Manager: n/a
Reason for Expenditure:
This is an amount reserved for purchase of power/lab and tool equipment.
Brief Description/Scope:
Refer to the project cost sheet for planned purchases for CY19.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
Not applicable.
CY19 Budge[ 66 Septemher 20,2018
CAPITAL PROJECT COST SHEET
PROIELTNAME: Power/Lab and Tom Equipment SCHEDULE: D19
RMLD LABOR
MATERIALS/CONTRACTORS
lenortowl
NOl Unit, ween—Morueml VMIOe
Shine. Sird,M IMavnh Pm
rtEMR>Sg OT ➢me Wctlrcnparame in DESCRIPTION Unit Unk ft. Unhs TOTAL
Una Dep .1: $6p55 $6,267 19,20
2man pew-ramy1.As wsb
$0 $0 $O Dennis phasing meter/ni-pot each $L. 65 IB,WJ
$0 $0 $o.serace meter accuracy tester for each
metering
tial 540,Ob 1 5
$0 $o SO Four poil nrtlery did aU@prtss each 53.8N 2 $ 1,60f
So $0 %ACSA Ratchet Clary each $WB 12 5 610]
Wireless phasing tool and base each 42agg 1 5 12,493
5
5
$D $0 $o $
o $o SO
Wre OperaCOMSuperAalm: $106 5203
unit raa In News
$O So
EngNeerm,
uNt rate In handor W $18 $
SO So
$
Stela Tech:
fell N.In M1ms SC $
$O So Sc, $
$0 $0 $o
eTnlol yrvKes Manger. $101 $98 IS
mit NN In Nuts
$o SO $
Pdke Details week $2421 $
T4TAre ..199
CY19 Budget 67 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Meters Project#: 117
Project Schedule: Annual Project Manager: Nick D'Alleva,
Technical Services Manager
Reason for Expenditure:
Purchase of meters and metering equipment for new construction, upgrades, and
failures.
Brief Description/Scope:
Two hundred residential and commercial meters as well as miscellaneous hardware will
be purchases for stock.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year:
Not applicable.
Status Update:
Not applicable.
CY19 Budget 68 Scpmmheu 28.2018
CAPITAL PROJECT COST SHEET
PROJECTNAME: Meters SCHEDULE: CY19
RMLD LABOR
ubw Total MATERIALS/CONTRAQORS
#M Units wnM1rmtltlw unnn v Ide
waNM SbiiBbt INxwunv. NOI
nU.,,- 51t m Tme 0.... m kn, .l DESCRIPTION Unit Unil Rate Units TOTAL
Ux N
DeOanmU %,ehi $6,363 593
3man pear-unn nne M wepki
50 $0 $O resikentlal and than—al meters for each $3W 3M $ an'.
,toc
$o $0 $0 Potential transformers to,stuck. each $1," 30 5 3o,00J
$0 $0 $0 ur mrent trabrmers(or stock. each $1,0") 2n $ 30WJ
$0 $0 $0 $
5o $U $n $
50 50 D
INe DPwanwn wPwwslon: $las $mi P
.Mt me In M1oun
SD 50 $0 $
fsones"U $n0 $38 $3 $
unt rate In Noun
a $0 a $
5
Senor Te°" m $6o $3 $
ink wte In Mun
$0 0 $0
o
St $U
Techh= rvl[n MareRr: $101 $98 $3 $
um stem llwn
50 50 $0
Volia Detaik x'eek iZl
MAL, F 0 Sol fol 1, 1-1
CY19 Budget 69 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Transformers and Capacitors Project#: 116
Project Schedule: Annual Project Manager: Vaughan Bryan,
Distribution Engineer
Reason for Expenditure:
A major quantity of standard units is necessary for proposed projects and stock on an
ongoing basis.
Brief Description/Scope:
Transformer and capacitor bids will be prepared and units purchased as outlined on the
Project Cost Sheet.
Barriers:
None anticipated at this time
Change in Scope of Work From Prior Fiscal Year:
Not applicable.
Status Update:
Not applicable.
CY19 Budget 70 September 28,2018
CAPITAL PROJECT COST SHEET
PROJECTNAME: Transformers and Capacnors SCHEDULE: CY19
WILD LABOR
tabs royal MATERIALS/CONTRACTORS
am Vnite lonnrmr—.aml venme
of
..I'm St algin n,buuaxs, in
l(
rtalUnf nme m nme OveNme mq DESCRIPTION Unit Unit Rate Units TOTAL
Une Detainment $6p5S $6,267 nniae$92
2. ncrew.unit natem wean
e=pnase pact Itansm,me,s
5o on $o in,f,.p.,sd romme,mi:rmr-ana on $10,5oo 27 $ ."re
.,
$p $p $O Single-ph—eadmount to—sm—, Nnb $21,.. x5 x5 $ 95,LU0
or and wk
p,opnieE subtlinsions s[ .
e-phase polomountInamfu
5o 50 $o rm pmposea mm—r-1 .-,as and -on $S.'. 12 $ 66.OA
tock
Smgle-phase dole.mens o-snsm,me,s
$e So $o for mopnsee,aiaembl se mas and n,h $3.5W 85 5 122.5
stork
50 $0 0 1,2.kVar raparitor banks on $12,5M 0 $ 59,DA'
0 0
U.Odense.supvarawn: $u% Sxo9 $x
wX rate In Iwun
So $o So
ENdreerlq: $gp $rg u $
anal In bods
So So SO
5
Senien Tem: 5u $90 $z
mutntemmwa $
$0 $0 $a
p o a
TttfiMOlhods", nYnaBen: $101 $98 $x $
unhnttmM1aus
a 0 a $
P.for Daai, week $2627 $
AL•
CY19 Budget 71 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Pole Replacement Program, R, NR Project#: 175
Project Schedule: Annual Project Manager: John McDonagh,
General Line Foreman
Reason for Expenditure:
In 2015 RMLD initiated a Pole Inspection Program. Ten percent of RMLD-owned poles are
inspected annually by an outside contractor using various technology including
resistorgraph technology. This Inspection Program provides RMLD with verifiable data on
pole condition. Testing (through FY18), has identified 475 poles that were recommended
for replacement. Annual testing takes place each year in the Fall.
Brief Description/Scope:
RMLD will replace 50 poles per year that are identified as part of the Pole Inspection
Program. This project includes setting poles, transfers, and replacement of secondary
services as needed.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update From Prior Fiscal Year:
Since the inception of the Pole Inspection Program a total of 235 poles have been replaced,
and 188 transfers have been completed (as of September 2018).
CYI9 Budget 72 Septemh,28,2018
CAPITAL PROJECT COST SHEET
PROIERNAME: Pole Replacement Program SCHEDULE: CY19
WILD LABOR
blrottotel MATERIAE/CONTRACTORS
I of Units I .eft—..-.evq
HnikFt s4a15M IeVmrFemur Nof
mal Ine, OT 9me OuenI.Pw DMRIPTION Unit Unit Rate Units TOM
Une OepakmeaU $6A55 $6.361 n[591
iman crew unit me In w[Nu
set ana rtan51er 50 poles. 30 5 $139,105 531,330 $33,W0 Pole, each 50W 50.0 $ 30W0
Sp $p $0 Mlmellaoeo..mreware lFoh>etel per Pole S. 1. 5 asoo
uPBnEes 11 $7,746 $o ".11onn lt. antlwiresl(or—o, Par $313 50.0 s 10,650
a 0 au
5a 5o So 5
0
Une Operatlms wpeMSlam $UN ON
unkran In Faurs
uew[u enision zao ao $zu% $<}03 5
EnpinleNnF $b $78 $
Pole Poreman and of sales a0 512 $0 5
Sen
na Tele b $3
$Bi $ k
an. $
nrcMFWrs
0 50 $0
0 0 0
.lXnkes
unkMauger: 5101 598 $
untt rateF n M1ou
So So 5
Police 0e[aili wale $2,727 3.0 $ 7383
7, 777,777M=-
CY19 Rudget 73 Septerl 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Secondary and Main Replacement Program Project#: 458
Project Schedule: Annual Project John McDonagh, General Line Foreman
Manager: All Engineers
Reason for Expenditure:
This preventive maintenance program is intended to upgrade and improve system
reliability and address aging infrastructure.
Brief Description/Scope:
This program identifies aging infrastructure and addresses a variety of work to include:
secondary upgrades and service drop upgrades as needed. The pole replacements,
primary cable replacement and transformer upgrades will be done in conjunction with the
Stepdown Area Conversions, Project 107. Two areas will be targeted for upgrade in CY19
in conjunction with the Stepdown Area Upgrades Project 107.
Barriers:
Future upgrades are in Verizon set territory and could result in pole setting delays.
Change in Scope of Work from Prior Fiscal Year: Increase (Decrease)
Not applicable.
Status Update from Prior Fiscal Year:
Not applicable.
CY19 Budget 74 September 28,2018
CAPITAL PROJECT COST SHEET
secondary&Maln Replacement program
PROTECT NAME: Project l: Gerry&Drury Road Area,LC SCHEDULE: CY19
RMLD LABOR
MATERIALS/CONTRACTORS
UEOriWI
•W Unitsluanner-kewumul u.,"s
Steapn Sb9prr[ rycei tlof
ruperA51t lime M nine Omtlme mel DESCRIPTION Unit Unit Rate Links TOTAL
UneDgaaessi %,4SS $6,267 nk$93
2man vew-unll rate In weeks
Frame up to 28 Verizon set on essn the Ymntlary Funds,braake[s.
Gerry&thin,pod area In LC for new 30 $9,037 $0 $11288 ea[M1 $Sa.CU 56 $ 3,014
ar,moder,cable neon,>en
Install 4,IW of secondary cable 48 $3Q985 $0 KAU /0J/C—charitable foo, $3W 41W $ 6,SW
Peplare 56teMres 4 $'1 $n $3,680 QO'of3/o 3/C serv[e were for ach eacM1 5100.00 $6 $ s'.
So $0 5 s 5
W sc $o $
So $0 $o
une Opnatldls SupeMMn: Oce, $303
unit nh In hate,
Su ery on a Line news W War, $0 $
rnPreerlR' $80 $78
unithours $
Construction plans,outage Fears,re, $3,205 $o $
YnIV Tabi $& $N $2 $
unity race In hpna
$0 0 0
$0 N 0
TlNnlal Yrvkes Manage: $101 $98 $
reit ah In M1ours
0 0
Police Oebils week 1 $2427 4.5 10,924
limp 1111171folik
CY19 Budget 75 September 28,2018
CAPITAL PROJECT COST SHEET
YcoadaryB Main Replacement Pratt—
Pmlett3: llloma,Putney,Bancroft,
PROIERNAME: Atherton Area,LC SCHEDULE: CY19
WILD LABOR
laborTwal MATERIALS/CONTRACTORS
a Of Units tum rm.kq uxnl VMltle
Nnlpt straightIW�nin. Nn
IIEM/IA3R Oi lima Ona".. „n DMRIPTION Unit Unit Rite Units TOTAL
une 0epmrn nt:
3mMaew unitnnlnweMs S6A06 $6,167 Nx
F.me up to 67 Venaon ul pales in the $6, 5¢onEary M1aNwart,bracNets.
Thum,Put-,6ancroft,AtMrturt.r. n 6 563,x50 $0 I6a 116 $ Qx6f
LC for new w...d,ctble nett..,etc
install 6,e Wof secondary cable 8 $51,62 $0 $1,360 V.3/C—,o.,-,lo loot $1.60 6600 $ 10,880
Repla-up to 11"m1ces n $56,161 $0 1W.11/0 3/C servicewin f....th rvm $ICa.00 116 $ 1160]
1.
$e $0 sen
$O 5
5e o a $
$0 $0 So 5
une Opaatlons 5uperWlan: SaOfi riO3
uof raft in hours
a not Lme c.ews 120 Lx,6s6 $0 5
[naMeennR: Me $)a $
Construct—plans,outage noticry etc 80 $6,610 $0 $
an"nM In M1oun $
So 50
$0 5
10 0 O
Terhnlol5ervk6 Minip.:
unit rate In hau $a0a $96 $
$a 50 5
Liu..A, went 5262) As 5 aO x6
CY19 Budget 76 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: 13.8kV Upgrade (Step-down Area, etc.) Project#: 107
All Towns
Project Schedule: Annual Project Manager: All Engineers
Reason for Expenditure:
There are 35 step-down areas left in the RMLD service territory. These areas on the
RMLD distribution system were originally fed from 5 kV distribution circuits. When
RMLD began moving load over to the 13.8kV distribution circuits, most areas were
converted but some areas were re-fed with pole-mount, step-down transformers. Most
of the distribution system in these areas are 30+ years old and in need of upgrade
before they can be converted.
Brief Description/Scope:
Replace poles, primary cable, and overhead transformers, as needed, in the various
step-down areas. Convert areas to 13.8kV and remove step-down transformers. The
secondary cable and service upgrades will be done in conjunction with Project 458.
Barriers:
Some areas are Verizon set areas.
Change in Scope of Work From Prior Fiscal Year:
Not applicable.
Status Update:
A conversion has been completed on Federal Street, Main Street, Vine Street and
Timberneck Drive in Reading and Putnam Road, Peter Road and Anthony Road in
North Reading. Additional conversions scheduled for completion by December 2018
include Grove Street and McDonald Road in Wilmington, and Adams Street in North
Reading.
CY19 Budget 77 Sgtemb,26,2018
CAPITAL PROJECT COST SHEET
13.9kV Upg2Ee ISteOdewn Ana;el[.j
PRCJECTNAME: Proje[tl G,&Drury RoaEArea,LC SCHEDULE: d1R
RMLD LABOR
Ialgriotul MATERIALS/CONTRACTORS
N of untsIunMrwr Ybunlul
Ace, saakbt "ar—Rated. xa1
REnal OT T.. OcFHnp ml DESCRIPTION Unit Unk Rah Units TOTAL
13ne Oe0anmeM: $6AS5 $6.36) r kIe$9
2manoew-IMlnhlnweeb
[nme up to 28 Ve o4nse1 Polefin Pe NarPxart,lnsulabq mnnetlors.guy.
Gerry&Drcry Read area In LC for new 2.6 $16,]86 $0 52.392[utoWs,upgbnchtt-nnini r,usee. wrb 5180W 28 5 5,040
wble
InsV112.8W of on me ry cable 36 $23.239 W $3,3121/0 bUC Pri man, loot $OW 2800 5 E,636
Replace seven l]I polemount lranslormers 2.8 $18,05 $0 $2,176 5
$0 $0 $0 $
$0 $0 $0 $
0 0 $0 $
Une Operatlwusur eMSlm:
unit rah In hours $ $1m
SupeMson of line crews $gp6E $0 $
Engineding:
unh
nitln $i&
houri $
sol a foreman,WSAy ronst...non 10s 58<l3 W $
clewing,awimMngortlers,et
trnb TBH:
unNnceMlimn $8E $80 $2 $
W So $01 1 1 1 15
W So $o
TeNnlnl Services Mamgr: 5301 $9R
oelracelnkans i $
50 $0 $
WI[e OMils week 1 52A 055 10924
CY19 Budget 78 September 28,2018
CAPITAL PROJECT COST SHEET
Moll UMP)(Step-0awn Amos,etc.)
Pmletl 2: Thomas,Putney,Bancroft,
PROIECTNAME: Atherton Area,¢ SCHEDULE: CY19
RMLO UE OR
labor total MATERIALS/CONTRACTORS
a of units lana mee I.-umul
insumight (law,, pof
myM/TMK one Or lime Oamors, anowns, DESCRIPTION Unit Unit Rah unite TOTAL
une
pantomime 56055 $6,267 5920
2—vew unit note In-6
Frnme up to 28 Verem xl poles In the Hntlwa rc(iniulabrsmnnettors,Pc,p
Gerry A Q,Road areal,LC for new $59,388 $o $8.a,aeacM1 $18000 67 $ 12,Cfi0
[able .taps,bracken,gmond rod,etc
Ins
)Ill 2,1200olprimaryeable 6.6 $@,605 $0 %P12 c/a PAAC Primary loot Se B] SSW $ a,]8$
Replan oven)])polem oum tch-h-mers Q8 $30985 $0 $Qal $
$0 $0 $0 $
$0 W $0 $
SP o $o $
.no Opeptloss wcerWlos
unn rate In hours $lp6 S1Di
$u raon or pm crews 160 $un"I $0 5
Feelmorin4 "0 $]g 5
Pole Porem an,605Ay mntarms- 270 $19, $0 $
drawing, t[hing order
Ynxr Te Eupa. M 522 $Mrc nhxbmrs
0 0 0
B $o $p
Temnlol yrvkee hJussa : 5201 59g $
' 2
unarm xboars
50 $o $
Police posts week 2727
r
CY19 Budget 79 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Underground Facilities Upgrades Project#: 106
(URDs, Manholes, etc.)
Project Schedule: Annual Project Manager: Vaughan Bryan,
Distribution Engineer
John McDonagh, General Line
Foreman
Reason for Expenditure:
There are 210 +/- underground residential subdivisions in the RMLD service territory, of
which, 90 +/- are over 25 years old. These subdivisions are in need of new primary
cable and transformers. Some of the URDs are in step-down areas and need to be
upgraded before they can be converted to 7,970 volts. Most of the existing transformers
are live-front units. The new padmount transformers will be dead-front units, which will
improve reliability by eliminating the possibility of animal contacts within the pad
transformer. The new transformers will be placed on box-pads that will raise the
transformers out of the mulch beds, which will prevent premature rusting & corrosion of
the transformers.
Brief Description/Scope:
Replace primary and neutral cables, and padmount transformers as needed in the
various URDs. Some of the transformers within each of these subdivisions have already
been replaced. The precast transformer pads will be replaced with fiberglass box pads
as needed for elevation requirements. Certain areas will be targeted each year.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year:
Not applicable.
Status Update:
The Department completed Shasta Drive, Snowcrest Run, Aspen Road, and Colonial
Hill Drive in North Reading, Cherokee Lane, Wilmington, and Wymon Way, Lynnfeld.
The Department is working to complete Carriage Way and Turner Drive in North
Reading, Marion Street Wilmington, Westover Drive, Maddison Lane, and Essex
Village, Lynnfield in FY19.
CY19 Budge[ BO September 28.2018
CAPITAL PROJECT COST SHEET
UG Facilities Ul rod.INROb Manholeb etc.)
PROJECT NAME: Protect 1: Mend,Ella and Eranun,W SCHEDULE: CY19
RMLD LABOR
labor*oral MATERIALS/CONTRACTORS
a Of Units IuM,au 4evunlnl VMkle
gnlgnl ..4h'
Ilm.mva Nof
rtEM/)h5X onceM )Me Urcnlme ssli DESCRIPTION Unit Unit Pax Units TOTAL
cat,Oepartmeen $6A55 $6,E6) aM59
aanangee unitrate Inwab
cap.-l d"and neutral cable ]0 $60,553 $0 $9.360 P3 CU 15 W ubie anti—,nal utral f— $3 55W $ le".
Splice,mrminaV,elcows,eounding,etc. 3 6 $16]9a $0 $),39):plias,elWws.dware em.terminecons tape
rs,ha. eacM1 $130 13 $ 1.000
Replace to pad-mounted transmrme:s oa 518,ao3 S. S4'0cl bop pass each 5160 un 5 1,f-00
$0 so 50
$o Sa Sa $
0 50 $p 5
Une Operations Suparedice: $106 $103
Lane nx In Fours
su on of oneerew: 160 516,925 $o 5
EnFlneetlnL
nitrtelnFu $)B $
5—hlnp,scheduling,notice,ad,etc @8 510,355 $0 $
xchae Tea: $ay 5)1 5
unkmxmh m
50 50 50 5
50 50 50
1KFn1,,1 es Manages $101 $9! $
Lank
Faun
O 0
Police De.ift weeF $3 aZ) 3A G055
CY19 Budget 81 Sep[elnbdT 28,2018
CAPITAL PROJECT COST SHEET
UO faelrtiea Ugnee URD,ManM1oled,eal
PROJECT NAME: Project 2: Caner and Willard,lT SCHEDULE: CY19
RMLD LABOR
aborrmal MATERIALS/CONTRACTORS
Rmunna en n—fake lnl vanix
nlent Stal{MIlrcw unlnr of
II[ µR Ton, el lime Oaenime M1'�
ae na l DMIMPTON Unat Let Rate UU.I. TOTAL
Une DepartTlM:
]resell N-unAaa bweeb
Replace URD and neutral able. 6 $38,731 $0 $5,530 3 N 15 W cable and neutral fort $3 35N $ ],SN
lease,carminate.elbows,8mundm&etc 1.1 $],)46 $D $1JM abod'alaw;ara.lifons,Gpe each $130 8 $ %0
Replan three(3)pad-m...ed 1A $9,037 $0 $1,]RB�pad,rs andwa each $160 3 $ sed
I.—es
$D D o
$D $D $o $
SD $o $D $
Une OpenUOne Supervision: Sv06 S.
una.Mnwa
Supaosorot One crews 110 $1259a 50 $
uRlns ednt,
SSD $]R $
Swdmm[,achedolm¢,n,b,plan:,ea. 36 $a,aa] $D 5
Senbr $M Sw 5]R s
nnn ra.1.In npurs
$o o sel
$D D 0
TeTnlol Services Manµen $vOv 59l $
unit tea In M1aun
0 D $
PoIIm Dwells week ISAIN, $]a]) 30 $ E427
CY19 Budget 82 Septerl all 2018
CAPITAL PROJECT COST SHEET
UG'"Imes Undide(URD;Manholes,et[)
PROJECT NAME: Project 3: Serious,NR SCHEDULE: cy19
RMLD LABOR
bbortaal MATERIALS/CONTRACTORS
pas Unks Iunxrw.Nmrumsl
usesa19me
v8M 71. lype g..w� NOf
RfM/rAme 58 liOi Metllme ,.el DESCRIPTION Line Unit Rule Unks TOTAL
N
Une DepanenL Send. 56.36E rcM[$9E
Emm same-unit ral In mYke
Replace URD and neutral[able 48 $34985 $0 $0,616#2 CU 15 kV cable and neutral loot 53 12M $ 9600
Spll[C terminate,elbow;gmul etc OR $5361 $0 $736 splices,elloes,terminations,tape ea[M1 $1. 6 $ ]]0
consul hal al
Replace two(E)o d-mounted transformers 1 $6055 j0 s"01 Mx pads ea[M1 $1W E $ 330
0 0 $D $
$D SD $o $
D 5D D
L.Operanwn Superson : $t% $103
uNe rate In lours
Su preoisia n a Li ne crews 00 N,E31 $0 $
G rl� $BO $78
sell rade ash $
S"duall cd dining,no[i[ex,plan,e[[. 00 $3,305 $0 $
5
$enlw Too
mit rah In hours $U $m $x $
$pI So $0 1 5
$0 $0 O
TeEmlolSwkn"haled : $101 59R $
unRTeln hours
SD So 5
Polim Debris weex Sx O27 1.0 $ E,OE]
r,r,
CY19 Budget 83 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Service Connections Project#: various
(Commercial and Residential)
Project Schedule: Annual Project Manager: John McDonagh,
General Line Foreman
Reason for Expenditure:
To install new and upgraded services for both residential and commercial/industrial
customers in the service territory.
Brief Description/Scope:
This item includes new service connections, upgrades, and service replacements for
residential, commercial, and industrial customers. This represents the time and
materials associated with the replacement of an existing or installation of a new
overhead service drop and the connection of an underground service, etc. This does
not include the time and materials associated with pole replacements/installations,
transformer replacements/installations, primary or secondary cable
replacements/installations, etc. These aspects of a project are captured under Routine
Construction.
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year
Not applicable.
Status Update:
Not applicable.
CY19 Rudga 84 Septe.her 28.2018
CAPITAL PROJECT COST SHEET
PRO3ECTNAME: Service Corrections(Residential/Commercial) SCHEDULE: Cy19
RILD LABOR
MATERIALS/CONTRACTORS
vfim Arai roof
Ya@M nI
pd units � Shaw miul VMltle
SLhtM1I I Ibb unN of
RE65/rA$g lime OT rime OuerUme vin.l.,.RI pESCRII110N annUnit UnF Rale Units TOTAL
unpepteenenc
]mm ertx-unit rate In cages
$6.0.55 $6,]6] $93
Im1a 11 nm a,it upgraded eeMee 13 $)),463 $0 S. Semn nary M1a rtlwa m,satins, per $� 3513.0 $ ]8,9W
connestrons at approprvialy 350 units
Se 50 $1120^of 1/0 31C seMCe wind for earth carVKe
$IW 350.0 $ 35,0]0
$0 $0 $0 se $
$0 $o p $
$0 se 6 $
0 e annann0 $
floe Opentlons 5upervhlpn:
unit rate In M1wxs
$
106 $103
o So
Engineering:
t mte In M1ours $60 $78 5
50 0 $
xnlw Tetl:
unit raceFhours $6i $g0 $3 $
So $0 $o $
$o $o $0
Technical yrv%x Inarg : 5101 596 5
-urate In hods.
So So $
na ocelli l
5 av 5
11
CY19 Budget 85 September 28,2018
CAPITAL PROJECT SUMMARY
Project Name: Routine Construction Project#: various
Project Schedule: Annual Project Manager: Various
Reason for Expenditure:
Routine Construction covers routine activity as well as capital construction projects that
develop during the year including, but not limited to items shown below.
Brief Description/Scope:
• Overhead and underground system upgrades
• Miscellaneous projects
• Pole damage
• Station upgrades
• Porcelain cutout replacements
• Street Light Connections— new equipment installation
• Pole setting/transfers
• Underground subdivisions (new construction)
Barriers:
None anticipated at this time.
Change in Scope of Work From Prior Fiscal Year:
Not applicable.
Status Update:
Not applicable.
CY19 Budget 86 September 28,2018
CAPITAL PROJECT COST SHEET
PRO9ECTNAME: Routine Coonrualon SCHEDULE: criz
RMLD LABOR
veer rural MATERIALS/CONTRACTORS
s
xaumta Ir.10 a0f
.m vbNnp
sI„
Toe
or Time,
rtEM/IpSX Wemme
V 'k .0, , DESCRiP ION Unit Unit Rate Unk, TOTAL
Une DePartmem: 56.655 SAM $9
20
2—oe.-unn rate in weak:
Ounni fanrtruRion 30 10 $1391 $61,668 $1),600 Materia as nexssary $ 200,000
hrert tight LutallNans $35.821 $0 $3,600 Mrtemis u nwea ry $ SQ000
Pole'lla anilers 31 SVN,291 $0 $20.. 0 Memhlx a no, $ 9gW0
Untleiem-d Ccnxtrutin, IS $9 6 $0 $L380 Matenalsas necessary $ 115,000
$o $o Si,
$o 50 ei—ei0
Une OaenNonasuPernnon: St. $to
..It It In nwrs
Cree supernsion 110 51L6]6 $0 5
Initiation,: 580 $Te 5
unit rate F hours
Projttt managemem32D $25.638 $0 $
Sendai
eeen
unk $82 $80 $3 $
unNtaNM hour;
$0 $0 $0 $
$0 $0 $0
Teanbl...kEani 5102 $98 $
unit pate In hours
$o so $
li Dennis week $20$7 530 $ II6229
:rsli ..
CY19 Budget 87 SeptaOher 28,2018
CY 2019 OPERATING BUDGET
ATTACHMENT 3
OPERATING
BUDGET
CY19 Rudgct 88 Scptcmbcr 20,2018
cR , , onn ! RRR ; r
P.
ERR , REAR : ERR ! !
\ §
No 5B
/ (
; R9R , RR9R , l — n
o
: RRR 9RRn , ERR ! ! }
• ERR ! RRop , RRRa � C
A.
© — n ReRR , RRR , ;
N.
\
R -
g / / . Hedd � D Gp :
Tman W Reading,Mm lmx0a
MUngpel LqM Oepedm¢T
Statement 0 Budgeted Revenues and EVenxs
rV1H
FY18 FY18 FY19 Jul 2018-Dec 2010 CY19
Budpet "rad Dueled Examine Budget
Operating Revenues
Beae Revenue 6 26]3],621 5 25]59,146 5 21]¢0,190 5 14,0]1,$45 3 2].]61148
Fuel Revenue 32A91810 31,504,838 33,390,1% 16,18],3" 30,326,893
Purchased"max Cepac"ry Rnamisaion 38088978 39,516,277 37,877,303 18,938,652 3],]56,892
Ferriled Discounts 800,000 829159 833,586 422.148 Oz..
Energy Comervaen Revenue 6]5077 Uid, 05.924 327.952 662001
NAPA ]1200ON) (1,190]56) (12LY1000) 1461,967) (11LU.Po0)
Total Operating Revenues 9],1 Gam 9],206]43 77,3431. 49402,]25 96139,019
Exo es
Pawer Exp¢ns¢m
547
PUNmmdd Poser-Fuel 31,291,810 30159/46 32.190,196 152]8]91 39,126.083
555
PmcbaeN Pwzr-Capi 24476,161 25.608460 22.884 320 12,341,182 22,]08,83]
565 Purdrased Prover-Tra an isatin 13,or 2,817 1].]38,4]9 14W2,983 7.146,680 14967,055
Text 1umM1esed Poser a.Ja..700 69.5061& ]00fi],48H 352fi6,561 a..3,]05
Operating and MaintainExpenses:
5905upervision an Engineer, 90C 777 59],195 10]5,]57 53],6]0 1093959
SBi ,.mvdC.ZRoom Operators 500570 0¢9,410 502112 251,056 481,952
.2 games IN. 392932 152.380 504,300 252150 522365
Ni Line General Lebpr 24,818 12409 g0,308
.5 Shed Lighting 111146 145,677 136,060 68@0 50722
500 M¢br G¢ne21 200,412 224,"1 211933 10645] 21],303
500 Me4reb Management 3]9,313 53].523 "0,005 220.Po3 442,Ofi1
me Mei to enw d Sed uses and Equipment 10,500 08]51] -
593MainlenanceWOps-Overhead 1058,2]6 12]10]0 ]03 38 391,771 000,537
593 Mainlenanw dLines-Tree Tramming 806310 627962 B86065 "9,433 0995th
594 Meinlenanceou-Z -Undergrcund 197 W2 fi2790 4.1. 212,199 577,42]
595 Mainlen anw d Line Tmndormem 300Po0 146926 300977 150 No IO64W
OR: Main len add d Bnem Light and Si Singer 45M 13936 -
$HB Gne General Leave lame Lebar 50000] 236,8" 118422 283298
Total Operzting and Maintenance Expenses 5,509029 5452,807 5,5993. 2]77,677 50360"
General d Administrative Eve-
.2 MNor RCading 374. 32,189 31]41 15,0]1 ."Oh
50.3 Cutlomer CCNtlbn 977024 1642009 1114077 551439 1,154199
.1 UncoM¢lible Accounts 1500. 09142 105000 52.500 105,00
elft lntegmled Resources 5.,232 50,77] .5 7`1
24],777 5..50
916 Energy Consomme- 952.565 673"2 975712 4137, 8.,110
920 MmidaneW¢and Coming Saltriea 1,98321] 10]5,182 1080477 .4.246 20.,253
921 Otter,Supplies 25.0 B,We IDD. to... 20.0
9230utaid¢$eMcea-Legel 471 a. $0,570 467900 233850 Me.
9230utaide$er iwLCareacl -niew2]1,.1 3"000 1]20. 3057.
923 Outside Sas-Edubon 2.fi91 123.2 243093 121917 243.893
924 Pro p.,Insurance 4272. 330]10 @62. 213,100 420,200
9251nryraes and Damages -T13 08,221 41"9 23.725 56411
926 Employee Pensions and Jerome 3000,431 2,980459 3]]2,990 1,886495 3,581,615
930 Mls¢Xenea s General Expense 456.4 457414 4&5659 242,829 483477
.1 Tom Expense 21200 198.639 212.000 IO6o00 2120.
933 id Time Expense 391,116 288.595 311200 155 NO 3112W
933 VeOide Expense-Capital Ckamg Pi 596) (337 360) Doi (142220) (253302)
935 MeinhTaOce d General Plant 2018. 30191fi 335140 101574 385,003
935 Meinlenenceal Guiding BGarege 074195 11 21N
891195 418,$77 996,80
Tobl General B Admimstmve Expenses 1073/032 0,979779 119907]7 5775389 12.224072
Other Oidem ng Expenses:
403 Gathered a 4,362,000 4,305.779 4516Po0 2232000 4521,.0
4.Vduntery Pa m-,$lO T.-a 1500000 1097.473 1,569708 701,095 1,570.801)
Total Other EsPena¢a 5.062000 5003452 6111 3,016095 601
(Rover,lnwme 5.641550 6404403 5111 2404094 51CO.
Nan OpereSng Revenues(Expenses)
4191ntemat Income 150.0. 102477 2500Po 125.0 175.0
4190"er Income N.C. 10]7202 850000 425.0 850077
420 Vtlund"PILOT Payment to Reading (2.4204.) R01a 170) (2400500) (1240,253) (200,506)
425 Lasf on 0ifpoaal " d NOT
1fiJ,016) [150,0.) V,ON) (100.0)
I31
Interest Expense J2.1.1 00290) G6.0) (0.01 116ON)
Total Nw Opens,Revenues(Expenses) (1532,a.) (I 04,148) (1$15506) (773 253) (1 571,506)
Net Income $ 4,114622 E 5,230251 6 4053232 0 18311831 5 3,529,59E
CY19 Budget 90 Septernher 28,2018
§ \
8888
-
§
) \ \ \ / \ \ � \ } {/ \ \ { ) \ \ \( � §
gea
. / \ ! l22R/k5%2}\2©//JR22R/G / 4 ) }
2§\%»\\//QJ&//\ \ § § /
: j / ! \ E39/22&2\/§)\j
\\ /\/§�/\\§£2222° ) \ ( }
J//2»\
lzeee�\ sae..& &\ \ 6»\2\\2»/}\\\2k\%\ ( \ \ (
-
) } } } } }}}}}}\}}}\\ ; }! }
} \ \ \ } \\\\\\\\\\\\\\\\\\\\\j ` } } }
Description of RMLD's Power Supply
Stony Brook Intermediate Unit
The Stony Brook Intermediate Unit is a 354-megawatt, combined-cycle power plant that
entered commercial operation in 1981.
The unit's three gas turbines generate electricity using either No. 2 oil or natural gas,
with additional electricity produced using a single steam turbine in the combined-cycle
process. MMWEC completed construction of a natural gas pipeline to serve the
Intermediate Unit in September 2002. The RMLD has a Life of Unit (LOU) entitlement
for 14.453% of the unit or approximately 51 Mws. The WILD has paid off the debt
service associated with this project.
Quick Facts— Stonybrook Intermediate Unit
Location Ludlow, Massachusetts
On-Line Date 1981
Fuel No. 2 oil/natural gas
Principal Owner/Operator MMWEC
Total Capacity 354 megawatts
Stony Brook Peaking Unit
The Stony Brook Peaking Unit is a 172-megawatt peaking plant that entered
commercial operation in 1982.
The unit's two turbines generate electricity using No. 2 oil. The RMLD has a Life of Unit
(LOU) entitlement for 19.516% of the unit which is equivalent to approximately 33 Mws.
The RMLD has paid off the debt service associated with this project.
CYI9 Budget 93 September 28,2018
Quick Facts—Stonybrook Peaking Unit
Location Ludlow, Massachusetts
On-Line Date 1982
Fuel No. 2 oil
Principal Owner/Operator MMWEC
Total Capacity 172 megawatts
Braintree Electric Light Department -Watson Unit
The simple-cycle gas fired plant is powered by the first two Rolls-Royce Trent 60 gas
turbines built for the U.S. power generation market— known as Watson Units#1 and #2.
The units entered commercial operation on June 23, 2009.
Both Watson Units are bid into the ISO New England markety system daily and are
dispatched based on their bid price.
The units two turbines generate electricity using natural gas, with No. 2 ail as backup
fuel. The RMLD has a 20 year entitlement for 10% of the unit which is equivalent to
about 10 Mws.
Quick Facts—Watson Unit
Location Braintree, Massachusetts
On-Line Date 2009
Fuel Natural gas/No. 2 oil
Principal Owner/Operator BELD
Total Capacity 100 megawatts
Seabrook Station
Seabrook Station is a 1,244-megawatt nuclear generating plant located in Seabrook,
New Hampshire. An operating license for Seabrook was issued in 1986, but the plant
did not begin commercial operation until 1990. The principal owner and operator of
Seabrook Station is NextEra Energy Resources LLC, a subsidiary of Florida based FPL
CY19 Budget 94 September 28,2018
Group, Inc. NextEra owns 88.2% of Seabrook Station. The other owners are MMWEC
(11.59%) and two Massachusetts municipal utilities, the Taunton Municipal Lighting
Plant (0.13%) and Hudson Light& Power Department (0.08%).
NextEra has announced plans to seek an extension of its Seabrook operating license
from the current license expiration of 2030 to 2050. RMLD signed 3 different projects to
finance Seabrook, Mix 1, Project 4, and Project 5. The debt service associated with
these projects will be paid-off in 2014, 2017 & 2018 respectively. The RMLD has a Life
of Unit (LOU) for 0.635% or approximately 8 Mws of the unit.
Quick Facts—Seabrook Station
Location Seabrook, New Hampshire
On-Line Date 1990
Fuel Nuclear— Pressurized Water Reactor
Principal Owner/Operator NextEra Energy Resources, LLC
Total Capacity 1,244 megawatts
Millstone Unit 3
Millstone Unit 3 is a 1,237-megawatt nuclear generating plant located in Waterford,
Connecticut, Millstone Unit 3, which began operation in 1986, is the newest and largest
of the Millstone Station's three nuclear units, one of which is retired from service. The
principal owner and operator of Millstone Station is Dominion Nuclear Connecticut, Inc.,
a subsidiary of Virginia-based Dominion Resources, Inc. Dominion Connecticut owns
93.4% of Millstone Unit 3.
The Nuclear Regulatory Commission (NRC) on November 28, 2005 approved Dominion
Nuclear Connecticut's request for a 20-year operating license extension for Millstone's
Unit 3 reactor. The license now expires in November, 2045. RMLD signed two different
projects to finance Millstone#3, Mix 1 and Project 3. The debt service associated with
these projects will be paid off in 2014 & 2018 respectively. The RMLD has a LOU
agreement for 0.404% of the units which equates to approximately 4.6 Mws.
CY19 Budget 95 September 28,2018
Quick Facts —Seabrook Station
Location Waterford, Connecticut
On-Line Date 1986
Fuel Nuclear— Pressurized Water Reactor
Principal Owner/Operator Dominion Nuclear Connecticut, Inc.
Total Capacity 1,237 megawatts
New York Power Authority (NYPA)
The RMLD receives inexpensive hydroelectric power from the NYPA. RMLD receives
capacity and energy from this contract. The Massachusetts Department of Public
Utilities (DPU) has appointed MMWEC as the administrator of this contract. The current
contract expires in 2025.
Hydro-Quebec Interconnection
The Hydro-Quebec Interconnection is an approximate 2000 Mw, direct current electric
transmission line connecting central New England with the Canadian utility Hydro
Quebec. Construction of the U.S. portion of the interconnection, which stretches from
Groton/Ayer, in Massachusetts to the Canadian border in northern Vermont, was a joint
effort of many New England utitilies. The RMLD receives approximately 4.5 Mws of
capacity from this contract.
Shell Energy
In November, 2014 the RMLD signed a system power contract with Shell Energy that is
effective from January 1, 2015 through December 31, 2018. The RMLD receives enery
only from this contract. The amount of energy purchased Fluctuates on a monthly basis
for both the on-peak and off-peak period. RMLD has secured fixed pricing for this
contract.
CY19 Budget 96 September 28,2018
Exelon
In May, 2015 the RMLD signed a system power contract with Exelon that is effective
from January 1, 2016 through December 31, 2019. The RMLD receives energy only
from this contract. The amount of energy purchased Fluctuates on a monthly basis for
both the on-peak and off-peak period. RMLD has secured fixed pricing for this contract.
EDF Trading
In June, 2016 the RMLD signed a system power contract with EDF Trading that is
effective from January 1, 2017 through December 31, 2018. The RMLD receives
energy only from this contract. The amount of energy purchased fluctuates on a
monthly basis for both the on-peak and off-peak period. RMLD has secured fixed
pricing for this contract.
NextEra
In June, 2016 the RMLD signed a system power contract with NextEra that is effective
from January 1, 2019 through December 31, 2020, The RMLD receives energy only
from this contract. The amount of energy purchased fluctuates on a monthly basis for
both the on-peak and off-peak period. RMLD has secured fixed pricing for this contract.
NextEra
In December, 2017 the RMLD signed a master agreement as well as a Transaction
Facilitation Agreement with NextEra that enables RMLD to leverage NextEra's trade
floor. RMLD approved a Risk Management Strategy that secures transactions based
on price and time triggers. The Risk Management Strategy will permit RMLD to take
advantage of price opportunities consistently over the next several years and beyond.
This strategy will allow RMLD to secure monthly quantities that are below the four year
average versus locking in annual quantities. Additionally, the strategy of utilizing time
triggers will smooth out variations in the market over time.
Eagle Creek Energy Holdings
In March, 2011 the RMLD signed a purchase power agreements with Swift River Hydro
LLC for the output of four hydro systems located in Massachusetts that are effective
from February 1, 2011 through January 31, 2026. The Swift River Trading Company is
the lead market participant for and represents these hydroelectric generators with a total
nameplate capacity of approximately 7 Mws and average annual generation of 25,000
megawatt-hours per year.
These facilities include the Woronoco Hydro facility in Russell, MA, Pepperell Hydro in
Pepperell, MA, Indian River Power Supply in Russell, MA, and Turners Falls Hydro in
CY19 Budget 97 September 28,2018
Turners Falls, MA. Each of these facilities is owned by a special purpose entity, e.g.,
the Woronoco facility is owned by Woronoco Hydro LLC. In 2016, Swift River Trading
Company assigned the projects to Eagle Creek Energy Holdings. The four facilities are
now managed by the Eagle Creek Energy Holdings as the lead market participant for
each of the facilities. RMLD is the only buyer.
• Pepperell Hydro: 15 year term beginning on February 1, 2011 and ending
January 31, 2026. RMLD is purchasing all of the products produced by or
attributable to the facility. The facility has a nameplate capacity of 1.9 Mws. The
products include, but are not limited to, Energy, Installed Capacity, Ancillary
Services, Renewable Energy Certificates and Environmental Attributes (to the
extent not included in the RECs). The contract price for these products is
$100/Mwh for the first year, escalated 2.25% thereafter.
• Woronoco Hydro: 15 year term beginning on February 1, 2011 and ending
January 31, 2026. RMLD is purchasing all of the products produced by or
attributable to the facility. The facility has a nameplate capacity of 2.7 Mws. The
products include, but are not limited to, Energy, Installed Capacity, Ancillary
Services, Renewable Energy Certificates and Environmental Attributes (to the
extent not included in the RECs). The contract price for these products is
$100/Mwh for the first year, escalated 2.25% thereafter. The facility is not
currently qualified for FCM. Until the Seller qualifies the facility for FCM the
contract price is reduced by $5.00/Mwh.
• Turners Falls Hydro: 15 year term beginning on February 1, 2011 and
ending January 31, 2026. RMLD is purchasing all of the products produced by or
attributable to the facility. The facility has a nameplate capacity of 1 Mw. The
products include, but are not limited to, Energy, Installed Capacity, Ancillary
Services, Renewable Energy Certificates and Environmental Attributes (to the
extent not included in the RECs). The contract price for these products is
$100/Mwh for the first year, escalated 2.25% thereafter. The facility is not
currently qualified for FCM. Until the Seller qualifies the facility for FCM the
contract price is reduced by $5.00/Mwh.
• Indian River Hydro: 15 year term beginning on February 1, 2011 and
ending January 31, 2026. RMLD is purchasing all of the products produced by or
attributable to the facility. The facility has a nameplate capacity of 1.4 Mws. The
products include, but are not limited to, Energy, Installed Capacity, Ancillary
Services, Renewable Energy Certificates and Environmental Attributes (to the
CY19 Budge[ 98 Sep[emb,28,2018
extent not included in the RECs). The contract price for these products is
$100/Mwh for the first year, escalated 2.25% thereafter. The facility is not
currently qualified for FCM. Until the Seller qualifies the facility for FCM the
contract price is reduced by$5.00/Mwh.
Collins Hydro
In August, 2013 the RMLD signed a purchase power agreements with Swift River Hydro
LLC.for the output of Collins Hydro located in between Ludlow and Wilbraham
Massachusetts. The contract with Swift River Hydro is effective from September 1,
2013 through August 31, 2028. The RMLD receives enery only from this contract. The
average annual generation is approximately 51667 megawatt-hours per year.
Pioneer Hydro
In August, 2013 the RMLD signed a purchase power agreements with Ware River
Power Inc. for the output of Pioneer Hydro located in Ware, Massachusetts. The
contract for Pioneer Hydro is effective from September 1, 2013 through August 31,
2028. The RMLD receives enery only from this contract. The average annual
generation is approximately 4,480 megawatt-hours per year.
Hoisery Mills Hydro
In March, 2014 the RMLD signed a purchase power agreements with Silver Street
Hydro Inc. for the output of Hosiery Mills located in Hillsborough, New Hampshire. The
contract for Hosiery Mills Hydro is effective from March 1, 2014 through February 28,
2034. The RMLD receives enery only from this contract. The average annual
generation is approximately 2,046 megawatt-hours per year.
Aspinook Hydro
In August, 2016 the RMLD signed a purchase power agreements with Aspinook Hydro
Inc. for the output of Aspinook Hydro located in Connecticut. The contract is effective
from August, 2016 through August, 2017. The RMLD receives enery only from this
contract. The average annual generation is approximately 9,300 megawatt-hours per
year.
CY19 Budget 99 September 28,2018
Saddleback Ridge Wind
In December, 2013 the RMLD signed a purchase power agreement with Saddleback
Ridge Wind, LLC for the output of Saddleback Ridge Wind located in Carthage, Maine.
The contract for Saddleback Ridge Wind is effective from January 1, 2015 through
December 31, 2035. The RMLD receives enery plus all attributes this contract. The
average annual generation is estimated to be approximately 15,820 megawatt-hours
per year.
Jericho Wind
In November, 2014 the RMLD signed a purchase power agreements with Jericho
Power, LLC for the output of Jericho Wind located in Berlin, New Hampshire. The
contract for Jericho Wind is for 20 years. The project went Commercial December,
2015. The RMLD receives energy plus all attributes from this contract. The average
annual generation is estimated to be approximately 10,788 megawatt-hours per year.
One Burlington -Solar
In March, 2015 the RMLD signed a purchase power agreement with CREECA Energy
LLC for the output of 2,000 kW AC solar array located at One Burlington Ave.,
Wilmington, Massachusetts. The solar array went on-line in November, 2015. The term
of the contract for One Burlington is effective for ten years. The average annual
generation is estimated to be approximately 3,450 megawatt-hours per year.
Altus Power— Community Solar
In March, 2016 the RMLD signed a purchase power agreement with ECA Solar LLC for
the output of 1,000 kW AC solar array located at 326 Ballardvale Street, Wilmington,
Massachusetts. The solar array went on-line in June, 2017. In May, 2017 the contract
was assigned to Altus Power America, Inc DBA WL MA Solar LLC. The term of the
contract for WL MA Solar LLC is effective for twenty years. The average annual
generation is estimated to be approximately 1,700 megawatt-hours per year. RMLD
has developed a Community Shared Solar program called Solar Choice. This project is
RMLD's first Solar Choice project and is fully subscribed by 500 residential customers.
CY19 Budget 100 September 28,2018
Kearsage—Community Solar
In October, 2017 the RMLD signed a purchase power agreement with Kearsage
Wilmington LLC for the output of 1,800 kW AC solar array located at 40-50 Fordham
Road, Wilmington, Massachusetts. The solar array went on-line in February, 2018.
The term of the contract for Kearsage Wilmington LLC is effective for twenty years. The
average annual generation is estimated to be approximately 2,376 megawatt-hours per
year. This project is RMLD's second Solar Choice project and is fully subscribed by 617
residential/commercial customers.
Energy Storage— NextEra
In December, 2017 (RMLD) was recently awarded a $1 million grant for the installation
of an energy storage unit at its North Reading substation. The grant is funded by the
Department of Energy Resources (DOER). RMLD's project consists of installing a 5-
megawatt Lithium Ion Battery unit at its North Reading substation to reduce peak
demand, thereby lowering future transmission and capacity costs related to the
purchase of wholesale electricity, The battery unit will be co-located with RMLD's new
2.5-megawatt Distributed Generator. RMLD is negotiation an Energy Storage
Agreement with NextEra. The Energy Storage unit is expected to be on-line by
December, 2018.
CY19 Budget 101 Scpmrab,,28,2018
POWER SUPPLY REPORT
AUGUST 2018
ATTACHMENT 4
Vf
L
O 0o N
y Q
y N o
= co
d
mom
myo O
� co
u a
yy N
L O v
rn
}� o
V CL
O c a
a 09
m
d
T
O
M C
QO ^ �p
N N ^ `
N y
Y
O
Ol
d
v 3
O p
J N
y p n co ^ �
a CJc � P K
1 L N N
r �
ON
d y
H `o �3 0
N O C i
N 3
— v
a c O
P ;
U
N N r
y
M
Lr 'Q h Lq h N N N d
N N N N N N N d 3
3 �
� p
J
O �
.n.CP
r �N
a
N
M
N
N
N
r
N
O
N
P
O O
n
� ^ 7
O o Q
~ ^ P
U C d 1^ N
N L
I
00 n
N v
Q1 t N r -+
Y Q O N c � >
aCL P
� O
N_
� OI
�O Q
N N
r
v I
M
N
r
O O O O O O O O
O O O O O O O O
N M P N LO M
N N t? N VT
N VT K
N
Cl)
N
N
N
r
N
O
N
P Go
r r
r �
r Q
O o
` w C4
4 N
to U QO M
a a O0 N
N 7
'q-
C4 �O
� � Y o o M
O N P
baa co
On :o
r
N ,o OI
L a
a
M
N
O O O O O O O O O
O ON
M C O C C C C C
m r
R M N N r N N
To: Coleen O'Brien
From:, MMaureen McHugh,Jane Parenteaull
Date: 'U October 5, 2018
Subject: Purchase Power Summary —August, 2018
Energy Services Division(ESD)has completed the Purchase Power Summary for the
month of August,2018.
ENERGY
The RMLD's total metered load for the month of August was 73,231,334, which is a
14.10%increase from the August,2017 figures.
Table 1 is a breakdown by source of the energy purchases.
Table 1
Amount of Coal of %of Total Total S $as a
Resource Energy Energy Energy Costs %
(kWh) ($/Mho)
Millstone P3 3.633.830 $6.38 090% $23.178 873%
Seabrook 5,891,705 $592 7.95% $34,879 1.10%
Stonybrook lntermsakee. 2.652.986 $36.19 3.58% $96,018 3.02%
She Energy 13,384.200 $58.50 18.06% $782,997 24.59
NYPA 2,373,457 $5.33 320% $12.648 0.40%
Nextera 9,055,000 $35.23 1222% 5319,022 1002%
ISO InterC4nge 7,410,984 S74.95 10.00% $555.428 17.44%
Name Con,shon $000 000% 462.970 .1.98%
Coop Resales 21.09 $148.31 003% $3.116 0.10%
EOr 8.557.600 $33.38 1155% $285,682 8.97%
Hydro Protects' 5,093,998 $73.75 8.871/6 $375,692 11.80%
Braintree Watson unit 405,114 $95.90 0.55% 539.850 1.22%
SaddtebacklJehorc Wind 1,121,798 $87.79 1.51% $98.481 309%
Community Solar 789,038 $73.11 i.W% $58227 1]7%
Exelon 13,658,400 $40.09 1843% $547,618 1120%
StonyWook Peaking 89.775 $193.52 0.12% $17,373 0.55%
Monthly Total 74,118.892 $42.96 100.00% $3.184,239 197.00%
•PePPresifi Woronow,kW/an R7ker,nhh r Falb,Coulns,P/onw,Hoskery Use,ASP/nook Hydro
Table 2 breaks down the ISO interchange between the DA LMP Settlement and the RT
Net Energy for the month of August,2018.
Table 2
Amount Cost %of Total
Resource of Energy of Energy Energy
(kWh) ($/Mwh)
ISO DA LMP16,369,871 $46.84 22.09%
Settlement
RT Net Energy" (8,958,886) $23.15 -12.09%
Settlement
ISO Interchange 7,410,985 $74.95 10.00%
(subtotal)
Indepen4enl System Operator DayAhea4 Localional Marginal Price
AUGUST 2018 ENERGY BY RESOURCE
,.�'�Y�eok n4 1_ar,ho min
4 11(,11
$c1UN,geCs
1 W'✓,
cm1115vk s.onvbrook,:u��
Exelon
i /95K
ldh3%
v:UieWck '
dk lJ
Shod enersY
td ocw
FIIF
Coat/ xee�s 1155%
U UYK HydraPr',
Sd/Y, Nuxlma
ISin:r.u.hanir 1'�_
iO Ut✓K
IUYVN
i 4111
CAPACITY
The RMLD hit a demand of 163,635 M, which occurred on August 29, at 3 pm. The
RMLD's monthly UCAP requirement for August,2018 was 233,628 kWs.
Table 3 shows the sources of capacity that the RMLD utilized to meet its requirements.
Table 3
Source Amount(kWs) Cost(SlkW-month) Total Cost$ %of Total Cost
Millstone N3 4,950 22.76 $112,682 625%
Seabrook 7,914 911 $74088 3.99%
Stonybrook Peaking 24,980 2.00 $49,857 2,76%
Stanybrook CC 42,925 3.35 $143,921 7.98%
NYPA 0 0.00 -$48,921 -271%
Hydro Quebec 0 0 -$43,886 -243%
Bnontree Watson Unit 0 0.00 -56.189 -0.34%
ISO-NE Supply Auction 152,859 9.97 $1,524,662 84.51%
Tale] 233,628 S7.72 $1804,194 100.00%
Table 4 shows the dollar amounts for energy and capacity per source.
Table Castor
%.I Amtal Energy Power
Resource Energy Capsay Total cost Total Cast (kWh) (S*Wnl
Millstone 43 $23.178 $112.682 $135,859 2.72% 3,633.830 00374
Seabrook $34,879 $72.068 $106,947 2.14% 5,891,705 00182
Stonybrook Intermediate $96.018 5143,921 $239.939 481% 2,852.986 0.0904
Hydr Quebec 50 843886 $43.886 -0.W% 0.0000
Shell Energy $78$997 $0 $782997 1570% 13.384.200 0.0585
NextElalEDF $319,022 SO 5319.022 640% 9.055.000 0.0352
e NYPA $12648 -548,921 436,274 -073% 2,373,457 0.0153
ISO lottecharge $555,426 51,524,662 $2,086,090 4170% 7.410.984 0.2807
Nem.C9ri,,niven 462,970 $0 -$62,970 -1.26% OWN
EDF 5285,662 $0 $285.682 5.13% 855IWO 0.0334
e Hydro Projects $375.692 $0 $375.692 7.53% 5,693,996 0.0738
Braintree Watson Unit $38,850 $6,189 $32,661 0.65% 405.114 0.0806
Sadd1ab8ok7Jeriel10 $98.481 $0 SMA81 1.97% 1,121,798 0.W78
e Burlington a Community Solar $56,227 $0 $58,227 113% 769,038 0.0731
Coop Resales $3,116 $0 $3.116 0.06% 21 Gas 01483
Exelon Energy 5547618 $0 $547.618 1098% 13,858,400 00401
Stonybrook Peking $17,373 $49.857 $67,230 1.35% 89,775 07469
Monthly Total $3,184,239 $1,904,194 $4,988,433 100.00% 74,118,892 00673
*Renewable Resources;per HAILD Board Pont,any NEG are sold to offset energy costs for all customers.
RENEWABLE ENERGY CERTIFICATES (RECO
Table 5 shows the amount of banked and projected RECs for the Swift River Hydro
Projects through August,as well as their estimated market value.
Table 5
RECs Summary
20018
REC RECs RECs BID Revenue' Revenue'•
Classification Protected Sold Current Potential Rece'Med
at 8,047 3.684 375 $30,194 $28,589
MA 2088, 1,033 375 57,621 $7,649
NWa/RI/RHI 13.606 6,724 375 $51,023 $50,09D
MA/RI/NH1 7,318 3,654 3.75 $27,443 $27,222
MA 4,256 2.115 25.00 $106,400 $54,403
Totals 35,312 17,410 $222,860 $167,952
'RECs proleetecl 3016 at cumnt EW prinks
"Tout doRan to date for REG fold
TRANSMISSION
The RMLD's total transmission costs for the month of August,2018 were$1,352,807.
This is a decrease of J2%from the July transmission cost of$1,362,656. In August,
2017 the transmission costs were$1,414,026.
Table 6
Current Month Last Month Last Year
Peak Demand(kW) 163,635 152,472 140,722
En.,,(kWh) 74,118,892 72,638,493 62,759,403
Energy($) $3,184,239 $2,841.176 $2.548,801
C-0.6ty($) 51,804.194 $2,049.586 $2053.870
Transmission($) $1,352.807 $1,362,656 $1,414,026
Total $6,341240 $6,253.418 $6.016.497
ENGINEERING & OPERATIONS REPORT
JULY AND AUGUST 2018
ATTACHMENT 5
N
c
O
•— c
MIN= O
C:
L � a
O
CL oCD
C 00 a
O O O c N
O N N 0 C
� O)
LU06 m
O � o O
U
O
o m O
O Q
•- L T
L 0
W
^ @ ! § e ¥ qEq ¥ ■ km \ f § e ■ d
& & ® ; > BB ) fm ■ 9m ■ n :
• ; # § ' ! 4 ! } 5 § # # § im5 ' § / § ! m § §
■ ¥ \ # ! G & " ; ' 4m " ' " # & ■ ' 4
ee » m2
f [
� � ; : J ■ ; <
o -
/ § : { < \ } ■ ) r 0000 0 as 0 0 a
D0 : /
— CL
E =
0 ` / / _ C } 2 o
3 u ! » . _ A
i £ { !
} \ { / ) ) \ , o ! \ / ! | k \ )
_ 20M25a0 ;
& _ | ] 7f i « } } ; {
0M2
\ 0
0a- 2 3 1 \ l � � � J0 { { { \ { /
. . | & � , ; . # # ! , ! !
\ \ eflz ! ! # « # - � # , ° {
k \ \ \ \ / \ \ ) \ ( { { \ \ \ \ /
nar ! n@m : ^ m : Rnel , BeeRem �
O M N V O 00 00 N 00
N O rl n 01 I�
N ry .y V tp
.-1
N M 00 01 V1 00 I�
Ol M O
� N h � N •m-1 V
N H M a N an n N
N H h O N 00 00 W W
N J eti tp w a Ci
M V N N
0 C
Q
LS V
^� N
LL C
Q 3
y v_ J
V{J Q O
CP a 3
c
.50 Z
Ly O
1 ` r 2 a
v
W c
^ ° 0 a
p m�o za �
v
u a a v
m � z � E'
c
C m C d N 2 J a NC. N fO C
N C U
.m m 0 N N j
d d N N CO o ]
o •o v3 m W `o � fzf .c
a O a
rim,
o �
vi o vi
h = h v
d
s $o
o � w
a
„ � a
H
N
~ N o Q w
8 n W C
a Q
LLL. (�. M 0 J n
Q H
c �... N
O O
m
3
D L co
O u N
N �
� C
� � N
� O
:c m
U � O
� C C
a 3
u n;
C
N d
N
s � 3
� 3
v ro
Q s 3 3
C v o x
O J
r Gam° N v 3 Q �
H 15 h W U
w• J P � v� � J O
m
6 a
8 r U `u C o
oE m
G1 i oap� m � o m U E
C
CL•� U O C N = v C N
(D n
ve3N U a
�. co C N C `U 3 O
Q O o < 3 m C. c O
c L O � 3 C E
U C a
U C C o
E E C a ON N
N a � 'd E
C a N N Q nLr� ^' C U
c
CL d
1 1 1 1 1
+ �
\ } /
< \ \ \
\ \ t
. )
\ ( 5
) } /
/ 2 \ \
CL
\ \ ) «
\ \
E U ± 2 o ± — c
� \ \ \
�
2 4 r
\ § 2 \ { � {
E ® 0
■ a ■
v
0
d16
R
QCZ
p
O C !? C >
o 0 O I a
Q > 70
cm
0 0
�
C) o z° 3
N
3
O U
§/ . . . . . . . . . . . . . . . �
}, . 0
,!() )
! � ! �
§ !
/
. f
) i § � � § \ � | f! ) | } � � 12
� ) - - -
2 & - �
zk
0 z (
! !
)31
E ( \ § � \ \ _ |
| | 0 , ] K) .
§ !w ` ! ' $ ` $ |
.
E � (
\ i .
! ! -
!
! $ < $2
o
mpg Illllll
111111 1 1 i � �
o uU o ee
ffl }90 $g9 OI
� N
N S _
y m me
C
m a o
� 8ara8ss � � ' 889838888
•� o 0o a ede
O L
N y ZpU4 +�i55 O
0
a gt i2 °
:ads o
=a o
a 8
z
e o 3 a m o 0
� m
N a`r o
N -EE
7 x
0
00 3
V c
N
m
u x
a � €
77
cam•
c
0
}
N
RMLD PROCUREMENT REQUEST
REQUIRING BOARD APPROVAL
ATTACHMENT 6
gy/ � NrovrPa.oigha Dea m
ent
RMLD ors
�..� 230 Ash Sten
P.O.Box 150
Reeding,Wi 01867-0250
Td(781)966-1340
Fn:(781)962-2409
Web:.ww.mdd.ev.
October 10,2018
Town of Reading Municipal Light Board
Subject: IFP 2019.03 Cooper Power Systems Meters and Equipment for
AMI Mesh Network System Expansion and Migration
Pursuant to M.G.L c. 164§ 56D,on September 26,2018,an invitation for proposals(IFP)was placed as
a legal notice in the Middlesex East section of the Daily Times Chronicle requesting sealed proposals for
Cooper Power Systems Meters and Equipment for RMLD's AMI Mesh Network System Expansion and
Migration.
An IFP was sent to the following company:
Cannon Technologies, Inc.,an affiliate of Eaton Corporation plc dba Eaton
One sealed proposal was received from Eaton.
The sealed proposal was publicly opened and read aloud at 11:00 a.m., October 9, 2018, in the Town of
Reading Municipal Light Department's Audio Visual Spurt Room, 230 Ash Street, Reading,
Massachusetts.
The proposal was reviewed,analyzed,and evaluated by staff and recommended to the General Manager.
Move that IFP 2019.03 for Cooper Power Systems Meters and Equipment for the AM[ Mesh
Network System Expansion and Migration be awarded to Cannon Technologies, Inc.,an affiliate
of Eaton Corporation plc dba Eaton for$274,380.00,pursuant to M.G.L. Chapter 164 § 56D, on
the recommendation of the General Manager.
The Miners and Equipment will be purchased as budgeted in the FY 19 and CY19 Capital Budgets.
N
'Alleva
Hamid Jaffa
—K�Al
Coleco O'Brien
File IFP2019,3/&,ardletterand Analysk/&,xrdletter
Y
q c
�p O
5 N
C W
R
O
H b
C O N
N p p
X 8 8
W n q O C
v E v ry g 8
a
Y O
L N N
N a U
d - p
C N J O O N
a ry N
M
Q - N
W O
v e m O
C p
A m p
d _ S
f p 8
N �
N q p
8 88
E o N m
a ry a
y a Y
a V Y
a` a`
m � �0
of
0
N
a ,m,
LL_ C
N f
N � 4
N
T a �
a T C W
BOARD MATERIAL AVAILABLE
BUT NOT DISCUSSED
! §!r
;!! !,
V. G.
( N-.n
� . .
�) , . ., _;. �., •.; •., ;..
I ", . , ., . . •.! _ : „ _ , , ..
, |] ! |
From: Tracy Schub
To: RMID Board Members Group:'Wye Menne (Daydhennew0ama rom)"
Subje : AP and Payroll Questions for 10-18-18 Board Book
Date: Tuesday,October 16,2018 6:42:00 AM
Good afternoon,
AP:
On September 14th the Commissioner asked what the inter-office messaging 'Slack'
is.
On September 21s1 there were no Commissioner questions.
On September 28th there was a Commissioner question about legal fees.
On October 5th there were no Commissioner questions.
On October 12th there were no Commissioner questions.
Payroll:
On September 4th there were no Commissioner questions.
On September 17th there were no Commissioner questions.
On October 11t there were no Commissioner questions.
On October 15th there were no Commissioner questions.
This e-mail will be included in 10-18-18 Board Book.
Tracy Schultz
Executive Assistant
Reading Municipal Light Department
230 Ash Street. Reading. MA. 0186