HomeMy WebLinkAbout1974-05-13 Board of Public Works Minutes i
May 13, 1974
Meeting of the Board of Public Works opened at 7:00 P.M.
at 195 John Street, Municipal Incinerator . Chairman Blood,
Secretary Reed, Board Members Price and Russell and Superin-
tendent Louanis met in Room 16, Municipal Building at 8:00
P.M.
Minutes of the previous meeting were accepted as read.
Town Counsel Donald Connors appeared before the Board
and there was a discussion relative to the Grolier property.
The Superintendent was later directed to contact Town Counsel
and request a written opinion as to the proper legal ground
the Board of Public Works has to resolve the drainage problem
caused by the construction of the building and parking area by
Redstone Realty Trust.
Read Notice of Public Hearing regarding Petition of the
Municipal Light Department to install conduit and locate and
maintain poles, as follows:- "Washington Street, southerly
' side of street, install 1 - 2" steel conduit from existing
manhole 17.5' to property line at 145 Washington Street and
relocate one aluminum street pole and base 4' westerly and
install 1 - 2" steel conduit 9.5 ' to existing manhole.' No
one attended the Hearing. The Hearing was closed. It was
moved, seconded and voted to allow the Petitioner to install
the conduit and locate the aforementioned poles .
Read Petition from residents of Deborah Drive for Sani-
tary Sewer . Mr . DiGiovanni represented his neighbors and out-
lined the problems in his area. Following a brief discussion
the Chairman advised Mr. DiGiovanni that there was no possible
- way the sewer could be constructed in Deborah Drive this year,
and that another week would pass before a policy decision could be
made with regard to the sewer construction schedule. Mr. DiGiovanni
will be notified when this has been accomplished.
The Board met with Mr. and Mrs . Paul Martins of 55 Martin
Road. Several household items were displayed showing discolor-
ation allegedly caused by the supply of water to the Martins
home. One item was left to be analyzed. It was agreed that
the Martins would be contacted at a later date when further
information was available.
Reviewed Change Order No. 5 from Fred DeLisio and Co. ,
Inc. Contract for Construction of Sludge Collection Facilities.
It was moved, seconded and voted to accept the net decrease
change in the Contract Price in the amount of $214.03•
The bids for materials were reviewed and it was moved,
seconded and voted to award bids in accordance with the recom-
mendations of the Superintendent, as follows:
Nyanza, Inc. . . . . . . . . . . . . . . . . . .Liquid Chlorine. . . . . . . . .$ 14.25 100#
Crystal Chemical and Pkg. . . . . . .Sodium Mypochlorite. . . . . 0.42 gal .
E & F King & Co. Inc. . . . . . . . . . .Ferric Chloride. . . . . . . . . 12.85 100#
Caustic Soda. . . . . . . . . . . . 7.80 100#
Waltham Lime and Cement. . . . . . . .Cement Conc. Brick. . . . . . 90.00 M
Clay Sewer Brick. . . . . . . . 140.00 M
Portland Cement. . . . . . . . . 2.60 bag
Mortar Cement. . . . . . . . . . . 2.30 bag
New England Conc. Pipe 7-1-74 to 1-1-75 . 1-1-75 to 6-30-Z5 '
12" R.C.Pipe Class III . . . . . . $ 2.66. . . . . . . . . . . .$ 2.93
12" R.C.Pipe Class IV. . . . . . . 2.66. . . . . . . . . . . . 2.93
15" R.C .Pipe Class IV. . . . . . . 3.68. . . . . . . . . . . . 4.05
18" R.C.Pipe Class IV. . . . . . . 4.98. . . . . . . . . . . . 5.48
21 " R.C.Pipe Class V. . . . . . . 7. 37. . . . . . . . . . . . 8. 11
J. J. Cronin Company. . . . . . . . . . .Concrete sand. . . . . . . . . . . 2.50 ton
Delivered. . . . . . . . . . . . . . . 3.00 ton
Crusher Run. . . . . . . . . . . . . 2.50 ton
Delivered. . . . . . . . . . . . . . . 3.00 ton
Bank Run. . . . . . . . . . . . . . . . 2 . 15 ton
Delivered.. . . . . . . . . . . . . . 2.70 ton
Gravel Stone. . . . . . . . . . . . 2.90 ton
Delivered. . . . . . . . . . . . . . . 3.40 ton
Unclassified borrow. . . . . 1 .80 ton
Delivered. . . . . . . . . . . . . . . 2. 30 ton
Clay washings. . . . . . . . . . . 0.90 ton
Delivered. . . . . . . . . . . . . . . 1 .65 ton
The Superintendent retired from the meeting and the Board
k reviewed the schedule of salary increases. It was moved,
seconded and voted that the Chairman notify the Personnel
� Board of the Board ' s approval of rating 4 for the Superinten-
dent, E. Roger Louanis, and that his salary be increased to
the sum of $418.00 per week. The Superintendent joined the
meeting. The remainder of the salary schedule was (approved
' as amended.) reviewed.
The Board reviewed the Petition from the Municipal Light
Department read at Public Hearing on April 29th. It was
moved seconded and voted to grant permission to install and
maintain underground conduit in Lowell Street from pole #53/78
to existing Manhole #1 a distance of 123 ' and in Grove Street
from pole #41/30 to proposed Manhole #3 a distance of 801 .
It was also moved, seconded and voted' to allow the Muni-
cipal Light Department to install power lines across Water
Department land known as Revay Meadow and to use Water Depart-
ment' s Easement across private land at 200 Grove Street.
The Board reviewed the cost of operation of the Incin-
erator and since reviewing the work at the plant, recognized
that much of the increase in cost was due to the need of tech-
nical redesign and reconstruction of the furnace bed grate
structure. It is felt that this cost will not be of a recurring
nature and the budget for fiscal year 1975 should be adaquate
to maintain the Incinerator .
The Board reviewed the bids for the 1974-75 sewer contract.
The three low bidders were as follows:
Charm Construction, Inc. . . . . . . . . . . . . $ 223,278.40
Warren Manter Company, Inc. . . . . . . . . . 252,321 .00
Great Northern Const. Inc. . . . . . . . . . . 262, 120.00
It was moved, seconded and voted to award the contract for the
1974-75 sewer contract to the low bidder, Charm Construction,
Inc. in the amount of $223,278.40.
Read letter dated May 8th and Citation from the Department
of Public Health, Commonwealth of Massachusetts relative to
the dump site off John Street, and copy of letter from the
Superintendent to Mr . Tarbell dated February 23, 1973• Steps
to comply with the regulations will be initiated at once and
it was agreed that the Superintendent attend the meeting to be
' held on May 29th at the Northeast Regional Office of the De-
partment of Public Health .
The Board signed the Bill Roll dated May 17th and the Pay Roll
for the period ending May 12th.
Meeting adjourned at 11 :00 P.M. '
Respectfully submitted,
Q
Secretary
* delete words (approved as amended. )