Loading...
HomeMy WebLinkAbout2018-05-19 RMLD Board of Commissioners Minutes - . Town of Reading ������� �������� 1�M��� r� ' � � �� �� xr�� ' _ ��/^^^ \ RE P1 ��& - , ^..'` ' , --- d - Commmm�tee - Commmm�siom - CounmUU: 9QY� JUL 8U �� �� J: 58 RMUOBoard ofCommissioners Date: 2018-05-09 Time: 6:30 PM Building: Reading Municipal Light Building Location: Winfred Spurr Audio Visual Room Address: 3]OAsh Street Session: Open Session Purpose: General Business Version: Attendees: NNemmbemw - Prement: David Hennessy, Chair David Talbot, Vice Chair Tom O'Rourka, Commissioner John SternpeckiConnrnisaimnar Philip B. Pacino, Commissioner / Members Not Present: - ! 0themsPnesemt: RMLDStoff: Co|men O'Brien, General Manager !' \ Hamid ]affah, Director ofEngineering and Operations \ ' ]onePorantamu, Director ofIntegrated Resources Wendy Markiewicz, Director ofBusiness, Finance, and Technology Tracy Schultz, Executive Assistant Citizens' Advisory Board: h/ivahSuni, Member Minutes Respectfully Submitted By: David Talbot, Secretary Pro Tern Topics ofDiscussion: Call Meeting hmOrder Chair Hennessy called the meeting toorder. Chair Hennessy announced that the meeting is being videotaped at the RMLD office at 230 Ash Street, for distribution to the community television stations in Reading, North Reading, Lynnfie|d' and Wilmington. Chair Hennessy then read Rh\LD'sCode ofConduct. Public Comment Chair Hennessy welcomed Mr. Soni, and asked Mr, Talbot tm'serve ooBoard Secretary. There was nopublic comment. Review oyRMLD'mFiscal Year 2019 Capital Budget(Attachment 1) KAr. ]offohbegonvvithonmviewofprojeohcomp(ehmdorschedu|edtob000mp|etodbyJune ' . 30, the end of Fiscal Year 2018. Mr. Jaffarii then listed the projects that will be continued in Fiscal Year 2019. These include two-year pole line upgrades on Woburn Street in Wilmington, 115 kV transmission line upgrades on the lines that feed Station 4, 35 kV underground cable upgrades on the lines that feed Station 5, and pad-mount swifchgear upgrades as part of the six-year Page | 1 Review of RMLD's Fiscal Year 2019 Capital Budget(Attachment 1) plan. Grid modernization will have cost approximately $8.5 million. Of that, $381,000 was budgeted for Fiscal Year 2018 and $676,000 is being budgeted for Fiscal Year 2019.$267,000 was % budgeted in Fiscal Year 2018 for land for the new Wilmington substation in the Ballardvale area. $151,000 has been budgeted for Fiscal Year 2019 for engineering. Miscellaneous continuing projects in Fiscal Year 2019 include LED lighting at 230 Ash Street, a parking lot upgrade at 230 Ash Street, electric vehicle charging stations, and battery storage. Mr.Jaffari then discussed new projects for Fiscal Year 2019, including Ballardvale Street pole line upgrades and 4W5, 4W6, and 4W16 Wilmington getaway replacements. These will bring up the ratings of the station feeder cable, which will help reliability during switching. New projects also include a .Massachusetts Department of Transportation project on Main and Hopkins in Reading, for which RMLD will be reimbursed by the state, and new equipment purchase, including electric phasing meters. Mr. Jaffari then reviewed the annually budgeted recurring projects. Mr. Jaffari then summarized: Fiscal Year 2018 was budgeted for $7,686,000. Spending is estimated to come to $8,009,000, resulting in a $323,000 variance. Fiscal Year 2019 estimated spending is$7,570,000. Mr. Pacino asked what redoing the parking lot will entail. Ms. O'Brien answered that the parking lot currently pools with water and ice. It needs to be resurfaced and there is wasted space. The amount of parking spaces will be doubled. The lot will extend to Station 1.The curb cuts will be reused and the public electric vehicle charger will be relocated to the upgraded parking lot. Mr. Pacino asked for details about the Mass D.O.T. project. Mr. Jaffari replied that the state is widening the area.The poles are being relocated as part of the intersection upgrade. Chair Hennessy announced the CAB voted to approve the Capital Budget:3:0:2 on April 30, 2018. l Mr.Stempeck made a motion, seconded by Mr. Pacino, that the RMLD Board of Commissioners approve the Fiscal Year 2019 Capital Budget dated March 29, 2018, in the amount of$7,570,489 as presented, on the recommendation of the General Manager. Motion Carried:5:0:0. RMLD's Fiscal Year 2019 Operating Budget Mr. Stempeck made a motion, seconded by Mr. Pacino, that the RMLD Board of Commissioners approve the Fiscal Year 2019 Operating Budget dated March 29, 2018, with a Net Income of $4,053,233 as presented, on the recommendation of the General Manager. Motion Carried:5:0:0 Proposed Rate Adjustment Chair Hennessy verified that the Commission is voting to implement Scenario 3. Ms. Parenteau affirmed. Chair Pacino asked Mr. Soni about the two CAB members who voted against the rate adjustment and confirmed that they were opposed to any rate increase. Mr.Soni explained that the two members of the CAB were concerned about the rate increase and wondered if something else could be done. Mr. Pacino stated he would abstain from the vote, citing his concern over the CAB objections, since the CAB represents the community of ratepayers. However, Mr. Pacino stated he does not want to vote against the motion:therefore,he abstains. Mr.Stempeck stated that it is not unusual for the CAB to have reservations about rate changes. }, Page 1 2 J Proposed Rate Adjustment Ms. O'Brien stated that there was no system planning or maintenance for two decades. These 1 nominal increases, along with RMLD doing as much as possible in-house allow the upgrades to be done at minimal cost. s i Mr. Stempeck made a motion, seconded by Mr. Pacino, that the RMLD Board of Commissioners I approve the adoption of rates MDPU numbers 279, 280, 281,282,283, 284,285, 286, 287,288,289, and 290, dated to be effective July 1,2018, on the recommendation of the General Manager. Motion Carried:4:0:1. General Manager's Report-Ms. O'Brien Ms. O'Brien announced the overall winner of the high school art contest, whose art will appear on the cover of RMLD's annual report. The winner had received the Environmental Inspiration I award during the awards ceremony: Megan Coram, from Reading Memorial High School. Ms. Coram's piece is titled 'Growing a Sustainable Future.' Ms. O'Brien then read Ms. Coram's description of her artwork: f "I chose to focus on the Community Solar Program for my art because I think it's an excellent project. I'm very impressed by the accessibility, efficiency, and sustainability of the program. In my artwork, I chose to draw the Community Solar Program as a tree to represent that it is good i for the environment. The symbol of the tree also shows that the program and its members depend on each other, just like the roots and the leaves are both indispensable parts of the tree.The bright colors convey the hopefulness and promise of the program." i Mr. Pacino stated that he attended the awards ceremony the previous week and all the entries were very creative. Everybody who had a piece on display was a winner. k �- Ms. O'Brien asked the Board's permission to attend the annual NEPPA conference. Mr. Pacino made a motion, seconded by Mr. Talbot, that the RMLD Board of Commissioners approve Ms. O'Brien's travel to, and attendance at, the NEPPA conference to take place from August 19 to August 22,in North Falmouth,MA. (� Motion Carried:5:0:0. All the Commissioners confirmed that they would be attending the conference as well. Ms. O'Brien stated that the CAB is being invited to attend this year. Engineering and Operations Report-March 20187 Mr. Jaffari(Attachment 5) Mr. Jaffari presented next, since he was already at the microphone due to his Capital Budget presentation.$152,939 was spent on routine capital construction in the month of March, bringing the year-to-date total to $1,131,537. The total capital spending in March, for all divisions, was $659,288, bringing the year-to-date total to $4,595,933. $3,089,588 remains in the budgeted $7,685,521. Good progress is being made on routine maintenance. Mr. Jaffari then reviewed the NJUNS report. Lynnfield has seven pending pole transfers. North Reading has 10 pending pole transfers and 35 pull poles. Reading has 26 pending pole transfers and 54 pull poles. Wilmington has 34 pending pole transfers and four pull poles. Reliability indices show that RMLD's outages are well below regional and national averages. Mr. Jaffari explained that the annual average of tree-caused outages from 2013-2017 was 57. Year-to date, there have been four outages caused by trees:the tree trimming program is effective. Mr.Stempeck and Mr. O'Rourke remarked on the dramatic change. Financial Report- March 2018 -Ms.Markiewicz- (Attachment 4) Ms. Markiewicz stated that she would be reporting on the first nine months of Fiscal Year 2018. The unrestricted cash, totaling $14.6 million at the end of March, covers less than two months of operating expenses. Accounts receivable remains 97 percent current (up to 90 days). Net plant increased by$3.8 million as compared to March 31, 2017. Base revenue increased by one Page 1 3 Financial Report-March 2018- Ms.Markiewicz - (Attachment 4) percent compared to the previous year with a decrease of kWh sales of 2.6 percent. Purchase power fuel expense exceeds purchased power fuel revenue by $2.3 million. Purchase power, capacity, and transmission (PPCT) expenses exceed PPCT revenue by $146,000. Operating and maintenance expenses remain under budget by one percent as of March 31, 2018. This may change due to invoices related to the March storms still being received. Ms. Markiewicz then discussed cash and investments as'of March 30, 2018. 67 percent of cash is restricted and cannot be touched. 33 percent (one-third) is being used as a checkbook to fund operating expenses-RMLD can cover less than two months of the operating fund with the current balance. Ms. Markiewicz then compared base revenue to operating expenses (without power) using Actual Fiscal Year 2017 and projections for Fiscal Years 2018 through 2023. Operating and maintenance expenses only. Base revenue is projected to increase 20.37 percent and operating expenses are projected to increase 21.27 percent over the seven-year span. This results in a .90 percent difference between revenue and operating expenses. As revenue increases, spending increases. All money is being reinvested into RMLD's infrastructure and the operations of the business. Ms. Markiewicz concluded her presentation with a comparison of operating and maintenance expenses in the first nine months of Fiscal Year 2017 and Fiscal Year 2018 and the Fiscal Year 2018 Budget. Integrated Resources Division -Ms. Parenteau(Attachment 3) Ms. Parenteau began by announcing that RMLD will be at North Reading Town Day on Sunday, June 3 and Reading Friends and Family Day on Saturday,June 16. RMLD's new website is close to being complete, with a potential launch at the end of the month. The redesigned site will be mobile friendly. RMLD will be beginning its promotion of the Shred the Peak campaign in the upcoming months. 1� Ms. Parenteau then discussed Fiscal Year 2018 Quarter 3 kWh sales,January through March,from 2016 through 2018. January 2018 was colder than previous years, which resulted in higher sales. February 2018 was consistent and flat, and March 2018 sales were slightly below that of the previous two years. Overall,quarter sales were flat as compared to 2017 and higher than 2016. However, sales are down two percent overall. Quarters 1 and 2 were significantly lower. This is due to the impact from sales from July to December. Ms. Parenteau then discussed Quarter 3 purchase power, capacity and transmission revenue. It has increased steadily. From 2016 to 2017 there was a $446,000 increase that was primarily due to transmission increases. 2017 to 2018 the increase in Quarter 3 was about $1.68 million. The main reason for that increase was the NEMA capacity zone increase. Ms. Parenteau concluded with capacity, transmission, and fuel costs from January through March, from 2016 through 2018. There was a capacity revenue increase from 2016 to 2017 of $291,000. From 2017 to 2018 there was a $1.5 million capacity cost increase. Transmission costs rose by $250,000 from 2016 to 2017, and then by $353,000 from 2017 to 2018. Fuel costs decreased by $372,000 from 2016 to 2017, then increased by $1.4 million from 2017 to 2018 primarily due to a higher load in January.The cold spell had significant cost impacts. Mr. Soni asked, when making the budget how do you prevent surprises and factor in what's happening in the market? Ms. Parenteau replied New England's fuel source is gas-based. During winter time, New England is at the end of the pipeline which makes it a constrained zone.As a result, the energy markets are more volatile from December to February. RMLD's strategy is to secure more contracts to cover load so as to not be subject to this price volatility. RMLD's power needs are 95 percent covered during the volatile winter months. ,i Page 14 I i C RMLD Procurement Request Requiring Board Approval - Ms. Parenteau(Attachment b) IFB-44 Electrician Services for the Removal of Load Control Modules(LCM)and Associated Parts a Ms. Parenteau explained that the RMLD had installed approximately 300 hot water heater load i control modules that are now at the end of their useful life. They were installed by an electrician and now must be removed by an electrician.The bid request was sent to 20 companies, and six i responded. Removal of load control module, installation of a splice box, part of electrical code if cannot see control panel disconnect switch needs to be installed. equipment returned to RMLD. RMLD will be contacting customers to schedule appointments. The electrician will be I responsible for getting the electrical permit and the removal will take approximately one hour to complete. I Mr. Pacino verified that no one is currently providing this service. Ms. Parenteau affirmed. Mr. ! Talbot asked why the equipment can't be left where it is. Ms. Parenteau explained that the old equipment is a liability issue for RMLD. Mr. Talbot asked if it would be possible to hand the customer an alternative at the time of f removal, even a device that would be the customer's responsibility, or any other promotion. Ms. Parenteau answered that IRD is developing an RFP to look at other technologies and residential load control proposals that are not limited to water heaters. Ms. Parenteau explained that RMLD is restructuring its program; it is a challenge to have RMLD equipment in customer homes. Mr. Talbot asked about giving customers an alternative at the time of the equipment removal, 3 just as RMLD offers other devices and discounts to customers. Mr. Talbot noted that control of a few hundred water heaters with timers has the potential to produce perhaps a 1/2 megawatt load control,which is a lot considering we just spent millions on a gas generator for 2 megawatts of load control,so it's worth the effort while we are interacting with these customers. Ms. O'Brien explained that many customers have shut off the load control but are still receiving a discount on their bill. Installing equipment creates a liability. Chair Hennessy asked how long it will take to complete all the removals. Ms. Parenteau replied that, assuming six removals are done per week, it will take about a year. It will depend on All Tech's manpower. Chair Hennessy remarked that there's time to implement Mr. Talbot's j suggestion at a later date. , s I Mr. Talbot requested that the Board wait a month to vote on the bid to give time to consider alternatives. Ms. O'Brien replied that it's a liability issue. 1 Mr. Stempeck asked if there have been any issues with the equipment currently in customer j homes. Ms. Parenteau answered in the affirmative. 1 Mr. Talbot stated he would like to offer customers an alternative at the time of removal. Ms. O'Brien stated that appliances are becoming smarter. RMLD would rather concentrate its efforts there.The RMLD is an overall smart appliance controller under its rebate program.i.e. Nest. Mr. Stempeck stated that there's a liability and customers are receiving a rebate for equipment I that is disconnected. Ms. O'Brien explained that anything that is not in the bid cannot be added to the electrician's duties. Mr.Talbot stated he will be voting against the bid. I Mr. Stempeck asked if the cost of the equipment removal will be recouped by the removal of the customer rebate. Ms. Parenteau explained that it would;customers receive a credit per year of approximately$220. Mr. Pacino verified that RMLD has done its due diligence checking references. Ms. Parenteau replied in the affirmative. t 'J Ms. O'Brien stated that she is not in favor of installing any equipment in homes. Page 1 5 RMLD Procurement Request Requiring Board Approval - Ms. Parenteau(Attachment 6) IFB-44 Electrician Services for the Removal of Load Control Modules(LCM) and Associated Parts Mr.Stempeck made a motion,seconded by Mr. O'Rourke,that IFB-44 Electrician Services for the Removal of Load Control Modules (LCM) and Associated Parts be awarded to All Tech Electric for $83,400.00 pursuant to M.G.L. Chapter 149/M.G.L. Chapter 30, Section 39M, as the lowest responsive and responsible bidder, on the recommendation of the General Manager. Motion Carried:4:1:0. Chair Hennessy Board meetings on June 21 and July 19. NEPPA Conference in August. Board meeting September 21. Mr. Stempeck stated that he is unable to attend the May CAB meeting as scheduled. Mr. Pacino agreed to take the May meeting, Mr.Stempeck agreed to attend the June meeting, and Mr.O'Rourke stated that he would go to the July meeting. Mr. O'Rourke expressed his wish for Mr. Talbot's concern about the water heater load control modules be addressed at a later meeting and stated that there is merit in examining options. Ms. Markiewicz pointed out that there was supposed to be a vote on the change to a calendar year. Mr. Pacino made a motion, seconded by Mr. Stempeck that the RMLD Board of Commissioners approve RMLD's change from a Fiscal Year to a Calendar Year, with the change becoming effective January 1,2019,on the recommendation of the General Manager. Motion Carried:5:0:0. Adjournment Mr.Stempeck made a motion,seconded by Mr. O'Rourke,that the Board go into Executive Session to consider the purchase of real property and return to Regular Session for the sole - purpose of adjournment. Motion Carried:5:0:0. A true copy of the RMLD Board of Commissioners minutes as approved by a majority of the Commission. David Talbot,Secretary Pro Tem RMLD Board of Commissioners Page 1 6 i 1 READING MUNICIPAL LIGHT DEPARTMENT BOARD OF COMMISSIONERS 1 REGULAR SESSION WEDNESDAY., MAY 9, 2018 I RMLD ' S FISCAL YEAR 2019 CAPITAL BUDGET ATTACHMENT 1 �n►nuunn�n►uu►unnnnnenenuunen�nnnnuunnnniuun►u►n� READING MUNICIPAL LIGHT DEPARTMENT FISCAL YEAR 2019 CAPITAL BUDGET BOARD OF COMMISSIONERS PRESENTATION MAY 9, 2018 ►Ill/11►1►I1►►1►111►11111/►IIIII111/►1►►//►/1IIlIId1I1II1I1111►/I/I1d11►111/1►1I►II11 REVIEW OF PROJECTS COMPLETED OR SCHEDULED TO BE COMPLETED IN FY18 FY18 ESTIMATE TOTAL COST PROJECT ESTIMATE* SCHEDULE ✓ Distributed Gas Generation $581k $2,613k FYI 6-18 ✓ GIS $380k $790k FYI 6-18 ✓ LED Street Light Implementation-All Towns $940k $2,193k FYI 6-18 ✓ 4W9 Getaway Replacement $132k $268k FYI 7-18 ✓ Various Upgrades at Station 3 $373k $784k FYI 7-18 Reactors, Remote Terminal Unit, Relay Upgrades and SCADA Integration ✓ Miscellaneous Projects $195k $195k FY18 Control Center Modifications, Remote SCADA Room, and Power Washer and Vacuum *Total Project Cost Estimate= Prior Years Actual Spending Plus FY18 Estimated Spending BOOTH RECOMMENDATION eeeeeeeeeeereeeeeee►ser►eereeeeeereereeeereerereeeereeeeeerre►ease►r►r►reeeeeeeeree�e PROJECTS CONTINUING IN FYI FY18 FY19 PROJECT ESTIMATE ESTIMATE SCHEDULE ➢ Woburn Street Wilmington - Pole Line Upgrade $213k $213k FYI 8-19 ➢ 115kV Transmission Pole Upgrade $145k $223k FYI 8-19 ➢ 35kV Underground Cable Upgrade $207k $252k FY 18-20 ➢ Pad-mount Switchgear Upgrade (Industrial Parks) $500k $436k 6-YEAR PLAN ➢ Grid Modernization & Optimization $381k $676k 15-YEAR PLAN ➢ New Wilmington Substation $267k $151k FYI 7-23 ➢ Miscellaneous $155k $340k FY18 LED Lighting at 230 Ash Street, Parking Lot Upgrade at 230 Ash Street, EVSE, Battery Storage BOOTH RECOMMENDATION I/I//I/IIIIlll111111111111111111111I1111111/11111111111/I/111111/II1I11/111/1I1/1/Il/ NEW PROJECTS. FOR FYI FYI ESTIMATE ❖ Ballardvale Street, W - Pole Line Upgrade $225k two-year project ❖ 4W5 Getaway Replacement, W $152k one-year project ❖ 4W6 Getaway Replacement, W $157k one-year project ❖ 4W 16 Getaway Replacement, W $206k one-year project ❖ Mass DOT Project: Main & Hopkins, R $225k one-year project ❖ Power/Lab and Tool Equipment $76k recurring BOOTH RECOMMENDATION 1 i ►►rr►►►►►►►►►rr►r►►er►►►►►e►r►rr►►►►eee►►►►►►ee►r►►►ee►rerrrr►►r►reeee►►►►►rrr►ee►►►► ANNUALLY BUDGETED/RECURRING PROJECTS FYI ESTIMATE FYI ESTIMATE ■ Miscellaneous Computer Hardware/Software Upgrades $186k $550k ■ Rolling Stock Replacement $229k $275k ■ Building, Office and Security Upgrades $215k $60k ■ AMI Mesh Network Expansion $120k $121 k ■ Communications Equipment $100k $49k ■ Pole Replacement Program $209k $263k - ■ Secondary and Main Replacement Program . $222k $344K ■ 13.8kV Upgrades (Step-downAreas, etc.) $71k $331k ■ Underground.Facilities Upgrades $345k $332k ■ Service Connections (Residential and.Commercial) $150k '.$142k ■ Routine Construction $1,044k • $1,078k r ■ Miscellaneous Purchases $651k $693k (Meters and Metering Equipment,Transformers,and Substation Equipment) BOOTH RECOMMENDATION ►I11►1►1►I/1►ll1111►1111►IlIll►1/►Il/l/►I/1111/I/Ill/lllllll/Illl►Il1/l/1►Ill1►1►1111 SUMMARY FYI RECAP Budgeted Estimated Spending Variance $7,686k $8,009k ($323k) FY19 PLANNED Estimated Spending $7,570k READING MUNICIPAL LIGHT DEPARTMENT Q , FYiq BUDGET March Z9, zoi8 i `� �-- TABLE OF CONTENTS Page# RMLD Mission and Vision Statements 5 RMLD System Profile 5-6 FY19 CAPITAL BUDGET Planned Programs 7-10 ,:FACILITIES MANAGEMENT � Continuing Projects: Page# Project# X RMLD Lighting(LED) Upgrade Program 11 104 New Projects: _ X Parking Lot Upgrade—230 Ash Street 13 140 Annual Projects: X Office Upgrades—230 Ash Street 15 098 X Security Upgrades—All Sites 17 119 X Rolling Stock Replacement(vehicles,trailers,fork trucks) 19 118 ",,INTEGRATED RESOURCES 7 Continuing Projects: Page# Project# 3$ Electric Vehicle Supply Equipment(EVSE) 23 099 39 Demand Management: Battery Storage 25 101 ''INFORMATION TECHNOLOGY Annual Projects: Page# Project# X Hardware Upgrades 27 127 X Software and Licensing 29 128 SYSTEM Continuing Projects Update: Page# Project# X Woburn Street,Wilmington—Pole Line Upgrade 31 137 FY19 Budget March 29,2018 Page 3 39 115kV Transmission Pole Upgrade 33 108 39 35 kV Underground Cable Upgrade Station 4,5 and RR ROW 35 109 X Pad-mount Switchgear Upgrade at Industrial Parks 37 102 Grid Modernization&Optimization 39 103 3$ New Wilmington Substation 47 105 New Projects: Page# Project# 39 Ballardvale Street,Wilmington—Pole Line Upgrade 49 123 Force Account(Mass DOT): Main and Hopkins, R 51 TBD 4W5 Getaway Replacement—Station 4 53 122 4W6 Getaway Replacement—Station 4 55 132 3$ 4W16 Getaway Replacement—Station 4 57 135 Annual Projects: Page# Project# AMI Mesh Network Expansion 59 112 Communication Equipment(Fiber Optic) 61 126 Substation Equipment Upgrade 63 111 X Power/Lab and Tool Equipment 65 115 Meters 67 117 39 Transformers and Capacitors 69 116 X Pole Replacement Program 71 175 Secondary and Main Replacement Program 73 458 13.8kV Upgrade(Step-down Areas,etc.)—All Towns 77 107 UG Facilities Upgrades(URDs, Manholes,etc.) —All Towns 81 106 Service Connections(Commercial and Residential) 85 Various 3$ Routine Construction 87 Various FY1.9OPERATING: BUDGET 39 Six Year Plan 91 Statement of Budgeted Revenues and Expenses 92-93 Fixed and Semi-Variable Costs 94-95 Purchase Power Expense Summary 96 Description of RMLD's Power Supply 97-105 FY19 Budget March 29, 2018 Page 4 Reading Municipal Light Department Mission Statement: RMLD is committed to providing excellent customer service,including competitively priced electricity through due diligence of power supply,risk management,system reliability,safety,and overall business efficiency. Vision Statement: RMLD has transitioned from a reactive to a proactive approach in all aspects of the utility business to ensure efficiency,safety,and competitive rates. The Be Efficient-Get Greener-Go Paperless, Peak Performance,and Shred the Peak campaigns,have been integrated into a core business and include sustained procedural changes in the areas of long-term planning,technology road mapping,talent managing,customer communication,system maintenance and power supply portfolio balancing. SYSTEM PROFILE (based on FY17) SERVICE TERRITORY 51 square miles serving Reading, North Reading, Wilmington, and part of Lynnfield TOTAL OPERATING REVENUES $92,616,757 POWER PURCHASED 697,052,494 kWh NUMBER OF CUSTOMERS/ 29,720 METERS SERVED ANNUAL PEAK DEMAND 155,746 kW on June 13,2017,at 4:00 pm ANNUAL SALES 675,536,970 kWh PLANT VALUE $144,799,000(Gross) $76,111,000(Net) SUPPLY VOLTAGE 115 kV Station 4: (3)60 MVA Transformers (2)35 MVA Transformers—feeds Station 5 SUPPLY CAPACITY 250 MVA Connected, 190 MVA Firm Station 3: (2) 60 MVA Transformers 120 MVA Connected,60 MVA Firm DISTRIBUTION SYSTEM VOLTAGE 13,800 volt wye 4,160 volt wye OVERHEAD PRIMARY LINES All 336 miles UNDERGROUND PRIMARY LINES All 144 miles DISTRIBUTION TRANSFORMERS 4,202 transformers—310 MVA Capacity STATION TRANSFORMER CAPACITY 370 MVA Capacity 17,841 poles UTILITY POLES Ownership: 50%Verizon,50%RMLD Custodial By Town: FY19 Budget March 29, 2018 Page 5 North Reading —RMLD Lynnfield—Verizon Reading • east of Main Street—Verizon • west of Main Street, east of West Street,south of Prescott Street—Verizon • west of West Street—RMLD • west of Main Street,north of Prescott Street—RMLD Wilmington • all poles with 35 kV sub-transmission circuits, and Concord Street—RMLD • all other locations in Wilmington—Verizon APPLICATION SOFTWARE Great Plains/Cogsdale Windows Server 2012,2008, Microsoft SQL Office 365 E3 ESRI GIS VMware Windows 7,8,8.1, 10 SharePoint WindMil (in process) LightTable (in process) PoleForeman SpryMobile Survalent CONTACT INFORMATION Address: 230 Ash Street Reading, MA 01867 Telephone: 781-942-6598 Fax: 781-942-2409 Website: www.rmid.com Office Hours 8:00 am-4:30 pm Monday through Friday KEY PERSONNEL General Manager Coleen O'Brien email: cobrien@rmid.com Director of Business, Finance & Wendy Markiewicz email: wmarkiewicz@rmid.com Technology Director of Integrated Resources Jane Parenteau email: iparenteau@rmid.com Division Director of Engineering and Operations Hamid Jaffari email: hiaffari@rmid.com GOVERNING BODY David Hennessy Thomas O'Rourke Philip B. Pacino John Stempeck David Talbot Number of Employees 74 Year Founded 1894 3/27/2018 FYI Budget March 29, 2018 Page 6 l READING MUNICIPAL LIGHT DEPARTMENT Capital Improvements FY38 thru FY23 $Shown in thousands Project FY18 FY18 FY19 LINE# PG# If FERC# PROJECT NAME Budget Estimate PLAN EST. FY20 FY21 FY22 FY23 BRIEF DESCRIPTION 1 n/a 129 361 Master Facilities Site Plan(ON-HOLD) Town economic development plan Impact.Master-hold.Evaluate maintenance only. 2 11 104 361 RMLD Lighting Upgrade Ash Street and other RMLD facilities including substations with new LED fixtures.Evaluate transformer. Change in g g(LED)Upgrade Program 100 25 10 Scope:installation of fixtures by an electrical contractor. 3 13 140 390 Parking Lot Upgrade-230 Ash Street 100 _ 1301 Reconfigure parking lot at 230 Ash Street. 4 n/a 095 361 Building Upgrades 110 110 80 75 125 50 Partial roof covering over 30%of building at 230 Ash Street,and lobby insulation(FY18).No major building upgrades planned for FY19. s 15 098 1 391 Office Upgrades-230 Ash Street 92 75 .-_ 30 30 30 30 30 Reconfigure IRD area to accommodate staffing changes. 6 17 119 384 Security Upgrades All Sites 30 30 30 30 30 30 30 Access control,alarm monitoring,video and perimeter monitoring along the fence lines. 7 19 118 392 Rolling Stock Replacement(vehicles,trailers,fork trucks) 230 229 275 300 300 300 300 Scheduled vehicle replacement based on Fleet Assessment.FY19:forklift,light duty pick-up,underground utility vehicle. a 23 099 392 Electric Vehicle Supply Equipment One electric charging station per town in the service area.Research grant options.FY18:unit installed at 230 Ash Street, PPY E Q Pmen[(EVSE 1 SO 30 1 10 10 Reading.FY19 location TBD 9 DEMAND MANAGEMENT - - •Alternate years solar/battery storage and gas.: - - .to", ..n/a 100: 344. , Distributed Gas Generation - .. 581 - -. _ -FY16-18:Pilot OG gas peakirig unit. • '11 25 _ 101 363 -"Battery Storage .25 0 " too Project redirected to SM W storage at Station 3.Substation integration into battery unit. - 12 27 127 382 Hardware Upgrades 105 56 ,125 119 119 119 119 General hardware purchases,wireless internal network configuration. 13 29 128 383 Software and LicensingGeneral software purchases/custom programming(Itron,Cogsdale,Milsoft,Survalent,MSF,Substation Asset Management 235 130 • 425 314 239 239 239 Software,etc.) 14 31 137 364/365 Woburn Street,Wilmington(between W est and Concord Streets)-Pole Line Upgrade 200 213 213 Replace/upgrade twenty-four(24)main line poles and four(4)stub poles on Woburn Street(from Concord to West Street)to proper strength and height,create proper NESC clearance between utilities.Benefit to long-term reliability. 1s 33 108 355 115 kV Transmission Pole Upgrade 95 145 223 115kV transmission poles feeding Station 4 built in 1970 and have reached the end of their useful life. 211-503 upgraded in (1 LINE PER YEAR FY18&19) FY18 and 211-504 to be upgraded in FY19. 16 35 109 1 366 35kVUG Cable Upgrade at Station 4,Station 5 207 207 ,.252 322 35kV Underground cables feeding substation 5(4P2 and 4P9)are over 36 years old.Both are due for upgrade.FY18:4P2 - and RR ROW FY19;4P9 at Station 4 FY20:4P9 on RR ROW and Station 5 17 37 102 367Pad-mount Switchgear Upgrade at Industrial Parks 196 500- 43 439 439 439 176 Starting In FY18,replace all 15 kV pad-mounted switchgears at Industrial parks(i.e.,River Park Drive,Jonspin Road,Haven Street,etc.)There are 29 switches system-wide. ,19, '.39 „103' GRID.MOOERNIZATION&DPTIMIZATION ,tt'i -:i,-- ”~; _".. Fifteen-year plan to Implement Technology.Road Map forged efficiency,reduction of losses etc`.-' 1 227 _ 381 q FY18:;$94k,for 20M5 modules(outage'pdrtaFand dash board) " -' ,Scdda_Mare Switches $ 301 ,':307 " -307 ='307 `".'307.4'swRthes ear lus IntelliTeam licenses:= 19 " .y 365 ..z >- "S k't .. ._ IF:C r /V p s.26 365 - 1, ,. I -:j) 'IntelGRupter°. _ 135 J;r;337, 13Z` ,137 .'137,2�swiiches/year plus IntelliTeam licenses- 21. - •' i•i I'li,383. ,. .,..,.. ..�. _ `I 5('ADA Upgrade I _`•fl - 27 If 'I S66ware upgrade a',, I ,`,1,383 y I•'_,.�;!.•cl It '�! 11S.twarelntegrbdon _ I;!:'I r, 14 `IS 201 20 ,',20 IntegrationofAMI/Scada'Mateswitches/OMS'.:23' '11383 :,;...i: .. :. - g .... ' I' ,I6'i : I',,! OMSModules 1,�, ;' I°' _ 0 :,.L•'60 50 Addie OMS modules:'FY20-arew'management module,FY21,.:p'dwer factor correction module;', - ,- :1a '-.. IT IVR 138 AddlegIVRto OMS ik - t r 383 - .:,m 30 30 c o r.30 ..;3 r _ .. .,. ,,. p nk'Automation' { --' Adding feeder cap,banksand making them SCADA,controlled,< ..: ,t.. 'I ... , New Wllmmg[pn Substation r�,., _ 650 ;267 151{ „;4572 . .;:4;465 730 730 Conceptual desl n„land/a ralsals-substatlonand etawa s .... 7( ,�,�� g Pp g. Y Jli+.,,,.,,'.,;iY' ^ ,:f�f :.I ^' r{1 ..{ 4 +., f.{. .'•'L +.`, t ,� •8,r. ,>, .::.:r., .rts�.n,,r,f 1.,. u' 3 v.r...:..„. , ,..t'i• U grid..e,.8,,0.0crcu._.t.,:„,,.-,t..,.(5•..Wi)o. 55.6.,:6.. abceeer.fIo2r7cuir circuits a+`oit"st:wx o4,0200afoedeittl)oannadl ufepegdreard'se`.frtoom3`0 rpa,..Wo4s,e,i?6,.4V` domI m.0mtoodda'steaErestmatnlodnu ctor::;, ,r 0 i 225 ^,,253`6 5 Ballardva,Stree?Wllm.mg[o0.,;Pole Llne,UPgrade I.I„o#1, , r o.99 .yupgradeandprovide adde,d,spac,eon pole - „ t.:-•_. , •:<� '--,„a t-n.:;,.,,,. „ .,,- .i. d-+hrtt� t P I r,.l, „i, P-- O P P I g la. st t i. t ,'4S t n t a r Y r ;! n' {;36q/; Upton Drive Pole,U pgrade(oCProposed Wilmingtons.Substatlon/Related ,, r: ,,. I�!:•',>', t1r ','3• •� U rade 4000 c'rcui �' ze na :'TBD`�: ,. -,t,-, •n- .,,••,L ., ,•, •• :,� ,,, U.: I ` :•,. Pg„ I tfeet to556 spacer and upgrade roug%30 poles to accommodate the'recomiuctor upgrade and,provloe, / ,.. ,. ,,. .,r. : _. ,• ,- f Lf: F. ,,.,' ,,, .:' .;,'..,,.:., ,I,,.1,, ....,, {•,,s; . J •r „ ,,., .,!u,{ ,.365 Improvements,r: r ._.:,•.,.y. .,;;,,. , I ,.,; I s , : addeds-ace o I, ••- 't.,�::t,t,; , .r ,+•. - :k!-`• r, i ::,:: l,pp„ a• -i?- n po a tine for up to four ai1dl[Ional future fegders from proposed Wllmmgton Suhstat�on ,...• f •, t...a;,: .. <:, ,,.:A,ItrAl, _ T t••.; •,f, t J;t P „ ...II{�Ii , "E l 4, - 19. -na. Industrial Way Reconh uration:.,. • .I, ' ' ” ' 365. - Y-- g -• °`• `'il, { ,,, ' '• t ,:.. .1,000 1,000 Load redistribution Indus[nal Way/Analog 19 Ft4.,✓�„ ,.,: • ,,:.,. ,.. ...,..,_ .,.. „- �•.,. ^; r-x __;::. ,..�,..,, :. ,,._, ::; ..,,- _t,,.-.�• ':,< {: .-* -'-lnsta118500,circult feet of 5565 acer cable.The.nla'ori of ole upgrades oa��-- ,.,�_.... .N in ,nS - • ,?Stre - id e.e .I ...,1 ;s p,,,p, t ,P 1...SY„ P pg. st ccommodate thlsfeeder should-nave been a. , n/a rTBD,..,;a.,-'"... NewWllmin ton Sub Salem5[reet Middlesex Feed..a.h " `•` "' "" I _ _g„ ,- / 450 completed daring Ballard�ale;5treet upgr_odes:This feedervrilLgofromBalla rdvale Street to the 5a"Iem Street'/Mitldlesex „ _ ,f',.�:` •i�, „w,s t a -,t 3, �� ':Avenue'intersect on s - fr,�';Q�� •, � ....364/ .,:. , ... ,,,. .�.• c x -., h.:, _, ,...: ^ Te. .. ,5^�,:. In5ta114000 tlftult feeCo556's a -. n/a TBD;,,;: N6'wWllmiOton Sub to Andovec5treetFeeder Ick-u 3W5'� r _. -.,, ., ,_ ,,_,, ,.,I,,„,, +,_.• ., f, pcercable The ma(oiity of pple upgradesto'accommodate,thls feeder'should have been g ...P P y _ 225 - I '•fr,•:_I_. - „,, i�, ; completed during UptonStee'tupgr-des"i'7hisfeedei:wlll go�from Uptoo,Drlve io Andover Strltt'i„I '.•I, a'a Oro '„,,364,.0 ..�:; ,. svx 'r,l ".• .. s.:y,,., s, y..r,.xt t '.,i:. ,.,y, ,,,:,,tr,,, ,• r s,. .. ,,.. t •..k;.t r s t `.,:s s.,,l s(, I :.. ,,..R 4.. .7.„ t� 5 ,,,'(es §.:+ ,. -..ss ♦ ,i.,1,._.L. ., .a ,-.-- _,.,M. I z .-.. yF +I. ,•. ,.. ..x.G.,., .,-?• � ,. .,4'F'{x. 'r•';, s tY;., w ::>, a t. ;.rd ., 5.,. ,<. s l a ,_.dn• ,. ,,Force Account,(MassDOT) Mam.&Hopkins;:R; ,. ?rr. .t 4 s,•„ c. ;.,n ,Lt�ny,.if, -,. 225 ,,q.y. P, s,?;,,,s 1.• Mass DOT ro ect[o wldenM 1,u„.t.:.. .. .... .:-... 1 f a � -rsQ �s^s., t,��IL'J'1., ...k I,.t is •l', s ,. �tk4 ..,. ..- p.J .., 4 a st Itrafflclights Y.., 1 .ta,,.. <..th.,.t ,Altl n,k366.0 to It,,.J,.. k,u rks:mstC�L'f -I�, o s..tis ..e4. n R�:41�:1',L�ti1t ..,r,•.„:...,, ,e'A:a. o ro.altl;cir�R Page 7 READING MUNICIPAL LIGHT DEPARTMENT Capital Improvements FY18 thru FY23 $Shown in thousands Project FY18 FY18 FY19 URE4 PG R R FERC R PROJECT NAME Budget Estimate PLAN EST. FY20 FY21 FY22 FY23 BRIEF DESCRIPTION 33 53 122 367 4W5 Getaway Replacement-Station 4 152 Station 4:Upgrade approximately 1,600 circuit feet of UG cable on West Street,R to 750 mcm cu for Increased reliability and capacity. 34 55 132 367 4W6 Getaway Replacement-Station 4 157 Station 4:Upgrade approximately 1,700 circuit feet of UG cable on West Street,R to 750 mcm cu for Increased reliability and capacity per Booth Reliability Study recommendations. 35 57 135 367/ 4W16 Getaway Replacement-Station 4 206 Station 4:Upgrade approximately 2,250 circuit feet of underground cable on Causeway Road/Lowell Street to 750 mcm cu for Increased reliability and capacity. 36 59 112 370 AMI Mesh Network Expansion 120 120 121 150 150 150 150 Install relays,meters,and retrofit kits to expand the AMI mesh network.This will allow for end-of-the-line voltage readings. Materials to accommodate expanded use of fiber optic network for distribution automation and Eaton AMI system.In FY19 we 37 61 126 397 Communication Equipment(Fiber Optic) 215 100 49 50 50 50 SO will add approximately 12 nodes to the distribution automation fiber loop to expand communications options for substations and automation devices. 38 63 111 362 Substation Equipment Upgrade 50 40 so 30 3030 30 Upgrade various equipment at substations to Include TLC controls,remote racking devices,cable trays and various minor items.FY18:35 kV Insulators at station 4 replaced.FY19:Remote racking device for breakers at Station 3. 39 65 115 395 Power/Lab and Tool Equipment 76 58 68 20 20 Purchase phasing meter/hi-pot-six units;meter accuracy tester;resistance tester(for substations);four point battery hydraulic press(2 units) 40 67 117 370 Meters 60 50 60 60 60 3 60 60 Purchase meters for stock-new construction,upgrades and failures. 41 69 116 368 Transformers and Capacitors 561 561 583 595 612 631 630 Purchase units for stock,new construction and proposed reliability projects. 42 71 175 364 Pole Replacement Program 209 209 263 222 229 235 235 Replace poles Identified through the Pale Inspection Program(700 poles/year Inspected).This will Include transfers and replacement of secondary services as necessary.Fifty poles scheduled for replacement each year. 43 73 458 365 Secondary and Main Replacement Program 222 222 344 252 238 344 316 Repair as necessary secondary/main services and connectors prioritized by age as determined by system-wide inspection. FY19:Gerry Road and Drury Lane Area,LC,and Thomas Road Area,LC(in conjunction with Stepdown area upgrades) Convert step-down areas to 13.8kV.Remove antiquated equipment and step-downs to lower losses and Improve system 44 77 107 365 13.8kV Upgrade(Step-down Area,etc.)-AII Towns 71 71 331 452 216 613 367 efficiency. FY19:Gerry Road and Drury Lane Area,LC,and Thomas Road Area,LC(in conjunction with Secondary and Main Replacement Program) 367/ Replace primary and neutral cables and pad-ount transformers as needed in various aging URDs.Improved reliability. For the 45 81 106 368 UG Facilities Upgrades(URDs,Manholes,etc.)-AII Towns 345 345 332 475 529 501 623 next five years,three subdivisions are planned to be upgraded per year.FY19: Arlene/Ella/Franklin area In Wilmington; Carter/Willard area in Lynnfield;and Sandspur Lane In North Reading. 46 85 various 369 Service Connections(Residential and Commercial) 156 150 .142 165 170 176 200 Install new and upgraded residential and commercial services as requested, Miscellaneous capital expenses including:overhead and underground system upgrades,pole hits,station upgrades,porcelain 47 87 various various Routine Construction 1,044 1,044 1,078 1,107 1,141 1,175 1,200 cutout replacements,street light connections(new equipment),pole setting/transfers,new construction(underground divisions) 48 n/a 3645 5W9 Reconductoring-Ballardvale Area,Wilmington 515 567 Upgrade to 556 spacer for capacity feeding Ballardvale area(Target). 49 n/a 364/ 4W23 Getaway Upgrade to 795 / 365 y pg 60 165 Station 4:Upgrade main feeder to Circuit 4W23 to 795 to address voltage and conductor capacity issues(1.1 miles) 364/ 4W24 Partial Circuit Reconductoring - se n/a 365 (Upgrade 4W24 to 795) 1 328 328 Station 4:Upgrade main feeder of Circuit 4W24 to 556 to address voltage and conductor capacity Issues(1.5 miles) 51 n a 364/ SWS Reconductorin Wildwood toU ton Drive Station 5:Upgrade 25,000 overhead circuit feet of 336 spacer cable on Wildwood,Woburn,and Andover Streets to 556 spacer / 365 g p 214 214 214 cable. 52 n/a 367 4W28 Getaway Replacement 316 Station 4:Replace 3,400 feet of underground getaway to 750 mcm cu for Increased reliability. 53 n a 364/ 5W4 SW5 GetawayRe / 365 / placement 119 Station 5:Upgrade feeders from substation to risers to Increase feeders'ampacity. 54 n/a 367 4W7 Getaway Replacement 177 Station 4:Replace 1,900 feet of underground getaway to 750 mcm cu for Increased reliability. 55 n/a 367 4W10 Getaway Replacement 177 Station4:Replace 1,900 feet of underground getaway to 750 mcm cu for Increased reliability. ss n/a 096 390 Control Center Modifications 125 Modify the physical arrangement of the existing Control Center In order,to meet grid modernization-optimization. 57 n/a 097 394 Power Washer and Vacuum 20 20 Replace power wash system in garage;add vacuum system. FY19 Budget March 29,2018 Page 8 i READING MUNICIPAL LIGHT DEPARTMENT Capital Improvements FY18 thru FY23 $Shown in thousands Project FY18 FY18 �FY19, LwE0 PGR R FERC# PROJECT NAME Budget Estimate PLAN EST, FY20 FY21 FY22 FY23 BRIEF DESCRIPTION is ••n/a 121 383' Remote SCADA'Room .. , I '75 NERC- ry-to be located at Station 3.-_SCADA redundan ' 55 n/a 125. 383 GIS i- 219 380 GIS model required data Integrity and quality inspections as well as comprehensive data collection..i 325 - Install twosets of reactors to lower fault currentand Incident energy or ARC flash at Sta[lon 3 per Booth Reliability Stydy •sp � n/a, 138 362. Station 3 Reactors --�° .; - .: �_ - 561 -• - ., ..... recommendation. • - - , 6i-' n/a.- 133 '362„' Station 3:;Relay Upgrades and SCADA Integration - 76 "21 - .Upgrade oESEL 351 relays to.SEL 351-7.to enhance data delivery to SCADA.' ,6z' n/a fl30 362 Remote Terminal Unit.(RTU)Replacement-Station 3^ " "'-" ^ 27 Upgrade RTU to add functionality ofthe existing SELrelays�RTU;will be IP addressable and-will include Ethernet connection ` - ' _ • for RMLD and NSTAR connection. 63 n/a 11-0 367 4W9 Getaway Replacement-Station 4132 Upgrade 2,850'circult feet of UG cable on Causeway Road and Lowell Street;R,with.750 MCM cu for increased reliability and capacity. 6a n/a. 131• '373 LEDStreet Light Implementation All Towns ._ 1,169 940 Full Implementation.On targetfor completion by the eno of FY18.Price of lights reduced.Labor costs increased for FY18 to •�-. -. ' ' - �, ' include expense portionbf project,,Approximately8,800 lights/$125k grant. TOTAL 7,686 81009 ;, 7,570 11,510 11,017 8,313 8,463 FYI Budget March 29,2018 Page 9 READING MUNICIPAL LIGHT DEPARTMENT Capital Improvements FY18 thru FY23 $Shown in thousands FY18 FY18 FY19 Budget Estimate PLAN EST. FY20 FY21 FY22 FY23 TABLE 1:PLANT VALUES&DEPRECIATION EXPENSE: Plant In Service(Beginning) 146,671 144,799 151.808 158,379 168.889 178,906 186,219 Additions 7,686 8,009 7,670 11,610 11,017 8,313 8,463 Adjustments(Property Retirement) -1,000 -1,000 -1 000 -1,000 -1_i00 -11 000 -1,000 Plant in Service(Ending) 153,356 151,808 158,379 168,889 178,906 186,219 193,682 Less Land and Land Rights -1,2266 -1 266 -1 66 -12366 -1266 -12366 :L266 Depreciable Plant In Service 152,090 150,542 157,113 167,623 177,640 184,953 192,416 Accumulated Reserve For Depreciation _74_37 -72.99 -77.51 -82_`24 -8752 -92_581 -98,130 Net Plant in Service 79 119 78,814 80 869 886665 91,654 93638 95 552 TABLE 2:DEPRECIATION FUND BALANCES: Beginning Balance 767 2,407 2,450 3,523 4,530 2,924 2,250 Depreciation Rate(3%) 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% Depreciation Expense 4,362 4,306 4,516 4,713 5,029 5,329 5,549 Bond Proceeds and Other Fund Sources 650 46 228 4,804 2,003 11 0 Operating Fund Transfer 2,500 3,700 3,900 33 000 223_79 2.310 1,794 8,285 10,459 11,094 16,041 13,941 10,563 9,593 Capital Improvement -7,686 -8,009 -7,570 -11,510 -11,017 -8,313 -8,463 Ending Balance 600 2,450 3.523 4,530 22924 2,250 1,130 TABLE 3:BOND PROCEEDS&OTHER FUND SOURCES: _ ' '-Bond Proceeds fot'New Wllmington,Substahon 650 f,4;801 2 0110 l.i y .. __ _ ..... -..- For'ceAttount(MassDOT):Main&HopkmsR 225 Electric Vehicle Supply Equipment(EVSE) 3 1 3 3 Mass DOT(Highway)West Street - 43 650 46 A. 4,804 2,003 0 0 REIMBURSEABLE JOBS: DOER Grants Available:Electric Vehicle(FY18) 3 MASS DOT:West Street,R(FY17/18) 307 Mass DOER Grant: LED Streetllghts(FY35/17) 125 Force Account(MassDOT):Main&Hopkins,R - 225 FY19 Budget March 29,2018 Page 10 CAPITAL PROJECT SUMMARY Project Name: RMLD Lighting (LED) Upgrade Program Project#: 104 Project Schedule: FY18-19 Project Manager: Paul McGonagle, Facilities Manager Reason for Expenditure: Upgrade the existing lighting at 230 Ash Street, 218 Ash Street, and the substations with new,LED fixtures. Energy use will be reduced when switching to LED. This will include interior and exterior light fixtures at the Ash Street campus, including all office spaces, the garage and bay area, and all lighting at the substations. Brief Description/Scope: FY18 A professional electrical engineering firm to design and develop specifications for LED lighting upgrade project. Electrical contractor will be hired to replace existing fixtures with LED retrofits as per electrical engineering recommendation. Work will begin at 230 Ash Street office facilities. �l\ FY19 Work will continue to replace existing interior and exterior light fixtures at all sites as described above. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: The scope includes the installation of new fixtures by an electrical contractor. Status Update: Not applicable. i/ \l FY19 Budget March 29, 2018 Page 11 r t CAPITAL PROJECT COST SHEET � PROJECT NAME: RMLD Lighting(LED)Upgrade Program SCHEDULE: FY18-19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #Of Units (unit rate z labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Une Department: 2-man crew-unit rate in weeks $6,455 $6,267 $92 $0 $0 $0 Engineering and design(contractor) $ 8,000 $0 $0 $0 Electrical contractor $ 25,000 $0 $0 $0 LED fixtures and materials $ 92,000 $0 $0 $0 $ - $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $21 $0 $0 $0 $ Engineering: unit rate in hours $80 $78 $21 $ $0 $0 $0 $ Senior Tech: unit rate in hours $82 $80 $2 $ $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $21 $ $0 $0 $0 $ Police Details week $2,427 $ TOTAL: $0 $0 $0 $ 125,000 PROJECT TOTAL: $125,000 1, ~i FY19 Budget March 29, 2018 Page 12 ' CAPITAL PROJECT SUMMARY Project Name: Parking Lot Upgrade at Ash Street Project#: 140 Project Schedule: FYI 8-19 Project Manager: Paul McGonagle, Facilities Manager Reason for Expenditure: RMLD is planning to install additional electrical vehicle charging stations at the Ash Street facility. The parking lot area is to be expanded and reconfigured to accommodate the installation of these charging stations. RMLD will install one charging station in this newly reconfigured area in FYI 9. Brief Description/Scope: A professional engineering firm to develop construction drawings and bid documents for the construction of the parking lot, installation of conduit and wiring to accommodate future installation of additional charging stations, landscaping, line striping, and signage. A contractor will be hired to do the parking lot construction. Barriers: Unforeseen schedule changes. Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update From Prior Fiscal Year: Not applicable. i� t� FY19 Budget March 29,2018 Page 13 CAPITAL PROJECT COST SHEET PROJECT NAME: Parking Lot Upgrade at 230 Ash Street SCHEDULE: FY18-19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit ratex labor units) Vehicle Straight Straight (labor units x #Of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 $0 $0 $0 Engineering and design $ 30,000 $0 $0 $0 Construction $ 130,000 Installation of conduit and wiring for $0 $0 $0 charging stations(to accommodate $ 20,000 future expansion) $0 $0 $0 Line Striping $ 4,000 $0 $0 $0 Landscaping $ 36,000 $0 $0 $0 Electric Vehicle Charging Station $ 10,000 Une Operations Supervision: unit rate in hours $106 $103 $21 $0 $0 $0 $ - Engineering: unit rate in hours $80 $78 $21 $ i $ Senior Tech: unit rate in hours $82 $80 $21 $ $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $21 $ $0 $0 $0 1 $ Police Details week $2,427 $ TOTAL: $0 $0 $0 $ 230,000 PROJECT TOTAL: $230,000 FY19 Budget March 29, 2018 Page 14 t CAPITAL PROJECT SUMMARY Project Name: Office Upgrades—230 Ash Street Project#: 098 Project Schedule: Annual Project Manager: Paul McGonagle, Facilities Manager Reason for Expenditure: Annual allotment for general.office upgrades at 230 Ash Street. Brief Description/Scope: In FY19, upgrade the Integrated Resources Division area in order to accommodate increased staffing. The room that was formerly a computer repair room needs to be repurposed to an office. Remodel will include modification to the walls, ceilings, flooring, electrical, sprinkler and HVAC. Office cubicle furniture will be purchased to accommodate new employees. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. FY19 Budget March 29, 2018 Page 15 CAPITAL PROJECT COST SHEET PROJECT NAME: Office Upgrades-230 Ash Street SCHEDULE: IY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit ratex labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 $0 $0 $0 Contractor to remodel IRD $ 26,000 $0 $0 $0 Cubicles for IRD $ 4,000 $0 $0 $0 $ - $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $21 $0 $0 $0 $ Engineering: unit rate in hours $80 $78 $21 $ $0 $0 $0 $ $ Senior Tech: unit rate In hours $82 $80 $21 $ ' $0 $0 $0 $ $0 $0 $0 Technical Services Manager: $101 $98 $21 $ unit rate in hours $0 $0 $0 $ Police Details week $2,427 $ TOTAL: $0 $0 $0 $ 30,000 PROJ ECT TOTAL: $30,000 r FY19 Budget March 29, 2018 Page 16 �= CAPITAL PROJECT SUMMARY Project Name: Security System Upgrades—All Sites Project#: 119 Project Schedule: Annual Project Manager: Paul McGonagle, Facilities Manager Reason for Expenditure: The original access control system was installed in 1994 and was replaced in 2016 with a new open-source software system to provide more flexibility to adapt to the changing needs of the RMLD. Funds should be available to continually update equipment and perform maintenance and repair work on both the access control and the surveillance systems at the Ash Street campus and substations. Brief Description/Scope: Access control and surveillance systems upgrades over the next five (5) years: • Add security fencing to server room • Repair and replace card readers annually as needed • Upgrade a portion of high-definition cameras annually as needed • Upgrade cabling f • Repair/replace site lighting Re-key buildings and sensitive areas annually as needed Barriers: None anticipated at this time. Change in Scope of Work from Prior Fiscal Year: Not applicable. Status Update: Not applicable. FY19 Budget March 29,2018 Page 17 \i CAPITAL PROJECT COST SHEET PROJECTNAME: Security Upgrades-All Sites SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit ratex labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: " 2-man crew-unit rate in weeks $6,455 $6,267 $92 $0 $0 $0 Upgrade security equipment,card readers,cameras,lighting,fences,etc. $ 30,000 $0 $0 $0 $ - $0 $o $0 $ $o $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $21 $0 $0 $0 $ Engineering:. unit rate in hours $80 $78 $21 $ $0 $0 $0 $ $ Senior Tech: unit rate in hours $82 $80 $21 $ $o $0 $0 $ $0 $o $0 Technical Services Manager: unit rate in hours $101 $98 $21 $ $0 $0 $0 $ Police Details 1week 1 $2,427 $ TOTAL: $0 $0 $0 - $ 30,000 PROJECT TOTAL: $30;000 i FY19 Budget March 29,2018 Page 18 t � CAPITAL PROJECT SUMMARY Project Name: Rolling Stock Replacement Project#: 118 Project Schedule: Annual Project Manager: Paul McGonagle, Facilities Manager Reason for Expenditure: Replace vehicles based on an eight to.ten-year cycle to reduce maintenance costs and improve reliability. Vehicles removed from the fleet will be disposed of under RMLD Policy No. 2 "Surplus Material." Brief Description/Scope: Specifications, bids, and purchase orders will be completed for FYI delivery of the following: • one (1) new forklift with trade-in of one (1) 1999 Yale forklift • one (1) new pick-up truck with trade-in of one (1) 2009 Ford F150 • one (1) new underground utility vehicle with trade-in of one (1) Ford E350 Barriers: None anticipated at this time. Change in Scope of Work from Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update: Not applicable. FY19 Budget March 29, 2018 Page 19 r� CAPITAL PROJECT COST SHEET Rolling Stock Replacement PROJECT NAME: (vehicles,trailers,fork trucks) SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #Of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Une Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 $0 $0 $0 Forklift each $25,000 1.0 $ 25,000 $0 $0 $0 Light duty pick-up truck each $50,000 1.0 $ 50,000 $0 $0 $0 Underground Utility Vehicle each $200,000 1.0 $ 200,000 $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Une Operations Supervision: unit rate in hours $106 $103 $21 I I $0 $0 $0 $ Engineering: unit rate in hours $80 $78 $21 $ $0 $0 $0 $ - $ Senior Tech: unit rate in hours $82 $80 $21 $ $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $21 $ $0 $0 $0 $ Police Details week $2,427 $ TOTAL: $0 $0 $01 '$ 275,000 PROJECT TOTAL: $275,000 FY19 Budget March 29, 2018 Page 20 Lighf'Duty Velv.cles Average Annual Last Vehicle Year Mileage Current Maintenance Department Vehicle Type FY 18 FY 19 ID# Date Mileage Costs 2008- I present Customer 7 2007 3/10/17 123,077 $1,927.12 Ford Escapc Trade/5 Service i 47 2009 3/10/-17 128,208 $2,03I.24 Engineering Ford F=15Q PU Trade/56 i 28 2007 3/10/17 40,026 $1,302"27 Line Ford E-350 Trade/58 I New(54) iff X Y I Custorn.er � ?0" All Electric Vehicle `60 WO.00 i Electric Service New.(56) 2018 l x x ( X - Engineering � Engneering Pick u Truck f $SU.tIUU;CO ' ~ { New(5Underground 8} 2418 X x Y, Line i � '$2t1UOil 1.011 Utility Vehicle Heavy Duty Line Trucks i j Average Annual 4 Vehicle Last Current Maintenance Year Mileage Department Vehicle Type FY 18 FY 18 j ID# Mileage Costs ZOOS- Date present t 9 2010 3/10/17 119,506 $10,363.61 Linc Inter-40'Bucket Trade/55 New(55) ;2018 x X Y Line letter 40'Bucket- S200,000.0 '. 3 f Fork Lift Average Annual' Vehicle Last Hour Current Maintenance Year Department Vehicle Type FY 18 FY 19 ID# Date Hours Costs 2009- present i Stock/ Line/ Yale Fork FI'-1 1999 3/10/17 772.5 0 Station Truck Trade 5, Ne�v I Stock/ Line./ ' (FT-5) 20'I$ ; k ?C. i Fork Truck ` l; $?x,000 00 :nation FY Totals: $230,QQ0.00 $275.000.00 FY 18 FY 19 FY19 Budget March 29, 2018 Page 21 - CAPITAL PROJECT SUMMARY Project Name: Electric Vehicle Supply Equipment (EVSE) Project#: 099 Project Schedule: FY18-21 Project Manager: Jane Parenteau, Director of Integrated Resources Reason for Expenditure: RMLD will plan to install EVSEs in each of the four towns in the service territory. This will increase RMLD's kWh sales. Brief Description/Scope: Each EVSE is a dual charger. RMLD will work with each town to determine interest in locating a unit within the town and the appropriate location. RMLD will plan to install one EVSE per year. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: In FY18 RMLD installed the first EVSE at the RMLD offices located at 230 Ash Street, Reading. i FY19 Budget March 29,2018 Page 23 rte.. CAPITAL PROJECT COST SHEET PROJECT NAME: Electrical Vehicle Supply Equipment(EVSE) SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: - 2-man crew-unit rate in weeks 1 $6,455 $6,267 $920 One EVSE for installation in RMLD $0 $0 $0 each $10,000 1.0 $ 10,000 service territory. $0 $0 $0 $ - $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Une Operations Supervision: unit rate in hours $106 $103 $2 $0 $0 $0 $ Engineering: unit rate in hours $80 $78 $21 $ $0 $0 $0 $ Senior Tech: - unit rate In hours $82 $80 $21 $ !; $0 $0 $0 $ $0 $0 $0 Technical Services Manager:, unit rate In hours $101 $98 $21 $ $0 $0 $0 $ Police Details, week $2,427 $ TOTAL: $0 $0 $0 $ 10,000 PROJECT TOTAL: $10,000 FY19 Budget March 29, 2018 Page 24 CAPITAL PROJECT SUMMARY Project Name: Battery Storage (Station 3, NR) Project#: 101 Project Schedule: FY19 Project Manager: Tom 011ila, Integrated Resources Engineer Reason for Expenditure: RMLD has been awarded a three-year, $1 m grant from Mass Department of Energy Resources (DOER) to install a 5 MW (10 MWh) grid scale energy storage system at the North Reading substation to provide peak shaving services. The goal for commercial operation date is December 15, 2018. Project contracts, license agreements, system impact study, etc., are now underway or in negotiations. An amount of$100,000 has been allocated to the Capital Budget for substation integration into battery unit. Brief Description/Scope: To be determined. Barriers: ; None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) Not applicable Status Update From Prior Fiscal Year: Not applicable FY19 Budget March 29, 2018 Page 25 CAPITAL PROJECT SUMMARY Project Name: Hardware Upgrades Project#: 127 Project Schedule: Annual Project Manager: Mark Uvanni, IT Manager Reason for Expenditure: This is an amount annually reserved for failed and/or obsolete computer and related equipment. This budget item is also used for unforeseen purchases, which may be necessary. Brief Description/Scope: In addition to the standard hardware purchases described above, we anticipate the following: • EMC SAN Unity 300 to replace VNXe3150 that has reached end of life (per EMC). • Network updates to wireless mesh. Network updates to accommodate feeders. • EMC Data Domain DD2200 to replace current DD160 that will reach end of life (per EMC). Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. FY19 Budget March 29, 2018 Page 27 CAPITAL PROJECT COST SHEET PROJECT NAME: Hardware Upgrades SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $92 $0 $0 $0 General hardware purchases $ 70,000 $0 $0 $0 EMC SAN Unity 300 to replace V $ 26,000 NXe3150 $0 $0 $0 Network updates to wireless mesh $ 8,000 $0 $0 $0 Network updates(to accomodate feeders) $ 5,000 $0 $0 $0 EMC DD2200 Data Domain $ 16,000 $0 $0 $0 $ Une Operations Supervision: unit rate in hours $106 $103 $21 $0 $0 $0 $ Engineering: $80 $78 $21 $ unit rate in hours $ Senior Tech: $82 $80 $21 $ unit rate in hours $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $21 $ $0 $0 $0 $ Police Details week $2,427 $. - TOTAL: $or $o $o $ 125,000 PROJECT TOTAL: $125,000 t FY19 Budget March 29, 2018 Page 28 � 1 CAPITAL PROJECT SUMMARY Project Name: Software and Licensing Project#: 128 Project Schedule: Annual Project Manager: Mark Uvanni, IT Manager Reason for Expenditure: Each year RMLD must renew existing software licenses and purchase new software, either to update existing users or for new users. Additionally, new software may be added at the request of various operating units. This item includes these ad hoc purchases as well as more specific items (outlined below) which are anticipated at this time. Brief Description/Scope: In addition to the standard software and licensing purchases described above, we anticipate the following: • Custom programing/development for GIS/GPS, OM/fixed network, continued CIS integration. e • Substation asset management software to track and trend RMLD's substation assets testing and maintenance. This software could also provide mobile deployment of tablets to upload test results. • Microsoft Great Plains Work Order Management System. This is fully integrated with our existing ERP software and fully integrated to ESRI GIS. The software is provided by Harris Corp (Cogsdale) and installed by them as well. This will be a two-year project, with $75,000 budgeted each year (FY19 and FY20). • SharePoint needs to be completely re-built with Microsoft's "modern" design tools. All groups and security levels needs to be modified. This requires specific expertise with SharePoint. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. FY19 Budget March 29, 2018 Page 29 CAPITAL PROJECT COST SHEET PROJECT NAME: Software and Licensing SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS it of Units (unit rate x labor units) Vehicle Straight Straight (la borunits: #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 $0 $0 $0 General software purchases $ 50,000 $0 $0 $0 Custom programming/development $ 200,000 $0 $0 $0 Substation Asset Management Software $ 80,000 Microsoft Great Plains Work Order $0 $0 $0 Management($150k total;$75KFY19 $ 75,000 and$75K FY20) $0 $0 $0 Re-design SharePoint $ 20,000 $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $21 Supervision of Line crews $0 $0 $0 $ Engineering: unit rate in hours $80 $78 $21 $ \ Pole Foreman,605As,construction $0 $0 $0 $ drawings,switching orders,etc. i1 Senior Tech: unit rate in hours $82 $80 $21 $ $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $21 $ $0 $0 $0 $ Police Details week $2,427 $ - TOTAL: ! �$0 ' $D $4 _ $ . 425,000` PROD ECT TOTALe $425,000 FY19 Budget March 29,2018 Page 30 - ' CAPITAL PROJECT SUMMARY Project Name: Woburn Street (West Street to Concord Street) W Project#: 137 Pole Line Upgrade Project Schedule: FY18-19 Project Manager: John McDonagh, General Line Foreman Reason for Expenditure: The pole line on Woburn Street, Wilmington, between Concord Street and West Street currently has three (3) spacer cable circuits. These poles are under-sized, under-classed, and over 30 years old. This project will upgrade the poles to the proper strength and height class, create the proper NESC clearances between utilities and benefit the long- term reliability of the system. Brief Description/Scope: Replace approximately twenty-four (24) main line poles with 55' poles and four (4) stub poles with 40' poles along a section of Woburn Street in Wilmington between Concord Street and West Street. Frame poles with new hardware and transfer the three (3) spacer cable circuits, replace five (5) transformers, transfer one (1) primary lateral, reconductor with secondary cable, transfer/replace 32 services, and 14 street lights. Street lights will be changed to LEDs (as part of the LED Upgrade Project). Barriers: Although this is a Verizon set area, RMLD will set the poles because this project requires 55' poles. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. FY19 Budget March 29, 2018 Page 31 CAPITAL PROJECT COST SHEET �- Woburn Street,W(West Street to Concord Street), PROJECT NAME: Pole Line Upgrade SCHEDULE: FY18-FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS R of Units (unit rate x labor units) Vehicle Straight Straight (laborunitsx #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Set(24)55'class 1 poles and(4)40'poles. 18 3 $116,194 $18,800 $19,320 55'poles each $800.00 28.0 $ 22,400 Frame 28 poles 40'poles each $400.00 4.0 $ 1,600 Transfer(28)poles/three circuits 9 3 $58,097 $18,800 $11,040 Miscellaneous hardware per pole $800.00 28.0 $ 22,400 Install five(5)transformers 1 1 $6,455 $6,267 $1,840 Install 3,000'of 4/0-3C secondary main 3 $19,366 $0 $2,760 4/0 secondary main triplex AAAC foot $1.23 3000.0 $ 3,690 Install new services(approximately 32) 2 $12,910 $0 $1,840 1/0 service triples AAAC foot $0.90 3200.0 $ 2,880 Line Operations Supervision: $106 $103 ' unit rate in hours Supervision of Line crews 100 32 $10,578 $3,286 $ - Engineering: unit rate,in hours $80 $78 $ Switching and off hours outages for 40 40 $3,205 $3,111 Contract engineering services for pole design cutovers. line design $9,300 1.0 $ 9,300 ; �\ $0 $0 $ Senior Tech: unit rate in hours $82 $80 $21 $ Switching as needed 8 $657 $0 $168 $ - $0 $0 $0 Technical Services Manager: ' $101 unit rate in hours .$98 $ - $0 $0 $ Police Details - week 1 $2,4271 20.01$ 48,550 TOTAL: 1 $227,463 $50,265 $361968 $ 110,820 PROJECT TOTAL: $425,516 a FY19 Budget March 29, 2018 Page 32 CAPITAL PROJECT SUMMARY J Project Name: 115kV Transmission Pole Upgrade, R Project#: 108 Project Schedule: FYI 8-19 Project Manager: John McDonagh, General Line Foreman Reason for Expenditure: The transmission lines that feed Station 4 were built in 1970. The poles, davit arms, insulators, guys, etc., are reaching their end of life and in need of replacement/upgrade. PLM has done a design to bring the poles and hardware up to today's standards. The 211-503 was completed in FYI 8. The 211-504 line will be completed in FYI 9. Brief Description/Scope: The RMLD will purchase all the materials needed to replace six (6) poles on the 211-504 line in FYI 9. The messenger and phase conductors will be re-used as they are the proper size and,are in good condition. Pole 211-504 -4 was replaced in the mid 90's. Although this pole will not be replaced, all the guys, anchors, insulators, etc., will be replaced. Barriers: This work will require the RMLD to secure a transmission line contractor and a transmission line outage from Eversource. During this time, Station 4 will be running on one line. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. 4 f FY19 Budget March 29, 2018 Page 33 CAPITAL PROJECT COST SHEET PROJECT NAME: 115kV Transmission Pole Upgrade(211-504line) SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit ratex labor units) Vehicle Straight Straight (laborunitsx #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: ' 2-man crew-unit rate in weeks $6,455 $6,267 $920 $0 $0 $0ransmission Line Contractor job $160,000 1 $ 160,000 for 211-504 line $0 ` $0 $0 Various materials(insulators,davit per arms,poles,anchors,guy grips,etc.) pole $7,100 7 $ 49,700 $0 $0 $0 $ - $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 - Project Oversight 40 $4,231 $0 $ - Engineering: - unit rate in hours $80 $78 $ Switching and monitoring. 31 9 $2,484 $700 $ - $ �� ! SeriiorTech: $62 $80 $21 $ unit rate in hours Switching and testing. a20 $1,643 $o $420 $$0 $0 $0 Technical Services Manager:unit rate in hours $101 $98 $ Switching and monitoring. $3,338 $0 $ Police Details week 1 $2,4271- 1$ TOTAL: 1 $11,696 $700 $420 $ 209700 PROJECT TOTAL:.'" $222,516 2 r' FYI Budget March 29, 2018 Page 34 CAPITAL PROJECT SUMMARY Project Name: 35 kV Underground Cable Upgrade Project#: 109 Station 4, 5 and RR ROW Project Schedule: FY18-20 Project Manager: Brian Smith Senior Distribution Engineer Reason for Expenditure: The 35 kV underground cables that make up circuits 4P2 and 4P9 are original to the building at the Station 5 and are over 36 years old. The cables have reached their end of life. The riser structures for 4P2 and 4P9 on the ROW at Causeway Road are also near the end of life and will be replaced. Brief Description/Scope: Replace approximately 16,200 feet of 350 mcm CU underground cable on.circuits 4P2 and 4P9 at Station 4, Station 5 and on the RR ROW. Replace riser pole structures at ROW at Causeway Road for 4P2 and 4P9. FY18: Replace 4,500' of 4P2 at Station 4. Replace riser pole structures at ROW at Causeway Road for 4P2. FYI 9: Replace 4,500' of 4P9 at Station 4. Replace riser pole structures at ROW at Causeway Road for 4P9. FY20: Replace 6,300' of 4P9 on the railroad right of way, and 900' at Station 5. Barriers: This project will need to be scheduled for light load periods.While either circuit is out of service, Station 5 will be running on one line. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. FY19 Budget March 29, 2018 Page 35 i CAPITAL PROJECT COST SHEET 35kV Underground Cable Upgrade PROJECT NAME: 4P9 Substation 4,R SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #Of Units (unit rate x labor units) Vehicle Straight Straight (laborunitsx #of 1TEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Remove and install 4,500' of 35kV,350CU UG cable-Station 4 UG 5 $32,276 $0 $4,600 35kV cable,350 CU foot $15 6000.0 $ 90,000 Terminations/splicing of cable 4 $25,821 $0 $3,680 Underground contractor assist week $7,054 4.5 $ 31,741 $0 $0 $0Termination/splice kits each $350 48.0 $ 16,800 Reconstruct 35kV riser structure 3.5 $22,593 $0 $3,220 Poles/miscellaneous materials each $1,000 2.0 $ 2,000 $0 $0 $0 $ - $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 Supervision of Line crews 40 $4,231 $0 $ Engineering: unit rate in hours $80 $78 $ Project management,switching/ 40 $3,205 $0 $ tagging Senior Tech: $82 $80 $21 $ unit rate in hours Testing,switching,tagging 80 $6,574 $0 $1,680 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $ Testing,switching,tagging 40 $4,046 $0 $ - Police Details week $2,427 $ TOTAL: $98,746 $0 $13;180 $ 140,541 I?ROJECT TOTALS $252,467 u FY19 Budget March 29, 2018 Page 36 CAPITAL PROJECT SUMMARY Project Name: Pad-mount Switchgear Upgrade at Project#: 102 Industrial Parks Project Schedule: Annual Project Manager: Peter Price, Senior Distribution Engineer Reason for Expenditure: Increase distribution system protection in the underground industrial parks in Wilmington and North Reading as well as the three-phase underground distribution areas in Reading, i.e., River Park Drive, Jonspin Road, Haven Street, Woburn Street, Industrial Way, etc. Brief Description/Scope: Purchase new units to replace live front pad-mounted switchgear. New units will be dead front with provisions for remote/supervisor control. There are currently 29 units system-wide. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update From Prior Fiscal Year: The Department is working to complete the replacement of switch-1 on Jonspin Road, Wilmington, switch-2 on River Park Drive, North Reading, switch-2 and switch-3 on Concord Street, North Reading, switch-1 and switch-2 at 80 Industrial Way, Wilmington and switch-1 on Woburn Street at Reading Town Hall. ).tel FY19 Budget March 29, 2018 Page 37 CAPITAL PROJECT COST SHEET PROJECT NAME: Pad-mount Switchgear Upgrades at Industrial Parks SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight (labor units #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $92 Replace pad-mount switchgear 2 $0 $12,534 $1,840 raver pad-mounted switches each $62,500 5 $ 312,500 (2-220A,2-600A positions) Make up t-bodies and LB elbows 2 $12,910 $0 $1,840 -bodies,LB elbows,miscellaneous each $300 12 $ 3,600 connectors for 12 primary cables Splice out line and load side primary cables 2 $0 $12,534 $1,840 Splices for line and load side primaries each $250 12 $ 3,000 $0 $0 $0 Primary cable for piece outs foot $20 1000 $ 20,000 $0 $0 $0 Excavation contractor to adjust pad for each $8,000 5 $ 40,000 newswitchgear $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 Supervision of Line crews 40 24 $4,231 $2,465 $ Engineering: unit rate in hours $80 $78 $ Prepare switching order,coordinate outages,pad modifications,order 40 48 $3,205 $3,733 $ materials,etc. $ Senior Tech: - - unit rate In hours $82 $80 $21 $ $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $ $0 $0 $ Police Details week $2,427 $ TOTAL:. 1 $20,346 $31,2651 $5,520 $ `379;100 PROJECT TOTAL: $436,232 FY19 Budget March 29, 2018 Page 38 CAPITAL PROJECT SUMMARY Project Name: Grid Modernization & Optimization Project#: 103 Project Schedule: On-going Project Manager: Hamid Jaffari, Director of Engineering & Operations Peter Price, Senior Distribution Engineer Brian Smith, Senior Distribution, Engineer Reason for Expenditure: In compliance with DPU/OSHA Order DPU 12-76B, increase system reliability, modernize/optimize system operation and functionality, decrease system losses and expenses for labor and truck rolls related to outage management. Brief Description/Scope: Continue implementation of grid modernization/optimization road map including installation and integration of smart switches, IntelliRupters, and capacitor banks and controls. Installation and integration of outage management system (OMS) with an IVR system to optimize outage restoration process. Cyber security, simulator, fiber -� rationale connection, fault detection, economic dispatch, and overall system integration, including GIS and AMI. Barriers: Technology/software integration; merging old technology with new emerging technology. Change in Scope of Work From Prior Fiscal Year: Addition of IVR system. Status Update: We anticipate 12 switches and two IntelliRupters will be installed by the end of FY18. We anticipate the OMS system, customer portal, and outage dashboard to be operational by the end of FY18. r 4 � FY19 Budget March 29, 2018 Page 39 a CAPITAL PROJECT COST SHEET r, Grid Modernization&Optimization PROJECT NAME: Scada-Mate Switches SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight (iaborunitsx #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Install Scada-Mate Switches and controls 1 $6,455 $0 $920 Scada-Mate CX Switch each $35,000 4 $ 140,000 Replace pole,install by-pass disconnects, 7 $45,187 $0 $6,440 55'pole,x-arms,brackets,guys, each $2,000 4 $ 8,000 transfer pri,sec,etc. anchors,miscellaneous hardware,etc. switch $0 $0 $0 6801 license each switch $2,000 4 $ 8,000 $0 $0 $0 IntelliTeam License each $1,000 4 $ 4,000 switch Install three(3)repeaters/radios per switch. 0.4 $2,582 $0 $368 S&C repeaters/radios each $3,000 12 $ 36,000 $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 Supervision of Line crews 160 $16,925 $0 $ - Engineering: unit rate in hours $80 $78 $ 40 �L Pole Foreman,construction drawings,etc. $3,204.80 $0 $ Prepare switching orders,order materials, 40 $3,204.80 $0 establish communication $ Senior Tech: unit rate in hours $82 $80 $21 $ Controls,programming,commissioning,etc. 64 $5,259 $0 $1,344 $ $0 $0 $0 Technical Services Manager: $101 $98 $ , unit rate in hours Controls,programming,commissioning,etc. 32 $3,237 $0 $ Police Details 1week 1 $2,427 4.0 $ 9,710 TOTAL: +: $86,054 $0 $9,072 $ ,`• 205,750 PROJECT TOTAL: $300,836 l� FY19 Budget March 29, 2018 Page 40 CAPITAL PROJECT COST SHEET Grid Modernization and Optimization PROJECT NAME: IntelliRupters SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: $6,455 $6,267 $920 2-man crew-unit rate in weeks Install lntelliRupterSwitch 1 $6,455 $0 $9201ntelliRupterswitch each $40,000 2 $ 80,000 Replace pole,install by-pass disconnects, 3 $19,366 $0 $2,760 55'pole,cross-arms,brackets,guys, each $2,000 2 $ 4,000 transfer pri,sec,etc anchors,miscellaneous hardware,etc. $0 $0 $0 IntelliRupter license each $2,000 2 $ 4,000 $0 $0 $0 IntelliTeam license each $1,000 1 $ 1,000 $0 $0 $0 $ - $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $0 $0 $ Engineering: unit rate In hours $80 $781, $ Pale Foreman,construction drawings,etc. 24 $1,923 $0 $ - iPrepare switching orders,order materials, —` establish communication 24 $1,923 $0 $ Senior Tech: unit rate in hours $82 $80 $21 $ Controls,programming,commissioning,etc. 64 $5,259 $0 $1,344 $ 0 0 0 Technical Services Manager: unit rate in hours $101 $98 $ Controls,programming,commissioning,etc. 16 $1,618 $0 $ Police Details - week $2,427 2.01$ 4,855 1' TOTAL:' $36,5444 $0 $5,024. PROJECT TOTAL: $135,423 I FY19 Budget March 29,2018 Page 41 L CAPITAL PROJECT COST SHEET Grid Modernization&Optimization PROJECT NAME: SCADA Upgrade SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks 1 $6,455 $6,267 $920 $0 $0 $0 Software upgrades for SCADA $ 21,000 $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $0 $0 $ Engineering: „ $80 $78 unit rate In hours $ $0 $0 $ $ Senior Tech: unit rate In hours $82 $80 $21 $ $0 $0 $0 $ -��--v $0 $0 $0 _ _ -L Technical Services Manager: unit rate in hours $101 $98 $ $0 $0 $ Police Details week $2,427 $ TOTAL: $0 $0 $0 $ •21,000 PROJ ECT TOTAL: $21,000 1 FY19 Budget March 29,2018 Page 42 CAPITAL PROJECT COST SHEET Grid Modernization&Optimization PROJECT NAME, Software Integration SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle Straight Straight (laborunits■ #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 $0 $0 $0 Services from vendor for integration of $10,000 1 $ 10,000 AMI and various devices $0 $0 $0 $ - $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Une Operations Supervision: unit rate in hours - $106 $103 $0 $0 $ Engineering: ' unit rate in hours $80 '$78 - $ Work with vendor for software integration 24 $1,923 $0 $ - i - enlorTech: >._,i nit rate in hours $82 $80 $21 $ Work with vendor for software integration 24 $1,972 $0 $504 $ - $0 $0 $0 Technical Services Manager: unit rate in hours - $101 $98 $ - $0 $0 $ Police Details 1week 1 $2,427 $ TOTAL: $3,895 $0 $5041 10,000. PROJECTTOTAL• $14,399 i FY19 Budget March 29,2018 Page 43 r CAPITAL PROJECT COST SHEET Grid Modernization&Optimization PROJECT NAME: IVR Integration SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 $0 $0 $0 IVR System each $100,000 1 $ 100,000 $0 $0 $0 IVR System integration with Survalent each $32,000 1 $ 32,000 (license and commissioning) $0 $0 $0 $ - $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $0 $0 $ Engineering: $80 $78 $ unit rate In hours Work with new vendor and Survalent for 80 $6,410 $0 $ r � project integration Senior Tech: unit rate in hours $82 $80 $21 $ $0 $0 $ $0 $0 Technical Services Manager: $101 $98 $0 $ unit-rate in hours $0 $0 $ Police Details week $2,427 $ TOTAL: $6,410 $0 $0 $ ''' 132,000 PROJECT TOTAL: $138,410 L FY19 Budget March 29, 2018 Page 44 h j CAPITAL PROJECT COST SHEET Grid Modernization&Optimization PROJECT NAME: Capacitor Bank Automation SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #Of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit in weeks $6,455 $6,267 $920 t $0 $0 $0 CBC 800 CAP controller each $2,200 6.0 $ 13,200 $0 $0 $0 RFN 1200 radio each $800 6.0 $ 4,800 $0 $0 $0 Miscellaneous controller er $400 6.0 $ 2,400 $0 $0 $0 $ - $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $0 $0 $ Engineering: unit rate in hours $80 $78 $ Connecting to Eaton System and SCADA 144 $11,537 $0 $ - switching eniorTech: � nit ratein hours $82 $80 $21 $ Controls,programming,commissioning, 192 $15,777 $0 $4,032 $ - installation,etc. $0 $0 $0 Technical Services Manager:: - $101 $98 $ - unit rate in hours Controls,programming,commissioning, 144 $14,566 $0 $ - installation,etc. Police Details !week $2,427 $ - TOTAL: $41,880 $0 $4,032 $ 20,400 PROJECT TOTAL F $66,312 FY19 Budget March 29, 2018 Page 45 CAPITAL PROJECT SUMMARY Project Name: New Wilmington Substation Project#: 105 Project Schedule: FY17-23 Project Manager: Manole Agouridis, Distribution Engineer Reason for Expenditure: Substation 5 has reached the end of its useful life. The transformer and switchgear need major upgrades / repairs to keep substation operational. The new Wilmington substation will be a replacement for Substation 5, while also providing added benefits to RMLD. Brief Description/Scope: Install a new 115k/ 13.8 kV substation in Wilmington in the Ballardvale area. The new substation will include two (2) 60 MVA transformers and 15kV switchgear with eight (8) feeder breaker positions. It shall also provide backup and load relief for both Substation 3 and Substation 4. Barriers: Availability of land. JJ, Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update From Prior Fiscal Year: RMLD continues to explore options for location of the new substation. FY19 Budget March 29, 2018 Page 47 r CAPITAL PROJECT COST SHEET PROJECT NAME: Wilmington Substation SCHEDULE: FY17-23 DESCRIPTION COST Purchase Land $ 650,000 Construction Contractor $ 1,800,000 Power Transformers $ 2,000,000 15kV Switchgear $ 2,000,000 Substation Equipment Package $ 600,000 Testing and Commissioning $ 120,000 Environmental Permitting $ 25,000 Distribution Phase 1 $ 869,0001`_-- Distribution Phase 2 $ 2,329,000 Indirects(includes RMLD labor) $ 505,000 Contingency $ 400,000 $ 11,298,000 FYI Budget March 29, 2018 Page 48 CAPITAL PROJECT SUMMARY Project Name: Ballardvale Street Pole Line Upgrade, W Project#: 123 Pole Line Upgrade Project Schedule: FY19-20 Project Manager: Manole Agouridis, Distribution Engineer Reason for Expenditure: To upgrade the pole line starting near the location of the proposed Wilmington substation and ending at Route 125. This shall include pole upgrades and attached feeder upgrades, and associated work to install provisions for future circuits.from the proposed substation. Brief Description/Scope: The aforementioned, one-mile section of Ballardvale Street spans 30 poles that starts at the location of the proposed Wilmington substation and ends at the intersection of Route 125. This project will result in the upgrade of almost all 30 poles, and shall include the reconductoring of circuits 5W5 and 5W9 in this area. In addition, poles with added height will be installed for the potential to install additional circuits from the proposed Wilmington substation. The idea is to perform these upgrades ahead of new substation construction so these two projects are NOT occurring concurrently and disrupting the Ballardvale Street area. } Barriers: This project shall coincide with the proposed Wilmington substation location. If the location of the substation is moved, this capital project shall be revisited/reprioritized accordingly. Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update From Prior Fiscal Year: Not applicable. FY19 Budget March 29, 2018 Page 49 CAPITAL PROJECT COST SHEET PROJECTNAME: BallardvaleStreet-PoleLineUpgrade,W SCHEDULE: FY19-FY20 RMLD LABOR MATERIALS/CONTRACTORS Labor Total O of Units (unit rate.labor units) Vehicle Straight Straight (labor units. 0 of ITEM/TASK Time OT Time Overtime vsnida rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: , 2-man crew-unit rate in weeks $6,455 $6,267 $920 Set(30)55'Class 1 poles 12 $77,463 $0 $11,040 55'-1 poles each $800.00 30 $ 24,000 15 kV Hendrix brackets,miscellaneous Transfer(30)poles 12 $77,463 $0 $11,040 hardware,miscellaneous primary per $800.00 30 $ 24,000 connectors(spacers,insulators,etc.) pole Setup for(8,000')spacer install 4 $25,821 $0 $3,680 0.052 messenger wire foot $1.23 8000 $ 9,840 Pull in and install(8,000')556 4 $25,821 $0 $3,680 15kV,556AL spacer cable foot $2.02 24000 $ 48,480 Transfer secondaries,services,street lights, 2 $12,910 $0 $1,840 Miscellaneous secondary hardware, per and fiber optic cable brackets and connectors pole $500.00 30 $ 15,000 $0 $0 0 $ Line Operations Supervision: unit rate in hours $106 $103 Su ervision of Line crews 200 $21,156 $0 $ Engineering: " unit rate in hours $80 $78 $ - Prepare construction documents,Pole 110 $8,813 $0 $ foreman,605As Switching and off-hour outages for cutovers. 40 40 $3,205 $3,111 $ Senior Tech:, .. unit rate in hours $82 $80 $21 $ - Switching as needed. 8 $657 $0 $168 $ $0 $0 $0 �) V Technical Services Manager: $101 $98 $ unit rate in hours $0 $0 $ Police Details week' .$2,427 17.0.$' -41,267 `.TOTAL: $253,310 $3,111".$31,448 $ '`362;587- $121,320 PROTECT TOTAL: $450,456 i FY19 Budget March 29, 2018 Page 50 �-� CAPITAL PROJECT SUMMARY Project Name: Force Account- Massachusetts Department Project#: TBD of Transportation: Main and Hopkins, R Project Schedule: FY19 Project Manager: Peter Price, Senior Distribution Engineer Reason for Expenditure: The Massachusetts Department of Transportation has notified RMLD of a project that may be planned for FY19. We are reserving an amount in the Capital Budget for this project. Brief Description/Scope: MassDOT has plans to improve the traffic flow at the intersection of Main Street and Hopkins Street in Reading. This plan includes the widening of Main Street and the installation of traffic signals. This project will require the RMLD to relocate up to 12 poles and petition and install up to three (3) guy poles along Main Street and Hopkins Street. This project may require the installation of laminated poles. Barriers: Verizon set area. Some poles will need to be petitioned. MassDOT will need to secure - easements as needed for poles, anchors and guys at several locations. Project also involves the relocation of the UG service to the restaurant at 107 Main Street. Change in Scope of Work from Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update From Prior Fiscal Year: Not applicable. � 3 FY19 Budget March 29, 2018 Page 51 `-' CAPITAL PROJECT SUMMARY Project Name: 4W5 Getaway Replacement, W Project#: 122 Project Schedule: FYI Project Manager: Manole Agouridis, Distribution Engineer Reason for Expenditure: To upgrade 1,515 circuit feet of underground cable from Station 4 to West Street. The cable is being replaced to add capacity and replace the existing getaway, which is nearing the end of its useful life. Brief Description/Scope: The 4W5 getaway has five (5) sections of underground cable. It is assumed this project will only focus on replacing the existing 500 CU cable with 750 CU cable. Barriers: Potential unforeseen issues with existing duct bank, conduit, and/or manholes that need to be addressed. Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update From Prior Fiscal Year: Not applicable. FY19 Budget March 29,2018 Page 53 CAPITAL PROJECT COST SHEET -- PROJECT NAME: 4W5 Getaway Replacement,W SCHEDULE: FY19 RMLD LABOR Labor Total TR MATERIALS/CONACTORS #of Units (unit rate z labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Prepping for new cable installation loading 2 $12,910 $0 $1,840 15kV cable,750 MCM 1/C,strand foot $14.43 4545.0 $ 65,584 trailers,pumping down manholes,etc. shield,EPR New cable installation-pulling in cable 2 $12,910 $0 $1,840 $ - Terminating and splicing,and wrapping cable,labeling,etc. 2 $12,910 $0 $1,840 Underground contractor assist week $7,054 1.2 $ 8,464 $0 $0 $0 Cold shrink splice or terminations,and point $1,060 6.0 $ 6,358 ancillary Existing cable removal,and scrapping cable 2 $12,910 $0 $1,840 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 Supervision of Line crews 53 $5,606 $0 $ Engineering: unit rate In hours $80 $78 $ l Project management,write,review and 40 $3,205 $0 $ administer switching. Create work order Senior Tech: unit rate in hours $82 $80 $21 $ Switching cable out and back 8 $657 $0 $168 $ Testing and commissioning of new cable. 8 $657 $0 $168 $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $ Oversight of work in substation,switching 8 $809 $0 $ - review Police Details week $2,427 0.5 $ 1,214 TOTAL: $62,577 $0 $7,696 $ 81,621 PROJECT TOTAL: $151,894 f FY19 Budget March 29, 2018 Page 54 t / CAPITAL PROJECT SUMMARY Project Name: 4W6 Getaway Replacement, W Project#: 132 Project Schedule: FY19 Project Manager: Manole Agouridis, Distribution Engineer Reason for Expenditure: To upgrade 1,635 circuit feet of underground cable from Station 4 to West Street. The cable is being replaced to add capacity and replace the existing getaway, which is nearing the end of its useful life. Brief Description/Scope: The 4W6 getaway has five (5) sections of underground cable. It is assumed this project will only focus on replacing the existing 500 CU cable with 750 CU cable. Barriers: Potential unforeseen issues with existing duct bank, conduit, and/or manholes that need to be addressed. �- Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update From Prior Fiscal Year: Not applicable. FY19 Budget March 29, 2018 Page 55 ti CAPITAL PROJECT COST SHEET - PROJECT NAME: 4W6 Getaway Replacement,W SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unitratex labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $92 Prepping for new cable installation loading 2 $12,910 $0 $1,840 15kV cable,750 MCM 1/C,strand foot $14.43 4905.0 $ 70,779 trailers,pumping down manholes,etc. shield,EPR New cable installation-pulling in cable 2 $12,910 $0 $1,840 $ - Terminating and splicing,and wrapping cable,labeling,etc. 2 $12,910 $0 $1,840 Underground contractor assist week $7,054 1.2 $ 8,464 Cold shrink splice or termination,and $0 $0 $0 point $1,060 6.0 $ 6,358 ancillary Existing cable removal,and scrapping cable 2 $12,910 $0 $1,840 $ - $0 $0 $0 $ Line Operations Superv)sion: unit rate in hours. $106 $103 Supervision of Line crews 53 $5,606 $0 $ Engineering: unit rate in hours $80 $78 $ . i Project management,write,review and 40 $3,205 $0 $ administer switching. Create work order $ Senior Tech: unit rate in hours $82 $80 $21 $ Switching cable out and back 8 $657 $0 $168 $ Testing and commissioning of new cable. 8 $657 $0 $168 $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $ Oversight of work in substation,switching 8 $809 $0 $ review Police Details week $2,427 0.5 $ 1,214 TOTAL:: $62,577 $0 $7,696 :., $ 86,816 PROJECT TOTAL:' $157;089 FY19 Budget March 29, 2018 Page 56 CAPITAL PROJECT SUMMARY Project Name: 4W16 Getaway Replacement, W Project#: 135 Project Schedule: FY19 Project Manager: Manole Agouridis, Distribution Engineer Reason for Expenditure: Upgrade 2,250 circuit feet of underground cable from Station 4 to Causeway Road/Lowell Street. The cable is being replaced to add capacity and replace the existing overloaded getaway, which is nearing the end of its useful life. Brief Description/Scope: The 4W16 getaway has six (6) sections of underground cable. It is assumed this project will only focus on replacing the existing 500 CU cable with 750 CU cable. Barriers: Potential unforeseen issues with existing duct bank, conduit, and/or manholes that need to be addressed. Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) j Not applicable. Status Update From Prior Fiscal Year: Not applicable. FY19 Budget March 29, 2018 Page 57 CAPITAL PROJECT COST SHEET PROJECT NAME: 4W16 Getaway Replacement,W SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight I (lab orunits x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Prepping for new cable installation loading 2.5 $16,138 $0 $2,300 15kV cable,750 MCM 1/C,strand foot trailers,pumping down manholes,etc. shield,EPR $14.43 6750.0 $ 97,403 New cable installation-pulling in cable 2.5 $16,138 $0 $2,300 $ Terminating and splicing,and wrapping cable,labeling,etc. 2.5 $16,138 $0 $2,300 Underground contractor assist week $7,054 1.4 $ 9,875 $0 $0 $0 Cold shrink splice or termination,and ancillary point $1,092 7.0 $ 7,643 Existing cable removal, and scrapping cable 2.5 $16,138 $0 $2,300 $ - $0 $0 0 $ Line Operations Supervision: unit rate in hours $106 $103 Supervision of Line crews 64 $6,770 $0 $ Engineering: $80 $78 unit rate in hours $ r, Project management,write,review and 40 $3,205 $0 $ - administer switching. Create work order Senior Tech:- unit rate in hours $82 $80 $21 $ Switching cable out and back 8 $657 $0 $168 $ Testing and commissioning of new cable. 8 $657 $0 $168 $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $ Oversight of work in substation,switching 8 $809 $0 $0 review $ Police Details week $2,427 2.0 W" TOTAL:. $76,61 $0 $9,536 . PROJECT TOTAL: $205,962 FY19 Budget March 29,2018 Page 58 CAPITAL PROJECT SUMMARY Project Name: AMI Mesh Network Expansion Project#: 112 Project Schedule: Annual Project Manager: Nick D'Alleva, Technical Services Manager Reason for Expenditure: In order to expand RMLD's AMI mesh network, additional relays, retrofit kits, and meters need to be purchased and installed. These new/retrofit meters will give the RMLD the ability to monitor voltage, current, demand, power factor and power quality. They will also provide end-of-the-line voltage. Brief Description/Scope: Purchase and install meters and retrofit kits that are compatible with the AMI Mesh Network. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update From Prior Fiscal Year: Not applicable. FY19 Budget March 29, 2018 Page 59 1 CAPITAL PROJECT COST SHEET — PROJECT NAME: AMI Mesh Network Expansion SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight (labor units #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: $6,455 $6,267 $920 2-man crew-unit rate in weeks $0 $0 $0 1$ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $0 $0 $ Engineering: unit rate in hours $80 $78 $ $0 $0 $ Meter Tech: unit rate in hours $50 $48 $21 $ Install relays and meters to expand AMI 240 $11,990 $0 $5,040 Relays each $300 25 $ 7,500 Mesh Network AMI Retrofits each $100 250 $ 25,000 Commercial meters each $700 50 $ 35,000 Single-phase meters each $122 250 $ 30,500 Technical Services Manager: - unit rate in hours $101 $98 $ Oversight of project 60 $6,069 $0 $ - Police Details 1week 1 $2,427 $ TOTAL: $18,0591 $0 $5,0401 1$ 98,000 r PROJECT TOTALi $121,099 FY19 Budget March 29, 2018 Page 60 CAPITAL PROJECT SUMMARY Project Name: Communication Equipment (for Fiber Optic) Project#: '126 Project Schedule: Annual Project Manager: Peter Price, Senior Distribution Engineer Brian Smith, Senior Distribution Engineer Reason for Expenditure: As the RMLD expands its use of the fiber optic network to establish communication with metering equipment, recloser controls, capacitor bank controls and other distribution equipment, the Department will create fiber nodes at various locations along the fiber optic network. Each node will require an enclosure, a fiber optic interface, a power supply, cabling, fiber optic cable, and the termination of the fiber optic cable. Brief Description/Scope: Purchase materials and procure fiber optic cable splicers as needed. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: The Department has expanded the fiber optic network at existing fiber nodes for use with the distribution automation projects. � s FY19 Budget March 29, 2018 Page 61 r_\ CAPITAL PROJECT COST SHEET PROJECT NAME: Communication Equipment(Fiber Optic) SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #Of Units (unit ratex labor units) Straight Straigh� Vehicle(labor unitsx #Of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Une Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 $0 $0 $0 Siemens RS900,9 port managed each $1,500 12 $ 18,000 ethernet switch $0 $0 $0 Fiber optic patch cords SC-SC each $5 72 $ 360 $0 $0 $0 Pole-mount fiber optic cable enclosure each $2,500 3 $ 7,500 with patch panel and UPS $0 $0 $0 ADSS fiber optic cable 72 ft $1 10000 $ 10,000 $0 $0 $0 Contractor: Fiber optic cable splicing day $1,600 5 $ 8,000 and materials. $0 $0 $0 $ Une Operations Supervision: unit rate In hours $106 $103 $0 $0 $ Engineering: unit rate In hours $80 $78 $ $0 $0 $ p- $ Senior Tech: unit rate in hours $82 $80 $21 $ $0 $o $0 $ $D $0 $0 Technical Services Manager: unit rate in hours $101 $98 $ $0 $0 $ Police Details 1week 1 $2,427 2.0 $ 4,855 TOTAL: 1 $0 ,$0 $0 $ 48,215 PROJ ECT TOTAL:. $48,715, Y l FY19 Budget March 29, 2018 Page 62 CAPITAL PROJECT SUMMARY Project Name: Substation Equipment Upgrade Project#: 111 Project Schedule: Annual Project Manager: Nick D'Alleva, Technical Services Manager Reason for Expenditure: United Power Group and RMLD personnel have identified equipment that needs to be replaced or upgraded as a result of their condition assessment of our substation equipment. Brief Description/Scope: Purchase remote racking device for breakers at Station 3. Purchase and install miscellaneous equipment at Stations 3, 4 and 5. Barriers: Availability of replacement parts. Change in Scope From Prior Fiscal Year: None. Status Update: Not applicable. i FY19 Budget March 29, 2018 Page 63 CAPITAL PROJECT COST SHEET PROJECT NAME: Substation Equipment Upgrade SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #Of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Une Department: $6,455 $6,267 $920 2-man crew-unit rate in weeks $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate In hours $106 $103 $0 $0 $ Engineering: unit rate in hours $80 $78 $ $0 $0 $ Senior Tech: unit rate in hours $82 $80 $21 $ Install equipment 100 $8,217 $0 $2,100 Remote racking device for breakers at each $30,000 1 $ 30,000 Station 3 $0 $0 $0 Miscellaneous equipment $ 10,000 r Technical Services Manager: unit rate In hours $101 $98 $ $0 $0 $ Police Details week $2,427 $ TOTAL: 1 $8,217 $0 $2,100 $ 40,000 PROJECT TOTAL: $50,317 FY19 Budget March 29, 2018 Page 64 CAPITAL PROJECT SUMMARY Project Name: Power/Lab and Tool Equipment Project#: 115 Project Schedule: Annual Project Manager: n/a Reason for Expenditure: This is an amount reserved for purchase of power/lab and tool equipment. Brief Description/Scope: The following items will be purchased in FY19: a Electric phasing meter/hi-pot—six (6) units will be purchased in FY19. Additional units will be scheduled for purchase in the future. a In-service meter accuracy tester for commercial metering (1 unit) a Contact resistance tester for substations (1 unit) i - a Four-point battery hydraulic press (2 units) Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. FY19 Budget March 29,2018 Page 65 CAPITAL PROJECT COST SHEET PROJECT NAME: Power/Lab and Tool Equipment SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit ratex labor units) Vehicle Straight Straight (labor unitsx #Of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 $0 $0 $0 Electric phasing meter/hi-pot each $3,000 6 $ 18,000 $0 $0 $0 In-service meter accuracy tester for each $40,000 1 $ 40,000 commercial metering $0 $0 $0 Contact resistance tester(for each $10,000 1 $ 10,000 substations) $0 $0 $0 Four point battery hydraulic press each $3,800 2 $ 7,600 $0 $0 $0 $ - $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $0 $0 $ Engineering: $80 $78 $ unit rate inhours $0 $0 $ Senior Tech: $82 $80 $0 $ unit rate in hours $0 $0 $0 $ $0 $0 $0 Technical Services Manager: $101 $98 $ unit rate in hours $0 $0 $ Police Details week $2,427 $ - TOTALd. $0 $01 $0 $ 75,600 PROJECT TOTAL $75,600 FY19 Budget March 29, 2018 Page 66 4 s CAPITAL PROJECT SUMMARY Project Name: Meters Project#: 117 Project Schedule: Annual Project Manager: Nick D'Alleva, Technical Services Manager Reason for Expenditure: Purchase of meters and metering equipment for new construction, upgrades, and failures. Brief Description/Scope: Two hundred residential and commercial meters as well as miscellaneous hardware will be purchases for stock. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. FY19 Budget March 29, 2018 Page 67 CAPITAL PROJECT COST SHEET PROJECT NAME: Meters SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate z labor units) Vehicle Straight Straight (labor units z #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: - - 2-man crew-unit rate in weeks $6,455 $6,267 $920 $0 $0 $0 Residential and commercial meters for each $300 200 $ 60,000 stock. $0 $0 $0 $ - $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $21 $0 $0 $0 $ Engineering: $80 $78 $21 $ unit rate In hours $0 $0 $0 $ Sen)orTech: $82 $80 $21 $ unit rate in hours $0 $0 $0 $ - - $0 $0 $0 Technical Services Manager: $101 $98 $21 $ unit rate in hours $0 $0 $0 $ - Police,Details week $2,427 _ $ TOTAL:::' $0' $0 $0 $ 60,000, PROJECT TOTAL: $60,000 1` 1 FY19 Budget March 29, 2018 Page 68 C�J CAPITAL PROJECT SUMMARY Project Name: Transformers and Capacitors Project#: 116 Project Schedule: Annual Project Manager: Vaughan Bryan, Distribution Engineer Reason for Expenditure: A major quantity of standard units is necessary for proposed projects and stock on an ongoing basis. Brief Description/Scope: Tranformer and capacitor bids will be prepared and units purchased as outlined on the Project Cost Sheet. Barriers: None anticipated at this time Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. FYI Budget March 29, 2018 Page 69 CAPITAL PROJECT COST SHEET PROJECT NAME: Transformers and Capacitors SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle straight Straight llaborunitsz #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Three-phase pad-mount transformers $0 $0 $0 for proposed commercial services and each $12,500 20 $ 250,000 stock $0 $0 $0 Single-phase pad-mount transformers each $2,500 50 $ 125,000 for proposed subdivisions and stock. Three-phase pole-mount transformers $0 $0 $0 for proposed commercial services and each $5,500 15 $ 82,500 stock Single-phase pole-mount transformers $0 $0 $0 for proposed residential services and each $1,500 50 $ 75,000 stock $0 $0 $0 1,200 War capacitor banks each $12,500 4 $ 50,000 $0 $0 $0 $ Une Operations Supervision: $106 $103 $21 unit rate in hours $0 $0 $0 $ Engineering: unit rate in hours $80 $78 $21 $ $0 $0 $0 $ Senior Tech: unit rate in hours $82 $80 $21 $ $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $21 $ $0 $0 $0 $ Police Details week $2,427 $ TOTAL: $0 $0 $0 $., ..582;500! PROJECT TOTAL:: $582,500 FY19 Budget March 29, 2018 Page 70 �j CAPITAL PROJECT SUMMARY Project Name: Pole Replacement Program, R, NR Project#: 175 Project Schedule: Annual Project Manager: John McDonagh, General Line Foreman Reason for Expenditure: In 2015 RMLD initiated a Pole Inspection Program. Ten percent of RMLD-owned poles are inspected annually by an outside contractor using various technology including resistorgraph technology. This Inspection Program provides RMLD with verifiable data on pole condition. Testing (through FY18), has identified 475 poles that were recommended for replacement. Brief Description/Scope: RMLD will replace 50 poles per year that are identified as part of the Pole Inspection Program. This project includes setting poles, transfers, and replacement of secondary services as needed. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update From Prior Fiscal Year: Since the inception of the Pole Inspection Program a total of 187 poles have been replaced, and 172 transfers have been completed (as of March 2018). FY19 Budget March 29, 2018 Page 71 CAPITAL PROJECT COST SHEET - PROJECT NAME: Pole Replacement Program SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle Straight Straight (laborunitsx #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Set and transfer 50 poles. 20 5 $129,105 $31,334 $23,000 Poles each $400 50.0 $ 20,000 $0 $0 $0 Miscellaneous hardware(bolts,etc.) per pole $90 50.0 $ 4,500 Service upgrades as necessary 1.2 $7,746 $0 $1,104 Connectors and wires(for service per $213 50.0 $ 10,650 upgrades) service $0 $0 $0 S - $0 SO $0 $ So Sol SO S Une Operations Supervision: unit rate in hours $106 $103 Crew supervision 200 40 $21,156 $4,108 $ Engineering: unit rate in hours $80 $78 $ - Pole Foreman and DigSafes' 40 $3,205 $0 1 $ - Senior Tech: - unit rate in hours $82 $80 $21 $ $0 $0 $0 $ $O $0 $0 �~ Technical Services Manager: }' unit rate in hours $101 $98 $ - $0 $0 $ - Police Details Iweek 1 $2,4271 3.01$ 7,282 TOTAL: 1 $161,2121 $35,4421 $24,1041 432 PROJ ECT TOTAL: $263,190 1 FY19 Budget March 29, 2018 Page 72 t_ CAPITAL PROJECT SUMMARY Project Name: Secondary and Main Replacement Program Project#: 458 Project Schedule: Annual Project Manager: John McDonagh, General Line Foreman All Engineers Reason for Expenditure: This preventive maintenance program is intended to upgrade and improve system reliability and address aging infrastructure. Brief Description/Scope: This program identifies aging infrastructure and addresses a variety of work to include: secondary upgrades and service drop upgrades as needed. The pole replacements, primary cable replacement and transformer upgrades will be done in conjunction with the Stepdown Area Conversions, Project 107. Two areas will be targeted for upgrade in FY19. Barriers: Future upgrades are in Verizon set territory and could result in pole setting delays. Change in Scope of Work from Prior Fiscal Year: Increase (Decrease) Not applicable. Status Update from Prior Fiscal Year: Not applicable. FY19 Budget March 29,2018 Page 73 1 , CAPITAL PROJECT COST SHEET Secondary&Main Replacement Program PROJECT NAME: Project 1: Gerry Road&Drury Lane Area,LC SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Frame up to 28 Verizon set poles in the Gerry&DruryRoad area in LC for new 1.4 $9,037 $0 $1,288 Secondary hardware,brackets, each connectors,etc $54.00 56 $ 3,024 secondary cable Install 4,100'of secondary cable 4.8 $30,985 $0 $4,416 4/0-3/C secondary cable foot $1.60 4100 $ 6,560 Replace 56 services 4 $25,821 $0 $3,680 120'of 1/0-3/C service wire for each each $100.00 56 $ 5,600 service $0 $0 $0 $ - $0 $0 $0 $ $0 $0 $0 $ Une Operations Supervision: unit rate in hours $106 $103 Supervision of Line crews 80 $8,462 $0 $ Engineering: unit rate in hours $80 $78 $ Construction plans,outage notices,etc. 40 $3,205 $0 $ Senior Tech: unit rate in hours $82 $80 $21 $ �� ) $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $ $0 $0 $ Police Details week $2,427 4.5 $ 10,924 , , TOTAL: $77511 $0 $9384 ,,, .-°., $ ,;','26,108 PROJECT TOTAL; $113,002 FY19 Budget March 29, 2018 Page 74 CAPITAL PROJECT COST SHEET Secondary&Main Replacement Program Project 2: Thomas,Putney,Bancroft, PROJECT NAME: Atherton Area,LC SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle Straight Straight (laborunitsx #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Frame up to 67 Verizon set poles in the Secondary hardware,brackets, Thomas,Putney,Bancroft,Atherton area in 6.7 $43,250 $0 $6,164 each $54.00 116 $ 6,264 LC for new secondary cable connectors,etc Install 6,800'of secondary cable 8 $51,642 $0 $7,360 4/0-3/C secondary cable foot $1.60 6800 $ 10,880 Replace up to 116 services 8.7 $56,161 $0 $8,004 120'of 1/0-3/C service wire for each each $100.00 116 $ 11,600 service $0 $0 $0 $ - $0 $0 $0 $ $0 $0 SO $ Line Operations Supervision: $106 $103 unit rate in hours Supervision of Line crews 120 $12,694 $0 $ - Engineering: - -- unit rate in hours $80 $78 $ Construction plans,outage notices,etc. 80 $6,410 $0 $ - 1eniorTech: $82 $80 $21 $ )snit rate in hours $0 $0 $0 $ $0 $0 $0 Technical Services Manager: EE unit rate in hours $101 $98 $ $0 $0 $ Police Details week $2,4271 4.51$ 10,924 TOTAL: $170,156' $0 $21,5281 39,668 PROJECT TOTAL:' " $23051 FY19 Budget March 29,2018 Page 75 CAPITAL PROJECT SUMMARY Project Name: 13.8kV Upgrade (Step-down Area, etc.) Project#: 107 All Towns Project Schedule: Annual Project Manager: All Engineers Reason for Expenditure: There are a number of step-down areas left in the RMLD service territory. These areas on the RMLD distribution system were originally fed from 5 kV distribution circuits. When RMLD began moving load over to the 13.8kV distribution circuits, most areas were converted but some areas were re-fed with pole-mount, step-down transformers. Most of the distribution system in these areas are 30+ years old and in need of upgrade before they can be converted. Brief Description/Scope: Replace poles, primary cable, and overhead transformers, as needed, in the various step-down areas. Convert areas to 13.8kV and remove step-down transformers. The secondary cable and service upgrades will be done in conjunction with Project 458. Barriers: Some areas are Verizon set areas. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status.Update: A conversion has been completed on Federal Street and Main Street in Reading. Additional, conversions are underway on Vine Street, and Timberneck Road in Reading; McDonald Road in Wilmington, and Adams Street in North Reading. �i FY19 Budget March 29,2018 Page 77 CAPITAL PROJECT COST SHEET — 13.8kV Upgrade(Step-down Areas,etc.) PROJECT NAME: Project 1: Gerry&Drury Road Area,LC SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight (labor units K #Of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Frame up to 28 Verizon set poles in the Gerry&Drury Road area in LC for new 2.6 $16,784 $0 $2,392 Hardware,insulators,connectors,guys, each $180.00 28 $ 5,040 primary cable cutouts,taps,brackets,ground rods,etc Install 2,800'of primary cable 3.6 $23,239 $0 $3,312 1/0 AAAC Primary foot $0.87 2800 $ 2,436 Replace seven(7)polemount transformers 2.8 $18,075 $0 $2,576 $ $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 Supervision of Line crews 80 $8,462 $0 $ - Engineering: unit rate in hours $80 $78 $ Pole Foreman,605As,construction 105 $8,413 $0 $ drawings,switching orders,etc. Senior Tech: unit rate In hours $82 $80 $21 $ $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $ $0 $0 1 1 1 $ Police Details 1week 1 $2,427 4.5 $ 10,924 TOTAL: $74,972 $0 $8,280 $ 18,400 PROJECT TOTAL: $101,652 FY19 Budget March 29, 2018 Page 78 CAPITAL PROJECT COST SHEET 13.8kV Upgrade(Step-down Areas,etc.) Project 2: Thomas,Putney,Bancroft, PROJECT NAME: Atherton Area,LC SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #Of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Frame up to 28 Verizon set poles in the Hardware,insulators,connectors,guys, Gerry Drury Road area in LC for new 9.2 $59,385 $0 $8,464 cutouts,taps,brackets,ground rods,etc each $180.00 67 $ 12,060 y rima cable Install 2,800'of primary cable 6.6 $42,605 $0 $6,072 1/0 AAAC Primary foot $0.87 5500 $ 4,785 Replace seven(7)polemount transformers 4.8 $30,985 $0 $4,416 $ ' $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 Supervision of Line crews 160 $16,925 $0 $ - Engineering: .. • - unit rate In hours $80 $78 $ Pole Foreman,605As,construction 240 $19,229 $0 $ - _ drawings,switching orders,etc. tf 15eniorTech: $82 $SO $21 $ unit rate in hours $0 $0 $0 $ $0 $0 $0 TechnicalServices Manager: unit rate in hours $101 $98 $. $0 $0 $ Police Details - week $2,427 10.0 $ 24,275 TOTAL: $169;132 $0 $18,952 120, PROJECT TOTALf. $229,203 FY19 Budget March 29,2018 Page 79 1 `--� CAPITAL PROJECT SUMMARY Project Name: Underground Facilities Upgrades (URDs, Project#: 106 Manholes, etc.) Project Schedule: Annual Project Manager: Vaughan Bryan, Distribution Engineer John McDonagh, General Line Foreman Reason for Expenditure: There are 210 +/- underground residential subdivisions in the RMLD service territory, of which, 90 +/- are over 25 years old. These subdivisions are in need of new primary cable and transformers. Some of the URDs are in step-down areas and need to be upgraded before they can be converted to 7,970 volts. Most of the existing transformers are live-front units. The new pad-mount transformers will be dead-front units, which will improve reliability by eliminating the possibility of animal contacts within the pad transformer. The new transformers will be placed on box-pads that will raise the transformers out of the mulch beds, which will prevent premature rusting and corrosion of the transformers. Brief Description/Scope: Replace primary and neutral cables, and pad-mount transformers as needed in the various URDs. Some of the transformers within each of these subdivisions have already been replaced. The precast transformer pads will be replaced with fiberglass box pads as needed for elevation requirements. Certain areas will be targeted each year. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: The Department completed Crestwood and Robin Road in North Reading, portions of Spruce Road in North Reading, Cherokee Lane in Wilmington, and Aspen Road in North Reading. The Department is working to complete Westover Estates in Lynnfield and Shasta Lane in North Reading in FY18. FY19 Budget March 29,2018 Page 81 CAPITAL PROJECT COST SHEET UG Facilities Upgrade(URDs,Manholes,etc.) PROJECT NAME: Project 1:Arlene/Ella/Franklin Area,W SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight (laborunitsx #of ITEM/TASK Time OT Time Overtime vehicle rate( DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Replace URD and neutral cable 10 $64,552 So $9,200#2 CU 15 kV cable and neutral foot $3 5500 $ 16,500 Splice,terminate,elbows,grounding,etc. 2.6 $16,784 $0 $2,392 splices,elbows,terminations,tape each $120 12 $ 1,440 connectors,hardware,etc. Replace 10 pad-mounted transformers 4.4 $28,403 $D $4,048 box pads each $160 10 $ 1,600 So $0 $0 $ - $0 $0 $0 $ $0 $0 So $ Line Operations Supervision: unit rate In hours $106 $103 Supervision of Line crews 160 $16,925 $0 $ - Engineering: unit rate in hours $80 $78 $ Switching,scheduling,notices,plans,etc. 128 $10,255 $0 $ Senior Tech: $ � unit rate in hours .$82 $80 $21 � $ i $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $ $0 $0 $ Police Details 1week 1 $2,427 2.0 $ 4,855 TOTAL: $136,9191 $0 $15,640 $ 24,395 PROJECT TOTAL:: $116,954 FY19 Budget - March 29, 2018 Page 82 CAPITAL PROJECT COST SHEET UG Facilities Upgrade(URDs,Manholes,etc) PROJECT NAME: Project 2: Carter/Willard Area,LC SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: $6,455 $6,267 $920 2-man crew-unit rate in weeks Replace URD and neutral cable. 6 $38,731 $0 $5,520#2 CU 15 kV cable and neutral foot $3 2500 $ 7,500 Splice,terminate,elbows,grounding,etc. 1.2 $7,746 $0 $1,104 splices,elbows,terminations,tape each $120 8 $ 960 connectors,hardware,etc. Replace three(3)pad-mounted 1.4 $9,037 $0 $1,288 box pads each $160 3 $ 480 transformers $0 $0 $0 $ $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: - unit rate in hours $106 $103 Suprevision of Line crews 120 $12,694 $0 $ Engineering: unit rate in hours $80 $78 $ Switching,scheduling,notices,plans,etc. 56 J$72,695 , $ - --.enlorTech: _ $21 $ nit rate in hours ^r $0 $ - $0 Technical Services Manager: unit rate in hours $ - $ Police Details week $2,427 1.0 $ 2,427 TOTALS ,$7;912 _ ', $ :;11;367 PROJECT TOTAL:.:: FY19 Budget March 29,2018 Page 83 I CAPITAL PROJECT COST SHEET UG Facilities Upgrade(URDs,Manholes,etc) PROJECT NAME: Project 3: Sandspur Lane,NR SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight (labor units x #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Une Department: 2-man crew-unit rate in weeks $6,455 $6,267 $92 Replace URD and neutral cable 4.8 $30,985 $0 $4,416#2 CU 15 kV cable and neutral foot $3 1200 $ 3,600 Splice,terminate,elbows,grounding,etc. 0.8 $5,164 $0 $736 splices,elbows,terminations,tape each $120 6 $ 720 connectors,hardware,etc. Replace two(2)pad-mounted transformers 1 $6,455 $0 $920 box pads each $160 2 $ 320 $0 $0 $0 $ - $0 $0 $0 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 Su prevision of Line crews 40 $4,231 $0 $ Engineering: unit rate in hours $80 $78 $ Switching,scheduling,notices,plans,etc. 40 $3,205 $o $ Senior Tech: $82 $80 $21 $ unit rate in hours $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $ $0 $0 1 1 $ Police Details week 1 $2,4271 1.0 $ 2,427 TOTAL: 1 $50,041 $0 $6,0721 1$ 7,067 PROJECT TOTAL: $63,180 i FY19 Budget March 29, 2018 Page 84 CAPITAL PROJECT SUMMARY Project Name: Service Connections Project#: various (Commercial and Residential) Project Schedule: Annual Project Manager: John McDonagh, General Line Foreman Reason for Expenditure: To install new and upgraded services for both residential and commercial/industrial customers in the service territory. Brief Description/Scope: This item includes new service connections, upgrades, and service replacements for residential, commercial, and industrial customers. This represents the time and materials associated with the replacement of an existing or installation of a new overhead service drop and the connection of an underground service, etc. This does not include the time and materials associated with pole replacements/installations, transformer replacements/installations, primary or secondary cable replacements/installations, etc. These aspects of a project are captured under Routine Construction. Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year Not applicable. Status Update: Not applicable. FY19 Budget March 29, 2018 Page 85 CAPITAL PROJECT COST SHEET PROJECT NAME: Service Connections(Residential/Commercial) SCHEDULE: FY19 RMLD LABOR MATERIALS/CONTRACTORS Labor Total #of Units (unit rate x labor units) Vehicle Straight Straight (labor units #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man.crew-unit rate in weeks $6,455 $6,267 $920 Install new and upgraded service Secondary hardware,brackets, per connections at approximately 350 units connectors, $77,463 $0 $11,040 connectors,etc. service $54 350.0 $ 18,900 $o $0 $0 120'of 1/0-3/C service wire for each per $100 350.0 $ 35,000 service service $0 $0 $0 $ - $0 $0 $0 $ $0 $0 $0 1 $ $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 $0 $0 $ Engineering: . unit rate in hours $80 $78 $ $0 $0 $ Senior Tech: unit rate in hours $82 $80 $21 $ $0 $0 $0 $ $0 $0 $0 Technical Services Manager: unit rate in hours $101 $98 $ $0 $0 $ Police Details 1week $2,427 $ TOTAL: $77;463 $0 $11,040 53,900 PROJ ECT TOTAL: $142,403 �i FYI Budget March 29, 2018 Page 86 �--'' CAPITAL PROJECT SUMMARY Project Name: Routine Construction Project#: various Project Schedule: Annual Project Manager: Various Reason for Expenditure: Routine Construction covers routine activity as well as capital construction projects that develop during the year including, but not limited to items shown below. Brief Description/Scope: • Overhead and underground system upgrades • Miscellaneous projects • Pole damage • Station upgrades • Porcelain cutout replacements • Street Light Connections — new equipment installation • Pole setting/transfers • Underground subdivisions (new construction) Barriers: None anticipated at this time. Change in Scope of Work From Prior Fiscal Year: Not applicable. Status Update: Not applicable. 1� ) FY19 Budget March 29, 2018 Page 87 CAPITAL PROJECT COST SHEET PROJECT NAME: Routine Construction SCHEDULE: FY19 RMLD LABOR Labor Total MATERIALS/CONTRACTORS #of Units (unit rate x labor units) Vehicle Straight Straight (Iborunlux #of ITEM/TASK Time OT Time Overtime vehicle rate) DESCRIPTION Unit Unit Rate Units TOTAL Line Department: 2-man crew-unit rate in weeks $6,455 $6,267 $920 Capital Construction 20 10 $129,105 $62,668 $27,600 Materials as necessary $ 200,000 Street Light Installations 4 $25,821 $0 $3,680 Materials as necessary $ 50,000 Pole Setting/Transfers 27 $174,291 $0 $24,840 Materials as necessary $ 90,000 Underground Construction 1.5 $9,683 $0 $1,380 Materials as necessary $ 115,000 $0 $0 $0 $ - $0 $0 $0 $ Line Operations Supervision: unit rate in hours $106 $103 Crew supervision 110 $11,636 $0 $ Engineering: unit rate in hours $80 $78 $ Project management 320 $25,638 $0 $ - Senior-Tech: unit rate in hours $$0 $80 $$0 $ $0 $0 $0 —/ Technical Services Manager: unit rate in hours $101 $98 $ $0 $0 j $ Police Details lweek 1 $2,4271 52.01$ 126,229 TOTAL: $376,174 $62,668 $57,500 $:, ,581,229 PROJ ECT TOTAL: $1,077,572 FY19 Budget March 29, 2018 Page 88 APPROVAL OF BOARD MINUTES APRIL 5, 2018 AND APRIL 17, 2018 ATTACHMENT 2 y POWER SUPPLY REPORT MARCH 2018 ATTACHMENT 3 x, i i INTECr (�TEP RESOURCES RML.D Board of Commissioners Meeting May 9, 2018 Jane Parenteau, Director of Integrated Resources - = ' Reporting for March 2018 - --- KWA Sales -3rd .FY Quarter 2.01-6 - 2-01- 8 3 Y _ 1atluary ( February ( March Q3 Total ! ■2E315 S `48,836,336 54,279,2.29 52,417,738 �- --155,533_,303 2017 56,812,248 -� y 57,075;966166,169,353 } 02018 58,239,485 56,125,461 51,190,699 165,556,645 i -- - PurchasePowe�, Capacity & Taysin�issrov� (PPCARevenue E 2 4 la �FebrUa i AA-arch, Q-STeals. "W20,16 i $2,;075 7S`S .$2,7-12,251' $2,894,687 _$7,682,;,GO2. A. 210 $ ,9i� ;�1 , 4� 693 �;,4$3,355 $:%129,024 a, 2018 $ .625,661 $3d �,� � $ ,c 8,354 $9,99-5,714f dmE Capacitor, Transmission and Fuel Cost u � January - March 2016 - 2018 511,000,000 Y $9,000,000 $7,000,000 $5,000,000 $3,000,000 - -- - -� - �� _ -_® $1,000,000 --- n- -- --_ .^------- a Capacity Transmisssion - Fuel a ■ 2016 $4,639,763� _.�__$21734,569 $8,369,163 ii 1 ®20 7 $4,930,428 $2,985,380 $7,997,109141 �p 20181 $6,478,820 $3,337,965 $9,430,375 ■ 2016 ■ 2017 ■ 2018 I , I i 1 To: Coleen O'Brien Fro 1 V '' Maureen McHugh, Jane Parenteau Date: May 2,2018 Subject: Purchase Power Summary—March,2018 Energy Services Division(ESD)has completed the Purchase Power Summary for the month of March,2018. ENERGY The RMLD's total metered load for the month was 54,091,528,which is a 3.39% decrease from the March, 2017 figures. Table 1 is a breakdown by source of the energy purchases. Table 1 Amount of Cost of %of Total Total$ $as a Resource Energy Energy Energy Costs % (kWh) ($/Mwh) Millstone#3 3,712,659 $6.38 6.76% $23,680 0.89% Seabrook 5,901,595 $5.92 10.74% $34,937 1.31% Stonybrcok Intermediate 242,232 $4.31 0.44% $1,043 0.04% Shell Energy 7,529,850 $56.88 13.71% $428,328 16.05% NYPA 2,155,416 $5.30 3.92% $11,427 0.43% Nextera 1,802,000 $33.45 3.28% $60,285 2.26% ISO Interchange 11,414,569 $42.34 20.78% $483;241 18.11% Nema Congestion - $0.00 0.00% $19,676 0.74% Coop Resales 9,523 $149.43 0.02% $1,423 0.05% EDF 5,326,100 $44.81 9.70% $238,678 8.94% Hydro Projects` 5,993,138 $68.79 10.91% $412,291 15.45% Braintree Watson Unit 79,424 $2,740.98 0.14% $217,700 8.16% Saddleback/Jericho Wind 3,341,204 $95.39 6.08% $318,730 11.94% One Burlington&Comm.Solar 179,482 $73.16 0.33% $13,131 0.49% Exelon 7,226,800 $55.59 13.16% $401,752 15.05% Stonybrook Peaking 12,100 $208.54 0.02% $2,523 0.09% Monthly Total 54,926,092 $48.59 100.00% $2,668,846 100.00% "Pepperell, Woronoco,indian River,Turner Falls,Collins,Pioneer,Hosiery Mills,Aspinook Hydro 5 Table 2 breaks down the ISO interchange between the DA LMP Settlement and the RT Net Energy for the month of March,2018. r Table 2 Amount Cost %of Total Resource of Energy of Energy Energy (kWh) ($/Mwh) ISO DA LMP* 21,957,269 $38.14 39.98% i Settlement RT Net Energy*" (10,542,700) $33.14 -19.19% Settlement ISO Interchange 11,414,569 $42.34 20.78% (subtotal) f� •Independent System Operator Day-Ahead Locational Marginal Price i MARCH 2018 ENERGY BY RESOURCE i S?ony roalc P!<, Jcrirh,Wind, .l)u'n i 1�.'lill$',i1t1iC;ice 5:lE% 1 Exeiitn �� k-aa�o;t4 l ;i;�ciial:ar.§: SYonywi,t,,4 int��. 0.44'4, 5h�il�;ler�y Ciao -.Lsmt-S' LiIF - t9.02: 'r!ydra f'rt7)iir?5 3.°L?'.a S U.tiJ1'.'�i NYPA t51)�nLerr°h:rty� 30.734!, r CAPACITY The RMLD hit a demand of 90,379 M, which occurred on March 7, at 6 pm. The RMLD's monthly UCAP requirement for March, 2018 was 222,643 Ms. Table 3 shows the sources of capacity that the RMLD utilized to meet its requirements. Table 3 Source Amount(kWs) Cost($/kW-month) Total Cost$ %of Total Cost Millstone#3 4,950 24.74 $122,445 6.55% Seabrook 7,909 18.90 $149,517 8.00% Stonybrook Peaking 24,980 1.94 $48,520 2.60% Stonybrook CC 42,925 3.30 $141,817 7.59% NYPA 0 0.00 -$15,084 -0.81% Hydro Quebec 0 0 -$49,242 -2.63% t Braintree Watson Unit 0 0.00 -$181,593 -9.71% ISO-NE Supply Auction 141,879 11.65 $1,653,261 88.43% !� Total 222,643 $8.40 $1,869,640 100.00% I Table 4 shows the dollar amounts for energy and capacity per source. j Table 4 Cost of %of Amt of Energy Power Resource Energy Capacity Total cost Total Cost (kWh) ($/kWh) Millstone#3 $23,680 $122,445 $146,125 3.22% 3,712,659 0.0394 Seabrook $34,937 $149,517 $184,455 4.06% 5,901,595 0.0313 Stonybrook Intermediate $1,043 $141,817 $142,860 3.15% 242,232 0.5898 Hydro Quebec $0 -$49,242 -$49,242 -1.08% - 0.0000 Shell Energy $428,328 $0 $428,328 9.44% 7,529,850 0.0569 NextEra/EDF $60,285 $0 $60,285 1.33% 1,802,000 0.0335 NYPA $11,427 -$15,084 -$3,657 -0.08% 2,155,416 -0.0017 ISO Interchange $483,241 $1,653,261 $2,136,501 47.08% 11,414,569 0.1872 Nema Congestion $19,676 $0 $19,676 0.43% - 0.0000 EDF $238,678 $0 $238,678 5.26% 5,326,100 0.0448 Hydro Projects $412,291 $0 $412,291 9.08% 5,993,138 0.0688 Braintree Watson Unit $217,700 -$181,593 $36,107 0.80% 79,424 0.4546 W Saddleback/Jericho $318,730 $0 $318,730 7.02% 3,341,204 0.0954 " Burlington&Community Solar $13,131 $0 $13,131 0.29% 179,482 0.0732 Coop Resales $1,423 $0 $1,423 0.03% 9,523 0.1494 Exelon Energy $401,752 $0 $401,752 8.85% 7,226,800 0.0556 Stonybrook Peaking $2,523 $48,520 $51,043 1.12% 12,100 4.2184 Monthly Total $2,668,846 $1,869,640 $4,538,485 100.00% 54,926,092 0.0826 `Renewable Resources;per RMLD Board Policy,any RECs are sold to offset energy costs for all customers. RENEWABLE ENERGY CERTIFICATES (RECO Table 5 shows the amount of banked and projected RECs for the Swift River Hydro Projects through March, as well as their estimated market value. Table 5 RECs Summary Period- January 2018-March 2018 Banked Projected Total Est. j RECs RECs RECs Dollars Woronoco 1,044 2,479 3,523 $24,329 Pepperell 461 1,190 1,651 $11,402 Indian River 350 1,193 1,543 $10,656 ` Turners Falls 202 749 951 $6,568 Saddleback 2,800 7,554 10,354 $71,505 Jericho 1760 5,703 7,463 $51,540 Sub total 6,617 18,868 25,495 176,003 RECs Sold 0 $0 Grand Total 6,617 18,868 25,485 $176,000 i TRANSMISSION M The RMLD's total transmission costs for the month of March, 2018 were$927,237.This is an decrease of 24.86% from the February transmission cost of$1,233,987. In March, 2017 the transmission costs were$942,832. I i Table 6 I Current Month Last Month Last Year Peak Demand(kW) 90,379 96,259 93,625 Energy(kWh) 54,926,092 50,211,908 56,742,776 Energy($) $2,668,846 $2,950,027 $2,574,285 Capacity($) $1,869,640 $2,499,420 $1,453,415 Transmission($) $927,237 $1,233,987 $942,832 Total $5,465,722 $6,683,434 $4,970,532 ,s -- FINANCIAL REPORT MARCH 2018 ATTACHMENT 4 l FINANCIAL PRESENTATION MARCH 31, 2018 PRESENTED 5i9a018 9 MONTHS OF FY18 ENDING MARCH 31, 2018 ➢ UNRESTRICTED CASH OF $14.6M COVERS LESS THAN 2 MONTHS OF OPERATING EXPENSES @ 3/31/18 ➢ ACCOUNTS RECEIVABLE ARE 97% CURRENT (up to 90 days) ➢ NET PLANT INCREASED BY $3.8M AS COMPARED TO 3/31/17 ➢ BASE REVENUE INCREASED BY 1% YEAR TO YEAR WITH A DECREASE OF KWH SALES OF 2.6% ➢ PURCHASED POWER FUEL EXPENSE EXCEEDS PURCHASED POWER FUEL REVENUE BY $2.3M , ➢ PURCHASED POWER CAPACITY & TRANSMISSION (PPCT) EXPENSES EXCEED PPCT REVENUE BY $146,000 ➢ OPERATING & MAINTENANCE EXPENSES REMAIN UNDER BUDGET BY 1% @ 3/31/18 r Petty Cash, $4,500.00, Customer Deposits, 0% Sick Leave Buy Back, $1,162,123.66,-2 �—�— $1,329,906.48,3 r Sick Leave Benefits Cash & Investments Investment, $1,869,848.65,4% As of . March 30, 2018 Pension Trust Cash&, y Hazard Waste Reserve, Investments $750,000.00,2% M $44,409,117 ■Sick Leave Buy Back Depreciation Fund, ■Sick Leave Benefits $4,830,754.58,11% Operating Fund, `; $14,566,454.85,33 ' •Operating Fund .Deferred Fuel Reserve Uncollectable E` S `., ■Energy Conservation Reserve Accounts, $200,000.00,OJ ■Town Payments �" �': �Ratetabifrzation Fund; * $61955 665 51,,16% n Rate Stabilization Fund ■Uncollectable Accounts a Depreciation Fund Reserve,, o Hazard Waste Reserve a` a Pension Trust Cash&Investments ®Customer Deposits Town Payments, $2,956,492.53—,7° —� Energy Conservation Reserve, ■Petty Cash $566,368.92,1% Base Revenue & Operating Expenses Comparison $35,000,000 -- $30,510,112 $30,815,213 $30,000,000 — --- ------ _-- - -- $29,621,468 --- ----- -_ —$28,758707 $27,786,190 $27,193,192 $25,601,354 $26,136,738 $26,336,7... $25,368,682 $25,000,000 --- $24,432,116 — $23;67b;960 $22,424,371 $22,348 $20,000,000 - — — $15,000,000 --- — --- --- $10,000,000 --- ----- — — ------ --- — --- --- $5,000,000 ----- — -- - ___ $0 ---- ------ — --- -- ----- -- --- FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 Increase Increase ■ Base Revenue 20.37% ®Operating Expenses 21.27% Year to Date Operating and Maintenance Expenses Comparing FY17 FY18 July 2017—March 2018 (9 months FY 18) �� = July 2016—March 2018 (9 months FY 17)and FY18 Budget(9 months) March 18,000,000 r' i Feb 16,000,000 14,000,000 12,000,000 ' Dec 10,000,000 %' Nov 8,000,000 6,000,000 '` �,. Sept 4,000,000 %i' i' Aug 2,000,000 i' ' ` July Yearto Yearto Yearto Date Date Date FY17 Actual FY18 Actual Budget ■July 1,399,966 1,327,675 1,847,088 ■Aug 3,134,666 2,859,053 3,694,177 ®Sept 4,904,753 4,548,252 5,541,265 ■Oct 6,493,213 6,385,102 7,388,354 ®Nov 8,309,939 8,282,985 9,235,442 ■Dec 10,144,029 10,239,188 11,082,530 Wan 12,232,070 12,962,188 12,929,618 ■Feb 13,874,352 14,103,851 14,776,706 ■March 15,675,254 16,458,083 16,623,794 Town of Reading, Massachusetts J Municipal Light Department %f Statement of Net Assets , March 31,2018 2018 2017 ASSETS Current: Unrestricted Cash $ 14,570,954.85 $ 14,115,318.66 Restricted Cash 28,508,255.97 23,446,243.15 Restricted Investments 1,329,906.48 1,345,663.06 Receivables, Net 9,992,825.86 9,285,515.91 Prepaid Expenses 1,576,270.30 1,420,555.30 Inventory 1,532,196.60 1,762,542.80 Total Current Assets 57,510,410.06 51,375,838.88 Noncurrent: Investment in Associated Companies 212,427.92 144,418.75 Capital Assets, Net 77,477,379.12 73,691,430.41 Total Noncurrent Assets 77,689,807.04 73,835,849.16 Deferred Outflows-Pension Plan 4,135,078.00 6,338,218.00 TOTAL ASSETS 139,335,295.10 131,549,906.04 LIABILITIES Current % Accounts Payable 8,447,693.64 6,057,787.63 Accrued Liabilities 737,108.47 415,220.54 Customer Deposits 1,162,123.66 1,042,347.41 Customer Advances for Construction 1,354,671.13 1,126,545.53 Total Current Liabilities 11,701,596.90 8,641,901.11 Non-current Accrued Employee Compensated Absences 3,150,134.05 3,257,809.00 Net OPEB Obligation 138,068.00 0.00 Net Pension Liability 13,076,538.00 8,833,549.00 Total Non-current Liabilities 16,364,740.05 12,091,358.00 Deferred Inflows-Pension Plan 714,888.00 883,172.00 TOTAL LIABILITIES 28,781,224.95 21,616,431.11 NET POSITION Invested in Capital Assets, Net of Related Debt 77,477,379.12 73,691,430.41 Restricted for Depreciation Fund 4,830,754.58 4,594,181.29 Restricted for Pension Trust 5,683,014.26 0.00 Unrestricted 22,562,922.19 31,647,863.23 TOTAL NET POSITION 110,554,070.15 109,933,474.93 Total Liabilities and Net Assets $ 139,335,295.10 $ 131,549,906.04 1 Town of Reading, Massachusetts Municipal Light Department Schedule of Cash and Investments - March 31,2018 2018 2017 Unrestricted Cash Cash-Operating Fund $ 14,566,454.85 $ 14,112,318.66 Cash-Petty Cash 4,500.00 3,000.00 Total Unrestricted Cash 14,570,954.85 14,115,318.66 Restricted Cash Cash-Depreciation Fund 4,830,754.58 4,594,181.29 Cash-Town Payment 2,956,492.53 2,850,500.97 Cash-Deferred Fuel Reserve 3,533,987.86 5,187,757.45 Cash-Rate Stabilization Fund 6,955,665.51 6,863,426.03 Cash-Pension Trust 5,683,014.26 0.00 Cash-Uncollectible Accounts Receivable 200,000.00 200,000.00 Cash-Sick Leave Benefits 1,869,848.65 1,954,601.17 Cash-Hazard Waste Reserve 750,000.00 150,000.00 Cash-Customer Deposits 1,162,123.66 986,734.14 Cash-Energy Conservation 566,368.92 659,042.10 Total Restricted Cash 28,508,255.97 23,446,243.15 Investments Sick Leave Buyback 1,329,906.48 1,345,663.06 Total cr r—. 2 Town of Reading,Massachusetts Municipal Light Department iCapital Funds March 31,2018 SOURCE OF CAPITAL FUNDS: DEPRECIATION FUND BALANCE 7/1/17 $ 2,406,969.15 CONSTRUCTION FUND BALANCE 7/1/17 2,500,000.00 ADDITIONAL FUNDS ADDED TO CONSTRUCTION FUND BALANCE 12/31/17 1,200,000.00 INTEREST ON DEPRECIATION FUND FY 18 47,171.71 DEPRECIATION TRANSFER FY 18 3,229,491.78 WEST STREET-MASS DOT FINAL PAYMENT 43,056.31 TOTAL SOURCE OF CAPITAL FUNDS 9,426,688.95 USE OF CAPITAL FUNDS: ADDITIONS TO PLANT THRU FEBRUARY 2018 TOTAL USE OF CAPITAL FUNDS 4,595,934.37 GENERAL LEDGER CAPITAL FUNDS BALANCE 2/28/18 $ 4,830,754.58 J 3 Town of Reading,Massachusetts Municipal Light Department Statement of Revenues,Expenses and Changes in Fund Net Assets March 31,2018 Month Month Year to Date Year to Date Percent Current Year Last Year Current Year Last Year Change Operating Revenue Base Revenue $ 1,952,703.86 $ 1,965,228.87 $ 19,879,516.93 $ 19,692,087.57 1.0% Fuel Revenue 2,684,399.71 2,739,292.96 22,708,805.07 26,135,977.28 (13.1%) Purchased Power Capacity 3,078,354.01 2,468,111.95 29,880,354.08 25,944,729.46 15.2% Forfeited Discounts 56,893.40 77,060.64 642,722.75 660,011.11 (2.6%) Energy Conservation Revenue 50,140.74 51,243.62 501,039.83 513,859.77 (2.5%) NYPA Credit (149,684.98) (101,806.73) (885,387.24) (880,171.69) 0.6% Total Operating Revenue 7,672,806.74 7,199,131.31 72,727,051.42 72,066,493.50 0.9% Expenses Power Expenes: 547 Purchased Power Fuel Expense 2,669,989.13 2,574,284.96 24,159,424.46 25,172,914.01 (4.0%) 555 Purchased Power Capacity 1,885,091.19 1,534,433.14 19,229,920.19 14,834,380.20 29.6% 565 Purchased Power Transmission 927,236.95 942,831.64 10,796,193.45 10,076,669.48 7.1% Total Purchased Power 5,482,317.27 5,051,549.74 54,185,538.10 50,083,963.69 8.2% Operations and Maintenance Expenses: 580 Supervision and Engineering 69,716.61 35,139.83 452,136.19 305,210.39 48.1% 581 Station Supervison 19,054.16 12,789.97 119,977.75 106,591.78 12.6% 581 Line General 21,741.04 47,272.29 507,894.07 491,711.32 3.3% 582 Control Room 39,543.82 31,492.26 312,113.23 343,143.75 (9.0%) 585 Street Lighting 15,848.95 6,092.46 88,448.09 154,265.69 (42.7%) 586 Meter General 12,242.79 17,145.09 182,241.23 157,512.92 15.7% 588 Materials Management 48,463.55 38,629.04 424,906.58 335,930.97 26.5% 590 Maintenance of Structures and Equipment 67,880.97 49,399.82 381,745.36 362,450.42 5.3% 593 Maintenance of Lines-Overhead 325,287.81 128,868.16 1,343,763.29 1,481,436.82 (9.3%) 594 Maintenance of Lines-Underground 544.59 3,322.75 54,793.73 198,949.31 (72.5%) 595 Maintenance of Line Transformers 12,623.15 4,829.08 95,686.87 28,387.28 237.1% Total Operations and Maintenance Expenses 632,947.44 374,980.75 3,963,706.39 3,965,590.65 (0.0%) General&Administration Expenses: 902 Meter Reading 776.43 323.24 29,306.25 17,201.38 70.4% 903 Customer Collections 131,345.22 139,904.29 1,264,913.85 1,191,640.21 6.1% 904 Uncollectible Accounts 12,500.00 12,500.00 112,500.00 112,500.00 0.0% 916 Energy Audit 31,716.90 43,713.39 347,845.57 377,509.65 (7.9%) 916 Energy Conservation 142,157.81 96,596.85 537,614.06 572,235.91 (6.1%) 920 Administrative and General Salaries 78,259.79 81,743.02 819,146.28 706,663.86 15.9% 921 Office Supplies and Expense 33,826.68 45,818.05 242,295.07 232,030.49 4.4% 923 Outside Services 70,288.53 109,063.21 645,367.57 445,712.18 44.8% 924 Property Insurance 28,372.95 49,473.65 253,598.63 272,518.50 (6.9%) 925 Injuries and Damages 3,568.30 5,622.36 48,134.99 46,688.99 3.1% 926 Employee Pensions and Benefits 556,880.92 263,515.28 2,965,865.13 2,707,557.80 9.5% 930 Miscellaneous General Expense 8,616.21 2,223.11 80,400.02 109,896.01 (26.8%) 931 Rent Expense 22,931.37 16,105.71 146,949.67 132,620.11 10.8% 933 Vehicle Expense 18,101.36 32,121.87 210,207.19 32,121.87 (100.0%) 933 Vehicle Expense-Capital (18,806.50) - (242,541.45) - 100.0% 935 Maintenance of General Plant 49,820.46 22,132.57 284,884.95 218,800.38 30.2% 935 Maintenance of Building&Garage 65,244.90 45,289.65 408,073.41 400,613.15 1.9% Total General&Administration Expenses 1,235,601.33 966,146.25 8,154,561.19 7,576,310.49 7.6% 4 Town of Reading,Massachusetts Municipal Light Department �j Statement of Revenues,Expenses and Changes in Fund Net Assets March 31,2018 Month Month Year to Date Year to Date Percent Current Year Last Year Current Year Last Year Change Other Operating Expenses: 403 Depreciation 358,832.42 341,775.67 3,229,491.78 3,075,981.03 5.0% 408 Voluntary Payments to Towns 126,851.67 118,000.00 1,110,324.01 1,057,372.00 5.0% Total Other Expenses 485,684.09 459,775.67 4,339,815.79 4,133,353.03 5.0% Operating Income (163,743.39) 346,678.90 2,083,429.95 6,307,275.64 (67.0%) Non Operating Revenue(Expenses): 419 Interest Income 23,035.63 18,608.32 180,017.45 115,325.91 56.1% 419 Other 40,901.75 (13,214.53) 747,565.23 488,363.74 53.1% 426 Return on Investment to Reading (201,647.50) (198,722.33) (1,814,827.50) (1,788,500.99) 1.5% 431 Interest Expense (425.65) (187.50) (10,174.42) (3,476.61) 192.7% Total Non Operating Revenue(Expenses) (138,135.77) (193,516.04) (897,419.24) (1,188,287.95) (24.5%) Change in Net Assets (301,879.16) 153,162.86 1,186,010.71 5,118,987.69 (76.8%) Net Assets at Beginning of Year 109,368,059.44 104,814,487.24 109,368,059.44 104,814,487.24 4.3% Ending Net Assets 09,066, 80.28 $104,967,650.10 110,554,070.15 09,933, .93 0.6% I 5 Town of Reading,Massachusetts - Municipal Light Department Statement of Budgeted Revenues,Expenses and Changes in Fund Net Assets March 31,2018 Actual Budget Remaining Remaining Year to Date Full Year Budget Budget% Operating Revenue Base Revenue $ 19,879,516.93 $ 26,337,621.00 $ 6,458,104.07 24.5% Fuel Revenue 22,708,805.07 32,491,810.00 9,783,004.93 30.1% Purchased Power Capacity 29,880,354.08 38,088,978.00 8,208,623.92 21.6% Forfeited Discounts 642,722.75 800,000.00 157,277.25 19.7% Energy Conservation Revenue 501,039.83 675,000.00 173,960.17 25.8% NYPA Credit (885,387.24) (1,200,000.00) (314,612.76) 26.2% Total Operating Revenue 72,727,051.42 97,193,409.00 24,466,357.58 25.2% Expenses Power Expenses: 547 Purchased Power Fuel Expense 24,159,424.46 31,291,810.00 7,132,385.54 22.8% 555 Purchased Power Capacity 19,229,920.19 24,476,161.00 5,246,240.81 21.4% 565 Purchased Power Transmission 10,796,193.45 13,612,817.00 2,816,623.55 20.7% Total Purchased Power 54,185,538.10 69,380,788.00 15,195,249.90 21.9% Operations and Maintenance Expenses: 580 Supervision and Engineering 452,136.19 764,615.00 312,478.81 40.9% 581 Station Supervisor 119,977.75 130,662.00 10,684.25 8.2% 581 Line General 507,894.07 596,007.00 88,112.93 14.8% 582 Control Room 312,113.23 466,783.00 154,669.77 33.1% 585 Street Lighting 88,448.09 156,893.00 68,444.91 43.6% 586 Meter General 182,241.23 212,909.00 30,667.77 14.4% 588 Materials Management 424,906.58 458,328.00 33,421.42 7.3% 590 Maintenance of Structures and Equipment 381,745.36 494,936.00 113,190.64 22.9% 593 Maintenance of Lines-Overhead 1,343,763.29 1,980,611.00 636,847.71 32.2% 594 Maintenance of Lines-Underground 54,793.73 197,002.00 142,208.27 72.2% 595 Maintenance of Line Transformers 95,686.87 300,000.00 204,313.13 68.1% Total Operations and Maintenance Expenses 3,963,706.39 5,758,746.00 1,795,039.61 31.2% General&Administration Expenses: 902 Meter Reading 29,306.25 37,461.00 8,154.75 21.8% 903 Customer Collection 1,264,913.85 1,869,393.00 604,479.15 32.3% 904 Uncollectible Accounts 112,500.00 150,000.00 37,500.00 25.0% 916 Energy Audit 347,845.57 509,232.00 161,386.43 31.7% 916 Energy Conservation 537,614.06 952,565.00 414,950.94 43.6% 920 Administrative and General Salaries 819,146.28 1,017,151.00 198,004.72 19.5% 921 Office Supplies and Expense 242,295.07 350,000.00 107,704.93 30.8% 923 Outside Services 645,367.57 759,191.00 113,823.43 15.0% 924 Property Insurance 253,598.63 427,200.00 173,601.37 40.6% 925 Injuries and Damages 48,134.99 52,613.00 4,478.01 8.5% 926 Employee Pensions and Benefits 2,965,865.13 3,000,437.00 34,571.87 1.2% 930 Miscellaneous General Expense 80,400.02 179,215.00 98,814.98 55.1% 931 Rent Expense 146,949.67 212,000.00 65,050.33 30.7% 933 Vehicle Expense 210,207.19 381,116.00 170,908.81 44.8% 933 Vehicle Expense-Capital (242,541.45) (301,596.00) (59,054.55) 19.6% 935 Maintenance of General Plant 284,884.95 281,880.00 (3,004.95) (1.1%) 935 Maintenance of Building&Garage 408,073.41 666,457.00 258,383.59 38.8% Total General&Administration Expenses 8,154,561.19 10,544,315.00 2,389,753.81 22.7% 6 Town of Reading,Massachusetts Municipal Light Department Statement of Budgeted Revenues,Expenses and Changes in Fund Net Assets March 31,2018 Actual Budget Remaining Remaining Year to Date Full Year Budget Budget% Other Operating Expenses: 403 Depreciation 3,229,491.78 4,362,000.00 1,132,508.22 26.0% 408 Voluntary Payments to Towns 1,110,324.01 1,500,000.00 389,675.99 26.0% Total Other Expenses 4,339,815.79 5,862,000.00 1,522,184.21 26.0% Operating Income 2,083,429.95 5,647,560.00 3,564,130.05 63.1% Non Operating Revenue(Expenses): 419 Interest Income 180,017.45 150,000.00 (30,017.45) (20.0%) 419 Other Income 747,565.23 890,000.00 142,434.77 16.0% 426 Return on Investment to Reading/Loss on Disposal (1,814,827.50) (2,570,438.00) (755,610.50) 29.4% 431 Interest Expense (10,174.42) (2,500.00) 7,674.42 (307.0%) Total Non Operating Revenue(Expenses) (897,419.24) (1,532,938.00) (635,518.76) 41.5% Net Income $ 1,186,010.71 $ 4,114,622.00 $ 2,928,611.29 71.2% i 7 -F ' ENGINEERING & PE O RATIONS REPORT MARCH 2018 ATTACHMENT 5 l Engineerin Report RMLD Board of Commissioners Meeting May 9, 2018 IY March 2018 Reporting Period x Hamid Jaffari, Director of Engineering & Operations Engineering & Operations Capital Improvement Projects DESCRIFTION BALANCE 100 ;Distributed Gas Generation Pilot(Demand Management) 100% ! 397,174' 584,9601 (584,960) 102 Pad-mount Switchgear Upgrade at Industrial Parks 8% 21,730 272,950 196,285 (76,665) 103 ;Grid Modernization and Optimization _ !I On-going 3,008 273,559; 227,183 (46,376) 105 New Wilmington Substation 6% 9,471 42,867 650,000 607,133 -- -;i -- - - - - - - -- -- - -- - � - - - --• -- - - -fir-. --,•----- ---- �-- - 7] , 5; L-106 IU d 124,79 Underground Facilities Upgrades (URDs, Manholes, etc_)^ ;l- On-going - J� 344 72 219,928 - - 107 13.8kV Upgrade (Step-down Areas, etc.) On-going 70 69,692 70,851 1,159 108 X115 kV Transmission Line Upgrade � - 50% _482 144,546; 95,098' (49,448) 109 35 kV Underground Cable Upgrade Station•---- -- - --- - -- -- - -- -- -- -- -4, 5 and RR ROW 0% 261 261 206,817 205,556 - - - - 110 l4W9 Getaway Replacement -Station 4 1 100% 131,61-i 1 ? (131,611 --.-_ _ ------ -- --- -- - ` - - -- ----- uL - - - ---- -_ - - 111 Substation Equipment Upgrade On-going 50,218` 50,218 01 112 AMI Mesh Network Expansion On-going- - - _, - -65, -- 120,311, - 120_,246 116 Transformers &Capacitors On-going 273,509 560,500 286,991 117 )Meter Purchases On-going -mss_ `I 15,963_-- 60,000, 44,03,7 125 GIS 100% 41 140,029 218,726 78,697 f- _126 ;Communication Equipment(Fiber Optic) !`- On-going 1i 214,629, _ - 214,629 130 Remote Terminal Unit (RTU) Replacement -Station 3 100% 27,164 - (27,164) ' - -- - - - - --- -- . -- - - - �? - - - �I - -- - -lt --t;_ - 1i- --- 9. 131 LED Street Lights Upgrade-All Towns _-- - -� 93%- ��- 31,381; 599,3820- 1'169,332 569,950 -.-- - ' 133 Station 3: Relay Upgrades and SCADA Integration 100% 5,941 26,488 76,103 49,615 137 :Pole Line Upgrade_Woburn Street (West to Concord), W ;j- - 50% ?L 7,380, 8,580, 200,284 191,704 138 Station 3 Reactors 99% 1,404 162,295 561,347 399,052 11 175 'Pole Replacement Program _ - --- r -On going �4� - !I - _ 61.5461 -209,000 147,454• --- ' 458 Secondary and Main Replacement Program On-going 583 77,103 222,285 145,1831 various New Service Installations_(Residential/Commercial/Industrial),-_ On=going_ 10,228____-, _ 104,130=_- -_1-55,9361_ _,___= 51,806'__________ Engineering & Operations Routine Capital Construction betcriptione Pole Setting/Transfers $7,753' $193,155 Overhead/Underground $46,167 $263,077 Projects Assigned as Required '- $13,751! $160,429 VoltageRegulators ---_----_--------------_-_.._ + Pole Damage/Knockdowns- Some Reimbursable - • Work was done to repair or replace one (1) pole. $4,286 $87,287 Station Group - $12,721; Hazmat/Oil Spills • Barton Estates,R $811 $7,546 .;Porcelain Cutout Replacement Pro ram la - Lighting (Street Light Connections) - $22,578 Storm Trouble - - - $60,694� _ $140,682 Underground Subdivisions (new construction) $621 $73,859. • Martins Landing, Lowell Road, North Reading ,Animal Guard Installation ij - $415' Miscellaneous Capital Costs j • Progress Way, W $18,857 $169,788 • 301 Ballardvale, W 1� 4, TOTAL $1 ,1311 ,537.1_ - '� i Facilities, IR® and IT Capital Projects/Purchases FYI 8 REMAINING BUDGET BALANCE ,Facilities $8,5611 $161 ,557' $657,000i $495,443 Integrated Resources Division (IRD) $7,952 $48,030, $35,000 ($13,030) JnformationTechnology (IT) _ i_;; _ $1 ,648 $1 13,310, $340,000 $226 690 TOTAL CAPITAL SPENDING YT® (All Divisions) REMAINING BALANCE $659,288 _ -.-l+ $4,595,933 ._ $7,685,521 1; $3,089,588 --- —_—__------- ---.—v ___--_.—�L-- -- ------- — --- - _ moi- ------------ --- --- i i , i i ) Routine Maintenance :Transformer Replacement (through March 2018) Pad mount 28.76% Overhead 20% r Pole Inspection (as of 4/25/2018) 195 poles have been replaced 178 of 195 transfers have been completed f" Quarterly Inspection of Feeders (as of 4/25/2018) Inspected Circuits Jan-Mar : 3W7 3W8 3W14 3W18 4W4 4W6 4W9 4W24 5W4 5W5 5W6(transfer),5W8,5W9 Manhole Inspection (through March 2018) 961 of 1 ,237 manholes have been inspected. Porcelain Cutout Replacement (through March 2018) 91%complete 242 remaining to be replaced Routine Maintenance (continued) -� Tree Trimming Mar: 12 spans YTD: 825 spans through March Substation Maintenance A Infrared Scanning - through March complete - no hot spots found Underground Subdivisions Upgrade Recent Completed: Crestwood Estates (NR), Aspen Road (NR), Long Hill Lane (NR) In Progress: Shasta Drive (NR), Westover Drive (LF ), Greenbriar Drive (NR), Great Neck Drive (W), Gandalf Estates (W), Deerfield Place (NR), Cherokee Lane (W), Nichols Street (NR) Double Poles Town of Reading j Ownership: 16,000 (approximately) Pole Jurisdiction I� 50% RMLD 50% Verizon "" ' ' r�>Eti�, �,�1 .( J y + `� C stodial: { Reading - split (see map) yl`�1 " M Y&. y" North Reading - RMLD ,<, r a� J< 7 ,', .•� .,3 f Q V'"'° '';`/� �^_w�"�r�C � L_;_.1. G//: f fl�r'� Lynnfield- Verizon ��'� �, ;� ' ",VAR � a \rte 1'�.��1�✓\a Wilmington - VerizonF : • \r\\)I._�"r:=�,J�='.— •t:"," ReaEingSo-eMe F Town of fieadln Polo Owner Q ;IAC (2:)RMLD l ppy 1 Y• I + �'TELCO NJUNS "Next to Go" as of May 4, 2018 READING WILMINGTON NORTH READING Countof LYN N F I ELD Countof Ticket Countof Ticket I NTG Member and JobType Number Countof NTG Member and JobType u Number Ticket Ticket INTGMember and JobType Number, OCMCTNR 3 BNP3PMA 3 ,NTG Member and JobType Q Number BCMCTNR 18 BComcast Massachusetts OCMCTNR Z oComcastMassachusetts TRANSFER 3 Non-participating 3rd Party oComcast Massachusetts TRANSFER 18 BAttacher-Massachusetts TRANSFER 2 0-NP3PMA 4 TRANSFER 3 Non-participating 3rd Party NRDGFD 38 JAttacher-Massachusetts �LFLDFD 6 ONorth Reading Fire Department TRANSFER 4 ORMLD 38 U Lynnfield Fire Department TRANSFER 38 TRANSFER 6 DReading Municipal Light Department TRANSFER 34 BRDNGFD 5 PULL POLE 4 JRMLD 7 BRMLD 45 oReading Fire Department DReading Municipal Light Department DReading Municipal Light Department TRANSFER 5 GVZNEDR 3 TRANSFER 7 TRANSFER 10 PULL POLE 35 UVerizon Massachusetts O RMLD 80 TRANSFER 3 OVZNESA 1 DReading Municipal Light Department 0-Verizon Massachusetts BVZNEDR 7 TRANSFER 26 BWLMFIB 11 OVerizon Massachusetts 7Town of Wilmington TRANSFER 1 PULL POLE 54 Bt 0+(blank) TRANSFER 6 TRANSFER ii Grand Total 16: PULL POLE 1 C VZNESA 2 C+](blank) 0-WMGNFD 88 �7Verizon Massachusetts TGrand Total 108_• TRANSFER 1 E)Wilmington Fire Department PULL POLE 1 TRANSFER 88 U(blank) 60(blank) i +( ) 'Grand Total 143 ; Grand Total 94 RMLD Reliability Indices Minutes SAIDI 2013-2018 CAIDI 201-3-2018 Minutes, 100.00 - 90.00 94.36 •160.00 80.00 az_sa _ .140.00 134:18 2013 70.00 2013 .120.00 X2014 2014 60.00 •100.00 50.00 1111111111112015 IEEE day threshold 80,00 -- -- _:1.2015 40.00 ---- 2016 IEEE day threshold 60.00 - - --------------- ----1•.2016 30.00 2017 YTD IEEE day threshold 40.00 --- !2017 20.00 -- •- ----------------------- 2018 YTD IEEE day threshold 20.00 ! in su`. 10.00 1a.ea -2017 Region Average 2018 YTD 0.00 2013-2014-2015-2016-2017-2018 -2017 National Average 2013-2014-2015-.2616-2617-2018 -2017 Region Average Average SAIDI -2017 National Average 493:54 Average CAIDI 1 1' Total DilYQttoTl o Customer frftel74! 1t OTFS Total Durationof Customer Interruptions SAIDI (Mimttes)= f P CRIDI(34ir2utes}=Total Nwnber o Customers Interruptions a Total Aumber of Customers Served f ' Note: The majorev ent(ME)threshold allows a,utility to remove outages that SAM 2013-201.8 i exceed the IEEE 2.5 beta threshold forev ents.These events could be'severe weather,which can lead to unusually long outages in comparison to your 0.90' distribution system's typical outage. 0.80' .._.___-_---__-- ------ 0:77 --- WM2013 0.70 ! 0.65 111111111111111.2.014 t0.60' -- --....- -- ----------- - } 0.50 -NOW 2015 l Total VWnbero Customer Interruptions f r�P 0.40 �2016 Total:4umber of Customers Served 0:30 2017 i 0:20' MEN 2018 YTD 0:10 i 0.00 - -2017 Region,Average 2013-2014 2015.2016-2017.-2018 -2017National Average Note: Regional and national averages have been updated for 2017. QveragesAlFt Causes of Outages as of March 2018 | oU 59 sn' ---' ----------- --' -'---------------- | m m :0 Annual Average 2013-2017 an0 2018 Year to Date / / m -- - -- ' - -- --- ---------- . . u> ) r— — ----- ----' | | ^ LIz p o o uo _NN�___����" ' Equipment Tree Wildlife Vehicle Weather ovknvwn Utility Natural Power � *ccment H uman Supply ^ Error � | . ' ` - , f Quest*ionis i� f �r �r r �(� v r. e fi 1 I RMLD PROCUREMENT REQUEST REQUIRING BOARD APPROVAL ATTACHMENT 6 . RMLDReading Municipal Light Department � RELIABLE POWER FOR GENERATIONS 230 Ash Street,P.O.Box 150 Reading,MA 01867-0250 i" May 9,2018 Town of Reading Municipal Light Board Subject: IFB 2018-44 Electrician Services for Removal of Load Control Module(LCM)and Associated Parts Pursuant to M.G.L. c. 149/ M.G.L. c. 30, § 39M, on March 26,2018, an invitation for bid (IFB)requesting sealed bids for Electrical Services was advertised in the Commonwealth of Massachusetts Goods and Services Bulletin.On March 22, 2018, the IFB was posted on COMMBUYS, and on April 4, 2018, it was posed on the RMLD website, the RMLD bulletin board and in the Daily Times Chronicle. An invitation for bid was sent to the following 20 companies: All-Tech Electric Dagle Electrical Construction Corp. D.M.H. Electrical Contractors Electrical Construction & Design aka R.J. Puliafico Electrical Dynamics Inc. Joe O'Connell Electrical Services John Savin Electric J.P.O'Brien Electric Mike Senarian Electric Modern Electric Inc. ONVIA Prime Vendor, Inc. :�-- Projectdog Quinn Electric Sartell Electric Services, Inc. Spinale Electric Inc. Town of Lynnfield Weston&Sampson Williams Electric, LLC Your Electrical Solution Sealed Proposals were received from 6 companies: All-Tech Electric D.M.H. Electrical Contractors Hub Electric Inc. J.P. O'Brien Electric Quinn Electric Your Electrical Solution The sealed bids were publicly opened and read aloud at 11:00 a.m.,April 25,2018,in the Town of Reading Municipal Light Department's Audio Visual Spurr Room, 230 Ash Street, Reading, Massachusetts. The bids were reviewed, analyzed,and evaluated by staff and recommended to the General Manager. Move that proposal 2018-44 for Electrician Services for Removal of Load Control Module(LCM) and Associated Parts from Residential Homes be awarded to:All-Tech Electric for$83,400.00 pursuant to M.G.L. c. 149/M.G.L. c.30, § 39M,as the lowest responsive and responsible bidder, on the recommendation of the General Manager. These services will be paid from the fiscal year Operating Budget. Y� Ben Thiv' rge J ne arente Coleen O'Brien 1 ; s ) J PRICE ANALYSIS-IFB 2018-44 Electrician Services for Removal of Load Control Module (LCM)and Associated Parts_From Residential Homes BiddersT1 Unit Quantity Type 1 Toal Type 2 Type Quantity Type 2 Total — _ Unit Total All-Tech Electric__ — — --- -- -----;-------- ----------- �— — -- . $258.00 150 $38,700.0_0 $298.00 150_ $44,7_00.00 $83,400.0 _ JP O'Brien Electric $38,250.0_0 $305.00_ 150 $45,750.00 __$84,000.00 $255.00 150 —II— Quinn Electric $290.00 150 $43,500.00 $290.00 _150 $43,500.00 __$87,000.00 Hub Electric —— _ $425.00 _150 $63,750.00 $425.00_150 _ _ $63—,750—.0-0 - --$1--2-7,-5 00.00 DMH Electric $349.00 __150 $52,350.00 $519.00 150- 7 ,850_00 — —T -- - — — $130,200.00 Your Electrical Solution,Inc.(YES) $520.00 150 $78,000.00 $690.00 150 $103,500.00 $181,500.00 _ I 5/3/2018 2016-18 BOARD MATERIA �V . L AVAILABLE BUT NOT DISCUSSED From: Tragi Schultz 5 \ To: RMLD Board Members Group;"David Hennessy" Subject: AP Warrants and Payroll Date: Friday,May 04,2018 8:29:00 AM Good afternoon, 4.13.18, 4.20.18, and 4.27.18 AP. 4.17.18 and 4.30.18 Payroll. There were no Commissioner questions. This e-mail will be included in the 5-9-18 Board Book. Tracy Schultz Executive Assistant Reading Municipal Light Department 230 Ash Street. Reading. MA. 01867 Tel: 781.942.6489 \ J