HomeMy WebLinkAbout2017-12-14 RMLD Board of Commissioners Minutes'4o��y oFR O'IY
x Town of Reading
v Meeting Minutes
e - �
Js'�9eINC0R40�
Board - Committee - Commission - Council:
RMLD Board of Commissioners
Date: 2017-12-14
Building: Reading Municipal Light Building
Time: 7:30 PM
RECEIVE' 3
TOWN CIERK
READiNG, MA.
2818 FEB 26 AN 9: 34
Location: Winfred Spurr Audio Visual Room
Address: 230 Ash Street Session: Open Session
Purpose: Public Meeting Version:
Attendees: Members - Present:
Philip B. Pacino, Chairman, Secretary Pro Tem
David Hennessey, Commissioner
John Stempeck, Commissioner
David Talbot, Commissioner -Remote Participant
Members - Not Present:
David Hennessy, Vice Chairman
Others Present:
Staff:
Coleen O'Brien, General Manager
Hamid Jaffari, Director of Engineering and Operations
Jane Parenteau, Director of Integrated Resources
Wendy Markiewicz, Director of Business/Finance
Tracy Schultz, Executive Assistant
Citizens' Advisory Board:
Vivek Soni, Member
Public:
Mary Ellen O'Neill, 125 Summer Street, Reading
Minutes Respectfully Submitted By: Philip B. Pacino, Chair, Secretary Pro Tem
Topics of Discussion:
Call Meeting to Order
Chair Pacino called the meeting to order and announced that the meeting is being videotaped
at the RMLD office at 230 Ash Street, for distribution to'the community television stations in
Reading, North Reading, Lynnfield, and Wilmington.
Opening Remarks
Chair Pacino read the RMLD Board of Commissioners' Code of Conduct and welcomed Mr.
Soni, the new member of the Citizens' Advisory Board.
Public Comment
Reading resident Mary Ellen O'Neill distributed leaflets to the Board containing research she had
conducted on electric utility tree stewardship programs. Three models were highlighted: utilities
that donate money, utilities that follow Arbor Day tree standards, and utilities that give away
trees. Ms. O'Neill stated that she wanted to plant the seed and ask that the Board consider
Page 1 1
Public Comment
developing a tree stewardship program based on the needs of the service territory. Ms. O'Neill
suggested that RMLD make a $2,500 donation to each community.
Report of the Committee -General Manager's Committee
Chair Pacino .explained that all votes would be roll call due to Mr. Talbot participating remotely
by telephone.
Chair Pacino stated that the General Manager Committee met to conduct its annual review of
Ms. O'Brien. The reviews were positive, with Ms. O'Brien receiving 99.2 out of a possible top score
of 100. The Committee recommends a 4.5 percent salary increase and $5,000 that Ms. O'Brien
has the discretion to use as she chooses.
Mr. Stempeck made a motion, seconded by Mr. O'Rourke, that the Board of Commissioners
follow the recommendations of the General Manager Committee, as stated.
Chair Pacino called for a poll of the vote: Mr. O'Rourke: Aye; Chair Pacino: Aye; Mr. Stempeck:
Aye; Mr. Talbot: Aye.
Motion Carried.
4:0:0.
The Board commended Ms. O'Brien on doing a good job. Ms. O'Brien replied that it would be
impossible to do it alone and thanked the RMLD staff. Mr. O'Rourke verified that Ms. O'Brien's
raise would be retroactive to the start of the fiscal year. Chair Pacino affirmed.
Subsequent Town Meeting
Chair Pacino stated that Ms. O'Brien made a presentation. Ms. O'Brien explained that it reviews
the highlights of the previous FY, including the audit, which was clean, and goes over the
strategic visions from the five to 20 -year plans. Ms. O'Brien stated that she was very proud of the
high school art contest winners which were showcased in the presentation.
Citizens' Advisory Board
Mr. O'Rourke suggested that Ms. Schultz draft a schedule for Commissioner attendance at CAB
meetings.
Approval of Board Minutes -June 15, 2017 and September 14, 2017 (Attachment 1)
The September 14, 2017 Board minutes were not ready in time for the meeting.
Mr. Stempeck made a motion, seconded by Mr. O'Rourke to approve the minutes of the June
15, 2017 Board meeting.
Chair Pacino called for a poll of the vote: Mr. O'Rourke: Aye; Chair Pacino: Aye; Mr. Stempeck:
Aye; Mr. Talbot: Aye.
Motion Carried.
4:0:0.
General Manager's Report - Ms. O'Brien
Ms. O'Brien held up that day's edition of the Daily Times Chronicle, which featured an article on
RMLD and NextEra and a photo of RMLD employees with Governor Baker. RMLD received a $1
million grant with NextEra from the Baker -Polito Administration Energy Storage Initiative. Ms.
O'Brien stated that RMLD is excited to add renewables to the peak reduction portfolio. The unit
is expected to be built before next year's peak. It's a five megawatts storage unit, using lithium
ion batteries, that discharges over two hours.
Mr. Talbot expressed his enthusiasm for the project. Ms. O'Brien said that RMLD is honored to
receive the grant. The million will be split over three years to reduce power supply cost. That will
be passed on to the customers. Mr. Talbot asked what in RMLD's portfolio is renewable. Ms.
Page 1 2
General Manager's Report - Ms. O'Brien
O'Brien stated that it is about 13 percent and that Ms. Parenteau will elaborate when she does
her presentation.
a. Quarterly Updates: Organizational & Reliability Reports - Mr. Jaffari and Ms. O'Brien
(Attachment 2)
Mr. Jaffari highlighted RMLD's progress on the Booth and Associates and UPG's Reliability
Recommendations. These included automating Station 3 so that if something happens to one
transformer, the load will automatically transfer to another in less than ten seconds. Before it
needed to be done manually. All relays at Station 4 have been upgraded. More information is
received in the Control Room.
Mr. O'Rourke asked what the timeframe for completion of the reliability study is. Mr. Jaffari
replied between one to five years. Mr. O'Rourke complimented the team on the process and
acting on the report's recommendations.
Mr. Soni asked for the ages and locations of the substations, which Mr. Jaffari provided.
Ms. O'Brien provided progress updates on the organizational study. Integrated Resources
Department (]RD) is working on a visual outline of the Department's strategic vision. [RD has
already started on milestones, such as the cost of service study, the rate adjustments to
eliminate subsidies, adding renewables to the power portfolio, rebate restructuring, and risk
mitigation. The visual road map should be laid out by the first quarter of next year. The
reorganization effort is down to a granular level, groups now being assessed individually.
Information Technologies is being finished and Technical Services is being started. Additionally
two engineers have been hired in Engineering and Operations.
Mr. O'Rourke asked once an engineer is hired, how long is it before he or she can run the entire
system? Ms. O' Brien replied that an engineer, without any utility background, takes
approximately five to seven years; the training is thorough and specific to the system criteria.
Ms. O'Brien stated that the communications roadmap will change once the new outage
management system goes online. Ms. O' Brien invited the Board to take a tour at the next
meeting so that they can see the physical reorganization of the building, aimed at improving
communications and efficiency.
At 8:15 p.m. Mr. Talbot disconnected and left the meeting.
Mr. Soti asked about RMLD's cybersecurity. Mr. Jaffari replied that RMLD is NERC compliant.
Integrated Resources Division
a. Community Engagement -Ms. Parenteau
Ms. Parenteau announced that RMLD is sponsoring a holiday decorating contest. Pictures must
be uploaded to RMLD's website by Sunday, December 17. From the 19th through the 29th
customers vote online. January 3,d the winners will be announced and will receive a $50 credit
on their bill.
The elementary school art contest awards will be held over two nights: Thursday, January 11 th at
7 p.m., with a snow day of Tuesday, January 16th, and Thursday, January 18th, with a snow day of
Tuesday, January 23rd. I
b. Power Supply Report -October 2017 -Ms. Parenteau (Attachment 3)
Ms. Parenteau began by discussing the October fuel charge adjustment. Customers directly
receive this benefit.
Page 1 3
b. Power Supply Report -October 2017 -Ms. Parenteau (Attachment 3)
From November of 2015 to October of 2016 the charge averaged $0.0496. Now it is $0.048 cents,
which is a reduction of three percent.
As of June 2017, Reading and other utilities in the Northeast Massachusetts (NEMA) zone have
experienced significant transmission increases, reflected in the Purchase Power Capacity
Transmission (PPCT) charge. When comparing October 2016 to October 2017, it has increased
four and a half percent.
Ms. Parenteau explained that the New York Power Authority (NYPA) credit is a benefit that
residential customers receive because RMLD has a NYPA contract for hydro. It has been flat over
the last two years. In October 2016 it was $0.0049 cents and in October 2017 it is still $0.0049.
Addressing Mr. Talbot's question, Ms. Parenteau referenced the October Power Supply Report,
where RMLD had 13 percent renewable -generated projects. That encompasses hydro, wind,
and solar. If you count nuclear as being carbon -free, that number becomes 26.6 percent. RMLD
is working diligently to make portfolio environmentally friendly.
Mr. Soni asked about RMLD's renewable policy. Mr. Stempeck replied that the goal is 15 to 17
percent renewables. Ms. Parenteau stated that there is a stipulation in the policy that the
projects be low-risk and cost conscious. Mr. Soni then asked if there was pressure from the state.
Ms. O' Brien replied that the RMLD is locally owned and controlled, but that discussions with the
state are ongoing.
Financial Report- October 2017 -Ms. Markiewicz- (Attachment 4)
Ms. Markiewicz stated that she was reporting through October 31, on the first four months of FY
18. On the balance sheet cash is down, but this is due to the timing -of receivables and payables.
Restricted cash increased due to $5.6 million being added from the pension trust. The balance
of the depreciation fund at the end of FY 17 was $2.4 million. $2.5 million was added to the
construction fund from the operating funds. The total use of capital funds through October was
$1.6 million, which leaves the current balance at $4.7 million. When comparing July 2016 through
October 2016 and July 2017 through October 2017, there is a two percent decrease in base
revenue, and a two percent decrease in operating expenses. Overall, RMLD is under budget on
operating and maintenance expenses. base revenues have increased over the last 12 months,
except in August and September. kWh sales are 4.1 percent lower in FY 18 than they were in FY
17.
Mr. Stempeck and Mr. O'Rourke asked if there should be concern about the decrease in sales.
Ms. 'Markiewicz stated that sales were flat; the decrease could be weather-related. Ms.
Parenteau added that a cold winter will increase sales. Last summer was milder.
Ms. O'Brien stated that there is economic growth in the area around the proposed Wilmington
substation. RMLD is targeting offset any decline in sales with demand reduction techniques and
economic growth incentives.
Mr. Soti asked if the weather has a significant impact on sales and whether degree temperature
days are looked at. Ms. Parenteau answered in the affirmative.
a. Report on any potential cost savings of changing the Department's fiscal year end to a
calendar year.
Ms. Markiewicz stated that the Board asked her to do a cost analysis of changing the financial
reporting from fiscal year to calendar year. There would be a one-time $36,000 six-month audit
fee.
Chair Pacino explained that RMLD is on a Fiscal Year and the Department of Public Utilities is _on
a Calendar Year. Therefore, RMLD has two closings a year.
Page 1 4
a. Report on any potential cost savings of changing the Department's fiscal year end to a
calendar year.
Ms. Markiewicz explained that Accounting needs to take six months of one fiscal year and six
months of the following fiscal year and combine them to get a DPU report that's accurate.
Power supply must do more calculations and power supply costs are typically not published until
March. Due to the staff time needed to combine half of two fiscal years into one report, Ms.
Markiewicz estimated $15,000 in avoided costs by switching to a calendar year. Additionally, the
Town of Reading and RMLD finalize their year-end reports at the same time, which can delay
RMLD finishing its reporting. Changing to a calendar year will end double warrant'concerns: For
three or four weeks, there are two sets of warrants, one for each fiscal year. This causes extra
work for the Town and for RMLD. Ms. Markiewicz concluded, stating summer vacation time and
the fact that vendors aren't quick to finalize their books and get us invoices complicates matters
further. However, most companies clean up their books at the end of the calendar year for tax
purposes.
Mr. Stempeck asked Ms. Markiewicz if she would recommend moving to a calendar year. Ms.
Markiewicz replied in the affirmative.
Ms. O' Brien stated her previous place of employment changed to a calendar year. It created
efficiency and was consistent with the Department of Public Utilities' filing. RMLD works hard to
evaluate rates fiscally, without all the data, so that we can provide some input to the Towns'
fiscal year budget processes. Having a calendar year budget would allow us to complete our
analysis before providing premature data.
Chair Pacino stated that it would be up to the Board to vote when all five members are present.
Ms. Markiewicz announced that the auditors are on board.
Engineering and Operations Report -July, August, and September 2017 -Mr. Jaffari (Attachment 5)
Mr. Jaffari explained that most of the heavy construction projects will be done in the' spring. In
the month of October, $131,812 was spent on Routine Capital Construction, bringing the YTD
total to $411,263. This is for FY 18. Mr. Jaffari stated he expects that number to reach $1 million.
All divisions spent a total of $322,741 in October, bringing the YTD to $1,651,984. $7,685,521 has
been budgeted.
Routine Maintenance test 10 percent of poles. First time tested 37 percent failed. last report
down to 5 percent. making progress. tree trimming program .is working. 3 -year cycling program
will end in 2018, then go to 5 -years. RMLD has five double poles to be transferred in Lynnfield.
Reading has 70 pull poles and 29 transfers pending, for a total of 99. North Reading has 31 pull
poles and 13 transfers for a total of 44. Wilmington has 31 pending transfers and four pull poles.
Mr. Jaffari stated that this is a good sign. RMLD is making progress upgrading the system.
Mr. Jaffari explained that the reliability indices include the October storm numbers, where the
outages were all tree -related.
RMLD Procurement Requests Requiring Board Approval (Attachment 6)
IFB 2018-13 Janitorial Services
Ms. O'Brien explained that the square footage in the bid specification was reduced and the
contract re -bid. Large areas that only require sweeping will be done in-house.
RMLD Procurement Requests Requiring Board Approval (Attachment 6)
IFB 2018-13 Janitorial Services
-Mr. Stempeck made a motion, seconded by Mr. O'Rourke, that bid IFB 2018-13 for: Janitorial
Services be awarded to: Transcend Maintenance Services, Inc. for $67,325.40, pursuant to
M.G.L., Chapter 308, as the lowest responsive and responsible bidder on the recommendation of
the General Manager. This is a three-year contract.
Motion Carried.
3:0:0.
Page 1 5
IFP 2018-17 Cooper Power System or Compatible Meters and Equipment for the AMI Mesh
Network Expansion and Migration
Mr. Jaffari stated that the Invitation for Proposals went out to 15 companies. Two replied.
Mr. Stempeck made a motion, seconded by Mr. O'Rourke, that proposal IFP 2018-17 for Cooper
Power System or Compatible Meters and Equipment for the AMI Mesh Network Expansion and
Migration be awarded to: Eaton for $83,199.36, pursuant to M.G.L Chapter 164 Section 56D on
the recommendation of the General Manager.
Motion Carried.
3:0:0.
IFB 2018-19 Line Truck Chassis and Trailer Inspection, Preventative Maintenance, and Repair
Services
Mr. Jaffari stated that the Invitation for Bids was sent to seven companies; one responded.
Mr. Stempeck made a motion, seconded by Mr. O'Rourke, that bid IFB 2018-19 Line Truck Chassis
and Trailer inspection, Preventative Maintenance, and Repair Service be awarded to: Taylor &
Lloyd, Inc. for $151,462.31, pursuant to M.G.L. Chapter 30B, as the lowest responsive and
responsible bidder on the recommendation of the General Manager. This is a three-year
contract.
Motion Carried.
3:0:0.
IFB 2018-20 Line Truck Lift Equipment Inspection, Preventative Maintenance, and Repair Service
Mr. Jaffari stated that the Invitation for Bids went to four companies; one responded.
Mr. Stempeck made a motion, seconded by Mr. O'Rourke, that bid IFB 2018-20 Line Truck Lift
Equipment Inspection, Preventative Maintenance, and Repair Service be awarded to: James A.
Kiley Co. for $111,495.00, pursuant to M.G.L. Chapter •3013, as the lowest responsive and
responsible bidder on the recommendation of the General Manager. This is a three-year
contract.
Motion Carried.
3:0:0.
General Discussion
Chair Pacino stated that the Art Awards are coming up. The next Board meeting is January 25th
and the next CAB meeting is January 17th. Chair Pacino asked Ms. Schultz to coordinate another
meeting of the Payment to the Town of Reading Sub -Committee.
Executive Session
At 8:52 p.m. Mr. Stempeck made a motion, seconded by Mr. O'Rourke, that the Board go into
Executive Session to consider the purchase of real property and discussion thereon and to return
to regular session for the sole purpose of adjournment.
Chair Pacino called for a poll of the vote: Mr. O'Rourke: Aye; Chair Pacino: Aye; Mr. Stempeck:
Aye.
Motion Carried 3:0:0.
Adjournment
Mr. Stempeck made a motion, seconded by Mr. O'Rourke, to adjourn the Regular Session.
A true cop f the RMLD Board of Commissioners minutes
as a ro ed by a majority of the Commission.
Phili B. acino, Secretary Pro Tem
RMLD Board of Commissioners
Page 1 6
READING MUNICIPAL
LIGHT DEPARTMENT
BOARD OF COMMISSIONERS
REGULAR SESSION
DECEMBER 14, 2017
APPROVAL OF BOARD MINUTES
JUNE 15,2017&SEPTEMBER 141
2017
ATTACHMENT 1
READING MUNICIPAL LIGHT DEPARTMENT
BOARD OF COMMISSIONERS MEETING
230 Ash Street
Reading, MA 01,867
June 15, 2017
7:30 p.m.
Start Time of Regular Session: 7:33 p.m.
End Time of Regular Session: 9:06 p.m.
Commissioners:
Philip B. Pacino, Chairman
Dave Hennessy, Vice Chairman
Thomas O'Rourke, Commissioner
Dave Talbot, Commissioner
John Stempeck, Commissioner -Absent
Staff:
Coleen O'Brien, General Manager Wendy Markiewicz, Director of Business Finance
Hamid Jaffari, Director of E & O Tracy Schultz, Executive Assistant
Jane Parenteau, Director of Integrated Resources
Citizens Advisory Board:
Dennis Kelley, Secretary
Guest:
Mayhew Seavey, PLM Engineering
Public:
Tony D'Arezzo, Resident, 130 John Street, Reading, MA
Call Meeting to Order
Chairman Pacino called the meeting to order and announced that the meeting is being videotaped at the
RMLD office at 230 Ash Street, for distribution to the community television stations in Reading, North Reading,
Lynnfield, and Wilmington. Chairman Pacino expressed his concern that he received a complaint from the North
Reading Selectmen that North Reading Cable Access and Media (NORCAM), North Reading's public access
station, hasn't been receiving DVDs of the meetings.
Ms. Parenteau explained that RMLD makes copies of the meeting DVDs and she will make sure that they are
being delivered.
Opening Remarks
Chairman Pacino read the RMLD Board of Commissioners' Code of Conduct and welcomed Mr. Kelley from the
Citizens Advisory Board. Mr. Kelley commented that the recent solar tour was interesting.. Chairman Pacino
announced that Mr. Stempeck is away and would not be in attendance this evening.
Public Comment
There were no Board Liaisons present and there was no public comment.
Report RMLD Board Member Attendance at Citizens' Advisory Board Meeting May 24, 2017
Chairman Pacino stated that the CAB meeting's primary focus was the rate adjustments that the Commission will
examine this evening. The CAB voted to recommend that the Commission approve the new rates.
Report of the Chair
Chairman Pacino stated that he wanted to comment publicly that he saw a sign on Ash Street that read "Hate
has no home here" and that he totally endorses and agrees with that statement.
The Wilmington solar ribbon cutting ceremony was held last Thursday and that project is now up and running. The
Commission had a strategic session with discussion and many assignments for the group to come, back with.
Chairman Pacino asked Mr. Kelly whether the CAB has determined who will be its members on the Committee
on Payment to the Town of Reading stands. Mr. Kelley replied that he will check with Mr. Hooper.
Regular Session Meeting Minutes 2
June 15, 2017
General Manager's Report - Ms. O'Brien
Ms. O'Brien announced that RMLD Customer Service will be closed on Monday, July 3rd and Tuesday, July 4th.
RMLD held a ribbon cutting ceremony at the community solar project at 326 Ballardvale on Thursday. It was a
great event. There is another ribbon cutting coming up for the peak generator, but that date remains to be
determined. -In terms of community engagement, an informational table on Shred the Peak will be set up at the
Reading Lions Club Friends and Family Day on June 17th, and at the Wilmington farmers' market on June 25th.
Info sessions will be held at local senior centers on various days in June. Ms. O'Brien will be meeting with the North
Reading Board of Selectmen on Monday, June 19th.
Mr. O'Rourke asked that event dates now be included in the Commission packets
Quarterly Updates: Organizational & Reliability Reports - Ms. O'Brien and Mr. Jaffari (Attachment 1)
Ms. O'Brien explained that she would be talking about the Organizational highlights. A report will be issued in the
first quarter of next year on the progress of the Strategic Plan. The Six-year plan was updated as part of the
budget, and is ongoing every year. The electric system master plan has essentially been completed by Mr. Jaffari
and his group. There will be a final report and presentation in September to show where we are with grid
modernization and the entire technological road map. The workforce development plan is wrapping up -that
means career development plans and rewritten job descriptions for all employees. We're in the final stages and
it has been quite an undertaking. A part of that is succession planning. As we've been redoing the job
descriptions we've been anticipating employees who may be retiring in 5 -years and making sure that skill sets
have been broadened, so other employees in those groups have opportunities to move ahead.
RMLD now has a new review process that was just finalized. All managers are sitting down with their employees
and giving out goals. The process starts July 1, fiscal year 2018. Organizational culture and employee satisfaction
will be assessed; we will get a lot of input once the review process begins. A year from now, everyone will be
reviewed in the management union. The labor union doesn't have a formal review process. There is an increase
in efforts to fill vacant positions. Engineering will now be composed of five system engineer positions. All five
engineerswill be cross trained and capable of running the system.
Mr. O'Rourke suggested an employee survey. Ms. O'Brien stated that RMLD has a survey that is part of what
Leidos said to do; now that the reorganization is nearing completion, feedback can be solicited.
Ms. O'Brien continued: cross -divisional management training is occurring, as is leadership training. Project
management training will be held onsite at RMLD. Policies are ongoing. A risk management plan, as for as power
supply, is an ongoing process. Changes in financial business processes are moving along. Assigning a compliance
manager has not been done yet -figuring out the best way to address that. Asset management plan putting in
SpryPoint-an automated quasi -work order stock timesheet system, that will serve as an interim while work order
systems are reviewed. There has never been a true work order system here. There's now a pilot program in place
for the interim program. The current work place is being enhanced; once the office is painted and reorganized,
Ms. O'Brien proposed a tour for the Commissioners in September.
Vice Chairman Hennessy asked if the leadership development for the management team has already started.
Ms. O'Brien replied that there are a couple of levels of leadership. For middle management, project
management, supervisory skills, and conflict resolution have been put onto everyone's career development
plans. Middle management knows what they must take. Leadership in unions will also be required to take courses.
Training plans for direct reporting managers are being developed.
Mr. Kelley asked, without a work order system, how have you been tracking labor and cost?
Ms. O'Brien replied, by using a paper stock sheet system. We will implement a full Work Order system. It is being
evaluated.
Regular Session Meeting Minutes
June 15, 2017
3
Quarterly Updates: Organizational & Reliability Reports - Ms. O'Brien and Mr. Jaffari (Attachment 1
Mr. Kelley asked how were you doing inventory management then?
Ms. O'Brien answered that everything was being done manually. The stock sheet has now become automated,
and it has also become integrated. It's on tablets and is being piloted with the troublemen and the Control Room.
Once that pilot is done it will be rolled out to everyone else and we'll get rid of the paper stock sheets.
Mr. Jaffari stated that RMLD is making good progress on the Booth reliability recommendations. Mr. Jaffari stated
that he is glad to announce that the bus work at Station 5 is completed. That substation is old and is nearing the
end of its useful life so we're looking for land in the Wilmington area to build a new substation. However, that will
take 3 to 5 years to be completed. In the interim, RMLD has made upgrades and rejuvenated the switchgear
and reinsulated the bus in the existing station. While doing so, asbestos was discovered, which has prolonged the
project. The switchgear's life has been extended for another 5 to 10 years.
GIS data collection is completed and the contractor's work is being checked. This is anticipated to be completed
by September 1 and then the data will be put into the engineering model so analysis can be down with more
accuracy. SCADA work is underway. This week, consultants are upgrading SCADA and programming substation
3 and substation 4 to send telemetry data and connect to Eversource and National Grid so RMLD can join the
overall 115 kv network.
All critical substation items that were identified by UPG, the contractor that was brought in to test substations,
have been addressed and completed.
Mr. Kelley asked if a recent Wilmington outage was due upgrades to Substation 5.
Ms. O'Brien replied it was not. The drawing setting didn't match the relay setting. It wasn't a new setting. It
wasn't part of an upgrade. It was a mistake on how it had been labeled originally. Recent directed testing was
performed to catch it.
Proposed Rate Adjustments (Attachment 3)
RATE
TARIFF No.
Residential Schedule A
MDPU #269
Residential Time -of -Use Schedule A2
MDPU #270
Commercial Schedule C
MDPU #271
Industrial Time -of -Use Schedule I
MDPU #272
School Schedule SCH
MDPU #273
Residential Schedule RW
MDPU #274
Backup and Standby Rate
MDPU #275
Purchase Power, Capacity, and Transmission Charge
MDPU #276
RATE
TARIFF No.
Electric Vehicle EV Charging Rate
MDPU #277
Mr. Seavey from Powerline Models (PLM) introduced himself, and explained that he is here to make final
recommendations for fiscal year 18 rates.
Mr. Seavey stated that the objectives that RMLD set out to accomplish with the rate design included adjusting
subsidies between and within classes of customers, ensuring that rates for large and high -load customers continue
to attract and retain such customers, and ensuring that the rates reflect cost of providing service. RMLD wants to
provide price signals to encourage customers to reduce demand during peak periods. Additionally, RMLD wants
to protect distribution revenues from erosion due to customer -owned generation such as solar and battery
storage. The phase-in for some of these changes will occur over time to give customers time to adjust.
Regular Session Meeting Minutes 4
June 15, 2017
Proposed Rate Adjustments (Attachment 3)
Instead of across-the-board increases, the new rates are meant to adjust for subsidies and move towards more
uniform rates of return. The residential rate of return should increase up to zero over the next 5 -year period; right
now, it's significantly negative. The commercial rate of return should be reduced from high double digits down
to low double digits. The industrial rate of return will remain where it is; it's low and appropriate for customers of
that size.
If the increase was flat across the board to cover expenses and produce the targeted 8 percent rate of return,
residential customers would have had a 5.5 percent increase; commercial would have had a 5.7 percent
increase. Instead, the first year of the 5 -year phase-in is a residential increase of 6.6 percent. Commercial
customers will have a 3.5 percent increase this year. There will be similar changes each year. However, each
year the rates will be revisited. The rate percentage changes over 5 years are based on projections that we have
today regarding increases in kRMLD's operating and maintenance costs and increases in capacity, transmission,
and purchase energy costs.
Mr. Seavey explained the changes to commercial and industrial rates. While industrial and commercial customers
will see an increase, the next few years should show a decrease as capacity costs change. Rates will be more
uniform and fair, but still quite competitive and attractive, particularly for the commercial and large customers.
Another recommendation that aims to get price signals correct is to phase in a purchase power capacity
transmission (PPCT) demand charge. In the past, all those costs have been recovered through an energy charge.
That tends to result in a subsidization of poor load factor customers by high load factor customers. By charging
the correct price signal for demand, we remedy that situation and provide rate relief to customers who use their
demand a lot. Only one customer in the first year is going to see an increase of more than ten percent. With the
decreases in the following years no demand customers will see an increase, even with the phase ins of the
demand. This is as painless a way of doing a significant shift of revenue, from energy to demand charges, as you
can accomplish.
The renewable generation rate has a subsidization, but it is relatively small. It is $15 or $20 thousand a year for the
existing 80 customers. It is more reasonable to cap the total amount of the subsidy rather than putting a cap on
the amount of solar that can be installed. The cap is significant: $100,000, but only represents a cost to customers
of 11 cents a month. It will not penalize customers who have already made an investment in facilities.
Immediately recommending back up and stand by rate to protect against customers installing larger amounts
of generation, particularly non-renewable generation like back up and stand by generators or co -generation
systems.
Ms. O'Brien clarified that the charge is to protect RMLD and its customers and that she wants customers to
understand what that means. It's to protect everyone because we still pay distribution charges, we still have to
keep the system up and running. RMLD is not trying to penalize people for putting in solar. We must recover our
production charges and we still have to maintain the electric system.
Mr. Seavey stated that everyone who uses the distribution system supports it appropriately. When a customer
installs generation behind their meter they're continuing to use the distribution system just as much. The idea is to
continue to recover revenues to maintain, own, if you don't, rates will rise for everyone. That, or you don't earn
enough money to cover your expenses and you don't maintain the system.
Mr. Talbot asked if a customer would still be able to disconnect from RMLD. Ms. O'Brien answered yes, although
it's risky and it's'their responsibility. Mr. Talbot asked for the amount of the standby rate, and clarified that this is
just a recommendation at this point. Mr. Seavey corrected him and explained that the rate is being filed. The
charge is the present distribution rate times the amount of capacity the customer wants you to back up. They'll
still avoid purchase power, capacity, and fuel charges.
Regular Session Meeting Minutes 5
June 15, 2017
Proposed Rate Adjustments (Attachment 3)
Mr. Talbot asked who would this rate effect right now? Mr. Seavey answered: nobody, but it should be on the
books. Mr. Talbot then asked how many municipals have a back-up and stand by rate now? Mr. Seavey replied,
about half.
Ms. O'Brien explained that there is a strategy behind this rate; when she arrived at RMLD the first thing she did
was unbundle the rates, because she knew this was coming. if large customers are producing all this power, we
still must pay for the distribution system.
Mr. Seavey stated that the residential time of use rate, proposed changes will not work with RMLD's billing system.
Presently the time of use is in the distribution rate and there is no time varying component in the distribution
charge. It should be in the purchase, capacity, and transmission charge where you have the on and off peak
component. This should be addressed at some point in future. For now, equal factors were added to on and off
peak across the board.
Mr. Talbot asked if that meant those customers won't have as high an increase. Mr. Seavey explained there is still
a high increase because the current rate is too low.
Mr. Seavey continued, stating In 2014 an electric vehicle rate was piloted for the three charging stations at
Analog. Took a look at how that has been working and how the cost has changed. There is not enough usage
data to be conclusive as to whether the existing rate is adequate. He is proposing a rate that is roughly equivalent
to the pilot rate but that the use of the charging stations is monitored.
There was discussion as to where the best location to place a charging station in Reading would be. Ms. O'Brien
explained that there will be two at RMLD; one is from the grant and we're getting an electric vehicle. Ms. O'Brien
explained RMLD is trying to encourage its employees to purchase electric vehicles. Mr. Talbot expressed his
reservations that any resident would want to charge their vehicle at RMLD.
Ms. O'Brien mentioned that RMLD could get into the business of installing electric vehicle charging stations.at
people's homes. Braintree has an electric vehicle leasing program. They're really engaging the community to
bring in electric vehicles and putting in charging stations. But, we're not going to build them and see if customers
come. They need to come and we'll build them.
Mr. Talbot asked what will happen when people are charging during peak times. Ms. Parenteau explained that
the charging stations can be programmed to either shut off or reduce the amount of electricity being used.
Chairman Pacino stated that he has a procedural question. Why did the Electric Vehicle rate not go before the
CAB before being presented to the Board?
Ms. Parenteau explained that it was an oversight. Rates are scheduled to be effective on July 1, contingent on
being approved at the June 21st CAB meeting.
Mr. O'Rourke asked Mr. Kelley if he had any guidance from a CAB member's perspective. Mr. Kelley replied that
this was his first time seeing the rate; Mr. Talbot has been helpful in giving insight. However, he needs more detail
to understand make an educated decision and thinks the rest of group will have questions.
Mr. Talbot asked if the Commission can defer this rate tonight. There are no electrical vehicle stations up yet.
Mr. O'Rourke asked if pulling this piece out of the proposed rates will impact operations. Ms. Parenteau answered
no.
Mr. Talbot stated, as a time of use customer, he pays 6 or 7 cents to charge his car overnight at his house. He
Regular Session Meeting Minutes 6
June 15, 2017
Proposed Rate Adjustments (Attachment 3)
would never use the electric vehicle rate at his job and pay 11 cents. Mr. Talbot asked how ChargePoint works.
A discussion about how ChargePoint operates and makes its revenue ensued, with Ms. Parenteau explaining
that they get ten percent of sale for processing the credit card payment.
Mr. Talbot added, and we get to use their name and be on their app.
Mr. O'Rourke made a motion, seconded by Vice Chairman Hennessy, that the RMLD Board of Commissioners
approve the rates MDPU numbers #269, 270, 271, 272, 273, 274, 275, and 276, effective July 1, 2017 on the
recommendation of the General Manager.
Motion Carried: 4:0:0.
Chairman Pacino stated that the Commission agreed to hold off on voting on the electric vehicle rate motion,
and will defer that to a future meeting.
Mr. Kelley asked if Mr. Talbot could make it to the next CAB Meeting; he cannot. Chairman Pacino will attend.
Power Supply Report - March and April 2017- Ms. Parenteau (Attachment 2)
Ms. Parenteau stated that she will be reporting on the April and May Purchase Power, starting with kWh sales in
the first quarter of 2016 versus 2017. In 2017, 216 million kWh were sold, compared to 210 million kWh in 2016. Sales
were up about 2.88 percent in 2017. However, when you look at the full fiscal year, it's considerably flat. It's 0.6
percent higher in 2017 than 2016, and that includes May and June estimated.
The total revenue received in the first quarter from Purchase Power, Capacity, and Transmission (PPCT) totaled
about $500,000 less in 2017 than 2016. There are two contributing factors related to this -in 2016 sales were down
about 2.6 percent, so we had to recover more dollars over less kWh. In 2017 we're up about 1 percent.
Additionally, in 2016 our revenue in the beginning of the year was less than our expenses. Over the year, we try
to recover the full Purchase Power and Capacity costs. It was necessary to increase PPCT in the 3rd quarter
because of that situation. In 2017, revenues were exceeding expenses so that allowed us to decrease PPCT in
the third quarter. Overall, capacity and transmission expenses from 2016 to 2017 increased 5.6 percent or $1.7
million dollars.
Now that our portfolio contains quite a bit of hydro projects, thought it would be interesting to look at precipitation
and how that relates to the hydro projects. January and April of 2017 had considerably higher precipitation than
in 2016; overall, for the quarter, the average was 3.5 inches compared to 2.6 inches. In 2017, productions were
up in January and April for the hydros that we have purchase power agreements with.
Natural gas is the commodity that really dictates the spot market. However, the more hydro that we have, the
less we have to buy on the spot market. These projects have been very beneficial to us within our portfolio.
Financial Report - April 2017 - Ms. Markiewicz (Attachment 4)
Ms. Markiewicz said that she would be reporting on the April 2017 financials, beginning with accounts receivable.
RMLD is 82 percent current, 15 percent overdue by 30-90 days, and only 3 percent over 90 days is outstanding.
In FY 16, 89 percent was current, 9 percent was overdue by 30-90 days, and 2 percent was over 90 days. We've
improved greatly since FY 15, where we had.75 percent current, 20 percent overdue by 30-90 days, and 5
percent over 90 days past due. Moratorium ended in April with two big collection pushes, which we should see
the effects of in May or June.
Vice Chairman Hennessy asked if the percentages were for all customers. Ms. Markiewicz replied in the
affirmative; this is for commercial, residential, and industrial.
Regular Session Meeting Minutes 7
June 15, 2017
Financial Report - April 2017 - Ms. Markiewicz (Attachment 4)
Vice Chairman Hennessy asked whether it was residential or commercial customers who typically owe more. Ms.
Parenteau explained that RMLD can shut off commercials for non-payment. Residential customers have a
moratorium protecting them from shut off from November to April, so it's usually residential who owe more.
Ms. Markiewicz continued, stating that the base revenue as compared to our operating expenses in fiscal year
2017 year-to-date $21,660,000 in base revenue, compared to fiscal year 2016 of $19,702,000, which is about a 10
percent increase. The 2017 budget was $21,250,000, so we're slightly above budget; about 1.6 percent. The base
revenue compared to our operating expenses is on target, with a 10 percent increase as well. Fiscal year 2017
year-to-date is right on target: $17,538,00; FY 2016 was $15,915,000. When you compare that to the budget, we're
about 1.4 percent less than anticipated at $17,837,000. Overall, we're right on target budget -wise.
Purchase Power, Transmission, and Capacity revenue is $28.2 million, as compared to the expense of $26.8 million.
Fuel revenue was $27.7 million, with a fuel expense of 27.4. The $1.7 million excess in revenue will bring our true
net income to $4 million, as compared to last year's 3.6 million. The overall budget is looking at an 18 percent
increase. It's important to remember that there are lots of adjustments on the books at year end. Auditors were
in-house yesterday doing preliminary testing. They were supposed to be here again today, but didn't feel that it
was necessary.
Engineering and Operations Report - March and April 2017 - Mr. Jaffari (Attachment 5)
Mr. Jaffari stated he would be reporting on March and April 2017. Routine construction year to date spending is
$1,606,613. For fiscal year 2017 $9.5 million has been budgeted for capital projects. To date, $5.8 million of the
budgeted amount has been spent and a balance of $3.7 million remains. We're going to catch up in June;
there's a large payment being made on the DG project and that will bring expenditures to $9.5 million.
Routine maintenance is on target. Good progress is being made, especially on pole inspections, transformer
replacements, and substation maintenance. There were no hot spots either month. Double poles are a work in
progress.
The reliability indices, SAID[ CAIDI and SAIFI, are measures that show the health and wellbeing of the system. Our
reliability is good. RMLD is well below the national and regional averages for outages. Bench markers are set by
APPA. We're doing very well. The main outage causes from 2012 to 2017 were equipment, trees, and wildlife.
2017 year-to-date, April had a couple of storms that brought trees down. Unfortunately, there's nothing that can
be done about pine trees that come down and cause extensive damage to the lines. Equipment outages are
shrinking. We're heading in the right direction.
General Discussion
The next RMLD Board of Commissioners Meeting will be on Thursday, July 20, 2017. The next CAB meeting is
Wednesday, June 21, 2017. Chairman Pacino will attend.
Chairman Pacino stated that since he is signing the AP Warrants for this month he is also Secretary. He expressed
his concern that a lot of minutes need to be approved. Ms. Schultz agreed, and stated they were on the agenda
for the next meeting.
Executive Session
At 9:06 pm, Mr. O'Rourke made a motion, seconded by Vice Chairman Hennessy that the Commission go into i
Executive Session to conduct business in relation to other entities making, selling or distributing electric power, to
consider the purchase of real property, and to discuss strategy with respect to collective bargaining and return
to Regular Session for the sole purpose of adjournment.
Chairman Pacino called for a Poll of the Vote:
Vice Chairman Hennessy: Aye; Chairman Pacino: Aye; Mr. O'Rourke: Aye; Mr. Talbot: Aye.
Motion Carried: 4:0:0
Regular Session Meeting Minutes
June 15, 2017
Adjournment
Mr. O'Rourke made a motion, seconded by Vice Chair Hennessy, to adjourn the Regular Session.
Chairman Pacino called for a Poll of the Vote:
Vice Chairman Hennessy: Aye; Chairman Pacino: Aye; Mr. O'Rourke: Aye; Mr. Talbot: Aye.
A true copy of the RMLD Board of Commissioners minutes
as approved by a majority of the Commission.
Philip B. Pacino, Secretary Pro Tem
RMLD Board of Commissioners
QUARTERLY UPDATES: RELIABILITY 8
ORGANIZATIONAL REPORTS
ATTACHMENT 2
BOOTH AND ASSOCIATES - 2015 RELIABILITY STUDY - RECOMMENDATIONS
Print date: 12/11/2017 1 of 3
RECOMMENDATION
CONSULTANT RECOMMENDATION
YEAR
COST (Booth Estimate)
AETEaNATE
RMLD WORK PLAN
-
ACCEPTED
sc=oN
STATUS
- - -
Replace cable trench covers at Sub 4 (should be expense, but most put large investments
1
BOOTH
in capital)
2015-16
$100,000
V.
completed-
... -
Sub 5 bus duct from transformer to switchgear has reached the end of useful life and
2
BOOTH
should be replaced with the switchgear replacement -
2015-16
$400,000
..
✓
completed'
_
3
BOOTH
Replace fence at Sub 4 and fix grounding issues
2015-16
$100,000
✓
completed
-
4
BOOTH
Rebuild pole line along Lowell Street
2015-16
$375,000
✓
completed
5 ,BOOTH
Complete AMI Upgrade and RF Mesh Network
P pg
2015.16
$350,000 • .✓'
•
_ - -
in progress.
Five gateways installed. Relays installed. Additional meters in stock. Working on communicating issue with
• :r -, •. •, . -
-
(1) deployed meter. - - -
6
BOOTH
Implement GIS Upgrade Program
2015-16
$350,000 - $750,000
✓
in progress
GIS asset survey is in -progress
7
BOOTH
Implement Arc Flash Study Analysis
2015-16
$30,000
✓
completed
8
BOOTH
Develop construction standards
2015-16
in-house
✓
in progress
9
BOOTH
Update Joint -Use Agreement with Verizon
2015-16
in-house
✓
.in progress_
10
BOOTH
Replace bushings on Sub 4 transformer.
2015-16
$150,000
: ✓
completed • .
11
BOOTH
CT wiring at Sub 3 should be fixed. The CT circuits should only be bonded on grounding in
exactly one spot
, 2015-16
O&M
- .✓
-
completed .,
CT's are grounded in only one location:. - ..
12
BOOTH
Sub 3 has NO under -frequency trips. Relay is not programmed to trip.
- 2015-16
0&M
✓
completed
Station 3has UF capability. RMLDis in compliance with ISO's OF requirement.
Fence grounding is not up to code@ Station 4. Fabric and barbed wire should be
13
BOOTH
grounded. _
2015-16
O&M
✓ -
completed
14
BOOTH
Earth/gravel around fence at Sub 5
2015-16
O&M
✓
completed
15
BOOTH
Interface CIS with GIS platform
2015-16
in-house
✓'
in progress
GIS Data collection is in -progress
16
BOOTH
Create Milsoft Windmil• model
2015-16
in-house
✓ -
'in progress
Being donein conjunction with'GIS collection.
17
BOOTH
Complete SCADA software and hardware upgrade
2015-17
$350,000
✓
-
in progress
nDimensions cyber security software complete.' -
18
BOOTH
Upgrade main feeder of Circuit 5W9 to 795 to address voltage and conductor capacity1.6
2015.17
$240000
✓
in
The first 3000' has. been reconductored. This work can only be done during the fall/winter months. May have
issues miles
( )
,
progress
•. _
a fiurdle with Verizon and pole replacements. -
Upgrade UG circuit 3WS, 3W 13, 4W9, 3W14, 4W14, 4W36, 4W23, 4W24, 4W28, 4W30,
Can't parallel up the feeder get -a -ways at Station 4 and Station 5, no spare conduits available. Can't parallel
19 (1)
BOOTH
SW4 exits to parallel 750 Cu
2015-19
$850,000
✓'
-
up the feeder get-a=aways,at Station 3, no room for the second set of cables in the back of the switchgear.
- - . .
•
Solution: Load reliefby feeder switching and/pr new Wilmington Substation. - - -
20
BOOTH
Replace breakers at Sub 4 due to age and condition
2015-20
$3,000,000
✓
'completed
All 26 breakers were replaced by 1/10/2016.
Pole inspection and replacement program. RMLD currently inspects 10% of RMLD-owned
21
BOOTH
poles per year. Negotiate with Verizon to address Verizon -owned poles. Total 13,000
2015-24
$9,000,000
..✓
in progress
FY: 2015 /2016/2017/2018.inspections completed. Pole replacement in -progress.
poles.
-
-
22
BOOTH
Continued implementation of Grid Modernization Plan (GMP)
2015-24
OMS Installed waiting for GIS overhaul and AM[ integration
• Outage Management OMS
g g (OMS)
$100,000
✓'
in progress
'
• Transformer Loading Management (TUM)
$100,000
✓ -
in progress-
• Demand Response (DR)
$100,000
✓
in progress
'
• Demand Side Management (DSM)
$100,000
✓
` in progress
• Distributed Generation Program
$11,000,000
✓
-
'in'progress
- - -
23 (1)
BOOTH
Upgrade UG circuit exit 4W7 to parallel 750 Cu
2016
$70,000
•/ -
Can't parallel up the feeder get -i-way at Station 4, no spare conduits available. Solution: Load relief by
feeder switching and/or new Wilmington Substation. .• -
24
BOOTH
Upgrade main feeder for Circuit SW5 to 795 to address voltage and conductor capacity
✓,
-
issues (2.5 miles)
2016-17
$375,000
.
, .
Change construction years to FY17, FY18-and FY19. Hurdle: Verizon pole replacement area..
25
BOOTH
New Wilmington Substation (land acquisition and design)
2016-17
$750,000
✓
in progress -
Searching for land in Wilmington
BOOTH
dfeeder of Circuit 4W24 to 795 to address voltage and conductor capacity
Upgrade main
✓
Z6
issues (1.5 miles)
2016-17
$225,000
Print date: 12/11/2017 1 of 3
Print date: 12/11/2017
2 of
RECOMMENDATION
CONSULTANT RECOMMENDATION
YEAR
COST (Booth Estimate)
RMLD WORK PLAN
ALUM E
ncavrrO
sowrION
STATUS
27
BOOTH
Complete comprehensive distribution system analysis upon GIS completion
2016-17
in-house
✓-
'-
28
BOOTH
Complete the 4 kV Conversion Program -
P g
2016-19
$1,500,000.
? ✓
in progress
Change completion date to FY20. Multiple year project. 32f/- stepdown areas in the service territory.' -
Converted the Burrough's Road area October 22, 2015: -
Sub 3 does have SEL relays but they are all legacy models that don't provide the function
- -
29
BOOTH
(especially communication) of today's versions. If the plan is to have a fully-automated
2016-19
$200,000
✓
completed
'
system then: replace the SEL relays with the modern version. Should be able to replace in
existing hole and wiring.
-
30
BOOTH
New Wilmington Substation (procurement, design, construction and commission)
2017-19
$4,250,000
✓
in progress .
Searching for land near 115 kV lines in Ballardvale/Upton Rd area -
Sub 5 Switchgear is at the end of useful life. The relaying needs to be updated for the
3; (1)
BOOTH
system automation project. The existing breakers are 2008 vintage but should not be
2017-19
$1,200,000
✓.
�.
As part of the planning for the proposed substation in-Wilmington the needfor the Wildwood Substation will
,.
reused. They can be sold on the open market.
-
- , -
be reviewed.- .,
Upgrade UG circuit exits 3W7, 4W5, SWS, 5W9 to parallel 750 Cu to Increase circuit
Can't parallel up the feeder get-a-ways at Station 4 and Station 5, no spare conduits available. Can't parallel
32 (1)
BOOTH
capacity
2017-19
$280,000
✓
up the feeder get-a-aways at Station 3, no room for the second set of cables in the back of the switchgear:
Solution: Load relief by feeder switching and/or new Wilmington Substation. -
33
BOOTH
Feeder Automation - complete System Coordination Study in conjunction
2017-24
$4,000,000
✓
-
in planning
34
BOOTH
Upgrade main feeder of Circuit 4W28 to 1000 Cu to address voltage and conductor
2018
$60,000
✓
4W28 is the dedicated circuit for Analog Devices. Any typeof load relief for feeder 4W28 will require the -
-
capacity issues 0.3 miles
P Y ( )
reconfiguration of ADI distribution system or an additionblRMLD feeder to the site.
35
BOOTH
Substation automation
2019
$112,000
✓' -
complete
Completed, as part of relay upgrade project at Station 3 and Station 4.
'
-
Can't parallel up the feeder get-a-ways at Station 4 and Station 5, no spare.conduits available. Can't parallel.
36(3)
BOOTH
Upgrade UG circuit exits 4W6, SWS to parallel 750 to increase circuit capacity.
2019
$120,000
✓
-
up the feeder get-a-aways at Station 3, no room for the second set of cables in the back of the switchgear.
•
-
Solution: Load relief by feeder switching and/or new Wilmington Substation..
37
BOOTH
Upgrade main feeder of Circuit 4W23 to 795 to address voltage and conductor capacity
'✓
'Change
- -
issues 1.1 miles
2020
$165,000
=
construction years [o FY20, FY21 and FY 22. Hurdle: Verizon pole. replacement area.
Upgrade UG circuit exits 3W18, 4W4, 4W10, 4W38 to parallel 750 to increase circuit
Can't parallel up the feeder get-a-ways at Station 4 and Station 5, no spare conduits available, Can't parallel
38(l)
BOOTH
capacity.
2021-23
$370,000
✓
up the feeder get-a-aways at Station 3, no room for the second set of cables in the back of the switchgear.,
,
..
Solution: Load relief by feeder switching and/or new Wilmington Substation.-
Upgrade main feeder of Circuit 4W9 to 795 to address voltage and conductor capacity
-
39
BOOTH
issues.
2021-23
$75,000
✓
-
•- - -
40
BOOTH
Review and upgrade electric system comprehensive analysis
2024
$100,000
✓
-
_
_
Transformer D and E replacement at both Sub 4 and Sub S. They are approaching their
41
BOOTH
end of useful life.
2024-25
$3,400,000
✓
42
BOOTH
Install oil containment for Transformer D and E at Sub 4
2024-25
$100,000
✓
completed
- -
-
Can't parallel up the feeder get-a-ways at Station 4, no Spare conduits available. Can't parallel up the feeder
43(l)
BOOTH
Upgrade UG circuit exits 3W8, 4W12 to parallel 750 Cu to increase circuit capacity.
2024-26
$180,000
_
"✓
get-a-aways at Station 3, no room for the second set of cables in the back of the. switchgear. Solution: Load
—
-
relief by feeder' switching and/or. new Wilmington Substation.
Upgrade main feeder of Circuit 4W30 to 795 to address voltage and conductor capacity
44
BOOTH
Issues.
2024-26
$165,000
✓
- -
45
BOOTH
Replace control panels for Ring bus at Sub 4
2024-26
$200,000.
✓
. completed
Design Complete. Construction 100% completed in early March 2017.
46
UPG
Station 3 Transformers: 113. Adjust timing delay on the winding temperature trip.
✓
in progress.
Work to be complete during reactor installation, outage..
Station 3 Transformers: f14. Add a low oil trip to transformers so they trip before any
47
UPG
winding damage can occur.
-�/,
'in progress
Work to be complete,during reactor installation outage:
48UPG
Station 3 Transformers: g5. Replace LTC main braking rollers with the new design that has
•
a brass sleeve for the roller to ride on.
x/
_
completed
,
49
UPG
Station 3 Transformers: 116. Repair LTC control displays for ftTA and kTB
✓
completed
LTC controls repaired and installed.' -.
Print date: 12/11/2017
2 of
�a „� n�auvus anti pnunues are DaseD on existing system conomons. snowo conunions mange, mese priorities win HWY require re-
evaluation.
(1) New Substation in Wilmington will address these recommendations; alternate solution provided in the meantime.
Print date: 12/11/2017
3 of3
RECOMMENDATION
CONSULTANT RECOMMENDATION
YEAR
COST (Booth Estimate)
RMLD WORK PLAN
ALTERNATE
ACCEPTED
sotunoN
STATUS
50
UPG
Station 3 Transformers: #7. Replace or repair the Trans-TB Hydran unit.
✓
- -
Station 3-fransformers: #8. Repair the Trans TB temperature differential.unit which is in
51
UPG
failure mode.
✓ '
-
'torimpleted
Unit replaced. - - -
52
UPG
Station 3 15 kV Breakers #2: the close spring assembly needs to be replaced.
`✓
in progress
Station 3 15 kV Breakers: #3. DC control power fuses for trip, close, motor should be
53
UPG
separated.
�/
-completed•
- - '
Station 3 15 kV Breakers: #4. Control handle trip should be separated from relay and
54
UPG
should trip breaker directly.
✓
-
completed
- -
Station 3 Relays: #1. The DC negative feed to the differential relay for the digital inputs
55
UPG
should be altered to tie a DC negative via a fuse.
-
completed,
-
Station 3 Relays: 112. Review and alter the under voltage transfer scheme so that it
56
UPG
operates like the same schemes at the other stations.
completed
- "
57
UPG
Station 4 115 kV Breakers: #1(GCBI). Replace the breaker.
✓
completed
-
58
UPG
Station 4 Transformers: 111. Repair trans#110D cooling contactor for stage 112.
Will need to follow-up with UPG for more information.
59
UPG
Station 4 Transformers: #2. Replace the trans #110D main tank pressure relief device
✓
-
-
contact.
completed
60
1 UPG
Station 4 Transformers: 113. Replace the trans #110D main tank low oil gauge.
✓
completed
61
UPG
Station 4 Transformers: #4. Repair the DC control power supply control cabling.
✓
completed
_
Station 4 Transformers: 45. Replace the trans 110E main tank low oil and pressure relief
62
UPG
device cables from the devices to the conduit bodies.
✓
_
completed
- - - - -
63
UPG
Station 4 Transformers: 96. Replace the trans 110E cooling fan mounted top left.
•✓
completed
'
64
UPG
Station 4 Transformers: 47. Replace all four bushings of Trans #110E and #110D.
✓.
completed
See Item #10,(Booth Recommendation) -
Station 4 15kV Breakers: 42. check circuit 4W11 on a normal basis to insure that the
-
65
UPG
heaters remain on to keep the breakers above ambient temperature so that no moisture
- ✓
-
completed
condenses on the breaker Insulation.
66
UPG
Station 4 Breakers: #4. Replace the ground stab on 4W22.
✓ .
completed
Station 5 Transformers:. #1. Replace the trans #D main tank low oil and pressure relief
67
UPG
divide output cable. Reconnect the LTC low oil level gauge wiring in the conduit body
where the device cable terminates.
_completed
Station 5 15kV Breakers: #1. Take bus out of service and check alignment and correct if
68
UPG
possible.
- ✓
-
completed
-
Station 515k Breakers: #2. Remove breaker SW9, Inspect for corrosions, and correct
69
UPG
misalignment of the Breaker contact Rosette and cell stab during maintenance cycle.
✓
completed
-
- -
Station 5 15kV Breakers: #3. Take bus out of service and check alignment and correct if
70
UPG
possible.
completed`-
-
71
UPG
Station 5 15kV Breakers: 114. Take bus tie breaker out of service and check alignment and
- - -
correct if passible.
✓
completed
�a „� n�auvus anti pnunues are DaseD on existing system conomons. snowo conunions mange, mese priorities win HWY require re-
evaluation.
(1) New Substation in Wilmington will address these recommendations; alternate solution provided in the meantime.
Print date: 12/11/2017
3 of3
LEIDOS - 2015 ORGANIZATIONAL STUDY
Leldos Timeline
Recommendation Not Accepted
®RMLD Proposed Timeline
Recommendation Completed
Print date: 12/12/2017 1 of 3
DIVISION
CY 2015
CONSULTANT RECOMMENDATION CY 2016 CY 2017 CY 2018 RMLD WORK-PLAN/COMMENTS
Q3 I Q4 I Q1 I Q2 I Q3 Q4 Q1 Q2 I Q3 I Q4 03 02
1
ESTABLISH PLANNING CULTURE
1.1
GM
Update 2008 Strategic Plan (New Strategic Plan)
1.2
GM
Establish planning culture
On-going
1.3
1.4
1
GM
Update Integrated Resources plan
Update six-year plan
Strategic plan - On-going
6q=9Annually
1.5
EO
Develop electric system master plan
Long-term Planning, GIS, and Technology Roadmap - "
Completed
2
DEVELOP AN EFFECTIVE SUSTAINABLE WORKFORCE
2.1
2.2
2.3
HR
Develop workforce development plan
Develop succession plans
Update job descriptions
IT & TS
2.4
2.5
Implement consistent performance review process
Hire additional HR personnel
Completed
On hold
2.6
Increase efforts to fill vacant positions
On-going; evaluating
3
IMPROVE ORGANIZATIONAL EFFECTIVENESS
3.1
Reorganize to better align functions
On-going
3.2
GM
Create new Finance and Administration division
Completed
3.3
GM
Align Customer Services under the Integrated Resources Division 6m6mJ
Completed
3.4
EO
Reorganize &Expand Engineering group (Develop System Engineering Group)
Tied to IBEW negotiations. Posted two systems
engineer positions; CBA
3.5
Formalize business process and performance measurement
Assessing IT roadmap and staffing - near completion.
Reor anizin and hirin .
3.6
Develop and implement internal and external communication plans
Review roadmap.
3.7
Assess organizational culture and employee satisfaction
IlSeeking consultant.
4
DEVELOP LEADERSHIP CAPABILITIES
4.1
GM
Assess leadership
Completed
4.2
4.3
Provide management and leadership training.
Provide cross -divisional management training.
On-going - CDPs
On-going -CDPs
Print date: 12/12/2017 1 of 3
LEIDOS - 2015 ORGANIZATIONAL STUDY
Leidos Timeline
Recommendation Not Accepted
®RMLD Proposed Timeline
Recommendation Completed
oivisiON
CY 2015 CY 2016 CY 2017 CY 2018
CONSULTANT RECOMMENDATION RMLD WORK-PLAN/COMMENTS
Q3 Q4 Ql Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
5
ESTABLISH PROJECT MANAGEMENT CULTURE
5.1
Develop project management policies and procedures Completed
5.2
Establish project management training plan HR to organize with Director of E&0; CDP
5.3
Add project management experience and certifications to job descriptions
On-going - job description revisions; CBA
5.4
Establish project management performance expectations
CBA
6
ENSURE COMPETITIVELY PRICED SERVICES
6.1 IR
Continue regular cost of service and rate design review Performing COS 2017
6.2 IR
Increase customer and engagement and education of alternate rates
OU, DSM, Education, Solar Choice - Completed
7
IMPROVE FINANCIAL PLANNING AND RISK MANAGEMENT
7.1 B
Review and update reserve policies All policies - steady progress
7.2
Establish a risk management committee and enterprise risk management plan. Integrated Resources -Nextera
7.3 B
Develop a succession plan for the Manager of Accounting and Business
Completed
7.4 B
Formalize financial and accounting business processes In progress.
8
STRENGTHEN SAFETY CULTURE
8.1 GM
Review Board Safety Policy
All policies. Developed Safety Program.
8.2
Develop injury and illness prevention program Review of existing manual and OSHA requirements.
Safety Program.
9
DIVERSIFY RESOURCES
9.1 IR
Develop distributed generation penetration study
Complete ? DSM and max/feeder?
9.2
Review cost effectiveness and economic potential for end-use measures
Tangent and DSM
30
ESTABLISH A CULTURE OF COMPLIANCE
10.1
Assign Compliance Manager and develop compliance plan and requirements. Seek consultant.
11
IMPROVE CUSTOMER SERVICE
11.1 IR
Conduct customer satisfaction surveys. Communication Plan
Print date: 12/12/2017 2 of 3
LEIDOS - 2015 ORGANIZATIONAL STUDY
Leidos Timeline
Recommendation Not Accepted
®RMLD Proposed Timeline
Recommendation Completed
11.2
DIVISION
IR
CONSULTANT
CONSULTANT RECOMMENDATION
Conduct post transaction surveys.
CY 2015 CY 2016 CY 2017 71 CY 2018
RMLDblORK-PLAN/COMMENTS
Communication Plan
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Ql I Q2
11.3
IR
Develop and implement customer engagement plan.
Service Requirements Handbook completed. Issued
new Terms and Conditions. Constant Contact - 17,000
email addresses
12
PLAN FOR FUTURE TECHNOLOGIES
12.1
1
Complete operating technology roadmap
13
FOCUS ON ASSET MANAGEMENT
13.1
Develop and implement an asset management plan
Asset Management System - GIS/Cogsdale; WO system.
13.2
Develop and implement asset management business processes
Sprypoint
13.3
13.4
IR
Implement asset management system
Develop customer service manual (Service Requirement Handbook)
WO system
Completed
14
LEVERAGE GEOGRAPHIC INFORMATION SYSTEMS
14.1
14.2
EO
Conduct robust GPS -based inventory of assets and infrastructure
Adopt and implement industry standard common information model
GIS complete
Completed
14.3
EO
Develop and implement business processes for GIS management
14.4
EO
Provide GIS training for Engineering and Operations (All Other Divisions)
On-going - all divisions
15
IFORMALIZE AND ENHANCE WORK MANAGEMENT
15.1
Develop work management business processes
Integrated with asset management plan. SpryPoint
then WO system
15.2
Implement modern work management system
Completed
16
PLAN FOR RESILIENCY
16.1
Develop disaster recovery and business continuity plans
Emergency OP Procedure - completed.
17
ENHANCE FACILITIES
17.1
Enhance current workspace
Control Room, Engineering
Print date: 12/12/2017 3 of 3
POWER SUPPLY REPORT
OCTOBER 2017
ATTACHMENT 3
)hC(
9-00
F
f o L`Fj,,r s'C,(Q)Er (j P.,UC
k
Fuel Charge Adjustment (FCA) to Ultimate Consumers
M; November 2015 - October 2016
November 2016 - October 2017
$0-0585
d
$0.0555
$0.0525 -
$0.0495
$ 0.0465
$0.0435
$0-0405
$0.0375 --
Nov Dec Jan Feb
Mar Apr May Jun
Nov 15 -Oct 16 Nov 16 -Oct 17
Jul Aug
Sep Oct
$0.0-5250
$0.0,5000
$0.04750
$0.04500
$0.04250
$0.04000
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
� Nov 15 -Oct 16 -Nov 16 -Oct 17
�
Monthly New York Plower. A uth ority Credit (NYP-A)
Residential Consumers -
November 2015 -October 2016
November 2016. -October 2017
� $000700
--------------'-----� -- — ---�'------- ------------------------------- �
, '
`
'
" 50.08600 --------------------' --- -- —''����---- ���---- -- ----- --- — —'----------------'- �
$0.00400 '--
00200Nov
---���
Dec ]an Feb Mar Apr
May Jun
Jul
Aug
Sep
___-_
Oct
To: Coleen O'Brien
From�p�f . Maureen McHugh, Jane Parentea
Date: November 30, 2017
Subject: Purchase Power Summary — October, 2017
Energy Services Division (ESD) has completed the Purchase Power Summary for the
month of October, 2017.
ENERGY
The RMLD's total metered load for the month was 52,485,616 kWh, which is a. 15%
increase from the October, 2016 figures.
Table 1 is a breakdown by source of the energy purchases.
Table 1
Amount of
Cost of
% of Total
Total $
$ as a
Resource
Energy
Energy
Energy
Costs
%
(kWh)
($/Mwh)
Millstone #3
1,373,270
$6.72
2.57%
$9,231
0.45%
Seabrook
5,902,973
$5.90
11.04%
$34,833
1.70%
Stonybrook Intermediate
2,358,319
$36.78
4,41%
$86,746
4.22%
Shell Energy
8,055,400
$50.65
15.07%
$488,578
23.79%
NYPA
2,523,259
$4.92
4.72%
$12,414
0.60%
EDF
5,707,200
$23.49
10.68%
$134,050
6.53%
ISO Interchange
4,560,136
$32.26
8.53%
$147,116
7.16%
Community Solar Power
126,267
-$180.99
0.24%
-$22,853
-1.11%
Coop. Resales
3,207
$169.40
0.01%
$543
0.03%
BP Energy
9,901,400
$46.78
18.52%
$463,187
22.55%
Hydro Projects"
1,527,559
$72.13
2.86%
$110,185
5.36%
Braintree Watson Unit
348,310
$62.57
0.65%
$21,793
1.06%
Saddleback/Jericho Wind
2,645,358
$97.82
4.95%
$258,762
12.60%
One Burlington Solar
240,297
$71.00
0.45%
$17,061
0.83%
Exelon
8,029,600
$31.68
15.02%
$254,371
12.38%
Stonybrook Peaking
157,848
$241.00
0.30%
$38,041
1.85%
Monthly Total
53,460,403
$38.42
100.00%
$2,054,057
100.00%
Table 2 breaks down the ISO interchange between the DA LMP Settlement and the RT
Net Energy for the month of October, 2017.
Table 2
Amount Cost % of Total
Resource, of Energy of Energy Energy
(kWh) ($7Mwh)
ISO DA LMP * 11,597,384 $34.40 21.69%
Settlement
RT Net Energy ** (7,037,248) $35.68 -13.16%
Settlement
ISO Interchange 4,560,136 $32.26 8.53%
(subtotal)
Independent System Operator Day -Ahead Locational Marginal Price
OCTOBER 2017 ENERGY BY RESOURCE
Stonybrook Pk.
0.30%
Saddleback'
BELD
0.65% •-4Q
1
Coop resales,
0.01%
Jericho Wind
2.36% kldistone 93
2.57%
Solar6rbjeMs',1,
0.69% l
Sconyhrook mror.
4.4 j
CAPACITY
The RMLD hit a demand of 99,845 M, which occurred on October 9, at 7 pm. The
RMLD's monthly UCAP requirement for October, 2017 was 222,570 Ms.
Table 3 shows the sources of capacity that the RMLD utilized to meet its requirements.
Table 3
Source
Amount (kWs)
Cost ($/kW -month)
Total Cost $
% of Total Cost
Millstone #3
4,950
3.23
$15,983
0.76%
Seabrook
7,909
22.89
$181,045
8.57%
Stonybrook Peaking
24,980
2.37
$59,236
2.80%
Stonybrook CC
42,925
3.32
$142,434
6.74%
NYPA
0
0.00
-$12,123
-0.57%
Hydro Quebec
0
0
$2,727
0.13%
Braintree Watson Unit
0
0.00
$33,811
1.60%
ISO -NE Supply Auction
141,806
11.91
$1,688,869
79.97%
Total
222,570
$9.49
$2,111,981
100.00%
Table 4 shows the dollar amounts for energy and capacity per source.
Table 4
Cost of
% of
Amt of Energy
Power
Resource
Energy
Capacity
Total cost
Total Cost
(kWh)
($/kWh)
Millstone#3
$9,231
$15,983
$25,214
0.61%
1,373,270
0.0184
Seabrook
$34,833
$181,045
$215,878
5.18%
5,902,973
0.0366
Stonybrook Intermediate
$86,746
$142,434
$229,180
5.50%
2,358,319
0.0972
Hydro Quebec
$0
$2,727
$2,727
0.07%
-
0.0000
Shell Energy
$488,578
$0
$488,578
11.73%
8,055,400
0.0607
NextEra/EDF
$134,050
$0
$134,050
3.22%
5,707,200
0.0235
* NYPA
$12,414
-$12,123
$291
0.01%
2,523,259
0.0001
ISO Interchange
$147,116
$1,661,191
$1,808,307
43.41%
4,560,136
0.3965
Nema Congestion
-$32,007
$27,677
-$4,330
-0.10%
126,267
-0.0343
BP Energy
$463,187
$0
$463,187
11.12%
9,901,400
0.0468
* Hydro Projects
$110,185
$0
$11D,185
2.64%
1,527,559
0.0721
Braintree Watson Unit
$21,793
$33,811
$55,604
1.33%
348,310
0.1596
Saddleback/Jericho
$258,762
$0
$258,762
6.21%
2,645,358
0.0978
* Burlington & Community Solar
$26,215
$0
$26,215
0,63%
240;297
0.1091
Coop Resales
$543
$0
$543
0.01%
3,207
0.1694
Exelon Energy
$254,371
$0
$254,371
6.11%
8,029,600
0.0317
Stonybrook Peaking
$38,041
$59,236
$97,277
2.34%
157,848
0.6163
Monthly Total
$2,054,057
$2,111,981
$4,166,039
100.00%
53,460,403
0.0779
RENEWABLE ENERGY CERTIFICATES (RECs)
Table 5 shows the amount of banked and projected RECs for the Swift River Hydro
Projects through October, as well as their estimated market value.
Grand Total 0 27,530 27,530 $440,481
TRANSMISSION
The RMLD's total transmission costs for the month of October, 2017 were $1,269,309.
This is a decrease of 6.07% from the September transmission cost of $1,351,323. In
October, 2016 the transmission costs were $1,236,067.
Table 6
Current Month
Table 5
Last Year
RECs Summary
f
Peak Demand (kW)
99,845
Period - January 2017 - October 2017
91,673
Banked
Projected Total
Est.
52,590,960
RECs
RECs RECs
Dollars
Woronoco
0
5,235 5,235
$83,760
Pepperell
0
3,107 3,107
$49,712
Indian River
0
1,582 1,582
$25,313
Turners Falls
0
1,327 1,327
$21,232
Saddleback
0
10,733 10,733
$171,728
Jericho
0
5,546 5,546
$88,736
Sub total
0
.27,530 27,530
440,481
RECs Sold
$0
0
$0
Grand Total 0 27,530 27,530 $440,481
TRANSMISSION
The RMLD's total transmission costs for the month of October, 2017 were $1,269,309.
This is a decrease of 6.07% from the September transmission cost of $1,351,323. In
October, 2016 the transmission costs were $1,236,067.
Table 6
Current Month
Last Month
Last Year
f
Peak Demand (kW)
99,845
127,181
91,673
Energy (kWh)
53,460,403
56,437,192
52,590,960
Energy ($)
$2,054,057
$1,982,794
$2,463,471
Capacity ($)
$2,111,981
$2,166,683
$1,745,945
Transmission($)
$1,269,309
$1,351,323
$1,236,067
Total
$5,435,348
$5,500,800
$5,445,482
FINANCIAL REPORT
OCTOBER 2017
ATTACHMENT 4
Town of Reading, Massachusetts
Municipal Light Department
Statement of Net Assets
10/31/2017
2018 .2017
ASSETS
Current:
3,150,134.05
3,257,809.00
Unrestricted Cash
$15,450,445.92
$19,124,725.20
Restricted Cash
29,837,347.72
22,965,595.26
Restricted Investments
1,329,906.48
1,345,663.06
Receivables, Net
9,598,343.86
8,848,561.47
Prepaid Expenses
1,107,814.84
1,029,781.86
Inventory
1,631,846.08
1,524,683.56
Total Current Assets
58,955,704.90
54,839,010.41
Noncurrent;
Investment in Associated Companies 212,427.92 26,993.75
Capital Assets, Net 76,328,195.92 72,612,857.67
Total Noncurrent Assets 76,540,623.84 72,639,851.42
Deferred Outflows - Pension Plan 4,135,078.00 6,338,218.00
TOTAL ASSETS 139,631,406.74 133,817,079.83
LIABILITIES
Current
3,150,134.05
3,257,809.00
Accounts Payable
6,631,787.82
9,503,208.92
Accrued Liabilities
300,659.15
549,038.11
Customer Deposits
1,121,506.40
947,599.39
Customer Advances for Construction
1,163,116.49
1,003,670.84
Total Current Liabilities
9,217,069.86
12,003,517.26
Non-current
Accrued Employee Compensated Absences
3,150,134.05
3,257,809.00
Net OPEB Obligation
138,068.00
0.00
Net Pension Liability
13,076,538.00
8,833,549.00
Total Non-current Liabilities
16,364,740.05
12,091,358.00
Deferred Inflows - Pension Plan
714,888.00
883,172.00
TOTAL LIABILITIES
26,296,697.91
24,978,047.26
NET POSITION
Invested in Capital Assets, Net'of Related Debt 76,328,195.92 72,612,857.67
Restricted for Depreciation Fund 4,709,199.30 5,594,293.48
Restricted for Pension Trust 5,683,014.26 0.00
Unrestricted 261,614,299.35 30,631,881.42
TOTAL NET POSITION 113,334,708.83 108,839,032.57
Total Liabilities and Net Assets 139,631,406.74 133',817,079:83
Unrestricted Cash
Cash - Operating Fund
Cash - Petty Cash
Total Unrestricted Cash
Restricted Cash
Cash - Depreciation Fund
Cash - Construction Fund
Cash - Town Payment
Cash - Deferred Fuel Reserve
Cash - Rate Stabilization Fund
Cash - Pension Trust
Cash - Uncollectible Accounts Receivable
Cash - Sick Leave Benefits
Cash - Hazard Waste Reserve
Cash - Customer Deposits
Cash - Energy Conservation
Total Restricted Cash
Investments
Sick Leave Buyback
Town of Reading, Massachusetts
Municipal Light Department
Schedule of Cash and Investments
10131/2017
2018 2017
$15,446,945.92 $19,121,725.20
3,500.00 3,000.00
15,450,445.92 19,124,725.20
4,697,508.68
5,594,293.48
11,690.62
0.00
1,313,996.68
1,266,889.32
6,624,606.82
5,230,756.75
6,913,479.67
6,839,594.80
5,683,014.26
0.00
200,000.00
200,000.00
1,837, 258.79
1,927,148.16
750, 000.00
150, 000.00
1,121, 506.40
947, 599.39
684,285.80
809,313.36
29,837,347.72
22,965,595.26
1,329,906.48 1,345,663.06
Total 46,617 700.12 43,435;983.52
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
RECONCILIATION OF CAPITAL FUNDS
10/3112017
SOURCE OF CAPITAL FUNDS:
DEPRECIATION FUND BALANCE 7/1/17
CONSTRUCTION FUND BALANCE 711117
INTEREST ON DEPRECIATION FUND FY 18
DEPRECIATION TRANSFER FY 18
WEST STREET - MASS DOT
TOTAL SOURCE OF CAPITAL FUNDS
USE OF CAPITAL FUNDS:
LESS PAID ADDITIONS TO PLANT THRU OCTOBER
2,406,969.15
2,500,000.00
19,489.54
1,435,329.68
0.00
6,361,788.37
TOTAL USE OF CAPITAL FUNDS 1,652,589.07
4,709,199.30
Town of Reading, Massachusetts
Municipal Light Department
Business Type Proprietary Fund
Statement of Revenues, Expenses and Changes in Fund Net Assets
10/31126-17
Operating Revenues
Base Revenue
Fuel Revenue
I _ Purchased Power Capacity
Forfeited Discounts
i Energy Conservation Revenue
NYPA Credit
€ Total Operating Revenues
f Expenses
,
Power Expenes:
547 Purchased Power Fuel Expense
560 Purchased Power Capacity
565 Purchased Power Transmission
Total Purchased Power
Operations and Maintenance Expenses:
580 Supervision and Engineering Labor & Expense
581 Station Supervisor Labor & Expense
581 Line General Operational Expense
582 Control Room Labor & Expense
585 Street Lighting Operation & Maintenance
586 Meter General Labor & Expense
588 Materials Management
590 Maintenance of Structures and Equipment
593 Maintenance of Lines - Overhead
594 Maintenance of Lines - Underground
595 Maintenance of Line Transformers
Total Operations and Maintenance Expenses
General & Administration Expenses:
902 Meter Reading
903 Customer Collections
904 Uncollectible Accounts
916 Energy Audit
916 Energy Conservation
920 Administrative and General Salaries
921 Office Supplies and Expense
923 Outside Services
924 Property Insurance
925 Injuries and Damages
926 Employee Pensions and Benefits
930 Miscellaneous General Expense
931 Rent Expense
933 Transportation Expense
933 Transportation Expense Capital Clearing
935 Maintenance of General Plant
935 Maintenance of Building & Garage
Total General & Administration Expenses
Other Operating Expenses:
403 Depreciation
408 Voluntary Payments to Towns
Total Other Expenses
Month Month Year to Date Year to Date Percent
Current Year Last Year Current Year Last Year Change
$2,146,563.62
$2,038,430.72
$9,465,698.81
$9,671,313.71
(2.1%)
2,246,579.45
2,564,278.01
10,394,096.91
12,132,735.26
(14.3%)
3,339,879.62
2,686,792.84
13,895,664.87
12,969,466.41
7.1%
67,356.08
79,437.27
293,585.44
324,963.47
(9.7%)
55,497,98
53,110.99
240,031.08
251,961.25
(4.7%)
(101,661.07)
(80,934.45)
(316,546,20)
(374,740.51)
(15.5%)
7,754,215.68
7,341,115.38
33,972,530.91
34,975,699.59
(2.9%)
2,056,956.88
2,463,471.01
9,299,908.90
11,644,097.67
(20.1%)
2,116,047.79
1,734,350.07
8,430,907.04
6,836,036.63
23.3%
1,269,308.87
1,236,066.74
5,580,808.63
5,361,773.86
4.1%
5,442,313.54
5,433,887.82
23,311,624.57
23,841,908.16
(2.2%)
46,106.12
36,281.10
159,193.95
161,467.45
(1.4%)
11,688.81
11,288.03
48,260.68
45,028.14
7.2%
54,618.14
50,121.24
214,753.09
192,655.47
11.4%
27,663.96
37,403.57
124,204.48
161,862.73
(23.3%)
49.04
(68,365,92)
49.04
113,187.94
(100.0%)
20,768.92
16,944.70
79,538.63
63,989.22
24.3%
37,762.94
36,468.81
153,904.25
129,399.46
18.9%
34,262.73
29,679.78
126,155.29
153,965.56
(18.1%)
204,044.76
217,767.13
527,152.55
551,532,54
(4.4%)
9,909.73
11,335.19
38,116.70
116,236.03
(67.2%)
478.75
8;314.49
478.75
17,923.39
(97.3%)
447,353.90
387,238.12
1,471,807.41
1,707,447.93
(13.8%)
1,223.05
1,674.55
10,483.39
9,976.90
5.1%
129,560.21
119,979.33
536,304.02
573,418.43
(6.5%)
12,500.00
12,500.00
50,000.00
50,000.00
0.0%
40,588.83
37,255.03
145,753.53
145,264.19
0.3%
53,409.89
44,674.00
158,688.43
160,066.13
(0.9%)
85,082.19
72,232.08
346,928.58
317,807.75
9.2%
29,968.63
9,428.28
93,229.87
77,544.40
20.2%
58,431.89
54,639.21
169,387.30
112,871.01
50.1%
28,148.99
27,632.72
112,595.96
111,002.88
1.4%
8,150.32
4,071.09
21,335.51
17,128.68
24.6%
361,551.27
255,836.08
1,033,126.50
1,006,875.37
2.6%
13,780.31
18,198.90
41,411.90
41,495.51
(0.2%)
13,914.18
13,956.12
68,715.83
55,257.87
24.4%
13,378.79
0.00
69,374.52
0.00
100.0%
(31,411,00)
0.00
(123,875.75)
0.00
(100.0%)
38,726.51
17,366.82
97,342.29
87,043.07
11.8%
46,806.05
52,002,00
139,756.34
180;910.40
(22.7%)
903,812.11
741;446.21
2,970,558.22
2,946,662.60
0.8%
358,832.42 341,775.67 1,435,329,68 1,367,102.68 5.0%
126,851.67 118,000.00 507,406.68 472,000.00 7.5%
485,684.09 459,775.67 1,942,736.36 1,839,102.68 5.6%
Operating Income 475,052.04 318,767.56 4,275,804.35 4,640,578.22 (7.9%)
Town of Reading, Massachusetts
Municipal Light Department
Business Type Proprietary Fund
Statement of Revenues. Expenses and Changes in Fund Net Assets
10/31/2017
Non Operating Revenues (Expenses):
419 Interest Income
419 Other
426 Return on Investment to Reading
431 Interest Expense
Total Non Operating Revenues (Expenses)
Change in Net Assets
Net Assets at Beginning of Year
16,201.80
8,685.37
71,290.66
44,623.23
59.8%
32,402.42
7,249.44
289,808.70
135,011.80
114.7%
(201,647.50)
(198,722.33)
(806,590.00)
(794,889.32)
1.5%
(426.03)
(192.16)
(1,732.32)
(778.80)
122.5%
(153,469.31)
(182,979.68).
(447;222.86)
(616;032;89)
(27.4%)
321,582.73 135,787.88 3,828,581.39 4,024,545.33 (4.9%)
109,368,059.44 104,814,487.24 109,368,059.44 104,814,487.24 4.3%
Ending Net Assets 4.00%
Town of Reading, Massachusetts
Municipal Light Department
Business Type Proprietary Fund
Statement of Revenues, Expenses and Changes in Fund Net Assets
10/31/2017
Operating Revenues
Base Revenue
Fuel Revenue
Purchased Power Capacity
Forfeited Discounts
Energy Conservation Revenue
NYPA Credit
Total Operating Revenues
Expenses
Power Expenses:
547 Purchased Power Fuel Expense
555 Purchased Power Capacity
565 Purchased Power Transamission
Total Purchased Power
Operations and Maintenance Expenses:
580 Supervision and Engineering Labor & Expense
581 Station Supervisor Labor & Expense
581 Line General Operational Expense
582 Control Room Labor & Expense
585 Street Lighting Operation & Maintenance
586 Meter General Labor & Expense
588 Materials Management Labor & Expense
590 Maintenance of Structures and Equipment
593 Maintenance of Lines - Overhead
594 Maintenance of Lines - Underground
595 Maintenance of Line Transformers
Total Operations and Maintenance Expenses
I
General & Administration Expenses:
902 Meter Reading
903 Customer Collection
904 Uncollectible Accounts
916 Energy Audit
916 Energy Conservation
920 Administrative and General Salaries
921 Office Supplies and Expense
923 Outside Services
924 Property Insurance
925 Injuries and Damages
926 Employee Pensions and Benefits
930 Miscellaneous General Expense
931 Rent Expense
933 Transportation Expense
933 Transportation Expense Capital Clearing
935 Maintenance of General Plant
935 Maintenance of Building & Garage
Total General & Administration Expenses
Actual Budget Remaining Remaining
Year to Date Full Year Budget Budget %
$ 9,465,698.81
$26,337,621.00
$ 16,871,922.19
64.1%
10,394,096.91
32,491,810.00
22,097,713.09
68.0%
13,895,664.87
38,088,978.00
24,193,313.13
63.5%
293,585.44
800,000.00
506,414.56
63.3%
240,031.08
675,000.00
434,968.92
64.4%
(316,546.20)
(1,200,000.00)
(883,453.80)
73.6%
33,972,530.91
97,193,409.00
63,220,878.09
65.0%
9,299,908.90
31,291,810.00
21,991,901.10
70.3%
8,430,907.04
24,476,161.00
16,045,253.96
65.6%
5,580,808.63
13,612,817.00
8,032,008.37
59.0%
23,311,624.57
69,380,788.00
46,069,163.43
66.4%
159,193.95
764,615.00
605,421.05
79.2%
48,260.68
130,662.00
82,401.32
63.1%
214,753.09
596,007.00
381,253.91
64.0%
124,204.48
466,783.00
342,578.52
73.4%
49.04
156, 893.00
156, 843.96
100.0%
79,538.63
212,909.00
133,370.37
62.6%
153,904.25
458,328.00
304,423.75
66.4%
126,155.29
494,936.00
368,780.71
74.5%
527,152.55
1,980,611.00
1,453,458.45
73.4%
38,116.70
197,002.00
158,885.30
80.7%
478.75
300,000.00
299,521.25
99.8%
1,471,807.41
5,758,746.00
4,286,938.59
74.4%
10,483.39
37,461.00
26,977.61
72.0%
536,304.02
1,869,393.00
1,333,088.98
71.3%
50,000.00
150,000.00
100,000.00
66.7%
145,753.53
509,232.00
363,478.47
71.4%
158,688.43
952,565.00
793,876.57
83.3%
346,928.58
1,017,151.00
670,222.42
65.9%
93,229.87
350,000.00
256,770.13
73.4%
169,387.30
759,191.00
589,803.70
77.7%
112,595.96
427,200.00
314,604.04
73.6%
21,335.51
52,613.00
31,277.49
59.4%
1,033,126.50
3,000,437.00
1,967,310.50
65.6%
41,411.90
179,215.00
137,803.10
76.9%
58,715.83
212,000.00
143,284.17
67.6%
69,374.52
381,116.00
311,741.48
81.8%
(123,875.75)
(301,596.00)
(177,720.25)
58.9%
97,342.29
281,880.00
184,537.71
65.5%
139,756.34
666,457.00
526,700.66
79.0%
2,970,558.22
10,544,315.00
7,573,756.78
71.8%
I Town of Reading, Massachusetts
Municipal Light Department
Business Type Proprietary Fund
Statement of Revenues, Expenses and Changes in Fund Net Assets
10/31/2017
Other Operating Expenses:
403 Depreciation
1,435,329.68
4,362,000.00
2,926,670.32
67.1%
408 Voluntary Payments to Towns
507,406,68
1,500,000.00
992,593.32
66.2%
Total Other Expenses
1,942,736.36
5,862,000.00
3,919,263.64
66.9%
Operating Income I
4,275,804.35
5,647,560.00
1,371,755.65
Non Operating Revenues (Expenses):
419 Interest Income
71,290.66
150,000.00
78,709.34
52.5%
419 Other Income
289,808.70
890,000.00
600,191.30
67.4%
426 Return on Investment to Reading/Loss on
Disposal
(806,590.00)
(2,570,438.00)
(1,763,848.00)
68.6%
431 Interest Expense
(1,732.32)
(2,500.00)
(767.68)
30.7%
Total Non Operating Revenues (Expenses)
(447,222.96)
(1,532,938.00)
(1,08.5,715.04)
70.8%
Net Income
$ 3,828,581.39
$ 4,114,622.00 $
286,040.61
Cost Analysis to Change Financial Reporting from Fiscal Year
to Calendar Year
• One time, 6 -month, audit fee of approximately $36,000
• Approximately $15,000 of avoided salary costs to combine 6 months of one
fiscal year with another 6 months from a prior fiscal year to submit a
calendar year DPU report
➢ Power Supply calculations
➢ Net Plant calculations
➢ Combination of entire Balance Sheet and Profit & Loss
statements
➢ Inefficiency in budget review — calendar year financials would
help mitigate the inaccuracies of submitting premature data of
rates, which are dependent on power supply costs, publicized
in late March
• Tangible and Intangible costs for efficiency purposes
➢ Inefficiencies of having the Town and the RMLD finalize fiscal
year reports at the same time — this creates excessive
demands for the Town of Reading
➢ Alleviate Town concerns of accounts payable cutoff and double
warrant reporting
➢ OPEB/Pension actuarial reporting timeline
➢ Vendor cooperation during months on slow productivity—very
late invoice submission for fiscal year cut off. It is most
common for businesses to clean up at 12/31
➢ Lack of Department staff availability during a high vacation
season
ENGINEERING & OPERATIONS
REPORT
OCTOBER 2017
ATTACHMENT 5
F-Igineering & Operations
Report
RMLD Board of Commissioners Meeting
December 14, 2017
October 2017 Reporting Period
Hamid Jaffari, Director of Engineering & Operations
Engineering & Operations
Capital Improvement Projects
100
Distributed Gas Generation Pilot (Demand Management)
100%
102
Pad mount Switchgear Upgrade at Industrial Parks
7%
103
Grid Modernization and Optimization
On-going
105
New Wilmington Substation
5%
106
Underground Facilities Upgrades (URDs, Manholes, etc.)
On-going
107
13.8kV Upgrade (Step-down Areas, etc.)
On-going
108
115 kV Transmission Line Upgrade
50%
109
35 kV Underground Cable Upgrade Station 4, 5 and RR ROW
0%
110
4W9 Getaway Replacement - Station 4
100%
111
Substation Equipment Upgrade
On-going
112
AMI Mesh Network Expansion
On-going
116
Transformers & Capacitors
On-going
117
Meter Purchases
On-going
125
GIS
100%
126
Communication Equipment (Fiber Optic)
On-going
130
Remote Terminal Unit (RTU) Replacement - Station 3
100%
131
LED Street Lights Upgrade - All Towns
79%
133
Station 3: Relay Upgrades and SCADA Integration
100%
137
Pole Line Upgrade -Woburn Street (West to Concord), W
10%
138
Station 3 Reactors
20%
175
Pole Replacement Program
On-going
458
Secondary and Main Replacement Program
On-going
various
New Service Installations (Residential/Commercial/Industrial)
On-going
5,835
141,002
-
(141,002)
226,100
196,285
(29,815)
11,203
51,477'
227,183
175,706
10,555
18,986
650,000
631,014
31,276
68,593
344,725,
276,132
1,658
70,851
69,193
3,940
9,307
95,098'
85,791
0
206,817
206,817
40,634
131,611
-
(131,611)
-
50,218
50,218
120,311;
120,311
560,500
560,500
1,659'
60,000'
58,341
15,944
72,651
218,726
146,075
-
214,629,
214,629
275
2,564
-
(2,564)
46,482
280,667
1,169,332
888,665
70
19,873
76,103
56,230
1,200
200,284,
199,084
2,191
12,552
561,347
548,795
2,241
58,868:
209,OOOi
150,132
3,423
30,926
222,285
191,359
5,791
30,587
155,936
125, 349
Engineering & Operations
Routine Capital Construction
Pole Setting/Transfers
Overhead/Underground
Projects Assigned as Required
• Voltage Regulators - Lynnfield
Pole Damage/Knockdowns - Some Reimbursable
• Work was done to repair or replace three (3) poles.
Station Group
Hazmat/Oil Spills
Porcelain Cutout Replacement Program
Lighting (Street Light Connections)
Storm Trouble
Underground Subdivisions (new construction)
• 318 Haverhill Street, NR
• Deerfield Place (Charles St. Ext), NR
• Murray Hill Subdivision (Phase 2), W
Animal Guard Installation
Miscellaneous Capital Costs
• Solar Project - Fordham Road, W
• 330 Ballardvale Street, W
• 301 Ballardvale Street, W
TOTAL
24,356
55,262
39,301
115,174
2,327
78,446
6,939
36,339
-
9,991,
5,700
5,700
2,382
3,890
11,141 59,820
- 415
39,666 46,226
$131,812 $411,263
Facilities, IRD and IT
Capital Projects/Purchases
Facilities
6,7551
60,289
657,000
596,711'
Integrated Resources Division (IRD)
0
8,623
35,000
26,377
Information Technology (IT) _
4,313
11,529,1;
340,000
328,471,
TOTAL CAPITAL SPENDING YTD
(All Divisions)
$322,741 $1,651,984 $71685,521
$6,033,537
transformer Replacement (through September 2017)
Pad mount 26.94% Overhead 18.38%
Pole Inspection (as of 12/1/2017)
250 poles have been replaced 148 of 250 transfers have been completed
quarterly Inspection of Feeders (as of 12/1i17)
Inspected Circuits (Jul -Sep): 3W5, 3W7, 3W8, 3W 13, 3W 14, 3W 18
Manhole Inspection (through October 2017)
961 of 1,237 manholes have been inspected.
2orcelain Cutout Replacements (through October 2017)
91 % complete 249 remaining to be replaced
free Trimming
Oct: 124 spans YTD: 488 spans through October
substation Maintenance
Infrared Scanning - through October complete - no hot spots found
✓nership: 16,000 (approximately)
50% RMLD
50% Verizon
stodial:
Reading - split (see map)
North Reading - RMLD
Lynnfield - Verizon
Wilmington - Verizon
Town of Reading r
r
Pole Jurisdiction
r
l`�b{�I,+fij�.\n��� ��•�y':� A
kl
S 1
i � 13 L. n _ _ _✓
Town of Readin
Polo C—r
L..�3 TELCO
LYNNFIELD
Count of
Ticket
NTGMember and JobType
Number,
8CMCTNR
5
[Comcast Massachusetts
[Comcast Massachusetts
TRANSFER
5
LFtDFD
3
SLynnfield Fre Department
Non-partidpating 3rd Party Attadher-
TRANSFER
3
a RMLD
5
B Reading Munidpal tight Department
TRANSFER
5
w VZNESA
4
(blank)
6
Grand Total
17
NJUNS
"Next to Go" as of December 1, 2017
READING
Count of
Ticket
;NTGMember and Job TypeNumber
I -t Number
JCMCTNR
CMCTNR
7
[Comcast Massachusetts
TRANSFER
TRANSFER
r
7
3 NP3PMA
8
Non-partidpating 3rd Party Attadher-
TRANSFER
r_i Massachusetts
1NRDGFD
TRANSFER
8
-RDNGFD
6
BReadirg Fina Department
9 RMLD
TRANSFER
6
IMLD
99
BReading Municipal Light Department
31
TRANSFER
29
PULL POLE
70
B VZNESA
35
Verizon Massachusetts
3
TRANSFER
35
'f� (blank)
110
'Grand Total
155
NORTH READING
Count of
Ticket
NTG Memberand JobType
I -t Number
JCMCTNR
5
lComcast Massachusetts
TRANSFER
5
-7NGMA
1
O National Grid
TRANSFER
1
1NRDGFD
37
r -i North Reading Fire Department
4
TRANSFER
37
9 RMLD
44
oReading Muntdpal Light Department
TRANSFER
13
PULLPOLE
31
9VZNLEDR
23
R Verizon Massachusetts
57
TRANSFER
20
PULL POLE
3
(blank)
3
Grand Total
110
WILMINGTON
Count of
Ticket
NTG Member and JobType L'
Number
F-r1CMCENR
5
J Comcast Massachusetts
TRANSFER
5
�NP313MA _
1_
Non -participating 3rd Party
- eAttarher-Massadwsetts
TRANSFER
1
d NPFAMA
4
F' Non -participating Fire Alarms - Musetts
TRANSFER
4
B RMLD
35
_' Reading Municipal Light Department
TRANSFER
31
PULL POLE
4
B VZNEDR
57
E Verizon Massachusetts
TRANSFER
54
PULL POLE
3
S WLMFIB
10
ETown of Wilmington
TRANSFER
10
3WMGNFD
72
GWilmingtonFire Department
TRANSFER
72
fl(blank)
Grand Total
784
Minutes
SAIDI 2012-2017
100.00___-------
80.00
60.00 ---- ----
40.00
4
20.00
22. 7.33
0.00
2012-2013-2014-2015-2016-2017
Average SAIDI
RMLD Reliability Indices
95.45 ® 2012
X2013
�2014IEEE day threshold
49.40 �20151EEEdaythreshold
1111111111111111112016 IEEE day threshold
2017 YTD IEEE day threshold
-2016 Region Average
-2016 National Average
SAID] (Minules) = lotal Duration of Custonaerinterruptions
Total Number of Cus7omer s S'en ed
Note: The major event (ME) threshold allows a utility to remove outages that
exceed the IEEE 2.5 beta threshold for events. These events could be severe
weather, which can lead to unusually long outages in comparison to your
distribution system's typical outage.
SAM = Total Number of Customer Inlerruptions
Total Number of Customers Sensed
Note: Regional and national averages have been updated for 2016.
Minutes
160.00
140.00
120.00
100.00
80.00
60.00
40.00
20.00
0.00
2012-2013-2014-2015-2016-2017
Average CAIDI
CAIDI 2012-2017
® 2012
2013
2014
® 2015
X2016
2017 YiD
-2016 Region Average
-2016 National Average
CA ID] (Minmes) = T olal Din alion of Customer lnler"iplions
Total Number of Customers Inlerruptions•
SAIFI 2012-2017
0.90
0.80
O
2012
0.70
2013
0.60
0.50
0.54
2014
0.40
® 2015
0.30
0.20
0.15
2016
0.32
0.10
2017 Y-rD
0.00
- 2016 Region Average
2012-2013-2014-2015-2016-2017
-2016 National Average
Average SAW I
Weather
3Utility Human
Unknown Error
Vehicle
5 0
Accident
4 Natural
- 0
WiII'rf
Tree
35 j
Outages Causes
2017 YTD
October
■ Equipment
a Tree
■ Wildlife i
■ Vehicle Accident i
I
■ Weather
• Unknown
■ Utility Human Error
■ Natural
r
r
Annual Average 2012-20171
Utility Human Error
2
Unknown
Weather 7 /Natural j
Vehicle Accident
9
■ Equipment
I
a Tree
f
I ■ Wildlife
a Vehicle Accident
■ Weather
Wi{diit '
u Unknown
r
■ Utility Human Error
i
■ Natural
Questwio
RMLD PROCUREMENT REQUESTS
REQUIRING BOARD APPROVAL
ATTACHMENT 6
RMLD Reading Municipal Light Department
RELIABLE POWER FOR GENERATIONS
CC)230 Ash Street, P.O. Box 150
Reading, MA 01867-0250
November 29, 2017
Town of Reading Municipal Light Board
Subject: IFB 2018-13 Janitorial Services
Pursuant to M.G.L. c. 30B, on October 9, 2017, an invitation for bid (IFB) requesting sealed bids for Janitorial Services
was advertised in the Commonwealth of Massachusetts Goods and Services Bulletin. On October 11, 2017, the IFB was
placed as a legal notice in the Middlesex East section of the Daily Chronicle, and on October 12, 2017, posted on
COMMBUYS, the RMLD website, and the RMLD bulletin board.
An invitation for bid was sent to the following forty-four companies:
ACP Facility Services
ABM Janitorial Northeast, Inc.
Advanced Maintenance
All Pro Cleaning Systems
American Cleaning Co.
AMPM"Facility Services
Brenner Facility Services
Cleaning Services Group, Inc.
Compass Facility Services
Complete Cleaning Co., Inc.
Empire Cleaning, Inc.
Express Janitorial Service Group
Facilities Maintenance &
FMN Services, Inc.
G Associates Corp.
Management, Inc.
Green Life Cleaning
Greenlife Janitorial Corp.
Harvard Maintenance, Inc.
Integrity Services
J C Zampell
Janitronics, Inc.
Jan -Pro Cleaning Systems of
M&M Cleaning, Inc.
M & M Contract Cleaning, Inc.
Massachusetts
McGarr Service Corp.
Metro Facility Maintenance &
MP Building Services
Management
National Cleaning Corp.
NECC Corp.
ONVIA
Prospect Building Services
Prime Vendor, Inc.
Pro City Facilities Services, Inc.
Corp.
ResourceOne
S.J. Services, Inc.
Service Master
Star Building Services, Inc.
State Cleaning Svc., Inc.
Swilley Commercial Cleaning
(SBS)
T & T Janitorial Services &
T & S Professional Cleaning Service,
The Cleaning Crew
Sales
Inc.
Tidy Cleaning Service Transcend Maintenance Services, Inc.
Sealed bids were received from four companies: Complete Cleaning Co., Inc., S.J. Services, Inc., Star Building Services, Inc.
(SBS), and Transcend Maintenance Services, Inc.
File: Bid/FY18/2018-13 Janitorial Services
RMLD Reading Municipal Light Department
RELIABLE POWER FOR GENERATIONS
230 Ash Street, P.O. Box 150
Reading, MAO 1867-0250
The sealed bids were publicly opened and read aloud at 11:00 a.m. on November 2, 2017, in the Town of Reading
Municipal Light Department's Audio Visual Spurr Room, 230 Ash Street, Reading, Massachusetts.
The bids were reviewed, analyzed and evaluated by staff and recommended to the General Manager.
Move that bid 2018-13 for Janitorial Services be awarded to: Transcend Maintenance Services, Inc. for
$67,325.40, pursuant to M.G.L., c. 30B, as the lowest responsive and responsible bidder on the recommendation
of the General Manager. This is a three-year contract.
These services will be paid from the Operating Budget.
�C
Paul McGonagle
Hamid Jaff
Cole—en O`Brien
File: Bid/FY18/2018-13 Janitorial Services
Janitorial Services
M.G.L. Chapter30B
Bid 2018-13
Bidder
Complete Cleaning Co., Inc.
S.J. Services, Inc.
Star Building Services, Inc. (SBS)
Year 1 Year 2 Year 3
$25,488.00 $26,376.00 $27,312.00
$32,808.00 $33,504.00 $34,152.00
$23,494.00 $24,294.00 $24,286.00
Transcend Maintenance Services, Inc. $22,441.80 $22,441.80 $22,441.80
Non -Responsive Bidder
1 Star Building Services (SBS) - Unauthorized signature on forms,
l
Combined 3-
Responsive
Exceptions
Year Total
Bidder
$79,176.00
Yes
No
$100,464.00
Yes
No
$72,074.00
'No
No
$67,325.40
Yes
No
Copy of 2018-13 Janitorial Services Analysis Page 1
RMLD 0
December 4, 2017
Reading Municipal Light Department
RELIABLE POWER FOR GENERATIONS
230 Ash Street, P.O. Box 150
Reading, MA 01867-0250
Town of Reading Municipal Light Board
Subject: IFP 2018-17 Cooper Power System or Compatible Meters and Equipment for the AMI Mesh Network
System Expansion and Migration
Pursuant to M.G.L c. 164 § 56D, on November 8, 2017, a bid invitation was placed as a legal notice in the
Middlesex East section of the Daily Times Chronicle requesting sealed proposals for Cooper Power System or
Compatible Meters and Equipment for the AMI Mesh Network System Expansion and Migration.
An invitation for proposals was sent to the following fifteen companies:
D & D Electrical Sales, Inc.
Genergy Corporation
J.F. Gray & Associates
Power Sales Group
Eaton
Graybar
Omicron Electronics Corp. USA
Power Tech dba UPSC
E.L. Flowers & Associates
Hasgo Power Sales
ONVIA
Robinson Sales
Shamrock Power Siemens Industry, Inc. WESCO Distribution
Sealed proposals were received from two companies: Eaton and WESCO Distribution.
The sealed proposals were publicly opened and read aloud at 11:00 a.m., November 27, 2017, in the Town of Reading
Municipal Light Department's Audio Visual Spurr Room, 230 Ash Street, Reading, Massachusetts.
The proposals were reviewed, analyzed and evaluated by staff and recommended to the General Manager.
Move that proposal 2018-17 for Cooper Power System or Compatible Meters,and Equipment for the AMI
Mesh Network System Expansion and Migration be awarded to: Eaton for $83,199.36, pursuant to M.G.L.
Chapter 164 § 56D on the recommendation of the General Manager.
The FYI Capital Budget amount for these items is $92,500.
Nick D'Alleva
Hamid Jaffari
Coleen O'Brien
File: Bid/FY18/2018-17 Meters and Equipment/AMI Mesh Network
Cooper Power System or Compatible Meters and Equipment for the AMI Mesh Network System Expansion and Migration
Bid 2018-17
Bidder
Eaton
Item 1 Retrofit kits
Item 2 Mesh Network Relays
Item 3 6S Meters
Item 4 5S Meters
Item 516S Meters, Class 200
Item 616S Meters, Class 320
WESCO Distribution
Item 1 Retrofit kits
Item 2 Mesh Network Relays
Item 3 6S Meters
Item 4 5S Meters
j Item 5 16S Meters, Class 200
Item 6 16S Meters, Class 320
2018-17 Meters & Equipment Analysis
Page 1
Meet
Certified Exceptions to
Total Net
Specification
Specification Firm All forms Check or stated bid Authorized
Manufacturer
Delivery Date
Unit Cost
Qty
Cost
requirement
Data Sheets Price filled out Bid Bond requirements signature
yes
yes yes yes waived yes yes
Eaton
2-8 weeks
$91.80
500$45,900.00
Eaton
8-20 weeks
$260.10
25
$6,502.50
Exceptions:
Eaton's proposal Is based upon the mutually -agreed to Terms & Conditions
Eaton
6-14 weeks
$642.60
25
$16,065.00
of the written contract that is in place between our organizations. Eaton
Eaton
6-14 weeks
$586.50
15
$8,797.50
complies with all technical specifications per our supplied proposal and
Eaton
4-14 weeks
$586.50
6
$3,519.00
Bill of Materials.
Eaton
4-14 weeks
$603.84
4
$2,415.36
Note:
Although Eaton checked exceptions, this is actually a clarification
$83,199.36
and is acceptable.
yes
yes yes yes waived no yes
no quote
$0.00
no quote
$0.00
no quote
$0.00
Schweitzer
4-6 weeks
$1,750.00
15
$26,250.00
no quote
$0.00
no quote
$0.00
$26,250.00
2018-17 Meters & Equipment Analysis
Page 1
RMLD C())
November 29, 2017
Reading Municipal Light Department
RELIABLE POWER FOR GENERATIONS
230 Ash Street, P.O. Box 150
Reading, MAO 1867-0250
Town of Reading Municipal Light Board
Subject: IFB 2018-19 Line Truck Chassis and Trailer Inspection, Preventative Maintenance and Repair Service
Pursuant to M.G.L. c. 30B, on November 6, 2017, an invitation for bid (IFB) requesting sealed bids for Line Truck
Chassis and Trailer Inspection, Preventative Maintenance and Repair Service was advertised in the Commonwealth of
Massachusetts Goods and Services Bulletin. On November 8, 2017, the IFB was placed as a legal notice in the Middlesex
East section of the Daily Chronicle, and on November 9, 2017, posted on COMMBUYS, the RMLD website, and the
RMLD bulletin board.
An invitation for bid was sent to the following seven companies:
Altec, Inc. Dynamic Mobile Repair HP Fairfield
Lowell Fleet Maintenance Parker's Pitstop Ryder Truck Rental
Taylor & Lloyd, Inc.
Sealed bids were received from one company: Taylor & Lloyd, Inc.
The sealed bid was publicly opened and read aloud at 11:00 a.m. on November 27, 2017, in the Town of Reading
Municipal Light Department's Audio Visual Spurr Room, 230 Ash Street, Reading, Massachusetts.
The bid was reviewed, analyzed and evaluated by staff and recommended to the General Manager.
Move that bid 2018-19 for Line Truck Chassis and Trailer Inspection, Preventative Maintenance and Repair
Service be awarded to: Taylor & Lloyd, Ine.,for $151,462.31, pursuant to M.G.L. c. 30B, as the lowest
responsive and responsible bidder on the recommendation of the General Manager. This is a three-year contract.
The
se services will be paid from the Operating Budget
I Hca d
Paul .onagle J
Hamid Jaffari
Coleen O'Brien
File: Bid/FY18/2018-19 Line Truck Chassis and Trailer Inspection, Preventative Maintenance and Repair Service
Line Truck Chassis and Trailer Inspection, Preventative
Maintenance and Repair Service
M.G.L. Chapter 30B
Bid 2018-19
Bidder Year 1 Line Year 1
Trucks Trailers
Taylor $ Lloyd, Inc. $41,518.54 $6,651.54
Year 2 Line Year 2
Trucks Trailers
$43,203.54 $6,923.00
Year 3 Line
Year 3
Trucks
Trailers
$45,678.74
$7,486.95
Combined 3- Responsive Exceptions
Year Total Bidder
$151,462.31 Yes No
2018-19 Line Truck Chassis and Trailer inspection Preventative Maintenance and Repair Service Analysis Page 1
RMLD 0
November 29, 2017
Reading Municipal Light Department
RELIABLE POWER FOR GENERATIONS
230 Ash Street, P.O. Box 150
Reading, MAO 1867-0250
Town of Reading Municipal Light Board
Subject: IFB 2018-20 Line Truck Lift Equipment Inspection, Preventative Maintenance and Repair Service
Pursuant to M.G.L. c. 30B, on November 6, 2017, an invitation for bid (IFB) requesting sealed bids for Line Truck Lift
Equipment Inspection, Preventative Maintenance and Repair Service was advertised in the Commonwealth of
Massachusetts Goods and Services Bulletin. On November 8, 2017, the IFB was placed as a legal notice in the Middlesex
East section of the Daily Chronicle and on November 9, 2017, posted on COMMBUYS, the RMLD website, and the
RMLD bulletin board.
An invitation for bid was sent to the following four companies:
Consolidated Utility Equipment
Service, Inc.
James A. Kiley Co.
D.C. Bates Equipment Co., Inc. J&D Power Equipment, Inc.
Sealed bids were received from one company: James A. Kiley Co.
The sealed bid was publicly opened and read aloud at 11:00 a.m. on November 27, 2017, in the Town of Reading
Municipal Light Department's Audio Visual Spun- Room, 230 Ash Street, Reading, Massachusetts.
The bid was reviewed, analyzed and evaluated by staff and recommended to the General Manager.
Move that bid 2018-20 for Line Truck Lift Equipment Inspection, Preventative Maintenance and Repair Service
be awarded to: James A. Kiley Co. for $111,495.00, pursuant to M.G.L. c. 30B, as the lowest responsive and
responsible bidder on the recommendation of the General Manager. This is a three-year contract.
These services will be paid from the Operating Budget.
Paul McGonagIe
Flamed Jaffa
Coleen 'Brien
File: Bid/FY18/2018-20 Line Truck Lift Equipment Inspection, Preventative Maintenance and Repair Service
Line Truck Lift Equipment Inspection, Preventative
Maintenance and Repair Service
M.G.L. Chapter 30B
Bid 2018-20
Bidder Year 1
James A Kiley Co. $36,240.00
Year 2 Year 3 Combined 3 -
Year Total
$37,140.00 $38,115.00 $111,495.00
Responsive Exceptions
Bidder
Yes No
2018-20 Line Truck Lift Equipment Inspection Preventative Maintenance and Repair Service Analysis Page 1
BOARD MATERIAL AVAILABLE
BUT NOT DISCUSSED
TOWN OF READING MUNICIPAL LIGHT DEPARTMENT
RATE COMPARISONS READING & SURROUNDING TOWNS
December -17
PEABODY MUNICIPAL LIGHT PLANT
TOTAL BILL $83.33 $160.46 $109.04 $976.04 $154.58 $4,822.98 $660,645.16
PER KWH CHARGE $0.11111 $0.10697 $0.10904 $0.13370 $0.14313 $0.13780 $0.09603
%DIFFERENCE -29.65% -22.02% -24.33% -5.41% -22.70% 0.20% -14.00%
MIDDLETON MUNICIPAL LIGHT DEPT.
TOTAL BILL $98.74 $201.66 $132.75 $959.51 $168.44 $4,762.93 $807,171.40
PER KWH CHARGE $0.13165 $0.13444 $0.13275- $0.13144 $0.15596 $0.13608 $0.11733
%DIFFERENCE -16.65% -2.00% -7.89% -7.01% -15.77% -1.05% 5.08%
WAKEFIELD MUNICIPAL LIGHT DEPT.
TOTAL BILL $128.61 $239.67 $161.88 $1,221.04 $194.38 $5,735.58 $973,158.30
PER KWH CHARGE $0.17148 $0.15978 $0.16188 $0.16727 $0.17999 $0.16387 $0.14146
%DIFFERENCE 8.57% 16.47% 12.33% 18.33% -2.79% 19.15% 26.68%
INDUSTRIAL - TOU
RESIDENTIAL
RESIDENTIAL-TOU
RES. HOT WATER
COMMERCIAL
SMALL COMMERCIAL
SCHOOL RATE
109,600 kWh's
_
760 kWh's
1600 kWh's
1000 kWh's
7,300 kWh's
1,080 kWh's
36000 kWh's
260.000 kW Demand
76126 Split
26.000 kW Demand
10.000 kW Demand
130.5 kW Demand
60120 Split
READING MUNICIPAL LIGHT DEPT.
TOTAL BILL
$118.46
$205.78
$144.11
$1,031.89
$199.96
$4,813.55
$768,181.01
PER KWH CHARGE
$0.15795
$0.13719
$0.14411
$0.14135
$0.18515 -
$0.13753
$0.11166
NATIONAL GRID
TOTAL BILL
$176.21
$407.40
$220.64
$1,684.69
$257.76
$6,411.12
$1,169,516.60
PER KWH CHARGE
$0.23494
$0.27160
$0.22064
$0.23078
$0.23867
$0.18317
$0.17000
%DIFFERENCE
48.74%
97.98%
53.10%
63.26%
28.91%
33.19%
52.24%
EVERSOURCE(NSTAR)
TOTAL BILL
$146.81
$260.13
$193.60
$1,433.47
$238.48
$6,948.02
$1,185,688.95
PER KWH CHARGE
$0.19574
$0.17342
$0.19360
$0.19637
$0.22081
$0.19851
$0.17235
%DIFFERENCE
23.93%
26.41%
34.34%
38.92%
19.26%
44.34%
54.35%
PEABODY MUNICIPAL LIGHT PLANT
TOTAL BILL $83.33 $160.46 $109.04 $976.04 $154.58 $4,822.98 $660,645.16
PER KWH CHARGE $0.11111 $0.10697 $0.10904 $0.13370 $0.14313 $0.13780 $0.09603
%DIFFERENCE -29.65% -22.02% -24.33% -5.41% -22.70% 0.20% -14.00%
MIDDLETON MUNICIPAL LIGHT DEPT.
TOTAL BILL $98.74 $201.66 $132.75 $959.51 $168.44 $4,762.93 $807,171.40
PER KWH CHARGE $0.13165 $0.13444 $0.13275- $0.13144 $0.15596 $0.13608 $0.11733
%DIFFERENCE -16.65% -2.00% -7.89% -7.01% -15.77% -1.05% 5.08%
WAKEFIELD MUNICIPAL LIGHT DEPT.
TOTAL BILL $128.61 $239.67 $161.88 $1,221.04 $194.38 $5,735.58 $973,158.30
PER KWH CHARGE $0.17148 $0.15978 $0.16188 $0.16727 $0.17999 $0.16387 $0.14146
%DIFFERENCE 8.57% 16.47% 12.33% 18.33% -2.79% 19.15% 26.68%
From: Tracy Schultz
To: RMLD Board Members GrouB
Subject: AP and Payroll Questions for 12/14/17 Book of Board
Date: Friday, December 08, 2017 7:26:00 AM
There were no Commissioner questions on the 11.3.17, 11.9.17, 11.17.17, and 12.1.17
AP (there was no AP on 1 1.24.17 due to the Thanksgiving holiday).
There were no Commissioner questions on the 1 1.13.17 and 1 1.27.17 Payroll. This e-
mail will be included in the 12.14.17 Board Book.
Tracy Schultz
Executive Assistant
Reading Municipal Light Department
230 Ash Street. Reading. MA. 01867
Tel: 781.942.6489