Loading...
HomeMy WebLinkAbout2017-11-08 Historical Commission MinutesTown of Reading Meeting Minutes Board - Committee - Commission - Council: Historical Commission Date: 2017-11-08 Time: 7:00 PM i;I iIF. U W, 1 CLERK READ{ tG F� SCS: :.1010 JAN - 2 A. Building: Reading Town Hall Location: Conference Room Address: 16 -Lowell Street Session: Open Session, Purpose: General Business Version: Final. Attendees: Members - Present: Ron Weston (RW) - Chair Sharlene. Reynolds Santo (SRS) - Secretary Jack Williams - Members Samantha Couture (SC) - Associate Member Virginia'Adams (VA) Associate Member Members - Not Present: Jonathan Barnes (JEB) - Treasurer Others Present: Keith Forlizzi Minutes Respectfully Submitted By: Sharlene Reynolds Santo Topics of Discussion: ip Called to order.at 7:00 pm. VA was appointed as a voting member. • 119 Salem St - KF presented an. updated design for the property with enlarged windows in the front. KF also had an example of the Boral a durable wood plastic composite to be used'for window trim. May use Aztec on the corners: Both products can be painted There is a plan to use the foundation fieldstone on the property as non-structural walls less than .4 feet in height. Driveway curb cut remains the same and the structure will be more . centered on the property. JW moved that the structure at 119 Salem St be released from the stay of demolition as the owner has agreed in writing to accept a demolition permit on specific conditions including measures approved by the Commission. VA seconded the motioned. Vote 5-0. RW will bring the. letter to the building -inspector tomorrow. • Post Mark Square - Project has been approved by CPDC. • 24 Gould St - A new..plan has been presented with changes. At CPDC meeting last Monday a decision was made to.approve the project. The decision -included some of the issues the RHC. had mentioned specifically in the historic memorial display area. JW voiced concern about the loss of architectural integrity, of the design. RW felt that the architectural changes to the front and sides of the building were an improvement. The garage has-been pushed back by 3 feet from the rear abutters lot line.. The 2nd floor living units are now 15 feet from the rear lot line, with slightly increased. separation for the 3`d and 4th floors. Materials were changed. The project remains 4 floors. • Finances - VA attends the Arts Reading ,group that is trying to start an. Arts district. RHC discussed potential membership in the future.with a minimal fee. • Minutes - Review minutes from 9/11, 9/13 Page 1 1 • New Business - o Budget Review meeting in December o SC is researching better storage for the glass plate negatives and will report at the next meeting. - o Doris Driscoll painting email. RW will call owner, possibly .view painting and suggest disp'osition.- o 10/28 received an email regarding our Adobe software expiring at the end of the year; RW will follow-up. . o 75 Pearl St recently changed owners. o Economic Development meeting was attended by. RW, ]EB, SC &VA. o VA attended Housing .Forum. • Next Meeting - December 13, 2017 at 7 pm • Adjourn at 9:00 pm . Page 1 2