Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2016-12-15 RMLD Board of Commissioners Minutes
Town of Reading Meeting Minutes Board - Committee - Commission - Council: RMLD Board of Commissioners Date: 12-15-2016 Building: Reading Municipal Light Building Address: 230 Ash Street Purpose: General business. Attendees: Members - Present: RECEIVES :.. TOWN CLERK READING. MASS. 11111 AUG 21 P 2-- N' Time: 7:30 PM Location: Winfred Spurr Audio Visual Room Session: Open Session Version: Final Thomas O'Rourke, Chairman, David Talbot, Commissioner, John Stempeck, Commissioner, Dave Hennessy, Secretary Pro Tem Members - Not Present: Philip B. Pacino, Vice Chair - Absent Others Present: Coleen O'Brien, Wendy Markiewicz, Hamid Jaffari, Jeanne Foti, Tracy Schultz Peter Lydecker, Member, Town of Reading Finance Committee Minutes Respectfully Submitted By: Philip B. Pacino, RMLD Board Chairman Topics of Discussion: Call Meeting to Order Chairman O'Rourke called the meeting to order and announced that the meeting is being live broadcast in the Town of Reading. Due to technical limitations, the meeting is also being videotaped for distribution at community television stations in North Reading, Wilmington, and Lynnfield. Opening Remarks Chairman O'Rourke read the RMLD Board of Commissioners Code of Conduct and wished the RMLD staff and the residents of the RMLD service territory a happy and joyous holiday season. Chairman O'Rourke added that no one from the Citizens' Advisory Board was available and that Mr. Pacino had a work commitment so he would not be in attendance. Mr. Hennessy agreed to serve as Board Secretary. Additionally, Chairman O'Rourke acknowledged the presence of Peter Lydecker from the Town of Reading Finance Committee. Report of the Committees Policy Committee — Mr. Hennessy Mr. Hennessy reported that the Policy Committee met on November 10 and discussed adjustments to Policy No. 4 Smoking and Policy No. 9 Procurement. The latter raised the amount for bids requiring a board vote from $25,000 to $50,000. General Manager Committee — Chairman O'Rourke Chairman O'Rourke began by explaining that the Board of Commissioners is responsible for hiring, evaluating and determining the compensation of the General Manager, as well as establishing policies that guide RMLD operations in accordance with M.G.L. Chapter 164. The Board members are asked to individually assess how the General Manager performed between July 15 and June 30, based on seven criteria with the following weightings: Finance 20%, Energy Efficiency and Load Management 15%, System Reliability 20%, Leadership 20%, Board Relations 5%, Employee Safety and Relations 10%, and Community Relations 10%. Each Board Member is required to submit an evaluation, which is then reviewed by the subcommittee composed of Chairman O'Rourke, Mr. Stempeck, and Mr. Talbot. The subcommittee then makes a recommendation to the Board in regards to salary. Page 1 1 General Manager Committee — Chairman O'Rourke Chairman O'Rourke summarized the feedback, stating that there were no audit findings for the fiscal year, leadership and employee development were strong in the face of considerable organizational changes, and there was a focus on succession planning and ensuring that the right people are in the right positions. The significant recommendations of the reliability and organizational studies are being implemented, there has been a heavy emphasis on rebuilding and maintaining infrastructure, improving quality of service and productivity, and developing and implementing renewable energy plans. Ms. O'Brien's responsiveness to all constituents and RMLD's great strides in process improvements and automation were also highlighted. Based on Ms. O'Brien's self- assessment, she has saved the RMLD approximately $1.7 million over the length of the review period. Chairman O'Rourke concluded that it has been an excellent year for Ms. O'Brien and invited the other commissioners to add their comments. Mr. Stempeck lauded Ms. O'Brien's extremely high level of performance and expressed his hope that this will continue for many more years to come. Mr. Talbot added that there was a lot of fundamental infrastructure that needed a lot of attention. Ms. O'Brien has ensured that has happened, addressing engineering concerns with an impressive level of detail. Mr. Hennessy then noted that RMLD employees are empowered, effective, and engaged, which serves as a testament to Ms. O'Brien's leadership. Chairman O'Rourke then explained that, averaging the scoring from the five Commissioners, Ms. O'Brien received a score of 98.7 out of a possible 100. Any score over 95 denotes extraordinary performance and merits any additional increase in salary that the Commissioners deem warranted. Benchmark data such as the MEAM survey is considered because the RMLD needs to offer competitive compensation. Furthermore, while the RMLD is the largest sized municipal utility with the largest revenue in the area, Ms. O'Brien is not the highest paid General Manager. Chairman O'Rourke stated that the subcommittee had agreed on a CPI increase of 2.6% and an additional 2.4% (sic) increase due to extraordinary performance, totaling 6%, to be retroactive to July 1, 2016. Additionally, all RMLD employees will be having their ICMA retirement matching increase from 3% to 4%, and Ms. O'Brien will receive the same. Chairman O'Rourke then invited Ms. O'Brien to ask questions or make comments. Ms. O'Brien stated that she enjoys the review process as it allows her to make sure that she is in line with what the Commissioners are expecting. Ms. O'Brien then took the opportunity to thank her staff and stated that RMLD is undergoing major organizational changes, in which change is difficult for everyone. Ms. O'Brien concluded by saying that she feels that RMLD is back in a leadership position, with other utilities looking to RMLD for best practices. Ms. Parenteau then pointed out that the math was incorrect and 2.6% and 2.4% do not total 6%. Chairman O'Rourke stated that the total is correct but he would now correct the sections. Chairman O'Rourke then summarized that the Board is recommending that Coleen O'Brien's salary be increased by 6%, which is comprised of two components. The first is 2%, plus 0.6% CPI, for a total of 2.6%, based on the scoring of the Commissioners. The second is an additional 3.4%. The increase will be retroactive to July 1. Additionally, ICMA will change from 3% to 4%. Mr. Stempeck made a motion seconded by Mr. Hennessy that the Board approve that the General Manager's salary be increased by 6% and ICMA will be changed to 4%, retroactive to July 1. Motion carried 4:0:0. Ms. Foti then interjected, reminding the Board that a vote must be taken on the updates to Policy No. 4 and Policy No. 9, respectively. Mr. Hennessy made a motion, seconded by Mr. Stempeck, that the Board approve Policy No. 4, Revision No. 6 and Policy No. 9, Revision 5. Motion carried 4:0:0. Approval of Board Minutes Mr. Stempeck made a motion, seconded by Mr. Hennessy, to approve the meeting minutes of May 26, 2016, as presented. Motion Carried 4:0:0. Page 1 2 Report RMLD Board Member Attendance at RMLD Citizens' Advisory Board Meeting Ms. Schultz explained that Mr. Pacino was unable to attend the CAB meeting. General Manager's Report — Ms. O'Brien Ms. O'Brien stated that she had recently met with the Town Manager/Administrator of each of the four towns served. RMLD had a 15 -slide presentation and the discussion that followed primarily centered on NJUNS, LED streetlights, double poles, highlights of the Annual Report, service requirements, terms and conditions, and preliminary notice of a rate increase pending a formal cost of service study. Additionally, Reading and North Reading each have CAB vacancies that need to be filled. Two volunteers are currently being vetted and should be active in time for the January CAB meeting. Additionally, Ms. O'Brien met with Lynnfield Selectmen on Monday, December 13, and it went well, with the representatives responsive to the RMLD presentation. Ms. O'Brien continued, announcing that RMLD is a recipient of funds from a Volkswagen class-action lawsuit. The money will be used to install a dual operator electric vehicle charging station for public use in the RMLD parking lot in the spring. Additionally, RMLD is researching grants for leasing programs since some RMLD vehicles are due for turnover. Chairman O'Rourke remarked that the Board is appreciative of Ms. O'Brien meeting with local officials and constituents. Ms. O'Brien stated that December 6 marked the Budget kick-off meeting, with a follow up meeting occurring on December 12. The 6 -Year and Capital Budgets were discussed. Expenses are going to be unbundled due to maintenance and training. The financials will be consolidated. This year, the formal cost of service will be in draft form by January 15, with the final product completed and in the Citizens' Advisory Board's hands by March 211 The CAB meeting will span two -nights. This year's budget will mark a shift towards FERC accounting for utilities. Chairman O'Rourke clarified that the two nights of meetings will culminate in a vote on the Capital Expense and the Operating Budgets at the end of the second meeting. Ms. O'Brien answered in the affirmative. Ms. O'Brien stated that historical calendars are available. The Reading Festival of Trees was held on December 3 and 4. RMLD donated a tree to the event. The Good Neighbor Energy Fund Breakfast is being held on January 11 and RMLD will have a representative in attendance. The Art Contest Awards Ceremonies will take place on Thursday, January 12 and Thursday, January 19 at 7 p.m. The RMLD is saving money by migrating away from the T- shirt contest and instead holding a watercolor contest. Recycled frames will be used to mat the artwork, and RMLD will be giving away more prizes. Ms. Parenteau then explained that this year twelve schools participated, with three winners per school, for a total of thirty-six winners instead of last year's twelve. Due to the number of winners, the awards will be divided over two nights, with six schools attending each evening. The Commissioners are all invited and can split the nights up. Chairman O'Rourke asked if the home lighting contest was being held this year. Ms. Parenteau answered that the contest is suspended this year due to the Community Relations vacancy. Additionally, there is a sabbatical on trains under the RMLD lobby Christmas tree because the retiree who usually sets up the display is having health issues. Both will hopefully be reinstated next year. Mr. Talbot interjected, asking if the RMLD had a rate incentive to reduce use during peak hours and expressing his desire to see a rate that charges commercial customers more during peak -time usage. Ms. Parenteau replied in the negative, explaining that the RMLD does not have any step rates. Mr. Talbot stated that pricing is a powerful tool when it comes to modifying behavior and then communicated his dismay that the Time of Use Rate only has a few hundred participants. Ms. O'Brien then explained that for commercial customers to have a peak -time -contingent rate they would need to have a real-time meter. Ms. Parenteau then voiced her concerns about the implications of implementing such a rate. Mr. Talbot suggested it could be done in baby steps for commercial customers, to which Mr. Stempeck countered that care would need to be exercised and each customer considered individually. Page 1 3 General Manager's Report — Ms. O'Brien Ms. O'Brien then stated that the RMLD has helped many commercial customers significantly reduce their usage to the point that there is not much left to conserve. However, capacity and transmission costs are continuing to go up in this area and commercial customers are under increasing pressure from corporate to further reduce their bill. Chairman O'Rourke then stated that this would be better suited for discussion in the strategic meeting. Power Supply Report — September and October 2016 — Ms. Parenteau (Attachment 1) Ms. Parenteau's presentation began with September capacity requirements and imbedded costs for the last 5 - years. In 2012, RMLD paid $10.11 per kilowatt a month, now the cost is $13.9 per kilowatt a month. The capacity requirement is also increasing. It was just shy of 225 megawatts in 2015, now it's over 230 megawatts. The cost of transmission is also going up. There has been $9 billion invested in New England transmission infrastructure and all constituents in New England are paying for that. We started by paying $9.7 million, and it is now up to $15.4 million. This cost is passed through, so RMLD tries to structure its programs to minimize this cost. As compared to September 2015, kWh sales went down in September, 2016. The cost per kWh was 4.5 cents in October, 2012 and 4.8 cents in October, 2016. The monthly fuel charge was level due to a cash reserve, the cost of natural gas stabilizing, and contracts that RMLD had secured. However, sales have decreased. In 2014 the cost of service was unbundled. The last three months of the fiscal year (March, April, and May) showed a decrease in sales. RMLD needs to ramp up the rate to recover that loss. Per the Board, RMLD is trying to eliminate volatility. Ms. Parenteau also referred to the New York Power Authority Credit. This is a credit that residential customers receive per kWh. It goes up and down and is based on the replacement cost of power. Engineering and Operations Report — September and October 2016 — Mr. Jaffari (Attachment 2) Mr. Jaffari began by remarking that good progress is being made on Capital Improvement Projects, with spending year to date totaling $260,503 as of October 31, 2016. Year to date routine construction totals $619,818. Good progress is being made on routine maintenance. Approximately 23% of pad mount transformers have been replaced from a list of 3,600 aging transformers. About 15% of overhead transformers have been replaced. Mr. Stempeck asked if the new transformers are more efficient. Mr. Jaffari replied in the affirmative, per the Department of Energy mandating that transformer manufacturers make efficiency improvements. 194 poles have been replaced, and 112 out of 194 pole transfers have been completed. Overhead line visual inspections were conducted. 961 of 1,237 manholes have been inspected and the porcelain cutout replacement program is 91% completed. 376 tree trim spans have been completed so far this year, and no hot spots were found during substation scans. Mr. Jaffari then reported on double pole ownership. Reading's pole ownership is split in half: 50 percent are owned by Verizon and 50 percent are owned by RMLD. North Reading's poles are owned by RMLD, while Lynnfield and Wilmington's poles are owned by Verizon. Mr. Jaffari then referend to the NJUNS report for double pole management. In Lynnfield, RMLD has 4 pending transfers. In North Reading, there are 15 pending transfers and 45 pull poles. In Reading, RMLD has 48 pending transfers and 45 pull poles. In Wilmington, there are 46 transfers, 1 attachment, 4 pull poles, and 1 guy install. Mr. Jaffari explained that NJUNS automatically notifies the next party of their responsibility in taking care of the pole. Mr. Jaffari took this opportunity to say that he appreciates the customers' patience as we go through upgrades. Continuing, Mr. Jaffari stated that the RMLD reliability indices are under the national average but SAIDI and SAIFI are slightly above the regional average due to storms and motor vehicle accidents that caused damage to main lines. Mr. Jaffari then asked the residents of the service territory to exercise caution while driving this winter and to refrain from texting while driving. Unsafe driving can be fatal and can also cause damage to infrastructure. Mr. Jaffari then stated that the major reasons for outages were equipment, trees, and wildlife. Chairman O'Rourke inquired if the investment year to date cost was based on the July 1 fiscal year, to which Mr. Jaffari answered in the affirmative. Chairman O'Rourke then said that he was curious what the total amount would be if we continue spending at the current rate. Mr. Jaffari replied that $9.5 million has been budgeted, and that he is anticipating close to $8.5 million. It is going to take a long time to upgrade old equipment. The maintenance program has addressed critical issues and caught issues before equipment failure: we're getting there and reliability will only continue to improve. Page 1 4 RMLD Procurement Requests Requiring Board Approval (Attachment 3) IFP 2017-27 Single Phase Pad Mounted FR3 Transformers Mr. Jaffari explained that this equipment is for the underground maintenance program. These are environmentally friendly transformers that use vegetable oil. RMLD sent the bid out to 15 companies; 4 responded. The other responders didn't meet qualifications, didn't accept RMLD's conditions, and one sent out two prices for the same transformer. Mr. Stempeck made a motion, seconded by Mr. Hennessy, that proposal 2017-27 for Single Phase Pad Mounted FR3 Transformers be awarded to WESCO for $151,110, pursuant to Chapter 164 §561) on the recommendation of the General Manager. Motion carried 4:0:0. Mr. Jaffari then wished RMLD's customers Happy Holidays and Merry Christmas. Financial Report — First Quarter Fiscal Year 2017 — Ms. Markiewicz (Attachment 4) Ms. Markiewicz stated that Accounting has been diligently working to revamp the financials and consolidate the reports into a more efficient format. Ms. Markiewicz apologized for the lack of slides and then directed the Board's attention to page one of the distributed copy. As of the end of the first quarter of fiscal year 2017 the RMLD is in a strong financial position. Cash balances are solid, which means that if accounts receivable or collections were to decrease, or payables increase, the RMLD could handle the swing. Receivables are 95% current. Page two shows an increase in net capital assets of about $3 million, partly because of ongoing capital projects. Page three shows PPCT and fuel revenues exceed PPCT and fuel expenses by about $1.1 million, which is a 3% revenue increase from last year. Base revenues are up about 12.7% and operating expenses are up around 12.9%. On the last page, operating and maintenance expenses are under budget by about $500,000 due in part to labor contracts and retro pay, as well as vacancies and the timing of the payables. Chairman O'Rourke asked if there is anything that we should be thinking about in respect to financials and added that it sounds like the RMLD is in a strong financial position. Ms. Markiewicz responded that we are in a strong position. Mr. Hennessy asked why the unrestricted cash has gone up $5 million. Ms. Markiewicz said that most likely -it could be due to the timing of receivables and what has been billed out. Ms. O'Brien added that the operating fund is how we pay our bills and is constantly changing. General Discussion BOARD MATERIAL AVAILABLE BUT NOT DISCUSSED RMLD Board Meetings Chairman O'Rourke announced that the Board will next convene on January 26 and February 23, and a date yet to be determined for the strategic meeting. Chairman O'Rourke then asked Ms. O'Brien to give a brief idea of what she envisioned being discussed in the strategic meeting. General Discussion Ms. O'Brien stated that technology is changing very quickly and is impacting the utility industry in unexpected ways. Change used to be solely efficiency -based in terms of equipment like transformers. Now with the advent of solar, revenue erosion is a possibility. Therefore, RMLD needs a plan going forward, such as developing more community solar and getting in on electric vehicle charging stations. Chairman O'Rourke suggested the meeting take place in late January or February. Mr. Stempeck added that he likes morning meetings, to which Mr. Hennessy agreed. RMLD Committee Meetings Will be set up in the coming weeks. Page 1 5 Executive Session At 9:00 p.m. Mr. Stempeck moved seconded by Mr. Hennessy that the Board go into Executive Session to consider the purchase of real property and discuss strategy with respect to collective bargaining, Chapter 164 Section 47D exemption for competitively sensitive or other proprietary information provided in the course of proceedings conducted pursuant to this chapter when such municipal lighting plant board determines that such disclosure will adversely affect its ability to conduct business in relation to other entities making, selling, or distributing electric power and energy pursuant to this chapter and return to Regular Session for the sole purpose of adjournment. Chairman O'Rourke called for a poll of the vote: Chairman O'Rourke, Aye; Mr. Talbot, Aye; Mr. Stempeck, Aye. Mr. Hennessy: Aye. Motion carried 4:0:0. Adjournment At 9:47 p.m. Mr. Talbot made a motion seconded by Mr. Stempeck to adjourn the Regular Session. Motion carried 3:0:0. Mr. Hennessy was not present for the vote. A true copy of the RMLD Board of Commissioners minutes as approved by a majority of the Commission. David Hennessy, Secretary Pro Tem RMLD Board of Commissioners Page 1 6 D LU H Q w H Z s+soD ANaodoD Pappo"l O P m O M d n � ^ f N ^ O m00 O O O ._ p0O0O N0OO 0 0 M H 04 O N O N N N N N N N C4 P P Y 4 K « luau+aunbaa Apodo:) s 01WII 3 lv° 1 Z w CLO U 0 LU 0 Q w m Z ; w p ;: Q LL, W = m� ULuQ_ ac F- L,., W >-- V) Lr) CW G D V) z O u 0 CJ C O H z WC C F -- V) D n 0 Q V fWcy� Q 'O = O U N J QAI: w W m DO U— V O _ "o ~' ZN O 0 '- Q d. z F- C) W F- O D Q Y O cn W Lu W W Co z z 0 o JPO = Q � zz0 Lu O0� L Q LU � To: Coleen O'Brien From: Maureen McHugh, Jane Parenteau I Date: December 5, 2016 Subject: Purchase Power Summary — September, 2016 Energy Services Division (ESD) has completed the Purchase Power Summary for the month of September, 2016. ENERGY The RMLD's total metered load for the month was 57,671,462 kWh, which is a 7.76% decrease from the September, 2015 figures. Table 1 is a breakdown by source of the energy purchases. Table 1 Vepperall, Womnoco,indian Rlver,Tumor, FaH;Collins, Ploneer,Hostory Mills, Summit Hydro Amount of Cost of % of Total Total $ $ as a Resource Energy Energy Energy Costs % (kWh) ($IMwh) Millstone #33 3,531,903 $6.72 6.09% $23,740 0.86% Seabrook 5,697,170 $6.32 9.83°x6 $36,006 1.30% Stonybrook Intermediate 704,726 $48.60 1.22% $34,253 1.24% Shell Energy 9,716,400 $63.53 16.76% $617,259 22.290/6 NYPA 2,000,296 $4.92 3.45% $9,841 0.36% ISO Interchange 7,623,831 $93.85 13.15% $715,512 25.84% NEMA Congestion 0 $0.00 0.00% $81,144 2.93% Coop Resales 13,271 $92.90 0.02% $1,233 0.04% BP Energy 9,631,200 $46.90 16.62% $451,703 16.31% Hydro Projects- 180,091 $74.38 0.28% $11,907 0.43% Braintree Watson Unit 437,054 $117.91 0.75% $51,535 1.86% Saddleback/Jericho Wind 1,131,736 $96.38 1.95% $109,073 3.94% One Burlington Solar 281,136 $70.00 0.49% $19,680 0.71% Exelon 17,034,000 $35.52 29.39°x6 $604,998 21.85% Stonybrook Peaking 3,123 $428.22 0.01% $1,337 0.05% Monthly Total 57,965,937 $47.77 100.00% $2,769,221 100.00% Vepperall, Womnoco,indian Rlver,Tumor, FaH;Collins, Ploneer,Hostory Mills, Summit Hydro Table 2 breaks down the ISO interchange between the DA LMP Settlement and the RT Net Energy for the month of September, 2016. Table 2 Amount cost % of Total Resource of Energy of Energy Energy (kWh) ($1Mwh) ISO QA LMP11,080,131 $74.55 19.11% Settlement RT Not Energy ** (3,456,300) $31.98 -5.96% Settlement ISO Interchange 7,623,831 $93.85 13.15% (subtotal) Independent System Operator Day -Ahead Locational Marginal Price Real Time Net Energy SEPTEMBER 2016 ENERGY BY RESOURCE ■ Exelon, 29.53' • Saddleback, 1.25% • Hydro Project 0.28% • BELD, 0.76% ■ Stonybrook Jericho Wind, 0.71% Peaking, 0.01% • One Burlington Millston Solar, 0.49% a #3, C „•. • ISO Interchange 8.77% Stonybrook Intermediate, 1.22% ,3.47% CAPACITY The RMLD hit a demand of 143,166 kW, which occurred on September 9, at 4 pm. The RMLD's monthly UCAP requirement for September, 2016 was 230,679 kWs. Table 3 shows the sources of capacity that the RMLD utilized to meet its requirements. Table 3 Source Amount (kWs) Cost (VkVv-month) Total Cost $ % of Total Cost Mi stone #3 4,950 33.59 $166,254 9.94% Seabrook 7,909 36.38 $287,705 17.21% Stonybrook Peaking 24,981 -1.21 -$30,321 -1.81% Stonybrook CC 42,925 7.07 $303,636 18.16% NYPA 0 0.00 $16,834 1.01% Hydro Quebec 0 0 -$926 -0.06% Nextera 60,000 6.15 $369,000 22.07% Braintree Watson Unit 0 0.00 $83,115 4.97% ISO -NE Supply Auction 89,914 5.30 $476,618 28.51% Total 230,679 $7.22 $1,671,914 100.00% Table 4 shows the dollar amounts for energy and capacity per source. Table 4 Cost of % of Amt of Energy Power Resource Energy Capacity Total cost Total Cost (kWh) ($/kWh) Millstone #3 $23,740 $166,254 $189,994 4.28% 3,531,903 0.0538 Seabrook $36,006 $287,705 $323,711 7.30% 5,697,170 0.0568 Stonybrook Intermediate $34,253 $303,636 $337,889 7.62% 704,726 0.4795 Hydro Quebec $0 -$926 $926 -0.02% - 0.0000 Shell Energy $617,259 $0 $617,259 13.92% 9,716,400 0.0635 NextEra $0 $369,000 $369,000 8.32% - 0.0000 # NYPA $9,841 $16,834 $26,675 0.60% 2,000,296 0.0133 ISO Interchange $715,512 $511,548 $1,227,060 27.66% 7,623,831 0.1610 Nema Congestion $81,144 -$34,930 $46,213 1.04% - 0.0000 BP Energy $451,703 $0 $451,703 10.18% 9,631,200 0.0469 i Hydro Projects $11,907 $5,567 $6,339 0.14% 160,091 0.0396 Braintree Watson Unit $51,535 $83,115 $134,650 3.04% 437,054 0.3081 * SaWleback/Jadcho $109,073 $0 $109,073 2.46% 1,131,736 0.0964 * One Burlington Solar $19,680 $0 $19,680 0.44% 281,136 0.0700 Coop Resales $1,233 $0 $1,233 0.03% 13,271 0.0929 Exelon Energy $604,998 $0 $604,998 13.64% 17,034,000 0.0355 Stonybrook Peaking $1,337 -M,321 $28,984 -0.65% 3,123 -9.2808 Monthly Total $2,769,221 $1,666,347 $4,435,567 100.00% 57,965,937 0.0765 * Renewable Resources 6.16% RENEWABLE ENERGY CERTIFICATES (RSCA Table 5 shows the amount of banked and projected RECs for the Swift River Hydro Projects through September 2016, as well as their estimated market value. TRANSMISSION The RMLD's total transmission costs for the month of September, 2016 were $1,540,298. This is an increase of 12.42% from the August transmission cost of $1,370,117. In September, 2015 the transmission costs were $1,284,290. Table 6 Current Month Table 5 Last Year Peak Demand (kW) 143,166 RECs Summary 154,933 Energy (kWh) 57,965,937 Period - January 2016 - September 2016 62,864,230 Banked Projected Total Est. $3,302,140 RECs RECs RECs Dollars WofOnoco 0 7,621 7,621 $190,525 Pepperell 0 3,816 3,816 $95,400 Indian River 0 1,702 1,702 $42,550 Turners Falls 0 1,135 1,135 $28,375 Saddleback 0 5,873 5,873 $146,825 Jarkho 0 4,389 4,389 $109,725 Sub total . 24,5536 613,400 RECs sow S0 0 $o Grand Total 0 24,536 24,536 $613,400 TRANSMISSION The RMLD's total transmission costs for the month of September, 2016 were $1,540,298. This is an increase of 12.42% from the August transmission cost of $1,370,117. In September, 2015 the transmission costs were $1,284,290. Table 6 Current Month Last Month Last Year Peak Demand (kW) 143,166 163,134 154,933 Energy (kWh) 57,965,937 74,092,068 62,864,230 Energy ($) $2,769,221 $3,194,092 $3,302,140 Capacity ($) $1,666,347 $1,915,137 $1,346,792 Transmission($) $1,540,298 $1,370,117 $1,284,290 Total $5,975,866 $6.479,345 $5,933,222 To: Coleen O'Brien From:,, Maureen McHugh, Jane Parenteau Date: December 6, 2016 Subject: Purchase Power Summary — October, 2016 Energy Services Division (ESD) has completed the Purchase Power Summary for the month of October, 2016. ENERGY The RMLD's total metered load for the month was 52,407,904 kWh, which is a 2.09% decrease from.the October, 2015 figures. Table 1 is a breakdown by source of the energy purchases. Table 1 •PMpperoll, Woronoco,indlan River, Tumor FAIN Collins, Plonow hiosiery Mllls, Summit Hydro Amount of Cost of % of Total Total $ $ as a Resource Energy Energy Energy costs % (kWh) ($/Mwh) Millstone #3 3,665,166 $6.72 6.97% $24,636 1.00% Seabrook 5,895,894 $6.32 11.21% $37,262 1.51% Stonybrook intermodate 0 $0.00 0.00% $10,117 0.41% Shell Energy 7,638,000 $65.91 14.52% $503,447 20.44% NYPA 2,246,209 $4.92 4.27% $11,051 0.45% ISO Interchange 3,594,284 $68.44 6.83% $245,981 9.99% NEMA Congestion 0 $0.00 0.00% $247,548 10.05% Coop Resales 15,710 $126.43 0.03% $1,986 0.08% BP Energy 9,729,600 $46.90 18.50% $456,318 18.52% Hydro Projects* 522,216 $92.13 0.99% $48,110 1.95% Braintree Watson Unit 382,459 $118.65 0.73% $45,380 1.84% SaWleback/Jericho Wind 2,161,967 $99.87 4.11% $215,906 8.76% One Burlington Solar 231,497 $70.00 0.44% $16,205 0.66% Exelon 16,498,200 $36.20 31.37% $597,282 24.25% Stonytxook Peaking 9,758 $229.82 0.02% $2,243 0.09% Monthly Total 52,590,960 $46.84 100.00% $2,463,471 100.00% •PMpperoll, Woronoco,indlan River, Tumor FAIN Collins, Plonow hiosiery Mllls, Summit Hydro Table 2 breaks down the ISO interchange between the DA LMP Settlement and the RT Net Energy for the month of October, 2016. Table 2 Resource Amount Cost % of Total of Energy of Energy Energy (kWh) ($/Mwh) ISO DA LMP " 7,727,644 $46.78 14.69% Settlement RTNet ent Energy *" (4,133,360) $27.96 -7.86% ISO Interchange 3,594,284 $68.40 6.83% (subtotan • Independent System Operator Day -Ahead Locational Marginal Price Real Time Net Energy OCTOBER 2016 ENERGY BY RESOURCE • Stonybrook Peaking, 0.02% • One Burlington Jericho Wind, 1.41% Solar, 0.44% • Millstone #3, 7.00% a Exelon, 31.51% Saddleback, 2.72% • Hydro F • BELD, 1.0 0.73% BP Energy, 18.58% 8.77% Stonybrook Intermediate, 0.00% 1, 4.29% CAPACITY The RMLD hit a demand of 91,673 M which occurred on October, at 7 pm. The RMLD's monthly UCAP requirement for October, 2016 was 232,349 Ms. Table 3 shows the sources of capacity that the RMLD utilized to meet its requirements. Table 3 Source Amount (kWs) Cost ($AcW-nwnth) Total Cost $ % of Total Cost Mdstone #3 4,950 33.46 $165,607 9.49% Seabrook 7,909 36.45 $288,320 16.51% Stonybrook Pealing 24,981 1.06 $26,387 1.51% Stonybrook CC 42,925 7.00 $300,337 17.20% NYPA 0 0.00 $6,554 0.38% Hydro Quebec 0 0 -$15,089 -0.86% Nextera 60,000 6.15 $369,000 21.13% Braintree Watson Unit 0 0.00 $83,166 4.76% ISO -NE Supply Auction 91,584 5.70 $521,664 29.88% Total 232,349 $7.51 $1,745,945 100.00% Table 4 shows the dollar amounts for energy and capacity per source. Table 4 Cost of % of Amt of Energy Power Resource Energy Capacity Total cost Total Cost (kWh) ($/kWh) Millstone #3 $24,636 $165,607 $190,243 4.52% 3,665,166 0.0519 Seabrook $37,262 $288,320 $325,582 7.73% 5,895,894 0.0552 Stonybrook Intermediate $10,117 $300,337 $310,454 7.38% - 0.0000 Hydro Quebec $0 415,089 -$15,089 -0.36% - 0.0000 Shell Energy $503,447 $0 $503,447 11.96% 7,638,000 0.0659 NextEra $0 $369,000 $369,000 8.77% - 0.0000 * NYPA $11,051 $6,554 $17,605 0.42% 2,246,209 0.0078 ISO Interchange $245,981 $521,664 $767,645 18.24% 3,594,284 0.2136 Noma Congestion $247,548 $0 $247,548 5.88% - 0.0000 BP Energy $456,318 $0 $456,318 10.84% 9,729,600 0.0469 * Hydro Projects $48,110 $0 $48,110 1.14% 522,216 0.0921 Braintree Watson Unit $45,380 $83,166 $128,546 3.05% 382,459 0.3361 * Saddleback/Jericho $215,906 $0 $215,906 5.13% 2,161,967 0.0999 * One Burlington Solar $16,205 $0 $16,205 0.38% 231,497 0.0700 Coop Resales $1,986 $0 $1,986 0.05% 15,710 0.1264 Exelon Energy $597,282 $0 $597,282 14.19% 16,498,200 0.0362 Stonybrook Peaking $2,243 $26,387 $28,629 0.68% 9,758 2.9339 Monthly Total $2,463,471 $1,745,945 $4,209,416 100.00% 52,590,960 0.0800 # Renewable Resources 9.82% RENEWABLE ENERGY CERTIFICATES (- ECS) Table 5 shows the amount of banked and projected RECs for the Swift River Hydro Projects through October 2016, as well as their estimated market value. TRANSMISSION The RMLD's total transmission costs for the month of October, 2016 were $1,236,067. This is a decrease of 19.75% from the September transmission cost of $1,540,298. In October, 2015 the transmission costs were $1,276,977. Table 6 Current Month Table 5 Last Year Peak Demand (kW) 91,673 RECs Summary 92,325 Energy (kWh) 52,590,960 Period- January 2016 -October 2016 Energy ($) Banked Projected Total Est. Capacity ($) RECs RECs RECs Dollars Woronoco 0 7,659 7,659 $191,469 Pepperell 0 3,981 3,981 $99,525 Indian River 0 1,702 1,702 y42,&0 Turners Falls 0 1,135 1,135 $28,375 Saddleback 0 7,299 7,299 $182,475 Jerk ho 0 5,125 5,125 $128,125 Sub total0 - 26,901 26 901 �.s �_ -_ =__—z '�' 67i,519 RECs Sold 0 .: $0 Grand Total -- 0 26 901 ,, 901 26 $672,519 TRANSMISSION The RMLD's total transmission costs for the month of October, 2016 were $1,236,067. This is a decrease of 19.75% from the September transmission cost of $1,540,298. In October, 2015 the transmission costs were $1,276,977. Table 6 Current Month Last Month Last Year Peak Demand (kW) 91,673 143,166 92,325 Energy (kWh) 52,590,960 57,965,937 53,541,382 Energy ($) $2,463,471 $2,769,221 $2,543,917 Capacity ($) $1,745,945 $1,666,347 $1,442,001 Transmission(s) $1,236,067 $1,540,298 $1,276,9717 Total $5,445,482 $5,975,866 $5,262,895 U v { 0 CD a .� Q O O # 5 W so 7 o a o �- E c4 W O O W o _U v ' _o O U U 7C) O .N O •� m � N � J � � v CA N4-- nV W .m' O L CL E 0 CL E *EL 0 U �j N O ori c M4 ON. N a O v `n 4M.M �O W N u4 0� L r4 r4 p. (E.9 00 `CD O� a eR U' 00 c 06 D c D c DQ H C 3 c Q .-; m '0 tj° z c E o m 0.-0s U > +. < O Q 'a O o O v �- rn c y p U <io 0-. h Oo O a U $ •- ° O^' aaCD c cmom o c a C`C) o 12 �mc€� oz p crn O 0 c o cM 3g m a ; ' o o a3 s aO Lni` waZO0.-Q •U N O) H vL� U - 3i -0 °C °� N N O N o'OD _p O C In O V D�0ul �cm„o = ;G 0 U a U O c 0 O N r v O�USua Q. _v a m ce '^ C C m Z v) Yccc •Z o M_ v 0 �Hco n�K y C _a�.2 �C y Q Q OO C ,N n c 0 V n LIMH 0 U 0 ad r 0o RT: 14V N C 0 Q L D i E N C CL "' O 0 3 c 0 ca) c c c m0 _E E C O m N U o U 3 — N C C -Q N D•mca OO i : O c c `6 -0 O ° c COL N C C N a v.Eoc'a ° Q 10 03032 C 0 �a O Cv C.0 0 - U �� r v v :C-: Q U a o oa E p 0 �C.W 76 a `-i°Oa3 3 vOi C.«- �oW�U CL 0 a C° r 0o RT: 14V C 0 p i N C CL "' U 3 c O c m0 U c E 'S m E } N 0 V C C N C oc; C O O U Q O O Cv E U �� r v v 3 -C �C.W 76 a Hoc} C.«- �oW�U • _O N 0.9 )0 cE 0L D O N O LZ U p Q Q) �,z Q— Q N U C~ s � U 2 N � m V-) � Q N E E N , C 0 a N NO ri 3 c i L - c o 063ED } a O m v Jo - u U p W C 3� -q N E _ C4 o Lo3 p 0C: c C6C63: o a 3 `'' c r .G.- O v o v `r N u N 7 N `0 CV Qi 0 3 0- co Q O _ �� "T 1 C U N CV O � J � C� n j CV) uO � 0 a) V O W (v w N `n � � N tL _O O i N c63� c 0 O Cie c� .00 0 O j N Q S .0 a s `� RL m CV U N .5 N N C > uv C ^ V � C EC: CN 0� 0 H E— a a uo C,t_ ° O o 1- E -F- _� h a3 a u o N i2 a F- 1 1 1 0 C. a) .o D 0 0 E .o Q Q � o � C: 0 C:LO .Q c LO 0 +- 3 O U' 1 1 '\ 9 x 4 b N t n v T A n � Q A W W G •� O "ssssssss y c 0 � Illi � W W OO '� •_ r+ N M Q IM1 ID N 1f1 J O M ry 0 N H H h N N N N y < n 8 p N m a 0 M a N' CA p � Q � N ` N C pp oOp 8 p 8O p 8O p• O S p S qQ �v i f ^ o8 8 a$ $ r N pp pp pp o pp oo p 9 L ffi 0 0 0 0 0 0 0 0 0 0 y u n Z � h M Q N b Jt N N N H M H H N N Q r Q � N S z Q ? Z IZ IA h � � � t N 1 pf N Q o ui t L r, Wn N W `o W F y C a � a • � r i c IV E 'D 3 N C W ON 0 RMLD - December 1, 2016 Reading Municipal Light Department RELIABLE POVIR FOE GENERATIONS 230 Ash Street P.O. Box 150 Reading, MA 01867-0250 Tel: (781) 944-1340 Fax: (781) 942-2409 Web: www.rmld.com Town of Reading Municipal Light Board Subject: IFP 2017-27 Single Phase Pad Mounted FR3 Transformers Pursuant to M.G.L c. 164 § 56D, on November 16, 2016, a bid invitation was placed as a legal notice in the Middlesex East section of the Daily Times Chronicle and on the ECNE (Energy Council of the Northeast) website requesting sealed proposals for Single Phase Pad Mounted FR3 Transformers. An invitation for proposals was sent to the following fifteen companies: EDI Graybar Electric Hasgo Power IF Gray Irby Jordan Transformer Power Sales Group Power Tech-UPSC Robinson Sales Shamrock Power Sales Inc. Transformer Exchange Ward Transformer Sales Weidman Electrical Technology WESCO Yale Electric Supply Sealed proposals were received from four companies: Graybar Electric, Power Sales Group, Irby and WESCO. The sealed proposals were publicly opened and read aloud at 11:00 a.m., November 30, 2016, in the Town of Reading Municipal Light Department's Audio Visual Spurr Room, 230 Ash Street, Reading, Massachusetts. The proposals were reviewed, analyzed and evaluated by staff and recommended to the General Manager. Move that proposal 2017-27 for: Single Phase Pad Mounted FR3 Transformers be awarded to: WESCO for $151,110 pursuant to Chapter 164 § 56D on the recommendation of the General Manager. The FY 17 Capital Budget amount for these items is $100,000. Peter rice 1 amid Taffig Coleen O'Brien Attachment 3 File: Bid/FY17/2017-27 Single Phase Pad Mounted FR3 Transformers / C/) R k0 % k\ 0 2 - 0 £ CD A a EJ e k ,DL § Lu Acc 0 CL 8 R2\ m \ tm� 2 0 vE2 E . \ A , CL k@ § § m t / ƒ k c E k k . z ] O , . .§ C7 R ka .$ 2 k x w § § a 7 c / e k 2 t k G8o2 $888 k \ kJ §28$ E§0® E 2 k k® �� /\ L /&� \§ ® ® S � 40 in �qq m0 0 ©a U)© . coo 880 888 2 m md� Baa ■£mw a■R WCO 0 -m % X22 22A 2 f©m CD .7E 000 000 c B\R «« �•.c- o�aa , ) ` E & 410. $ $ ■ o � ` © c _ ■ » ■ § § § E ` k AAA 2J2 ■mom �ERƒf @ream LL 7E \���0 2 SSS 3222 .9 U) m e : •�!§§ /22e/ § www 0III $a®k— ■ E u �Ek 2 -00 & \? 2 > E� 2�»�k oinf-0 ao U�a£ 0Z CC , 0w ��® »_Nn c� j ���0 �D U) ca 0.0 / TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT BUSINESS -TYPE PROPRIETARY FUND STATEMENT OF NET ASSETS 9/30/16 ASSETS CURRENT UNRESTRICTED CASH (SCH A P.9) RESTRICTED CASH (SCH A P.9) RESTRICTED INVESTMENTS (SCH A P.9) RECEIVABLES, NET (SCH B P.10) PREPAID EXPENSES (SCH B P.10) DEFERRED OUTFLOWS OF RESOURCE; (SCH B P.10) INVENTORY TOTAL CURRENT ASSETS NONCURRENT INVESTMENT IN ASSOCIATED CO (SCH C P.2) CAPITAL ASSETS, NET (SCH C P.2) TOTAL NONCURRENT ASSETS TOTAL ASSETS LIABILITIES CURRENT ACCOUNTS PAYABLE CUSTOMER DEPOSITS CUSTOMER ADVANCES FOR CONSTRUCTION ACCRUED LIABILITIES TOTAL CURRENT LIABILITIES NONCURRENT ACCRUED EMPLOYEE COMPENSATED ABSENCES DEFERRED INFLOWS OF RESOURCES TOTAL NONCURRENT LIABILITIES TOTAL LIABILITIES NET ASSETS INVESTED IN CAPITAL ASSETS, NET OF RELATED DEBT RESTRICTED FOR DEPRECIATION FUND (P.9) UNRESTRICTED TOTAL NET ASSETS (P.3) TOTAL LIABILITIES AND NET ASSETS 3!1 PREVIOUS YEAR 10,504,383.61 22,784,514.36 1,284,061.45 9,750,201.71 1,110,312.97 1,547,815.00 1,629,353.82 48,610,642.92 CURRENT YEAR 15,779,554.95 22,779,550.64 1,345,663.06 9,535,148.75 1,221,849.93 6,338,218.00 1,559,509.06 58,559,494.39 26,993.75 26,993.75 69,912, 215.61 72,380,004.50 69,939,209.36 72,406,998.25 118,549,852.28 130,966,492.64 7,109,548.67 863,919.67 904,188.35 3,192,834.75 12,070,491.44 3,070,487.93 0.00 3,070,487.93 6,757,526.59 920,196.89 1,013,604.84 9,430,938.63 18,122,266.95 3,257,809.00 883,172.00 4,140,981.00 15,140,979.37 22,263,247.95 69,912,215.61 6,426,869.32 27,069,787.98 103,408,872.91 72,380,004.50 5,527,527.31 30,795,712.88 108,703,244.69 118, 549, 852.28 130, 966,492.64 Attachment 4 TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT NONCURRENT ASSET SCHEDULE 9/30/16 SCHEDULE C SCHEDULE OF INVESTMENTS IN ASSOCIATED COMPANIES PREVIOUS YEAR CURRENT YEAR NEW ENGLAND HYDRO ELECTRIC 2,975.74 2,975.74 NEW ENGLAND HYDRO TRANSMISSION 24,018.01 24,018.01 TOTAL INVESTMENTS IN ASSOCIATED COMPANIES 26,993.75 26,993.75 SCHEDULE OF CAPITAL ASSETS LAND 1,265,842.23 1,265,842.23 STRUCTURES AND IMPROVEMENTS 6,035,452.03 7,541,231.87 EQUIPMENT AND FURNISHINGS 11,679,481.40 12,423,259.61 INFRASTRUCTURE 50,931,439.95 51,149,670.79 TOTAL CAPITAL ASSETS, NET 69,912,215.61 72,380,004.50 TOTAL NONCURRENT ASSETS 69,939,209.36 72,406,998.25 (2) TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT BUSINESS -TYPE PROPRIETARY FUND STATEMENT OF REVENUES, EXPENSES AND CHANGES IN FUND NET ASSETS 9/30/16 MONTH MONTH LAST YEAR CURRENT YEAR YTD % OPERATING REVENUES: (SCH D P.11) LAST YEAR CURRENT YEAR TO DATE TO DATE CHANGE BASE REVENUE 2,307,286.56 2,601,766.65 6,774,150.99 7,632,882.99 12.68% FUEL REVENUE 3,385,022.47 3,313,075.69 9,640,963.29 9,568,447.25 -0.75% PURCHASED POWER CAPACITY 3,131,926.41 3,565,602.15 8,696,014.94 10,282,673.57 18.25% FORFEITED DISCOUNTS 71,838.93 75,132.46 195,863.12 245,526.20 25.36% ENERGY CONSERVATION REVENUE 70,453.61 68,948.15 196,791.89 198,850.26 1.05% NYPA CREDIT (100,901.03) (107,461.09) (236,799.08) (293,806.06) 24.07% TOTAL OPERATING REVENUES 8,865,626.95 9,517,064.01 25,266,985.15 27,634,574.21 9.37% OPERATING EXPENSES: (SCH E P.12) PURCHASED POWER CAPACITY 1,351,093.27 1,669,620.61 4,616,045.21 5,101,686.56 10.52% PURCHASED POWER TRANSMISSION 1,284,290.11 1,540,298.14 3,774,337.74 4,125,707.12 9.31% PURCHASED POWER FUEL 3,302,139.93 2,769,220.69 10,064,678.82 9,180,626.66 -8.78% OPERATING 853,864.63 907,452.86 2,492,658.16 2,604,178.29 4.47% MAINTENANCE 242,044.04 402,858.51 628,488.90 921,247.91 46.58% DEPRECIATION 328,732.65 341,775.67 986,197.95 1,025,327.01 3.97% VOLUNTARY PAYMENTS TO TOWNS 118,000.00 118,000.00 354,000.00 354,000.00 0.00% TOTAL OPERATING EXPENSES OPERATING INCOME NONOPERATING REVENUES (EXPENSES) CONTRIBUTIONS IN AID OF CONST RETURN ON INVESTMENT TO READING INTEREST INCOME INTEREST EXPENSE OTHER (MDSE AND AMORT) TOTAL NONOPERATING REV (EXP) CHANGE IN NET ASSETS NET ASSETS AT BEGINNING OF YEAR NET ASSETS AT END OF SEPTEMBER 7,480,164.63 1,385,462.32 7,749,226.48 1,767,837.53 22,916,406.78 2,350,578.37 23,312,773.55 1.73% 4,321,800.66 83.86% 33,493.54 8,631.42 34,474.88 1,062.10 (197,537.08) (198,722.33) (592,611.24) (596,166.99) 11,074.27 11,669.62 34,303.10 35,937.86 (179.97) (200.31) (536.57) (586.44) 1,201.00 (1,966.47) 137,581.14 126,710.26 (151,948.24) (180,588.07) (386,788.69) .(433,043.21) 1, 233, 514.08 1, 587, 249.46 (3) 0.00% 0.60% 4.77% 9.29% -7.90% 11.96% 1,963,789.68 3,888,757.45 98.02% 101,445,083.23 104,814,487.24 3.32% 103,408,872.91 108,703,244.69 5.12% TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT RECONCILIATION OF CAPITAL FUNDS 9/30/16 SOURCE OF CAPITAL FUNDS: DEPRECIATION FUND BALANCE 9/1/16 CONSTRUCTION FUND BALANCE 9/1/16 INTEREST ON DEPRECIATION FUND TO DATE DEPRECIATION TRANSFER TO DATE TOTAL SOURCE OF CAPITAL FUNDS USE OF CAPITAL FUNDS: LESS PAID ADDITIONS TO PLANT THRU SEPTEMBER TOTAL USE OF CAPITAL FUNDS GENERAL LEDGER CAPITAL FUNDS BALANCE 9/30/16 (4) 5 6,183,346.71 773,146.10 7,247.44 1,025,327.01 6,989,065.26 1,202,918.99 S 6,786,146.27 TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT SCHEDULE OF CASH AND INVESTMENTS 9/30/16 SCHEDULE A PREVIOUS YEAR CURRENT YEAR UNRESTRICTED CASH CASH - OPERATING FUND 10,501,383.61 15,776,554.95 CASH - PETTY CASH 3,000.00 3,000.00 TOTAL UNRESTRICTED CASH 10,504,383.61 15,779,554.95 RESTRICTED CASH CASH - DEPRECIATION FUND 6,426,869.32 5,527,527.31 CASH - CONSTRUCTION FUND 417,982.97 258,618.96 CASH - TOWN PAYMENT 946,611.00 950,166.99 CASH - DEFERRED FUEL RESERVE 4,519,770.54 5,210,889.20 CASH - RATE STABILIZATION FUND 6,784,114.10 6,835,216.32 CASH - UNCOLLECTIBLE ACCTS RESERVE 200,000.00 200,000.00 CASH - SICK LEAVE BENEFITS 1,791,428.02 1,926,058.60 CASH - HAZARD WASTE RESERVE 150,000.00 150,000.00 CASH - CUSTOMER DEPOSITS 863,919.67 920,196.89 CASH - ENERGY CONSERVATION 683,818.74 800,876.37 TOTAL RESTRICTED CASH 22,784,514.36 22,779,550.64 INVESTMENTS SICK LEAVE BUYBACK 1,284,061.45 1,345,663.06 TOTAL CASH BALANCE 34,572,959.42 39,904,768.65 (9) TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT SCHEDULE OF ACCOUNTS RECEIVABLE 9/30/16 UNBILLED ACCOUNTS RECEIVABLE 5,166,349.95 TOTAL ACCOUNTS RECEIVABLE, NET 9,750,201.71 SCHEDULE OF PREPAYMENTS PREPAID INSURANCE PREVIOUS YEAR SCHEDULE OF ACCOUNTS RECEIVABLE (396,811.75) RESIDENTIAL AND COMMERCIAL 4,731,364.33 ACCOUNTS RECEIVABLE - OTHER 251,462.03 ACCOUNTS RECEIVABLE - LIENS 6,837.76 ACCOUNTS RECEIVABLE - EMPLOYEE ADVANCES 543.53 SALES DISCOUNT LIABILITY (184,488.64) RESERVE FOR UNCOLLECTIBLE ACCOUNTS (221,867.25) TOTAL ACCOUNTS RECEIVABLE BILLED 4,583,851.76 UNBILLED ACCOUNTS RECEIVABLE 5,166,349.95 TOTAL ACCOUNTS RECEIVABLE, NET 9,750,201.71 SCHEDULE OF PREPAYMENTS PREPAID INSURANCE 921,423.64 PREPAYMENT PURCHASED POWER (396,811.75) PREPAYMENT PASNY 307,572.50 PREPAYMENT WATSON 263,258.52 PURCHASED POWER WORKING CAPITAL 14,870.06 TOTAL PREPAYMENT 1,110,312.97 OTHER DEFERRED DEBITS 1,547,815.00 ACCOUNTS RECEIVABLE AGING SEPTEMBER 2016: RESIDENTIAL AND COMMERCIAL 3,563,300.23 LESS: SALES DISCOUNT LIABILITY (136,915.65 GENERAL LEDGER BALANCE 3,334.58 CURRENT 2,839,476.81 82.87% 30 DAYS 430,379.78 12.56% 60 DAYS 103,125.17 3.01% 90 DAYS 11,949.54 0.35% OVER 90 DAYS 41,453.28 1.21% TOTAL 3,426,384.58 100.00% (10) SCHEDULE B CURRENT YEAR 3,563,300.23 649,031.80 8,173.91 543.53 (136,915.65) (235,094.78) 3,849,039.04 5,686,109.71 9,535,148.75 990,229.68 (380,870.38) 307,572.50 289,909.20 15,008.93 1,221,849.93 6,338,218.00 TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT SCHEDULE OF OPERATING REVENUE 9/30/16 SCHEDULE D MONTH MONTH LAST YEAR CURRENT YEAR YTD °/ SALES OF ELECTRICITY: LAST YEAR CURRENT YEAR TO DATE TO DATE CHANGE RESIDENTIAL SALES 2,653,308.66 2,840,767.74 7,598,826.11 8,324,388.16 9.55% COMM AND INDUSTRIAL SALES 2,871,325.15 2,844,592.06 8,209,110.72 8,221,873.89 0.16% PRIVATE STREET LIGHTING 9,883.06 11,229.79 29,878.66 33,742.89 12.93% TOTAL PRIVATE CONSUMERS 5,534,516.87 5,696,589.59 15,837,815.49 116,229.48 4.69% 16,580,004.94 (100,901.03) (107,461.09) MUNICIPAL SALES: (293,806.06) 24.07% TOTAL REVENUE 8,865,626.95 9,517,064.01 STREET LIGHTING (34,958.40) 27,102.28 21,205.57 81,306.84 283.42% MUNICIPAL BUILDINGS 65,898.85 65,461.84 192,471.79 193,149.55 0.35% TOTAL MUNICIPAL CONSUMERS 30,940.45 92,564.12 213,677.36 28.44% 274,456.39 SALES FOR RESALE 33,471.30 32,036.95 93,038.60 90,026.85 -3.24% SCHOOL 93,380.41 93,651.68 270,582.83 256,842.06 -5.08% SUB -TOTAL 5,692,309.03 5,914,842.34 16,415,114.28 17,201,330.24 4.79% FORFEITED DISCOUNTS 71,838.93 75,132.46 195,863.12 245,526.20 25.36% PURCHASED POWER CAPACITY 3,131,926.41 3,565,602.15 8,696,014.94 10,282,673.57 18.25% ENERGY CONSERVATION - RESIDENTIAL 27,658.06 28,218.95 78,450.63 82,620.78 5.32% ENERGY CONSERVATION - COMMERCIAL 42,795.55 40,729.20 118,341.26 116,229.48 -1.78% NYPA CREDIT (100,901.03) (107,461.09) (236,799.08) (293,806.06) 24.07% TOTAL REVENUE 8,865,626.95 9,517,064.01 25,266,985.15 27,634,574.21 9.37% TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT SCHEDULE OF OPERATING EXPENSES 9/30/16 SCHEDULE E OPERATION SUP AND ENGINEERING EXP MONTH MONTH LAST YEAR CURRENT YEAR YTD % OPERATION EXPENSES: LAST YEAR CURRENT YEAR TO DATE TO DATE CHANGE PURCHASED POWER CAPACITY 1,351,093.27 1,669,620.61 4,616,045.21 5,101,686.56 10.52% PURCHASED POWER TRANSMISSION 1,284,290.11 1,540,298.14 3,774,337.74 4,125,707.12 9.31% TOTAL PURCHASED POWER 2,635,383.38 3,209,918.75 8,390,382.95 9,227,393.68 0.20 OPERATION SUP AND ENGINEERING EXP 41,915.63 43,877.05 127,996.78 124,505.11 -2.73% STATION SUP LABOR AND MISC 10,388.37 12,232.12 32,889.40 33,740.11 2.59% LINE MISC LABOR AND EXPENSE 52,590.00 50,886.45 169,461.65 142,734.23 -15.77% STATION LABOR AND EXPENSE 26,835.11 48,724.92 93,901.52 124,459.16 32.54% STREET LIGHTING EXPENSE 11,757.77 17,022.66 25,300.13 32,132.77 27.01% METER EXPENSE 17,301.55 20,033.40 51,269.41 47,044.52 -8.24% MISC DISTRIBUTION EXPENSE 35,907.59 40,557.98 107,067.41 92,930.65 -13.20% METER READING LABOR & EXPENSE 1,443.79 3,127.63 9,249.31 8,302.35 -10.24% ACCT & COLL LABOR & EXPENSE 113,322.93 135,800.55 393,393.73 453,439.10 15.26% UNCOLLECTIBLE ACCOUNTS 10,000.00 12,500.00 30,000.00 37,500.00 25.00% ENERGY AUDIT EXPENSE 37,807.60 44,306.43 134,404.73 108,009.16 -19.64% ADMIN & GEN SALARIES 54,399.88 93,546.12 190,095.49 245,575.68 29.19% OFFICE SUPPLIES & EXPENSE 34,076.89 32,512.23 69,913.34 68,116.12 -2.57% OUTSIDE SERVICES 53,975.15 28,220.16 86,789.48 58,231.80 -32.90% PROPERTY INSURANCE 31,242.39 27,632.72 93,727.17 83,370.16 -11.05% INJURIES AND DAMAGES 5,278.12 4,348.57 12,069.40 13,057.59 8.19% EMPLOYEES PENSIONS & BENEFITS 227,733.83 234,433.43 691,802.99 751,039.29 8.56% MISC GENERAL EXPENSE 13,097.37 10,229.07 31,841.23 23,296.61 -26.84% RENT EXPENSE 13,855.09 13,904.67 43,905.88 41,301.75 -5.93% 'ERGY CONSERVATION 60,935.57 33,556.70 97,579.11 115,392.13 18.25% TOTAL OPERATION EXPENSES 853,864.63 907,452.86 2,492,658.16 2 604 178 297 4.47% MAINTENANCE EXPENSES: MAINT OF TRANSMISSION PLANT 227.08 227.08 681.24 681.24. 0.00% MAINT OF STRUCT AND EQUIPMT 29,658.62 44,387.63 79,293.08 124,285.78 56.74% MAINT OF LINES - OH 76,309.51 195,109.50 322,003.59 333,765.41 3.65% MAINT OF LINES - UG 35,646.33 54,129.43 39,394.04 104,900.84 166.29% MAINT OF LINE TRANSFORMERS 38,239.81 5,654.65 46,450.90 9,608.90 0.00% MAINT OF ST LT & SIG SYSTEM (46.13) 41,304:46 (165.87) 149,421.09 -90183.25% MAINT OF GARAGE AND STOCKROOM 53,087.61 45,016.95 114,839.08 128,908.40 12.25% MAINT OF METERS 0.00 0.00 0.00 0.00 0.00% MAINT OF GEN PLANT 8,921.21 17,028.81 25,992.84 69,676.25 168.06% TOTAL MAINTENANCE EXPENSES 242,044.04 402,858.51 921,247.91 46.58% 628,488.90 DEPRECIATION EXPENSE 328,732.65 341,775.67 986,197.95 1,025,327.01 3.97% PURCHASED POWER FUEL EXPENSE 3,302,139.93 2,769,220.69 10,064,678.82 9,180,626.66 -8.78% VOLUNTARY PAYMENTS TO TOWNS 118,000.00 118,000.00 354,000.00 354,000.00 0.00% TOTAL OPERATING EXPENSES 7,749,226.48 23,312,773.55 1.73% 7,480,164.63 22,916,406.78 (1 2) TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT BUDGETED OPERATING EXPENSE VARIANCE REPORT 9/30/16 SCHEDULE G MAINTENANCE EXPENSES: MAINT OF TRANSMISSION PLANT ACTUAL BUDGET (68.76) -9.17% OPERATION EXPENSES: YEAR TO DATE YEAR TO DATE VARIANCE • CHANGE PURCHASED POWER CAPACITY 5,101,686.56 4,676,885.00 424,801.56 9.08% PURCHASED POWER TRANSMISSION 4,125,707.12 3,684,553.00 441,154.12 11.97% TOTAL PURCHASED POWER 9,227,393.68 75,000.00 865,955.68 10.36% 8,361,438.00 149,421.09 OPERATION SUP AND ENGINEERING EXP 124,505.11 161,891.00 (37,385.89) -23.09% STATION SUP LABOR AND MISC 33,740.11 22,580.99 11,159.13 49.42% LINE MISC LABOR AND EXPENSE 142,734.23 226,727.98 (83,993.75) -37.05% STATION LABOR AND EXPENSE 124,459.16 116,245.58 8,213.58 7.07% STREET LIGHTING EXPENSE 32,132.77 25,341.08 6,791.69 26.80% METER EXPENSE 47,044.52 45,304.91 1,739.61 3.84% MISC DISTRIBUTION EXPENSE 92,930.65 114,915.99 (21,985.34) -19.13% METER READING LABOR & EXPENSE 8,302.35 8,074.68 227,67 2.82% ACCT & COLL LABOR & EXPENSE 453,439.10 431,963.89 21,475.21 4.97% UNCOLLECTIBLE ACCOUNTS 37,500.00 37,500.00 0.00 0.00% ENERGY AUDIT EXPENSE 108,009.16 155,730.86 (47,721.70) -30.64% ADMIN & GEN SALARIES 245,575.68 281,500.03 (35,924.35) -12.76% OFFICE SUPPLIES & EXPENSE 68,116.12 87,300.00 (19,183.88) -21.97% OUTSIDE SERVICES 58,231.80 144,125.00 (85,893.20) -59.60% PROPERTY INSURANCE 83,370.16 106,050.00 (22,679.84) -21.39% INJURIES AND DAMAGES 13,057.59 14,748.00 (1,690.41) -11.46% EMPLOYEES PENSIONS & BENEFITS 751,039.29 785,867.00 (34,827.71) -4.43% MISC GENERAL EXPENSE 23,296.61 72,051.73 (48,755.12) -67.67% RENT EXPENSE 41,301.75 53,001.00 (11,699.25) -22.07% ENERGY CONSERVATION 115,392.13 217,381.60 (101,989.47) -46.92% TOTAL OPERATION EXPENSES 2,604,178.29 (504,123.01) -16.22% 3,108,301.30 MAINTENANCE EXPENSES: MAINT OF TRANSMISSION PLANT 681.24 750.00 (68.76) -9.17% MAINT OF STRUCT AND EQUIPMENT 124,285.78 101,396.47 22,889,31 22.57% MAINT OF LINES - OH 333,765.41 507,967.94 (174,202.53) -34.29% MAINT OF LINES - UG 104,900.84 55,859.87 49,040.97 87.79% MAINT OF LINE TRANSFORMERS 9,608.90 75,000.00 (65,391.10) -87.19% MAINT OF ST LT & SIG SYSTEM 149,421.09 2,539.32 146,881.77 5784.31% MAINT OF GARAGE AND STOCKROOM 128,908.40 136,564.82 (7,656.42) -5.61% MAINT OF METERS 0.00 16,172.07 (16,172.07) -100.00% MAINT OF GEN PLANT 69,676.25 45,000.00 24,676.25 54.84% TOTAL MAINTENANCE EXPENSES 921,247.91 (20,002.57) -2.13% 941,250.48 DEPRECIATION EXPENSE 1,025,327.01 995,790.00 29,537.01 2.97% PURCHASED POWER FUEL EXPENSE 9,180,626.66 9,413,918.00 (233,291.34) -2.48% VOLUNTARY PAYMENTS TO TOWNS 354,000.00 361,350.00 (7,350.00) -2.03% TOTAL OPERATING EXPENSES 23,182,047.78 130,725.77 0.56% 23,312,773.55 () = ACTUAL UNDER BUDGET (12A) Tracy Schultz im: Tracy Schultz Sent: Monday, December 12, 2016 10:36 AM To: RMLD Board Members Group Cc: Jeanne Foti Subject: Account Payable and Payroll Questions Good morning, There were no Account Payable Warrant questions for the following dates: October 14, October 21, October 28, November 11, November 18, December 2. Commissioner Talbot had a question on the AP on November 4, which will be addressed in Executive Session. There was no AP on Friday, November 25 due to the holiday. There were no Payroll questions for the following dates: October 17, October 31, November 14, November 28 This message will be printed for the Board Packet for the RMLD Board Meeting on Thursday, December'15, 2016. Tracy Schultz Executive Assistant ,ding Municipal Light Department 230 Ash Street Reading, MA 01867 Tel: (781) 942-6489 Ext: 489 fU/1 ~ CQi J 5 r » y m O Y; O N N 0) U Y N O N O O J p N p w J � O U N � C n o J x 5 r,� 0 o O0, � r pppp c c n W p�p�� w � w = v p ON N W t» Y N n N 00 e J A N Q n Y S S N cn -7 N O w fU/1 ~ CQi J 5 r » y m O Y; O N N 0) U Y N O N O O J p N p w g t E Mo m g �� goo a WY N�; E i g Y Q� Y N i CO M o w V v O g J � O U N � C 0: W h to r J C g t E Mo m g �� goo a WY N�; E i g Y Q� Y N i CO M o w V v O g N � M o O N W N OCM o N W O O M N w r N to co � o V W O � O � O t0 ww O NOj N o to�� rO N o R 00 in CO K v c fill, C OI C C N p M 00 6% ww teaC4 0. O M co a C O p w rn o LO 00 Ln m t0 � O � N w �j N Y o I N c N C tQ w 0 M �p Ofo M toM � N "N cnp 00 N N M N O - mM o CV w N w O n w CL CL w 0 x 0 a CL U w � c w Se = U U w m W U.a r dao C Z U N 0: W T+ L O 0 gci = v p ON H W a' 7 O ~ • 3a O O06 N 2 S cn -7 N O C t, N N W OC U) 2 Z 0 5 r n 100, 64 2 C Y Q 2 y^ Nuj W a 0: r rc x � J b d � CL Z LU o CL o r i� O 2 Q W Z N p a C7 U a K a f U U. Uz j m UJ b ja z a N � M o O N W N OCM o N W O O M N w r N to co � o V W O � O � O t0 ww O NOj N o to�� rO N o R 00 in CO K v c fill, C OI C C N p M 00 6% ww teaC4 0. O M co a C O p w rn o LO 00 Ln m t0 � O � N w �j N Y o I N c N C tQ w 0 M �p Ofo M toM � N "N cnp 00 N N M N O - mM o CV w N w O n w CL CL w 0 x 0 a CL U w � c w Se = U U w m W U.a r dao N tD 0 0 r. � N CL C N M G O o r 0, p O N � N In N ;s GD aj u C N 6 i M o toco N M K A O OOD 00 00 G7 NN (N1 � N Z C ~ Yf _Z O N G S O n t^C OD ng ao O In a, 3 oN Y m o m O W 0 V N ao N M N N Z F Z m 3 p Q Y p N W 2 C Y LL O� Z uOf N z N W C d at wi ae H b C L W O e0 c) N W a J Y cn � n � N D) YOap7 S N M N ON N N N n J C p f E R GO < N o N o O m to O J C g 001 N p ��h} O N ON N Q O O N GO CCg a b E Ua p ~ �g 0 O o w Y 2 0 V O O W ='$Sc Q Oa 00 Vn $ w609 C04 N 0 N N C W F- p CD t00 N o F co Gp v 0 N 0 � r S$ r p NN 0 MN C7 w W K O J s S N 0 co C. h Val ZY O p g 0 O � 0 N O O NON N ON tOp W C U) Z pp C4O o 2 � C N w N a Z W n N N N N M W O 0 K D 2 � C7 Gn 7.e a a ZO o U a ~ Z ul S J N tD 0 0 r. � N CL C N M G O o r 0, p O N � N In N ;s GD aj u C N 6 i M o toco N M K A O OOD 00 00 G7 NN (N1 � N Z J Yf _Z O N G a w U O w W a, C Z Q 0Q g -W C Q U Z C W Q W W 0 V g J U J J V W Z z E ' J m Z F Z m 3 p Q Y p 3 LL.W O Y W W 2 C Y LL O� YCWQ7pa z d at wi ae t.^ ^ o g Yf O 0 � n o 0 o n 1D N ' N 0 N N GD It co Ci M ON GV ONE 0 O44 e Nw CD r O y" C N N O o LO t00 W) NC N b N •- V n e o N a e G0O r � O N N w�7 64 - `°n^'o a N C N ' N 0 GA ON C C, � N N n N N � e A co In � M N N QO N O ^ O N � N O N z z a w F S � C7 J J J a w a U W U C7 Z a W 7 a w W oJyw m 3 LL W m W 0 QO W O W O O~ O ar-aae a X VC M 0o .= O eOt Np N p N N co (D N N o � r MCO V) n ~O n N � N 0 p o OO cl 0 ,GV W 0 O 0) GV coo N N O O N 0 F- S O J CL U W M CK Q W 2 O wcc m w Y H � LL i� CL