Loading...
HomeMy WebLinkAbout2016-10-04 Historical Commission MinutesN orR Town of Reading Meeting Minutes RECEIVD TCN CLERK O,s39.1NCORpO Er1DING, MMSS. Board - Committee - Commission - Council: IUIb OEC —I p 5: 310, Historical Commission Date: 2016-10-04 Time: 7:45 PM Building: Reading Town Hall Location: Conference Room Address: 16 Lowell Street Session: Open Session Purpose: General Monthly Meeting Version: Final Attendees: Members - Present: Sharlene Reynolds Santo (SRS) - Secretary Jonathan Barnes (JB) - Member Ron Western (RW) - Acting Chair Virginia Adams (VA) - Associate Members - Not Present: Carl Mittnight - Chair Jack Williams - Member Others Present: Angelo Romano (AR) Romano Roofing Minutes Respectfully Submitted By: Sharlene Reynolds Santo Topics of Discussion: CM and JW being absent from this meeting, acting chair, RW, appointed associate member, VA to fill in as a voting member for this meeting. Mill Street — JB and VA attended recent meeting of the Conservation Commission regarding what happened at the Mill St Bridge where actions were taken by North Reading without proper notice to the town of Reading and a meeting with Reading & North Reading representatives. 32 Lincoln/Depot Shingles (AR) from Romano Roofing; shingle company representing owner of the Reading Depot who was unable to attend. The current skylights planned to be replaced. There is currently copper flashing used on the existing slate roof. Work is planned to be done in the spring. The options offered along with ballpark costs are: • Landmark Certainteed. Proposed conventional shingle give look of wood shingles, about 1/3 the cost of slate with possible life of 40-50 years per AR; not confirmed in brochure. • Highland Slate. Certainteed. Fiberglass shingle. Lifetime 50 year transferrable. Per AR possibly good for another 10 years. About $45-50k to replace. AR to check if warrantee is impacted by copper flashing. • Inspire composite slate Classic Lifetime 50 year transferrable. Per AR possibly good for another 10 years. About $70-75K. AR to check if warrantee is impacted by copper flashing. • Natural Slate $95-100k. 100 year roof. Copper flashing would increase cost about $25K. JB also mentioned the metal roof option as suggested by JW at last month's meeting. Page 1 1 RHC is considering the middle options (Highland & Inspire). AR will obtain samples of these products for review. RHC will visit site and review samples. Ron will let the town know the progress made. AR mentioned owner's intension is to perform work next spring. • 35 Scotland Rd - Jean Delios and Julie Mercier did speak to town counsel whose position is that the now demolished garage is not on the Inventory of Historical and Architecturally Significant Structure, therefore not within the jurisdiction of the Historical Commission. The Building Inspector will address the demolition without a permit as a violation of the building code. RHC has concerns about town counsel's assessment of the RHC position as the structure in questions is in fact referenced on the Inventory and where the RHC's practice has been to consider such referenced structures to be within the Bylaw. RW will contact Chris Skelly at MHC regarding how to deal with such structure. • Inventory documents: not yet copied for members; JB to follow up with CM, RHC also discussed reviewing inventory sheets to determine the best way to deal with secondary structures. Finances JB will follow up with town hall and CM regarding the current process for submitting reimbursement forms. JB will also contact CM regarding the plaque application received and clarify that procedure. Reading Street Faire Great event. RHC spoke about how to improve how we display. There were a few inquiries to be addressed. • Archives VA to follow up on inquiries received on Town Day. Minutes VA moved to approve the minutes as amended from September 7, 2016; SRS seconded; All in favor 4 - 0. Meeting Adjourned at 10 pm. Next Meeting November 15, 2016 at 7:30 pm. Page 1 2