Board - Committee - commission - Council:
Ad Hoc Library Building Commies SEP 11 )
Date: 2016-08-18 Time: 7:00 PM
Building: Reading Town Hall Location: Conference Room
Address: 16 Lowell Street Session: Open Session
Purpose: General Business Version:
Attendees: Members - Present:
Chairman David Hutchinson, Vice Chairman Rachel Baumgartner, Cherrle
Dubois, Gregory Stepler, Jane Kinsella, Nancy Twomey and Bob Newton
Members - Not Present:
Marc Mall
Others Present:
Bob Labrecque, Joe Huggins, Vicki Yablonsky, Kevin Cabuzzi, Amy Lannon,
Paula Schena and Joseph Huggins, Jr.
Minutes Respectfully Submitted By: Secretary
Topics of Discussion:
Approval of Minutes
A motion by Dubois seconded by Newton to approve the minutes of July 14. 2016
as amended was approved by a vote of 7-0-0.
Discussion /Action
Project Activity and Timeline Update - Bob Labrecque reviewed pictures of the project. He
noted that the parking lot was striped today and the plants will be tagged next week. The
AMH was installed and tested. Amy and staff will be over there training on September 15Th.
The Installation of book shelving has started.
Bob Labrecque reviewed the site photometric plan and noted the site lighting on School
Street has been checked. There are two of the 12 foot poles that are projecting more light
onto the Soucy property. It is anticipated that dimmers will be added to them. Otherwise
the worst case scenario is that they would have to retrofit them with a lower bollard base at
a cost of approximately $2,400 each. He noted that light poles are a specialty item so it is
more practical to try dimmers first. Amy Lannon noted that a goodwill effort would be to
replace them in the future and perhaps seek donations for it.
Bob Labrecque noted that the fencing will be kept up as long as possible until after the
landscaping is done. They will be relocating a tree and installing arborvitae along the east
end of the parking area. Rachel Baumgartner noted they are actually yews, not arborvitae.
Bob Labrecque noted that the bike rack was moved to the east side of the site due to
grading issues. A gate will be installed by facilities to block off access behind the fence to
address the neighbor's concerns about kids hanging out in there. Trumpet vines will be
planted to cover the back side of the fence so the neighbor won't have to look at it. It was
noted that changes were made to address the neighbor's concerns.
Page I 1
Ad Hoc Library Buildina Committee Minutes - Aucust 18. 2016 - page 2
Bob Labrecque noted that the millwork is limping along. He is holding $175,000 in the
requisition for the balance of the millwork. The carpeting is nearly completed. Installation
of the resilient Flooring has resumed. They have started installation of the porcelain pavers
but there is an issue with the sub straight in the reception area. An anti -fracture
membrane is required to be installed over the wood subfioor by the manufacturer under the
porcelain pavers. Interior painting continues and drywall is coming to a close. Doors and
hardware have been installed except for three that will be installed on Monday. The
elevator was tested and inspected on Tuesday. They are working on the emergency phone
system. Internet access is now live in the building and the HVAC work is nearing
completion. The Fire Department tested the fire alarm system and has required adding two
horn strobes.
Bob Labrecque noted that the Engineer started the punch list on the MEP system. Water
was tested today. There HVAC systems are required to be operational before the Engineer
will sign off. He expects the structural affidavit on Tuesday. The Library signage is due to
start next week. The temporary C of O is anticipated on August 301h.
David Hutchinson asked if the shelving needs to be completed to get in and Bob Labrecque
noted the second Floor does because it has the lighting that is integral with it. Certain desks
such as the reception, reference and self check are required to be installed and in place as
they have electrical in them. He has advised the contractor that he can work 24/7 yet they
all leave at 3:30 every day.
David Hutchinson asked if there are any charges for furniture storage and Bob Labrecque
noted there is but it is minimal. David Hutchinson asked if we can bring the balance of the
furniture in and Bob Labrecque noted no, it Is safer in storage.
Budoe[ - Bob Labrecque noted that there has been an uptick on changes. The final
projected cost within this budget update is a $67,000 overrun at the present. The
contractor remains to provide backup to close out a significant number of changes. It was
noted that the majority of the change work is however completed.
Amy Lannon asked about the builders risk insurance and Bob Labrecque noted we need
substantial completion by September 8, 2016 as the policy ends on that date. The "hot
work" is done and the risk is minimal to the building at this point In time. The gas service Is
hooked up and the boiler is working.
David Hutchinson asked about a water stain on the ceiling and Bob Labrecque noted that
there were a couple of leaks In the sprinkler lines when they were charged. Ceiling tiles shall
be replaced.
Rachel Baumgartner asked if the millwork gets done in the shop or onsite and Bob
Labrecque noted that the majority is done in shop. He advised Delphi 15 months ago to
replace the millworker and they elected not to replace them. Delphi has three carpenters of
their own on site and anticipates that they will need to start installing millwork for their
subcontractor.
Vicki Yablonsky noted that the elevator was not outfitted to lock down certain Floors at night
and Bob Labrecque assured her that will be done. A quote has been requested from the
elevator company. Vicki Yablonsky noted that they must have that because they cannot
have night meetings without it.
David Hutchinson asked if the change order metric is high and Bob Labrecque noted it is
high. Vicki Yablonsky asked if It is high for an old building and Bob Labrecque noted it
usually is 8 - 10% and we are at 15% but some are owner driven. In the end we want a
good value.
Page 1 2
Ad Hoc Library Building Committee Minutes - August 18 2016 - oaae Q
Rachel Baumgartner asked if there will be any project energy savings and Bob Labrecque
replied no. He noted that the exterior walls in the old building do not have insulation as the
brick walls need to dry from the inside out during the winter months otherwise brick would
spauld and crack. Joe Huggins noted the energy costs will be higher because even though
they are using energy efficient lighting, there is more lighting.
David Hutchinson noted that the next meeting will be on September 15, 2016.
Amy Lannon noted she is setting up tours the week of September 15th for abutters, press,
Board of Selectmen, Finance Committee, etc.
Bob Labrecque noted he is looking at a September 26 - September 28 opening.
A motion by Baumgartner seconded by Twomey to adjourn the meeting at 8:10
p.m. was approved by a vote of 7-0-0.