Loading...
HomeMy WebLinkAbout2016-06-30 RMLD Board of Commissioners Minutes� or Town of Reading 4S Meeting Minutes �a Board - committee - Commission - Council: RMLD Board of Commissioners Date: 2016-06-30 Building: Reading Municipal Light Building Address: 230 Ash Street Purpose: Public Meeting Attendees: Members - Present: Time: 7:30 PM RECEIVED TOWN CLERK READING, MASS. Ali OCT 25 A 41111 Location: Winfred Spurr Audio Visual Room Session: Open Session Version: Thomas O'Rourke, Chairman Philip Pacino, Vice Chairman David Hennessey, Commissioner John Stempeck, Commissioner -Secretary Pro Tem David Talbot, Commissioner Members - Not Present: Others Present: Staff: Coleen O'Brien, General Manager Bob Fournier, Accounting/Business Manager Hamid Jaffari, Director of Engineering and Operations Jane Parenteau, Director of Integrated Resources Jeanne Fob, Executive Assistant Climate Action Committee: Ron D'Addario, Chair Ron Porter, Member David Zeek, Member Jeffry Emerson, Associate Member Gina Snyder, Associate Member Public: Mark Dockser Peter Lydecker Michael T. Smerczynski Minutes Respectfully Submitted By: John Stempeck Topics of Discussion: Call Meeting to Order Chairman O'Rourke called the meeting to order and stated that the meeting was being videotaped, it is not a live broadcast. Alexander will be this evening's videographer. Chairman O'Rourke welcomed him and thanked him for his service. Viewers can check at www RCTV.ore for more information and replay times. This meeting will also be played on YouTube tomorrow. The meeting is also being videotaped for distribution for community television stations in North Reading, Wilmington and Lyn diield. Page I 1 Introductions ..i Chairman O'Rourke read the RMLD Board of Commissioners Code of Conduct Chairman O'Rourke acknowledged and welcomed Mark Dockseq Ray Porter, Peter Lydecker, David Zeek, Jeffry Emerson, Ron D'Addario. Chairman O'Rourke thanked them for their participation. Chairman O'Rourke stated that there will be no CAB representation at the meeting this evening. d ' Chairman O'Rourke stated that Mr. Hennessy needs to leave early due to a previous engagement. Report of the Board Committee — Mr. Hennessy Policy Committee Mr. Hennessy reported that the Policy Committee met before the RMLD Board meeting and will be voting on new draft policies soon. Report of the Chairman of the Board General Manager Vehicle Allowance This was discussed at the General Manager Committee meeting on October 20, 2015, vote is required. Chairman O'Rourke reported that the General Manager Vehicle Allowance will be taken out of order. Chairman O'Rourke explained that the General Manager's agreement includes an opportunity for a vehicle to use. Evaluation of the costs and adminiytration consistent with what other businesses are doing has been performed. The cost and benefit analysis and the benefit to the RMLD<as well as the General Manager were evaluated. The analysis demonstrates a break even whether there is a vehicle provided by the RMLD or vehicle allowance. By surrendering a company vehicle, it will free up a vehicle for/organization use. The arrangement provides for a fixed monthly allowance that is all inclusive of operating expenses, insurance as well as the cost of maintenance for the vehicle. Mr. Talbot added that this would be approximately 18,000 miles at the federal rate. When all else is added the allowance is on track. Chairman O'Rourke said that after a yew the General Manager will have an option of a company vehicle and the General Manager can then opt out for an RMLD vehicle. Mr. Pacino made a motion seconded by Mr. Talbot that the RMLD Board of Commissioners propose to the General Manager an amendment to the Reading Municipal Light Department General Manager Employment Agreement, dated lune 26, 2013, which will give the General Manager the option, exectimble in her discretion, to receive a monthly vehicle allowance of $800.00 for a 4 wheel or all -wheel drive vehicle, which amount would also cover capital, operating, maintenance and insurance expenses. Motion carried 5:0:0. Mr. Hennessy left the meeting at this point Fiber Optic Committee Meeting Chairman O'Rourke reported that the Fiber Optic Committee needs a vote to be taken to reinstate the committee. The committee has been spending time analyzing the opportunities the fiber optics have for the RMLD. Mr. Talbot reported that the members am Mr. Patina and Mr. Talbot and polled any other Board members that have interest in the Fiber Optic Committee, in which there was none. Mr. Talbot stated that the Fiber Optic Committee has had a couple of meetings and discussed having a small trial to explore what the costs would be to provide high cost speed services to businesses in Wilmington. It is a small contract in which there am some questions about, how to perform the quick and dirty analysis. Mr. Talbot added that the Fiber Optic Committee should reconvene for one meeting on how to finalize the questions on one small exploratory trial. Chairman O'Rourke said that he would like the Fiber Optic Committee to look at the feasibility and may need a more robust survey that includes the other towns. Ms. O'Brien said that she and Mr. Jaffati have a little bit of concern about what the scope is. What was identified in the scope in the Fiber Optic Committee, she is not sure if that was conveyed properly to the potential consultant. Ms. O'Brien said that when this committee reconvenes, what we want to get out of this, the small test was Ms. O'Brien stated that she has no problem implementing it, there were changes in the scope. Ms. O'Brien would like to clarify with the committee to see if this what they want. Mr. Talbot said that this can be handled at the committee meeting. Mr. Pacino made a motion to reinstate the Fiber Optic Committee seconded by Mr. Stempeck with a mandate that it make a report back to the Board by the September meeting after which it will expire. Motion carried 4:0:0. Page 1 2 Public Comment Chairman O'Rourke said that the Climate Action Committee is present and can now speak There will be a presentation on solar, he does not want to take away the option. Mr. Talbot commented if there could be give and take with members of the community during that presentation which could serve as a time to communicate. Ms. Snyder stated that she is an Associate Member of the Climate Action Committee and is very excited to hear what Mr. 011ila has to say and the Climate Action Committee is excited about this concept and the presentation. Chairman O'Rourke polled those present for any other comments, there were none. Report RMLD Board Member Attendance at RMLD Citizens' Advisory Board Meeting Vice Chair Pacing attended the CAB meeting on June 1, 2016. Mr. Pacing reported that he attended the CAB meeting on June 1, 2016. The community solar update and the RMLD's Electric Service Policy and Requirements Handbook were presented. Alan discussed was the Annual NEPPA Conference attendance. There was discussion on the generator project in North Reading in terms of what the town is looking for such as the paving of the driveway which is an open discussion with the Department. Chairman O'Rourke asked RMLD Board Commissioner, Mr. John Stempeck to act as Board Secretary for this evening's meeting. RMLD Citizens' Advisory Board Chairman O'Rourke stated that them was no RMLD Citizens' Advisory Board member present. Chairman O'Rourke pointed out that the CAB has representation from each town RMLD serves. The CAB attends RMLD Board meetings and the RMLD Board attends the CAB meetings. Mr. Pacino said that the CAB inquired if there is a Reading representative on the CAB. Mr. Pacino pointed that Mr. Mancuso recently left the CAB. Ms. O'Brien explained that the CAB representative is appointed by the Board of Selectmen. The RMLD will check into this. General Manager's Report — Ms. O'Brien Ms. O'Brien reported that National Public Power Week is the fust week of October. The RMLD will be having its Open House. All employees will be participating in the design of it this year. A couple of years ago, the RMLD had more of a line construction tangible displays. Last year was more of an internal educational displays with a big top theme. Weare looking for a theme. The theme of the annual report is going to be `shave the peak' with artwork at the Open House. Ideas such as shave the beard or the Italian ice for children. Any ideas can be brought forward. Charman O'Rourke said that it is a great event. Ms. O'Brien added that last year there were the electrical can. Maybe them can be solar panels displays as well as a local band. Mr. O'Brien said that when Mr. Fournier reports on the Financials, the auditors were in and the physical inventory has been completed. Power Supply Report — March and April 2016 — Ms. Parenteau (Attachment 1) Ms. Parenteau reported that she will be presenting the March and April 2016 purchase power. Kilowatt hours purchased from March 2012 to March 2016 show that there was a significant decrease this past Much, a 7.2% reduction in kilowatt hours purchased. On the preliminary side for the fiscal yew with some preliminary estimates for May and June, RMLD's annual sales are down a little less than 3%. The RMLD forecasted had anticipated a 1% decrease it is 2% higher than projected. RMLD's energy cost for March ranges to a little under 60 which occurred in 2014 to a low of 40 which occurred this past March. Costs have been coming down which is reflected in a lower Fuel Charge which is assigned to customers only a monthly basis. Transmission for March is increasing steadily which the RMLD has spoken about in many meetings. Transmission is expected to increase on a range from 6% to 10% annually. March 2012 to March 2016 there is slight variation, but the trend is upward in terns of transmission costs which is passed to the customer. The month of April reflects the that quarter of the calendar year or the third quarter of the fiscal year. Energy, capacity and transmission costs are reflected on a quarterly basis. As typically occurs in New England because of the central gas constraint, RMLD's energy costs are high in the winter period (January to February). As the RMLD gets into warmer weather those costs tend to decrease significantly in March and April. Page 1 3 Power Supply Report—March and April 2016—Ms. Parenteau (Attachment 1) Capacity costs are $ L4 to $ L6 million monthly. These costs are consistent over the first quarter. Transmission for the first quarter, it fluctuates based on the peak demand, the rate is steady with the range of $834,000 with a high of $996,000. Mr. Stempeck asked the if there is a root cause for the transmission costs are going up. Ms. Parenteau responded that the transmission is socialized in the New England region. The ISO implements that through a regional network service charge or an RNS charge. As transmission companied build more transmission all the ratepayers in the New England region absorb that cost. Ms. Parenteau pointed out that the RMLD is fighting these costs at the FERC on the return that transmission companies are able to earn which are in excess of 11% to 12%. The RMLD has been working with its legal counsel to try to get this adjusted to a more reasonable rate, 10% to 11%. Chairman O'Rourke stated that he wanted to acknowledge the interest, commitment and passion of the Climate Committee. The work they are performing is value added for the community and environment at large. Chairman O'Rourke stated that any information or suggestions will be acknowledged, brought forward. At the conclusion of the meeting there can be a separate focus discussion. Community Solar Update — Mr. 011ila Mr. 011ila thanked the Board for the opportunity to provide an update on the community shared solar efforts. Mr. 011ila said that this has taken longer than initially anticipated; we have been working on this for well over a year. It has gone through several iterations since inception. Mr. 011ila said that now the RMLD has a strong viable program which we are ready to launch. After the meeting, assuming that the Board gives the final go ahead, we can then publicize the program. Chairman O'Rourke asked if the slides would be available. Mr. 011ila responded yes, and he has provided the same presentation at a recent CAB meeting as well as to the Reading Climate Advisory Committee (CAC) a week ago. Mr. 011ila said that the program will be called Solar Choice. Solar Choice is RMLD's implementation of the more general concept, community shared solar. The community shared solar concept has been around five to ten years. This concept is relatively new in Massachusetts, but several communities and ad hoc groups have had success with community solar projects. One of the recent RMLD milestones was getting approval from Massachusetts Department of Energy Resources (DOER), who reviewed RMLD's implementation of the program and certified die RMLD does meet the guidelines of community shared solar. Mr. 011ila said that the certification from the DOER is economically valuable for rooftop applications, it dramatically increases the value of the SRECs. A solar PV system's SRECs are normally categorized at .9, but if the same system is deemed community solar it is 1, an extra 10% of the SREC value. This is additional value that helps to pay for the program and allows the cost savings to be passed on to the end users. Mr. 011ila said that the fust step in Solar Choice is that the site owner and RMLD select a developer to finance, engineer, procure, construct, own and operate the system. The army itself is owned and operated by a private developer. The RMLD negotiates the PPA with the developer, approves the system specs, the interconnect and then RMLD solicits residential customers to join the program. One of the requirements of DOER is that this has to be an "opt in' program. The main advantage of having the system privately owned is that it allows the private developer to take advantage of the various federal and state tax incentives. The RMLD as a municipal entity would not be entitled to these tax incentives. Mr. Talbot said that it states that the facility is privately owned, but also states a privately owned site. Mr. Talbot asked if the site is in Wilmington. Mr. 011ila responded that the RMLD does have a specific site in mind for its fust project which is on a private building in Wilmington. A PPA was negotiated with that developer who will make lease payments to the site owner. Mr. 011ila explained that the RMLD's original intent was to work with the towns and build a system like this on a town building. For many reasons it was not a good time and fit for the towns the RMLD spoke with. During the evolution of the program, the way it was structured was no different for the RMLD whether it was private or public. Mr. Talbot stated that the difference is if it is on a town site, the town receives the lease payment, and the town receives the revenue. Mr. 011ila replied that is correct. Mr. Talbot asked who decided at the town level not to do that. Mr. 011ila said that it is up to the town manager, facilities manager and/or whoever is taking leadership in the project for the town. Mr. Talbot asked if this would involve Town Meeting. Mr. 011ila said that he does not believe that Town Meeting needs to vote this, only notification. Mr. Pacino pointed out this would not go before Town Meeting unless the town was borrowing money for this project. RMLD did not have to go through an RFP process because it is not purchasing any hardware. It was a private developer that approached the RMLD. Mr. Talbot asked what the lease payment amount is. Mr. 011ila responded that recent market prices for such leases have been in the range of $15,000 to $30,000 per megawatt. Mr. 011ila said that it is a lease payment and that the property owner does not own the solar project's SRECS. All the power goes into the RMLD grid. Mr. Talbot asked if a town had Page 1 4 Community Solar Update — Mr. 011ila five acres of land a town entity could receive a six figure revenue from the lease of the site in theory. Mr. 011ila said that the way the program is structured there is no difference whether the site owner is private or the town, they would both receive the same benefit. For the project in Wilmington, the town will receive a personal property tax on the equipment. Mr. Patin asked what would that amount might be. Mr. 011ila responded that tax is typically in the range of —1% of the value of the solar PV system, or approximately $5,000 to $10,000 =natty for systems of this size. Mr. Talbot asked if that is a Wilmington specific thing. Mr. 011ila responded that it would be specific for each town and their tax assessing department. Mr. Talbot stated that hypothetically if Jordan's and Home Depot installed a solar PV system, then in theory Reading could receive that rax revenue. Mr. Paciao pointed out that the capital can be put out by the private developer. The towns may not have the capital for such projects. Mr. 011ila said that for the RMLD site in Wilmington, the site owner receives a lease payment for renting their property. This initial phase of Solar Choice will be limited to the first 500 RMLD residential customers to sign up. It is an opportunity for our customers to benefit from clean, renewable solar energy who may not have the capital or their home is not optimum for solar. The major economic benefit is that it is a fixed price hedge for the long term. The solar contracts are for twenty years with the hedge over inflation a major advantage. The town of Wilmington will receive a property tax payment. The direction from the Board is to increase RMLD's renewables and this project will assist in achieving that The participant fee is estimated to be approximately $6/month. In year two it is estimated that they will also start to receive $9/month in credits, which yields a net savings of —$3/month. A typical residential electric user will save approximately $300 over ten years. Mr. Stempeck asked if the ten-year savings is inflation adjusted. Mr. 011ila said that yes, inflation escalators were added to the Fuel Charge rate. What the residential customer will be doing with this program is paying the premium cost based on the difference between the PPA rate and the Fuel Charge rate. The program stands on its own and is not subsidized by residential customers not in the program. From the RMLD's standpoint it is revenue neutral. Mr. Stempeck asked if this shaves the peak Mr. 011ila responded that this will shave the peak Also a consideration is the increase in SRFC value because it is a communitysolarproject. The economic benefit is in the savings in capacity and transmission. Mr. Stempeck said that this does not stop in ten years. Mr. 011ila explained that the PPA is for twenty years. Mr. 011ila said that the RMLD is thinking of making the program enrollment for ten years, but with the option to continue after the initial ten-year period. The RMLD's intent is to have 500 customers sign up with others on a waiting list. Mr. 011ila said that the RMLD plans to end the Green Choice program which consists of 150-200 customers will be able to replace it with this Community Solar program. Mr. D'Addarfo said that he is the Chair of the Reading Climate Advisory Committee (CAC) for a short time, since his term expires this month. Mr. D'Addario said that he is totally behind the Community Solar program and solar coming to the RMLD. Mr. D'Addario added that Mr. 011ila made this presentation at a recent CAC meeting. Pan of the savings with solar is emissions. When we look at global warming. The state has mandated to reduce the carbon emissions 25% by 2020. The cost of solar has come down exponentially. Green Mountain Power is selling Tesla batteries for homes in Vermont as backup or can be used to shave the peak. In five years, someone with solar mould use battery storage and be independent from a utility. Mr. D'Addario stated that the utilities in New York and Massachusetts are trying to decouple the way they make money away from selling kilowatt hours, capacity and transmission. The CAC is questioning how we reconcile it; we are all on the same page. Global warming indicates that something is going on worldwide. New York has a system where it is performance based, not based on the kilowatt hours sold, but on distributed energy. Mr. D'Addario said that the CAC asks itself how do we begin with Community Shared solar so it can be implemented. Mr. D'Addario stated that our salvation is going to be energy conservation, solar, wind and geothermal. He would like to we that paradigm shift with community solar. As solar rates come down it could be less expensive thea fossil fuel. Mr. D'Addario said that he would like to we the RMLD be the champion of residential solar, the quicker the better. Mr. Talbot thanked Mr. D'Addario for his statement and his commitment w the community. The fundamental conflict comes back to organizations such as the RMLD where the business model is to sell electricity and that is in conflict with the societal need. A lot of carbon emissions are attributable to electricity generation. It is a tough problem, state and federal policies need to help to make those economics work. Mr. Talbot said that he is been in touch with Concord Municipal Light Plant for a study he is performing. They have the most sophisticated municipal smart grid in the state. They have put out a request for proposal for strategic planning consulting services which dovetails, as a public power entity CMLP, embraces its responsibility to serve the public interest recognizing that public interest imperative to protect our current and future customers from the profound consequences of climate change. Simultaneously we wish to continue our proud tradition of meeting our customers' needs at the highest quality of services in order to achieve both these goals. In the second century of their operations they want to change their business model, structures, policies and procedures, infrastructure, power supply, services, communication practices, Page 15 Community Solar Update — Mr. 011ila rates and strategic partnerships. Mr. Talbot is following that process and hopefully bringing that into Reading. There is one municipal out there that is going forward with this and they have a fiber structure tore that can enable the communications and rapid movement of power. If a home generates more than it uses, it needs a two-way meter. If you are storing it, you need two-way communication to the storage medium Mr. Talbot said that Mr. Jaffari is working on how RMLD can do this. The RMLD does not have a smart grid infrastructure in Reading. Mr. Talbot stated that as a board these topics can be advanced. Mr. D'Addario added that he would like to we the RMLD be part of the installation and ownership of solar. Mr. D'Addario commented that there are solar companies that have failed, but if RMLD were to sell solar, reat the batteries it bas cache within the community. There would be no concern of RMLD going bankrupt. Chairtm n O'Rourke thanked Mr. D'Addario. Mr. Talbot added that the RMLD has a great new initiative to shave the peak. It is a big effort by the Department to shave the peak which can be done in the near term. Mr. Stempeck stated that found in Consumer Reports this month there is an article that has a very good analysis of the cost of residential solar. Mr. Zeek will soon be replacing Mr. D'Addario as Chair of the CAC. Mr. Zeek said that as a resident of Reading he is pretty excited with RMLD's solar project and would like to subscribe m it. He hopes this is the first of several that the RMLD installs. Also, use solar for shaving the peak. Mr. Zook stated that he was impressed with Mr. 011ila's presentation when he came to the CAC meeting. Mr. Zeek said that he is a little disappointed that the first installation is not Reading. He hopes the second solar installation is not too far behind. As a member of the CAC, he would like to echo some of Mr. D'Addario's comments. The CAC is also looking at its own action plan for the fume. For the CAC to be effective it has to align with Reading as well as the RMLD. It will only work if it is a partnership. What they would like to pursue with the RMLD is that the RMLD become more of a service partner with its customers, not just a supplier of electricity, but a supplier of electric services. Light bulbs and water heaters are good that also cut the demand. If one of RMLD's customers purchases an electric vehicle and charges it at home that will require 300 kilowatt hours per month. Mr. Zeek added that Mr. Porter added a heat pump, but increased his energy usage by 400 kWhs/month. It is doubling their usage. RMLD could be leading that charge with its business model to make it notjust a supplier, but a partner. Mr. Talbot asked if there are rebates for a ground source heat pump. Ms. Parenteau reported that the RMLD has rebates for electric vehicle charging stations, RMLD will pay up to half the cost of the charging station including installation capped at $1,500 per installation. On the geothermal side, the RMLD has a rebate that will pay up to $4,500. Mr. Talbot asked how many customers have availed themselves of the heat pump. Ms. Paremeau reported that less than ten customers have. Mr. Talbot clarified is that for the whole history of the rebate. Ms. Primmeau responded that is correct Mr. Zeek said that it would be good to have a charging station downtown. Ms. Parenteau said that charging stations have been put in the capital budget for the next four years. Mr. Talbot said that the CAC does not need the RMLD's approval to promote these programs because they reduce carbon emissions. It would be good if there were advocates for this technology. Mr. Zeek said that their committee wants to promote these things with RMLD's participation. Mr. Zeek said that a municipal entity has the power to do things on its own that are optimal for the local businesses, communities and customers. Mr. Porter said that he has the heat pump at his residence. The value of that is the power he draws from RMLD that is from renewable sources. He has given up fossil fuel at his residence. It is a win-win to put in a ground source heat pump when the energy that comes from the utility is from a renewable energy source. Mr. Porter stated that he and Mr. Zeek will be making a presentation on RCTV. Do consider the CAC as a voice for the projects. Chairman O'Rourke stated that he appreciates all the feedback On behalf the commissioners, he thanked the committee for all the input. Mr. Dockser asked about the Reading sites, has Mr. 011ila surveyed sites that would be possible and revenue generated. Mr. 011ila explained that over the course of the last year and a half he has met with the town manager, facilities staff, there at least three easy sites that can be in Reading. Every project is a mix of potential, investment and logistics. The first project should be a "showcase", but a strong mix of attributes did not emerge for any of the town projects. Mr. 011ila explained that the combination of roof top and canopy for the Reading high school could supply as much as 1.3 megawatts of solar output and could potentially generate approximately $30,000 to $40,000 of lease revenue for Reading. The town is not buying anything. They are allowing for the use of their space. Mr. Dockser clarified that the risk is owned by the private group. Mr. 011ila said that is correct. The liability and insurance is on the developer who also signs the PPA. The developer only gets paid if they deliver power. The impems is on them to keep the system working as efficiently as possible. Page 1 6 Community Solar Update — Mr. 011ila Chairman O'Rourke thanked Mr. 011ila. RMLD Electric Service Policy and Requirements Handbook—Mr. Shah Mr. Shah reported that the he has been working on developing the RMLD Electric Service Policy and Requirements Handbook with a team of RMLD employees. This handbook is a tool not only for RMLD employees, but customers as well. This will be available on RMLD's website and is a searchable PDF. It will be reviewed every two years or if standards or practices needs to be updated. The handbook contains such items m temporary electric services. Chairman O'Rourke asked does the Handbook have any relation to the Terms and Conditions. Ms. O'Brien said that the Terms and Conditions are the contract between the RMLD and its customers that are taking service. It is not an overlap, but filed RMLD rates and Terms and Conditions are found in the Handbook. In addition, the scheduled referenced in the Terms and Conditions fee schedule has been added to the Handbook and kept a prevailing wage. As Mr. Shah stated, this is intended to be a mechanism for RMLD's customers and internally for consistency, how does the RMLD operate? How do you get a service connection? Ms. O'Brien pointed out over the last one hundred years there have been handshakes, but this brings everything together for consistency and safety when operating an electric utility. Chairman O'Rourke thanked Mr. Shah. Engineering and Operations Report—March and April 2016—Mr. Jaftari (Attachment 2) Mr. Jaffari reported on the Engineering and Operations report for the months of March and April. On the capital improvement projects for March and April there was substantial completion on projects. Routine construction the yew to date monies spent were $1,288,977. Routine maintenance there have a number of maintenance improvements initiated to improve the assets at RMLD. For the Transformer Replacement program padmount 17% and overhead 13% replaced. Pole inspections, 169 poles replaced, 94 the transfers have been completed by the RMLD. Visual inspection of overhead lines is performed to identify potential problems or failures have been completed on twenty-one circuits. Manhole inspections 277 have been inspected. Porcelain cutout replacements 91% complete with 257 remaining to be replaced. Tree trimming trimmed are as follows: March— 268, April — 160 and year to date 2,281 spans. Substation maintenance on a monthly basis this is performed. In April and May there were no hot spots found. The BUILD owns approximately 16,000 poles, 50% owned by RMLD and 50% by Verizon. The custodial (who maintains the poles) of the poles in Reading it is split, North Reading, RMLD, Lynnfield, Verizon and Wilmington, Verizon. Lynnfield four transfers, Reading forty-eight transfers, North Reading eighteen transfers, one set pole and forty-six pole removals, Wilmington, forty-three transfers, four poles pull and one guy wire installation. The reliability indices SAIDI, CAIDI and SAIFI we well below regional and national average. The outage causes 37% equipment, 30% trees and 20% wildlife. Financial Report—March and April 2016—Mr. Fournier (Attachment 3) In the absence of Ms. Markiewicz, Mr. Fournier will be presenting the Financial Report. Mr. Fournier reported that he is presenting the April Financials prepared by Ms. Markiewicz. The change in Net Assets for April which represents the first ten months of the fiscal yew, $1.1 million over budget expectations, the main factor driving that is Base Revenue is up by $244,000, Operating Expenses are down $232,000. A big piece of this is Energy Conservation is down $193,000, legal $87,000 monies not spent yet or a timing issue. The Maintenance is down $566,000 which has due with projects not started or in the case of the hazardous material there have not been any major spills, representing a cost savings of $200,000. Base Revenue is up $244,000 compared to budget. Kilowatt how sales are down 11 million compared to last year's actual, the rate increase help offset some of the decreasing kilowatt sales. Purchased Power Fuel and Purchased Power when compare budget to actual we close to what was budgeted. The Operating and Maintenance expense the savings were Energy Conservation below budget at $193,000. The RMLD uses this money for the customers for conservation programs. Transformers $200,000, Tree Trimming $200,000 no major events or storms. Legal is down $87,000. Cash is at $35 million which a little mom than a third represents the operating fund. Mr. Fournier said that Ms. O'Brien stated the auditors were out earlier this week. Inventory was counted over the weekend. The auditors tested the inventory and came up with the same number as the employees submitted. The auditors will be out again in the beginning of August. Page 1 7 Financial Report—March and April 2016—Mr. Fournier (Attachment 3) In the absence of Ms. Markiewicz, Mr. Fournier will be presenting the Financial Report. Mr. Fourier stated that Mr. Stempeck asked for ratios and bad debt analysis. Mr. Fournier called four other utilities and obtained their Department of Public Utilities report. RMLD's percentages are in line with other few utilities. The net income does not represent the eight percent retain. RMLD is the largest of the fora benchmarked. On the bad debt expense it looks like it represents 2/10 of 1% of the operating revenue whereas the RMLD is a.1%. Some of the utilities had just changed thew bad debt policy and increased significantly because they were cleaning it up. It takes one large commercial customer going bankrupt to skew the numbers. RMLD's five-year average for bad debt is $64,000. It is due to the tremendous work of the credit and collections performed at the RMLD. Chairman O'Rourke congratulated Mr. Fourier for all his support at the RMLD. Chairman O'Rourke wished Mr. Fournier a happy adventured in his retirement. Mr. Fournier stated that it has been a wonderful experience and a privilege to serve our customers for the twenty-seven years he has been at the RMLD. Chairman O'Rourke noted that he received an e-mail from Town of Reading Executive Assistant, Paula Schema, that last year the Board of Selectmen formed 'Reading 2020 working groups' to begin work on a five-year planning exercise for the town. The Board invites you and yew board/committee to attend the joint Selectmen/CPDC Zoning Charette on Tuesday July 19, 2016 at 6:OOpm at the Pleasant Street Center. This important community discussion will help shape the downtown and other areas of Reading as we all look ahead to the year 2020 and beyond. General Discussion Them was none. BOARD MATERIAL AVAILABLE BUT NOT DISCUSSED E -Mail responses to Account Payable/Payroll Questions Rate Comparisons, April and May 2016 RMLD Board Meetings Thursday, July 28, 2016 Thursday, August 11, 2016 No Board meeting in August. RMLD Board Policy Committee Meetin To be determined. CAB Meetings Wednesday, July 13, 2016 Executive Session At 9:45 p.m. Mr. Pacino made a motion seconded by Mr. Stempeck that the Board go into Executive Session to approve the Executive Session Meeting minutes of January 28, 2016, discuss strategy with respect to collective bargaining and return to Regular Session for the sole purpose of adjournment. Chairman O'Rourke called for a poll of the vote: Mr. Pacino, Aye; Mr. Talbot, Aye; Chairman O'Rourke, Aye; and Mr. Stempeck, Aye. Motion carried 4:0:0. Adjournment At 10:10 p.m. Mr. Pacino made a motion seconded by Mr. Stempeck to adjourn the Regular Session. Motion carried 4:0:0. A We copy of the RMLD Board of Commissioners minutes as approved by a majority of the Commission. John Stempeck, Secretary Pro Tem RMLD Board of Commissionera Page 18 0 4b u L m O ul 1.0 ri O N O M G1 c 0 L 0 0 0 8 8 0 8 8 0 8 0 8 0 0 0 0 8 8 O O O O 0 0 0 0 O o C; O eLA s m m o � o N L!1 0 O � N O O p O ^' N O N tvl O p O ^' N ti V O O N ° -J N V) O u° O m u • V1 L '' kn° r6 N E Ln C: ° N r N N 0 N O O O O O O « O O O O O O N N N 1R 1R M Ul N O O O O O O O O O O O O O O O O O O O O O O O O LQ O O Ln O M M N N r N bq tq Q W LA O v C- 0 Ln Ln E Ln ro L L L ro Z) a a-1 Ln H 0 0 N s co H m co w O 0 0 0 0 0 0 0 0 0 0 0 0 O O Gl H O 0 0 0 0 co «n 0 0 0 0 To: Coleen O'Brien �1 From:���taureen McHugh, Jane Pazenu Date: May 11, 2016 Subject: Purchase Power Summary - March, 2016 Energy Services Division (ESD) has completed the Purchase Power Summary for the month of March, 2016. ENERGY The RMLD's total metered load for the month was 54,319,434 kWh, which is a 7.80% decrease from the March, 2015 figures. Table 1 is a breakdown by source of the energy purchases. Table 1 Repperell, Womnoco,lndian RWa,rurnWFalls,Colllns, Plooear,f slery Mills, Summlf Hydro % of Amount of Cost of Total Total $ Sas a Resource Energy Energy Energy Costs % (kWh) ($INTM) Millstone R3 3,698,112 $6.71 6.77% $24,814 1.15% Seabrook 4,914,639 $2.32 8.99% $11.396 0.53% Stonybrook Intermediate 105,622 $311.82 0.19% $32,935 1.53% Shell Energy 7,467,780 $63.61 13.66% $475,056 22.10% NYPA 2,556,843 $4.92 4.68% $12,580 0.59% ISO Interchange 4,772.022 $37.52 8.73% $179,037 8.33% NEMA Congestion 0 $0.00 0.00% -$580,173 -26.99% Coop Resales 11,193 $154.28 0.02% $1,727 0.08% BP Energy 7,581,500 $46.90 13.87% $355,572 16.54% Hydro Projects' 6.700,842 $91.06 12.26% $610,190 28.39% Braintree Walson Unit 717,712 $60.62 1.31% $43,508 2.02% SaddlebaddJedcho Wind 1,945,241 $99.75 3.56% $194,029 9A3% One Burlington Solar 270,154 $70.00 0.491/6 $18.911 0.88% Eselon 13,891,850 $54.92 25.41% $762,986 35.50% Stonybrook Peaking 28,103 $242.24 0.05% $6.808 0.32% Monthly Total 54,661,613 $39.32 100.00% $2,149,376 100.00% Repperell, Womnoco,lndian RWa,rurnWFalls,Colllns, Plooear,f slery Mills, Summlf Hydro Table 2 breaks down the ISO interchange between the DA LMP Settlement and the RT Net Energy for the month of March, 2016. Table 2 MARCH 2016 ENERGY BY RESOURCE Exelo Saddleb 2 20, 4 BELC • Stonybrook Peaking, 0.05% • One Budingtan Jericho Wind. 1.30% ui,, n crwc ' Stonybrook Intermediate, 0.19% Amount Cost %of Total Resource of Energy of Energy Energy (kWh) ($/Mwh) ISO DA LMP • 14,698,542 $23.75 26.89% Settlement RT Net Energy" -9,926,520 $37.50 -18.16% Settlement ISO Interchange 4,772,022 $26.65 8.73% (subtotal) ' Independent System Operator Day -Ahead Locational Marginal Price " Real Time Net Energy MARCH 2016 ENERGY BY RESOURCE Exelo Saddleb 2 20, 4 BELC • Stonybrook Peaking, 0.05% • One Budingtan Jericho Wind. 1.30% ui,, n crwc ' Stonybrook Intermediate, 0.19% CAPACITY The RMLD hit a demand of 94,617 kW, which occurred on March 3, at 7 pm. The RMLD's monthly UCAP requirement for March, 2016 was 224,695 kWs. Table 3 shows the sources of capacity that the RMLD utilized to meet its requirements. Table 3 Source Amount (kWs) Cost ($BrW-month) Total Cost $ %of Total Cost Millstone #3 4,950 30.81 $152,510 9.97% Seabrook 7,910 38.54 $304,830 19.92% Stonybrook Peaking 24,981 1.97 $49,221 3.22% Stonybrook CC 42,925 6.72 $288,406 18.85% NYPA 4,019 4.19 $16,834 1.10% Hydro Quebec 0 0 $12,206 0.80% Nextem 60,000 5.90 $354,000 23.13% Braintree Watson Unit 10,520 10.52 $110,697 7.23% ISO -NE Supply Auction 67,388 3.58 $241,547 15.78% Hydro Projects 2,002 0.00 $0 0.00% Total 224,695 $6.81 $1,530,250 100.00% Table 4 shows the dollar amounts for energy and capacity per source Table Cost of %of Amt of Energy Po r Resource Energy Capacity Total cost Total Cost (kWh) ($/kWh) Millstone #3 $24,814 $152,510 $177,324 4.82% 3,698,112 0.0479 Seabrook $11,396 $304,830 $318,226 8.59% 4,914,639 0.0643 Stonybrook Intermediate $32,935 $288,406 $321,341 8.73% 105,622 3.0424 Hydro Quebec $0 $12,206 $12,206 0.33% - 0.0000 Shell Energy $475,056 SO $475,056 12.91% 7,467,780 0.0636 NextEre $0 $354,000 $354,000 9.62% - 0.0000 ` NYPA $12,580 $16,834 $29,414 0.80% 2,556,843 0.0115 ISO Interchange $179,037 $241,547 $420,584 11.43% 4,772,022 0.0881 Nema Congestion -$580,173 $0 $580,173 -15.77% - 0.0000 SP Energy $355,572 $0 $355,572 9.66% 7,581,500 0.0469 Hydro Projects $610,190 $0 $610,190 16.58% 8700,842 0.0911 Braintree Watson Unit $43,508 $110,697 $154,205 4.19% 717.712 0.2149 a Saddleback/Jedcho $194,029 $0 $194,029 5.27% 1,945,241 0.0997 a One Burlington Solar $18,911 $0 $18,911 0.51% 270,154 0.0700 Coop Resales $1,727 S4 $1,727 0.05% 11,193 0.1543 Exelon Energy $762,986 $0 $762.986 20.74% 13,891,850 0.0549 Stonybrook Peaking $6,808 $49,221 $56,028 1.52% 28,103 1.9937 Monthly Total $2,149,376 $1,530.250 $3,879,626 100.00% 54,661,613 0.0673 Renewable Resources 20.09% RENEWABLE ENERGY CERTIFICATES (RECO Table 5 shows the amount of banked and projected RECs for the Swift River Hydro Projects through March 2016, as well as their estimated market value. TRANSMISSION The RMLD's total transmission costs for the month of March, 2016 were $865,365. This is a decrease of 13.12% from the February transmission cost of $996,019. In March, 2015 the transmission costs were $987,624. Table 6 Current Month Table 5 Last Year Peak Demand(kW) 94,617 RECs Summary 102,366 Energy (kWh) 54,661,613 Period - January 2015 - March 2016 58,925,210 Banked Projected Total Est. $3,101,904 RECs RECs RECs Dollars Warmcro 1,076 2,474 3,550 $88,750 hppeml 714 1,938 2,652 $66,300 Indlan Mrer 690 1,238 1,928 $48,200 Tunws Falk 1,377 928 2,305 $0 Saddleback 4,348 4,484 8,832 $220.800 Jericho 0 2.586 2,688 $64,650 SOLI MFA Sell 0 $0 Grand Total 8,21/5 131648 21,853 $488700 TRANSMISSION The RMLD's total transmission costs for the month of March, 2016 were $865,365. This is a decrease of 13.12% from the February transmission cost of $996,019. In March, 2015 the transmission costs were $987,624. Table 6 Current Month Last Month Last Year Peak Demand(kW) 94,617 104,312 102,366 Energy (kWh) 54,661,613 54,713,753 58,925,210 Energy ($) $2.149,376 $3,056,024 $3,101,904 capacity(5) $1,530,250 $1,491,572 $1,463,262 TmnsmissiorN$) $865,365 59981019 $987,824 Total $4,544,992 $5,543.616 $5,552,790 »■ ■& r# §■ �§« �.. .. .. � n,. . d« §a� ■.. .. Mn ■§ #!!& �! «■ ,2! 0 I | E& ■� §r |! |K tt k�--. -- -- !bq �F� |£ r■ To: Coleen O'Brien Fro 1y:-.y>i 1�`„((� Maureen McHugh, Jane Parenteau A Date: lY� June 1, 2016 ,pry Subject: Purchase Power Summary — April, 2016 Energy Services Division (ESD) has completed the Purchase Power Summary for the month of April, 2016. ENERGY The RMLD's total metered load for the month was 50,114,392 kWh, which is a 3.66% decrease from the April, 2015 figures. Table 1 is a breakdown by source of the energy purchases. Table 1 'Pe Wl, Womnocn,lndfanM~,, rumor FalfAColflnA FYon44r,Noa MIIIA Summa Hydm Armm�l of Cost of % of Total Total E $"a Resource Energy Eh.W Eiwgy Costs % (kWh) Wm ) Millatme a3 1,019,439 $6.71 2.00% 5,840 0.38% Saab 5,rn3.242 $6.32 11.23% $3,171 1.99% Slmypook hternecilate 709,929 $48.15 1.39% 534,184 1.86% Shell Enegy 6,888,000 $65.86 13.08% $439,051 24.10% WPA 2.372,879 $4.92 4.58% $11,429 0.63% ISO hlahhange 3,431,187 $36.05 6.73% $123,702 6.7 NEMA Cpges6on 0 50.00 0.00% $562,976 J M% Coop Resales 10,186 $149.57 0.02% $1,524 0.011% BP Energy 7,664,400 546.90 15.04% 5359,460 19.73% Hydro Projects' 5,97,636 $88.72 11.73% 553,241 29.10% Bmneee Watson Unit 767,275 $82.22 1.51% $47,744 2.62% Sadde W-Wcho Wird 1,939,827 $99.85 3.81% $193,663 10.63% One Burlinglm Sdar 413,589 $89.72 0.81% $26,834 1.58% Eselon 14,226,000 $38.58 27.91% 5548,791 30.12% StorlyEr00k Peeking 1011094 $230.79 0.20% 523,331 1.28% Monthly Total 50,971,493 $35.75 100.00% $1,821,969 100.00% 'Pe Wl, Womnocn,lndfanM~,, rumor FalfAColflnA FYon44r,Noa MIIIA Summa Hydm Table 2 breaks down the ISO interchange between the DA LMP Settlement and the RT Net Energy for the month of April, 2016. Table 2 Amount Cost % of Total Resource of Energy of Energy Energy (kWh) ($/Mrh) ISO DA LMP • 12,300,814 $30.32 24.13% Sedlement RT Net Energy •• -8,869,628 $27.82 -17.40% Settlement ISO Interchange 3,431,187 $36.06 6.73% (subtotal) kkependent system Operator Dey-Aheadl Locational Marginal Price Real Time Net Enerpy APRIL 2016 ENERGY BY RESOURCE • Exelon, Saddlebac 2.31% • BELD, Hy • Stonybrook Jericho Wind, 1.32% Peaking, 0.05%. • One Burlington • BP Energy, 14.13% Stonybrook Intermediate, 0.20% CAPACITY The RMLD hit a demand of 93,804 kW, which occurred on April 4, at 8 pm. The RMLD's monthly UCAP requirement for April, 2016 was 224,094 kWs. Table 3 shows the sources of capacity that the RMLD utilized to meet its requirements Table 3 Source Amount (kWs) Cost ($IkW-mnth) Total Coat S %of Total Cost Mllstone#3 4,950 15.31 $75,797 5.20% Seabrook 7,910 38.55 $304,959 20.93% Stonybrook Peaking 24,981 2.05 $51,095 3.51% Stonybrook CC 42,925 7.09 $304,126 20.87% NWA 4,019 4.19 $16,834 1.16% Hydro Ombec 0 0 $12,183 0.84% Nexlera 60.000 5.90 $354,000 24.30% Braintree Watson Unit 10,520 10.65 $112,052 7.69% ISO -NE Supply Auction 66,787 3.38 $226,012 15.51% Hydro Projects 2,002 0.00 $0 0.00% Total 224,094 $6.83 $1,457,057 100.00% Table 4 shows the dollar amounts for energy and capacity per source Table 4 Cast of %of Amt of Energy Power Flow... Energy Capacity Total cost Total coat (kWh) ($IkWh) Millstone #3 $6,840 $75,797 $82,637 2.52% 1.019,439 0.0611 Seabrook $36,171 $304.959 $341,129 10.40% 5.M3,242 0.0596 Stanyb Intemedats $34,184 $304.126 $338,310 10.32% 709,929 0.4765 Hydro Quebec $0 $12,183 $12,183 0.37% - 0.0000 Shell Energy $439,051 $0 $4.19,0$1 13.39% 6,666,000 0.0659 NexlEra $0 $354,000 $364,1k10 10.80% - 0.0000 e WPA $11,429 $18,834 $28,262 0.86% 2,322.879 0.0122 ISO Interchange $123,702 $226,012 $349,714 10.67% 3,431,187 0.1019 Nema congestion -SM2,976 SO .$582,978 -17.17% - 0.0000 BP Energy $359,460 s0 $359,460 10.96% 7,664,400 0.0469 a hydro Projects $530241 $0 $53.241 16.17% 5,976.636 0.0887 Braintree Watson Unit $47,744 $112.052 $159,796 4.87% 767,275 0.2083 SaddlebacIdJedcM $193,663 $0 $193,663 5.91% 1,939,827 0.0998 e One Bulington Soar $28,834 s0 528.834 0.88% 413,599 0.0697 coop Resales $1,524 s0 $1,524 0.05% 10,186 0.14% Exelon Energy $548,791 SO $548,791 16.74% 14,226,000 0.0386 Stonybrook Peaking $23,331 551,085 $74.426 2.27% 101,094 0.7362 Monthly Total $1,821,989 $1,457,057 $3,279,046 100.00% 50,971,493 0.0643 e Renewable Resources 20.90% RENEWABLE ENERGY CERTIFICATES (RECO Currant Month Last Manth Table 5 shows the amount of banked and projected RECs for the Swift River Hydro Projects through April 2016, as well as their estimated market value. Table 5 94,817 RECs Summery Enen2y(kWh) Period- January 2015 -April 2016 54,661,613 Banked Projected Total Est. RECs Kcs RECs Dollars Woron= 1.076 3,906 4,982 $124,550 Paaeerell 714 2,615 3,329 $83,225 nden lUwr 690 1,474 2,161 $59,100 Turnan salla 1,371 1,251 2,628 $0 sMdNbad 4,348 5,731. 10,079 $251,975 lakbo 0 3,278 3,278 $81,950 Subtotal 8,205 18,255 26,460 595,800 AMC, tea 0 5o Grand Total 8,205 18,255 26,460 $595800 TRANSMISSION The RMLD's total transmission costs for the month of April, 2016 were $834,561. This is a decrease of 3.56% from the March transmission cost of $865,365. In April, 2015 the transmission costs were $927,050. Table 6 Currant Month Last Manth Last Year Peak Demand(kW) 93,804 94,817 92,907 Enen2y(kWh) 50,971,493 54,661,613 51,959,397 EoaW(S) $1,821,989 $2,149,376 $1,503,849 CsaaGty (9) $1,457,057 $1,53.250 $1,447,201 Transmission(s) $834,561 $865,385 $927,050 Total 54,113,607 54,544,992 $3,878,100 .....; \,; �-- -- -- �Pr� ■,,,.■ ` |.Fm �-- -- -- -!� ,, §§Bd|!|! �--� : -- -- ,■ „ ! .. |�:.� .. .. | | | | �kk ||||||| ■■� �# «E ¥« \# „■■�„■„ ■■ ;$ �#■ !#■ #� #■ !� - �!§!!E!!■! � .I.;Z;'::' \�| \ . . ■■§,�,,,,! , ':\ !; ! :'-;;;; it .....; \,; ■,,,.■ | -!� ,, ,■ „ ! �| ||||||| „■■�„■„ �!§!!E!!■! .I.;Z;'::' \�| ■■§,�,,,,! , ':\ ! :'-;;;; it , . |; :........ ,§,!■,!!!! !!!§!!!!|! | �- !|!|!!||!| .|� :.�.....�\ !||■,�l,!! � ! !■ !■§4�..\ ro L O L- CL W U_ O C— U L ru O V) N m v a 0 h I L\ 9r a e 0 0 - Lu G Q \ \ % § m u\2 §± 2%0 &% CL � # \ k § k k 20 2g � L $20 �& 0 5 ! Z u -0 \ E } ! $ § LUm 00J) §/kumems ®{\�§§ / § 2360x7 § r > ) m CL§ ^ E ) \ } m j '0 / § a\= �%&§\o E .0 $ j m ƒ ou �� /#\a u— a a %c m : § 2 -0 \ w- Eg=; 0 Lm CL 5�: = / f a) r- cu ' 7 a ®=\Et»7f$° a§ e c— � g ®q t fa Igk\7$}gS# �V<=0CLa— § r 3 0 2 i Y ua V N u a � 0 O C E C Y C v C H E Q T >� CL Q �0 v aj � L y 0 to L Q O ai O al Y O N O > O L ai L 3 Y Y Q T OQj J Q v� O O o + a9 Y 0 c O O N a ai N E T 7 T ns C o Q v X a� Y M Y Qj a) U c Q1 M O Q Q O O al Q ` v c a E aJ d > a, N QJ Q T U a) V > Y a) a/ V uC N Y O C O oY, 0 N O a1 ar a> Ln a E v U m C- L Vf � 0 O O N W Y C O n Y — 0 L to Y CL Y a L L Y O fo 7 0 a O c aiE M = v a � Y O C ? H O N N O � N N t w Y N O ` m l � Y N C C ao U Q O" O O l Y 0 0 Y a E > mOL O C CL a a m y n O a m _v u a y t O Cm H C m a > U tm L O U u m a 'o CL vc O U E 0 V s o t O Y C C d0 U E c m c m E a M m OU E L O N N9 O M vl C m O Y NO Y QJ N - V U ti C C O n a O 4 Y U C a L m 3 u O O u} '3 L C E � Y ar N L @ C w L C N E O O N a Y L -o m o > L mo E Y v O _ «> p O co p N m c z C h u t T a O c y U O L m U 3 aj CL > ° c a—° > d aco °o v c v 3> o Q �� ], a C O a L a :7 0 m `0 C O O OD 7 N " w0 m c E a L to v m c 3 m cc a N o m: m -o L E O c° x 3 c ai � L N yOj CL a N )>` -O N N — E V '� 0 O m L M m Y N O 0 !'' m m 0 LOb L C O _ a Y N O a) Q C C U_ W a Y C Q) a c L U 3 Qi L L m . 'O W 4 N 3 � a O E O Y VI .^� 4J n --I a c y o o E c4 CL v a) vCL v 0° c j 3 u a c -p O to X u a Z O O vm v oC C K . s cc . E 0 V s o t ,- E £ @ ƒ 2 / \ ) { 0 J o Ln _ c m ® o 4 0 % \ �� \/ E < Cl -c k idm / n c5 � -0 / 3 £ Crc ] 2�acu CL g § 1 a) /) . a) _ >. / o Q % § \ 2 7 lRo E \ _ _ @ 0 @7W/&�\_£ ( \ \ \ - \ x om { § \ c / / & / a- ® \ / ,ec= 2 m e E LA C e u u / � � (D- I $ # § £ E > o � E m a c s— R t }E en I/wa°7/2J 4 / U m e R z= w ! c 2— u m_ = E m. 2@$ 2■ V u o� . 2 �, e@ 2 5§ k)\ m>%~ ;! \ \ \ \ � <- --- \� � ` U G1 0 L- 0. a v _U .O U L- m m 0 fA E m m �z av u O `n u \ 0 0 w � CL � m � � . a CU .e 0 3 0 LA ; § k /! k\ ! §■| N |§ ■ } 2 } § § k \ \ ! -`° ® a; - , • , } !!| r \\ n 2} 7 7\ 2\ } !§! r 22 n \ } 7 § \ | k 2!§| r \\ N 2 7)§$ k k 7 !K| r $} n} 7 7)\ k k as |§ ■ 2 !/ ik �! � .! � t !! { }| } 7 f) � ! 31 ! E ! )�|t k( \. )/# | ) !}\§■� a! R 2;!\( ; § k /! k\ ! 1 ►a ro E Y C d yE l L (L v a C o O b0 C " t L O O N m N W N lD r -I i V tD 0C_ 00N W o 1-4 O V 1, O N a1 u O Ya 00 v g V) V) LC OHO I� C =not no - 2 c N c ti E v o m u =° 3 m H C w N w O 3 ►a ro E Reading Municipal Light Department (RMLD) Electric Service Policy and Requirements Handbook 07-01-2016 230 ASH STREET, P.O. BOX 150 READING, MASSACHUSETTS 01867 Telephone: (781) 944-1340 I 11 , ,nr, I:rya n -amen[, Haodbuok Table of Contents 1.0 GENERAL INFORMATION........................................................................................._......................................... 10 I.1.PURPOSE.............................................................................................................................................................. 10 1.2.APPLICABILITY AND REVISIONS.......................................................................................................................... 30 1.3.ADVIS0RY SERVICE.............................................................................................................................................. 30 1.4.OIGGING / EXCAVATIONS / DIGSAFE................................................................................................................. 11 1.5.CONSTRUCTION IN THE PROXIMITY OF OVERHEAD CONDUCTORS................................................................ 11 1.6.STREET AND PRIVATE AREA LIGHTING.............................................................................................................. 12 1.7.VEGETATION MANAGEMENT............................................................................................................................. 12 1.8.USE OF ELECTRICITY............................................................................... n SIP,,, 1.10.EFFICIENCY PROGRAMS ....................... :................................. ................... ..... ....... ...... .............. ........................ 14 1.11ASO-NE DEMAND RESPONSE PARTICIPATION.................................................................................................. 14 1.12.RMLD SYSTEM VOLTAGE CONVERSION AND UPGRADES............................................................................... 15 1.13. REQUIREMENTS AND COMPLIANCE WITH ELECTRIC CODES......................................................................... 15 1.14.SERVICE INTERRUPTION..................................................................................................................................... 15 2.0 PLANNING YOUR ELECTRIC SERVICE................................................................................................................... 16 2.1.AVAILABLE SERVICE VOLTAGES & CHARACTERISTICS...................................................................................... 16 2.2.SERVICE TYPE INDEX........................................................................................................................................... 16 2.3.PERMENANT SERVICES AVAILABLE FROM RMLD.............................................................................................. 17 2.4.00NTRIBUTION IN AID OF CONSTRUCTION (POLICY APPLICABLE TO ALL CUSTOMERS) .............................. 20 3.0 APPLYING FOR ELECTRIC SERVICE...................................................................................................................... 21 4.0 METERING, BILLING, PAYMENTS, AND NON-PAYMENTS.................................................................................. 21 4.1. M E TE R I N G............................................................................................................................................................21 4.2.6ILUNG AND PAYMENTS..................................................................................................................................... 22 4.3.SERVICE DISCONNECTION DUE TO NON-PAYMENT......................................................................................... 23 4.4.SERVICE RECONNECTION.................................................................................................................................... 23 4.5.BUDGET BILLING PLANS...................................................................................................................................... 23 5.0 EXISTING RESIDENCE OR COMMERCIAL SERVICE..........................................................................._................. 24 S.I.OWNER OCCUPANT- EXISTING RESIDENCE OR COMMERCIAL PROPERTY .................................................... 24 5.2.RENTER/TENANT - EXISTING RESIDENCE OR COMMERCIAL PROPERTY......................................................... 24 5.3.RESIDENTIAL CUSTOMER DEPOSITS................................................................................................................... 24 5.4.N0N-RESIDENTIAL CUSTOMER DEPOSITS.................................................................................._..................... 25 SIP,,, 6.0 TEMPORARY ELECTRIC SERVICE.......................................................................................................................... 27 6.I.GENERAL.............................................................................................................................................................. 27 6.2.APPLYING FOR TEMPORARY SERVICE (AVAILABLE AT SECONDARY VOLTAGES ONLY) .................................. 27 6.3.COSTS FOR TEMPORARY SERVICE...................................................................................................................... 27 6.4.RESPONSIBIUTIES ASSOCIATED WITH TEMPORARY SERVICE.......................................................................... 28 6.S.TEMPORARY CONNECTION METHODS.............................................................................................................. 29 7.0 RESIDENTIAL ELECTRIC SERVICE - NEW, UPGRADE OR RELOCATION............................................................... 29 7.1.GENERAL.............................................................................................................................................................. 29 7.2.COSTS FOR PERMANENT SERVICE...................................................................................................................... 29 7.3.APPLYING FOR PERMANENT RESIDENTIAL SERVICE.........................................................................................30 7.4.OPTIONAL CONNECTIONS TO RMLD DISTRIBUTION FACILITIES...................................................................... 30 7.5.RESPONSIBILITIES AND EASEMENTS ASSOCIATED WITH RESIDENTIAL PERMANENT SERVICE ..................... 33 8.0 COMMERCIAL/INDUSTRIAL/RESIDENTIAL DEVELOPMENT ELECTRIC SERVICE ................................................. 34 8.1.GENERAL.............................................................................................................................................................. 34 8.2.APPLYING FOR PERMANENT COMMERCIAL/INOUSTRIAL/RESIDENTIAL DEVELOPMENT SERVICE ............... 35 8.3.COST FOR COMMERCIAL AND INDUSTRIAL SERVICE........................................................................................35 8.4.OEPOSITS AND PAYMENTS................................................................................................................................. 35 S.S.OVERHEAD SERVICE TO SMALL COMMERCIAL BUSINESS (G-1 CUSTOMERS) ................................................ 36 8.6.PADMOUNT TRANSFORMER FOR MEDIUM TO LARGE COMMERCIAL CUSTOMERS (G-2 AND G-3 CUSTOMERS) .............................................................................................................................................................. 36 8.7.PRIMARY METERING...........................................................................................................................................37 8.8.RESPONSIBIUTIES AND EASEMENTS ASSOCIATED WITH COMMERCIAL PERMANENT SERVICE ................... 37 9.0 CUSTOMER SERVICE CONNECTION CLEARANCES AND RESPONSIBILITES......................................................... 38 9.110CATION OF METER AND SERVICE ENTRANCE............................................................................................... 38 9.2.POINT OF ATTACHMENT..................................................................................................................................... 39 9.3.SERVICE MASTS................................................................................................................................................... 39 9A.CONCEALMENT OF SERVICE ENTRANCE............................................................................................................ 39 9.5.SERVICE CLEARANCES TO BUILDING STRUCTURES...........................................................................................39 9.6.OVERHEAD SERVICE DROP CLEARANCES...........................................................................................................41 10.0 LINE EXTENSIONS ...................................................................................-.......................................................... 42 11.0 METER TAMPERING / THEFT OF SERVICE........................................................................................................... 43 11.1. DEFINITION........................................................................................................................................................43 11.2.METER TAMPERING WARNING........................................................................................................................ 43 11.3.NOTICE OF VIOLATION......................................................................................................................................44 11.4.BILL ADJUSTMENTS FOR THEFT........................................................................................................................ 44 61r',, cements Handbook 15.3.STANDARD METER INSTALLATIONS................................................................................................................. 54 15.4.OUTDOOR METER LOCATIONS......................................................................................................................... 55 15.5.I14DOOR METER LOCATIONS ............................................................................................................................. 56 15.6.METER HEIGHT.................................................................................................................................................. 56 15.7.IDENTIFICATION OF METER SOCKETS AND CUSTOMER DISCONNECTING MEANS ...................................... 57 15.S.UNMETERED CONDUCTORS.................................................... c, 7 1 V i.; 11.5. RESTORATION OF SERVICE............................................................................................................................... 45 11.6.CUSTOMER PAYMENT LIABILITY......................................................................................................................45 11.7.CUT-OFFS AND LIABILITY..................................................................................................................................45 11.8.CUSTOMER RESPONSIBILITY.............................................................................................................................45 11.9.0OURT AND ATTORNEY'S FEES........................................................................................................................ 45 12.0 CUSTOMER SYSTEM PROTECTION GUIDELINES ................... ».......................... _................................................ 45 12.1.SECONDARY SURGE ARRESTERS....................................................................................................................... 45 12.2.SHORT-CIRCUIT CURRENTS............................................................................................................................... 46 12.3.GROUNDING...................................................................................................................................................... 46 12.4.INSULATING TRANSFORMERS.......................................................................................................................... 47 13.0 GENERATION INTERCONNECTION.............................................................. _...................................................... 48 13.1.PHOTOVOLTAIC (PV) GENERATOR REQUIREMENTS......................................................................................... 48 13.2.GENERATOR ISOLATION REQUIREMENTS......................................................................................................... 48 13.3.STANDBY/BACK-UP GENERATION (NON -PARALLEL OPERATION)................................................................... 49 13A.FUEL STORAGE REQUIREMENTS........................................................................................................................... 49 13.5.CUSTOMER COGENERATION.............................................................................................................................. 49 13.6.SYSTEM OPERATION GUIDELINES...................................................................................................................... 50 14.0 SERVICE ENTRANCE GUIDELINES...._.................................................................................................................. SD 14.1.SIZE OF CONDUCTORS...................................................................................................................................... 50 14.2.SERVICE EQUIPMENT........................................................................................................................................ 50 14.31OCATION OF SERVICE DISCONNECT............................................................................................................... 51 14.4.MAIN SWITCHES AND DISCONNECTING MEANS............................................................................................ 51 14.5.ASSIGNING LOCATION OF SERVICE AND METERING EQUIPMENT................................................................ 51 14.6.UNMETERED CONDUCTORS............................................................................................................................. 51 14.7.OVERHEAD......................................................................................................................................................... 51 14.8.UNDERGROUND................................................................................................................................................. 53 15.0 METER INSTALLATION AND MAINTENANCE GUIDELINES.................................................................................. 54 15.1.GENERAL...................................................................................._.______............._.. ce 15.3.STANDARD METER INSTALLATIONS................................................................................................................. 54 15.4.OUTDOOR METER LOCATIONS......................................................................................................................... 55 15.5.I14DOOR METER LOCATIONS ............................................................................................................................. 56 15.6.METER HEIGHT.................................................................................................................................................. 56 15.7.IDENTIFICATION OF METER SOCKETS AND CUSTOMER DISCONNECTING MEANS ...................................... 57 15.S.UNMETERED CONDUCTORS.................................................... c, 7 1 V i.; 01J,I) I I, Li !i � 1 1, , ljoLf v iod l , qimenicnt, Handbook 1S.9.DEMAND AND KVA METER WIRING ................................................................................................................. S7 15.10.SECURITY .......................................................................................................................................................... 58 I5.11.MOVING OR REMOVING METERING EQUIPMENT ........................................................................................ 58 15.12.METER SOCKETS .............................................................................................................................................. 58 15.13.METER PEDESTALS .......................................................................................................................................... 60 15.14ANSTRUMENT TRANSFORMERS ...................................................................................................................... 60 15.1S.CUSTOMER REQUEST FOR METERING PULSES ............................................................................................. 61 15.16.APPROVED METERING EQUIPMENT .............................................................................................................. 62 16.0 POWER QUALITY ................................................................................................................................................. 63 16.1.VOLTAGE SENSITIVE EQUIPMENT ........................ . ......................................................................................... 64 16.2.FLUCTUATING LOADS ............................................................................................ ........ .................................. 64 16.3.SECONDARY LIGHTNING ARRESTERS ................... .... ........................................................................................ 64 16.4.SHORT CIRCUIT CURENTS ..................................................... ... .................................... " .................... I .............. 64 16.5.UNBALANCED LOAD ............................................................................... I ....... .......................................... ....... 64 16.6.SIGNS AND AUTOMATICALLY CONTROLLED LIGHTING .................................................................................. 64 16.7.HARMONIC DISTORTION ..................................... ............................................................................................. 65 16.8.GROUNDING ...................................................................................................................................................... 65 16.9.POWER FACTOR ................................................................................................................................................. 65 17.0 ELECTRIC UTILIZATION EQUIPMENT ......................................................................... . ...................... . ................ 66 17.1.GENERAL ..................................................................................................................................... I ....................... 66 17.2.SYSTEM DISTURBANCES...................................................................................................................................... 66 17.3.SINGLE-PHASE MOTORS ...................................................................................................................................... 66 17.4.THREE-PHASE MOTORS .......................................................................................................................... I ............ 68 17,S.EUECTRIC UTILIZATION EQUIPMENT PROTECTION ......................................................................................... 69 17.6.PROTECTION AGAINST SINGLE-PHASE OPERATION ............................. ......................................................... 70 17.7.UNDERVOLTAGE PROTECTION ......................................................................................................................... 70 17.8.OVERLOAD PROTECTION .................................................................................................................................. 70 17.9.PROTECTION AGAINST PHASE REVERSAL ........................................................................................................ 70 17.10.WATER HEATERS ................................. .................................................................. I ........................................ 70 18.0 LIST OF APPENDICES ........................ . ................................................................................................................ TBD APPENDIX A - TEMPORARY SERVICE METHODS .......................................................................................................... TBD APPENDIX B - UTILITY WORK AUTHORIZATION APPLICATION .................................................................................... TBD APPENDIX C - RATES AND TARIFFS ............................................................................................................................... TBD APPENDIX D - MASSACHUSETTS GENERAL LAWS ........................................................................................................ TBO APPENDIX E - NET METERING POLICY AND GUIDELINES ............................................................................................. TBD 81 1huu6 APPENDIX F- 30-500 KW PV ISOLATION SCHEMATIC APPENDIX G - ENERGY EFFICIENCY AND CONSERVATION PROGRAMS......................................................................TBD APPENDIXH - ILLUSTRATIONS......................................................................................................................................TBD FIGURE 1- PAD MOUNT CLEARANCES FIGURE 2- TYPICAL SWITCHING OF CUSTOMER'S EMERGENCY SUPPLY FIGURE 3 - TYPICAL TRANSFORMER ENCLOSURE FIGURE 4 - OVERHEAD SERVICE ENTRANCE GUIDELINES FIGURE 5 - SERVICE DROP CLEARANCE REQUIREMENTS FIGURE 6 - TYPICAL SERVICE MAST CONSTRUCTION FIGURE 7- OVERHEAD CONDUCTOR CLEARANCES FROM SWIMMING POOLS FIGURE 8 - WARNING AND CEARANCE DIAGRAM FIGURE 9 - CUSTOMER SECONDARY RISER AND SERVICE LATERAL FIGURE 10 -LOCATION OF PADMOUNTED EQUIPMENT FIGURE 11- TEMPORARY SERVICE FIGURE 12 - CUSTOMER SECONDARY RISER 600 VOLTS AND BELOW FIGURE 13 - TEMPORARY SERVICE STRUCTURE OVERHEAD DISTRIBUTION FIGURE 14- 7 TERMINAL METER SOCKET 200 AMP MAX FIGURE 15 - 5 TERMINAL METER SOCKET 320 AMP MAX FIGURE 16 - MULTIPLE METERS - VERTICAL MOUNTED TROUGH FIGURE 17 - MULTIPLE METERS - HORIZONTALLY MOUNTED TROUGH FIGURE 18 - CURRENT TRANSFORMATION INSTALLATION FIGURE 19 - WOOD POLE INSTALLATION DETAILS METERED POWER SUPPLY TO COMMUNICATION INSTALLATIONS FIGURE 20 - WOOD POLE INSTALLATION DETAIL OF CONNECTIONS FOR COMMUNICATION INSTALLATIONS FIGURE 21- WOOD POLE INSTALLATION DETAIL OF METER SOCKET BRACKET FIGURE 22 - TYPICAL TRENCH SPECIFICATIONS FIGURE 23 - SPECIFICATIONS FOR FIBERGLASS PAD FIGURE 24 - SECONDARY PEDESTAL SPECIFICATIONS FIGURE 25- LIGHT POLE INSTALLATION FIGURE 26 - RISER POLE - SPECIFICATION FOR PAD MOUNT INSTALLATION 5 KV- THREE PHASE, 112-500 KVA LARGE THREE PHASE TRANSFORMER 23 KV PAD MOUNT SWITCHGEAR APPENDIX 1- STREET LIGHTING REQUEST FORM.........................................................................................................TBD APPENDIX J -UNSAFE ELECTRICAL EQUIPMENT NOTIFICATION FORM......................................................................TBD APPENDIX K -ADDITIONAL FEES AND CHARGES .... _.-........................ _.............................................. _-................TBD 91r,e N �fi$ 4 W W W N W ®ui N OJ O N WN d [O J ui KO N (V b P OOJ a0 N O (O m P 1,(TVjj, O w NW W W Vi Vf N M W V •O W O�1 0) W m O O O Bp O 1�1 P c c C C P OI �+ O O O p c 0 4 D L 2 'o R `a 'c `o o U n 9 a mw c c E `o n a c 1 C.- d o o 'c a oD g> w ovt o o f _a U c c U N� N p-D y 0 a J Q D LR CL CD /� E\\ §6; / 2/2 ■aU E 2 a J :c )\k / 20 u - E k ° E E0 E » E g = 01.— \ƒ\k .+ ;E�° _ ; `,.. i - \ �� -� \ Ali=�-� i � _ �� t\ � f N � � � O N N i 3 a � '€ � 6 J R Q �(II R L-_$g R s R 8 8 8 S°� N N N N N N £ a a e P � �ssss�s"s I ' l l ' l 3 Y � � I a aa C E R i R �� N �� � e H N �' o e N � E o 8$ s $ a Q R 8 .. 0 0 z a �° � � R id � R R R R x =sssa���e fs x s 8 N N N N N N £ a a e P � �ssss�s"s I ' l l ' l I R i R R R R 8$ 9 F R 8 .. 0 0 0 0 0 �� LLQ O r W DC W O N O M Nj 1..1. Q ►9 8 .. m m o m ry v � ri rci 8 a a w a o° o w> Z N Q n n W N p o m F 0 o ro m o m Q m ry � o m Z o�'no m v m o n a 8 n m m ~ m Q N e4 N a a w a o° o w> Z N Q M n 00 n M O1 O O p p 0 O O O O O O O p p 0 W OO m cr ti cr, cn a) N at f% W W N a a o a u � w LL w to u � F a u CL a W N W M x W U i m W W •5� LL 06 ^� ozi m wL ^W ii �•1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V N O e0 �D O N ei r -I r -I a o y O m T O n 00 fm�l b O% O 'I N 1�1 SN tO r W G1 n a m a z > a a' o i a 9* co M 2 ^ cn co Q O U O ^ Ln M qc/lj- e El O N ti N � � N y LL V C O n d 06 ei f0 M V 1f1 a v n tO a D o � 12:10 PM 5/26/2016 READING MUNICIPAL LIGHT DEPARTMENT FY 15 CAPITAL BUDGET VARIANCE REPORT FOR PERIOD ENDING APRIL 30, 2016 NEW CUSTOMER SERVICES: New Service Installations (Commercial / Industrial) New Service Installations (Resident a0 SUB -TOTAL 114 Routine Construction ALL 34,000 34,000 ALL 12,177 113,659 164,000 50341 12,177 113,889 198000 84,341 ALL 112,729 1,288,977 1000990 12899771 SPECIAL PROJECTS I CAPITAL PURCHASES: ACTUAL 100 Distributed Generation ALL COST YTD ANNUAL REMAINING PROD DESCRIPTION TOWN APR ADDITIONS BUDGET BALANCE 114 CONSTRUCTION: ALL 9,013 15,00 5,987 101 5W9 RecarMuctoring- Ballardvale Area W 100,000 100,000 102 Pole Line Upgrade - Livell Street,W W 25,000 124,179 113,000 (11,179) 104 Upgrade Old LynnBeld Center URDs (Cooks Fann) LC 16,895 240,239 42," (198,239) 105 4W51W6Tie R 2,458 107,111 - (107,111) 106 URD Upgrades ALL 4,885 340,000 335,115 107 Step4own Area Upgrades ALL 23,181 39,581 352,000 312,419 110 Pde Lina Upgrade - Woburn Sense,W W 39,648 444,898 91,000 91,000 212 Force Account West Street R 139,932 151000 10,068 SUB -TOTAL 50,639 655,927 1,188,000 $32,073 STATION UPGRADES: 96 Station 4(GAW) Beck -up Generator R 1,188 49,290 107,000 57,710 100 Station 4 (GAW) Relay Replacement Project R 24,675 73,000 48,325 109 Station 4 (GAV✓) Transformer Replacement R 41,000 41,00 111 Boston Equipment Upgrade (all) ALL 108,252 110,233. 2 'w 143,767 112 Sharon 4(GAW) SmehgearlSreaker Replacement R 401,737 583,409 508,000 (75.409) 113 Station (GAW) Be" Bank Upgrade R 10,515 57,000 57,000 130 Station 3- Remote Terminal Unit( RTU) Replacement NR 29,090 84,000 94,000 121 SUS -TOTAL R 109,440 707,507 1,134,000 366,393 NEW CUSTOMER SERVICES: New Service Installations (Commercial / Industrial) New Service Installations (Resident a0 SUB -TOTAL 114 Routine Construction ALL 34,000 34,000 ALL 12,177 113,659 164,000 50341 12,177 113,889 198000 84,341 ALL 112,729 1,288,977 1000990 12899771 TOTAL CAPITAL BUDGET SPECIAL PROJECTS I CAPITAL PURCHASES: 100 Distributed Generation ALL 3,076 24,020 2,164,000 2,139,980 103 Distributor, Protection and Autanatlon ALL 1,516 110,634 70,000 (40,834) 114 Fiber Optic Test Equipment ALL 9,013 15,00 5,987 115 Fault Indicators ALL 50,000 50,000 116 Trenaformea and Capacitors ALL 366,646 576,346 MS." 91,654 117 Meter Purchases (including '500 Club') ALL 16,895 150,177 219,000 60,823 122 Engineering Analysis Software and Data Conversion ALL 73,250 73,000 (250) 125 GIS ALL 5,190 420,000 414,810 126 Communication Equipment (Fiber Optic) ALL 17,202 98,000 80,798 131 LED Sheat Light Implemembon ALL 39,648 444,898 1,200,000 755,102 134 Substation Test Equipment ALL 51,540 100,000 "',to SUB -TOTAL 427,]79 1,462,270 5,0771000 3,814,730 OTHER CAPITAL PROJECTS: 95 230 Ash St Building R 80,000 80,000 W HVAC Roof Units -Garage R 50'" 07,00 90 IRD hardware ALL 10000 10,000 99 Electric Vehide Supply Equipment ALL 50000 50000 118 Nothing Stock Replacement ALL 401,737 407,887 448,000 40,113 119 Sacenty Upgrades All Sites ALL 10,515 50,000 39,488 120 Great Plains/ Cogsdale Upgrade ALL 29,090 127,000 97,910 121 HVAC System Upgrade -230 Ash Sheet R 571,906 600,000 28,094 123 Oil Containment Facility Construction ALL 47,835 59,000 11,165 127 Hardware Upgrades ALL 4,402 71,433 152,00 80567 128 Software and Licensing ALL 81,968 172,000 90,033 129 Master Facilities Site Plan R 150,00 150000 136 Voltage Data Recorders ALL 50,000 5(1000 SUB -TOTAL 106,139 1,220,633 1,9the'm 777,367 TOTAL CAPITAL BUDGET FINANCIAL REPORT MARCH 31, 2016 ISSUE DATE: MAY 3, 2016 ASSETS CURRENT UNRESTRICTED CASH RESTRICTED CASH RESTRICTED INVESTRENT3 RECEIVABLES, NET PREPAID EXPENSES OTHER DEFERRED DEBITS INVENTORY TOTAL CURRENT ASSETS NONCURRENT INVESTMENT IN ASSOCIATED CO CAPITAL ASSETS, NET TOTAL NONCURRENT ASSETS TOTAL ASSETS TOWN OF READING, HASSACHUSETTS HUNICIPAL LIGHT DEPARTMENT BUSINESS -TYPE PROPRIETARY FUND STATEMENT OF NET ASSETS 3/31/16 PREVIOUS YEAR CURRENT YEAR (BCH A P.9) 11,]28,34].39 12,892,6]9.]6 (BCH A P.9) 20,526,355.15 20,932,393.91 (BCH A P.9) 1,292,906.26 1,284,061.45 (BCH B P.10) ],]16,416.82 7,525,382.95 2,918,8]0.]3 (BCH B P.10) 1,900,447.64 2.918.8]0.]3 1,562,102.39 3,0]0,48].93 (BCH E P.10) 0.00 1,547,815.00 1,628,593.64 15,577,004.28 1,661,466.46 44,'!93,066.]0 47,405,901.92 (BCH C P.2) (BCH C P.2) LIABILITIES CUM@iT ACCOUNTS PAYABLE CUSTOMR DEPOSITS CUSTO4 ADVANCES FOR CONSTRUCTION ACCRUED LIABILITIES TOTAL CURRENT LIABILITIES NONCURRENT ACCRUED EMPLOYEE CCNSENSATED ABSENCES TOTAL NWiCURRENT LIABILITIES TOTAL LIABILITIES INVESTED IN CAPITAL ASSETS, NET OF RELATED DEBT RESTRICTED FOR DEPRECIATION FUND (P. 9) UNRESTRICTED TOTAL NET ASSETS (P. 3) TOTAL LIABILITIES AND NET ASSETS I 26,993.75 69,664,353.99 26,993.75 ]1,34],9]2.]5 69.691.34].]4 71,374,;66.50 114.484,414,44 118,]80.968.42 6,169,828.91 7,531,521.68 834,407.D1 691,315.67 558,908.48 1,025,429.15 171,677.77 3,058,249.85 ].134.822.16 12,506,516 35 2,918,8]0.]3 3,070,487.93 2.918.8]0.]3 3,0]0,48].93 10,653.692.91 15,577,004.28 69,664,353.99 ]1,34],9]2.]5 5,]38,9]4.40 5,423,024.90 28,427,393.14 .26,432,866.49 103.830,]21.53 103,203,664.14 114.484 414.94 118,]80.868.42 TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT NONCURRENT ASSET SCHEDULE 3/31/16 SCHEDULE OF INVESTMENTS IN ASSOCIATED COMPANIES NEW ENGLAND HYDRO ELECTRIC NEW ENGLAND HYDRO TRANSMISSION TOTAL INVESTMENTS IN ASSOCIATED CMPANIES SCHEDULE OF CAPITAL ASSETS LAND STRUCTURES AND IMPROVEMENTS EQUIPMENT AND PURNISHINGS INFRASTRUCTURE TOTAL CAPITAL ASSETS, NET TOTAL NONCURRENT ASSETS 121 SCHEDULE C PREVIOUS YEAR CURRENT YEAR. 2,975.74 2,975.74 24,018.01 24,018.01 26.993.75 26.993 75 1,265,842.23 6,306,638.38 12,551,310.68 49.540.362.70 69.6fi4.353. 99 fig, 691,347.74 1,265,842.23 7,315,355.47 12,098,965.67 50,667.809.38 71.347 972 75 71.374 966 50 OPERATING EXPENSES: (SCE E P.12) PURCHASED PONBR CAPACITY PURCHASED POWER TRANSHV3SION PURCHASED POWER FUEL OPERATING MAINTENANCE DEPRECIATION VOLUNTARI PAYMENTS TO TONGS TOTAL OPERATING EXPENSES OPERATING INCW6 NONOPERATING REVENUES (EXPENSES) CONTRIBUTIONS IN AID Of CONST RETURN ON INVESTMENT TO READING INTEREST INCOME INTEREST EXPENSE OMER (IDBS AND AMORT) TOTAL NONOPERATING REV (EXP) CHANGE IN NET ASSETS NET ASSETS AT BEGINNING OF YEAR NET ASSETS AT END OF NARCN 1,463,262.28 TONN OF READING, MASSACHUSETTS 1,534,123.01 12,825,378.23 14,031,978.80 9.418 MUNICIPAL LIGHT DEPARTMENT 951,509.01 865,365.34 9,161,648.07 9,547,499.85 BUSINESS -TYPE PROPRIETARY FUND 3,101,903.54 2,149,376.47 25,912,228.26 STATEMENT OF REVENUES, EXPENSES AND CHANGES IN NNO NET ASSETS 851,655.64 1,053,856.62 8,137,944.46 3/31/16 -1.788 288,712.09 233,744.94 HONTE MORTM LAST YEAR CURRENT YEAR YTD i LAST YEAR CURRENT YEAR TO DATE TO DATE CHANGE OPERATING REVENUES: (SCH D P.11) 118.000.00 110.000.00 1,052,754.00 1.050,973.00 BABE REVENUE 1,617,939.53 1,170,013.51 16,656,711.52 1,957,387.37 17,852,328.16 1,758,780.91 0.698 -10.159 FUEL REVENUE 2,372,126.71 2,668,095.66 26,171,816.75 25,928,808.19 -0.938 PURCHASED PONER CAPACITY 2,396,563.72 2,894,686.58 22,667,928.12 23,105,038.79 1.938 FORFEITED DISCOUNTS 111,905.43 94,161.41 646,656.96 637,768.00 -1.370 ENERGY CONSERVATION REVENUE 51,465.20 51,413.94 517,597.83 509,466.18 -1.578 NYPA CREDIT (130.242.61) (115.732.84) (727.651.16) (860.453.41) 18.256 I=. OPERATING REVENUES 6,417,735.90 7,370,698.04 65,733,051.42 67,172,935.99 2.198 OPERATING EXPENSES: (SCE E P.12) PURCHASED PONBR CAPACITY PURCHASED POWER TRANSHV3SION PURCHASED POWER FUEL OPERATING MAINTENANCE DEPRECIATION VOLUNTARI PAYMENTS TO TONGS TOTAL OPERATING EXPENSES OPERATING INCW6 NONOPERATING REVENUES (EXPENSES) CONTRIBUTIONS IN AID Of CONST RETURN ON INVESTMENT TO READING INTEREST INCOME INTEREST EXPENSE OMER (IDBS AND AMORT) TOTAL NONOPERATING REV (EXP) CHANGE IN NET ASSETS NET ASSETS AT BEGINNING OF YEAR NET ASSETS AT END OF NARCN 1,463,262.28 1,534,123.01 12,825,378.23 14,031,978.80 9.418 951,509.01 865,365.34 9,161,648.07 9,547,499.85 4.218 3,101,903.54 2,149,376.47 25,912,228.26 26,224,452.28 0.978 851,655.64 1,053,856.62 8,137,944.46 7,993,407.36 -1.788 288,712.09 233,744.94 2,530,390.24 2,294,932.40 -9.319 921,788.79 328,732.65 2,896,099.11 2,958,593.65 2.16% 118.000.00 110.000.00 1,052,754.00 1.050,973.00 -0.17% 7,096,831.35 6,283,199.03 62,576,442.37 64,101,837.54 2.44% (679,095.37) 1,087,499.01 3,156,609.05 3,071,098.45 -2.718 0.00 (35,059.70) 09,491.75 11,741.25 -86.88% (194,405.26) (197,537.08) (1,749,641.28) (1,]]1,833.74) 1.618 5,641.29 12,176.30 98,271.69 105,125.18 6.978 (251.41) (177.38) (31546.86) (2,604.78) -26.52% 51,036.49 3,198.04 366,207.02 351,254.55 -4.080 (137.976.89) (211.399.82) (1.199.221.68) (1.312.311.541 9.438 (811.072.261 810.099.19 1,957,387.37 1,758,780.91 -10.159 101,873,334.16 101,445,083.23 -0.429 10].630.721.53 103.203.664.16 -0.600 OPERATING EXPENSES: (SCH G P.12A) PURCHASED ROMA - CAPACITY PURCHASED POWER - TRANSMISSION PURCHASED POWER FUEL OPERATING MAINTENANCE DEPRECIATION VOLUNTARY PAYMENTS TO TOWNS TOTAL OPERATING EXPENSES OPERATING INCOME NONOPERATING REVENUES (EXPENSES) CONTRIBUTIONS IN AID OF CONST RETURN ON INVESTMENT TO READNG INTEREST INCOME INTEREST EXPENSE OTHER (MSE AND AMORT) TOTAL NONOPERATING REV (EXP) 14,031,978.80 TOWN OF READING, MASSACHUSETTS 13,085,550.00 2,382,739.00 946,428.80 (623,958.09) 7.23% -26.19% MUNICIPAL LIGHT DEPARTMENT HET ASSETS AT BEGINNING OF YEAR 9,621,608.00 (74,308.15) -0.77% BUSINESS -TYPE PROPRIETARY FUND 26,224,452.28 26,826,671.00 103,203.864.14 (602,218.72) STATEMENT OF REVENUES, EXPENSES AND CHANGES IN FUND HET ASSETS 1623.958.091 7,993,407.36 -0.60% 8,249,334.00 3/31/16 (255,926.64) -3.10% 2,294,932.40 ACTUAL BUDGET (486,073.60) y 2,958,593.85 YEAR TO DATE YEAR TO DATE VARIANCE. CHANGE OPERATING REVENUES: (SCH F P.11B) -0.96% 1.050,973.00 1.062.000.00 BASE REVENUE 17,852,328.16 17,666,948.00 -1.00 185,380.16 1.05% FUEL REVENUE 25,928,808.19 2],501,6]1.00 (1,572,862.81) -5.72% PURCHASED POWER CAPACITY 23,105,038.79 22,]0],358.00 397,680.79 1.75% FORFEITED DISCOUNTS 637,768.08 530,010.00 107,758.08 20.33% ENERGY CONSERVATION REVENUE 509,446.18 512,066.00 (2,619.82) -0.51% NYPA CREDIT (860.453.41) (675,000,00) (185,453.4L) 27.47% TOTAL OPERATING REVENUES 6],1]2,935.99 68,243,053.00 (1,070,117,01) -1.57% OPERATING EXPENSES: (SCH G P.12A) PURCHASED ROMA - CAPACITY PURCHASED POWER - TRANSMISSION PURCHASED POWER FUEL OPERATING MAINTENANCE DEPRECIATION VOLUNTARY PAYMENTS TO TOWNS TOTAL OPERATING EXPENSES OPERATING INCOME NONOPERATING REVENUES (EXPENSES) CONTRIBUTIONS IN AID OF CONST RETURN ON INVESTMENT TO READNG INTEREST INCOME INTEREST EXPENSE OTHER (MSE AND AMORT) TOTAL NONOPERATING REV (EXP) 14,031,978.80 1,758,780.91 13,085,550.00 2,382,739.00 946,428.80 (623,958.09) 7.23% -26.19% 9,547,499.85 HET ASSETS AT BEGINNING OF YEAR 9,621,608.00 (74,308.15) -0.77% 26,224,452.28 26,826,671.00 103,203.864.14 (602,218.72) 103.82].822.23 -2.24% 1623.958.091 7,993,407.36 -0.60% 8,249,334.00 (255,926.64) -3.10% 2,294,932.40 2,781,006.00 (486,073.60) -17.48% 2,958,593.85 2,98],3]0.00 (28,776.15) -0.96% 1.050,973.00 1.062.000.00 (11,027.00) -1.00 64,101,837.54 64,613,739.00 (511,901.46) -0.79% 3,071,098.45 5,629,314.00 (558,215.55) -15.38% 11,741.25 1,758,780.91 150,000.00 2,382,739.00 (138,258.75) (623,958.09) -92.17% -26.19% (1,777,833.74) HET ASSETS AT BEGINNING OF YEAR (1,]]7,500.00) (333.74) 0.02% 105,125.18 112,500.00 103,203.864.14 (7,374.82) 103.82].822.23 -6.56% 1623.958.091 (2,604.78) -0.60% (1,575,00) (1,029.78) 65.384 351,254.55 270,000.00 81,254.55 30.09% (1.312.317.541 (1,246.575.00) (65.742,54) 5.27% CHANGE IN HET ASSETS 1,758,780.91 2,382,739.00 (623,958.09) -26.19% HET ASSETS AT BEGINNING OF YEAR 101,445,083.23 101,445,083.23 0.00 0.00% HET ASSETS AT END OF MARCH 103,203.864.14 103.82].822.23 1623.958.091 -0.60% - ( ) - ACTUAL UNDER BUDGET (3A( TOW OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT RECONCILIATION OF CAPITAL FUNDS 3/31/16 SOURCE OF CAPITAL FUNDS: DEPRECIATION FUND BALANCE 7/1/15 5,434,307.79 CONSTRUCTION FUND BALANCE 7/1/15 1,400,000.00 INTEREST ON DEPRECIATION FUND TY 16 20,293.33 DEPRECIATION TRANSFER FY 16 2.958.593.£5 TOTAL SOURCE OF CAPITAL FUNDS 9,813,194.97 USE OF CAPITAL FUNDS: LESS PAID ADDITIONS TO PLANT THRU !ARCH TOTAL USE OF CAPITAL FUNDS 4,390,170.07 GENERAL LEDGER CAPITAL FUNDS BALANCE 3/31/16 5.423.024. 9D TOWN OF READING, 1ASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT SALES OF KILOWATT HOURS 3/31/16 MUNICIPAL SALES: MONTH "IN LAST YEAR CURRENT YEAR YTD % SALES OF ELECTRICITY: LAST YEAA CURRENT YEAR TO DATE TO DATE CHANGE RESIDENTIAL SALES 20,626,652 19,021,810 199,492,134 194,916,901 -2.39% Conor. AND INDUSTRIAL SALES 29,273,602 30,884,897 3D4,911,288 296,607,913 -2.92% PRIVATE STREET LIGHTING 79,624 87,519 712,545 734,691 3.11E TOTAL PRIVATE CONSUNERS 49,979,878 49.994.226 _ 505,115,967 492.059,375 -2.58% MUNICIPAL SALES: STREET LIGHTING 237,189 220,596 2,179,674 2,054,216 -5.76% MUNICIPAL BUILDINGS 785,967 765,618 7,432,444 6,984,847 -6.02% TOTAL MUNICIPAL CONSUMERS 1.023.156 986.214 9,612,118 9.039.063 -5.96% SALES POR RESALE 246,558 238,160 2,584,169 2,442,454 -5.48% SCHOOL 1,291,370 1,263,893 11,609,559 10,894,125 -6.16% TOTAL KILOWATT HOURS SOLD 52,540.962 52.482,493 528.921,813 514.435,017 -2.74% (5) MONTH YEAR TO DATE LAST YEAR TO DATE TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT MI TT HOURS SOLD BY TOWN 3/31/16 TOTAL READING LYNNPIELD NO.EEADING WILMINGTON RESIDENTxAL 19,021,810 6,123,122 2,363,575 4,343,884 6,191,229 COMA I IND 30,884,897 3,980,365 229,446 4,643,913 22,031,173 PVT ST LIGHTS 87,519 16,756 2,768 26,241 41,754 PUB ST LIGHTS 220,596 74,583 28,161 39,499 78,353 MMI BLDGS 765,618 235,226 148,349 108,193 273,850 SALES/E85ALE 238,160 238,160 - 0 0 0 SCHOOL 1,263,893 443,505 270,583 250,920 298,885 TOTAL 52.482.493 11.111.717 3.042,882 9.418.650 28.915.244 RESIDENTIAL 194,716,781 61,735,990 27,591,010 44,931,742 60,452,039 CWm9 6 IND 296,607,913 36,695,955 2,391,029 46,382,010 211,148,919 PVT ST LIGHTS 734,681 128,200 16,864 226,747 362,870 PUB ST LIGHTS 2,054,216 693,093 269,994 363,791 727,338 MMI BLDGS 6,984,847 1,722,499 1,512,003 1,177,453 2,572,892 SALES/EE9AL4 2,442,454 2,442,454 0 0 0 SCHOOL 10,894,125 3,163,444 2,362,412 2,235,520 2,532,649 TOTAL 514,435.01] 10].181.]35 34.139.312 95.31].263 271.796.]0] RESIDENTIAL 199,492,134 62,381,127 28,379,843 45,643,242 63,088,922 Cpm% c IND 304,911,288 38,245,933 2,396,039 47,012,246 217,257,070 PVT ST LIGHTS 712,545 120,446 13,649 223,339 355,111 POB ST LIGHTS 2,179,674 732,410 294,595 382,641 770,028 HMI RIDGE 7,432,444 2,031,996 1,511,121 1,281,400 2,607,927 SALES/RESALE 2,584,169 2,584,169 0 0 0 SCHOOL 11,609,559 3,910,113 2,400,757 1,980,040 3,318,649 TOTAL 528,921,813 110.006.194 34,996,004 96.521.908 287.391 707 KIL0IATT BOMB SOLD TO TOTAL 37.85% 12.00% 5.36% 8.73% TOTAL REAMING LYNNPIELD NO.READING WIIHINGTON MONTH 0.46% 9.02% 41.05% RESIDERTIAL 36.24% 11.67% 4.50% 8.28% 11.79} CPom S IND 58.85% 7.58t 0.44% 8.85% 41.98% PVT ST LIGHTS 0.17% 0.03% 0.01% 0.05% 0.08% PUB ST LIGHTS 0.42% 0.14% 0.05% 0.08% 0.15% MUNI RLDGS 1.46% 0.45% 0.26% 0.211 0.52% SALES/RESALE 0.45% 0.45% 0.00% 0.00% 0.00% SCHOOL 2.41% 0.85% 0.52% 0.48% 0.56% TOTAL 100.00% 21.17% 5.80% 17.95% 55.05% YEAR TO DATE 2.19% 6.62% 18.52% 54.05% 0.45% LAST YEAR TO DATE RESIDENTIAL 37.85% 12.00% 5.36% 8.73% 11.76% COM I IND 57.66% COMA c IND 7.13% 0.46% 9.02% 41.05% PVT ST LIGHTS 0.14% 41.08% 0.02% PVT ST LIGHTS 0.00% 0.04% 0.08% PUB ST LIGHTS 0.40% 0.04% 0.13% 0.07% 0.05% 0.071 0.15% MUNI BLUGS 1.36% 0.06% 0.331 0.07% 0.29% 0.23% 0.51% MUNI BLOCS SALES/RESALE 0.47t 0.30% 0.47% 0.29% 0.00% 0.00% 0.00% 0.50% SCHOOL 2.12% 0.49% 0.73% 0.49% 0.46% 0.43% 0.50% 0.00% TOTAL 100.00% 20.81% 2.19% 6.62% 18.52% 54.05% 0.45% RESIDENTIAL 37.72% 11.79% 5.37% 8.63% 11.93% COMA c IND 57.65% 7.23% 0.45% 6.89% 41.08% PVT ST LIGHTS 0.13% 0.02% 0.00% 0.04% 0.07% PUB ST LIGHTS 0.41% 0.14% 0.06% 0.07% 0.14% MUNI BLOCS 1.41% 0.30% 0.29% 0.24% 0.50% SALES/RESALE 0.49% 0.49% 0.00% 0.00% 0.00% SCHOOL 2.19% 0.74% 0.45% 0.37% 0.63t TOTAL 100.004 20.79% 6.624 18.24% 54.35% 6) TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT 6VRNULA INCOME 3/31/16 TOTAL OPERATING REVENUES (P. 3) ADD: POLE RENTAL LESS: INTEREST INCOME ON CUSTOMER DEPOSITS OPERATING E"ENSES (P. 3) CUSTO@R DEPOSIT INTEREST EXPENSE FORMULA INCOME (LOSS) (7) 6],1]2,935.99 0.00 4,014.04 (64,101,537.54) (2,604.75) SALE OF HWH (P. 5( K PURCxRS£o AVE SASE COST PER RWH AVE BASE SALE PER I AVE COST PER KWH AVE SALE PER KWH FUEL CHARGE REVENUE (P.3( LOAD FACTOR f]AA[i Atl:41 TOWN OF RENDING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT GE RAL STATISTICS 3/31/16 MONTH OF MAR 2015 52,540,962 58,925,210 0.024633 0.030794 0.077474 0.075942 2,372,124.71 78.85% 102,366 MONTH OF % CHANGE YEAR THRU NAR 2016 2015 2016 NAR 2015 NAR 2016 52,482,493 -0.37% -2.74% 528,921,813 514,435,017 54,713,763 -3.04% 0.77% 535,201,067 539,328,030 0.028039 -39.43% 8.57% 0.023964 0.026018 0.033879 -53.13% 11.53% 0.031114 0.034703 0.067323 -15.90 2.97% 0.072492 0.074642 0.084717 -28.09% 5.60% 0.080595 0.085105 2,668,095.44 8.15% -0.93% 26,171,814.75 25,928,808.19 79.21% 94,617 (a) T0W OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT SCHEDULE OF CASH AND INVESTMENTS 3/31/16 UNRESTRICTED CASH CASH - OPERATING FUND CASH - PETTY CASH TOTAL UNRESTRICTED CASH CASH - DEPRECIATION FIND CASH - TOW PAYMENT CASH - DRFERRED FUEL RESERVE CASH - RATE STABILIZATION FUND CASH - UNCOLLECTIBLE ACCTS RESERVE CASH - SICK LEAVE BENEFITS CASH - HAZARD NASTE RESERVE GSH - CUSTOT&R DEPOSITS CASH - ENERGY CONSERVATION TOTAL RESTRICTED CASH INVESTMENTS SICK LEAVE BUYBACK TOTAL CASH BALANCE SCHEDULE A PREVICUS YEAR CURRENT YEAR 11,725,347.39 12,889,679.76 3,000.00 3,000.00 11.728.347.39 12.892.679.76 5,738,974.40 5,423,024.90 937,215.75 946,611.00 3,604,623.69 4,024,187.65 6,759,552.68 6,809,457.21 200,000.00 200,000.00 1,716,789.36 1,619,479.39 150,000.00 150,000.00 834,407.02 891,315.67 584,792.25 668,318.09 20.526.355.15 20.932,393.91 191 1.292.906.26 1.284.061.45 33.547.606.80 35.109,135.12 TOWN OF READING, MASSACHUSETTS HDNICIPAL LIGHT DEPARTMENT SCHEDULE OF ACCOUNTS RECEIVABLE 3/31/16 SCHEDULE B SCHEDULE OF PREPAYMENTS PREPAID INSURANCE PREVIOUS YEAR 1,920,573.63 CURRENT YEAR SCHEDULE OF ACCOUNTS RECEIVABLE PREPAYMENT PURCHASED POWER 358,882.24 (139,499.06) RESIDENTIAL AND CONHERCTAL 2,434,566.15 259,957.39 1,920,573.63 307,572.50 ACCOUNTS RECEIVABLE - OTHER 103,232.98 260,539.58 047,904.37 311,045.65 ACCOUNTS RECEIVABLE - LIENS 33,214.37 12,700.11 19,398.28 14,070.06 ACCOUNTS RECBIVABLE - EMELOYEE ADVANCES 892.14 1,900.447.64 543.53 1,562.102.39 SALES DISCOUNT LIABILITY (189,102.33) (91,073.73) 60 DAYS RESERVE FOR UNCOLLECTIBLE ACCOUNTS (288.655.57) 4.91% (238.313.08) TOTAL ACCOUNTS RECEIVABLE BILLED 2,094,147.54 2,359,033.00 UNBILLED ACCOUNTS RECEIVABLE 5,622,269.28 63,303.64 5,166,349.95 3.46% TOTAL ACCOUNTS RECEIVABLE, NET 7 716,416.82 TOTAL 7.525.352.95 SCHEDULE OF PREPAYMENTS PREPAID INSURANCE 1,008,368.32 1,920,573.63 1,068,113.24 PREPAYMENT PURCHASED POWER 358,882.24 (139,499.06) PREPAYMENT BARRY 259,957.39 GENERAL LEDGER BALANCE 307,572.50 1.829.499.90 PREPAYMENT WATSON 260,539.58 311,045.65 PURCHASED PONER WORKING CAPITAL 12,700.11 1,410,813.35 14,070.06 77.12% TOTAL PREPAYMENT 1,900.447.64 30 DAYS 1,562.102.39 OTHER DEFERRED DEBITS 0.00 1.547.815.00 ACCOUNTS RECEIVABLE AGING HARCH 2016: RESIDENTIAL AND CCHNERCIAL 1,920,573.63 LESS: SALES DISCOUNT LIABILITY (91.073.73) GENERAL LEDGER BALANCE 1.829.499.90 CURRENT 1,410,813.35 77.12% 30 DAYS 228,393.18 12.48% 60 DAYS 89,802.30 4.91% 90 DAYS 37,187.43 2.03% OVER 90 DAYS 63,303.64 3.46% TOTAL 1.829,499.90 100.00% poi MUNICIPAL SALES: TOWN OF READING, HASSACHDSETTS 4,446,168.95 42,628,526.27 MUNICIPAL LIGHT DEPARTMENT 2.709 STREET LIGHTING (64,851.50) SCHEOUL6 OF OPERATING HE VENUS 174,044.60 152,543.25 -12.359 3/31/16 MUNICIPAL BUILDINGS 59,375.40 62,824.86 582,186.39 578,152.70 SCnDULE D TOTAL MUNICIPAL CONSUMERS 15,476.101 MONTH NORTH LAST YEAR CURRENT YEAR YTD 9 SALES OF ELECTRICITY: LAST YEAR CURRENT YEAR TO DATE ENERGY CONSERVATION - CO RCIAL TO DATE CHANGE RESIDENTIAL SALES 1,959,329.86 1,900,]]0.50 18,896,674.52 314,615.22 19,357,230.44 19,691.69 2.449 COMA AND INDUSTRIAL SALES 2,014,889.49 2,322,006.98 21,795,933.70 (115,732,84) 22,508,168.71 (727,657.76) 3.274 PRIVATE STREET LIGHTING 9,148.12 10,609.53 84,797.20 92,291.47 6.417.735.98 8.849 TOTAL PRIVATE CONSUMERS 3.883.367.47 4.233.387.01 40.777.405.42 0.419 41.957.690 62 2.899 MUNICIPAL SALES: 3,990,064.24 4,446,168.95 42,628,526.27 43,181,136.35 2.709 STREET LIGHTING (64,851.50) 28,503.76 174,044.60 152,543.25 -12.359 MUNICIPAL BUILDINGS 59,375.40 62,824.86 582,186.39 578,152.70 -0.699 TOTAL MUNICIPAL CONSUMERS 15,476.101 91.328.62 756,230.99 730.695.95 -3.389 ENERGY CONSERVATION - CO RCIAL 30,806.99 32,364.98 317,968.57 314,615.22 SALES FOR RESALE 19,691.69 21,040.18 (130,242.61) 219,485.22 (115,732,84) 213,739.83 (727,657.76) -2.629 (860,453.41) SCHOOL 92,481.18 100,413.14 6.417.735.98 875,404.64 ].3]0,698.04 879,009.95 65.]33 051.42 0.419 67.1]2 935.99 SUE -TOTAL 3,990,064.24 4,446,168.95 42,628,526.27 43,181,136.35 2.709 FORFEITED DISCOONTS 111,905.43 94,161.41 646,656.96 637,768.09 -1.379 PURCHASED POWER CAPACITY 2,394,543.72 2,894,686.58 22,667,928.12 23,105,038.79 1.939 ENERGY CONSERVATION - RESIDENTIAL 20,658.31 19,048.96 199,629.26 194,830.96 -2.409 ENERGY CONSERVATION - CO RCIAL 30,806.99 32,364.98 317,968.57 314,615.22 -1.059 NYPA CREDIT (130,242.61) (115,732,84) (727,657.76) (860,453.41) 18.259 TOTAL REVENUE 6.417.735.98 ].3]0,698.04 65.]33 051.42 67.1]2 935.99 2.199 DU TOWN OF RENTING, NASSACHDSETTS MUNICIPAL LIGHT DEPARTMNT SCHEDULE OF OPERATING REVENUE BY TOWN 3/31/16 PERCENTAGE OF OPERATING INCOME TO TOTAL TOTAL READING RRADING NO.REAIIING LYNNFIRLD MONTH NO.READING WILMINGTON MONTH REGIDENTLAL 42.15% 13.851 PESIDENTIAL 1,900,]]0.50 615,590.24 235,749.46 53.64% 433,609.49 7.91% 615,821.31 0.76% INDUS/MUNI BLDG 2,384,831.84 36.50% 351,685.07 PUB. ST.LIGHTS 33,641.88 3]6,520.9] 1,622,983.92 0.12% PUB. ST.LIGHTS 28,503.76 9,653.18 0.241 3,607.32 0.04% 5,126.29 0.01% 10,116.97 PRV.ST.LIGHTS 10,609.53 CO-OP RESALE 1,835.76 261.95 3,380.43 0.00% 5,131.39 0.00% CO-OP RESALE 21,040.18 2.26% 21,040.18 0.79% 0.00 0.47% 0.00 0.00 SCHOOL 100,413.14 35,174.85 20,680.93 18.90% 21,337.65 51.20% 23,219.71 THIS YEAR TO DATE TOTAL 4.446.168.95 1.034.9]9.28 293.941.54 839.9]4.83 2.2]].273.30 44.22% THIS YEAR TO DATE 14.11% 6.22% 10.18% 13.71% INDUS/MUNI SLOG 52.73% RESIDENTIAL 19,357,230.44 0.77% 6,1]],145.84 2,721,003.84 4,455,166.75 0.35% 6,003,914.01 0.12% INDUS/NUNS SLOG 23,086,321.41 0.06% 3,193,221.12 0.13% 337,701.01 PRV.ST.LIGHTS 3,704,085.30 15,851,313.98 PUB. ST.LIGHTS 152,543.25 51,655.26 19,694.86 0.49% 27,402.49 0.494 53,790.64 0.00% PRV.ST.LIGHTS 92,291.47 0.00% 15,373.46 SCHOOL 1,964.85 29,943.90 45,009.26 0.44% CO-OP RESALE 213,739.83 213,739.83 0.00 22.75% 0.00 7.45% 0.00 SCHOOL 879,009.95 304,747.55 184,175.79 190,640.34 199,446.27 TOTAL 43.]91.136.35 9.955.883.06 3.261,540.33 8.407,238.79 22,153.470.17 RESIDENTIAL 44.33% 13.92% 6.27% 10.12% 14.02% INDUS/NUNS BLOC LAST YEAR TO DATE 7.50% 0.15% 8.51% 35.74% MB ST.LIGHTS 0.41% RZSIDENTW. 18,896,674.52 5,935,691.05 0.07% 2,672,364.35 0.14% 4,314,726.50 PRV.ST.LIGHTS 5,973,892.62 INDUS/MUNI BLDG 22,378,120.09 0.00% 3,195,418.54 318,364.04 3,629,456.77 0.51% 15,234,880.74 0.51% PUB.ST.LIGHTS 174,144.60 0.00% 58,482.14 0.00t 23,523.09 SCHOOL 30,553.47 61,585.90 PRV.ST.LIGHTS 84,797.20 14,061.11 1,651.90 _100.00% 27,562.07 22.80% 41,522.12 7.50% CO-OP RESALE 219,485.22 50.58% 219,485.22 0.00 0.00 0.00 SCHOOL 875,404.64 298,077.28 178,992.72 151,533.35 246,801.29 TOTAL 42.628.626.27 9.721.215.34 3.194.896.10 8, 153,832.1fi 21.558.682.67 PERCENTAGE OF OPERATING INCOME TO TOTAL TOTAL READING LYNNFIELD NO.REAIIING WILMINGTON MONTH REGIDENTLAL 42.15% 13.851 5.30% 9.75% 13.85% INDUS/NUNS BIDS 53.64% 7.91% 0.76% 8.474 36.50% PUB. ST.LIGHTS 0.64% 0.221 0.08% 0.12% 0.22% PRV.ST.LIGHTS 0.241 0.04% 0.01% 0.081 0.11% CO-OP RESALE 0.47% 0.47% 0.00% 0.00% 0.00% SCHOOL 2.26% 0.79% 0.47% 0.48% 0.52% TOTAL100.0O% 23.28% 6.62% 18.90% 51.20% THIS YEAR TO DATE RESIDENTIAL 44.22% 14.11% 6.22% 10.18% 13.71% INDUS/MUNI SLOG 52.73% 7.29% 0.77% 8.46% 36.21% PUS.ST.LIGHTS 0.35% 0.12% 0.00 0.06% 0.13% PRV.ST.LIGHTS 0.21% 0.04% 0.00% 0.07* 0.10% CO-OP REGALE 0.49% 0.494 0.00% 0.00% 0.00% SCHOOL 2.00% 0.70% 0.42% 0.44% 0.44% TOTAL100.00% 22.75% 7.45% 19.21% 50.59% LAST YEAR TO DATE RESIDENTIAL 44.33% 13.92% 6.27% 10.12% 14.02% INDUS/NUNS BLOC 52.50% 7.50% 0.15% 8.51% 35.74% MB ST.LIGHTS 0.41% 0.14% 0.06% 0.07% 0.14% PRV.ST.LIGHTS 0.20% 0.03% 0.00% 0.06% 0.11% CO-OP RESALE 0.51% 0.51% 0.00% 0.00% 0.00t SCHOOL 2.05% 0.10% 0.42% 0.36% 0.57% TOTAL _100.00% 22.80% 7.50% 19.12% 50.58% SALES OF ELECTRICITY: RESIDENTIAL COHN AND INDUSTRIAL SALES PRIVATE STREET LIGHTING MUNICIPAL BUILDINGS PUBLIC STREET LIGHTING BALES FOR RESALE SCHOOL TOTAL BASE SALES TOTAL FUEL BALES TOTAL OPERATING REVENUE FORFEITED DISCOUNTS PURCHASED POWER CAPACITY ENERGY CONSERVATION - RESIDENTIAL ENERGY CONSERVATION - COHXERCIAL HYPA CREDIT TOTAL OPERATING REVEHUeS ( ) - ACTUAL UNDER BUDGET TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT BUDGETED REVENUE VARIANCE REPORT 3/31/16 SCHEDULE F ACTUAL BUDGET % YEAR TO DATE YEAR TO DATE VARIANCE • CHANGE 9,617,065.80 9,551,349.00 65,716.80 0.69% 7,761,815.99 7,408,738.00 353,D77.99 4.77% 49,358.86 284,264.00 (234,905.14) -82.64% 92,566.46 103,876.00 (11,309.54) -10.69% 331,521.05 318.721.00 12.800.05 4.02% 17,652,328.16 17,666,948.00 185,380.16 1.05% 25,928,808.19 27,501.671.00 (1,572.862.811 -5.72% 43,781,136.35 45,168,619.00 (1,387,462.65) -3.07% 637,768.08 530,010.00 107,758.08 20.33% 23,105,038.79 22,707,358.00 397,680.79 1.75% 194,830.96 195,961.00 (1,130.04) -0.58% 314,615.22 316,ID5.DO (1,489.78) -0.47% (860,453.41) (675,000.00) (185,453.41) 27.47% -1.57% 67.172.935.99 68,243,053.00 (1.070.117.011 OPERATION EXPENSES: PURCHASED POWER CAPACITY PURCHASED POWER TRANSMISSION TOTAL PURCHASED POWER OPERATION SUP AND ENGINEERING RXP STATION SUP LABOR AND NISC LINE NISC LABOR AND EXPENSE STATION LABOR AND EXPENSE STREET LIGHTING EXPENSE MIER EXPENSE NISC DISTRIBUTION EXPENSE METER READING LAROR 6 EXPENSE ACCT 4 CO" LABOR 6 EXPENSE UNCOLLECTIBLE ACCOUNTS ENERGY AUDIT EXPENSE ADMIN 4 GEN SALARIES OFFICE SUPPLIES 6 EXPENSE OUTSIDE SERVICES PROPERTY INSURANCE INJURIES AND DAHNGES EMELOYEE9 PENSIONS G BENEFITS NISC GENERAL EXPENSE RENT EXPENSE ENERGY CONSERVATION TOTAL OPERATION EXPENSES IWINTRUAHCE EXPENSES: (MINT OF TRANSNZSSION PLANT !PINT OF STRUCT AND EQUI PNT NAINT OF LINES - ON NAINT OF LINES - UG NAINT OF LINE TRANSFORMERS NAINT OF ST IT 6 SIG SYSTEM NAZNT OF GARAGE AND STOCXROCH HAIM OF METERS MMMT OF GEN PLANT TOTAL MAINTENANCE EXPENSES DEPRECIATION EXPENSE PURCHASED POKER MEL EXPENSE VOLUNTARY PAYMENTS TO TOWNS TOTAL OPERATING EXPENSES TONN OF HEADING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT SCHEDULE OF OPERATING EXPENSES 3/31/16 SCHEDULE E MONTH NORTH LAST YEAR CURRENT YEAR YTD 6 LAST YP CURRENT YEAR TO DATE TO DATE CRINGE 1,463,262.28 1,534,123.01 12,025,378.23 14,031,970.80 9.418 951,509.01 865,365.34 9,161,648.07 9,547,499.85 4.218 2,414,]]1.29 2,399,488.35 21.987,026.30 23.5]9,4]0.65 7.248 47,212.01 52,952.93 397,020.30 419,435.25 5,650 13,542.19 14,326.27 120,176.99 116,490.39 -3.070 57,100.53 ]3,668.]3 631,164.63 533,844.25 -15.429 45,733.74 44,545.11 388,740.01 309,618.29 -20.366 9,015.47 10,112.10 69,008.86 87,402.15 26.65% 16,850.22 21,307.75 149,393.14 169,403.61 13.396 34,555.39 46,614.15 338,479.57 341,447.62 0.886 474.28 409.43 12,544.01 17,468.36 39.269 156,442.59 165,405.64 1,337,448.81 1,253,567.49 -6.270 10,000.00 10,000.00 90,000.00 90,000.OD 0.000 31,758.41 (4,278.03) 304,910.18 369,973.23 21.340 52,682.28 00,961.46 599,227.56 676,492.34 12.890 29,214.26 36,773.20 231,992.91 256,736.22 10.670 29,435.30 76,973.08 297,977.62 300,414.68 0.820 31,242.39 2],632.]2 272,737.70 273,314.15 0.216 4,472.39 4,627.56 33,566.42 36,429.00 8.536 225,136.83 235,210.85 2,233,137.41 2,064,437.13 -6.666 6,800.84 5,052.82 111,828.46 101,346.25 -9.370 16,405.41 13,983.07 128,515.22 129,852.90 1.044 33,501.11 129,576.98 390,066.58 425,734.05 9.146 651.655.64 1.053,856.62 8,137,944.46 7,993,407.36 -1.79% 227.00 227.00 2,043.74 2,043.74 0.009 35,932.35 49,313.13 400,337.11 300,410.02 -24.960 157,594.53 95,194.02 1,312,532.65 1,284,508.86 -2.140 16,192.11 6,940.93 129,667.45 89,221.89 -31.199 0.00 0.00 61,321.32 881896.50 44.979 (42.07) (62.66) (149.25) (501.13) 235.779 62,905.67 65,913.79 460,960.03 428,664.91 -7.016 0.00 33.34 0.00 33.34 0.008 15,023.22 16,177.31 163,677.19 101,654.27 -37.890 280 712.09 233,744.94 2,530,390.24 2.294,932.40 -9.319 321,788.79 328,732.65 2,896,099.11 2,958,593.85 2.160 3,101,903.54 2,149,376.47 25,972,228.26 26,224,452.28 0.97E 118,000.00 1191000.00 1,052,754.00 1,050,973.00 -0.170 ].096.831.35 6,293,199.03 62,5]6.442.3] 64.101.83].54 (12) 2.449 TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT BUDGETED OPERATING EXPENSE VARIANCE REPORT 3/31/16 SCHEDULE G MAINTENANCE EXPENSES HAINT OF TRANSUSSION PLANT ACTUAL BUDGET (206.26) -9.17% % OPERATION EXPENSES: YEAR TO DATE YEAR TO DATE VARIANCE • CHANGE PURCHASED POWER CAPACITY 14,031,978.80 4.60% 13,085,550.00 HAINT OF LINES - ON 446,428.80 7.23% PURCHASED POWER TRANSIISETON 9,547,449.85 -13.13% 9,621,808.00 HAINT OF LINES - UG (74,308.15) -0.]]% TOTAL PURCHASED POWER 23.5]9.4]5.65 -22.50% 22.]0].358.00 RAINY OF LINE TRANSFORMERS 872,120.65 3.84% (136,103.50) -60.49% OPERATION SUP AND ENGINEERING EXP 419,435.25 4]4,0]0.00 (54,634.75) -11.52% STATION SUP LABOR AND RISC 116,490.39 63,648.00 52,842.39 83.02% LINE MISC LABOR AND EXPENSE 533,844.25 516,245.00 17,599.25 3.41% STATION LABOR AND EXPENSE 309,618.29 33],53].00 (2],918.]1) -8.27% STREET LIGHTING EXPENSE 87,402.15 70,296.00 17,106.15 24.33% METER EXPENSE 169,403.61 171,D38.00 2,958,593.85 (1,614.39) 2,98],3]0.00 -0.94% (28,]]6.15) RISC DISTRIBUTION EXPENSE 341,447.62 344,941.00 26,224,452.2E (3,493.38) 26,826,671.00 -1.01% (602,218.72) METER READING LABOR 6 EXPENSE 17,468.36 24,487.00 1,050,973.00 (7,018.64) 1,062,000.00 -28.66% (11,027.00) ACCT 6 COLL LABOR 6 EXPENSE 1,253,50.49 1,281,542.00 (2],9]4.51) -2.18% UNCOLLECTIBLE ACCOUNTS 90,000.00 90,000.00 64.613,]39.00 0.00 0.004 ENERGY AUDIT EXPENSE 369,973.23 362,739.00 7,234.23 1.99% ADRQN 6 GEN SALARIES 676,492.34 629,574.00 46,918.34 7.45% OFFICE SUPPLIES 6 EXPENSE 256,736.22 225,900.00 30,836.22 13.65% OUTSIDE SERVICES 300,414.68 306,407.00 (5,992.32) -1.96% PROPERTY INSURANCE 273,314.15 349,650.00 (76,335.85) -21.83% INJURIES AND DAHAGES 36,429.00 38,589.00 (2,160.00) -5.60% EMPLOYEES PENSIONS I BENEFITS 2,084,437.13 1,995,172.00 89,265.13 4.474 MISC GENERAL EXPENSE 101,346.25 196,072.00 (94,]25.]5) -48.31% SENT EXPENSE 129,852.90 159,003.00 (29,150.10) -18.33% ENERGY CONSERVATION 425,734.05 612,444.00 (186,709.95) -30.49% TOTAL OPERATION EXPENSES ],993.40].36 8.249.334.00 (255.926.64) -3.10% MAINTENANCE EXPENSES HAINT OF TRANSUSSION PLANT 2,043.74 2,250.00 (206.26) -9.17% [HINT OF STAUCT AND EQUIPMENT 300,41D.02 287,186.00 13,224.02 4.60% HAINT OF LINES - ON 1,284,508.86 1,478,630.00 (194,121.14) -13.13% HAINT OF LINES - UG 89,221.89 115,120.00 (25,898.11) -22.50% RAINY OF LINE TRANSFORMERS 88,896.50 225,000.00 (136,103.50) -60.49% HAINT OF ST LT S SIG SYSTEM (501.13) 1,599.00 (8,090.13) -106.60% [MINT OF GARAGE AND STOCRROOH 428,664.91 493,831.00 (65,166.09) -13.20% HAINT OF METERS 33.34 3],]50.00 (3],]16.66) -99.91% HAINT OF GEN PLANT 101,654.27 133,65D,00 (31,995.73) -23.94% TOTAL MAINTENANCE EXPENSES 2,294.932.40 2.]81.006.00 (486.073.60) -17.48% DEPRECIATION EXPENSE 2,958,593.85 2,98],3]0.00 (28,]]6.15) -0.96% PURCHASED POKER FUEL EXPENSE 26,224,452.2E 26,826,671.00 (602,218.72) -2.24% VOLUNTARY PAYMENTS TO TOWNS 1,050,973.00 1,062,000.00 (11,027.00) -1.04% TOTAL OPERATING EXPENSES -0.79% 64,101.83].54 64.613,]39.00 (511.901.461 ( ) - ACTUAL UNDER BUDGET 1m) TONS OF HEADING, IASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT BUDGETED OPERATING EXPENSE VARIANCE REPORT 3/31/16 TAINTENANCE EXPENSES MINT OF TRANSMISSION PLANT RESPONSIBLE 3,000.00 2,043.14 ROAINING 31.88% MINT OF STRUCT AND EQUIPMT SENIOR 2016 ACTUAL BUDGET REMAINING OPERATION EXPENSES: TANAGER ANNUAL BUDGET YEAR TO DATE BALANCE 1,284,508.86 BUDGET % PURCHASED POWER CAPACITY JP 17,095,785.00 TAINT OF LINES - UG 14,031,978.80 130,694.00 3,063,806.20 89,221.89 17.92% 41,472.11 PURCHASED POWER TRANSMISSION JP 12,600,639.00 MINT OF LINE TRANSFORMERS 9,547,499.85 156,000.00 3,053,139.15 88,896.50 24.23% 67,103.50 TOTAL PURCHASED POWER 43.02% 29,696.424.00 MINT OF ST LT 6 SIG SYSTEM 23,579,478 65 6,116,945.35 (501.13) 20.60% 10,246.13 105.14% TAINT OF GARAGE AND STOCEROOM NJ 660,131.00 OPERATION SUP AND ENGINEERING EXP HJ 629,691.00 231,466.09 419,435.25 35.06% 210,255.75 MINT OF NETERS 33.39% 43,575.00 STATION SUP LA30R AND MISC HJ 84,858.00 43,541.66 116,490.39 99.92% (31,632.39) MINT OF GEN PLANT -37.28% 178,200.00 LINE MISC LABOR AND EXPENSE HJ 666,641.00 76,545.73 533,844.25 42.95% 132,796.75 TOTAL MAINTENANCE EXPENSES 19.92% 3.341.465.00 STATION LABOR AND EXPENSE HJ 448,347.00 1,046.532.60 309,618.29 31.32% 136,728.71 30.94% STREET LIGHTING EXPENSE BJ 93,347.00 DEPRECIATION EXPENSE 87,402.15 3,983,145.00 5,944.85 2,958,593.85 6.37% 1,024,551.15 MTER EXPENSE HJ 233,648.00 PURCHASED POWER FUEL EXPENSE 169,403.61 34,326,329.00 64,244.39 26,224,452.28 27.50% 8,101,576.72 MISC DISTRIBUTION EXPENSE HJ 457,068.00 VOLUNTARY PAYNENTS TO TOWNS 341,447.62 1,416,000.00 115,620.38 1,050,973.00 25.30% 365,027.00 NETER HEADING LABOR I EXPENSE HJ 32,578.00 TOTAL OPERATING EXPENSES 17,468.36 15,109.64 46.38% ACCT I COLL LABOR c EXPENSE RP 1,693,219.00 83.632,495.00 1,253,567.49 64.101.837.54 439,651.51 19.530.657.46 25.97% UNCOLLECTIBLE ACCOUNTS J4 120,000.00 90,000.00 30,000.00 25.00% ENERGY AUDIT EXPENSE JP 482,273.00 369,973.23 112,299.77 23.29% ADNIN c GEN SALARIES CO 838,461.00 676,492.34 161,968.66 19.32% OFFICE SUPPLIES 6 EXPENSE CO 301,000.00 255,736.22 44,263.78 14.71% OUTSIDE SERVICES CO 377,332.00 300,414.68 76,917.32 20.38% PROPERTY INSURANCE NJ 466,200.00 273,314.15 192,885.85 41.37% INJURIES AND DAMAGES BJ 51,254.00 36,429.00 14,825.00 28.92% EMPLOYEES PENSIONS I BENEFITS NJ 2,633,591.00 2,084,437.13 549,153.87 20.85% MISC GENERAL EXPENSE CO 231,022.00 101,346.25 129,675.75 56.13% NEXT EXPENSE NJ 212,000.00 129,852.90 82,147.10 38.75% ENERGY CONSERVATION JP 816,602.00 425,734.05 390,867.95 47.87% TOTAL OPERATION EXPENSES 10.869,132.00 7,993,407.36 2,875,724.64 26.46% TAINTENANCE EXPENSES MINT OF TRANSMISSION PLANT HJ 3,000.00 2,043.14 956.26 31.88% MINT OF STRUCT AND EQUIPMT NJ 484,026.00 3DD,410.02 183,615.98 37.94% TAINT OF LINES - ON NJ 1,675,794.00 1,284,508.86 391,285.14 23.35% TAINT OF LINES - UG NJ 130,694.00 89,221.89 41,472.11 31.73% MINT OF LINE TRANSFORMERS NJ 156,000.00 88,896.50 67,103.50 43.02% MINT OF ST LT 6 SIG SYSTEM NJ 9,745.00 (501.13) 10,246.13 105.14% TAINT OF GARAGE AND STOCEROOM NJ 660,131.00 425,664.91 231,466.09 35.06% MINT OF NETERS NJ 43,575.00 33.34 43,541.66 99.92% MINT OF GEN PLANT RF 178,200.00 101,654.27 76,545.73 42.95% TOTAL MAINTENANCE EXPENSES 3.341.465.00 2,294.932.40 1,046.532.60 31.32% DEPRECIATION EXPENSE RF 3,983,145.00 2,958,593.85 1,024,551.15 25.72% PURCHASED POWER FUEL EXPENSE JP 34,326,329.00 26,224,452.28 8,101,576.72 23.60% VOLUNTARY PAYNENTS TO TOWNS AF 1,416,000.00 1,050,973.00 365,027.00 25.75% TOTAL OPERATING EXPENSES 23.35% 83.632,495.00 64.101.837.54 19.530.657.46 TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT PROFESSIONAL SERVICES 03/31/2016 PROFESSIONAL SERVICES BY PROJECT ITEM DEPARTMENT ACTUAL BUDGET VARIANCE 1 ENID AND PENSION TRUST AUDIT FEES ACCOUNTING 28,895.25 DUNCAN AND ALLEN 35,000.00 (6,104.75) 589.60 2 LEGAL-FERC/ISO/POWER/OTHER INTEGRATED RESOURCES 80,532.46 103,725.00 12,430.00 (23,192.54) RUBIN AND BUCHAN 3 NERC COMPLIANCE AND AUDIT E 6 0 25,205.85 23,196.25 11,250.00 PLA ELECTRIC POWER ENGINEERING 13,955.85 4 LEGAL- SOLAR/FIBER ENGINEERING 24,936.00 FLEET COUNSELOR SERVICES INC. 1,497.00 17,439.00 300.414.68 5 LEGAL -GENERAL GM 90,844.12 56,250.00 34,594.12 6 LEGAL SERVICES HR 32,100.25 64,938.00 (32,837.75) 7 SURVEY RIGHT OF NAY/ ENVIRONMENTAL BLDG. MAINT. 0.00 7,497.00 (7,497.00) 8 INSURANCE CONSULTANT/OTHER GEN. BENEFIT 17,900.75 20,250.00 (2,349.25) TOTAL 300,414.68 306,407.00 (5,992.32) PROFESSIONAL SERVICES BY VENDOR ACTUAL MELANSON HEATH 28,500.00 DUNCAN AND ALLEN 38,895.79 CHOATE PALL 6 STEWART 589.60 COTTE MANAGEMENT CONSULTING LLC 633.75 UTILITY SERVICE INC. 12,430.00 RUBIN AND BUCHAN 138,912.32 SHERCZYNSHI c CORN, PC 23,196.25 PLA ELECTRIC POWER ENGINEERING 24,936.00 FERRITER SCOBSO c RODOPHELE, PC 15,708.47 FLEET COUNSELOR SERVICES INC. 16,612.50 TOTAL 300.414.68 (13) DEFERRED FUEL CASH RESERVE ANALYSIS 3/31/16 (14) GROSS MONTHLY TOTAL DATE CHARGES REVENUES NYFA CREDIT DEFERRED DEFERRED a.-15 5,180,285.15 Jul -15 3,492,949.80 3,083,024.15 (65,798.90) (475,724.55) 4,704,560.60 Auq-15 3,269,589.09 3,172,916.67 (70,099.15) (166,771.57) 4,537,789.03 Sa -15 3,302,139.93 3,385,022.47 (100,901.03) (18,018.49) 4,519,770.54 Oct -15 2,543,916.53 2,607,127.52 (105,545.52) (42,334.53) 4,477,436.03 N0v-15 2,489,548.12 2,551,186.05 (87,425.40) (25,787.47) 4,451,648.54 Diu -15 2,757,146.26 2,826,699.78 (91,032.01) (21,478.49) 4,430,170.05 Jae -16 3,163,761.69 2,656,333.87 (108,747.38) (616,175.20) 3,813,994.85 Fab -16 3,056,024.39 2,978,402.24 (115,171.18) (192,793.33) 3,621,201.52 Mas -16 2,149,376.47 2,668,095.44 (115,732.84) 402,986.13 4,024,187.65 (14) AMA BUDGET / ACTUAL CCA@ARISON SDNHARY SCHEDULE 3/31/16 DIVISION ACTUAL BUDGET VARIANCE VAR % BUSINESS DIVISION 7,538,039 7,607,458 (69,419) -0.91% INTEGRATED RESOURCES 876,240 1,078,910 (202,670) -18.78% ENGINEERING AND OPERATIONS 3,645,039 3,999,260 (354,221) -8.86% FACILITY 3,439,181 3,530,840 (91,660) -2.60% GENERAL MANAGER 579.847 642.315 162,468) -9.73% SUB -TOTAL 16,078,346 16,858,783 (780,438) -4.63% PURCHASED POWER BASE 23,579,479 22,707,358 872,121 3.84% PURCHASED POWER FUEL 26,224,452 26,826,671 (602,219) -2.24% TOTAL 65.882,277 66 392 812 1510.5361 -0.77% FINANCIAL REPORT APRIL 30, 2016 ISSUE DATE: MAY 31, 2016 ASSETS CURRENT UNRESTRICTED CASH RESTRICTED CASH RESTRICTED INVESTMENTS RECEIVABLES, NET PREPAID ENWENSES OTHER DEFERRED DEBITS INVENTORY TOTAL CURRENT ASSETS NONCURRENT INVESTMENT IN ASSOCIATED CO CAPITAL ASSETS, NET TOTAL NONCURRENT ASSETS TOTAL ASSETS TOWN OF HEADING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT BUSINESS -TYPE PROPRIETARY FUND STATE!ffiNT OF NET ASSETS 4/30/16 PREVIOUS THAN, CURRENT YEAR (BCH A P.9) 10,499,390.73 12,353,229.44 (BCH A P.9) 21,859,201.96 17 21,391,093.72 (BCH A P.9) 1,292,906.26 1,284,061.45 (BCH B P.10) 7,138,806.92 10,00],83].81 2,918,870.73 (BCH B P.10 2,322,]47.8] 2,918.870.73 1,036,936.50 3.070.487.93 (BCH B P.10) 0.00 1,547,815.00 1,64],9]4.25 16.317.967.92 1,623,032.70 44.]61.02].99 49.224.006.62 (BCH C P.2) (BCH C P.2) LIABILITIES CURRENT ACCOUNTS PAYABLE CUSTOMER DEPOSITS CUSTOMER ADVANCES FOR CONSTRUCTION ACCRUED LIABILITIES TOTAL CURRENT LIABILITIES NONCURRENT ACCRUED ENWMEES CO ENSATED ABSENCES TOTAL NONCURRENT! LIABILITIES TOTAL LIABILITIES INVESTED IN CAPITAL ASSETS, NET OF RELATED DEBT RESTRICTED FOR DEPRECIATION FUND (P. 9) UNRESTRICTED TOTAL NET ASSETS (P. 3) TOTAL LIABILITIES AND NET ASSETS u 26,993.75 26,993.75 69,609,835.42 72,138,142.09 fi9.fi36,829. 17 72.165.135.84 114.391,651.16 121.389.142.46 5,276,532.29 8,243,929.56 833,687.02 884,660.03 585,072.48 1,060,465.55 286,847.01 3,058,424.85 6.982.138.80 13.24],4]9.99 2,918,870.73 3,0]0,48].93 2,918.870.73 3.070.487.93 9,901.009.53 16.317.967.92 69,609,835.42 72,138,142.09 5,194,492.97 4,635,370.82 29,092,519.24 28,297,661.63 104,496.84].63 105,071.174.54 114.39].85].16 121.389.142.46 TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT NONCURRENT ASSET SCHEDDLE 4/30/16 SCHEDULE OF INVESTMENTS IN ASSOCIATED COMPANIES NEW ENGLAND HYDRO ELECTRIC NEW ENGLAND HYDRO TRANSMISSION TOTAL INVESTMENTS IN ASSOCIATED COMPANIES SCHEDULE OF CAPITAL ASSETS LAND STRUCTURES AND IIRROVXKRMTS EQUIPMENT AND FURNISHINGS INFRASTRUCTURE TOTAL CAPITAL ASSETS, NET SCHEDULE C PREVIOUS YEAR CURRENT YEAR 2,975.74 2,975.74 24,018.01 24,018.01 26.993.05 1,265,842.23 6,312,398.38 12,590,216.90 49,441.377.91 69.fi09 835 42 26.993 75 1,265,842.23 7,423,355.47 12,508,181.29 50,940.763.10 72 138 142 09 TOTAL NONCURRENT ASSETS 69.636.829.17 72.165.135.84 TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT 0EPARTMENT BUSINESS -TYPE PROPRIETARY FUND STATEMENT OF REVENVEP, EXPENSES AND CHANGES IN FUND NET ASSETS 4/30/16 OPERATING REVENUES: (SCH D P.11) BASE REVENUE FUEL REVENUE PURCWE80 POWER CAPACITY FORFEITED DISCOUNTS ENGAGE CONSERVATION REVENUE NYPA CREDIT TOTAL OPERATING REVBNUEE OPERATING EXPENSES: (SCH S P.12) PURCHASED POWER CAPACITY PURCHASED POWER TRANSMISSION PURCHASED POWER PUEL OPERATING MAINTENANCE DEPRECIATION VOLUNTARY PAFRENTS TO TOWNS TOTAL OPERATING EXPENSES OPERATING INCONM NONOPEPATING REVENUES (EXPENSES) CONTRIBUTIONS IN AID OF CONST RETURN ON INVESTMENT TO READING INTEREST INCONE INTEREST EXPENSE OTHER (MSE AND AMORT) TOTAL NONOPERATING REV (8.) ORANGE IN NET ASSETS NET ASSETS AT BEGINNING OF YEAR NIT ASSETS AT END OF APRIL NORTH MONTH LAST YEAR CURRENT YEAR YTD % LAST YEAR CURRENT YEAR TO DATA TO DAT) ORANGE 1,679,823.07 11850,100.08 18,136,536.59 19,702,428.24 8.63% 2,560,445.08 2,745,250.33 28,732,259.93 28,674,058.52 -0.20% 2,049,101.57 3,106,976.70 24,716,029.69 26,212,015.49 6.050 64,035.97 36,148.77 710,692.93 673,916.85 -5.17% 50,591.08 54,209.16 568,178.91 563,655.34 -0.80% (100.873.74) (129.300.16) (828.531.50) (989,753.5 19.46% 6,302,113.03 7,663,384.88 72,035,164.45 74,836,320.97 3.89% 1,447,201.16 1,460,665.08 16,272,579.39 15,492,643.88 8.55% 925,838.93 834,561.05 10,097,487.00 10,382,060.90 2.92% 1,503,848.55 1,021,988.77 27,476,076.81 28,046,441.05 2.08% 975,728.44 891,071.87 9,113,672.90 8,884,479.23 -2.51\ 201,021.16 279,471.04 2,731,411.40 2,574,403.64 -5.75% 321,788.79 320,732.65 3,217,887.90 3,207,326.50 2.161 118.000.00 110,000,00 1,170 756 00 368,973.00 -0.151 5,493,427.03 5,734,490.46 68,069,869.40 69,836,328.00 2.60% 808,606.00 1,920,894.42 3,965,295.05 4,999,992.87 26.09% 35,610.25 125,000.00 125,102.00 136,741.25 9.30% (194,405.26) (197,537.08) (1,944,052.54) (1,975,370.82) 1.61% 5,075.75 8,406.50 103,347.44 113,531.68 9.95% (251.64) (187.04) (3,796.50) (2,791.82) 46.46% 11,411.00 2,733.60 377,618.02 353,988.15 -6.26% (142.559.90) (61.584.02) (1.341.781.58) (1,373.90Z.56) 2.39% fifi 6.12fi .30 1.667.310.40 pl 2,623,513.47 3,626,091.31 38.22% 101,873,334.16 101,445,083.23 -0.42% 104.496.847.63 105.071.174.54 0.55% OPERATING EXPENSES: (SCH G P.12A) PURCHASED POWER - CAPACITY PURCHASED POWER - TRANSMISSION PURCHASED POWER FUEL OPERATING MAINTENANCE DEPRECIATION VOLUNTARY PAYMENTS TO TOWNS TOTAL OPERATING EXPENSES OPERATING INCOME NONOPERATING REVENUES (EXPENSES) CONTRIBUTIONS IN AID OF CONST RETURN ON INVESTMENT TO READING INTEREST INCON: INTEREST EXPENSE OTHER (MDSE AND AMORT) TOTAL NONOPERATING NEV (EXP) CHANGE IN NET ASSETS NET ASSETS AT BEGINNING OF YEAR NET ASSETS AT END OF APRIL ( ) = ACTUAL UNDER BUDGET 15,492,643.88 TGNN OF READING, MASSACHUSETTS 14,308,990.00 1,183,653.88 8.27% MUNICIPAL LIGHT DEPARTMENT 10,508,323.00 (126,262.10) -1.20% BUSINESS -TYPE PROPRIETARY FUND 28,046,441.05 29,196,996.00 (11150,554.95) STATEMENT OF REVENUES, EXPENSES AND CHANGES IN FUND NET ASSETS 8,884,479.23 91116,663.00 4/30/16 (232,183.77) -2.55% 2,574,403.44 ACTUAL BUOGET (566,542.56) % 3,287,326.50 YEAR TO DATE YEAR TO DATE VARIANCE. CHANGE OPERATING REVENUES: (SCR F (7.118) -0.96% 1,168,P73.00 1.180.000.00 EASE REVENUE 19,7D2,428.24 19,457,873.00 -0.93* 244,555.24 1.26% FUEL REVENUE 28,674,058.52 29,946,996.00 (1,272,937.48) -4.25% PURCHASED POWER CAPACITY 26,212,015.49 24,817,313.00 1,394,702.49 5.62* FORFEITED DISCOUNTS 673,916.85 583,738.00 90,178.85 15.45* ENERGY CONSERVATION RENENOE 563,655.34 564,364.00 (708.66) -0.13% HYPA CREDIT (989.753 571 (750.000 00) (239.753 571 31.97% TOTAL OPERATING REVENUES 74,836,320.87 74,620,284.00 216,036.87 0.29% OPERATING EXPENSES: (SCH G P.12A) PURCHASED POWER - CAPACITY PURCHASED POWER - TRANSMISSION PURCHASED POWER FUEL OPERATING MAINTENANCE DEPRECIATION VOLUNTARY PAYMENTS TO TOWNS TOTAL OPERATING EXPENSES OPERATING INCOME NONOPERATING REVENUES (EXPENSES) CONTRIBUTIONS IN AID OF CONST RETURN ON INVESTMENT TO READING INTEREST INCON: INTEREST EXPENSE OTHER (MDSE AND AMORT) TOTAL NONOPERATING NEV (EXP) CHANGE IN NET ASSETS NET ASSETS AT BEGINNING OF YEAR NET ASSETS AT END OF APRIL ( ) = ACTUAL UNDER BUDGET 15,492,643.88 14,308,990.00 1,183,653.88 8.27% 10,382,060.90 10,508,323.00 (126,262.10) -1.20% 28,046,441.05 29,196,996.00 (11150,554.95) -3.94% 8,884,479.23 91116,663.00 (232,183.77) -2.55% 2,574,403.44 3,140,946.00 (566,542.56) -18.04% 3,287,326.50 56M(1,351.750.001 3,319,300.00 (31,973.50) 561 -0.96% 1,168,P73.00 1.180.000.00 (11.027 001 -0.93* 69,836,328.00 70,771,218.00 (934,890.00) -1.32* 4,999,992.87 3,649,066.00 1,150,926.87 29.90% 136,741.25 200,000.00 (63,258.75) -31.63% (1,975,370.82) (11975,000.00) (370.82) 0.02% 113,531.68 125,000.00 (11,468.32) -9.17% (2,791.82) (1,750.00) (1,041.82) 59.53% 353,988.15 300,000.00 53,988.15 18.00% (1.373.901 56M(1,351.750.001 122.151 561 1.64% 3,626,091.31 2,497,316.00 1,128,775.31 101,445,083.23 101,445,083.23 0.00 105.071 174 54 103 9�y 39g p3 1.128.775.31 (3A 45.20% 0.00% 1.09% TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT RECONCILIATION OF CAPITAL FUNDS 4/30/16 SOURCE OF CAPITAL FUNDS: DEPRECIATION FUND EALANCE 7/1/15 5,434,301.99 CONSTRUCTION FUND BALANCE 7/1/15 1,400,000.00 INTEREST ON DEPRECIATION FUND FY 16 22,808.59 DEPRECIATION TRANSFER FY 16 3,287.326.50 TOTAL SOURCE OF CAPITAL FUNDS 10,144,442.88 USE OF CAPITAL FUNDS: LESS PAID ADDITIONS TO PLANT THRU APRIL TOTAL USE OF CAPITAL FUNDS 5,509,072.O6 GENERAL LEDGER CAPITAL FUNDS BALANCE 4/30/16 4.635,370.82 PI TOWN OF READING, HASSACHUSEWS MUNICIPAL LIGHT DHPARTNENT SAT -78 OF KILOWATT HOURS 4/30/16 (51 NONTH MONTH LAST YEAR CURRENT YEAR YTD % SALES OF ELECTRICITY: LAST YEAR CURRENT YEAR TO DATE TO DATE CHANGE RESIDENTIAL SALES 18,513,082 18,849,086 218,005,216 213,565,867 -2.04% COMH. AND INDUSTRIAL SALES 30,462,959 33,761,215 335,374,247 330,369,128 -1.49% PRIVATE STREET LIGHTING 79,466 92,443 792,011 827,124 4.43% TOTAL PRIVATE CONSUMERS 49.055.507 52.702.744 554.171.474 544.762.119 -1.70% HUNICIPAL SALES: STREET LIGHTING 236,614 214,472 2,416,288 2,268,688 -6.11% MUNICIPAL BUILDINGS 794,339 814,926 8,226,783 7,799,773 -5.19% TOTAL HDNICIPAL CONSUMERS 1.030.953 1.029.398 10.643.071 10.068.461 -5.404 SALES POR RESALE 237,244 195,754 2,821,413 2,638,208 -6.494 SCHOOL 1,375,007 1,355,198 12,984,566 12,249,323 -5.664 TOTAL KILOWATT HOURS SOLD 51.698.711 55.2E 3.094 580.620.524 569 118 111 -1.88% (51 TOWN OF HEADING, HA93MMSBTT3 MUNICIPAL LIGHT DEPARTMENT KILOWATT HOURS SOLD BY TOWN 4/30/16 TOTAL BEADING LYNNFIELD NO.RBMING WILMINGTON MONTH RESIDENTIAL 18,849,086 6,117,316 2,593,188 4,342,042 5,796,540 COM G IND 33,761,215 4,033,838 240,379 5,049,993 24,437,005 PVT ST LIGHTS 92,443 18,972 2,768 27,367 43,336 PGB ST LIGHTS 214,472 71,845 28,145 38,469 76,013 MONO BUGS 814,926 205,984 158,602 130,842 319,498 SALES/RESALE 195,754 195,754 0 0 0 SCHOOL 1,355,198 437,252 314,475 260,220 343,251 TOTAL 55,283,094 11.080.961 3.337.557 9.848.933 31 015.643 YEAR TO DATE HESIDENTIAL 213,565,867 67,853,306 30,190,198 49,273,784 66,248,579 COMM f IND 330,369,128 40,729,793 2,621,408 51,432,003 235,585,924 PVT ST LIGHTS 827,124 147,172 19,632 254,114 406,206 POB ST LIGHTS 2,268,688 764,938 298,139 402,260 803,351 MONI BUGS 7,799,773 1,928,483 1,670,605 1,308,295 2,892,390 SALES/EESALE 2,638,208 2,638,208 0 0 0 SCHOOL 12,249,323 4,200,796 2,676,887 2,495,740 2,875,900 TOTAL 569,718,111 118.262,696 37.476.869 105.166.196 308.812 330 LAST YEAR TO DATE RESIDENTIAL 218,005,216 68,265,591 30,732,777 50,050,139 68,956,709 COMM I IND 335,374,247 42,114,597 2,648,567 51,573,813 239,037,270 PVT ST LIGHTS 792,011 133,864 15,139 248,130 394,878 PUB ST LIGHTS 2,416,288 811,885 326,745 423,825 853,833 MUNI BUGS 8,226,783 2,265,886 1,678,611 1,410,064 2,872,222 SALES/RESALE 2,821,413 2,821,413 0 0 0 SCHOOL 12,994,566 4,373,793 2,706,939 2,258,620 3,645,214 TOTAL 580.620.524 120.787,029 38,108.778 105.964.591 315,760.126 KIWMTT HOURS SOLD TO TOTAL TOTAL READING LYNNPIELD NO. READING WILMINGTON MONTH RESIDENTIAL 34.10% 11.07E 4.69% 7.85% 10.49% COMM A IND 61.07% 7.30% 0.43% 9.13% 44,21% PVT ST LIGHTS 0.17% 0.03% 0.01% 0.05% 0.08% POB ST LIGHTS 0.39% 0.13% 0.05% 0.07% 0.14% Huai BUGS 1.47% 0.37% 0.29% 0.24% 0.57% SALES/MBALE 0.35% 0.35% 0.00% 0.00% 0.00% SCHOOL 2.45% 0.79% 0.57% 0.47% 0.62% TOTAL 100.00% 20.00 6.04% 17.61% 56.11% YEAR TO DATE ESSIDENTIAL 37.49% 11.91% 5.30% 8.65% 11.63% COMM 6 IND 57.99% 7.15% 0.46% 9.03% 41.35% PVT ST LIGHTS 0.14% 0.03% 0.00% 0.04% 0.074 POB ST LIGHTS 0.40% 0.13% 0105% 0.07% 0.15% MONO BUGS 1.37% 0.34% 0.29% 0.23% 0.51% SALES/EESALB 0.46% 0.46% 0.00% 0.00% 0.00% SCHOOL 2.15% 0.74% 0.47% 0.44% 0.50% TOTAL 100.00% 20.76% 6.57% 18.46% 54.21% LAST YEAR TO DATE RESIDENMAL 37.55% 11.76% 5.29% 8.62% 11.88% COM G IND 57.76% 7.25% 0.46% 8.88% 41.17% PVT ST LIGHTS 0.13% 0.021 0.00% 0.04% 0.07% POB ST LIGHTS 0.42% 0.14% 0.06% 0.07% 0.15% MOST BUGS 1.41% 0.39% 0.29% 0.24% 0.49% SALES/RESALE 0.49% 0.49% 0.00% 0.00% 0.00% SCHOOL 2.24% 0.75% 0.47% 0.39% 0.63% TOTAL 100.00% 20.80% 6.57% 18.24% 54.39% �8) TOM OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTNMNT FORMD.A INCOME 4/30/16 TOTAL OPERATING REVENUES (P.3) 74,836,320.89 ADD: POLE RENTAL 0.00 INTEREST INCOME ON CUSTOMR DEPOSITS 4,481.30 LESS: OPERATING EXPENSES (P.3) (69,836,328.00) CUSTOMER DEPOSIT INTEREST EXPENSE (2,791.82) FORMICA INCOME (LOSS) 5.001,682.15 III SALE OF SHE (P. 5) RWH PURCHASED AVE EASE COST PER EWH AVE ME SALE PER SHE AVE COST PER RWR AVE SALE PER RWH FUEL CHARGE REVENUE (P.3) LOAD FACTOR PEAR LOAD TOW OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTHENT GENERAL STATISTICS 4/30/16 MONTH OF ARR 2015 51,698,711 52,225,977 0.027710 0.032493 0.056505 0.082019 2,560,445.08 77.00% 92.907 MONTH OF % CHANGE YEAR THRU ARR 2016 2015 2016 AFS 2015 APR 2016 55,283,094 -0.64% -1.88% 580,620,524 569,718,111 50,971,493 -2.81% 0.49% 587,427,044 590,299,523 0.028657 -38.93% 8.02% 0.024297 0.026245 0.033466 -53.16% 10.71% 0.031236 0.034583 0.064402 ' -17.82% 3.78% 0.071070 0.073758 0.083124 -29.00% 5.19% 0.080722 0.084913 2,745,250.33 5.27% -0.20% 28,732,259.83 29,674,058.52 74.44% 93,804 (4) TOWN OF READING, HASHACHUSETYS MUNICIPAL LIGHT DEPARTMENT SCHEDULE OF CASH AND INVESTMENTS 4/30/16 UNRESTRICTED CASH CASH - OPERATING FUND CASH - PETTY CASH TOTAL UNRESTRICTED CASH RESTRICTED CASH CASH - DEPRECIATION HIND CASH - TOWN PAYMENT CASH - DEFERRED FUEL RESERVE CASH - RATE STABILIZATION FUND CASH - UNCOLLECTIBLE ACCTS RESERVE CASH - SICK LEAVE BENEFITS CASH - HAZARD WASTE RESERVE CASH - CUSTOMER DEPOSITS CASH - ENERGY CONSERVATION TOTAL RESTRICTED CASH INVESTMENTS SICK LEAVE BUYBACK TOTAL CASH BALANCE SCHEDULE A PREVIOUS YEAR CURRENT YEAR 10,496,39D.73 12,350,229.44 3,000.00 3,000.00 35.008.384 10.499,390.7312.353,]29.44 4,818,149.05 61 5,794,492.97 4,635,370.82 1,249,621.00 1,262,148.00 35.008.384 4,560,346.48 4,818,149.05 61 6,760,552.68 6,013,703.28 200,000.00 200,000.00 1,718,789.36 1,820,533.32 150,000.00 150,000.00 834,681.02 884,660.03 590,712.45 786,529.22 21.859.201.9621,371.093.72 1.292,906.261.284.061.45 33,651,498.95 35.008.384 61 I9I TOWN OF READING, NASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT SCHEDULE OF ACCOUNTS RECEIVABLE 4/30/16 SCHEDULE OF ACCOUNTS RECEIVABLE RESIDENTIAL AND CC9P@.RCIAL ACCOUNTS RECEIVABLE - OTHER ACCOUNTS RECEIVABLE - LIENS ACCOUNTS RECEIVABLE - EMPLOYEE ADVANCES SALES DISCOUNT LIABILITY RESERVE IVR UNCOLLECTIBLE ACCOUNTS TOTAL ACCOUNTS RECEIVABLE BILLED UNBILLED ACCOUNTS RECEIVABLE TOTAL ACCOUNTS RECEIVABLE, NET SCHEDULE OF PREPAYMENTS PREPAID INSURANCE PREPAYNENT PURCHASED POWER PREPAYI6NT PASNY PREPAYMENT i TSON PURCRASED POWER WORKING CAPITAL OTHER DEFERRED DEBITS ACCOUNTS RECEIVABLE AGING APRIL 2016: RESIDENTIAL AND CC-0P4:RCIAL LESS: SALES DISCOUNT LIABILITY GENERAL LEDGER BALANCE CURRENT 30 DAYS 60 DAYS 90 DAYS OVER 90 DAYS TOTAL SCHEDULE B PREVIOUS YEAR CURRENT YEAR 1,889,]]9.38 956,689.10 4,4]5,993.]0 (462,940.53) ]5,982.5] 259,957.39 ]]9,928.72 30],5]2.50 32,634.64 325,597.07 19,398.28 325,646.83 892.14 12,700.11 543.53 14,870.06 (183,221.21) 2.322,]47.87 (184,552.38) 1,036.936.50 (299.529.83) (249.823 99) 1,516,531.64 4,841,487.86 5,622,269.28 5,166,349.95 ].138.806.92 10,00].837.81 767,804.20 851,787.64 956,689.10 (462,940.53) 259,957.39 30],5]2.50 325,597.07 325,646.83 12,700.11 14,870.06 2.322,]47.87 1,036.936.50 0.00 1.54] 815.510- ACCOUNTS 15 00 4,475,993.10 (184.552.38) 4.291.441.32 3,833,164.81 89.32% 308,086.76 7.18% 78,786.11 1.64% 27,091.29 0.63% 44.312.35 1.03% 4.291.441.32 100.00% TOWN OF READING, lASSMHUSETTS MUNICIPAL LIGHT DEPARTM M SCHEDULE OF OPERATING REVENUE 4/30/16 SCHEDULE D SUB -TOTAL MONTH MONTH LAST YEAR CURRENT YEAR YTD % SALES OF ELECTRICITY: LAST YEAR CURRENT YEAR TO DATE TO DATE CHANGE RESIDENTIAL SALES 1,766,945.50 1,881,890.48 20,663,620.02 2,048,101.57 21,239,120.92 3,106,976.70 2.79% 24,716,029.69 COME AND INDUSTRIAL s=s 2,247,485.22 2,488,928.81 24,043,418.92 18,521.91 24,997,097.52 18,863.27 3.97% 218,151.17 PRIVATE STREET LIGHTING 9,511.88 10,876.26 94,309.08 32,059.17 103,16].]3 35,345.89 9.39% 350,027.74 TOTAL PRIVATE CONSUMERS 4,023.942.60 4.351.695.55 44.801,348.02 (100,873.74) 46.339.386.17 (129,300.16) 3.43% (828,531.50) (969,753.57) 19.46% TOTAL REVENVe 6.302,113.03 MUNICIPAL SALES: ]2,035.164.45 74 83,320.87 3.89% STREET LIGHTING 29,116.94 24,722.86 203,161.54 177,266.11 -12.75% MUNICIPAL BUILDINGS 63,853.66 65,865.03 646,040.05 644,01].]3 -0.31% TOTAL MUNICIPAL CONSUMERS 92,970.60 90.587.89 849.201.59 821.283 84 -3.29% SALES MR RESALE 20,136.22 17,304.74 239,621.44 231,044.57 -3.58% SCHOOL 1D3,218.73 105,762.23 978,623.37 984,]]2.18 0.63% SUB -TOTAL 4,240,268.15 4,595,350.41 46,868,794.42 48,376,486.76 3.22% FORFEITED DISCOURTS 64,035.97 36,148.77 710,692.93 673,916.85 -5.17% PURCHASED POWER CAPACITY 2,048,101.57 3,106,976.70 24,716,029.69 26,212,015.49 6.05% ENERGY CONSERVATION - RESIDENTIAL 18,521.91 18,863.27 218,151.17 213,694.23 -2.04% ENERGY CONSERVATION - COMIERCIAL 32,059.17 35,345.89 350,027.74 349,961.11 -0.02% NYPA CREDIT (100,873.74) (129,300.16) (828,531.50) (969,753.57) 19.46% TOTAL REVENVe 6.302,113.03 1.663,384.88 ]2,035.164.45 74 83,320.87 3.89% TOWN OF PE=ING, NASSACHUSETTS MUNICIPAL LIGHT DEPMTHENT SCHEDULE OF OPERATING MVENOE BY TOWN 4/30/16 RESIDENTIAL INDUS/M KI BLDG TOTAL READING LYNNPIELD NO.READING WILMINGTON MONTH POB.sT.LIGHTS 203,161.54 68,241.60 27,471.06 35,641.20 RESIDENTIAL 1,881,890.48 FRV.ST.LIGHTS 614,706.99 256,993.80 432,041.11 578,148.58 INDUS/MUNI BUG 2,554,793.84 CO-OP RESALE 35D,077.19 35,253.83 400,600.29 1,768,862.53 POB. ST.LIGHTS 24,722.86 SCHOOL 8,261.40 3,236.38 4,453.92 8,]]1.16 PRV.ST.LIGHTS 10,876.26 TOTAL 1,946.56 269.93 3,436.73 5,223.04 CO-OP RESALE 1],304.]4 1],304.]4 0.00 0.00 0,00 SCHOOL 105,762.23 PERCENTAGE OF OPERATING 34,]]5.99 23,250.29 21,870.95 25,865.00 TOTAL 4.595.350.41 TOTAL 1,02].0]2.8] LYMFIEU 319,004.23 WILMINGTON 862.403.00 2.386.0]0.31 RESIDENTIAL 40.95% THIS YEAR TO DATE 5.59% 9.40% 12.58% INDUS/MUNI BLDG 55.60% RESIDENTIAL 21,239,120.92 0.77% 6,791,852.03 8.72% 2,977,997.64 38.49% 4,88],20].86 POR. ST.LIGHTS 6,582,062.59 INDUS/MUNI BLDG 25,641,115.25 0.07% 3,543,298.31 0.10% 372,954.84 0.19% 4,104,685.59 PRV.ST.LIGHTS 1],620,1]6.51 POB.ST.LIGHTS 1]],266.11 0.01% 59,916.66 0.07% 22,931.24 0.11% 31,656.41 CO-OP RESALE 62,561.00 PRV.ST,LIGHTS 103,16].]3 0.00% 17,320.02 0.00% 2,234.78 0.00% 33,380.63 SCHOOL 50,232.30 CO-OP RESALE 231,044.57 0.51% 231,044.57 0.48% 0.00 0.55% 0.00 TOTAL 0.00 SCHOOL 904,]]2.18 6.95% 339,523.54 10.7]4 207,426.08 51.92% 212,511.29 THIS YEAR TO DATE 225,311.27 TOTAL 48.3]6.486.]6 10.982.955.93 3.583.544.56 9.269,641.]9 RESIDENTIAL 2d 54-=�'344'4B3g4,48 14.04% 6.16% 10.10% 13.60% INDUS/MUNI BUG 53.00% LAST YEM TO DATE 7.32% 0.]]1 8.48% 36.43% POB.ST.LIGHTS 0.37% RESIDENTIAL INDUS/M KI BLDG 20,663,620.02 24,689,450.97 6,501,321.39 3,528,758.60 2,895,916.63 352,509.]] 4,]34,01].82 3,994,079.46 6,532,364.10 16,814,111.14 POB.sT.LIGHTS 203,161.54 68,241.60 27,471.06 35,641.20 71,007.60 FRV.ST.LIGHTS 94,309.08 15,632.49 1,033.49 30,629.95 46,213.15 CO-OP RESALE 239,621.44 239,621.44 0.00 0.00 0.00 SCHOOL 978,623.37 332,977.64 201,132.83 172,779.76 2]1,]33.14 TOTAL 46.Bfi 0,794.42 10.fi86.553.24 3.418.863.18 0,96].148.19 23.]36.229 21 PERCENTAGE OF OPERATING INCOHBS TO TOTAL TOTAL READING LYMFIEU NO.RIMING WILMINGTON MONTH RESIDENTIAL 40.95% 13.384 5.59% 9.40% 12.58% INDUS/MUNI BLDG 55.60% 7.62% 0.77% 8.72% 38.49% POR. ST.LIGHTS 0.54% 0.18% 0.07% 0.10% 0.19% PRV.ST.LIGHTS 0.23% 0.04% 0.01% 0.07% 0.11% CO-OP RESALE 0.38% 0.391 0.00% 0.00% 0.00% SCHOOL 2.30% 0.76% 0.51% 0.48% 0.55% TOTAL 100.00% 22.360 6.95% 10.7]4 51.92% THIS YEAR TO DATE RESIDENTIAL 43.90% 14.04% 6.16% 10.10% 13.60% INDUS/MUNI BUG 53.00% 7.32% 0.]]1 8.48% 36.43% POB.ST.LIGHTS 0.37% 0.12% 0.05% 0.07% 0.13% PRV.3T.LIGHTS 0.21% 0.04% 0.00% 0.07% 0.10% CO-OP RESALE 0.48% 0.40% 0.00% 0.00% 0.00% SCHOOL 2.04% 0.70% 0.43% 0.44% 0.47% TOTAL 100.00% 22.70% 7.41% 19.16% 50.73% LAST YEAR TO DATE RESIDENTIAL 44.09% 13.87% 6.18% 10.10% 13.94% INDUS/MMI BUG 52.68% 7.53% 0.75% 8.52% 35.08% PUB. ST.LIGHTS 0.43% 0.15% 0.06% 0.00% 0.14% PRV.ST.LIGHTS 0.20% 0.03% 0.004 0.07% 0.10% Co -OP MEALS 0.51% 0.51% 0.00% 0.00% 0.00% SCHOOL 2.09% 0.71% 0.43% 0.37% 0.58% TOTAL 100.00% 22.80% 7.42% 19.14% 50.64% SALES OF ELECTRICITY: RESIDENTIAL CONN AND INDUSTRIAL SALES PRIVATE STREET LIGHTING MUNICIPAL BUILDINGS PUBLIC STREET LIGHTING SALES FOR RESALE SCHOOL TOTAL BASE SALES TOTAL FUEL SALES TOTAL OPERATING REVENUE FORFEITED DISCOUNTS PURCHASED POWER CAPACITY ENERGY CONSERVATION - RESIDENTIAL ENERGY CONSERVATION - CIX RCIAL NYPA CREDIT TOTAL OPERATING REVENUES ( ) - ACTUAL UNDER BUDGET TOWN OF READING, MASSACHUSETTS NUNICIPAL LIGHT DEPARTMENT BUDGETED REVENUE VARIANCE REPORT 4/30/16 SCHEDULE F ACTUAL BUDGET % YEAR TO DATE YEAR TO DATE VARIANCE • CHANGE 10,558,611.64 10,473,520.00 85,091.64 0.81% 8,600,017.35 8,199,320.00 400,697.35 4.894 74,081.72 315,793.00 (241,711.28) -76.54% 100,083.50 113,099.00 (13,015.50) -11.51% 369.634.03 356.141.00 13.493.03 3.794 19,702,428.24 19,457,873.00 244,555.24 1.26% 28.674.058.52 29,946.996.00 (1.272.937.48) -4.25% 48,376,486.76 49,404,869.00 (1,028,382.24) -2.08% 673,916.85 583,738.00 90,178.95 15.45% 26,212,015.49 24,817,313.00 1,394,702.49 5.62% 213,694.23 214,653.00 (958.77) -0.45% 349,961.11 349,711.00 250.11 0.07% (989,753.57) (750,000.00) (239,753.57) 31.97% 0.29% 74.836.320.87 74.620.284.00 216.036.87 (11B) OPERATION EXPENSES: PURCHASED POWER CAPACITY PURCHASED POWER TRANSMISSION TOTAL PURCHASED POWER OPERATION SUP AND ENGINEERING EXP STATION SUP LABOR AND MISC LINE MISC LABOR AND EXPENSE STATION LABOR AND EXPENSE STREET LIGHTING EXPENSE HETER EXPENSE HIBC DISTRIBUTION EXPENSE METER HEADING LABOR 6 EXPENSE ACCT 4 COLL LABOR 4 EXPENSE UNCOLLECTIBLE ACCOUNTS ENERGY AUDIT EXPENSE ADMIN L GEN SALARIES OFFICE SUPPLIES L EXPENSE OUTSIDE SERVICES PROPERTY INSURANCE INJURIES AND DAMAGES ENPLOYEES PENSIONS I BENEFITS MISC GENERAL EXPENSE SENT EXPENSE ENERGY CONSERVATION TOTAL OPERATION EXPENSES IAINTBNANCE EXPENSES: 6AINT OF TRANSMISSION PLANT NAINT OF BTRUCT AND EWIPHT HAINT OF LINES - ON TAINT OF LINEN - UG 6AINT OF LINE TRANSFOWLRS MAINT OF 8T IT 6 SIG SYSTEM 6AINT OF GARAGE AND STOCXROO4 6AINT OF METERS 6AINT OF GEN PLANT TOTAL MAINTENANCE EXPENSES DEPRECIATION EXPENSE PURCHASED POWER FUEL EXPENSE VOLUNTARY PAYMENTS TO TOWNS TOTAL OPERATING EXPENSES TONN OF READING, HAS SA(HUSETTS MUNICIPAL LIGHT DEPAXANXNT SCHEDULE OF OPERATING EXPENSES 4/30/16 SCHEDULE E NONTH HONTH LAST YEAR CURH&IT YEAR YTD % LAST YEAR CURRENT YEAR TO DATE 12,528.86 TO DATE 137,138.10 CHANCE 1,447,202.16 1,460,665.08 14,272,579.39 15,492,643.88 8.559 925,830.93 660,574.42 834,561.05 -2.61% 10,087,487.00 47,659.30 10,382,060.90 26,020.84 2.92% 2.373.040.09 2.295.226.1324. 360.Ofifi.39 25.874.704 78 6.22% 47,519.21 5,262.58 444,539.59 424,697.83 -4.46% 16,961.11 12,528.86 137,138.10 129,019.25 -5.92% 47,085.20 126,730.17 670,249.83 660,574.42 00 -2.61% 47,659.30 26,020.84 436,407.31 335,639.13 -23.09% 7,946.02 7,488.13 76,954.88 94,890.28 23.31% 18,488.45 18,417.36 167,801.59 107,820.97 11.89% 38,474.32 34,103.41 376,953.89 375,551.03 -0.37% 495.38 476.90 13,039.39 17,945.26 37.62% 147,784.66 115,444.62 1,485,233.67 1,369,012.11 -7.83% 10,000.00 10,000.00 100,000.00 100,000.00 44 0.00% 38,296.05 44,270.14 343,206.23 414,243.37 20.70% 77,420.59 69,755.90 676,640.15 746,240.24 10.29% 35,491.73 32,339.45 267,484.64 289,075.67 8.07% 118,487.41 25,861.23 416,465.03 326,275.91 -21.66% 31,242.39 27,632.72 303,980.09 300,946.87 -1.00% 3,717.42 3,627.56 37,283.64 40,056.56 7.44% 219,201.50 244,940.41 2,452,338.91 2,329,377.54 -5.01% 7,690.10 9,506.31 119,510.56 110,852.56 -7.25% 17,106.52 15,667.25 145,621.74 145,520.15 -0.07% 44,660.08 60,998.03 434,727.46 406,732.08 11.96% 975.728.44 891.071 87 9,113.672 90 8,884 479 -23-2 51% 227.08 227.08 2,270.82 2,270.82 0.00% 25,674.59 44,708.17 426,011.70 345,118.19 -16.99% 124,006.62 122,702.32 1,436,539.47 1,407,211.18 00 -2.04% 5,001.94 11,596.66 134,669.39 100,816.57 -25.14% 1,301.38 4,227.36 62,622.70 93,123.68 46.71% (44.63) (46.31) (193.88) (549.44) 103.39% 32,727.86 40,607.39 493,687.89 469,272.30 -4.95%. 0.00 0.00 0.00 33.34 0.00% 12,126.12 55,450.33 175,603.31 157,104.60 -10.64% 201,021.16 279.471.04 2,731.411.40 2.574.403 44 -5.75% 321,786.79 328,732.65 3,217,887.90 3,287,326.50 1,503,848.55 1,821,988.77 27,476,076.81 28,046,441.05 2.16% 2.08% 118,000.00 1161000.00 1,170,754.00 1,168,973.00 -0.15% 2.601 5.493.427.03 5.134.490.46 68,069,869.40 69 .836 326 00 TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT BUDGETED OPERATING EXPENSE VARIANCE REPORT 4/30/16 SCHEDULE G MAINTENANCE EXPENSES MAINT OF TRANSMESION PLANT ACTUAL BUDGET (229.19) -9.17% % OPERATION EXPENSES: YEAR TO DATE YEAR TO DATE VARIANCE • CHANGE PURCRASED POWER CAPACITY 15,492,643.88 7.91% 14,308,990.00 PAINT OF LINES - ON 1,183,653.88 8.27% PURCHASED POWER TRANSMSSION 10,382,060.90 -14.10% 10,508,323.00 MINT OF LINES - UG (126,262.10) -1.20% TOTAL PURCHASED POWER 25.8)4.]04.'18 -14.69% 24,61].313.00 PAINT OF LINE TRANSFORMER 1.057,391.70 4.26% (206,576.12) -66.969 OPERATION SUP AND ENGINEERING HIP 424,697.83 528,157.00 (103,459.17) -19.59% STATION SUP LABOR AND MSC 129,019.25 69,934.00 59,085.25 84.49% LINE MISC LABOR AND EXPENSE 660,574.42 566,361.00 94,213.42 16.63% STATION LABOR AND EXPENSE 335,639.13 372,958.00 (37,318.87) -10.011 STREET LIGHTING EXPENSE 94,890.28 77,756.00 17,134.28 22.04% !BIER EXPENSE 187,820.97 191,297.00 DEPRECIATION EXPENSE (3,476.03) -1.82% MISC DISTRIBUTION EXPENSE 375,551.D3 -0.96% 380,740.00 PURCHASED POWER FUEL EXPENSE (5,188.97) -1.36% METER READING LABOR 6 EXPENSE 17,945.26 -3.94% 27,229.00 VOLUNTARY PAYMENTS TO TONNE (9,283.74) -34.10% ACCT 4 CO" LABOR S EXPENSE 1,369,012.11 -0.93% 1,412,905.00 TOTAL OPERATING EXPENSES (43,892.89) -3.11% UNCOLLECTIBLE ACCOUNTS 100,000.D0 -1.32% 100,000.00 69.836,328.00 0.00 (934,890.00) 0.00% ENERGY AUDIT EXPENSE 414,243.37 402,536.00 11,707.37 2.91% ADMN 6 GEN SALARIES 746,248.24 694,113.00 52,135.24 7.51% OFFICE SUPPLIES 6 EXPENSE 289,075.67 251,000.00 38,075.67 15.17% OUTSIDE SERVICES 326,275.91 330,796.00 (4,520.09) -1.37% PROPERTY INSURANCE 300,946.87 388,500.00 (87,553.13) -22.54% INJURIES AND DAMAGES 40,056.56 42,810.00 (2,753.44) -6.43% INPLOYEES PENSIONS 6 BENEFITS 2,329,377.54 2,208,080.00 121,297.54 5.49% MISC GENERAL EXPENSE 110,852.56 215,335.OD (104,485.44) -48.52% ARM EXPENSE 145,520.15 176,670.00 (31,149.85) -17.63% ENERGY CONSERVATION 486,732.08 679,483.00 (192,750.92) -28.37% TOTAL OPERATION EXPENSES 8.084.479.23 9.116.663.00 (232.183.77) -2.55% MAINTENANCE EXPENSES MAINT OF TRANSMESION PLANT 2,270.82 2,500.00 (229.19) -9.17% HAINT OF STRUCT AND EQUIPHENT 345,118.19 319,812.00 25,306.19 7.91% PAINT OF LINES - ON 1,407,211.18 1,638,181.00 (230,969.82) -14.10% MINT OF LINES - UG 100,818.57 118,175.00 (17,356.43) -14.69% PAINT OF LINE TRANSFORMER 93,123.88 300,000.00 (206,576.12) -66.969 NAINT OF ST LT 6 SIC SYSTEM (549.44) 8,385.00 (8,934.44) -106.55% PAINT OF GARAGE AND STOCAEOON 469,272.30 565,637.00 (96,364.70) -17.04% PAINT OF HETERS 33.34 39,756.00 (39,722.66) -99.92% NAINT OF GEN PLANT 157,104.60 148,500.00 8,604.60 5.79% TOTAL MAINTENANCE EXPENSES 2.574.403.44 3.140.946.00 (566.542.56) -18.04% DEPRECIATION EXPENSE 3,287,326.50 3,319,300.00 (31,973.50) -0.96% PURCHASED POWER FUEL EXPENSE 28,046,441.05 29,196,996.00 (111501554.95) -3.94% VOLUNTARY PAYMENTS TO TONNE 1,168,973.00 111801000.00 (11,027.00) -0.93% TOTAL OPERATING EXPENSES -1.32% 69.836,328.00 ]0.7]1.218.00 (934,890.00) ( ) - ACTUAL UNDER BUDGET (13A) TOWN OF READING, MASSACHUSETTS MUNICIPAL LIGHT DEPARTMENT BUDGETED OPERATING EXPENSE VARIANCE REPORT 4/30/16 128) RESPONSIBLE REMAINING OPERATION EXPENSES: SENIOR MANAGER 2016 ANNUAL BUDGET ACTUAL YEAR TO DATE BUDGET BALANCE REMAINING BUDGET % PURCHASED PCWER CAPACITY JP 1],095,]65.00 15,492,643.85 1,603,141.12 9.384 PURCHASED POWER TRANSMISSION JP 12,600,639.00 10,382,060.90 2,218,578.10 17.614 TOTAL PURCHASED POWER 29.696 42400 25.8]4.]04.'!8 3.821.'119.22 12.87% OPERATION SUP AND ENGINEERING EXP HJ 629,691.00 424,697.83 204,993.17 32.55% STATION SUP LABOR AND MISC HJ 54,858.00 129,019.25 (44,161.25) -52.046 LINE HISC LABOR AND EXPENSE NJ 666,641.00 660,574.42 6,066.58 0.91% STATION LABOR AND EXPENSE HJ 448,341.00 335,639.13 112,707.87 25.14% STREET LIGHTING EXPENSE NJ 93,347.00 94,890.28 (1,543.28) -1.65% NBTER EXPENSE HJ 233,648.00 187,620.97 45,827.03 19.61% HISC DISTRIBUTION EXPENSE NJ 457,068.00 375,551.03 811516.97 17.83% HETER READING LABOR I EXPENSE NJ 32,578.00 17,945.26 14,632.74 44.92% ACCT 6 COLL LABOR I EXPENSE RP 1,693,219.00 1,369,012.11 324,206.89 19.15% UNCOLLECTIBLE ACCOUNTS JP 120,000.00 100,000.00 20,000.00 16.67% ENERGY AUDIT EXPENSE JP 482,273.00 414,243.37 68,029.63 14.11% AIB2N L GEN SALARIES CO 838,461.00 746,248.24 92,212.76 11.00% OFFICE SUPPLIES I EXPENSE CO 301,000.00 289,075.67 11,924.33 3.96% OUTSIDE SERVICES CO 377,332.00 326,215.91 51,056.09 13.53% PROPERTY INSURANCE HJ 466,200.00 300,946.87 165,253.13 35.45% INJURIES AND DAMAGES HJ 51,254.00 40,056.56 11,197.44 21.X5% ENFLOYEES PENSIONS 6 BENEFITS NJ 2,633,591.00 2,329,377.54 304,213.46 11.554 HISC GENERAL EXPENSE CO 231,022.00 110,852.56 120,169.44 52.02% RENT EXPENSE NJ 212,000.00 145,520.15 66,479.85 31.36% ENERGY CONSERVATION JP 816,602.00 486,732.08 329,669.92 40.40% TOTAL OPERATION EXPENSES _70,869,192 008.554.419.23 1.984.652 77 15.26% MAINTENANCE EXPENSES: NAINT OF TRANSMISSION PLANT NJ 3,000.00 2,270.82 729.18 24.31% WANTT OF STRUCT AND EQUIPHT HJ 484,026.00 345,118.19 138,907.81 28.70% HAINT OF LINES - ON NJ 1,675,794.00 1,407,211.18 268,582.82 16.03% HAINT OF LINES - UG HJ 130,694.00 100,818.57 29,875.43 22.86% NAINT OF LINE TAANSI'OAMER9 NJ 156,000.00 93,123.88 62,876.12 40.31% HAINT OF ST LT 6 SIG SYSTEM HJ 9,745.00 (549.44) 10,294.44 105.64% HAINT OF GARAGE AND SSOCHROOH NJ 660,131.00 469,272.30 190,858.70 28.91% HAIM OF !ETERS NJ 43,875.00 33.34 43,841.66 99.92% HAINT OF GEN PLANT AF 178,200.00 157,104.60 21,095.40 11.84% TOTAL MAINTENANCE EXPENSES 3.341.465.00 2,574,403.44 767.061.56 22.96% DEPRECIATION EXPENSE RF 3,983,145.00 3,287,326.50 695,818.50 17.47% PURCHASED POWER FUEL EXPENSE JP 34,326,329.00 28,046,441.05 6,219,587.95 18.29% VOLUNTARY PAYMENTS TO TOWNS HE 1,416,000.00 1,165,973.00 247,027.00 17.45% TOTAL OPERATING EXPENSES 16.506 53.632.495 00 fig, 836.328.00 13 796.167.00 128) TONS OF MMINO. NASSACEVSETTS NUNICIDAL LIGHT DEPASING NT PROFESSIONAL SERVICES 04/30/2016 PROFESSIONAL SERVICES BY PROJECT ITEM DEPARTMENT ACTUAL BUDGET ACTUAL VARIANCE 1 WED AM PENSION TRUST AUDIT FEES ACCOUNTING 28,895.25 47,600.64 35,000.00 CHOATE HALL 6 STBHART (6,104.75) 2 LEGALbTM/ISO/PONER/OTHER INTEGRATED RESOURCES 88,679.25 UTILITY SERVICE INC. 115,250.00 (26,570.75) 138,277.06 3 HBRC COMITANCE AND AUDIT E 6 0 26,885.85 13,250.00 32.252.00 13,635.65 MARITSA SCOBBO L RODOPHELE, PC 4 LEGAL- SOLAR/FIBER ENGINEERING 32,252.00 16,612.50 8,330.00 TOTAL 23,922.00 5 LEGAL-G6N8AAL GM 90,844.12 62,500,00 28,344.12 6 LEGAL SERVICES ER 37,600.25 65,636,00 (28,035.75) SURVEY RIGHT OF NAY/ ENVIROIORNTAL BLDG. MAINT. 0.00 8,330.00 (8,330.00) 8 INSURANCE CONSULTANT/OTBER GEN. BENEFIT 21,119.19 22,500.00 (1,380.81) TOTAL 326,275.91 330.726.00 14.520.09) PROFESSIONAL SERVICES BY VENDOR ACTUAL MELMSON REATH 28,500.00 DUNCAN AND ALLEN 47,600.64 CHOATE HALL 6 STBHART 589.60 COTTE NRNAGENENT CONSULTING LLC 633.75 UTILITY SERVICE INC. 14,110.00 ROBIN AND RUDNM 138,277.06 SWJtCEYNSBY 4 CONN, PC 28,696.25 PLN ELECTRIC POKER ENGINEERING 32.252.00 MARITSA SCOBBO L RODOPHELE, PC 18,926.91 FLEET COUNSELOR SERVICES INC. 16,612.50 TOTAL 326,275,91 (13) RNLD DEFERRED MEL CASE RESERVE ANALYSIS 4/30/16 (14) GROSS NONTHLY TOTAL DATE CHARGES REVENUES NYFA CREDIT DEFERRED DEFERRED Jun -15 5,180,285.15 Jul -15 3,492,949.80 3,083,024.15 (65,798.90) (475,724.55) 4,704,560.60 Aug -15 3,269,589.09 3,172,916.67 (70,099.15) (166,771.57) 4,537,789.03 S.p-15 3,302,139.93 3,385,022.47 (100,901.03) (18,018.49) 4,519,770.54 Oct -15 2,543,916.53 2,607,127.52 (105,545.52) (42,334.53) 4,477,436.01 Nov -15 2,489,548.12 2,551,186.05 (87,425.40) (25,787.47) 4,451,648.54 D.c-15 2,757,146.26 2,826,699.78 (91,032.01) (21,478.49) 4,430,170.05 Jan -16 3,163,761.69 2,656,333.87 (108,747.38) (616,175.20) 3,813,994.85 Fob -16 3,056,024.39 2,978,402.24 (115,171.18) (192,793.33) 3,621,201.52 N.r-16 2,149,376.47 2,668,095.44 (115,732.84) 402,986.13 4,024,187.65 Apr -16 1,821,988.77 2,745,250.33 (129,300.16) 793,961.40 4,818,149.05 (14) R DO BUDGET / ACTUAL CO!@AAISON 50441ARY SCHEDULE 4/30/16 DIVISION 0 (16) ACTUAL BUDGET VARIANCE VAR % BUSINESS DIVISION 8,397,676 8,437,481 (39,805) -0.47% INTEGRATED RESOURCES 989,655 1,197,271 (207,616) -17.34% ENGINEERING AND OPERATIONS 4,051,118 4,471,039 (419,821) -9.39% FACILITY 3,824,217 3,925,618 (101,402) -2.58% GENERAL MANAGER 630.680 702.249 (71.569) -10.19% SUB -TOTAL 17,893,345 18,733,658 (840,313) -4.49% PURCHASED POKER BASE 25,874,705 24,817,313 1,057,392 4.26% PURCHASED POKER FUEL 28,046,441 29,196,996 (1,150,555) -3.90 TOTAL 71,814,491 72.747.96] (933.476) -1.28% 0 (16) r!|! ,, ■. !r, : ,, ,,: at ka- f |;! §( (§/ as! ■;r , . z. §|)) 4!< ,:■ ■,! Sig ||! ,. .d ;|§ §|: as. Up]l |z •r �`| |f| `§ !, -� .!, \;; . ., §§) �.. ;« « ; / | �` 4•• r „ ;^- �!r ■•, §■ |. |§ !§; -)- ■§; ! § § § §� � ) | �• �.�; §,); �:(: �.�! 00 !! !!_ _! ■ §§(■ | § § § � � ,pR bR 8F Jeanne Foti From: Jeanne Foti Sent: Thursday, June 23, 2016 9:16 AM To: RMLD Board Members Group Subject Account Payable and Payroll Questions Good morning. In an effort to save paper, the following timeframes had no Account Payable and Payroll questions. Account Payable Warrant — No Questions May 6, May 13, May 20, May 27, June 3, June 30 and June 17. Payroll — No Questions May 16 and May 31 (Monday, May 30 was a holiday) and June 13. This e-mail will be printed for the Board Packet for the RMLD Board meeting on lune 30, 2016. Jeanne Foti Reading Municipal Light Department Executive Assistant 230 Ash Street Reading, MA 01867 781-942-6434 Phone 781-942-2409 Fax Please consider the environment before printing this e-mail.