HomeMy WebLinkAbout2015-04-27 Special Town Meeting MinutesSPECIAL TOWN MEETING
Reading Memorial High School
Preforming Arts Center
April 27, 2015
The meeting was called to order by the Moderator, Alan E. Foulds, at 8:40 PM, there being a quorum
present.
The Warrant was partially read by the Town Clerk, Laura Gemme, when on motion by Dan Ensminger,
Board of Selectmen, it was voted to dispense with further reading of the Warrant.
Motion made by Dan Ensminger, Board of Selectmen to dispense of the reading of all motions in their
entirety.
Motion Carried
ARTICLE 1: Motion made by Dan Ensminger, Board of Selectmen and Article 1 was tabled
ARTICLE 2: Motion made by John Halsey, Board of Selectmen and Article 2 was tabled
ARTICLE 3: Motion made by John Arena, Board of Selectmen and Article 3 was tabled
ARTICLE 4 Motion made by Dan �Ensminger, Board of Selectmen that the Town vote to
appropriate the sum of one million ($1,00 ,000.00) dollars for the purpose of extraordinary repairs,
replacement and /or new installation of field lighting systems, including the costs of consulting services,
audits, plans, documents, cost estimates, bidding services and all related expenses incidental thereto and
necessary in connection therewith, and, for the purpose of meeting such appropriation, to authorize the
Town Treasurer, with the approval of the Board of Selectmen, to borrow said sum in accordance with
Chapter 44, Section 7(25) of the Massachusetts General Laws, or any other enabling authority; said sum
to be expended by and under the direction of the Town Manager; and to see if the Town will authorize the
Board of Selectmen, Town Manager, or any other agency of the Town, to apply for a grant or grants, to be
used to defray the cost of all, or any part of, said field lighting systems improvements; and to authorize
the Town Manager to enter into any and all contracts and agreements as may be necessary to carry out
the purposes of this Article.
Background: A Master Plan for the Birch Meadow Complex was drafted in 2008 and approved by
the Board of Selectmen in 2009. Town Meeting subsequently approved funding in the Capital Plan to begin
in FY15. Approximately two years ago, a discussion with the Board of Selectmen concluded with a changed
approach that the Recreation Committee would revisit the Master Plan and make comments and
suggestions before any funds were expended. The project start date was pushed out beyond FY15 on the
capital plan.
Last fall the Recreation Committee and Town staff began discussing the Master Plan in detail and one
change evident to all was that the fields would not need to be shifted slightly. This represented a
substantial cost avoidance compared to what had been proposed previously. This decision then made the
SPECIAL TOWN MEETING
Reading Memorial High School
Preforming Arts Center
April 27, 2015
Birch Meadow Complex project divisible into two phases - field lighting in the near term and the
remainder of the project to follow.
The first phase of the project is the subject matter of this Article, which is a request to install newer
energy efficient field lighting for the entire Complex at an expected cost of $1.0 million. The second phase
will begin with a community -wide survey by the Recreation Committee later this spring. The results of the
survey will be discussed at public meetings with the Recreation Committee and the Board of Selectmen,
and the community should expect to see the rest of the Birch Meadow Complex Master Plan within the
next year. Town Meeting may see an Article at 2016 Annual Town Meeting to complete this last phase of
the project.
The field lighting phase will encompass five fields as shown in the picture below. Note the photo is old -
taken before the tennis courts were completed. Right away we shall admit to needing some creativity in
field naming, but currently two of the fields ( "Lighted Softball Field" and "Turf 2 ") are lit, with 'old' lighting
technology:
The field lighting portion of this project could be said to have two main components: community impact
and recurring cost.
From a community impact standpoint, the increased hours of field illumination are estimated to add 3 -5
hours per day for the three unlit fields, or the equivalent of adding 1.5 more fields to the existing Birch
SPECIAL TOWN MEETING
Reading Memorial High School
Preforming Arts Center
April 27, 2015
Meadow Complex. This estimate assumes that hours of use are not extended beyond their current limits,
but simply that more fields are available deeper into the evening. This additional field time will be a huge
positive step towards meeting unmet recreational demands from our residents, which are substantial.
Growing the availability of team sports and activities is consistent with the efforts of the Reading Coalition
Against Substance Abuse to provide alternatives and opportunities to engage the students and young
adults in the community.
The Board of Selectmen will schedule a spring 2015 neighborhood meeting if this Article is approved in
order to review the field lighting project details, answer all questions and hear any concerns. Parking,
traffic, light spillage and other impacts will be discussed. If the community has an appetite to expand the
current night -time hours of field use, that will be considered. Note that modern lighting design features
very low light leakage and as one can see from the picture above, this should have negligible impact on
abutters and neighbors. There is expected to be no impact on Conservation land, but Conservation staff
and the Commission as needed will be consulted before the project begins.
From a cost standpoint, it should first be noted up front that Recreation is not a profit- seeking enterprise.
Recall that revolving funds are meant to draw in just enough revenues to reasonably pay the costs. All
Recreation expenses are paid directly by the revolving fund during the year and at fiscal year end the
revolving fund turns back about $75,000 to $100,000 to the general fund, an amount purposefully below
the remaining wage and benefit costs of Recreation staff in order to provide a low -cost service to the
community.
On the financing side, selling project debt for ten years will add approximately $15,000 in annual interest
costs. Note that participants are directly charged the cost of field lighting, so there is no additional
operational cost to the town for adding new lighting. For the participants using the two currently lit fields,
there is an estimated total combined energy savings of about $10,000 annually.
Field revenues are currently estimated to be $55,000 during the year. The addition of extra field
availability should increase field hours purchased by at least 15 %. The Recreation Committee has already
discussed raising fees to help cover the cost of the first phase of the project. This is only possible
indirectly since fees do not currently fully support all costs. Note that it is affordable by current night -time
participants as they will get a break in lower lighting costs. Following is a chart that combines these two
impacts on revenues, as reviewed at a recent Board of Selectmen meeting. It is not difficult to see this
project paying for the extra $15,000 costs described above.
SCENARIOS FOR INCREASE OF
FEES AND PARTICIPATION
Increased Field Fees 20%
30%
40%
50%
Increased Participation
Current
$ 55,234
10%
15%
20%
$ 60,757
$ 63,519
$
66,281
$ 66,281
$ 72,909
$ 76,223
$
79,537
$ 71,804
$ 78,985
$ 82,575
$
86,165
$ 77,328
$ 85,060
$ 88,927
$
92,793
$ 82,851
$ 91,136
$ 95,279
$
99,421
In the next year when the remaining phase of the Birch Meadow Complex is presented to the community,
the financial approach to covering costs will again be explored, but weighed against the benefit of the
service provided to the community.
SPECIAL TOWN MEETING
Reading Memorial High School
Preforming Arts Center
April 27, 2015
Finance Committee Report - given by Mark Dockser• The Finance Committee recommends this
Article by a vote of 8 -0 -0 at their meeting on March 25, 2015.
Bylaw Committee Report: No report
Board of Selectmen Report: The Board of Selectmen at their meeting on March 24, 2015 voted 4-
0-0 to support this Article. Selectman John Halsey left the meeting for both the discussion and the vote on
this Article due to a possible perceived conflict of interest because of his association with baseball
activities in the community.
Presentation given by:
• Bob LeLacheur - See Attached
• John Feudo - See Attached
On motion made by Peter Carcia, Precinct 3 it was voted to move the question
2/3 Vote Required
140 Voted in the affirmative
18 Voted in the negative
163 Town Meeting Members in Attendance
Motion to Move the Ouestion Carried
2/3 Vote Required
115 Voted in the affirmative
43 Voted in the negative
163 Town Meeting Members in Attendance
Motion Carried
ARTICLE 5: Motion made by the Board of Selectmen as a courtesy to the School Committee that
the Town vote to amend the vote taken pursuant to Article 6 of the February 23, 2015 Special Town
Meeting to provide that appropriation of the sum of one million, two hundred thousand ($1,200,000)
dollars for the purpose of purchasing and placing modular classroom units at elementary schools, including
the costs of consulting services, audits, plans, documents, cost estimates, bidding services and all related
expenses incidental thereto and necessary in connection therewith, can be met by borrowing, and further
to authorize the Town Treasurer, with the approval of the Board of Selectmen, to borrow said sum in
accordance with Chapter 44, Section 7(9) of the Massachusetts General Laws, or any other enabling
authority; said sum to be expended by and under the direction of the School Committee and the Town
Manager; and to see if the Town will authorize the School Committee, Board of Selectmen, Town Manager,
or any other agency of the Town, to apply for a grant or grants to be used to defray the cost of all, or any
part of, said improvements; and to authorize the School Committee and /or the Town Manager to enter
into any and all contracts and agreements as may be necessary to carry out the purposes of this Article.
Background: A Special Town Meeting in February 2015 approved $1.2 million to be used from Free
Cash towards the purchase and siting of modular classrooms at the Joshua Eaton, Alice M. Barrows and J.
Killam Elementary Schools.
SPECIAL TOWN MEETING
Reading Memorial High School
Preforming Arts Center
April 27, 2015
A first round of the procurement process has revealed the need for the School Committee to make some
choices ranging from changing some technical specifications to a request for additional funding. Results
from a second round of the procurement process currently underway will provide the School Committee
with information to help determine the next steps.
In order to provide the most flexibility to the project, this Article has been placed on this Warrant. There
are three possible outcomes:
a) The Article will be tabled;
b) The Article will move forward as a request to use debt instead of Free Cash for an amount up to
$1.2 million;
c) The Article will move forward with a request to include additional funding above $1.2 million,
and to use debt instead of Free Cash.
The first two choices above indicate that the previously approved $1.2 million is ample for the project, and
that is the current expectation and desire of the School Committee. The third choice c) will indicate that
the $1.2 million is not adequate, in which case Town Meeting will be asked to approve debt for the entire
project. Note that if this is the case, the Capital plan in Article 4 of the Annual Town Meeting will need to
be first amended for the new total project cost.
Finance Committee Report - given by Karen Herrick: The Finance Committee recommends this
Article by a vote of 8 -0 -0 at their meeting on March 25, 2015.
Bylaw Committee Report: No report
School Committee Report - Chuck Robinson:
26, 2015 voted 4 -0 -0 to support this Article.
Presentation given by:
• Bob LeLacheur - See Attached
• John Doherty - See Attached
Motion Carried
The School Committee at their meeting on March
2/3 Vote Required
Declared by Moderator
163 Town Meeting Members in Attendance
ARTICLE 6 On motion made the Board of Selectmen as a courtesy to the School Committee that
the Town vote to appropriate the sum of five hundred thousand ($500,000) dollars for the purpose of
making extraordinary repairs, replacement and /or new installation of retaining walls at Reading Memorial
High School, including the costs of consulting services, audits, plans, documents, cost estimates, bidding
services and all related expenses incidental thereto and necessary in connection therewith, and, for the
purpose of meeting such appropriation, to authorize the Town Treasurer, with the approval of the Board of
Selectmen, to borrow said sum in accordance with Chapter 44, Section 7(7) of the Massachusetts General
Laws, or any other enabling authority; said sum to be expended by and under the direction of the School
Committee and the Town Manager; and to see if the Town will authorize the School Committee, Board of
Selectmen, Town Manager, or any other agency of the Town, to apply for a grant or grants to be used to
defray the cost of all, or any part of, said improvements; and to authorize the School Committee and /or
SPECIAL TOWN MEETING
Reading Memorial High School
Preforming Arts Center
April 27, 2015
the Town Manager to enter into any and all contracts and agreements as may be necessary to carry out
the purposes of this Article.
Background: Subsequent Town Meeting in November 2014 approved $30,000 in funding for an
engineering assessment of the retaining wall for the upper parking lot at Reading Memorial High School.
That assessment is 50% complete and the estimated repair cost will be known if the snow ever melts,
which hopefully will be before Annual Town Meeting!
Complete information for both Articles 5 and 6 will be known in advance of Town Meeting but not in
sufficient time for the printing of this Special Town Meeting Warrant Report. If Article 5 has converted
previously approved use of Free Cash to be debt instead, then it is possible that Article 6 will be tabled
and the retaining wall repair project will continue as a request to use Free Cash instead of debt. Such a
request would happen under Article 5 in the Annual Town Meeting. Otherwise this Article will request debt
funding for these repairs.
Finance Committee Report - given by Craig Merry: The Finance Committee recommends this
Article by a vote of 8 -0 -0 at their meeting on March 25, 2015.
Bylaw Committee Report: No report
School Committee Report- Chuck Robinson:
26, 2015 voted 4 -0 -0 to support this Article.
Presentation given by:
• John Doherty - See Attached
The School Committee at their meeting on March
2/3 Vote Required
126 Voted in the affirmative
1 Voted in the negative
163 Town Meeting Members in Attendance
ARTICLE 7: Motion made by the Board of Selectmen that the Town vote pursuant to Section 5.2
of the Reading General Bylaws, to approve and authorize the Board of Selectmen to settle potential
litigation involving the Sutton Brook Disposal Area Superfund Site, involving the possible payment of a
sum of $ 27,166.23 to be settled by June 30, 2015, or take any other action relating thereto.
Background: The Town may be named as defendant in a suit seeking contribution towards the
cost of cleanup of the Sutton Brook Disposal Area Superfund Site, formerly known as Rocco's Landfill. The
Town has received a preemptive offer of settlement, to be paid in exchange for avoiding litigation. Town
Counsel has been looking into both the chances such a suit will actually be brought as well as the
legitimacy of any claims the Town would face. Town Counsel and the Board of Selectmen will meet in
Executive Session on April 14, 2015 in order to recommend a course of action. This Article is placed on
this Warrant as a placeholder in the event that there is need for Town Meeting to approve the payment of
a settlement.
Finance Committee Report - given by Mark Dockser• The Finance Committee may be asked to
advise Town Meeting on this matter once Town Counsel recommends the best solution to the Board of
Selectmen.
SPECIAL TOWN MEETING
Reading Memorial High School April 27, 2015
Preforming Arts Center
Bylaw Committee Report: No report
Presentation given by:
• Bob LeLacheur - See Attached
Motion Carried
Dan Ensminger, Board of Selectmen moved to adjourn the 2015 Special Town Meeting sine die at 10:46
PM with 163 Town Meeting Members in attendance.
Motion Carried
A true copy Attest:
Laura A Gemme
Town Clerk
RM HS
Retaining Wall
SOUTHWEST RETAINING WALL SYNOPSIS
Timelines
August 2014 —April 2015
• Au ust 2014: During annual fire, building &safety rlkthrough with
Faci ttien Officials (Building Inspector Fire Chief) potential
deficiencies with the right retaining wall at RMHS
• Se tember — October 2014: Facilities contacted PARE Engineering (civil
engineers to pre orm an onsite preliminary review of condition of wall
• October 2014- December 2014: Facilities in conjunction with PARE began
to acquire various plans an review preliminary site notes
• December 2014 —lanua 2015: Design & Engineering contract between
ea ing __1, is coos ngineering is executed
• %bruua 201�5 —Site investigation and drilling delayed due to snow &
b azal" rds
March 2015 — Site Investigation, drilling & topographical survey's
compT�
• ril 2015 Design and Opinion of Cost (OPC) completed and ready for
reApview w pro— ject approval
Area in question:
• Southwest Edge of
Parking Lot adjacent to
Oakland Road & Faculty
Parking Lot
12/30/2015
Visual Representation of Failing
Retaining Wall:
• PARE preforming initial
structural condition
assessment — Fall 2014
Visual Representation of Failing
Retaining Wall:
-TO NOTE: see
undulating wall (wave
like failure)
Visual Representation of Failing
Retaining Wall:
-View: Along north -
south wall
-TO NOTE: wave in wall -
& settlement at railing
sono -tube foundations -
12/30/2015
Visual Representation of Failing
Retaining Wall:
• TO NOTE: fractured
Sono -Tube railing
foundation at wall
corner near stairs
Visual Representation of Failing
Retaining Wall:
• 90— degree corner,
looking along east -west
wall
• TO NOTE: Wall
Rotation: see wall
pulling away from
parent soil — should be
plumb
Recommendations:
• Remove & rebuild the entire southwest retaining wall from stairs to
PAC entrance
• Stairs are NOT affected and NOT impacted thus NO need to repair or
replace
• Repair sidewalk and parking lot immediately affected and impacted by
failure —(up to the first row adjacent to first light poles on right side)
• Estimated time for construction —8 -10 weeks
In Summary:
• Preliminary investigations, engineering site visits and review of field notes
determined the RMHS retaining wall at the southwest edge of the parking lot
adjacent to Oakland Road has failed and is in need of replacement
• Estimated OPC determine total project costs to be $495,950.00
• Estimated Project assumes an 8 -10 week schedule (Summer 2015)
• Next Steps:
• Approval of project by School & Town officials
• Appropriation of fiscal resources
• Contract execution & project development
12/30/2015
Opinion of Costs: (OPC)
• Conceptual Opinion of Total Construction Cost: $337,000
• Construction Administration: Estimated: $60,000
(still to be negotiated but estimates assume an 8 -10 week project schedule)
• Potential Add On's: $98,950
• LSP Services: $7,500 potential for LSP Services ifcontaminated soils are
encountered during over — excavation
• Rehabilitation of Parking Lot: $91,450 potential for increased parking lot rehab
if point of failure is determined to be further back from initial project costs (up to
first light pole parking lot) — Assumes 35 feet back with 325 long area
• Total Estimated Project Costs: $495,950
OPC ore based on aW %compkdon ofdesipn
J