HomeMy WebLinkAbout2014-02-13 Special Town Meeting MinutesSPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
The meeting was called to order by the Moderator, Alan E Foulds, at 7:41 PM, there being a quorum
present. The Pledge of Allegiance to the Flag was recited by those in attendance.
The Warrant was partially read by the Assistant Town Clerk, Julia Rodger, when on motion by James
Bonazoli, Board of Selectmen, it was voted to dispense with further reading of the Warrant.
ARTICLE 1: To hear and act on the reports of the Board of Selectmen, Town Accountant,
Treasurer - Collector, Board of Assessors, Director of Public Works, Town Clerk, Tree Warden, Board of
Health, School Committee, Contributory Retirement Board, Library Trustees, Municipal Light Board,
Finance Committee, Cemetery Trustees, Community Planning and Development Commission, Conservation
Commission, Town Manager and any other Board or Special Committee.
Backaround: This article appears on the Warrant for all Town Meetings. At this Special Town
Meeting, no report(s) are anticipated.
Finance Committee Report: No report
Bylaw Committee Report: No report
On motion made by James Bonazoli, Board of Selectmen Article 1 was tabled
ARTICLE 2: To choose all other necessary Town Officers and Special Committees and determine
what Instructions shall be given Town Officers and Special Committees, and to see what sum the Town will
raise by borrowing or transfer from available funds, or otherwise, and appropriate for the purpose of
funding Town Officers and Special Committees to carry out the instructions given to them, or take any
other action with respect thereto.
Backaround: This Article appears on the Warrant of all Town Meetings. There are no known
Instructional Motions at this time. The Town Moderator requires that all proposed Instructional Motions be
submitted to the Town Clerk in advance so that Town Meeting Members may be "warned" as to the
subject of an Instructional Motion in advance of the motion being made. Instructional Motions are
normally held until the end of all other business at Town Meeting.
Instructional Motions Submitted:
Motion made by Barry Berman, Precinct 4 to move that Town Meeting instructs the Bylaw Committee to
bring before Subsequent Town Meeting in November 2014 an amendment to the Bylaws creating a
Permanent Building Committee. The Bylaw Committee will hold at least on public hearing on the matter to
gauge Input from the public and other Board and Committees.
DUTIES
The Permanent Building Committee is responsible for oversight and management of construction,
reconstruction, major alteration or enlargement of all municipal buildings. The Permanent Building
Committee is also responsible for working with the Director of Facilities to conduct a periodic review of the
physical condition of all existing buildings and for preparing and recommending on -going comprehensive
capital management and spending plans to the School Committee and the Board of Selectmen.
The Permanent Building Committee works with the School Committee, the Board of Selectmen, the Library
Trustees and any other Board or Committee which proposes building or renovation projects.
I Page
SPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
The Permanent Building Committee establishes criteria and guidelines for communication regarding these
projects between and among interested committees and the public.
Any Board or Committee which intends to propose a project or a feasibility study before Town Meeting
shall provide goals and financial requirements to the Permanent Building Committee in advance of the
Town Meeting where funding will be requested. Permanent Building Committee will review the information
to determine whether the sums are reasonable and will report such to Town Meeting.
MEMBERSHIP
The Permanent Building Committee will be comprised of volunteer Reading residents, and be appointed
jointly by the Board of Selectmen and School Committee. Permanent Members will be selected from
among the following professions: architect, engineer, builder, project manager, building trades and
attorney.
Allowances will be made for each project to have temporary voting members from the proposing body.
The Bylaw Committee will recommend length of Terms, town staffing, number of members, temporary
membership rules and to whom the Committee reports.
Motion made by David Greenfield, Precinct 5 to include "or other solution that those instructed may
recommend"
amend Carried
Finance Committee Report: No report
Bylaw Committee Report: No report
Instructional Motion Carried as Amended
On motion made by John Arena, Board of Selectmen Article 2 was tabled
ARTICLE 3: On motion made by Ben Tafoya, Board of Selectmen it was voted to amend the FY
2014 - FY 2023, Capital Improvements Program as printed in the "Report on the Warrant - Special Town
Meeting - February 13, 2014" including the revised total of $18.4 million for the Library building project,
as provided for In Section 7 -7 of the Reading Home Rule Charter or take any other action with respect
thereto.
Background: The following amendments are proposed to the FY2014 - FY2023 Capital
Improvements Program (CIP) as previously approved at Annual Town Meeting in April 2013 and amended
at Subsequent Town Meeting in November 2013. These amendments need to be included in the CIP In
order for Town Meeting to consider funding them under Article 5 later at this Special Town Meeting. Since
the changes are so minor, blue pages showing these Capital Improvement Plans are not included in this
Warrant Report, but will be back at Annual Town Meeting when significant changes are proposed.
General Fund
FY14: +$200.000
♦ $200,000 School department technology for the State online testing system
FY1S:
♦ No changes made
21Page
SPECIAL TOWN MEETING
Reading Memorial High School
Hawkes Field House
♦ No changes made
Water Fund
February 13, 2014
FY14: +4120.000
♦ $120,000 dump truck - at November Town Meeting was moved to FY15 from FY18, but Is now In
urgent need of replacement
FYIS: 4120.000
♦ - $120,000 dump truck - see above
FY16 to FY23:
♦ No changes made
Sewer Fund
FY14: +4120.000
♦ $120,000 dump truck - not urgent, but was scheduled for replacement in FY15 and combining with
Water dump truck purchase will be most economical
FY1S: - 4120.000
♦ - $120,000 dump truck - see above
FY16 to FY23:
♦ No changes made
Finance Committee Reno rt - given by Paul McNeice: The Finance Committee recommends all of
the proposed amendments to the FY 2014 - 2023 Capital Improvements Program by a vote of 5 -0 -0 at
their meeting on January 29, 2014. Placing Items in the Capital Improvement Program is a prerequisite
but in itself does not authorize spending funds towards these items.
Bylaw Committee Report: No report
Presentation given by:
• Bob LeLacheur - See Attached
ARTICLE 4: On motion made by Dan Ensminger it was voted to see if the Town will vote to
authorize the Board of Selectmen to sell, or exchange, or dispose of, upon such terms and conditions as
they may determine, various items of Town tangible property, or take any other action with respect
thereto.
Backaround: Following is a list of surplus vehicles that are scheduled to be disposed of in FY 2014.
Town Meeting approval is required for disposition of tangible property with a value of $5,000 or more. It is
unlikely that all of these items have a value that exceeds that amount, but to be safe, Town Meeting
approval is requested. Disposition could be through trade in, auction, or other sale:
• Election equipment
• Library materials and equipment
• Water Dump Truck #14 {2000 International 4900, 4x2}
• Sewer Dump Truck #17 {2001 International 4900, 4x2}
31 Page
SPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
At Annual Town Meeting, the Capital plan will add $72,000 of election equipment replacement in FY16.
There is a chance that the Town may be able to participate in a beta test of new election equipment for
the state within the next year, at a substantial savings. Trading in old equipment would be part of the
transaction. As only Town Meeting can declare surplus equipment, that permission is sought now. If
funding is needed before FY16 for the new equipment and the opportunity cannot wait for the next vote of
a local Town Meeting, then the Town will approach the Finance Committee with a Reserves request.
The library will be disposing of some materials and equipment as they consolidate and move to smaller
temporary quarters. While it is unlikely that any item will exceed the technical $5,000 threshold, Town
Meeting should be aware that in total the disposed items may well exceed that value.
Finance Committee Report - given by Mark Dockser: The Finance Committee recommends the
subject matter of Article 4 by a vote of 5 -0 -0 at their meeting on January 29, 2014.
Bylaw Committee Report: No report
Presentation given by:
• Bob LeLacheur - See Attached
Motion Carried
ARTICLE 5: On motion made by Marsie West, Board of Selectmen it was voted to see if the Town
will vote to amend one or more of the votes taken under Article it of the April 22, 2013 Annual Town
Meeting relating to the Fiscal Year 2014 Municipal Budget, and amended under Article 11 of the November
12, 2013 Subsequent Town Meeting and see what sum the Town will raise by borrowing or transfer from
available funds, or otherwise, and appropriate as the result of any such amended votes for the operation
of the Town and Its government, or take any other action with respect thereto.
Backaround•
General Fund - Waaes and Expenses
Account Line
Description
Decrease
Increase
W99 - Water
Enterprise Fund
C99 Capital
School Technology for State online testing
system
$120,000
$200,000
392 - FINCOM
Reserves
In anticipation of replacing Boiler system at
Joshua Eaton School
$120,000
$200,000
Subtotals
Subtotals
$240,000
$400,000
Net Operating Expenses
$400,000
_
From Free Cash
$400,000
Enterprise Funds - Wages and Expenses
Account Line
Description
Decrease
Increase
W99 - Water
Enterprise Fund
Dump Truck
$120,000
W99 - Sewer
Enterprise Fund
Dump Truck
$120,000
Subtotals
$240,000
41 Page
SPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
Over the next two years, the Department of Elementary and Secondary Education is transitioning from the
current paper state test (MCAS) to a more computer -based online testing system called PARCC. The field
testing will begin this spring and may be fully Implemented next year. In order to prepare for this
transition, the Reading Public Schools is requesting this additional funding for the purchase of laptops,
workstations, and hardware infrastructure to improve wireless capacity and to allow multiple classes in
each school to take the test at the same time. This additional technology will help with scheduling during
the testing periods and will also be used outside of the testing periods for instructional use by students.
During the month of November, boiler #1 at Joshua Eaton developed an interior leak. Upon further
Investigation it was discovered that three sections of the boiler were rotted out causing a drop in system
pressure and an inability for the boiler to function properly. The sections, due to their location and size,
are cost prohibitive to repair. Therefore, a full replacement of both boilers is recommended at this time.
Since both were installed during the renovation in 1997, and in the same general condition, it makes
sense to upgrade these gas fire hydronic boilers to 4 smaller high efficiency gas fired condensing boilers.
Bids will be opened on February W, one day after the Special Town Meeting. Therefore the exact cost is
not known. To adjust for this uncertainty, a request to add $200,000 to the FINCOM Reserves Fund will
then allow the Facilities Department to seek reimbursement from FINCOM instead of waiting for the
Annual Town Meeting.
Finance Committee Report - given by Barry Berman: The Finance Committee recommends the
subject matter of Article 5 by a vote of 5 -0 -0 at their meeting on January 29, 2014. FINCOM would like to
have this equipment replaced as soon as possible, and agrees with the method of transferring funds to
their Reserve Fund.
Bylaw Committee Report: No report
Presentation given by:
. Bob LeLacheur — See Attached
Motion Carried
ARTICLE 6: On motion made by Andrew Grimes, Board of Library Trustees it was voted that the
Town raise by borrowing or transfer from available funds, or otherwise, and appropriate the sum of three
million five hundred thousand ($3,500,000) for the purpose of renovating and expanding the Reading
Public Library located at 64 Middlesex Avenue, including the costs of consulting services, audits, plans,
documents, cost estimates, bidding services, moving, temporary relocation, and all related expenses
incidental thereto and necessary in connection therewith, said sum to be expended by and under the
direction of the Board of Library Trustees and the Town Manager; and that the Town authorizes the Board
of Library Trustees, Board of Selectmen, Town Manager, or any other agency of the Town, to apply for a
51 Page
Net Operating Expenses
$240.000
From Water Reserves $120,000 (balance
declines from $1,728,653 to $1,608,653
$120,000
which is well above FINCOM suggested
minimum target)
$120,000
From Sewer Reserves $120,000 (balance
declines from $2,203,974 to $2,083,974
which is well above FINCOM suggested
minimum target)
Over the next two years, the Department of Elementary and Secondary Education is transitioning from the
current paper state test (MCAS) to a more computer -based online testing system called PARCC. The field
testing will begin this spring and may be fully Implemented next year. In order to prepare for this
transition, the Reading Public Schools is requesting this additional funding for the purchase of laptops,
workstations, and hardware infrastructure to improve wireless capacity and to allow multiple classes in
each school to take the test at the same time. This additional technology will help with scheduling during
the testing periods and will also be used outside of the testing periods for instructional use by students.
During the month of November, boiler #1 at Joshua Eaton developed an interior leak. Upon further
Investigation it was discovered that three sections of the boiler were rotted out causing a drop in system
pressure and an inability for the boiler to function properly. The sections, due to their location and size,
are cost prohibitive to repair. Therefore, a full replacement of both boilers is recommended at this time.
Since both were installed during the renovation in 1997, and in the same general condition, it makes
sense to upgrade these gas fire hydronic boilers to 4 smaller high efficiency gas fired condensing boilers.
Bids will be opened on February W, one day after the Special Town Meeting. Therefore the exact cost is
not known. To adjust for this uncertainty, a request to add $200,000 to the FINCOM Reserves Fund will
then allow the Facilities Department to seek reimbursement from FINCOM instead of waiting for the
Annual Town Meeting.
Finance Committee Report - given by Barry Berman: The Finance Committee recommends the
subject matter of Article 5 by a vote of 5 -0 -0 at their meeting on January 29, 2014. FINCOM would like to
have this equipment replaced as soon as possible, and agrees with the method of transferring funds to
their Reserve Fund.
Bylaw Committee Report: No report
Presentation given by:
. Bob LeLacheur — See Attached
Motion Carried
ARTICLE 6: On motion made by Andrew Grimes, Board of Library Trustees it was voted that the
Town raise by borrowing or transfer from available funds, or otherwise, and appropriate the sum of three
million five hundred thousand ($3,500,000) for the purpose of renovating and expanding the Reading
Public Library located at 64 Middlesex Avenue, including the costs of consulting services, audits, plans,
documents, cost estimates, bidding services, moving, temporary relocation, and all related expenses
incidental thereto and necessary in connection therewith, said sum to be expended by and under the
direction of the Board of Library Trustees and the Town Manager; and that the Town authorizes the Board
of Library Trustees, Board of Selectmen, Town Manager, or any other agency of the Town, to apply for a
51 Page
SPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
grant or grants to be used to defray the cost of all, or any part of, said Improvements; and that the Town
authorizes the Board of Library Trustees and /or the Town Manager to enter into any and all contracts and
agreements as may be necessary to carry out the purposes of this Article, subject to approval by the
voters of the Town of a Proposition 2 -1/2 debt exclusion for the additional cost of the project. These funds
will be additional to the $14.9 million previously approved by vote of Town Meeting on January 28, 2013
and a majority of the voters at a local election on April 2, 2013, or take any other action with respect
thereto.
Background:
Reading Public Library Building Project
Design and Cost Updates and Supplemental Funding Request
Project Introduction
In April 2013, Reading voters endorsed a proposed project to renovate and modestly expand the public
library by approving debt exclusion, authorized by Town Meeting in November 2012, in the amount of
$14.9 million, the total estimated project cast. Reading Public Library had successfully written a grant
application and was awarded a grant from the state library commission of $5.1 million to offset the total
project cost.
The Board of Selectmen and Library Trustees, at the request of Town Meeting, created a Library Building
Committee to oversee the project. This Committee comprises three Interested and well qualified residents
(appointed by the Town Moderator and a representative from each of the Boards), two Library Trustees,
the Library Director, a staff member, and a Finance Committee representative.
A project manager (ST/) was engaged In July 2013. An Architect (CBT) for the project was selected in
September, though only placed under contract in November 2013.
In October and November of 2013, when the architects and project manager took a first look at the
construction budget, they thought some costs may have been underestimated or overlooked at the
conceptual design phase completed two years ago. At that time, the hope was that some of those costs
could be designed out without compromising the integrity of the library renovation and addition, and that
offsetting savings might be available in the "soft" project categories.
The Library Building Committee urged the Town to allow the architects to proceed to develop the design
fully to generate solid information about existing conditions, a good schematic design, and a clear
understanding of both construction costs and overall project costs. The Town committed to the architects
by contract In November 2013. The Library Building Committee and Town Manager instructed the
architects to gather as much information as they could as quickly as possible and to bring back a complete
project with acute awareness of cost while they addressed the deficiencies of the current building and its
limitations as a functional library.
Now in January 2014, the Town has a schematic design from the architects that meets the requirements
of the library program it was planned to fulfill and meets the community's expectations for a well - planned,
highly- functioning renovation /addition. Though conformed to the now known details and Infirmities of the
existing building and systems and optimized for entry, flow and safety, this design follows the same
parameters for the renovation and addition previously proposed.
The Library Building Committee, the Board of Trustees and the Town Manager are committed to full
transparency. On January 16, 2014, the proposed schematic design and the compilation of updated costs
were presented to the Town Manager and the Library Building Committee and finalized in the weeks
61 Page
SPECIAL TOWN MEETING
Reading Memorial High School
Hawkes Field House
February 13, 2014
following. Accordingly, they were presented to the Board of Selectmen and the Finance Committee on
January 29, with a request to call a Special Town Meeting in February 2014.
Proposed Design
Following are drawings prepared by CBT, the project architects, showing the internal and external
renderings of the proposed building project.
7 i Page
Reading Memorial High School
Hawkes Field House
SPECIAL TOWN MEETING
February 13, 2014
z
O
U
I .�■ I
■muu
�IIIIIII
i
n
1 I --
I
I"
- 1
II
II II I
II I Ij
it I. ii S�
IIII
II I i
11 111111111 II I•u
II 11 111111 I1 II II I u iii
11 111111 II p II I
11 11111111_I� II II P ��'
milli
I
SPECIAL TOWN MEETING
Reading Memorial High School
Hawkes Field House
February 13, 2014
12
U
r
Z A
6
0
0
O a
LL C
N 9
K m
Il C
SPECIAL TOWN MEETING
Reading Memorial High School
Hawkes Field House
February 13, 2014
V
a
u
z
5 A
a a
0 J
0 a
LL �
� 6
z m
0
W b
N K
(N
Reading Memorial High School
Hawkes Field House
SECOND
FLOOR
FIRST
FLOOR
GRODND
FLOOR
SPECIAL TOWN MEETING
V ' C N `
f ". Reading Public Library
February 13, 2014
Reading Memorial High School
Hawkes Field House
SPECIAL TOWN MEETING
February 13, 2014
a
V
d
V
N L
w
W j
C_ y
N �
«� a
c
0
�dn
Reading Memorial High School
Hawkes Field House
\1
SPECIAL TOWN MEETING
r
- -F ..
'{
X
E -'
'o
L
E
0
v
r
I
it I
February 13, 2014
a
u
I ®a ate' I
I_
z Z
d
« a
E
:
a
a p,
j c
N
d
eEA
�f
L1. ifi7T
::�
I ®a ate' I
I_
z Z
d
« a
E
:
a
a p,
j c
N
d
SPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
Cost Estimates
Concurrent with the fully developed schematic design, the architects and project manager have developed
a project cost, based on the completed schematic design and extensive reports and Information from
technical specialists, engineers, code consultants, and advanced Investigatory methods about existing
conditions.
The detailed information supplied by these assessments was not previously available, and could only be
obtained by engaging and paying such consultants. Costs for leasing temporary quarters, professional
moving and storage, and a new circulation /materials handling system have been updated. In short, the
additional time and detailed building analysis has given the project team new and significantly better
Information on which to base the project cost.
These efforts have improved confidence and certainty in the costs. However, they also have revealed new
or more severe challenges, including the following examples:
• Extensive and continuing water damage between external masonry and internal walls and
throughout the external masonry
Many and significant code update requirements (stairs, fire, HazMat, ADA, insulation, seismic,
Flooring, elevator)
• Main floor needs more support (certain spans removed in 1984)
• Storm water has permeated foundation, mandating a new sub - surface drainage system including
new gutters and downspouts and regarding at the building perimeter
• Floors must be tied to walls (seismic code)
• Addition must have structural ties — can't rest against current building
Extensive presence of Hazardous Materials
Some of these challenges were becoming apparent but their scope was not easily quantifiable without
more invasive testing. Early conceptual design and assessments which were used to develop the state
application, related cost estimates and initial funding request approved by the Town was limited in scope,
given that the Town was not prepared to invest in extensive research, expert professionals, and testing
until project funding was certain. Consequently, some Items were omitted or insufficiently scoped. The
information was the best available at the time of the application and funding in January 2013.
The current proposed design and cost estimates include a fully funded project accommodating:
• Construction overhead and contingencies ( -29% of direct costs)
• Windows, replacement woodwork, roof, turrets
• . New furniture and equipment (network, materials handling, security)
• Project Contingency ( -8.6% of project costs)
• Continued commitment to a sustainable building
The proposed design also:
• assumes no growth in the physical materials collection (expected to be flat or declining over time)
• Incorporates Internal flexibility to enable:
• future redesign and reallocation of internal space
• evolution to more digital and electronic uses
The Library Building Committee and the Library Board of Trustees have both reviewed the design and the
associated costs in detail, and unanimously recommended that the Town adopt and fund the revised
project. Accordingly, the formal request is for the Town to approve an additional expenditure for this
project of $3.5 million, either by a larger debt exclusion or otherwise. On January 29, 2014, the Finance
Committee voted unanimously (5 -0 -0) to recommend such additional funding through such means as the
Town will determine, recognizing the need for significant repairs.
141 Pa g
SPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
The current project cannot be meaningfully pared back. Were the Town to choose not to fund the current
project in some manner, the Town would forfeit the associated $5.1 million state grant and need to begin
development on a new proposal. As noted below in the Alternatives section, other options are likely to
ultimately cost the Town substantially more and not meet the community's stated preferences.
The proposed timing of the request for approval by a Special Town Meeting and, if funded by debt
exclusion, the voters, will enable the project to stay on its current schedule and proceed in the summer of
2014 to bidding for general contractors. Delays could jeopardize the schedule and would very likely
translate into additional cost increases.
Below are categorical summary costs ($K) for the current proposal and the previously approved amount
Total Project
18,328
14,912
3,416
Direct Construction
10,195
7,495
2,700
Overhead
2,912
2,420
492
Contingency
Fess & Admin
1,983
2,018
(35)
Furnishings,
1,112
1,113
(1)
Fixtures &
Equipment
Temp Space &
675
546
129
Moving
Project Contingency
1,451
1,320
131
Total
18,328
14,912
3,416
State Grant
5,105
5,105
--
Local Funding
Requirement 13,223 9,807 3,416
The incremental $2.7 million of direct construction costs, which constitutes most of the difference from the
initial approved amount, Is driven primarily by higher estimates of certain structural and design costs and
more thorough assumptions on complete upgrades which were previously omitted (e.g. new roof, turrets,
foundation and drainage). These occur mostly in external envelope and systems cost groups.
151 Page
SPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
The core of the project spending occurs in the construction costs, a more detailed breakdown of which is
shown below.
Addition
$2,668
Sitework
705
Renovation
6,822
•
Accessibility
475
•
Functional Improvements
1,719
•
Exterior Envelope Repair
1,286
•
Public Safety
919
•
Systems, Tech, Energy
2,423
Total Construction Cost Direct 10,195
A further explanation of these categories is provided by our architects, CBT, below.
The changes in estimates are not attributable to any single item or category - they reflect more detailed
information gathered over the last two months and a careful parsing by dedicated professionals.
Report from CBT Architects:
Value Enhancement for the Town of Reading to the Exfstln • • ibrary r•V Renovation
Whereas the expansion of the Reading Public Library will benefit the Town with several new meeting
spaces available to the community, as well as a new reading and stack room of light - filled quality, the
proposed renovation of the existing building will also significantly enhance the value to the Town of this
historic facility through Improved accessibility, better functional organization, improved safety, abatement
of hazardous materials, integrity of the building envelope, and renewed mechanical systems of higher
efficiency.
An allocation of approximately $6.9 million dollars of direct cost will fund these needed improvements to
the original building. The order of magnitude cost for each of these principal categories of work is
indicated below as a proportion of the overall $6.9 million (exclusive of site work). The distribution of
costs is approximate as well, recognizing that categories overlap.
161 Page
SPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
Accessibility: ( ;475,000)
A new entry sequence is planned into the building from a landscaped entry plaza at the parking area,
featuring doorways on level with the sidewalk, leading to a lobby from which the various levels and areas
of the library can be readily accessed via clear circulation paths, and a new elevator - all within the secure
supervision and help of a new central circulation desk. The objective is clarity of orientation for the patron,
with easy linear circulation movements along the center of the library, and openly visible access to stairs
and the elevator serving the 3 levels of the library. The elevator is enlarged for ease of use to
accommodate parents with strollers, those with physical disabilities, indeed all patrons, as well as
emergency services. Access to the children's library, traditionally on the upper level at the Reading
Library, will be more direct than at present without necessarily traversing other parts of the library, if
desired. The accessibility extends through the existing building to a new exterior activity area at the roof
deck of the new addition, for the children. All accessory areas of the library will be updated to meet
dimensional standards for doors, aisles, toilet rooms and fixture placements.
Functional Improvements and General Overall Reconfiguration /Finishes Renovation:
($1,719,000)
The overall functional relationships amongst staff areas, collections, reading areas, exhibits, meeting
spaces, and utility uses have been studied to maximize efficiency, improve sight lines for supervision,
connect the staff positions directly to staff work areas, ease navigation through the facility, and to make
the access of the collections a positive experience. The functional improvements will enable the staff` to
have a visible presence throughout the building, and efficient use of space will translate into more staff
time available to assist the patrons. The spaces are designed to fit the current and future programmed
activities and collections.
Exterior Envelope Repair. ($1,286,000)
Funding will be assigned for refurbishment of the exterior envelope of the original building, in order to
address issues of deterioration, maintenance, and energy efficiency. The key elements of the envelope
have been studied to identify present deficiencies and points of failure. Principal components in particular
are highlighted: masonry, windows, roofing and associated drainage.
The masonry exterior is in need of general pointing and repair. Several areas of wall suffer from water
penetration which has displaced the brick via freeze -thaw cycles, which, if not corrected, will accelerate
the rate of failure. Mortar has deteriorated and water is infiltrating the decorative horizontal bands, where
the mortar is washed out leading to infiltration. Broken and cracked masonry is to be replaced. The
conditions have been identified by the design team for budgeting specific repair.
The original wood windows are past their useful life; many are no longer operable with failed balance
weight systems, the glass is only non - insulated glass, and there are excessive layers of paint The project
includes replacement of the windows using relatively low- maintenance aluminum - framed window with
insulating glass (including energy - saving coatings). The windows will be designed to match the historic
frame and trim profiles of the original wood windows, with fused finish coatings of historic appearance to
minimize the need to re- finish in time. The program includes exposing /re- opening windows to the lower
stack level areas along the south side of the library, now covered by the handicap ramp (to be removed
and replaced with direct entry access described above.)
The roof system has reached the point of replacement, as the gutters are leaking and the eaves have
areas of failure; the fascia and (lashings are due for replacement using improved materials and methods
reflecting current practice. Refurbishment of the subsurface drainage network for the rain leaders - which
are suspected for water penetration into the building at some locations of the lower level - is planned. The
roofing renovation presents the opportunity to consider reconstruction of the missing conical turret roofs
(lost in the past to rim).
public Safety: ($919,000)
Costs have been included for general improvement of public safety, within the context of an existing,
historic public facility, as modeled for by provisions of the Massachusetts State Building Code. The funding
for the project is not least valued for the contribution to safety. The renovation is an opportunity to
enhance the strength of the building to improve resistance to seismic events, within practical limits. For
example, the code provides for clipping all the wood floor framing to the masonry walls to mitigate
potential separation through a tie system. Selective floor areas for book collection loads will be
171 Page
SPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
strengthened. Egress stairs will be updated with fire-rated enclosures (now absent). Modernized fire alarm
and detection systems, along with updated sprinkler protection will serve the public good. In the course of
the refurbishment hazardous materials have been tested for and identified, and these materials will be
abated in accordance with regulations.
Systems Replacement, Technology Integration, Energy Efficiency and Sustainability.
( ;2,423,000)
Modernization of the mechanics, electrical, plumbing, and technology systems of the library will provide
measurable benefit and positive retum over time, together with responsible management of Town
resources. Funds are targeted for a complete replacement of the heating, ventilating and air conditioning
systems, using modern high - efficiency condensing boilers and an effective refrigerant -based heat -
exchange system, supplemented with proper fresh air ventilation meeting the current code standards.
Together with the insulated glass windows and a new insulation system for the large attic space, and an
electronic management control system, the energy efficiency of the original building will be advanced,
saving costs long -term for the Town and improving the environment of the facility in terms of air quality,
temperature control and comfort.
Furthermore the electrical system and lighting will be updated and enhanced to serve the operating
systems and the patrons. The improved lighting will also contribute to the public safety discussed above.
Plumbing systems will be renewed with more numerous toilet facilities of convenient location, utilizing low -
consumption fixtures for water conservation. Toilets will be configured for accessibility.
Along with the electrical system upgrade, the original library will benefit from a new technology
infrastructure to support extensive availability of computer stations. The network will feature an expanded
network of computer connection ports, coordinated with specialized furnishings, to facilitate fiexibility and
encourage usage by all patrons. The positive and long -term benefit and value of such technology access to
the community, in terms of education and opportunity is beyond measure.
Alternatives
The decay and decline of the library building has accelerated In recent years. Residents who toured the
building " behind the scenes" in the spring of 2013 saw major areas of deterioration and damage, and
were dismayed to discover the age and wear - and -tear on the 120 year -old building. At this point in time,
the Town must address the library. If not this project, then a substantial renovation of the existing
building or a new building must be pursued immediately. The Information and knowledge generated from
the current project has enhanced our awareness of major issues. Major drivers to update the space
include:
• Serious and accumulating damage (water between walls, foundation, masonry)
• Required Code Updates (stairs, fire, ADA, HazMat remediation, insulation, seismic, Flooring,
elevator)
• Community Usage (actual use, requested space reconfiguration, Flexibility for future uses)
• Updated systems to handle evolving usage (electrical, HVAC, network)
The Town has committed and approved the current project in all respects (location, layout, scope, etc.).
The current request is an informed update to it.
Questions have occasionally arisen during the project about these other alternatives. As you Can see by
the estimates below, neither would appear to make sense. However, for completeness we have asked
STV, our project manager, to assist us in preparing directional, high level estimates. The information
below regarding other alternatives is for reference only. Neither is under consideration.
The estimates for the two options have not been fully developed but represent a collective best guess and
are offered for comparison purposes. Each contains certain assumptions which would apply to each
alternative, Including the following:
• Are extrapolated from comparables but not based on specific design Information or detailed cost
estimates
IS Pa 9 e
SPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
• Will involve a project with enough changes to trigger full code compliance
• Will be of sufficient size to require professionals, temporary relocation, and new furniture and
equipment
• Will be funded entirely by Reading (current state grant forfeited; no eligibility for a Renovation
only; a successful approval of a resubmission for a new building is very uncertain and, even if
ultimately available, would likely result in substantial delays)
• For an expenditure reflecting all of the foregoing, the Town should invest in either project to deliver
a useful library
• Will not achieve Town's stated requirements (space, utility, location)
• Costs expended or committed on current project are aggregated and included
• As entirely new projects, redesign and new Town approvals will cause delays, which are
conservatively reflected as 18 month escalation of 6% (4% per year)
Total Project 15,398 23,024
Direct Construction 7,676 12,662
Overhead & Contingency 2,627 4,333
Fees & Admin 2,529 2,911
Furniture, Fixtures & 655 1,112
Equipment
Temp Space & Moving 675 100
Project Contingency 1,236 1,906
Total 15,398 23,024
State Grant Not Available for $5.1 million grant would
Renovation Only. have to be returned.
Reapplication would be
required and award and
funding are unknown.
Local Funding 15,398 23,024
Renovation only also assumes:
191 Pa g
SPECIAL TOWN MEETING
Reading Memorial High School February 13, 2014
Hawkes Field House
New Roof, Windows, and Exterior Repairs, HVAC, Toilets, Stairs, Elevator and Accessibility
Upgrades as required by code.
Significant storm drainage work to be performed and associated repair
New Building also assumes:
• Building parcel is immediately available, at no cost, and reasonably Flat and open site; no
demolition or Haz Mat; and utilities available in adjacent street(s) = $1m site work
• 37.5K sq ft new library, with direct construction costs of - $311 /sq R (based in other current MA
library projects, current proposed addition, and STV /CBT experience)
• No costs including for decommissioning or redeploying old building (which will be substantial)
External Fund Raising
Library supporters still expect to organize a funding campaign, both private and corporate, as well as in-
kind requests, but none have formally commenced. Efforts are pending both a final, funded design and the
establishment of a fund raising group.
Finance Committee Report - given by Karen Herrick: The Finance Committee recommends the
subject matter of Article 6 by a vote of 5 -0 -0 at their meeting on January 29, 2014. The need for
significant repairs to this facility has been evident for many years. FINCOM will hold another meeting prior
to the Special Town Meeting to discuss funding options for the additional funds that are needed at this
time. Their preferred method of financing may include Proposition 2 -1/2 debt exclusion for these
additional funds, but FINCOM will examine other options as well.
Bylaw Committee Report: No report
Presentation given by:
• Bob LeLacheur - See Attached
• Sharon Angstrom - See Attached
On motion by Barry Berman, Precinct 4 a friendly amendment was made "and that the 3.5 million
additional funds needed come from debt exclusion"
There were no objections to the friendly amendment, it was accepted by Town Meeting.
After discussion a vote was taken:
2/3 Vote Required
109 Voted in the affirmative
13 Voted in the negative
125 Town Meeting Members in Attendance.
Motion Carried with Friendly Amendment
James Bonazoli, Board of Selectmen moved to adjourn the 2014 Special Town Meeting sine die at 10:44
PM with 125 Town Meeting Members in attendance.
Motion Carried
A true copy Attest:
201 Pa g
SPECIAL TOWN MEETING
Reading Memorial High School
Hawkes Field House
Laura A Gemme
Town Clerk
211 Page
February 13, 2014
a
19
ensMls V d ^I
.:_
• Water damage inside -Accessibility issues
walls •New seismic code
•Eaves showing signs requires structural
of at reinforcement
-Extensive presence of •MEP Systems
Hazardous Materials wom /wearing nut
•Previous renovations
left multiple floors
and ceilings in place
sa.
• mvoe�aioo
. o..bo p....mum.
. eroi<n neveloFei.eu.nd Update.
. uLr.rr 9uadlna Commlu.. comm<nv.ry
•Co uvefim Can ...... is
• Ne.. step.
•Major envelope -Relocate main entry
repairs & rebuilding and additional exit
-Hazardous Materiel stairs
remediation requiring •Replace and update
additional unforeseen MEP systems
demolition and
removal
•stmcmral
reinforcement
extensive
PEADING
1
RESEARCH
& TECHNICAL ACTIVITY
SEPT
1 I
. 1..
....r
aEAOn9c
•Major envelope -Relocate main entry
repairs & rebuilding and additional exit
-Hazardous Materiel stairs
remediation requiring •Replace and update
additional unforeseen MEP systems
demolition and
removal
•stmcmral
reinforcement
extensive
PEADING
1
A T
� N
a �
� T
r
c 0
� A
n [T'
S 5
b Z
DOE I] m
i
A Y
1"!
MJ
cl
o
}� 2
A� O
rQ T
r
0 O
P A
V
z
Z
❑ ❑❑ ❑m
Q
R
Y,
T� r
'G
8
P A
v
r r
d ZD
'w
[HI ❑ ❑ N
A
Q
eT
M m
M m
a n0
Z
� o
8
r A
P �
� Z
❑❑❑❑�
N I rI_
MN
- Gel1e �
tr
a
R
N I rI_
MN
- Gel1e �
t£�
y9 T
z� T
8 �C
P Z'm
NOSE
I €E
n
Q
n O
'o Z
l.v O
c
� 00
A
r�
1 5
2
❑❑❑ ❑m
F � O
n 3
Q
R
� T
a W V:fll
a �
Ew T
r
O O
Or O
an A
v
z
d Z
❑❑❑ ❑c
� I
v
R
I IN,
:A m
&�a O
Z
Cv �
`O
a¢ a
�^ o
S A
a 5
z
❑❑❑ ❑c
n
Q
aqD
,um
m❑
ON3931
Xmgn 3!njnd 6uip —?j
N=j
aNnMO
HOOid
Buie
uoOiu
ON003s
a A.
s
n�
"g 3
z y
6'!1
_
_
A
A
n
n�
Z
T
0
0
T