HomeMy WebLinkAbout1978-05-08 Adjourned Annual Town Meeting Minutes42
Adjourned Annual Town Meeting
Reading Memorial High School Auditorium May 8, 1978
The meeting was called to order by the Moderator, Kenneth C. Latham, at
8:00 P. M.
The invocation was given by the Rev. David Reid of the First Baptist
Church, followed by the Pledge of Allegiance to the Flag.
The Moderator announced a meeting of the By -Law Appointment Committee to
be held at 7:15 P.M., May 22nd, 1978 in the Parker Junior High School, 45 Temple
Street, Reading, or, should the Annual Town Meeting be completed by this date,
the meeting to be held at 5:15 P.M. in the library of the office of Latham &
Latham, 643 Main Street, Reading.
On motion of Charles W. Hewitt it was voted to lay Article 12 on the table.
On motion of Charles W. Hewitt it was voted to take Article 2 from the table.
ARTICLE 2. The following report was read by Charles W. Hewitt, Chairman
of the Finance Committee:
SECOND SUPPLEMENT TO FINANCE COMMITTEE REPORT
FOR FISCAL YEAR 1979
CORRECTIONS
P.15 Tax Rate Calculations
Total to Be Raised from Current Income:
Estimated State & County Assessments:
Total Recommendations and Estimates:
Deductions to compute estimated tax rate:
Estimated receipts and available funds $5,602,653
Transfers and surplus revenue 1,237,609
Net Amount to be Raised by Taxation
Total Valuation
TAX RATE (per thousand)
p.17 Delete the following lines, which were added by the first
"Supplement to the Finance Committee Report"
Depot Museum Fund to Building Maintenance
Automatic Garage Doors to Police Department Expense
Fire Alarm Repeater to Fire Department Expense
Replace present lines with the following:
Group Insurance Dividend to Group Insurance
PL 874 to Schools
Add the following lines:
Municipal Light Department to Casualty Insurance
Water Construction and Maintenance to Casualty Insurance
Sewer Maintenance and Operation to Casualty Insurance
Municipal Light Department to Group Insurance
Municipal Light Department to Contributory Retirement
Municipal Light Department to Non - Contributory Retirement
TOTAL TRANSFERS and SURPLUS REVENUE:
p.19 Line 1 Selectmen Salary
Selectmen Total
Line 8 Town Accountant Salary
Town Accountant Total
Line 11 Treasurer Clerical Salary
Treasurer Total Salary
Treasurer Total
$ 18,648,983
1,664,580
20,313,563
- 6,840,262
13,473,301
$285,413,000
47.21
$ 8
381
4,219
4,131
50,000
71,000
17,000
13,000
42,571
121,570
40,408
$ 1,237,609
$ 50,121
100,051
37,267
39,242
34,226
44,466
53,710
43
Adnourned
Annual Town Meeting May 8, 1978
p. 19
Line
14
Tax Collector Clerical Salary
36,598
Tax Collector Total Salary
44,398
Tax Collector Total
62,528
Line
18
Town Clerk Clerical Salary
$
24,031
Town Clerk Total Salary
31,831
Town Clerk Total
39,781
Line
22
Appraisor & Clerical Salary
49,738
Assessors Total Salary
55,953
Assessors Total
70,153
p. 20
Line
30
Planning Board Salary
22,952
Planning Board Total
25,502
Line
35
Personnel Board Salary
13,392
Personnel Board Total
13,892
Line
39
Building Maintenance Salary
48,038
Building Maintenance Total
114,538
GENERAL GOVERNMENT - SUBTOTAL
618,489
GENERAL GOVERNMENT - TOTAL
619,839
Line
47
Police Department Salary
862,898
Police Department Total
965,830
p. 21
Line
52
Fire Department Salary
890,971
Fire Department Total
937,921
Line
59
Building Inspector Salary
36,048
Building Inspector Total
39,848
Line
63
Dog Officer Salary
13,163
Dog Officer Total
18,983
PROTECTION - SUBTOTAL
2,142,829
PROTECTION - TOTAL
2,243,298
p. 22
Line
77
Health & Sanitation Salary
28,859
Health & Sanitation Total
115,129
Line
87
Veterans Benefits Salary
20,532
Veterans Benefits Total
82,496
Line
91
Cemeteries Salary
84,500
Cemeteries Total
133,035
Line
96
Library Salary
191,464
Library Total
273,866
Line
104
Council on Aging Salary
19,118
Council on Aging Total
33,068
GENERAL SERVICES - SUBTOTAL
712,036
GENERAL SERVICES - TOTAL
$
2,725,395
p.23
Lane
114
Education Salary
$
7,143,003
115
Education Expense
1,144,140
116
Education Athletics
40,700
EDUCATION - SUBTOTAL
8,713,705
EDUCATION - TOTAL APPROPRIATION
$
8,713,705
Line
122
High School Concrete Repairs
68,755
EDUCATION TOTAL
$
9,048,567
FA I�
Adjourned Annual Town Meeting
p.23 Line 123
125
127
129
131
133
135
137
139
141
143
145
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
Public Works
May 8, 1978
Administration Salaries
Engineering Salaries
Highway Salaries
Sidewalk Maintenance Salaries
Parking Lot Maintenance Salaries
Storm Drain Maintenance Salaries
Drain Construction Salaries
Equipment Maintenance Salaries
Parks & Playgrounds Salaries
Forestry Salaries
Sewer Maintenance Salary
House Connection Salary
$ 43,205
132,464
234,325
14,570
1,276
27,066
13,826
67,367
65,724
84,786
67,825
38,286
SUBTOTAL - DPW SALARIES 790,720
p.24 SUBTOTAL - DPW SALARIES $ 790,720
Line 147 Snow and Ice Salaries 94,652
Snow and Ice Total 156,977
149 Water Department Salaries 253,613
Water Construction Total 646,888
151 Rubbish Collection Salaries 4,212
155 Landfill & Recycling Salaries 26,908
SUBTOTAL - RUBBISH SALARIES 31,120
SUBTOTAL - PUBLIC WORKS 2,416,845
PUBLIC WORKS - TOTAL $ 3,013,215
Line 168 Casualty Insurance 359,100
169 Group Insurance 422,955
170 Contributory Retirement 687,720
171 Non - contributory Retirement 106,648
SUBTOTAL 1,636,423
174 Anticipation Loans 45,000
DEBT & INTEREST SUBTOTAL $ 1,595,594
p.25 UNCLASSIFIED TOTAL $ 3,397,017
Total Raised by Town Meeting 21,047,547
Total to be raised $21,123,983
NET RAISED FROM CURRENT INCOME $18,648,983
This report was accepted as a report of progress.
ARTICLE 2. The following report was read by John C. Newman, Chairman of the
Personnel Board:
The Personnel Board, with the concurrence of the Finance Committee, recommends
a salary increase to non -union personnel of 6.75% to be distributed into 3% across -
the -board and 3.75% merit awards.
Present payroll for employees under Classification and Compensation Plan
is $874,212.
Proposed 6.75% increase = $59,009.
Annual total payroll $10,508,400. Increase equals .565% of total payroll.
This report was accepted as a report of progress.
On motion of James J. Sullivan, Jr. it was voted to lay Article 2 on the table.
45
Adjourned Annual Town Meeting May 8, 1978
ARTICLE 28. On motion of Paul C. Dustin it Was voted that the sum of
Five Hundred Thousand Dollars ($500,000.00) be appropriated for the construction
of sanitary sewers, sewerage work and other sewer facilities, and other costs
incidental thereto including costs of financing and land damages in connection
therewith, such sum to be expended by and under the direction of the Board of
Public Works, and to meet said appropriation, that the sum of Five Hundred
Thousand Dollars ($500,000.00) be raised by borrowing, and that the Town
Treasurer, with the approval of the Board of Selectmen, be and he hereby is
authorized to borrow said Five Hundred Thousand Dollars ($500,000.00) payable
in accordance with Section 7 of Chapter 44 of the General Laws so that each issue
shall be paid in not more than thirty (30) years from its date or at such earlier
time as the Treasurer and Selectmen may determine, said bonds or notes shall be
signed by the Treasurer and countersigned by the Selectmen, and that the Board of
Public Works be, and it hereby is, authorized to proceed with the construction of
said sewers, sewerage work and other sewer facilities and enter into all contracts
and agreements with respect thereto and to do all other acts and things necessary
or proper for carrying out the provisions of this vote.
155 voted in the affirmative
0 voted in the negative
2/3 vote required
ARTICLE 29. On motion of Paul C. Dustin it was voted unanimously that
the sum of Sixty Thousand Six Hundred and Fifty -eight Dollars ($60,658.00) as
may be provided by the Commonwealth under Chapter 356 of the Acts of 1977 and
appropriated for the purpose of improving, constructing, and reconstructing
public Town ways. Such sums to be spent by and under the direction of the Board
of Public Works and in such locations as the work may be deemed advisable.
ARTICLE 30. On motion of Douglas A. Cowell it was voted unanimously that
the sum of Five Thousand Thirty -two Dollars and Twenty -six cents ($5,032.26) be
transferred from the performance bond for Colonial Drive Extension and
appropriated for the purpose of completion of the construction of a private way
known as Colonial Drive Extension in accordance with the terms of a certain
performance bond executed by Dana Realty, Inc. to the benefit of the Town of
Reading on the 29th day of February pursuant to the Massachusetts General Laws
Chapter 41, such funds to be spent by and under the direction of the Board of
Public Works.
ARTICLE 31. On motion of Douglas A. Cowell it was voted that the Town
accept the layout as Public Ways of the following Private Ways, Track Road, Lisa
Lane, Field Pond Drive, Bainbridge Road and Chequessett Road as laid out by the
Board of Public Works in its reports and plans, both of which are filed in the
Town Clerk's Office, and adopt the recommendations contained therein, and that J
the Town authorize the Board of Public Works to take land in fee or rights of
easement therein by eminent domain, purchase, gift or otherwise, and to assess
betterments therefore and that the sum of Thirty Thousand Six Hundred Fifty -one
Dollars and eighty -six cents ($30,651.86) be transferred from the following accounts:
Guaranteed Deposit for Audubon Road $ 24,370.41
Street Betterments - "C" Street 3,999.86
Street Betterment - Twin Oaks Road 1,440.48
Street Betterment - Belmont Street Ext. 841.11
and the sum of Twenty -eight Dollars and fourteen cents ($28.14) be raised from
the tax levy and that said sums totalling Thirty Thousand Six Hundred Eighty
Dollars ($30,680.00) be appropriated for the Board of Public Works as follows, each
item being considered a separate appropriation:
Track Road $ 26,500.00
Lisa Lane 420.00
Field Pond Drive 1,750.00
Bainbridge Road 1,000.00
Chequessett Road 1,010.00
$ 30,680.00
155 voted in the affirmative
0 voted in the negative
i
46
Adjourned Annual Town Meeting May 8, 1978
ARTICLE 32. To see whether the Town under and pursuant to authority granted
in General Laws Chapter 40D, Section 21(g), as amended, will authorize the Board
of Public Works to enter into a contract with the operator of solid waste disposal
facilities to be established in the Town of North Andover for the use of by- products
resulting from the operation of such facilities, which contract will:
(1) Be for a term of twenty years, more or less;
(2) Include provisions for the delivery of minimum amounts of refuse,
garbage and waste and payments for the use of the facilities to be based thereon;
(3) Provide for unit prices that will be graduated and for adjustments
thereof and for the use of steam, electricity and other byproducts resulting from
the use of the facilities and for credits or payments of the Town resulting therefrom;
(4) The use by the Town or other municipalities of the uncommitted
capacity of such facilities;
(5) Contain other provisions incidental and related to the foregoing
general matters; and
(6) Be generally in the form of proposed contract negotiated by representatives
of the member communities of the Northeast Solid Waste Committee (NESWC) with
such changes therein as may be approved by said Board of Public Works or take
any other action with respect thereto.
On motion of Douglas A. Cowell it was voted that this article be indefinitely
postponed.
On motion of John H. Russell it was voted to take Article 2 from the table.
ARTICLE 2. The following report was read by John H. Russell for the Board
of Public Works:
REPORT OF PROGRESS
STUDY OF THE READING WATER SYSTEM
Under Article 28 of the 1976 Annual Town Meeting Twenty -five Thousand Dollars
($25,000.) was appropriated for a comprehensive study of the Reading water system.
The purpose of this study was to examine the present water system, estimate the
future requirements and recommend improvements that will be required to meet both
the water quantity and quality needs of the future.
After interviewing four qualified engineering firms, the Board of Public
Works selected the firm of Weston and Sampson, Engineers to perform the study.
The study was started in December, 1976, and was completed in December, 1977. The
report of the study was published in February, 1978, and after reviewing was
accepted by the Board of Public Works.
This 196 page report is available for review at the Department of Public
Works. As described below, the report presents study findings and recommendations
in four general areas:
- Availability of Water Supply Sources
- Water Treatment Plant Capacity
- Raw and Treated Water Quality
- Distribution System Requirements
A three -phase program of recommended improvements through the year 2010 was
developed. The total estimated construction cost of the recommended program at
1977 prices, including an allowance for engineering but not including land costs
is 6.3 million dollars.
Availability of Water Supply Sources
The Town obtains its water from groundwater supply sources. These consist of
a series of wells located in two areas of Town known as the One Hundred Acre Well
Field and the Revay Meadow Brook Well Field. Approximately 6100 customers,
representing 100 percent of Reading's population, are served by these sources.
Existing supply sources have a combined safe yield of 7.7 million gallons
per day (mgd). The current "average day demand "for 1985 and 2010 is 3.7 mgd and
5.5 mgd respectively; all within the capacity of existing sources.
The current "maximum day demand" however, is 5.8 mgd and the projected
maximum day demand for 1985 and 2010 is 7.4 mgd and 11.0 mgd respectively. The
year 1985 projection of 7.4 mgd is approaching the existing safe yield of 7.7 mgd
and by the year 2010, we will need an additional source of 3.3 mgd.
Adjourned Annual Town Meeting May 8, 1978
To meet these increasing demands, the study considered further development
of existing supplies; exploration within the Town for additional supplies;
dependence on regional supplies (including the M.D.C.); and water conservation.
7,
Y
Because it appears that regional water supplies (again including the
M.D.C.) will not be available in the near future the report recommends additional
ground water sources as the most viable means to augment existing sources.
Development includes upgrading existing sources and drilling test wells at
other sites including: One Hundred Acre, Revay, Mill Meadows, Cedar Swamp,
Bear Meadow Brook and Timberneck Swamp.
Although Reading is eligible to apply for admission to the M.D.C. System,
the M.D.C. currently has a moratorium on new connections due to the fact that
the M.D.C. system is currently delivering about 20 mgd more than the safe
yield of its supply sources. It is probable that no more communities will be
supplied until their sources are augmented. The M.D.C. has considered several
methods for increasing their supply including diverting of flood water from
the Connecticut River. This is not endorsed by the State however, and it
appears that any M.D.C. augmentation is 10 or more years away. Even if Reading
could join the M.D.C. the costs would be high - a capital cost in the order
of $1.9 million (covering connection fees, a shore of the M.D.C. mains and a
pumping station) plus a water charge. The study concludes that the annual
costs of an M.D.C. supply would be approximately $250,000 per year - over double
the $111,000 per year estimated for an expanded town ground water supply.
With regard to conservation the report suggests that the relatively small
number of new homes that can be built in Reading combined with the low level
of industrial water use significantly limit the chances of success for a
voluntary water conservation program. The Board of Public Works is in general
agreement with these findings, but we are continuing to consider the value of
a water conservation program for at least partial reduction of overall water
supply demand.
Water Treatment Plant Capacity
Because Reading's water supplies must be treated to make them suitable
for consumption, the capacity of the One Hundred Acre Treatment Plant must
accommodate our supply requirements. The present treatment plant, which was
constructed in 1935, expanded in 1964 and had automatic sludge removal equip-
ment added in 1972 has a design capacity of 3.0 mgd and a peak hydraulic
capacity of 5.0 mgd.
As discussed previously, existing sources have an estimated total
combined yield of 7.7 mgd. To handle all the existing supplies and new supplies
required to meet future demands, the One Hundred Acre Treatment Plant would have
to be enlarged to handle an average flow of 5.5 mgd (say 6 mgd), and the plant
should have a hydraulic capacity of 11.0 mgd.
Raw and Treated Water Quality
The quality of water from the existing supply sources meets the primary,
or "health- related ", standards as established by the Commonwealth of Massachu-
setts under the Federal Safe Drinking Water Act (P.L. 93 -523) for all substances
except sodium.
The state has set a standard of 20 mg /1 and a requirement that if this
level is exceeded, the public be notified so that consumers suffering from
hypertension and heart trouble can adjust their diets accordingly. PL 93 -523
does not, at this time, require that the concentration of sodium be reduced to
20 mg /l or less.
The level of sodium present in Reading's raw water supplies is approximately
40 mg /1. This concentration can be linked, to some degree, to the storage of
salt by the state at the intersection of I -93 and 129 and the spreading of salt
on roads that pass near areas which drain into the well fields.
Because caustic soda and sodium fluoride are used during treatment, sodium
levels in the finished water increase to 80 mg /1. In order to reduce this
level down to the original 40 mg /l, the report recommends substituting lime
for caustic soda in the treatment process (sodium fluoride which is added for
dental treatment contributes only about 1 mg /1). To further reduce sodium
levels to the state standard of 20 mg /1, further treatment or elimination of the
sodium sources would be required. Because the treatment technology required to
48 Adjourned Annual Town Meeting May 8, 1978
remove sodium at these levels is extremely expensive, the Board of Public Works
v is continuing to explore practical steps toward further reduction or elimination
of the sodium sources. Public notification of sodium levels is expected to
begin even before it is required by the State. Although the quality of raw
water from existing sources meets primary standards it does not meet secondary,
of "aesthetic- related ", standards for iron (0.3 mg /1), manganese (0.05 mg /1)
and color (15 units). The average iron, manganese and color concentrations in
our existed supplies are 9.5 mg /l, 0.4 mg /l and 270 units, respectively.
The existing One Hundred Acre Treatment Plant is presently capable of
reducing the concentrations of iron and manganese to levels below the recommended
limits, but the plant is not achieving successful results with color, reducing the
level from 270 to 30 units. Color has long been known to be the result of
decaying organic matter such as leaves. Up until a couple of years ago, colored
water was generally considered an aesthetic problem only. It has recently been
discovered, however, that organic compounds (principally those of the trihalo-
methane family) are formed when chlorine, which is added for disinfection,
reacts with color related organics occurring in the raw water. The
trihalomethane family has been found to be carcinogenic.
The report indicates that the U. S. Environmental Protection Agency is
preparing to announce the first standard for limiting these organics, but
that the initial standards are likely to apply only to communities of more than
75,000 persons. It is probable however, that due to its relationship with the
trihalomethane group, a primary standard for color will be adopted. The
recommended improvements at the treatment plant will include means to avoid the
formation of trihalomethanes in excess of standards and to reduce color to
below the present recommended level of 15 units.
Distribution System Requirements
Existing distribution storage consists of three facilities having a combined
usable capacity of 1.9 million gallons. The existing distribution system consists
primarily of 6 -, 8 -, 10- and 12 -inch unlined cast iron mains serving the
majority of the Town as a single pressure zone. The Dobbins Hill area is served
by a small high pressure system.
The Insurance Services Office has assigned fire flows of 500 to 1,500
gallons per minute (gpm) to residential areas of the Town. A hydraulic analysis
of the system by the engineers indicated that 10 locations do not receive flows
adequate for proper fire protection and that such inadequate flows could be
attributed to the fact that 6 -inch and 8 -inch unlined cast iron pipes have lost
up to one -half of their original carrying capacity. The 10 locations cited are
areas in the general vicinity of: 1) Bolton and Main Streets, 2) John and
Village Streets, 3) Salem and Eaton Streets, 4) along Libby Avenue, 5) Haverhill
Street and Pitman Drive, 6) Haverhill and Charles Streets, 7) Hillside and
Oakland Roads, 8) Prescott and Arlington Streets, 9) Summer Avenue and Oak Street
and 10) along Longwood Road.
To correct these deficiencies, the report recommends constructing
reinforcing mains in a number of the streets. To meet projected storage
requirements of 2 million gallons by 1990 and 4.6 million gallons by 2010, the
engineers recommend construction of one 6- million gallon storage facility. And
to satisfy pressure requirements in the Lothrop Road High Service System (Dobbins
Hill) it is recommended that existing constant speed pumps be replaced with two
small hydropneumatic variable speed pumps.
Recommended Program
To correct system deficiencies and to provide a quantity and quality of
water that will meet future demands, the report recommends a phased program of
improvements.
The Phase I program is recommended to determine where additional sources
of supply can be obtained and to upgrade and expand the existing treatment plant.
Improvements in this phase are also designed to upgrade the system serving Dobbins
Hill. This phase would run from the present to 1985 and would cost $3,052,600.
Phase II is recommended to correct deficiencies in the distribution
piping and provide additional storage. This phase also includes development of
supply sources located during Phase I. Phase II will span the period 1986 to 1995
at an estimated cost of $2,060,000.
4:9
Adjourned Annual Town Meeting May 8, 1978
The third and final phase would include additional improvements to
the distribution system and the development of more supplies to meet anticipated
demands through the year 2010. The cost of Phase III would be $1,218,000 and
would cover the time period of 1995 -2010.
Based on the recommendations resulting from the study, the Board of
Public Works is formulating a long term implementation plan. This will be
incorporated in the Finance Committee's updated capital plan which will be
presented at next Fall's Town Meeting.
It is the intent of the Board, with the approval of the Finance Committee
insofar as possible to fund the water system improvements from water revenue.
This will require increases in the water rate over and above the periodic
increases required to cover inflation induced operating cost increases.
The anticipated water income for Fiscal 79 precludes starting Phase I
of the program until fiscal 1980. Thus Article 33 of this Town Meeting will
be indefinitely postponed.
This report was accepted as a report of progress.
ARTICLE 2. On motion of John H. Russell it was voted to lay Article 2 on
the table.
ARTICLE 33. To see what sum the Town will raise by borrowing, or from
the tax levy, or transfer from available funds or otherwise and appropriate
for the purpose of making improvements to the water system, including the
engineering and construction of small buildings, the installation of pipes,
fittings, equipment and related facilities, or what it will do in relation
thereto.
On motion of John H. Russell it was voted that Article 33 be indefinitely
postponed.
ARTICLE 34. On motion of John H. Russell it was voted that the Town
authorize the Board of Selectmen, upon the written request of the Board of
Public Works, to convey and -or abandon certain rights and easements as hereinafter\'
described in land located in the City of Woburn, Middlesex County, Massachusetts
which rights and easements in land were part of that which were taken by Order
of Taking dated September 27, 1976, and that the conveyance and -or abandonment
of such rights and easements in land is conditioned upon acquisition by the
Board of Selectmen, upon the written request of the Board of Public Works, of
rights and easements in other lands owned by the Trustees of Mark - Phillip
Trust and the Trustees of Berm Realty Trust in the City of Woburn by a taking
in fee of rights of easements therein by eminent domain under Chapter 79 of
the General Laws, asamended, and Chapter 822 of the Acts of 1975, or by
purchase, gift or otherwise all for the purposes of constructing, maintaining,
repairing, using and doing any other and all acts incidental to the construction
of an interceptor sewer in the City of Woburn and the Town of Reading and such
conveyance and /or abandonments are upon the further condition that the minimum
amount of $1.00 be paid for each such conveyance and /or abandonment.
The rights and easements to be conveyed and -or abandoned are described as
follows:
1. A certain permanent easement on the land of Mark - Phillip Trust and
further c ortained within a private way known as Commerce Way in Woburn, County
of Middlesex, Massachusetts, being designated as PS -2A as shown on a plan
entitled "Plan of Land in Woburn, Mass., Showing Sewer Easements for Willow
Street Interceptor for the Town of Reading ", Scale 1" equals 40' dated September
23, 1977, revised January 27, 1978 by Dana F. Perkins and Sons, Inc.
Said easement being further bounded and described as follows:
Beginning at the westermost point of said permanent easement on the
westerly sideline of said Commerce Way at Station 41 plus 58.25, thence N 54
degrees 42' 00" E 20.00 feet to a point,
Thence S 35 degrees 18' 00" E 226.38 feet to a point,
Thence S 80 degrees 14' 24" E 113.25 feet to a point on the easterly
sideline of said Commerce Way at land of Berm Realty Trust,
50 Adjourned Annual Town Meeting May 8, 1978
Thence by the easterly sideline of Commerce Way and land of said Berm
Realty Trust S 35 degrees 18' 00" E 28.31 feet to a point,
Thence N 80 degrees 14' 24" W 141.57 feet to a point on the westerly
sideline of said Commerce Way and land of Aetna Life Insurance Company,
Thence by the westerly sideline of said Commerce Way and land of Aetna
Life Insurance Company N 35 degrees 18' 00" W 234.65 feet to the point of
beginning.
Containing 7,159 square feet more or less as shown on said plan.
2. A certain permanent easement on the land of Berm Realty Trust in
Woburn, County of Middlesex, Massachusetts, to be abandoned, being designated
as PS -2B -1 and shown on a plan entitled "Plan of Land in Woburn, Massachusetts,
Showing Sewer Easements for Willow Street Interceptor for the Town of Reading ",
Scale 1" equals 40', dated September 23, 1977, revised to March 22, 1978, and
prepared by Dana F. Perkins and Sons, Inc.
Said easement being further bounded and described as follows:
Beginning at a point on the easterly sideline of a private way known as
Commerce Way at the land of Berm Realty Trust thence S 80 degrees 14' 24" E
36.67 feet to a point,
Thence N 66 degrees 42' 00" E 158.70 feet to a point on the westerly
sideline of a permanent easement designated as PS -2E,
Thence along the westerly sideline of said easement PS -2E S 63 degrees
49' 47" W 183.46 feet to a point on the easterly sideline of a private way
known as Commerce Way.
Thence by the easterly sideline of said Commerce Way N 35 degree 18'
00" W 29.86 feet to the point of beginning.
Containing 1119 square feet more or less.
155 voted in the affirmative
0 voted in the negative
2/3 vote required
ARTICLE 35. To see what sum the Town will raise by borrowing, or from
the tax levy, or transfer from available funds, or otherwise, and appropriate
for the purchase of a van for the Council on Aging or take any other action
with respect thereto. ,
On motion of James J. Sullivan, Jr. it was voted to lay Article 35 on
the table.
ARTICLE 36. On motion of Duane B. Heineck it was voted that the sum of
$1,479.39 be transferred from the Municipal Bathhouse account and that the
sum of $879.68 be transferred from the Filtration System account - said sums V
totaling $2,359.07 to be appropriated for repair and maintenance of the
municipal swimming pool.
ARTICLE 37. On motion of Philip R. White, Jr. it was voted that the,
Town recind its prior acceptance of Section 59 of Chapter 33 of the General
Laws adopted by the Town Meeting on May 24, 1961.
ARTICLE 38. On motion of Virginia M. Adams it was voted that the Town
amend the General By -Laws of the Town, Section 9 of Article XXV by striking
out the first sentence thereof and inserting in place thereof the following
new sentence: "The record of the examination shall include a report of a
recognized tuberculin test as determined by the medical examiner."
ARTICLE 39. Lynn G. Stasz moved that the sum of $7,000.00 be raised from
the tax levy and be appropriated to be expended under the direction of the
Conservation Commission under General Laws Chapter 40, Section 8C, as amended
for the purpose of designing, improving, and constructing facilities for the
utilization of Pinevale Park, said park shown as lot 37 on the Reading
Assessor's Plat Number 35.
This motion did not pass.
5�1
Adjourned Annual Town Meeting May 8, 1978
ARTICLE 40. To see if the Town will vote to acquire the following
described parcel of land or any portion thereof, in fee or rights of easement
therein, by purchase or otherwise, for Conservation purposes under General
Laws Chapter 40, Section 8C, as amended, and to raise and appropriate or
appropriate from available funds a sum of money to pay for the same or to be
used for the payment of casts and expenses of such acquisition, and to
determine how any such appropriation will be raised whether by taxation, transfer
of available funds, by borrowing or otherwise, and, if by borrowing, to
authorize the issuance of bonds or notes to the Town therefore; and to
authorize the Conservation Commission to enter into agreements with state and
federal agencies for financial and other assistance in connection with such
acquisition; or take any other action with respect thereto:
A certain parcel of land shown as lot 8 on Reading Assessors' Plat 226 j
and lot 1 on Reading Assessors' Plat 239. J/
On motion of Lynn G. Stasz it was voted that Article 40 be indefinitely
postponed.
On motion of James J. Sullivan, Jr. it was voted that this meeting
stand adjourned until Thursday, May 11, 1978, at 8:00 P. M. to meet in the
Memorial High School Auditorium.
Meeting adjourned at 10:58 P. M.
166 Town Meeting members were present.
A. true copy. Attest:
Lawrence Drew
Town Clerk
ADJOURNED ANNUAL TOWN MEETING
Reading Memorial High School Auditorium May 11, 1978
The meeting was called to order by the Moderator, Kenneth C. Latham, at
8:00 P. M.
The invocation was given by the Rev. Russell J. Collins of St.Athanasius
Church, followed by the Pledge of Allegiance to the Flag.
ARTICLE 20. It was moved by Edward F. Fuller, Jr. that the Town raise
the sum of $1,975,000 by borrowing pursuant to General Laws, Chapter 44,
Section 7 and appropriate such sum for the purpose of constructing a new
library building on land owned by the Town between Sanborn Street and Linden
Street (Community Center site), including site preparation and other incidental
costs including costs of financing, and for originally equipping and
furnishing said library building, and to authorize the Library Trustees to
proceed with the construction of said library building, and to enter into any
and all contracts and agreements necessary therefore and incidental thereto,
such sums to be expended under the direction of the Board of Library Trustees.
This motion did not pass.
89 voted in the affirmative
87 voted in the negative
2/3 vote required
On motion of Frank A. Smith, Jr. it was voted that this meeting stand
adjourned until Monday, May 15, 1978, at 8:00 P. M. to meet in the Memorial
High School Auditorium.
Meeting adjourned at 11:22 P. M.
184 Town Meeting members were present.
A true copy. Attest:
Lawrence Drew
Town Clerk