HomeMy WebLinkAbout2012-02-29 RMLD Board of Commissioners Minutes Reading Municipal Light Board of Commissioners
Regular Session
230 Ash Street
Reading,MA 01867
February 29,2012
Start Time of Regular Session: 7:36 p.m.
End Time of Regular Session: 9:34 p.m.
Commissioners:
Richard Hahn,Chairman Philip B.Paciao,Vice Chair
Mary Ellen O'Neill,Commissioner Gina Snyder,Secretary
Robert Sall,Commissioner
Sten;
Vitiate Cameron,General Manager Beth Ellen Antonio,Human Resources Manager
Jared Carpenter,Energy Efficiency Engineer Nick D'ABeva,Technical Services Manager
Jeanne Foil,Executive Assistant Robert Fournier,AccountingBusiness Manager
William Seldon,Senior Energy Analyst
Citizens'Advisory Board
Arthur Carskatsane,Chair
Opening Remarks/Approval of Meeting Agenda
Chairman Hahn called the meeting to order and stated that the meeting of the Reading Municipal Light Department
(RMLD) Board of Commissioners is being broadcast live at the RMLD's office at 230 Ash Street, Reading, MA.
Live broadcasts are available only in Reading due to technology constraints. This meeting was video taped for
distribution to the community television stations in North Reading,Wilmington and Lynntield.
Introductions
Chairman Hahn introduced Chair Carakatsane of the Citizens' Advisory Board(CAB). Chair Camkatsane reported
that the CAB met earlier this month in which Chairman Hahn also attended. The major issue on the CAB agenda
was a motion made to reconsider the Renewable Energy Certificates (REC's), this motion passed, discussion
ensued, however no final action was taken. Chair Camkatsane aid that the CAB also attended to housekeeping
matters at this meeting. The CAB is currently seeking out another new date and will inform the Board of the new
meeting date as soon as possible.
Presentation—Quarterly Conservation Program Update—Mr.Carpenter(Attachment 1)
Mr. Carpenter presented his quarterly Energy Conservation Program update. Mr. Carpenter addressed the
fallowing: Awwds/Umnis, Project Review, New Project Update,Renewable Technology,and a Commercial Solar
Project.
Mr. Carpenter stated that the RMLD was awarded two grunts. The fust grant was awarded from the Metropolitan
Area Planning Council(MAPC)for the four towns in the RMLD's service territory to develop a local energy action
plan. Mr. Carpenter explained that this project will be ongoing for two years, he has met with the few towns and
this is progressing. The second grant was awarded from the Department of Energy Resources(DOER) funded from
the Regional Greenhouse Gas Initiative (RGGp in which the RMLD received$50,000. Mr. Carpenter pointed out
that these funds will be used for a residential demand response program, technology updates and for hot water
switches, however, the grant was for kilowatts hours for energy, not demand,but they were intrigued by RMLD's
proposal,therefore the RMLD received these funds.
Mr. Carpenter provided updates on three projects the goal of which is peak reduction. The first project is a
commercial building in North Reading the goal was 44 kW on peak reduction with the rebate of$310 per kW
removed. The second project is a commercial project in Reading the goal was 721W on peak reduction with actual
en peak of I68kW,with the rebate of$60 per kW removed. The thud project is a NorthReading Public School the
goal was 6 kW but the actual was 12 kW on peak reduction with the result of a rebate of$250 per kW removed—a
very small project with a very fast payback.
i�
I
s
Regular Session Meeting Minutes 2
February 29,2012
Presentation—Quarterly Conservation Program Update—Mr.Carpenter(Attachment 1)
Mr. Carpenter mentioned potential new,projects with customers on the commercial side including: lights,roof top
air conditioners, solar arrays under discussion, audits and automation systems. On the residential side, more
geothermal may came up especially where no gas service is available, with two projects complete. Mr. Carpenter
stated that he is currently working on four projects with the likelihood that one or two of these projects will come to
fruition.
Mr. Carpenter stated that it's important to get RMLD involved as soon m possible when considering renewable
projects. RMLD can help with any renewable or sustainability,project, and hopes that municipal renewable projects
will be proposed.In addition,Columbia Construction in North Reading has a 75 kW solar army. Mr.Carpenter said
that it is the best solar installation he has seen and Columbia Construction is willing to show the solar array to
anyone who is interested. Mr. Soli asked what voltage they generate. Mr. Carpenter replied most likely 480.
Chairman Hahn asked if there is a chance that they would send staff back to the grid and require net metering. Mr.
Carpenter replied, no. Mr. Carpenter added that their building is very efficient;hence the reason why going to this
array was a good idea.
Ms.O'Neill asked are we reaching a point where we can include what percentage of am power supply portfolio that
can be met by energy efficiency, conservation measures and efforts. Ms. O'Neill asked if we can start to put a
number on that. Mr. Carpenter replied, yes. Ms. O'Neill suggested setting some goals, strategies that can be
specifically identified and putting a number in them. Ms. O'Neill mentioned the Residential Time of Use program
as one means to achieve this, the Water Heater rate when that demand response program gem in place by reaching
out to people. Ms. O'Neill asked is that something we can start to take a look at. Mr. Carpenter responded, M.
Ms.O'Neill congratulated Mr.Carpenter on the two grants and thanked him for providing her with the Information
on them.
Ms. O'Neill had questions on the Water Heater demand response program. Ms. O'Neill clarified that this is a
demand response program with the customers being shut off daily, how does this integrate with the RMLD's
existing Water Heater rate? Mr. Carpenter responded that currently, the plan is to leave the rate m is, but Mr.
Cameron is going in analyze the rate to see if it needs adjustment. Mr. Carpenter gave a brief explanation of solar
hot water potential.
Ms.O'Neill said that within the grants policies were mentioned. Ms.O'Neill commented that these policies should
be shared with the Board. Ms.Snyder congratulated Mr.Carpenter an the grants and said it was great work
Approval of January 5,2012 Board Minutes
Ms.Snyder made a motion seconded by Mr. Patin that the RMLD Board of Commissioners approve the Regular
Session meeting minutes of January 5,2012.
Motion carried 5:0:0.
Report from RMLD Board Committees
Report of the General Manager Committee—Chairman Hahn
General Manager's Contract
Chairman Hahn reported that the General Manager Committee met on February 9 which was a short meeting. Items
discussed included recent events. Some members provided feedback on the General Manager as part of his
performance review. The consensus of the group is (hat the real evaluation will occur in August, no action was
taken.
Report of the Power& Rate Committee—Chairman Hahn
RMLD's Annual Request for Proposal for Power Supply
Chairman Hahn reported that the Power&Rate Committee mel this evening before the RMLD Board meeting. The
item on the agenda that was discussed is the next phase in RMLD's power supply procurement program. Messrs.
Cameron and Seldon made a presentation to recommend that the Department go out and seek bids for power
supplies beginning in 2013 and beyond. Chairman Hahn added that this was also raised at the Citizens' Advisory
Board meeting that Chair Carakastane referred to earlier. Chairman Hahn staled that the vote at the Citizens'
Advisory Board meeting was 5:0:0 to authorize the Department to go out,obtain the bids and procure power supply.
The Power&Rate Committee voted earlier this evening 3:0:0 to do the same.
Regular Session Meeting Minutes 3
February 29,2012
Report of the Power&Rate Committee—Chairman Hahn
RMLD's Annual Request for Proposal for Power Supply
Mr. Seldon explained that this is the sixth time they have gone through this process m part of the strategic power
supply plan to fill a portion of the Department's needs for energy in these four year chunks. Mr.Seldon said that the
Department thought it was prudent not to have all its eggs in one basket and the layering and laddering approach for
power supply spreads out and hedges pricing risks by not going out for overly significant amounts of power at one
time. Mr. Seldon stated that the Citizens' Advisory Board as well as the Power&Rate Committee were given this
presentation. Mr. Seldon said that the Department will be looking at indicative pricing and the entities that fit the
criterion will be short listed and move forward to procure the power supply. Mr. Seldon explained that this is being
done a little earlier this year, in April,because the natural gas fumes are low right now and the Department would
like to take advantage of this.
Ms. Snyder made a motion seconded by Mr. Soli that the RMLD Board of Commissioners authorize the General
Manager to execute one or more Power Supply Agreements in accordance with the RMLD's Strategic Power Supply
Plan for power supply purchases fm a period not in exceed 2013 through 2016 and in amounts not to exceed 28 MW
in 2013,22 MW in 2014,21 MW in 2015,and 20 MW in 2016 m presented by the General Manager and Staff.
Motion carried 5:0:0.
General Manager's Report—Mr.Cameron(Attachment 2)
RMLD's Telephone System
Mr. Cameron reported that them was a comment at the Board meeting in December on the RMLD's telephone
system with customers not getting through to a live voice during the October storm. Mr.Cameron said that there are
three things he has learned: 1. The present system has twenty-five lines coming in however,only eight callers can
listen to the message at once then the callers have the option of getting a live voice.Mr.Cameron explained that the
system works 99.9%of the time,but when there are norms or feeder outages then this is not sufficient. A feeder
outage can consist of 1,000 customers. Most feeder outages are on the order of an haw in duration.2. The system
can be upgraded in order that more customers listen to the message increasing it o sixteen customers listening to the
message is a one time charge of$32,000. 3. Use an outside messaging service. Smaller systems use this on a
smaller scale, not for 2,000 to 3,000 customers. There are logistical issues with respect to easuting that the
answering service has the most up to date and accurate message to give customers.
Mr. Cameron said that there has to be an exchange of information back from the answering service because this
information is vital in the diagnosis of the outages during storm outage situations. Mr. Cameron said that he is
Dunking of putting a committee together intemally or to commission a study of best practices and industry
standards.
Mr.Cameron stated that the phone system is good for our day to day operations with the exception of large outages
because customers want to speak to a live voice.
Mr. Patin said that the possibility of social media has been discussed and asked if this would be part of it. Mr.
Cameron stated that there have been meetings on social media and he does not think this will alleviate the phone
system. Mr.Cameron added that the RMLD is looking into using Twitter,not on a regular basis,but when there are
storms o provide updates. The RMLD's website can also be utilized. Also,as done in the past storm,updates can
be sent to the Town Administrators/Managers twice daily which worked well.
Chairman Hahn stated that we have to do something with more of these options fleshed out. Chairman Hahn
suggested that in place of a live person someone give their address and time of the outage logged into a Word
Document and have someone follow up with that later. Chairman Hahn stated that there are a bunch of options that
we are not looking at. It might happen only once in every ren years,but that is when you get egg on you face. This
is something we should do that should be expedited with a timeline to get this study completed. Chairman Hahn
asked Mr. Cameron what is a reasonable time. Mr. Cameron said that he could get the study completed by the end
of the fiscal year June 30.
Rate Stabilization Fund and Pension Trust Transfer,
Mr. Cameron stated that Ms. O'Neill had asked at the last meeting about the Rate Stabilization Fund and Pension
Trust Transfers. Mr. Cameron reported that the RMLD made a Pension Trust Transfer of$1 million because the
Pension Trust Fond was depleted.
Regular Session Meeting Minutes 4
February 29,2012
General Manager's Report-Mr.Cameron(Attachment 2)
Rate Stabilization Fund and Pension Trust Transfers
Mr.Cameron said that there was no Budget Committee meeting. In the past,when we have made transfers we have
had Budget Committee meetings. Mr. Cameron said that his attention was on the hurricane at the end of August.
Mr. Cameron said that a Budget Committee should be set when the Draft Audited Financial Statements are being
completed and have that meeting whether or not there me transfers and to discuss year end.
Ms. O'Neill slated that she had no confusion over the Pension Trust. In terns of the Rate Stabilization Fund
transfer, she thought there should have been a Budget Committee meeting. Mr. Cameron said that he will ensure
that a meeting will be scheduled at the end of August or the beginning of September in the future.
Massachusetts proposed Municipalization Bill
Mr. Cameron reported that the proposed Massachusetts Municipalization Bill has been discussed for the last two to
three years. The bili started out as a bill to lay down ground rules on how a town or a municipality can start a
municipal electric light utility. Mr. Cameron explained that Hudson and Stowe bad a case in the eighties which
went on for years with the result being that a template of the Twenty Year Agreement was utilized to resolve their
differences. There needs to be a willing seller and a willing buyer. Mr. Cameron stated that with the
Municipalization Bili in the last month the House Utilities Committee made changes to the bill. The changes took
away exemptions that were hard fought during the deregulation era in the late nineties. The exemptions include not
having to pay into the Renewable Energy Trust Fund, Energy Conservation Fund es well as the service territory
being protected from other utilities coming in.
Ms. Snyder suggested that in the letter to let the legislators know that the previous version of the bill could be
supported,however,the current revisions made by the committee are unacceptable as it stands and does not work for
public power. Ms. O'Neill commented that the letter is too long in its present format, we should work with the
legislators to phrase this in a manner that we will be working with them. Chairman Hahn added that the letter is too
long and he would be in favor of a more focused version. Ms.O'Neill will coordinate changes to the letter with Mr.
Cameron.
Executive Office of Energy and Environmental Affairs(EOEEA)
Mr. Cameron explained that he and representatives from both Braintree Electric Light Department and Energy New
England met with Barbara Kates-Gamick who is the Energy Undersecretary of the Executive office of Energy and
Environmental Affairs to discuss energy conservation programs in the municipal areas. This item is being
addressed in response to a question from one of the commission members on the payables relative to a Rubin and
Rudman billing. Mr. Cameron stated that Rubin and Rudman facilitated a meeting and coordinated information
with the commission members from the Massachusetts Department of Public Utilities (DPU) relative to energy
conservation programs and renewable energy incentives in which all three commission members, Berwick
Westbrook and Cash were in attendance. Mr. Cameron said that there needs to be more information Bow because
they are act in coned with what the municipals are doing with respect to energy conservation and renewable energy
projects. Mr.Cameron commented that this will be an ongoing effort to make sure that our information gets to the
hill.
Ms. O'Neill questioned why the RMLD would be paying legal bills with respect to this topic. Mr. Cameron
responded that some individuals at Rubin and Rudman have relationships with these people and they can schedule
meetings quickly and know how to shape the presentation. Ms. O'Neill asked for clarification. Mr. Cameron
explained that the issue is there may not be a clear understanding of what municipals are doing with respect to
energy conservation and renewable energy programs at the DPU and in the State House.
Financial Report-January 2012-Mr.Fournier(Attachment 3)
Mr.Fournier reported on the Financial Report for January 2012.
Mr. Fournier reported that for the month of January the Net Income is $498,000 increasing the year to date Net
Income to $2.4 million, coming in under budget by $2.5 million. Mr. Fournier said that the year to date Fuel
Expenses exceeded Fuel Revenues by $600,000. Year to dale Base Revenues are under budget by$1.9 million or ja
6.7%. Actual Base Revenues were $27.3 million compared to the budgeted amount of$29.2 million. Purchase
Power Base expense was under budget by$I million or 6.4%under budget. Actual Purchase Power Base costs were WF
$14.9 million compared to the budgeted amount of$15.9 million.
Regular Session Meeting Minutes 5
February 29,2012
Financial Report-January 2012-Mr.Fournier(Attachment 3)
Mr. Fournier commented that Operating and Maintenance expenses were under budget by $196,000. Actual
Operating and Maintenance expenses were$6.7 million compared to the budgeted amount of$6.9 million.
Year to date kilowatt hour sales were 419 million which is 15 million kilowatt hours or 3.5% below last year's
actual figure.
The Gaw revenues collected year to date were $419,000 bringing the total collected since the inception of the Gave
rate to a little over$1 million.
Mr. Soli clarified, the Base Revenue is off$1.9 million is that due to the fact that the RMLD dropped load due to
mild weather. Mr.Fournier replied that on the residential side is 920,000 under budget and the commercial side is
818,000 which is weather related. Mr.Cameron stated that this Inas occurred due to the weather because heating and
cooling days are down mostly hearing days,down 27% through January. Mr. Soli commented that a hot May and
June would make up for some of this.
Ms.O'Neill asked about the Operating Fond which has gone up$750,000 since last month. Ms. O'Neill questioned
that shouldn't something be done sooner m opposed to later such as a transfer to the Other Post Employment Benefit
or Pension Fund Trust that need funding. Mr. Cameron stated that he and Mr. Fournier have had discussions
relative to this;however,he would like to wait to see how the sales shake out between now and the end of the year.
If the RMLD is down that much revenue due to weather those funds may be needed to snake up for some
deficiencies. The funds can be transferred instead of pulling from the Rate Stabilization Fund. His recommendation
is to wait a couple of months.
Ms.O'Neill asked a question on the electronic billing,how many customers have moved over to that. Mr. Fournier
responded a little less than two thousand. Ms. O'Neill clarified that they do not receive anything in the mail. Mr.
Fourier responded that is correct. Ms. O'Neill asked about the estimated savings,would it be worthwhile to come
up with some incentive program. Mr.Fournier responded that they had a meeting with the vendor a couple of weeks
ago.
Mr. Fournier reported that their product is robust and the RMLD is only using a fraction of it. Mr. Fournier
explained that they wanted to ensure that the RMLD's personnel felt comfortable with this. Mr. Fournier reported
that phase two of this would be to obtain mono e-mail addresses, promote this and put it in the In Brief to attract
more customers to use this service.
Mr. Fournier noted that the vendor is pleased with RMLD's progress and impressed with the results. Ms. O'Neill
commented that once you go on paperless billing you do not receive the In Brief Mr. Fournier pointed out that the
In Brief is found on the RMLD's website. Ms. O'Neill said that customers arc not going to search for this and that
there should be some mechanisms available to send it with the bill. Mr.Cameron commented that we have to ensure
that the e-mail billing does not end up as spam. Mr.Cameron commented that if there are items that are sent out to
customers then a third billing party can be used and will be investigated. Ms. Snyder said that in her electronic bill
this month she believes it had a link to the In Brief. Ms. O'Neill noted that In Brief is a major way the RMLD
communicates with customers.Mr.Fournier said that he will get back to the Board on this.
On another matter, Ms. O'Neill said that she expected a memo from the General Manager relative to the budget,
since the budget is coming up in a month. Mr.Cameron said the philosophy of the budget memo will be out before
the end of the week.
Power Supply Report-January 2012-Mr.Salting(Attachment 4)
Mr. Seldon reported that RMLD sales totaled approximately 56.6 million kilowatt hours and as a result, the RMLD
undemoilected by approximately $274,000 resulting in a Deferred Fuel Cash Reserve (DFCR) balance of$2.45
million. The January Fuel Charge was set at$.055/kilowatt hour, lowered to 5.054tilowatt hour and anticipated to
remain the same for March.
The RMLD hit a peak demand of 106.6 megawatts at 6:00 p.m. on January 16 compared to a demand of 112.2
megawatts in 2011. Mr. Seldon said that this can be attributed to the weather. Mr. Seldon pointed out that January
was very mild with an average temperature of 34.2 degrees which is 5.2 degrees higher than normal.
Regular Session Meeting Minutes 6
February 29,2012
Power Supply Report-January 2012-Mr.Seldom(Attachment 4)
Mr. Seldon said that the RMLD's monthly capacity requirement was 201.3 megawatts equivalent to $6.64 per
kilowatt hour month.
Table 4 shows both the capacity and energy costs as well as the amount of energy. In January the average cost for
capacity and energy came in at $.0785/Kwh which is $.0045 higher than December. Transmission costs for the
month were$639,000 which is approximately a 2.7%increase from the previous month.
Mr. Soli commanded that he was surprised to we what happened to the ISO Interchange because it is naming $.02
above, is there something special happening. Mr. Seldon responded that they reviewed the ISO costs for the month
and there were times the real time load exceeded what we bid in the day ahead load where the prices were actually
high at over$300.
Engineering and Operations Report-January 2012-Mr.D'ABeva(Attachment 5)
Gaw Update
Mr. D'Alleva reported on the upgrade project at the Gaw Substation and the only change is a meeting scheduled for
mid March with the project engineer PLM for the final walk through for the project to make sure everything was
done as per the bid. There were finishing touches completed with the project one hundred percent complete.
In the variance report Project 1 -5W9 Reconductoring-Ballardvale Street-is being worked on,Project 2-High
Capacity Tie 4W 18 and 3W8 Franklin Street- is being worked on, Project 3 - Upgrading Old Lynnfield Center
URDa - is being worked on, Project 6 - Capacitor Banks - is being worked on, and Project 8 - Relay
Upgra&/Beplacement Project at Gaw-is being worked on.
There were two new commercial services and ten residential services.
In January there were 24 cutouts replaced bringing the total to 178 fiscal year to date.
In the Reliability Report the Customer Average Interruption Duration Index (CAIDI) for the month is 57 minutes
which is down 14 minutes from December. CABJI is down marginally for the year. The roiling average is 60.3
minutes. The System Average Interruption Frequency Index (SAIFI) for the month is .21 outage incidents. The
rolling average is .44 outage incidents. There was not much of a change from the December number. The Months
Between Interruptions(MBTI)is 27.3 months which is pretty much the same as December.
Number of calls for the month was 89, outage incidents 7; customers affected 508; feeder outages 2; area outages 2
and 3 service outages. Causes of outages are pretty much the same.
Mr. D'Alleva stated that there have been 15,000 meters installed as part of the meter upgrade project, Reading is
completed,they are now working on Wilmington and North Reading.
Ms. O'Neill commented that she would like an evaluation on the routine construction. We find ourselves seven
months through the budget with the routine construction over spent and not that much spent in capital projects;she
would like to see more items listed. Mr.Cameron said that he will take care of this.
Mr.Soli said that he would like to see on the meter upgrade project the progress versus scheduling and the projected
endpoint Mr. Patin added to follow up on Ms.O'Neill's comment;$5.9 million has been budgeted with only$2.3
million spent in seven months are there projects that are not going to get completed.
Mr. D'Alleva said that some of the system relay projects at the Gaw substation will probably not be completed by
the end of this fiscal year. Mr.Cameron added that the distribution automation project with a cost of approximately
$500,000 has not been completed.
Mr. Cameron pointed out that the reclosers and the SCADA communication system may not be completed. Mr.
Cameron said that there has been some technology advances recently and there has been discussion on whether to
hold back on such projects and defer to the next year even though specifications have been put together. Mr. Purim
asked for a quarterly update with an explanation of why projects have been put on hold.
Regular Session Meeting Minutes 7
February 29,2012
M.G.L.Chapter 30B Bids(Attachment 6)
2012-27 RTU Station Controllers and Supplementary Services
Mr. D'Alleva said that this is to replace the present RTU at Station 4 which is old and they are unable to obtain new
parts, it's in the capital budget to have the RTU replaced and upgraded. There were fifteen invitations to bid sent
out and two bids received with one bid non responsive. Chairman Hahn indicated his concern with this and with
two other bids in which them is one bidder. Chairman Hahn asked why only one qualified bidder. Mr. D'Alleva
could only speak to the bid that was thrown out, explaining that the non responsive bidder wanted to have remote
access to perform this work and the RMLD does not have any external access to the SCADA system.
Mr. D'Alleva commented that this type of work needs to be performed by the RMLD's Control Center in order to
keep compliant with the ISO. The non responsive bidder had several objections to the bid, but the key was the
offsite programming. Chairman Hahn said that he has no problem limiting offsite access to RMLD's SCADA
system,he does not understand why them is only one bid. Mr.D'Alleva said that prospective bidders come to look
at the potential project,but demographic restrictions such as the company being located in California is a deterrent
because it can take two to three months to get the system operational. Chairman Hahn mentioned WESCO, Stuart
Irby and Power Sales Group not bidding on this project-they am local companies. Chairman Hahn asked if anyone
called them to ask why they did not bid, if not the next time they should call. Mr. Cameron stated that we will call
everyone one of them.
Mr. D'Alleva explained that this is involved because it is a specialized piece of equipment.
Mr. Soli asked what an RTU is. Charman Hahn responded that it is a remote terminal unit. Mr. Soli asked what
Station 4 is. Mr.Cameron responded Gaw.
Ms Snyder questioned if the bid should be sent out again to see if them could be mom bidders. Mr. D'Alleva
commented that both bids received were within two percent of each other. Mr. Cameron added that if you go out to
bid again he does not think you will obtain better pricing. Chairman Hahn expressed his dissatisfaction with the one
bidder.
Ms. Snyder made a motion seconded by Mr. Patin that bid 2012-27 for RTU Station Controllers and
Supplementary Services be awarded to Survalent Technology Corp. for a total cost of$94,023.00 as the lowest
qualified bidder on the recommendation of the General Manager.
Motion carried 5:0:0.
2012-29 Line Truck Lift Equipment Inspection and Preventative Maintenance
Mr. Cameron stated that there was one bidder. The other companies were called they did act like the insurance
requirement of five million dollars. Mr.Cameron said that the RMLD requires this amount of insurance in the case
of lift equipment as someone could get injured if it does not function properly. Also,some of the companies do not
want to poet the bond which is required by Massachusetts General Laws,Section 30B.
Chairman Hahn asked what was paid in 2011. Mr.Cameron responded$92,685 for the prior three year contract.
Mr. Cameron explained there was an increase because the RMLD asked for more on the maintenance side with
respect to tightening bolts which translated into $7,600 annually. Chairman Hahn asked if this is the RMLD's
current supplier. Mr.Cameron replied,yes.
Ms. O'Neill said that it should be looked at m see what can be done to foster mom bids because this is problematic
with some of the bids. Ms. O'Neill commented that the work performed by such companies is looked at by the
RMLD m see if the work is acceptable. Mr. Cameron said that facilities staff checks on this before payment is
made.
® Ms. Snyder made a motion seconded by Mr. Patin that bid 2012-29 for Line Truck Lift Equipment Inspection and
Preventative Maintenance Service be awarded to James A. Kiley Co. for$115,560.00 as the lowest qualified and
responsive bidder on the recommendation of the General Manager. This is a three-year contract.
Motion carried 5:0:0.
Regular Session Meeting Minutes g
February 29,2012
M.G.L.Chapter 30B Bids(Attachment 6)
2012.30 Line Truck Chassis Inspection and Preventative Maintenance Service
Mr. Cameron said that the non bidders were contacted and the reason for not submitting a bid included they could
not guarantee that everyone working on the chassis had certified training. The RMLD requires American
Automotive Standards for mechanics that work on our trucks.
Ms. O'Neill commented that this is the current supplier the RMLD uses. Chairman Hahn said that there are
increases in the bids without competition and he is unsure what to do about that. Mr.Cameron said that the RMLD
does not want uncertified mechanics working on its vehicles.
CAB Chair Cmakatmne commented that with working with municipals over the years they have the same concern.
It is one of the constraints of the bidding process.
Ms. Snyder made a motion seconded by Mr. Pacino that bid 2012-30 for Line Truck Chassis Inspection and
Preventative Maintenance Service be awarded to Taylor& Lloyd, Inc. for$106,517.66 as the lowest qualified and
responsive bidder on the recommendation of the General Manager. This is a three-year contract.
Motion carried 4:0:1. Ms.Snyder abstained.
2012-31 Meters
Mr. D'Alleva said that this is a bid for five hundred network meters for some new developments going on.
Diamond Crystal in Wilmington is approximately one hundred meters and 30 Haven Street in Reading is forty
meters and Reading Woods which is a multi year project there will be four hundred to five hundred meters.
Mr.D'Alleva stated that sixteen invitations to bid were sent out and three bids were received with AvCom being the
lowest bidder. Chairman Hahn commented that we currently use this company. Mr.D'Alleva replied,yes.
Ms. Snyder made a motion seconded by Mr. Patin that bid 2012-31 for Form 12 S Network ERT Meters be As
awarded o AvCom Inc. for a total cost of$37,550.00 as the lowest qualified bidder on the recommendation of the
General Manager.
Motion carried 5:0:0.
General Discussion
Chairman Hahn said that a couple months ago Mr. Pacino raised the issue of International Financial Standards.
Chairman Hahn stated that he read in The Wall Street Journal that these standards are going to be enacted. Mr.
Pacino pointed out that at this point the SEC has to make the decision and is writing a plan for how to get to
International Financial Standards.The Chair of the SEC says it has to be reviewed and is not expected before 2016.
Mr. Pacino is not aware of any standards to deal with regulatory assets. It is a long process as the Char of the SEC
is still evaluating.
Ms. Snyder said that she had asked a question on the payables relative to the amount of electricity used by the
warehouse. She went to the warehouse, the lights were on and there was no one in there with employees working
7:00 am to 3:00 pm. According to facilities, the lights never get turned off. Some of the lights are high bays and
some are T-12's which are older. She hopes that someone can work with the owner. Mr. Cameron said that he will
look into this. Ms.Snyder would like something to be done;the RMLD should be setting the example.
Rate Comparisons,February 2012
The General Manager commented that the rate comparisons continue to took good, both compared to the investor
owned utilities and neighboring towns.
BOARD MATERIAL AVAILABLE BUT NOT DISCUSSED
E-Mail responses to Account Payable/Payroll Questions
RMLD Board Board Meetinen,
Thursday,March 29,2012 and Wednesday,April 25,2012
Regular Session Meeting Minutes 9
February 29,2012
Citizens'Advisory Board Meetinu
Thursday,March S,2012
Chair Carakatsane said that the Citizens' Advisory Board is in the process of rescheduling this meeting.
Executive Session
At 9:15 p.m Ms.Snyder made a motion seconded by Mr.Patin that the Board go into Executive Session m discuss,
Rubin and Rudman billing on 2011 power supply, Choate Hall & Stewart billing for professional services billing
and return to the Regular Session for the sole purpose of adjournment.
Motion carried by a polling of the Board.
Mr. Soli,Aye;Ms.Snyder,Aye;Chairman Hahn,Aye;Mr.Patin,Aye;and Ms.O'Neill,Aye.
Motion carried 5:0:0.
Adjournment
At 9:34 pm.Mr.Patin made a motion seconded by Mr.Soli m adjourn the Regular Session.
Motion carried 5:0:0.
A true copy of the RMLD Board of Commissioners minutes
as approved by a majority of the Commission.
Gine Snyder,Secretary
RMLD Board of Commissioners
`1 Z
w
U
4-A
i--I J--1
CIO
r^N O
a
o
� � N
O
ct
� w
bA �
0 W
a)
N
U
E-•I U
�O
in Con
rA
'2 Q a
C,
•0 3 � �
d a Z 04 U
M
yc�
W
i+1
0
h
}r
b
ct
/ •rl
0 cd
3 `�
Cdw
� o
o
C>
3 C
o tn
m
W
A
�r j
7 0
� $ u2
§ R ) �
} !
o ,§ ƒ \
/ § eu ._m _m
2 \ - a
MUM
ƒ \ \ .MU m L_,
)
._» ._,
; ILOZILIZ
|
) \ % ° OLOZILIZL
_ , m
7 ƒ 7 \ ° OLOZILIOL
_! ! _.
& k � 0 _, �a
9 # & § R _a
* § 3 _,
00 ? ; ° �m §§ ~
\ 7 § § ® §u ;
(mm)®� _ pA ..
w �tR
. �
�
0o /
§ & a
— : _
g § Ca •_a
>
7 2 2 MUM
u £ « | : ._.
.a_ |
, -
_ » __.
a a § 2 � ,_!
/ _«
o_!
k R \ \ ,_<
00 cd \ \� �
(MA) __ . . �
w ate /
� '
UOZ/94 ZLOZ/94
3 p uWZMM LIOZ/94L
p-I Q LLOZ/9/6 LLOZ/9/6
U 0 G 0 LLOZ19IL LLOZl9/L
crs u LLOZI9IS LLOZ/9/S
a73
ILOZ/9/C 6 LLOz/9/C
LLoz/9n p LLozl9n a
OLOZ/94L 7 OLOZ/9M
ZUOZ19/6 OLOZ/9/6
RS y
U iUi OLOZ/9/L OLOZ/9/L
•� �f..'� OLOZ/9/9 OLOZ/9/9
OLOZ/9IC
�p OLOZ/9/C
OLOZ/9/L
f6 OLOZ194 o 0 0 g g 0
RL 0 Q (w) PO.Wp wn04-URmOlrA
a d00 U - --
N � �D
V� rte+
� � y
y N y m
b
m
O
O
w
b
� O O
z cl
•.. O a
a� on
El Pq vi Q
0
I I I I
«
\
\
./
z �
� k �
a �
5
2 / \cd � S
8 » ( 7
§ \ § 0
@ § a $ A «
,/ +
9 ƒ § / to a
k 2 7 § \ �
q \
/ }
I
I
I tf'
I
1 �'
I �
2;
�, * �_ .�
• �� I
' �
„`� � �
- � � � ,
� � i
� �
� i , �°
tiI
� � , 1 :�
- � .,
� " , '
g
• � i
1
_ '' k ��� I ,�'\,
II
.• 1 /.
• s � �� �
i.� � � ���
M1 '
1
r , 1
R /
. 1rr1
4
1
5 f„1 1
1
I,e
� I
1
R Y I
. i I
P If
V r .. . .
__.-
■
,�.�;\
�_. ,. ,t
r.- ;
+'
__ �. - ,.
�. ;;
N
0
I
r4
0
U
m
0
a�
a�
• READING MUNICIPAL LIGHT DEPARTMENT
To: RMLD 6nard of Commis1spioners - Date: February 22, 2012
From: Vinnie Camemn
Subject: Telephone System Update
At the December 7, 2011, Reading Municipal Light Department (RMLD) Board Meeting
the Board of Commissioners asked to have the RMLD's telephone system analyzed to
see if it is sufficient to handle customer requirements when large outages occur. The
request was based on comments conceming the October snow storm that caused
considerable damage to the RMLD's distribution system and caused customer outages
for up to five days. Over the last year the RMLD experienced two storms (Hurricane
Irene and the October Snow Storm) when the phone system was overloaded at the
beginning of the storms and from time to time during the next day or so. The RMLD has
investigated the capabilities of the existing telephone system with respect to its operation
during perio ds of storms when a large amount of calls are being made into the RMLD.
When a feeder outage occurs there could be over one thousand customers affected. The
RMLD has the ability to switch its phone system to storm mode and twenty-five phones
can be used to answer phone calls. In addition, the RMLD has a messaging system set
• up so that a message can be recorded on its telephone system explaining the nature of
the outage(s). The messaging option during outagew has shown to be an effective toot in
getting outage information to the public. When the messaging Is in place the volume of
calls being answered by the Station Operators or Customer Specialists is more
manageable. Customers calling in about an outage want to be assured the RMLD knows
about the outage, and the messaging option has proven to be vfkctive in getting the
information to the customers.
During an outage situation twenty-five callers have the option of talking to a RMLD
employee or listening to a message explaining the nature of the outage, which the RMLD
updates during the outage. If callers choose to listen to the message, only eight callers
can listen to the message simultaneously. Overall, the telephone system works well for a
large portion of the RMLD's communication purposes. When a feeder operation or a
storm occurs, the RMLD's telephone system is stressed during the initial stages of the
incident. The more severe the outage is then the more stressed the phone systcm will be.
Me present phone system has an annual maintenance cost of appmximakly y50X1.
Ilse RMLD could upgrade its present system 4e allow twenty-fi%e callers he listen to the
messaging .%stem simultaneously, whir, would allow mare tlexibilty for nostomers
that want to Anew the nature of tile outage and hang up. In this option, the number of
lines coming into the RMLD would nut Change- the cost of this upgrade would be
appmaximate•Iv 532,im, with the same maintenance fee that prvsenth,exists.
theR%11.1) could also have an answcring service on retainer that would h.r%e rolls
direch•d to them when a storm ar some ether ,large vxent attests the RSII Ds scrvico-
ATTACHMENT2
territory. Obviously, more phone calls would be answered by a live person in this •
alternative; however, this it would also present some logistical problems. The message
about the outage would have to be,conveyed to the answering service very quickly along
with updates, so that the customers are receiving timely and accurate information
concerning the outage +ituation. The answering service would also mad the capability
to get outage information back to the Station in order that Fngineering is able to
assimilate and diagnose the outages in a timely manner. 1-his alternative would cost the
RMLD approximately $40,M) per year, in addition to the cost of the existing system.
The RMLD should commission a study on best practices with respect to communications
with customers during outage situations to determine industry standards and the
method that presents the greatest value to the RMLD. It should be noted that the RMLD
is also exploring more efficient use of its website and social media to provide
information to its customers during outage situations.
•
r
. READING MUNICIPAL GHT DEPARTMENT
To: RMLD Board of Commissioners. Date: February 22, 2012
From: Vinnie Cameron �WW
Subject: FYI l rransfers- Pension Trust and Rate Stabilization Fund
At the January 25, 2012 RMLD Board meeting Commissioner O'Neill asked about the
transfers made from the Operating Budget to the Pension Trust and the Rate
Stabilization Fund. Commissioner O'Neill wanted to know if these transfers should
have gone before the Budget Committee prior to making the transfers.
Pension Trust Transfer
On May 25, 2011 the Budget Committee made a motion to recommend to the RMLD
Board of Commissioners to transfer$1 million fn+m the Operating Fund to the Pension
Trust Fund for FY 11. The minutes of the May 25, 2011 Budget Committee meeting am
attached along with a memo suggesting that the transfer be made. At the May 25, 2011
RMLD Board meeting the RMLD Board made a motion to accept the Pension Trust
Fund transfer and made a similar motion to transfer the $1 million into the Pension
Trust Fund. The minutes of the RMLD Board meeting are attached. This transfer was
made on June 21, 2011.
® Rate Stabilization Fund Transfer
I sent a memo to the RMLD Board of Commissioners on November 19, 2010 (attached)
concerning the Rate Stabilization Fund balance, which was below the $6 million level,
which was set according to my performance items, and is attached. In this memo I
stated that in the third quarter 1 would examine the financial position of the RMLD to
determine whether the RMLD is able to make a transfer from the Operating Fund to the
Rate Stabilization Fund, in order to get it above the$6 million level.
On August 12, 2011, the Draft FYII Financials were sent to the Board of
Commissioners. In an e-mail (attached) sent to Chairman Mahn, 1 stated that the Net
Income number was a gird number (Mclanson 1-leath agreed with it.) I explained that
we couldn't finalize the balance sheet until Mll (Melansrm heath) blessed our cash
balances, which included the Rate Stabilization Fund transfer. The Draft June, 2011
Income Statement, kWh sales, and Budget Variance Report were included in the
financial report for the August 11, 2011 RMLD Board Meeting (attached.)
At the September '_%, 2011 RMLD Board mooting ( ninutes attached) the RMI 1) Board
approved the RMI.D's FY I I Audited Financial StIRCntent. At this nmeting I pointed out
that the RMLD had transferred $+0)00(1 from the Operating Fund to the Rate
Stabilisation Fund, in order that the Rate 5tabilizat1011 Fund is in the range of St, million
to s7 million, ,tca,rding to my performance items.
Going forward, a Budget Committee meeting will he scheduled when the draft audited
financials statements are being completed (without transfers) in order to discuss
potential year end transfer(s).
Attachments -6
Reading Municipal Light Board of Commissioners
Reaular Session ATTACHMENT 2
230 Ash Street
Reading,MA 01967
May 25, 2011
Start Time of Regular Session: 7:30 p.m.
End Time of Regular Session: 9:00 P.M.
.Attendees
Commissioners:
Richard Hahn,Chairman Philip B.Pacino,Vice Chair
Gina Snyder,First Secretary Mary Ellen O'Neill,Second Secretary
Robert Sufi,Commissioner
Start:
Vinnie Cameron,General Manager Robert Fournier,Accounting/Business Manager
Paula O'Leary, E&O Operational Assistant Jane Parenteau,Energy Services Manager
Kevin Sullivan,E&O Manager
Citizens'Advisors Board
Arthur Carskatsane,Chairman
Chairman Hahn called the meeting to order and staled that the meeting of the Reading Municipal Light Department(RMLD) Board of
Commissioners is being broadcast live at the RMLD's office at 230 Ash Street, Reading, MA. Live broadcasts are available only in
Reading due to technology constraints. This meeting was video taped for distribution to the community television stations in North
Reading,Wilmington and Lynnfield.
Opening Remarks/Approval of Meeting Agenda
4;
ai--Hahn asked the Board members present if there were suggested changes or additions to the agenda.
Ms.O'Neill requested that future agendas specify any anticipated items for action by the Board. The motion itself need not be listed,
but if there are any anticipated motions,the topic of those should be listed under the committees or separately if appropriate.
Chairman Hahn asked if it would be where the Board expects to lake a vote.
Ms.O'Neill responded."yes;'and explained that if someone wanted to come down and speak on a particular topic,heishe would know
what was being discussed at the meeting.
Chaimtont Hahn suggested that in the right hand column on the agenda words be added such as"Vote Required".
Discussion followed.
Mr. Pacino suggested the words,"Action Item',and the Board agreed.
Introductions
'there were no members of the public present,and the CAB representative,Chairman Arthur Carakatsane,would be laic arriving.
Report from Board Committees
Budget Committee—Vice Chair Pacino
Report of May 9 and May 25 Meetings
Mr. Pacino reported that the Budget Committee reviewed the FY12 Capital and Operating Budgets as presented on May 9. The C.4B
approved those versions of the budgets. The Committee approved both the Capital and Operating Budgets as presented at that meeting
by a vote of 3:0:0.
Pacino reported that at this evening's Committee meeting two items were considered: 1)The Operating Budget had some changes
d in an addendum that lowered the Net Income from S4.3 million to $3.9 million, approximately a S430,000 decrease due to
inoml casts related to Power Supply, the demolition of the old Control Center, fuel expenses and fuel revenue. Mr. Pacino said
that the Budget Committee reviewed those changes this evening with the General Manager and staff and approved the changes by a
vote of 3:0:0. Mr. Pacino explained that these changes had been presented to members of the CAB and at least four of the members
saw no problems with the addendum,and did not feel a meeting was necessary to discuss the changes. a_)Although the Department is
Regular Session Meeting Minutes 2
May 25,2011 '
Budget Committee—Vice Chair Pacino
Report of May 9 and May 25 Meetings
still below making its 8% return, it made more revenue than anticipated. The Committee discussion about the excess include
returning it to the customers or putting it in the Pension Reserve, which is severely under funded. If it were to be refunded no
customers may have to give it back in the future in the forth of a rate increase. 11 doesn't rule out a rate increase,but it would delay the
process. The Budget Committee fell it was prudent to Transfer the funds into the Pension Reserve,and recommended that the motion
for the transfer be approved.
Mr. Soli asked about whether the CAB was meeting on the changes.
Mr. Cameron explained that when the CAB recommends the budget, it includes "no significant changes are made without CAB
approval." The CAB was notified by e-mail and asked if they considered these changes significant, and they e-mailed back that they
did not.
Mr. Soli questioned the Open Meeting Law.
Mr.Cameron responded that it was informational only and no discussion took place.
Mr. Pacino made a motion seconded by Ms. Snyder that the RMLD Board of Commissioners approve the FY12 Capital Budget as
presented in the amount of$5,910,048 on the recommendation of the RMLD Board Budget Committee, the RMLD CitizensAdvisory
Board,and the General Manager.
Motion carried 5:0:0.
Mr.Soli questioned why the topic/motion was not on the agenda.
Chairman Hahn staled that the discussion of the budget was on the agenda,but not Bagged as a vote.
Mr.Cameron noted that the e-mails from the CAB would be a part of the meeting.
Mr. Pacino made a motion seconded by Ms. Snyder that the RMLD Board of Commissioners approve the FY12 Operating Budgdo
based on a Net Income Amount of$3,939,043 on the commendation of the RMLD Board Budge Committee, the RMLD Citizens
re
Advisory Board,and the General Manager.
Mr. Soli moved to table the motion until Mr.Caml atvame arrived to hear his input. Mr.Pacino seconded the motion.
Motion carried 4:1:0.(Chairman Hahn voted against this motion.)
Ms.O Neill asked if this is the format(the Net Income Amount)that the Board usually approves for the budget.
Mr. Cameron stated that it has been used in the past, although last year was done differently, the Board accepted the Operation and
Maintenance section of the budget,but the revenues were not accepted,because a Cost of Service Study(COSS)needed to be done.
Mr. Pacino noted that he would have liked to see the two(budget)motions on the agenda.
Chairman Hahn asked if they could be attached separately, and Mr. Pacino said that was fine. Chairman Hahn's preference was to
attach motions separmely or the agenda becomes crowded. He.aid that motions for bids will continue to be put in the agenda itself.
and motions that can be reasonably anticipated will be attached.
Power& Rate Committee—Chairman Hahn
Report of May 16 Meeting
Chairman Hahn reported the following: 1) A discussion continued from the Power & Rate Committee's April meeting regarding the
possibility of a long term contract with an existing resource in New England,and the Committee decided not to recommend any action
at this time. 2)An Annual Request for Proposals(RFP) for Power Supply was discussed. and a motion was made and approved by a
vote of 3:0:0 to recommend to the full Board that they approve the RFP as presented. 3) New streetlight rates were recommended by
the General Manager. Chairman Hahn pointed out for the most pan the rates are lower than the existing rates for most categories of
streetlights. although .some old fashioned streetlights cost more. The Committee made a motion to recommend to the full Board that
these new rales be accepted by a vote of 2:1:0 with Mr. Soli voting against this motion. 4) A change to the Commercial C Rate wa�
discussed at the April 20 Committee meeting, but no anion was taken, because it had to go to the CAB. The CAB accepted Ih
Commercial C Rale at its May 18 meeting,and the Power& Rate Committee voted m recommend the rate change to the full Board by
a cote of 3:0:0.
Regular Session Meeting Minutes 3
May 25, 2011
Power& Rate Committee—Chairman Hahn
Report of May 16 Meeting
CAB Chairman,Mr.Carakatsane,arrived at this time during the meeting.
Chairman Hahn told Mr. Carakalsane(hat there was one item regarding the FYI 2 Operating budget that was held until he arrived.
Mr. Camkatsane stated that the CAB had met several times on the FYI 2 budgets and recommended approval of both the Capital and
Operating budgets. He noted that the CAB was apprised of the changes to the Operating Budget and no one requested that a
discussion be re-opened. He added that they also recommended other items,i.e., rale changes that are before the Board tonight.
Ms. Snyder made a motion seconded by Mr. Pacini that the RMLD Board of Commissioners approve the Annual Request for Proposal
for Power Supply based on the recommendation of the RMLD Board Power & Rale Committee, the RMLD's Citizens' Advisory
Boart and the General Manger to authorize the General Manager to execute one or more Power Supply Agreements in accordance
with the RMLD's Strategic Power Supply Plan for power supply purchases for a period not to exceed 2012 through 2015 and in
amounts not to exceed 22.050 MW in 2012, 16.750 MW in 2013, 17.600 MW in 2014,and 15.925 MW in 2015.
Mr. Pacino amended the original motion with the following changes: strike the word"and", between Committee and the RMLD and
place a comma there. Add in after the CitizensAdvisory Board,"and the General Manager",and delete the words in the last sentence
after 2015.
Ms. Snyder accepted the amended motion.
Marion carried 5:0:0.
Ms. O'Neill mentioned that she still wants the Department to continue to pursue efforts to obtain additional renewable energy power
supply resources.
Chairman Hahn noted that it is still the objective of the Board to find reasonably priced renewable energy.
Ms. Snyder made a motion seconded by Mr. Pacino that the Reading Municipal Light Department Board of Commissioners approve
� adoption of the streetlight rate as proposed based on the recommendation of the RMLD Board Power & Rate Committee, the
ILD's Citizen's Advisory Board,and the General Manager.
Mr. Soli was concerned that sometime in the future someone may ask what did they really vote on since no real record of what is being
voted on,i.e.,the rates,is in the motion.
Chairman Hahn slated that his recollection is that the filing of the rates speaks for what was done,and asked the General Manager if
the rates have been attached to motions in the past.
Mr.Cameron responded that rates have not been attached in the past,but can be.
Mr. Soli said that a COSS has generally been on the meeting agenda, and the Board has approved the COSS, which is the record of
what the Board voted on.
Ms. O'Neill proposed to amend the main motion to read, "Move that the Reading Municipal Light Department Board of
Commissioners approve the adoption of the revised streetlight rate as shown in attachment A based on the recommendation of the
Power&Rale Committee,the RMLD's Citizens'Advisory Board,and the General Manager.
Mr. Soli handed out a chart,and aid that he would say,"Table I attached". He said the table shows what the committee voted on,but
that he had a problem squaring the number with Table 2,the operating budget,and came up with an S84,000 disparity.
Chairman Hahn staled that if Mr. Solis intention is to attach this"fable, he could not support that. 'Fhe only thing voted on was the
rates for each class of strcedigh(. lie added that it is not appropriate to attach this Table to the motion, but if Mr. Soli would like to
bring the table to the Committee for discussion that would be fine.
Mr. Soli wanted to find out about the disparity that appeared to be in the table between budget and expense on the steetlights.
tv,ts noted that there are two components,capital and maintenance per lamp.
Chairman Ilahn said that he has the opportunity to bring it to the Committee, and also noted that the table should be reviewed by the
staff and the Committee prior to being presented at a board meeting.
Regular Session Meeting Minutes 4
May 25. 2011
Power At Rate Committee-Chairman Hahn v
Report of May 16 Meeting
Ms. OTtcill clarified that the attachment is the chart that the Power & Rate Committee received that showed the different type o
streetlights and the proposed rates. Mr.Cameron suggested that the FY I I Streetlight COSS be attached. 10
Chairman Hahn stated that the Power & Rate Committee and the CAB voted to accept the rates that are contained in the FYI I
Streetlight COSS,and suggested creating a two-column table to show the lamps that are offered and the rates that will be charged. He
stated that the handout is inappropriate,and he would out attach the entire COSS,because it was the rates that were voted.
Ms.O'Neill asked if there were one chart in the COSS that contained the rates.
Chairman Hahn stated that Table 4 lists the existing rate and the proposed rale, and could be attached to the motion. He asked if the
motion could refer to Table 4.
Ms.O'Neill amended the motion as follows:
Move that the Reading Municipal Light Department Board of Commissioners approve the adoption of the revised streetlight rate
as shown in Table 4 of the April 14, 2011 memorandum from the General Manger to the Board of Commissioners based on the
recommendation of the RMLD Board Power&Rate Committee,the RMLD Citizens'Advisory Board,and the General Manager.
Ms.Snyder accepted the amended motion.
Motion carried 3:2:0.(Messrs. Pacino and Soli voted against this motion.)
Chairman Hahn asked the General Manager to take Mr. Soles handout,review it,and respond to Mr.Soli's question.
Mr.Cameron stated that the response would go to the entire Board.
Ms. Snyder made a motion seconded by Mr. Pacino that the Reading Municipal Light Department Board of Commissioners approve
the adoption of the Commercial C rate changes based on the recommendation of the RMLD Board Power & Rate Committee, the
RMLD's Citizens'Advisory Board,and the General Manager.
Mr.Soli had the same comment and concerns as the previous motion with no mte(s)being listed in the motion.
Ms.Snyder moved to amend the motion as follows:
Move that the Reading Municipal light Department Board of Commissioners approve the adoption of the Commercial C rate
changes based on the attached RMLD Tariff- MDPU N223 dated to be filed Jane 1, 2011 and on the recommendation of the
RMLD Board Power&Rate Committee,the RMLD's Citizens'Advisory Board,and the General Manager.
Ms.O Neill seconded the motion.
Motion carried 3:0:2.(Messrs. Pacino and Soli abstained.)
Mr. Pacino made a motion seconded by Mr. Soli to bring the(FY 12 Operating Budget)motion(see below)back to the table.
Motion carried 5:0:0.
Mr. Carakatsane stated that the CAB received the changes to the Operating Budget,and no member requested a meeting to reconsider
the budget. He added that if a member were interested in a meeting,one would have been convened.
Move that the RMLD Board of Commissioners approve the FY12 Operating Budget based on a Net Income Amount of
$3,939,043 on the recommendation of the RMLD Board Budget Committee, the RMLD Citizens' Advisory Board, and the
General Manager.
Motion carried 5:0:0.
Approval of April 27,2011 Board Minutes
Ms. Snyder made a motion seconded by Mr. Pacino to approve the Regular Session meeting minutes of April 27, 2011 with the
following changes requested by Mr. Soli: On Page 5, third paragraph from the bottom, after the words"transfer scheme",change the
period to a comma and add-and its design is being improved"
Motion as revised carried 5:0:0. 10
Pension Frust Transfer
Mr. Cameron reminded the Board a motion was needed for a transfer to the Pension Frust.
Regular Session Meeting Minutes 5
May 25,2011
Pension Trust Transfer
Ms.O'Neil made a motion seconded by Ms. Snyder to approve the transfer of$1 million from the Operating Fund to the Pension Trust
based on the recommendation of the Budget Committee and the General Manager.
lotion carried 5:0:0.
General Manager's Report—Mr,Cameron
E-Billing - The e-billing system went live on May 1, 2011 for both the residential and commercial customers, and any residential
customer who did not fill out an RMLD update sheet and would like to receive an a-bill should contact the RMLD.
Investments—The RMLD has a considerable amount of cash in a MMDT Pond that has very low interest,and therefore not working
well for the Department. Mr. Cameron advised the Board that he will be going out for an RFP for investment services. If a
satisfactory investment firm were selected,he would probably recommend that the OPEB fund be invested to try to cam more interest.
He spoke to the Town Manager and mel with the Assistant Town Manager, Treasurer, and Mr. Fournier. They interviewed one firm
just to see what they do for other municipal entities. He does have an RFP that he can put together and send out.
Chairman Hahn questioned if this is something that the Department would make a recommendation to the Budget Committee.
Mr.Cameron stated that bids do not go to a committee and the Board.
Chairman Hahn staled that the idea of choosing a different investment strategy, not the RFP itself, is something reasonable to put
before the Budget Committee.
Mr.Cameron said that he had no problem with submitting it to the Budget Committee.
Mr. Soli questioned when the Board went through the paperwork for the OPER, the Board was very careful about the language saying
that the Town Treasurer had that responsibility not the Board. He wondered how all of this would affect the language that is currently
set up for the OPEB.
Mr.Cameron responded that he didn't know how this would affect that language,and added that the town treasurer would be using this
to invest money.
r. Pacing asked if the town would have input with the selection of the firm.
Mr.Cameron stated that given that the town treasurer is custodian,they would be part of the selection process.
Mr. Patin asked if this is going to change the legal ramifications of what they put in that document.
Mr.Cameron suggested speaking to Rubin and Rudman.
Mr. Pacino staled that he would feel comfortable with Rubin and Rudman looking at it.
Chairman Hahn staled that one of the reasons he would want it sent to the Budget Committee is because he thinks it is important to
understand what the liability question is. He said that is why the change in strategy should be discussed further before an RFP is sent
out.The Board should have a better understanding and have some documentation on the pros and cons of doing this and how it affects
the Department. Chairman Hahn will leave it up to the General Manager as to how to best proceed in improving the use of the asse ta.
Mr. Pacino wished to again stress that if any member of the public has any questions or concerns, the General Manger is available
anytime in his once. Mr. Pacino added that the public may contact the General Manger directly or the Chairman of the Board or even
Mr. Pacino,the senior member of the Board.
Financial Report—April,2011—Mr.Fournier(Attachment 1)
Mr. Fournier reported on the Financial Report for April 2011.
Mr. Fournier reported that the ten-month year to date Net Income is a little over$2.6 million. The year to date budgeted Net Income is
$1.6 million, making the difference $999,000. Mr. Fournier said that the year to dale Fuel Revenues exceeded Fuel Expenses by
.hiall,00ft. 'rhe energy consenation expenses exceeded energy conservation revenues by $129,000. The Gaw soil remediation
uses total$1.2 million for this fiscal year bringing the total eost combining the two fiscal yeas to 52.3 million.
Mr. Fournier reported major expenses over budget were the maintenance of line transforms by $634.000, which represents a lot of
the Gaw mil remediation expense, and employee benefits by 5325.000. The latter number was due to sick leave buy hack payments
made.
Regular Session Meeting Minutes 6
May 25,2011
Financial Report—April,2011—Mr.Fournier(Attachment 1) s
The Depreciation Expense and Voluntary Payments to the Towns were on budget. Cumulatively, all five divisions were over budget
by$541,275.
Discussion followed.
Power Supply Report—April,2011—Ms.Parenteau(Attachment 2)
Ms. Parenteau presented the Power Supply Report for April 2011. Ms. Parenteau reported that RMLD's load for April was 53.3
Million kWh, about a half percent increase compered to April 2010. Energy costs were $2.75 million, which is equivalent to 5.051
cents per kilowatt hour. RMLD sales totaled approximately 56.3 million kWhs and,as a result,the RMLD overcollected by$229,000
resulting in a Deferred Fuel Cash Reserve balance of$2.66 million.
In April and May,the Fuel Charge Adjustment was set at$.0535 cents per kilowatt hour.
Ms. Parenteau reported that the RMLD purchased approximately 27% of its energy requirement from the ISO Spot Market at an
average cost of 541.20 per kilowatt hour. The RMLD hit a peak of 92.6 MW at noon on April 28,2011 as compared to a peak of 95.6
MW, which occurred on April 7. 2010 at 9:00 P.M. The RMLD's monthly capacity requirement was around 213 MW. The RMLD
paid $1.62 million for capacity, which is equivalent to $7.59 per kW-month. Ms. Parenteau noted that on Table 3, the Stoneybrook
Peaking Plant had an adjustment.
Ms.Parenteau reported that transmission costs for April were$620,000.
Discussion followed.
Engineering and Operations Report—April,2011-Mr.Sullivan(Attachment 3)
Gaw Update
Mr.Sullivan reported on the Engineering and Operations Report for April 2011.
Mr. Sullivan said that the Gaw Project had no changes in the tangible milestones. He added that the conning total of the project i�
$6.846 million,and the soil remediation expense for this month is$7,600.
Mr. Sullivan listed the following projects worked on during the month: Projects I, 2, 5,36,9,and 11. He added that another project
was completed this month making a total of 9 completed projects.
Mr. Sullivan said that on the service installations that there were two commercial services in Wilmington, one on Ballardvale Street
and one on Main Street. Residential services: there were approximately 25-30 services for the month. In routine construction there
were 31 cutouts replaced making a total of 338 for fiscal year 2011.
Mr. Sullivan reported on the Reliability Report: Customer Average Interruption Duration Index(CAIDI)is up nine minutes due to the
storm on April I; the System Average Interruption Frequency Index(SAIFI)decreased with 494 April customers affected by outages
as compared to March's 1,877. The Months between Interruptions(MBTI)is up from 22 to 23 months.
Mr. Sullivan provided an update on the reliability statistics numbers that include the April 1 storm: 124 calls, 24 (14 on 4/1) outage
incidents,494 customers affected, no feeder outages, 20 area outages,and 4 service outages. Fifteen outages were due to trees,others
were caused by birds,insulators and failed hardware.
Ms. O'Neill stated that although she understands the numbers on reconciling the Gaw Project, the numbers do not include the soil
remediation expenses,and to her that is the total project cost and therefore more realistic.
Ms.(3'Netll asked for an update on the Meter Upgrade Project, and would like one each month. She added that the publicity has been
good on the Project.
Mr. Sullivan responded that the conning total of installed meters is about 4,900, averaging about 1,000 per month. He added that the
concentration of installations has presently been in Reading, but does include all four towns, and installation is also being done on
Saturdays.
Mr. Soli questioned Mr. Sullivan on an invoice from the Massachusetts Department of Em'ironmental Protection(MassDEP)regardins
the Gaw Project asking how long these charges would be billed,and Mr. Sullivan responded that there was just this one charge.
Regular Session Meeting Minutes 7
May 25, 2011
M.G.L.Chapter 30B Bid
2011.14 Residential and Commercial Energy Audits
Ms. Snyder made a motion seconded by Ms. O'Neill to award bid 2011-14 for Tier 11 Residential Energy Audits to Energy Egghead,
C as the only qualified bidder on the recommendation of the General Manager.
non carded 5:0:0.
Mr.Cameron explained the bid was sent to many potential bidders,and only one was received. He then went over the costs.
Ms.Snyder asked if the Department is hacking if customers one saving energy aver an audit.
Ms. Parenteau stated that it has not been done;however,the Department has the ability to do it.
Ms.Snyder stated that she would like to see that.
Ms.ONcill had some reservations about awarding the contract to the only one that was received,not knowing why no one else bid.
Ms. Parenteau had spoken to the Purchasing Manager, who did contact several of the potential bidders as did Mr. Carpenter. It
appears to be a staffing issue for some of the organizations,because the RMLD requires that they be certified;others want to provide
mom than just an audit. She added that the bid was advertised in the Reading Chronicle. Chairman Hahn noted that the bid was e-
mailed to many companies,and thought that a longer term of two or three years might be more attractive to some. He added that there
is not a lot of margin in this for a company,and since the contract takes effect on July I,there is no time for a second bid. Mr. Hahn
asked if Egghead is the incumbent firm,and Ms. Parenteau replied that Egghead does provide the current audits. Ms.O'Neill asked if
there had been a previous bid, and Ms. Parenteau responded that it had been bid last year. Ms. Parenteau added that the Customer
Service Manager has received positive feedback from customers regarding the firm. The Department hopes to go out for a longer-term
contract next year. Ms. Parenteau repotted that through April 144 audits were completed,and three audits using the blower door.
Mr. Soli asked if all the munis have to provide this service,and Mr. Cameron responded that it is his understanding that they do,and
added that the investor-owned companies must also pmvide the service.
Gle ussion followed.
General Discussion
Mr.Carakffisane suggested making the Meter Project and E-billing more prominent on RMLD's web site.
Regarding e-billing,Ms. Snyder stated that she thought she would receive an e-mail after she resumed the red card.
Mr. Fournier responded that he would look into it.
Ms.O'Neill requested an update on the Green Communities Act in Massachusetts.
BOARD MATERIAL AVAILABLE BUT NOT DISCUSSED
Rale Comparisons,April,2011
E-Mail responses to Account Payable/Payroll Questions
Upcoming Meetings
R11LD Board Meetings
Wednesday,.lune 22,2011
Executive Session
Not held.
Adjournment
At 9.00 p.m. Mr.Soli made a motion seconded by Mr. Pacuto to adjourn the Regular Session.
Motion carried 4:1:0. (MA.O'Neill voted against this motion.)
® A true copy of the RMLD Board of Commissioners minutes
as approved by a majority of the Commission.
Gina Snyder.Secretary
RMLD Board of Commissioners
ATTACHMENT
AN READING MUNICIPAL LIGHT DEPARTMENT
To: RMLD Board of Commissioners Date: November 19, 2010
From: Vinnie Cameron
Subject: FY11 - Rate Stabilization Fund and 8% Return on Plant Balances
Net Income
According to the Reading Municipal Light Department's (RMLD) financial
statements the Net Income for FY10 was $2.78 million, which equates to
approximately one-half of the RMLD's allowable 8% return. The FY10 Net
Income level is higher than the $147,687 Net Income for FY09 due to strong
(weather related) sales in the last quarter of FY10 and the decision to decrease the
depreciation rate to 2%; which decreases the FYIO Operating Expense by about
$1 million. (The FY11 RMLD Operating Budget anticipates the depredation rate
to be 3%, which is the normal level.)
Transfers
The RMLD did not recommend any transfers for FY10 because the Construction
Fund had a $4.8 million balance at the end of FY10, which is adequate to start
FY11. The Operating Fund was at$8.1 million at the end of FYI O.
Rate Stabilization Ft nd Balance
The RMLD's Rate Stabilization Fund (RSF) had a balance of $5.4 million at the
end of FY10. The balance of the RSF should be in the range of $6 to $7 million
with a target of $6.5 million. This range was put into place by the RMLD Board
of Commissioners in 2003.
In the third quarter of FY11, I will examine the financial position of the RMLD to
determine whether the RMLD is able to make a transfer from the Operating
Fund to the RSF, in order to get the level above the$6 million level.
8"o Return on Plant
The R:MLD does not foresee the need to make its allowable 8% return on Net
Plant over the next few years. As stated earlier, the RMLD started out FY11 with
a balance of 54.8 million in the Construction Fund. The Depreciation Expense
should add another 53.5 million during FYI I. Presently, the RMLD's Capital
Budget of $5.6 million; includes the remainder of the Gaw Sub Station project of
about $875,000 and a meter upgrade project of about $766,000, with the
remainder of the Capital Budget at$4 million.
Presently, it is my goal, to keep the Capital Budget in the $4 million range not
including special projects. With the annual Depredation Expense approaching
$4 million and keeping the Capital Budget at $4 million, the RMLD does not have
to collect its entire allowable 8% return in order to meet annual capital
expenditures and Return to the Town of Reading.
In the future, if a large construction project is undertaken by the RMLD, I would
have the option of borrowing money to meet the cost of the project or
recommend a rate increase to meet the 8% allowable return, which would result
in more money available for construction.
Page I of I
Jeanne Foti
_
From: Vincent Cameron AT7ACHMENT4
Sent: Thursday, August 25, 2011 12:14 PM
To: Richard Hahn
Cc: Bob Fournier; Jeanne Fell
Subject: RE:August Board Agenda
I talked to Mary Ellen this morning and told her that the PSL that was e-mailed 8/12/11 and will be in the
Board books($2.8 mil in Net Income)is a good number. I also told her that the balance sheet cannot be
finalized until MH blesses our cash balances. She was all right with this.
I also told here that any questions that can be sent prior to the meeting would be appreciated.
From: Richard Hahn [maiRo:rhahn@lacapra.com]
Sent: Thursday, August 25, 20117:58 AM
To: Vincent Cameron; Mary Ellen O'Neill
Cc: Bob Fournier; Jeanne Fob
Subject: RE: August Board Agenda
I don't know what specific issues MaryEllen has,but will try and call her tonight.
What is the status of year-end financials,and when do we expect that they will be finalized?
From: Vincent Cameron [maiho:vcameron@RMLD.com]
Sent: Thursday, August 25, 20117:33 AM
To: Mary Ellen O'Neill
Cc: Richard Hahn; Bob Fournier; Jeanne Fod
Subject: RE: August Board Agenda
Is there anything specific that you want myself or staff to address in the separate discussion on the
financials?
From: MaryEllen O'Neill [mailto:maryelienoneill@hotmail.com]
Sent: Monday, August 22, 20118:57 AM
To: Richard Hahn
Cc: Vincent Cameron
Subject: August Board Agenda
I'd like to request that the lune 30 draft financials be included as a separate discussion item on our
August agenda, if that is not already planned.
Thanks.
2122 2012
Page I of I
Jeanne Foti
From: Bob Fournier
Sant: Friday, August 12, 2011 10:38 AM
To: Richard Hahn; Richard Hahn; Phil Pacino; Gina Snyder; Bob Soli; Mary Ellen O'Neill
Cc: Vincent Cameron; Jeanne Fott
Subject: FV 11 Draft Report
Hallo to all,
Attached are some draft figures for fiscal year ending June 30, 2011. The report includes pages 3A, 5
and 6 as well as the budget variance report. I also left a hard copy in your mail box.
Enjoy the weekend!
Bob
From: admin@rmld.com Imailto:admin@rmld.comj _-_-� _--- ---_ —
Sant: Friday, August 12, 20115:52 AM
To: Bob Fournier
Subject: Message from 606W-1
T'2,2012
1 TOAs OF MADT.G, DAS9A .MTTS
NDNIC°SAL LTG. DEPARTN6NT
USTHISS
DRAFT
BlR -TTPB PPOVSr% AY PVNO
STATrN6N[ OF PlVLMI89. ZXP8N988 MD CNANGCB W 8VM) !RT .9.5
6/30/11
ACNK aUMT 6
YLM TO WT[ YTAA TO DATR VARIMN - CXANGB
OPBMTING 08V 3: 19CB P P.11B1
888ER1N101tR 65,869,025.88 60,663,536.00 5,605,6]1.88 13.36%
N REV6Mn 40,9]7,068.75 60,112,666.00 866,386.]5 2.15%
PUNCSM. POB61 CAPACITT 1,055,106.66 5,366,803.00 (61289.698.361 -80.164
TORYETT6D DISCOUNTS 1,012,284.31 8.0,360.00 141,926.31 16.314
2NOIGT COMMVATION BLVGiVi 500,56].]1 333,228.00 132,660.201 -6.13\
GAN Btv9R1E 60],1]5.64 300,000.00 30],1'15.64 102-394
OA CP®IT 135.105 all 1600 COO.D01 (125, 105 81, 20.954
TC6AL CPDBACIPG BE VE s 89,295,501.12 07,024,609.00 2,210,092.12 2.614
OPYMTIIIG LEPO1888: (8C0 G P.1m)
PVRG.= SC °Gee 2],300,316.]6 27,111,576.00 1411.251.241 -1.404
PURCB TONE. YVEL 39,522,230.25 39,512,664.00 9,566.25 0.026
OMMTINO 9,290,513.09 8,636,586.00 633,921.09 1.324
HAINTpIANCE 6,049,792.17 3,095,161.00 952,631.71 30.184
OBPeeCiATTW 3,452,749.55 31500,000.00 (67,251.45) -1.356
VOLUNTARY vAZMNTS TO TOMS 1.330.070.00 1.320.000.00 10,070.00 0.16•
TOTAL OPBl1ATINC ETPENSE9 04,943,671.42 83,795,985.00 1,147,686.42 1.37%
OV=&TING TNCO6 6,351,829.70 3,228,624.00 1,123,205.70 34.194
NONOPBMTING 88V x IMP9N8881
CONTRIBUTIONS m AID or CONST 696,748.09 700,000.00 (3,251.11) -0.464
RETURN ON INVBSTI TO MAD.. (2,543,3]0.77) (2,223,000.001 (318,370.771 14.314
INTS"ST NCO L 103,164.63 450,000.00 1346,23157) -76.94\
.MST 2E 99 12,004.69) (12,000.001 9,095.31 -83.299
OTSER (WM AND MOST) 176,750.30 120,000.00 56,750.30 41.291
TOTAL NONOPSRATSNG MV fSTS) (1.568.111.041 (967,000,00) 1601.111.84) 62.166
CNANGE IN NST ASSETS 2,783,717.86 2,261,624.00 522,093.86 23.084
MT A89STS AT BEGINNING OP YE 90,819,664.61 08,039,716.12 2,700,148.49 3.164
NBT ASSETS AT = OP JUNE 93.603.592.41 90.]01.340.12 3.302.243.35 3.664
• 1 1 ACTUAL UxoM BUDGET
TOM =LIRMRLOLIGM DXVM lOftRi9 DRAFT
SAI26 Or KILO PTT Ha
6/30/11
MRRN 6 HI T YCM CORRIIIS Y6AA Y1D i
9AL98 Or 6LL'CTRICITY: LAST SERA CORRIIIP YHAR TO RATS TO DAM CHAHQ
RESIDENTSAL SALES 20,229,316 20,315,820 246,312 681 260,162,137 5.62%
CUM, AHO INDUSTRIAL UTMS 36,210,646 34.806,223 606,009,794 416,495,791 2.58%
PRIVATE ST=ET LICNTINO 70,918 72,139 952,109 8651495 1.57%
TOTAL PRIVAT[ CONRL M 56 510.940 55 194 1B2 653.114.384 611.524.023 3.73%
NW.ICIM SALES:
STREET LZGHTIHO 238,853 239,052 21952.096 2,866,615 0.51%
HUNICI9AL SUILOING9 760,191 791,409 91840,419 9,929,192 0.90%
TOTAL M XIM CON9'J m 999.D34 a 030 461 12.692.819 12.195 857 0.91%
SALES POR R[SA 844,455 1,111,696 31819,995 4.294,194 12.15%
SCHOOL 1,260,882 1,254,086 14,703,446 16,609,581 -0.64%
TOTAL MI TT HOURS SOLA 59.615.311 19.591.021 694,390.939 109.213.661 3.63%
•
•
[f)
mNxcx uDLIGM D:M�5 DRAFT
RILCWTT XWBB solo BY TpXX
6/30/11
TOTAL PEADIXB LY := NO.B 1= ylyQpCIGN
MOYStl
RS➢IDMT.1 20,315,820 6,030,986 31308,199 4,273,763 6,702,890
0486 l = 36,806,223 3,365,)2) 270,268 5,407,651 25,742,5))
PVT BT LIGHTS 72,139 16,081 1,360 21,600 35,896
POB ST LIGHTS 239,052 80,636 32,637 39,980 06,299
% 852703 791,609 171,732 132,633 175,132 312,112
SALSsim5 1,111,696 11111.696 0 0 0
SCHOOL 1,256,096 169,768 283,663 167,680 353,415
TOTAL 59.391.02511.264.606 f.O2B.ilp 10.085.288 ]3.2]3.191
SM TO OATS
M"DWp 260,162,731 81,652,319 36.936,826 60,316,637 81,457,155
CON 6 xem 616,495,791 50,979,171 3,369,056 63,219,1$3 298,947.611
evT ST LIGHTS 865,695 168,210 16,320 253,889 127,D76
PUS ST Lx<HTS 2,866,675 965,232 369,396 477,047 11035,000
MWI IIDG0 9,029,182 2,659,252 1,714,604 1,993,058 3,562,399
SAt1;8/NS9A[i 4,286,196 6,286,194 0 0 0
9CNNL 16,609,587 5,179,566 31119,600 1,926,520 6,385,901
T%'11L 709.313.661163.687.911 65.326.182T2s.196.101 389.813.131
LINT SEAP
TO ➢A^9
P SMMTT1 206,312,601 76,962,061 35,091,633 56,782,959 77,676,265
CDM 9 Rm 106,009,796 69,369,109 3,239,045 63,231,077 289,950,563
WT ST LIGHTS 852,109 167,216 16,320 251,340 617,233
DD• ST LIMS 2,852,096 969,067 303,626 476,295 1,033,309
XpNI a1D0$ 91010,716 2,626,960 1,667,323 11868,046 3,678,381
S.S/RS9A1.tl 3,819,995 3,619,993 0 0 p
9CHOOL 16,703,166 5,348,733 3,017,663 11913,160 6,626,110
TOTAL 686. PD 8 9 +a9.tla 132 U.616.990 126.322,8)) ]76.979,860
RSL4ATT Wb SOLD TO TOTAL
1T3AL HLAOIN9 LLMRStLO NO.91: xm NIL10CT41
NONTX
m2.nWTIA6 34.67% 10.29% 5.63% 7.29% 11.14%
COM 6 IM 59.61% 9.781 0.66t 9.23% 63.96%
PVT eT LIGHTS 0.12% 0.02% 0.00% 0.06% 0.06%
PU9 aT LIGN18 0.61% 0.16% 0.06% 0.07% 0.14%
NOMI =08 1.351 0.29% 0.23% 0.30\ 0.53%
HALes/RSH 1.909 1.900 0.00% 0.004 0.00%
9OXOOL 2.16% 0.771 0.0% 0.29% 0.606
TOTAL 100.00% 19.19% 6.B6Y 17.22% 56.71%
YGR TO ➢AT3
HSSIOSNTLAL 36.68% 11.48% 3.21% 8.50% 11.69%
COM 6 IM 96,73% 7.194 0.47% 8.91% 42,16%
WT ST LIGHTS 0.12% 0.02% 0.00% 0.04% 0.01%
eDtl ST LIOUT8 0.611 0.16% 0.05% 0.07% 0.13%
tUMi N l 1.60% 0.37% 0.24% 0.20% 0.51%
5ALt6/RS6A[i 0.60% 0.601 O.OG% 0.00% O.OD%
.c.00L 2.06% 0.73% 0 14% 0.271 0.62%
TOTAL 100.09\ 20.5]% 6.61\ 19.974 51.994
TO D %NAR
TO ASs
A[sIOWTLA4 35.99\ 11.25\ 5.131 8.30\ 11.31%
COM 1 Ilm 59.32% 7.24% 0.48% 9.26% 42.36%
WT ST LLCNTS 0.12% 0.021 0.00% 0.01% 0.06%
M4 9T LIONTS 0.42% 0.16% 0.06% 0.07% 0.15%
HUNS MOOS 1.66% 0.38% 0.21% 0.27% 0.55%
9ALS8/RtsA:.i 0.56\ 0.56% 0.00% 0.00% 0.00%
9CX- 2.15\ O.70% 0.16% 0.28% 0.65%
*
PAL 100.0_9\ ]0.37\ 6.35\ 18,20\ SS.OB\
HI
CE
FOR PERIODTENDING JUNE REPO
FOR DRAFT
DIVISIONS AND DEPARTMENTS ACTUAL BUDGET VARIANCE CHANGE
ZNGINERRING AND OPERATIONS;
eco MOR 199,902 202,420 (2,519) -1.24%
ENGINEERING 474,229 457,828 16,401 3.59%
LIM 2,400,522 1,989,601 410,921 20.65%
METER READING 72,072 64,358 7,714 11.99%
METER TECHNICIANS 310,116 403,021 (172.905) -35.Bot
STATION OP 555,868 611,643 44,225 6.64%
STATION TECHS 1,626,260 885,279 740,981 83.10%
DIVISION TOTAL 5,630,960 4.594.149 1,044,819 22.70
EMRGT SEWIMS DIVISION TDTAL 1 130,883 1,235,006 4104,123) -8.43%
LPJA"BLL-MANAML
GENERAL MANAGER 494,156 365,328 128,828 35.26%
HUMAN RESOURCES 126,322 2D4,964 (18,642) -38.37%
COM4UNITT RELATIONS 144,405 175,712 (31,307) -17.82%
CM 4,599 15,000 (10,401) -69.34%
BOARD 3,664 7,500 (3,036) -51.14% •
DIVISION TOTAL 773.146 760,504 4,642 0.6O%
malLimmanazEll
GENERAL BENEFITS 3,037,176 2,053,915 983,261 47.87%
BUILDING MAINTENANCE 635,989 696,532 (60,543) -0.69%
MATERIALS MANAGEMENT 334,149 340,615 (14,466) -4.15%
DIVISION 'TOTAL 41007,315 3,099.063 908.252 29.31%
BLBIN¢9A DIVISION:
ACCOUNTING 728,412 166,852 (40,440) -5.26%
CUSTOMER SERVICE 460,004 662,549 (202,545) -30.57%
HIS 564,420 594,993 (20,564) -3.52%
MISCELLANEOUS DEDUCTIONS 7,363,361 1,095,617 267,744 3.77%
DIVISION TOTAL 9.116.197 9,112,001 4,195 0.05%
DIVISION TOTALS 20,666,508 18,808,723 1,857,765 %A9%
PURCHASED POWER - BASE 27,300,317 27,111,574 (411,257) -1.48%
PURCHASED POWER - FUEL 39,522,230 39.512,664 9,566 0.02% •
TOTAL 87,489,055 86,032.961 1,456,094 1.69%
Reading Municipal Light Board of Commissioners
Reaular Session
230 Ash Street ATTACHMENT 5
Reading,MA 01867
rj August 31,2011
Start Time of Regular Session: 7:35 p.m.
End Time of Regular Session: 8:59 P.M.
:Attendees:
Commissioner,;
Richard Hahn,Chairman Philip B. Pacing Vice Chair
Mary Ellen O'Neill,Secretary Robert Soli,Commissioner
Absent:Gina Snyder,Commissioner
Stuff;
Vinnie Cameron,General Manager Beth Ellen Antonio, Human Resources Manager
Jeanne Fort,Executive Assistant Robert Fournier,AccountinWBusiness Manager
Jane Parenteau, Energy Services Manager Kevin Sullivan, E&O Manager
Citizens'Advisory Board
Tony Capobianco,Member
Chairman Hahn called the meeting to order and stated that the meeting of the Reading Municipal Light Department(RMLD)
Board of Commissioners is being broadcast live at the RMI-D's office at 230 Ash Street,Reading,MA. Live broadcasts are
available only in Reading due to technology constraints. This meeting was video taped for distribution to the community
television stations in North Reading,Wilmington and Lynnfield.
Opening Remarks/Approval of Meeting Agenda
"Iturman Hahn reported that Commissioner Snyder will not be present at the meeting this evening,Commissioner O'Neill
1 be the Secretary and Commissioner Pacino is en route.
Introductions
There were no members of the public present,and the CAB representative,Tony Capobianco had no report for the Board
Approval of July 27,2011 Board Minutes
Ms.O'Neill made a motion seconded by Mr. Soli to approve the Regular Session meeting minutes of July 27, 2011 with the
change presented by Mr. Soli, on page three, to add "revenue per kilowatt hour" m the last sentence in the next to last
paragraph.
Motion carded 3:0:0.
General Manager's Report—Mr.Cameron
Hurricane Irene
Mr. Cameron stated that the storm hit this weekend and he wanted to thank all the RMLD employees who worked diligently
to reverse the effects of Hurricane Irene. There was quite a bit of damage in the service territory, Reading, North Reading,
Wilmington and Lynnfield. Mr. Cameron reported that on Sunday. August 28 at 7:00 a.m. the crews had their first call and
power was restored to all customers by Monday,August 29 at 11:00 p.m. The employees were out working on system issues
during the storm. Mr.Cameron wanted to thank RM LD's customers who lost power for their patience during the storm.
Chairman Icahn echoed Mr. Cameron's comments because at least one utility, as noted on the 6:00 p.m. news, reported (hat
88,000 customers have been out for one to two days which is tough. Chairman Hahn thanked the staff at the RMLD for all
their efforts during the storm.
RMLD Employee LeeAnn Framni
Mr. Cameron said that RMLD employee LeeAnn Fram i who worked as an Accounting .Assistant in the Accomting
Department at the RMLD passed away a few weeks ago. She had worked at the R.AILD for ten ,years and was a loyal,
heated employee whose passing greatly affected the RMLD staff. She was a well liked employee who will be missed.
IL
Kegular Session Meeting Minutes 2
August 31, 2011
General Manager's Report—Mr.Cameron
Northeast Public Power Association(NEPPA)Conference
Mr. Cameron reported that the NEPPA Conference in Maine was well attended with very good subjects discussed such as
renewables and federal legislation issues. Mr. Cameron said that Mark Spitzer, FERC Commissioner, spoke about what is
going on in Washington with respect to energy regulation.
Chainmen Hahn pointed out that Commissioner Patina had previously mentioned the review by the Accounting Board about
a possible switch to the International Standards which may be imposed on utilities. Chairman Habn said that there was a
video distributed by the Chief Accountant at FERC who is opposing this because it would burden utilities with tremendous
cost to convert their systems. Chairman Hahn commented that Mr. Pacino asked Mark Spitzer,who did not plan to talk about
this,a question about this issue. Chairman Hahn stated that Mr. Spitzer was favorable towards Mr. Pactno's position on this
issue. Chairman Hahn mentioned that Mr. Spitzer's remarks arc refreshing.
Mr. Cameron added that NEPPA's Long Time Distinguished Service Award was presented to Commissioner Pacino. The
award is reserved for commissioners who have served a long time on a municipal light board.
Mr. Soli reported on the following that was covered at the NEPPA Conference:
NEPPA's lobbyist in Washington,DC and the FERC Commissioner pointed out that Congress is the most dysfunctional they
have ever seen and with that the greening of the energy field has virtually disappeared from the national were. Coal is in
favor. There are two new potential nuclear power plants underway; however, it is unlikely that there will be more due to the
recent events in Japan and the uneconomical cost of building. Renewables are going to be hard to achieve except for solar on
rooftops which has a huge potential. It was stated that the 25 year prediction for the decay of the utility infrastructure was
related to the nation's low rate of underground wires. New York City's power is largely underground and as a result, had
very few power outages compared to other states during the recent hurricane. Underground sounds like a good thing. It was
pointed out that the ISO structure is not really successful and is not achieving the ends the FERC wanted, however, them is
no other structure to replace it.
Groton Electric Light Department presented its Smart Grid program which includes a staff of ten with five thousand
residential customers. The smart meters afford them power outage indications, performing trouble-reporting, transformer
sizing for the peaks,daily meter reading and peak delay. This has resulted in only one blown transformer for their July peak.
Mr. Patina entered the meeting at this point.
Reading Fell Fair
Mr.Cameron reported that the Town of Reading Fall Fair will be on September I 1 downtown. There will be a moment of
silence in memory for the victims of 9/11.
RMLD Historic Calendars �!
Mr.Cameron said that the RMLD historic calendars are being worked on.
Mr.Pacino showed the NEPPA's Long Time Distinguished Award he received at the NEPPA Conference;he said that he
was honored and thanked the Board and the voters in Reading for their support.
Ms.O'Neill thanked Mr. Salt for his report on the NEPPA Conference.
Chairman Hahn asked if the slide presentations shown at the NEPPA Conference are available. Mr.Cameron responded that
he will check with NEPPA and ensure the presentations are on their website.
Preliminary Draft Financial Report—June,2011—Mr. Fournier(Attachment 1)
Mr. Fournier reported that the auditors from Mclanson& Heath were at the RMLD the week of August S. The draft numbers
have not changed to date nor does he expect them to change.
Mr. Fournier stated that Change in Net Assets or Net Income was$2,753,000 which represents 6.44%of RMLD's allowable
89,o return. Kilowatt hours sales increased 25 million from last year or 3.63% at 709 million kilowatt hours. The Budget
Variance report by divisions was over budget by $I.S million or 10°6 which is attributable to the increase in the pension
contribution amount;$100,000 was budgeted and$1 million was transferred into this fund in June per Board vote.
Regular Session Meeting Minutes 3
August 31,2011
Preliminary Draft Financial Report—June,2011—Mr. Fournier(Attachment 1)
Mr. Fournier reported that the soil remediation expense $600,000 was budgeted and the actual cost for FYI I was $1.4
0iilion. Melanson$ Heath will make their formal presentation to the Audit Committee and to the Board in September.
Mr.Fournier addressed questions submitted by Commissioner O'Neill:
The budgeted amount for line labor expense (account 581-1) was $377.306. The actual expense for FYI I was $524,774
resulting in the line labor expenses being over budget by S 147,468. These labor costa represent weather related dead time,
(mining,vacations,and sick time. Overhead labor is over budget due to the capital labor offset. Station Tech Budget is over
budget by$740,000 because of the Gaw Substation soil remediation project,which was budgeted to be$600,000 but came in
at $1.4 million. General Manager's budget is over budget by$128,000 due to the MMWEC arbitration. General Benefits
pension contribution was budgeted to be $100,000 but an additional SI million was awarder ed in June. The capital work
overhead distribution credit came in at$200,000 less than budgeted.
Mr. Fournier reported that the total cost of the Gaw soil remediation project which began in September 2009 is a little less
than$2.5 million. Mr. Fournier said that the rate surcharge instituted in FYI I for these costs has recovered$607,000 to date.
The energy conservation charge started in October 2008 has collected $1.475 million to date. The RMLD has spent $1.3
million on enargy conservation programs,which leaves a balance of$171,000 at the beginning of FY12.
Chairman Hahn asked if the RMLD Board Audit Committee needs to meet with the Town of Reading Audit Committee in
September. Mr. Puma responded that the RMLD Board Audit Committee will meet with the Town of Reading Audit
Committee at 6:30 p.m.prior to the September Board meeting.
Ms. O'Neill asked about the Purchase Power Capacity, how it is used and how the Board is kept informed of this. Mr.
Cameron explained why the Purchased Power Adjustment Charge (PPAC) was calculated and went through how it adjusts
for Fluctuations in the Base Capacity costa. Mr. Cameron said that the PPAC is beneficial in that it keeps the RMLD from
filing rate increases when there is an increase in the Base Capacity Costs.
Fournier said that he would have the draft July statement with the revenues to the Board tomorrow.
ower Supply Report—July,1011—Ms.Parenteau(Attachment 2)
Ms. Parenteau reported on the Power Supply Report for July 2011.
Ms. Parenteau reported that RMLD's load for July was 75.1 million kilowatt hours,about a 3.7%decrease compared to July
2010. Energy costs were $4.1 million, which is equivalent to $.0550 per kilowatt hour. The July Fuel Charge was set at
$.0600/kWh. RMLD sales totaled approximately 67.5 million kilowatt hours and, as a result, the RMLD undercollecled by
$160,000 resulting in a preliminary Deferred Fuel Cash Reserve balance of$2.9 million, which takes into account the June
accrual based on end of year financials.
In August, the Fuel Charge Adjustment was decreased by one half mill to$.0550 per kilowatt hour and in September will be
decreased 5.05 per kilowatt hour.
Ms. Parenteau reported that the RMLD purchased approximately [6.7%of its energy requirement from the ISO Spot Market
at an average cost of 5.049,kWh. The RMLD hit a peak of 170.4 megawatts at 2:00 p.m.on July 22,2011 with a temperature
of 101 degrees as compared to a demand of 168 megawatts, which occurred on July 6, 2010 at 4:00 p.m. with a temperature
96 degrees. The RMLD's all time peak was 172.5 megawatts on August 2, 2006. The RMLD's monthly capacity
requirement was 199.8 megawatts. The RMLD paid S 1.39 million for capacity,which is equivalent to$7 per kilowatt-month.
Ms. Parenteau reported that transmission costs for July were$855,000 a 15.4%increase from June 2011.
Discussion followed.
Engineering and Operations Report—July,2011 -Mr.Sullivan(Attachment 3)
Gaw CPdate
MT.Sullivan reported on the Engineering and Operations Report for July 2011.
Sullivan said that the Gaw Substation Transformer Upgrade project is complete. Mr. Sullivan stated that in October he
will provide the Board with an update once the project is dosed out and all billings have been received. Total soil remediation
costs are at$2.49 million.
Regular Session Meeting Minutes 4
August 31,2011
Engineering and Operations Report-July,2011-Mr.Sullivan(Attachment 3)
Update
Mc Sullivanivan staled that for the meter upgrade project as of August 12,meters installed are 8,000.
Mr. Sullivan said that the variance report for fiscal year 2012,Project 2-High Capacity Tie 4W I8 and 3 W 8 Franklin Street-
is being worked on and the crews have been working on routine construction. There were two new commercial services
installed and 22-25 new residential services. A total of 21 new cutouts were installed.
Mr. Sullivan reported on the Reliability Report that the CAIDI number is down l l minutes between June and July. The
CAIDI roiling average is about the same at 49 minutes for the year. The average July CAIDI is 65 minutes. The RMLD is at
51 minutes,which is the lowest July CAIDI the RMLD has had in six years.
The System Average Interruption Frequency Index (SAIFI) is up from .78 to .91 incidents due to 300 more customers that
were affected from the previous month for a total of 2,232 customers. The average July SAIFI is 1.05 incidents. The Months
between Interruptions(MBTI)increased 26 to 27 months.
Mr. Sullivan reported that on July 21 to July 23 there were heat events and total faulted transformers for the month were nine
and in August there were two.
Ms.O'Neill stated that she had she lost her power for three hours on August 2 during a violent storm late that afternoon. Ms.
O'Neill asked if,after such an event, does the staff look at how it played out,could things have been done differently, what
worked,what did not. Mr. Sullivan responded that there was a team meeting the morning after the outage where those issues
were covered. Mr. Sullivan said that it wait like a perfect storm because at 3:00 p.m. there was nothing on the radar to
indicate violent weather so there was no one on standby. Mr. Sullivan explained that every day we consistently listen to the
weather report. If there is any mdar that indicates the need, stomia crews will be held while being cognisant of fiscal
responsibility. At 6:02 p.m.when the storm occurred there were 2 feeder outages,5 area outages,2 separate circuits out with
2,443 customers being affected. Crews were called in,and there were trees down. It was not a tree that caused the breaker to
open,but a lightning strike on the circuit with concurrent damage on that circuit in Reading.
Discussion followed.
M.G.L.Chapter 30B Bid-Material(Attachment 4)
2012-01 Tree Trimming
Mr. Sullivan reported that this bid for tree trimming services was sent out to eight bidders with three responding. Mr.
Sullivan added this is a three year bid; 5455,619 has been budgeted in fiscal year 2012. Chairman Hahn stated that the total
amount of the bid is an estimate, but not a guarantee based on RMLD's need. Mr. Sullivan concurred but noted that the
amount is based on history.
Discussion followed.
Ms.O'Neill made a motion seconded by Mr. Soli that bid 2012-01 for Tree Trimming Services be awarded to Asplundh Tree
Expert Co. for$1,216,145.88 as the lowest qualified bidder based on the recommendation of the General Manager.
Motion carried 4:0:0.
General Discussion
Chairman Hahn said that the General Manager (GM) Committee needs to conduct the annual performance review of the
General Manager. Chairman Hahn asked that each commissioner fill out the GM evaluation form and return the completed
form to him by September 9. He will collate the information in preparation for the GM Committee meeting on September
13.
Chairman Hahn stated that if the Executive Session minutes are the only item for Executive Session and that there are no
changes to them, then the Board can approve such minutes in Regular Session. The Executive Session will continue to be
posted in the event there are changes to the minutes. Chairman Hahn noted that this approach was recommended to him by
Town Hall. I he Board agreed to adopt this approach.
Chairman O'Neill requested that money be designated in the next budget for renovations to Station One which is on the
National Historic Register. Mr.Cameron stated that this year's budget has$75,000 for a structural study of that building. If
am to he refurbished it would be used for storage Chairman O'Neill stated that she would like to have a lobby that would be
opened for tours with educational history if possible.
Kegular Session Meeting Minutes 5
August 31,2011
General Discussion
. Soli showed a book Not-Living Through The Next Fifty Years On Earth authored by Mark Hensgaard which he found
Wt
library. Mr. Soli said that due to the inattention of Congress to climate change, we will have stronger hurricanes and
nds as discussed in this book
Chairman Hahn said that the EPA passed the cross state air pollution rule on August 2, 2011 which requires fairly massive
reductions in SO2 and NOx emissions from coal planta in 28 states. Although Massachusetts is not one of those states those
winds blow this way. Mr. Pacino added that the Republicans have this as one of the ten items to be repealed. Chairman
Hahn commented that the predecessor rule was overturned in the courts.
BOARD MATERIAL AVAILABLE BUT NOT DISCUSSED
Rate Comparisons,August 2011
E-Mail responses to Account Payable/Payroll Questions
Upcoming Sleeting,
R.MLD Board %leetines
Wednesday,September 28,2011 and Wednesday,October 26,2011
RMLD Board Committee Meeting
Tuesday,September 13,2011,General Manager Committee
Wednesday,September 28,2011 Audit Committee with the Town of Reading Audit Committee
Executive Session
At 9:35 p.m. Ms. O'Neill made a motion seconded by Mr. Pacino that the Board go into Executive Session to approve
Executive Session meeting minutes of July 27, 2011, to discuss MMWEC Arbitration and retum to Regular Session for
oummem'
Soli,Aye;Chairman Hahn,Aye;Ms.O'Neill,Aye;and Mr.Perin,Aye.
don carried 4:0:0.
Adjournment
At 9:59 p.m. Mr. Pacino made a motion seconded by Ms.O'Neill to adjourn the Regular Session.
Motion carried 4:0:0.
A true copy of the RMLD Board of Commissioners minutes
a,approved by a majority of the Commission.
Mary Ellen O'Neill,Secretary
RMLD Board of Commissioners
if
Reading Municipal Light Board of Commissioners
Reeular Session
230 Ash Street ATTACHMENT 6
Reading,MA 01867
�.' September 28,2011
Start Time of Regular Session: 7:40 p.m.
End Time of Regular Session: 9:50 p.m.
Attendees:
Commissioners:
Richard Hahn,Chairman Philip B. Patin,Vice Chair
Mary Ellen O'Neill,Commissioner Robert Soll,Commissioner
Gina Snyder,Secretary
Staff:
Vinnie Cameron,General Manager Jared Carpenter, Energy Efficiency Engineer
Jeanne Fort,Executive Assistant Robert Fournier,Accounting/Business Manager
Jane Parenteau,Energy Services Manager Kevin Sullivan,E&O Manager
Citizens'Advisory Board
Arthur Carskatsane,Chair
Guest:
Frank Biron,Prestdent Melanson Heath&Company,PC
Karen Snow,Supervisor,Melanson Heath&Company,PC
Chairman Hahn called the meeting to order and stared that the meeting of the Reading Municipal Light Department(RMLD)
Board of Commissioners is being bmadcast live at the RMLD's office at 230 Ash Street, Reading,MA. Live broadcasts are
C-vailable only in Reading due to technology constraints. This meeting was video taped for distribution to the communityvision stations in North Reading,Wilmington and Lynnfteld.
Opening Remarks/Approval of Meeting Agenda
There were no suggested changes to the agenda.
Introduction,
There were no members of the public present.CAB representative,Chair Arthur Carakaoane had nothing to report,however,
there will be a Citizens'Advisory Board meeting on Tuesday,October 4,2011 at the RMLD.
Presentation of Fiscal Year 2011 Audit
Melanson Heath&Company,PC Audit Review—Mr. Frank Biron
Mr. Fournier introduced Mr. Biron and Ms. Snow from Melareson Heath & Company to present the audited financials for
fiscal year(FY)2011. Mr. Boon stated that he is the President and Ms. Snow has been the supervisor of the audit for the past
few years.
Mr. Biron explained that the report is in droll form until it is officially accepted by the Board; however,there is the potential
that there may be a couple of adjustments. The audit was completed in the last month and the financial statements will not be
ready for a couple of weeks. Mr. Biron reported that there was a recent development that occurred which is found in a new
Footnote 20 which appears on page twenty-eight and deals with an NST.AR situation. Mr. Biron said that the Footnote was
drafted late yesterday and revised today and,as a result,there may be adjustments made to the financial statements.
Mr. Biron reported that if not for the NS"rAR situation, the rest of the audit went pretty smoothly. The books were closed
and reconciled. The financial statement rellects that the Department had a very good year which is reflected in the cash
balances being .strong,balances have been where they have been in the past, and there is neither debt nor bonds payable on
the books. Mr. Biron pointed out that the Department started to fund the Other Post Employment Benefits(OPER) liability
which is an unusual thing to fund because most municipalities have not funded this; however it is a practice recommended by
Govcmmcm .Accounting Standards Board 045. It was a good bottom line for the year with a profit of$s_.7 to$2.8 million
liph is consistent with the prior year.
Regular Session Meeting Minutes 2
September 28,2011
Presentation of Fiscal Year 2011 Audit
Melanson Heath&Company, PC Audit Review—Mr. Frank Biron
Mr. Soli asked about the bottom line numbers. Mr. Biron reported that this is found on page seven. In FY I 1 the profit is
$2,783,718 and in FYIO it was$2,780,148. Mr. Baron said that the revenues arc up because more kilowatt hours were sold
during the year by 3.5%and the revenue is up 3.5%. The cost of power was down during the year which contributed to the
profit however, an additional $800,000 was paid into the retirement system. The reason behind this payment is due to the
poor investment results based on the economy over the past few years that impacted the retirement system. The actuaries
performed a valuation and determined that more money had to be paid into the retirement system. The Department took S 1
million of its current year's revenue and put it into the retirement system. A year earlier it was only $200,000. The
depreciation expense for the year was $3,452,000, a 3% rate in FYI I where in FY 10, it was $2,240,000 a 2%depreciation
rate.
Chairman Hahn asked on the depreciation rale in FY08 and FY09 it was at 3%, in FYI down to 2%, back up to 3% in
FY 11. Ms.Snow replied that it was a one year decrease for the depreciation.
Mr. Biron explained the new Footnote, number 20 on page twenty-eight. Mr. Biron stated that in 1979, the Department
entered into an agreement with Boston Edison(BECo,now known as NSTAR)for the transmission of power coming into the
system. At that time, it was called the radial transmission lines. Part of that agreement was for the Department to pay a
$12,000 monthly bill for operating and maintenance expenses relating to those lines. In 2003, this line was reclassified from
a radial transmission line to a looped transmission line, where a looped trammission line's costs should have been shared
with all utilities in New England. When that happened in 2003,apparently the Department was not made aware of that. The
bills continued to come in from NSTAR and were be paid monthly. This came to light this year, in May when the
Department discovered what had happened, looked into it and concluded that they should have not been billed on a monthly
basis from NSTAR. Our underatanding is that the agreement effective in 1979 was terminated on June 1, 2011, and the
payments stopped at that point. The original contract with BECo had a clause that the Department could not go back further
than twelve months to contest a bill. However,these bills go back to 2003. Under the ISO-NE for Regional Network Service
the Department was able to obtain eighteen months of rebates for the Radial Line Support bills. ISO-NE would credit the
Department's transmission costs to make up for that eighteen month period over the next two years, which exposures to
approximately$220,000 oFcredits. However,what is lost is the rest of those months from 2003 to 2009 for$1,072,000. This
issue is included in the Footnote and they may have to book a receivable for$220,000,but Melanesian Heath will look inm this
in more detail.
Chairman Hahn asked Mr. Cameron if he wanted to add anything. Mr. Cameron stated that Melanson& Heath did a good
job of summarizing this and spent a lot of time understanding the issue,which was not easy to understand.
Chairman Hahn asked if the statute of limitations is part of the rate schedule that ISO files with the FERC. Mr. Baron replied
that the original contract was from 1979. Chairman Hahn asked if the Department signed this. Mr. Biron responded that he
has been told it is signed,but has not seen it.
Mr. Biron explained that this issue came to light this week. It may require a couple more revisions. Ms. Snyder said that
based on the prior discussion it seemed that this has been thoroughly vexed by the attorneys for any other recourse. Mr.
Biron responded that he has copies of documentation that went back and forth however;he was not part of that process.
Audit Committee—Vice Chair Pacino
Mr. Pacino reported that the RMLD Board and the Town of Reading Audit Committee with representation from the
following Town of Reading committees: Chairman of the Finance Committee, representative of the School Department, the
Selectmen's representative and the Vice Chairman of the Finance Committee met prior to the Board meeting.
Mr. Pacino stated that there was much discussion about Footnote 20. The Town of Reading Audit Committee in the motion
to accept felt that Footnote 20 is required to be pan of the final audit in the financial suacmems.
Mr. Pacino said that there was also discussion on the decrease in the return on investment to the town; the question about the
CPI decreasing during the year and whether there should have been a corresponding decrease in the payment to the town.The
Department will look into this.
%it. Pacino added there was a lot of discussion about the 51.072,000 overpayments and he is unsure if this should be
addressed under the General Manager's Report and the root causes because he would like to know more about this.
Kegular Session Meeting Minutes 3
September 28,2011
Audit Committee—Vice Chair Pacino
Mr. Pacino reported that the Town of Reading Audit Committee voted that the audit be accepted with the proviso that
Footnote 20 is in there and that the issue on the rerun to the investment to the town be resolved. On the return on
estment, there is a committee that exists consisting of two members of the Citizens' Advisory Board,two members of the
LD Board and one member of the Reading Board of Selectmen.
Mr. Pacino said that the Vice Chairman of the Finance Committee said that this is something that should be looked at. Mr.
Pacino believes the last time this was put in place was 1997 and there may be information they will be looking for from the
Department. Mr. Pacino said that he and Mr. Soli voted to accept the audit with the same provisos that the Town of Reading
Audit Committee had to recommend the audit to the RMLD Board.
Chairman Hahn clarified that the CPI went negative. Mr. Pacino replied,yes. Mr.Cameron said that the CPI for the period
2009 to 2010 went negative. At a Board meeting in 1997, it was voted that the payment to the Town of Reading would be
based on the 1997 Town Payment and it would be adjusted by the Boston- Brockton. Nashua CPI. Mr. Cameron does not
remember anything in the motion sating that the Town Payment could not decrease. In that year(2009 to 2010) it went
negative,the town's payment decreased by S 16,000.
Mr. Pacino commented that his recollection is that the payment was not to go down,however,Mr.Cameron is going to check
the documentation. Mr. Cameron said that he will gel that information to the town. Chairman Hahn asked for clarification
on this issue.
On another matter, Ms. O'Neill asked when the Retirement Trust is going to be discussed next and would like to know when
rhe quarterly update will be provided. Mr. Fournier responded that the Retirement Trust will be discussed at the October
RMLD Board meeting.
Mr. Pacino made a motion seconded by Ms. Snyder that the RMLD Board of Commissioners accept the audited financial
statements presented by Melanesian Heath and Company for the fiscal year ending Jame 30, 2011 with the provision that
Footnote 20 be included;revised as needed,and that the issue with regard to the payment to the town be clarified.
Ms. O'Neill asked in terms of the town do they want clarification or reevaluation of the town payment. Mr. Pacino
Cponded that it could be a $16,000 liability not picked up in the finss
financial statements. Chairman Hahn stressed that he
old prefer to see the document that definitively shows the CPI calculation. Ms. O'Neill clarified that in terms of the CPI
the RMLD has been working on that since 1997 do they want it to be reevaluated. Mr. Pacino commented that the issue is
whether more money should have been paid out and whether there is a liability out there for that difference. Chairman Hahn
said that he is unsure why the CPI issue could not have been resolved before this evening. Ms. O'Neill pointed out that the
town was aware of the decrease Iasi January or February; she does not understand why that is an issue now and does not
agree that there is any liability. Ms.O'Neill said that she is open to looking into a reevaluation of the formula; however, we
need to play by the rules unless they are changed.
Mr. Soli asked if there would be a hardship if there is a$16,000 liability change for Melanson Heath to include. Mr. Biron
replied, no. Mr. Biron said that they would need to see the original document,and it would be a simple adjustment or if it
remains the same no adjustment is required. Chairman Hahn said(hat this evening is the first time he has heard of this issue
and is surprised it is surfacing at the last minute because the adjustment is always based on the CPI. Chairman Hahn
commented that it should not affect the statements. Mr.Cameron said that the(own was informed in April.
Ms. O'Neill asked if the town's representative is going to send a teller requesting this. Mr. Pacino responded that the only
request that was made was for the documentation on how the return on investment is calculated. Mr. Cameron said that
Marcie West asked that this information be sent to Bob LeLacheur and he would send it to the appropriate people. Chairman
Hahn said than this may raise discussion going forward on the CPI. Mr. Pacino added that it may and the Town of Reading
Audit Committee mentioned that they may hire a consultant on their side because of it being based on the CPL
Ms. O'Neill made a motion seconded by Ms. Snyder that the RMLD Board of Commissioners amends the main motion to
delete"and that the issue with regard to the payment to the to"be clarified."
Manion carried 3:1:1. Vice Chair Pacino voted against,Mr.Soli abstained.
�(Mr Pacino made a motion seconded by Ms. Snyder that the RMLD Board of Commissioners accept the financial statements
'(, , nted by Melanson Heath and Company for the fiscal year ending June 30, '_011 with the provision that Footnote 20 be
MWluded with revised as needed in language.
Motion carried 5:0:0.
Chairman Hahn thanked Mr. Biron and his. Snow for their hard work,sen ice,and patience.
Regular Session Meeting Minutes 4
September^_S,2011
Quarterly Conservation Program Update—Mr.Carpenter
Mr. Carpenter presented his quarterly Energy Conservation Program update. Mr. Carpenter addressed the following:
Residential Time of Use Growth.New Project Update,Demand Response Update and Energy Saved from Energy Efficiency
programs.
Mr.Carpenter reported that the Residential Time of Use program was in the April-May edition of the In Brief, In 2009,there
were 30 new customers, 33 in 2010 and 50 in 2011 on a calendar year basis. The red customer cards that were secured
through the RMLD's mass mailing are being used to set up e-mails on energy savings tips.
Mr. Carpenter stated that on the new project updates, the residential vegetable oil generator for I0kW is up and running
which puts out 6.0 to 6.5 kW. The 75kW solar array in North Reading should be completed by October IS. There have been
multiple 50kW peak reduction projects completed. There are more L.E.D. and induction lighting projects. Mr. Soli asked
about the induction lighting. Mr. Carpenter responded that they have received induction lighting for this building. Mr.
Carpenter explained that induction lighting costs a bit less than L.E.D. lighting and lasts twice as long for 50,000 hours
whereas induction can last for 100,000 hours. Their energy use is very similar as well as their efficiency.
Mr. Carpenter reported on the Demand Response in that they were able to predict the annual peak day and time to call an
event without technology to do it for an event. They have identified customers who are willing to partake in the demand
response program. There was monitoring equipment installed at the RMLD as a test. Currently, there are customers that
have contracts for demand response with ISO New England for 5 megawatts. The RMLD has to decide by 2013 if they want
to replace third parties with something else.
Mr. Carpenter said that kW saved is estimated on the energy efficiency programs at 5,000 going back to 2005. The RMLD
has rebated $1.54 million to commercial and residential customers. The net present value of savings through 2027 is $13.5
million.
Ms.O'Neill commented on the Time of Use rate what is the total number of residential customers. Mr. Carpenter responded
that the total number is about one hundred ninety. Ms.O'Neill asked besides the In Briefwhat else has been done to promote
this program. Mr. Carpenter said that the e-mails to RMLD's customers who provided them were one of the mechanisms to '
draw interest in this program; however, it was not easy to implement. Ms. O'Neill suggested going forward the approach to
take is consumer education on both the residential and commercial side, including utilizing RCTV which has an advertising
loop as a public service announcement,presenting a half hour energy program for ail the community televisions the RMLD
serves on energy conservation,rebates and Time of Use rate. Such programs can be timely based on the time of year.
Discussion followed.
Mr. Soli said that when the year Time of Use rates were changed it was agreed that a report on the new rales would be made
to the Board in six months. Mr. Cameron aid that he will provide the residential and commercial customer information at
the November or December meeting. Mr.Carakateane stated that the CAB expected to get a report on the Time of Use rates
at the end of the year.
Approval of August 31,2011 Board Minutes
Ms.Snyder made a motion seconded by Mr. Pacino to approve the Regular Session meeting minutes of August 31,2011 with
the changes presented by Mr. Soli,on page two,two paragraphs above Reading Fall Fair in the second line,trouble reporting,
put in a hyphen between them, last sentence in the paragraph add 'only' before one, page three delete, 'by an additional one
half mill' and page five the first paragraph first sentence a0er*Ho(',put hyphen in.
Motion carried 4:0:1. Ms. Snyder abstained.
Report of Board Committee-General Manager Committee—Chairman Hahn
General Manager's Evaluation July 1,2010 to June 30,2011
Chairman Hahn reported that the General Manager Committee is charged with the task of reviewing the General Manager's
performance during the fiscal year for which a performance plan has been set as well as making a salary recommendation
based on that performance to the Board.
Chairman Ilahn staled that also, a performance plan has been proposed for the next fiscal year. In fiscal year 2011, there
were scven categories that the General Manager was rated on which cover all aspects of the operations of the RMLD.
Chairman Hahn stated that each commission member was asked to till out the evaluation form which was assembled into a
rating summary. Chairman Hahn stated that the scores assigned the General Manager's performance plan ranged from Wo
to 4h°b with the acemge at 93.h%. According to the formula utilized, in the 2011 performance plan a score of 90%or greater
with the CPI of that year plus the CPI of 2°6 translates into a 5.1's increase.
Hagular Session Meeting Minutes 5
September 28, 2011
Report of Board Committee-General Manager Committee—Chairman Hahn
nerd blana' rb Evaluation July 1,2010 to June J0,3011
airman Hahn pointed out that this comes a0er a year when the General Manager was awarded no increase largely due to
the economic conditions that the'MLD faced(done on the General Manager's recommendation). It was not performance-
based because performance was excellent. The 5.1% represents an increase over two years of 2.5 0. Chairman HaM said
that the performance plan for FY 12 has red line changes in il. Chairman Icahn said that changes have been made such as a
comment section under the rating categories,per Mc Pacino's request; and we are seeking guidance on what an appropriate
score maybe. Mr. Soli had suggested a study on making the system hurricane proof and a was something the committee did
not want to add now.
Ms. Snyder made a motion seconded by Ms. O'Neill that the RMLD Board of Commissioners approve that the General
Manager's salary be increased by 5.1%retroactive to July 1, 2011,based on the General Manager's performance review for
the period 7'1,10 through 6/30/11.
Motion carried 4:0:1. Mr.Pacino abstained.
Mr. Soli said that there arc two items:the first is the rating and the second is that there is no motion for the performance plan
for the next fiscal year. Chairman Hahn replied that is correct.
Ms. Snyder made a motion seconded by Ms. O'Neill that the RMLD Board of Commissioners approve the FY12
performance plan for the General Manager.
Motion carried 5:0:0.
Mr. Soli made a suggestion to have a twenty-five year plan to make the system more resistant to hurricanes and ice storms.
Discussion followed.
Mr. Soli made a motion seconded by Ms. Snyder to add to Section III of the FYI performance plan for the General
Manager. The Reliability of the BUILD System,a new item,number 8: To propose a budget for funding a twenty five year
n for increasing the RMLD's resistance to hurricanes and ice storms.
lion carried 4:0:1. Chairman Hahn abstained.
Ms.O'Neill made a motion seconded by Mr. Snyder that Section IV. Manage Employees,Item 5;be amended to read
"Submit a report to the Board on the safety incidents at the RMLD by December J 1 at."
Motion carried 5:0:0.
Mr. Soli made a motion seconded by Ms. O'Neill that Section IL Energy Efficiency and Load Management, add Item 7.
Propose budget funding to decrease the RMLD energy use at the 230 Ash Street complex by at least 5%in FY 13.
Motion carried 5:0:0.
General Manager's Report—Mr.Cameron
Mr. Cameron stated that he wanted to mention to the Board that a of transfer of$500,000 from the Operating Fund to the
Rate Stabilization Fund was made and is found on page nine. This transfer was executed in response to one of his
performance items in that the Rate Stabilization Fund needs to be at a level of$6.0 to$7.0 million. That leaves$6.5 million
in the Operating Fund,which is adequate to pay the bills on a monthly basis.
Reading Fall Fair
RMLD employees Mr.Carpenter and Mses.Gottwald and Hanifan were at this event. There was a great turnout and interest
at RMLD'. table. There were questions on billing, conservation, and the operations at the RMLD. .attendees at this event
were eery complimentary about the RMLD.
RMLD Calendar
The RMLD calendar will be out within the nest month. The RMLD will communicate the date the calendars are available.
RMLD.Annual Report
a.Lhe RMLD Annual Report is currently being worked on and will be available at the Subsequent Town Meeting. Mr,
ern explained that in the past the Chair of the RMLD Board has presented the report to Subsequent Town Meeting
ch will be held on Monday, November 14. Chairman Hahn is not available to make the presentation; Vice Chair Pacino
will make the presentation.
Regular Session Meeting Minutes 6
September 228.2011
General Manager's Report—Mr.Cameron
Mr. Pacino said that he understands by Footnote 20 came about, however he would like an explanation. This is the first
time they have seen this,and it has not been seen by the Board before. He would like an explanation why, there were legal
costs that went on here, there was no discussion with the Board in advance, and he is concerned that the Department leR$1
million on the table that is gone, which negatively impacted the ratepayers and what steps will the Department take going
forward to ensure this does not happen. Mr. Pacino pointed out that in the General Manager's Performance items it states
that minimum task is to maintain comprehensive coverage on new information related to governmental regulations, financial
conditions,technological changes,energy and resource developments as they relate to public utilities. Mr. Patin stated that
in Item 1,under 5A Leadership,the General Manager failed on this one to address this. Mr. Pacino asked if there is any other
situation that is similar to this within the Department,and if it applies to other situations he wants this addressed as well.
Ms. O'Neill suggested this issue not be addressed this evening; it needs to be treated like a case study, what went wrong,
where do the responsibilities lie. Mr. Pacino replied that this situation needs to be addressed, it should not occur again, and
going forward,to be assured that there are no other situations.
Ms.Snyder said that she is in agreement with Ms.O'Neill.
Chairman Hahn said that he wants to see - a write up with a detailed summary to be brought to the General Manager
Committee within two weeks. There will be input at the committee level on this at the General Manager's Committee. All
members of the Board should receive a copy of the report.
Mr. Pacino asked if there are any other situations this may apply to. Mr. Cameron replied, no. Mr. Cameron said that the
Department looked at its contracts; there arc no other contracts with respect to transmission;and the power supply is straight
forward with regard to who is responsible. There are power supply agreements that are firm with other bilaterals or heat rate
fuel index contracts.
Mr. Cameron reported that there are agreements on the PSA's with MMWEC however,the RMLD is in a dispute relative to
the amount of the back up that accompanies the PSA's. Mr.Cameron said that there is nothing out there on the power supply
in which this would occur. It has been fully vetted. Mr. Soli commented whether the MMWEC dispute is something the
auditors should have been made aware of Mr. Cameron replied that the auditors are aware of the MMWEC issue and a
Footnote is found in the financials.
Financial Report—August,2011—Mr.Fournier(Attachment 1)
Mr. Fournier reported on the Financial Report for August 2011. Mr. Fournier apologized for the tardiness of the Financial
Report and noted that until FYI 1 numbers are final,there won't be a full balance sheet.
Mr. Fournier stated that for the first two months of the fiscal year 2012 the Net Income was $769,000 bringing the year to
date Net Income to S1,467,000 and the budgeted amount was S1,892,000 with the difference under budget being$425,000 or
22.5%. Year to dale Fuel Expenses exceeded year to date Fuel Revenue by 584,000. The Base Revenues are under budget
by$449,000 or 4.75%. Actual Base Revenues were$9 million compared to the budgeted amount of$9.4 million.
Mr. Fournier said that the Purchase Power Base Expense was under budget by $291,000 or 5.82%. The actual Purchase
Power Base cost was $4.7 million compared to the budgeted amount of $5.0 million. The Operating and Maintenance
Expense were over budget by $14,000 or .72%. The actual Operating and Maintenance Expense $1.940 compared to the
budgeted amount of$1.926 million. The Depreciation Expense and Voluntary Payment to the Towns is on budget. Kilowatt
hour sales are 138,858.000 kWh which is 1.1 million or less than 1%behind last year's. Cumulatively,the five divisions are
ocer budget by a little less than 54,000 or.12%.
Mr. Fournier staled that next month he will be reporting on the quarterly Pension Trust and will present the balance sheet on
time.
Power Supply Report—August,2011—Ma.Parenteau(Attachment 2)
Ms. Parenteau reported on the Power Supply Report for August 21311,
Ms. Parenteau reported that RMLD's load for August was 69.6 million kilowatt hours, about a 2.80b decrease compared to
August 2010. Energy costs were$3.R million, which is equivalent to 5.0545 per kilowatt hour. The August Fuel Charge was
act m 5.055 kWh. KMLD overcollected on fuel by $76.000 resulting in a Deferred Fuel Cash Resene balance of 52.97
nullion.
Regular Session Meeting Minutes 7
September 28,1Ijj 1
Power Supply Report-August,2011-Ms.Parenteau(Attachment 2)
Aisle Fuel Charge Adjustment was decreased less than $.05 per kilowatt hour in September, and is currently expected to
in at that level until the end of December. The Deferred Fuel is forecasted to go a little higher then go down in
November and December. Rather than Fluctuate it up and down it was decided to keep it level to maintain consistency,
expecting that the Deferred Fuel will be at$2.5 million by December.
Ms. Parenteau reported that the RMLD purchased approximately 11.3%of its energy requirement from the ISO Spot Market
at an average cost of$41.50 per megawatt hour. The RMLD hit a peak of 144 megawatts at 2:00 p.m. on August 1, 2011
with a temperature of 90 degrees as compared to a demand of 159.6 megawans, which occurred on August 31 2010 at 5:00
p.m. with a temperature 92 degrees. This August was considerably lea mild than last year. The RMLD's capacity
requirement which is based on last year's peak was set at 199.8 megawatts. For capacity, the RMLD paid$1.4 million which
is equivalent to$7.08 Per kilowan month.
Ms.Parenteau repotted that transmission costs for August were 5960,000 an 11%increase from July 2011.
Ms. O'Neill asked on the energy chart is the amount on this from Swift River what the RMLD anticipated. Ms. Parenteau
responded, yes, that it is a run of the river project so they tend to go higher in the spring and fall whereas in the summer
months it is anticipated to come in lower.
Ms.O'Neill asked on the transmission costs going up 11% for one month. Ms. Parenteau replied that with transmission the
billings are a month behind compared to August last year it tends to come in high because it is based on July's peak.
Engineering and Operations Report-August,2011 •Mr.Sullivan(Attachment 3)
Caw Update
Mr.Sullivan reported on the Engineering and Operations Report for August 2011.
Mr.Sullivan reported that there were no changes from July for the Gaw transformer upgrade project Mr. Sullivan stated that
the RMLD is in a close out phase and it is anticipated that completion will be in the next couple of months.
0.Sullivan stated that the soil remediation expense remains at$2.482 million.
Mr.Sullivan stated that the meter upgrade project to date is 9,200 meters arc installed.
Mr.Sullivan said that the variance report projects worked on for the month are: Project 1 -5W9 Reconductoring Ballardvale
Street-this has begun this month and all ten poles have been put in by Verimn,and Project 2-High Capacity Tie 4W 18 and
3W8 Franklin Street continues. There were no new commercial services and 25 new residential services were installed.
Under routine construction there is a line for storm trouble for the August 2 thunderstorm and Hurricane Irene. A total of 44
new cutouts were installed for a mating total of 65.
Mr. Sullivan reported on the Reliability Report that the CAIDI number is up significantly due to the violent thunderstorm of
August 2. The CAIDI rolling average is up for the same reason at five minutes for the year due to this occurrence.
The System Average Interruption Frequency Index (SAIFI) is down marginally where the rolling average is up marginally.
For the month,there were 2,018 customers out,however these figures do not include Hurricane Irene. During hurricane Irene
over 15%of the territory was out of service,and the service industry standard is when 15%of the service territory is affected
in one incident,this is not included in the stats. The Months between Interruptions(MBTU increased to 26 months.
Mr. Sulliwn reported on the outages based on the August 2 and August 28 norms with the number of calls more than 3,500.
Incidents for the month were 39, number of customers affected 2.018 with the outage types being feeder outages 2, area
outages 34,sen ice outages 2. Feeder outages based on Ilumcane Irene were 14 and 7 incidents of lightning damage.
Ms. O'Neill asked for clarification that the standard is if an event occurs when over 15%or more of the territory is affected,
those stats are not included. Mr. Sullivan replied that is correct. Ms. O'Neill asked on the variance report in terns of routine
construction we have gone through half of the budget in two months and why are we not working on other projects. Mr.
ullivan responded that a large amount of this is due to a carry over on one project in routine construction.
AWSnyder asked about the 61S GAP analysis report, it mentioned the concept of identifying transformers and poles by
customers when outages occur because it tiisters a better response. Ms. Snyder wanted to know when the RMLD will be
moving forward with some of the recommendations in the report. Mc Sullivan said that with the new meters that are being
installed it will allow for that type of data gathering for oumges.
Regular Session Meeting Minutes S
September 28,2011
M.C.L.Chapter 30B Bid—Mr.Sullivan(Attachment 4)
2012-10 Disconnect Switch"
Mr. Sullivan reported that the bid was sent to nine bidders and seven responded. This bid is for the four remaining
disconnect transformers at Gaw which is in the Capital Budget.
Mr. Soli asked are the other 13 switches the same. Mr. Sullivan replied, yes that is why the option of factory rep was not
utilized.
Ms. O'Neill commented that six out of the seven bidders were non responsive. It seems counterproductive. Mr. Sullivan
pointed out that when you open the bids you can never be sure what you get. Ms.O'Neill asked if the RMLD's material was !i
not accessible and clear. Chairman Hahn stated that if they manufacture a switch with cast parts and the specs state no cast
parts,there's no way to ask why did they bid,but that cannot be changed.
Ms.Snyder made a motion seconded by Mr. Pacino that bid 2012-10 for 115KV,2000 Amp Horizontal Disconnect Switches
be awarded to EMSPEC Electro Mechanical Systems Inc. for a tom]cost of$44,000.00 as the lowest qualified bidder on the
recommendation of the General Manager.
Motion carried 5:0:0.
2012.11 Three Phase Pad Mounted Dead Front Feed Transformer
Mr. Sullivan stated that the bid was sent to 17 bidders with four responding. The bid is for three phase pad mounted dead
from loop feed transformers. There is no line item in the capital budget for these transformers because they are"as-signed as
required"one in Reading Woods and 10 to Burlington Avenue Condo Project in Wilmington.
Mr. Soli asked about Stuart Irby 2, which was thrown out and is it a show stopper! Mr. Cameron responded that in the rules
for award you must supply the material specified. Mr. Soli asked if you can seek minor clarification. Mr. Cameron pointed
out that bidder must follow the engineering specs.
Ms. Snyder made a motion seconded by Mr. Pacino that bid 2012-11 for Three Phase Pad Mounted Dead Front Loop Feed
Transformers be awarded to: Power Sales for a total cost of $157,352.00 as the lowest qualified bidder on the
recommendation of rhe General Manager.
Motion carried 5:0:0.
General Discussion
There was no discussion.
BOARD MATERIAL AVAILABLE BUT NOT DISCUSSED
Rate Comparisons,September 2011
E-Mail responses to Account Payable/Payroll Questions
Upcoming Meetings
RMLD Board Meetings
Wednesday,October 20, 2011,Chairman Hahn will not be present.
Wednesday,November 30,2011
RMLD Board Committee Meeting
Power& Rate Committee Meeting,Monday,October 3,2011
Citizens Advisory Board Meeting
'Tuesday,October 4,2011 at the RMLD
Approval oLWgust 31,2011 Executive Session Minutes(Executive Minute Tab)
Ms. Snyder made a motion seconded by Ms. O'Neill that the RMLD Board of Commissioners approve Executive Session
meeting minutes of August 31,2011 as presented.
Motion carried 4:0:1. Ms.Snyder abstained.
Regular Session Meeting Minutes Y
September 28,2011
+journment
*a- 4a0 p.m. Ms. Snyder made a motion seconded by Ms.O'Neill to adjourn the Regular Session.
Motion carried 5:0:0.
A true copy of the RMLD Board of Commissioners minutes
as approved by a majority,of the Commission.
Gina Snyder,Secretary
RMLD Board of Commissioners
L�
QDear Representative/Senator
I am writing to express opposition to H.3896, which was voted favorably out of the Joint
Committee on Telecommunications, Utilities and Energy. The bill is now pending in the House
Ways and Means Committee.
There are forty municipal lighting plants ("MLPs') in Massachusetts, of which one of them is
the Reading Municipal Light Department (RMLD), which is owned by the Town of Reading.
Collectively,MLPs provide approximately 14% of all electricity consumed in Massachusetts.
The MLPs were established by vote in individual municipalities or by special act to serve the
citizens and businesses in those municipalities.The MLPs have the exclusive right to distribute
electricity within the borders of the municipalities they serve.
The MLPs me overseen by locally elected or appointed Boards and their operations are
overseen by General Managers hued by the Boards. The MLPs establish rates approved by
their Boards that pay the costs of the operation of their plant. The RMLD is very proud of the
fact that it has historically and is currently providing highly reliable power at the lowest electric
rates in the Commonwealth. The RMLD is unique inparison to other MLPs because in
addition to the Town of Reading the RMLD serves on, North Reading and Lynnfield
Center.
® The RMLD has instituted Energy Conservatio able Energy Programs in its service
territory,which provides educational and fin ial a to customers who choose to enact
energy conservation measures and ' r w e energy projects. Overall, the local control
aspect of Public Power provides aiety benefits to its customers including providing
assistance to customers to become m ironmentally friendly and lower their carbon
footprint.
If H.3896 were to pass, RMLD customers would pay an additional $350,000 per year, or an
additional 1% of its base rates, to the Commonwealth for energy conservation and renewable
energy projects. The RMLD already provides these benefits to its customers through its Energy
Conservation and Renewable Energy Program.
In addition, if the RMLD's exemption from the Energy Conservation Charge of $.0025/kWh is
lifted then the RMLD customers will be paying $1,050,000 more for the energy conservation
programs, which the RMLD presently has in place. In 2008, the RMLD added an Energy
Conservation Charge into its rate structure for the specific purpose of funding its Energy
Conservation and Renewable Energy Program. Since 2008, the RMLD has collected$1.6 million
through the Energy Conservation Charge and it has spent $1.5 million in the form of rebates
and incentives to RMLD customers for energy conservation measures and the renewable energy
projects.
The amount of funds the RMLD commits to its Energy Conservation and Renewable Energy
Program is mainly dependent on the economics and the cost/benefits that the elements of the
program provide to the RMLD and its customers. The RMLD can adjust its Energy
Conservation Charge to meet the financial requirements of its program from time to time.
Below is a description of the Energy Conservation and Renewable Energy initiatives that have
been instituted:
Energy Conservation and Renewable Energy Program
Residential
Tier 1 and Tier 2 Services
The RMLD follows the guidelines of the Department of Energy Resources with respect to
providing Tier 1 and Tier 2 services to residential customers. The RMLD has trained its
Customer Specialists to answer customer questions on energy conservation. The RMLD also
has contracted with a company who performs energy audits for residential customers.
Appliance Rebate Program
a'
In 2005 the RMLD started an Appliance Rebate Program. flits program offers rebates to
residential customers who have purchased an Energv Star fated appliance. The appliances in
the program include washers, dryers, air conditioners, t pumps, refrigerators, dishwashers,
dehumidifiers, ceiling fans, high performarrce waterers, and programmable thermostats.
The RMLD has rebated approximately 5250,t10kto 4,300 customers, who have applied for
appliance rebates.
Residential Time of Use Rate *{'
The RMLD offers a Time of Use rate to its residential customers that allow customers to move
their electrical usage to off Peak periods to save money on their electric bills as well as helping
the RMLD lower its peak demand. The Residential Time of Use Rate has been in effect since
1993.
Residential Water Heating Rate
The RMLD offers a Water Heating Rate to its residential customers who are willing to have
their electric water heaters controlled during peak periods. The RMLD is in the process of
upgrading this program and recently received a $50,000 grant from the Massachusetts
Department of Energy Resources to assist in the funding of the upgrade. The upgrade will
include a demand response control technology.
Renewable Energy Projects
The RMLD gives incentive payments to residential customers who develop renewable energy
projects at their homes. To date the RMLD has given over $64,000 in rebates to eleven solar
projects that total 57.2 kW and two cogeneration projects totaling 9.2 kW.
Commercial
Energy Audits
The RMLD provides third party energy audits at reduced rates for customers who want to
examine their manufacturing processes to determine if there we energy efficiency measures
they can take advantage of that will lower their peak demand and annual energy usage.
Additionally, the RMLD Energy Efficiency Engineer who works with customers to provide a
detailed audit of specific equipment or the RMLD will help fund a full standard audit
performed by an outside auditor.
Lighting Rebates
RMLD offers lighting rebates up to $10,000 for co. nal customers who upgrade their
lighting to more efficient technologies.
® Energy Efficiency Rebates
The RMLD offers rebates to customers ins en fficient measures to reduce their peak
load and annual energy usage throu ore efficient HVAC systems,variable speed
drives, compressed air systems, bulMng con Is, and other more efficient measures. In most
cases, these energy efficiency measures ve n recommended by the RMLD through audits,
which have been performed by the R or its contractor. These recommendations are
dependent on cost/benefit analysis that shows the economic payback to the customer for each
recommended energy efficiency measure.
Commercial Time of Use Rate
The RMLD offers Time of Use Rates to its commercial customers who have the ability to move a
portion of their energy usage to Off Peak periods. In doing so, commercial customers are able
to lower their electric bills and assist the RMLD in reducing its peak demand.
Renewable Energy Rebates
Commercial customers who install renewable energy projects at their facilities receive rebates
based on the mode of generation and the amount of peak load reduction the RMLD will see on
their system. To date,.the RMLD has rebated approximately $30,000 for a commercial solar
.� facility of 75 W.
The RMLD is working with other solar projects that are in the final stage of design, which total
approximately of 300 M Additionally, there is the potential for fifteen other commercial solar
projects that have a projected total of approximately 15 MW,
The RMLD has an extensive Energy Conservation and Renewable Energy Program and is
constantly seeking ways to enhance and expand this program to meet the needs of customers
who want to reduce their electricity cost and decrease their carbon footprint.
H.38%should be opposed for the following reasons:
• H. 38% would mandate an increase in monthly bills to RMLD customers to fund
renewable energy and energy efficiency programs.
• H.38%would jeopardize RMLD's service territory by mandating that they open their
systems to outside generation thus repealing the exclusive service territory provisions
of the Electric Utility Restructuring Act of 1997.
Rate Setting is the exclusive domain of the individual MLP Boards. The RMLD's rates are not
established by the Department of Public Utilities but are examined and approved by its Light
Board of Commissioners. This bill is a frontal attac - existing MLP's and local control,
which is the essence of Public Power.
The RMLD already funds energy conservation pr renewable energy, as you can see
above, without the cost increases mandated 1 tiu addition rather than the increased
revenues mandated by this bill going tate or its benevolent dispersal, the revenues
raised by MLP rates currently are wi a LP territory for the benefit of its customers
as determined by the MLP Board f uc ' gs as reliability, infrastructure investment,
renewable energy programs and energy e - ency programs. The RMLD has a more informed
view of what its customer's desire in the form of energy conservation and renewable energy
programs,which enables the RMLD to be more flexible in designing the programs it offers.
Section 21 of the bill would mandate that MLPs open their service territory to outside
generation by allowing its customers to negotiate directly with generation companies. This
means that after each MLP municipality determined to reject the Commonwealth's option to
allow outside generation within their boundaries, the Commonwealth would ignore that and
impose outside generation in those municipalities. The result would be that the RMLD, which
has engaged in long term power contracts to fulfill the usage requirements of its customers,
would not have sufficient revenues to pay for those obligations with the approach imposed by
H.3896 and would lead to higher rates because fewer and fewer customers would now pay for
all historical commitments entered into to provide electricity to all customers.
The MLPs throughout the Commonwealth have programs in place to increase their alternative
and renewable energy portfolios and continue to expand on those programs as appropriate for
their service territory and determined by the MLP Board.
While the legislation appears to recognize that MLPs should participate in the future
distribution of Regional Greenhouse Gas Initiative "so-called RGGP' monies, over the last four
years, MLP's did not receive their share of those funds. Meanwhile distribution companies and
municipal aggregators received millions of dollars from the $150 million accumulated in the
fund. In any event,increases in the costs to MLP customers under this bill far exceed any return
from future RGGI monies.
This legislation is touted by its sponsors and supporters as creating competition and allowing
choice in the existing electric market. In fact, under this bill, it is likely that very few, if any,
municipalities would have the necessary funds to purchase an investor owned utilities
distribution system in order to create their own municipal electric utility. The bill released by
Committee has boldly morphed into a new revenue stream to create additional energy
programs on the backs of MLP customers under the guise of increased competition and choice.
I urge you to vigorously oppose this legislation as it would result in the erosion of public power
in Massachusetts as well as diminishing both competition and choice in Massachusetts.
Dt: February 24, 2012
To: RMLB, Vincent F. Cameron,Jr., Jeanne Foti
Fr: Bob Fournier
Sj: January 31,2012 Report
The results for the seven months ending January 31, 2012, for the fiscal year 2012
will be summarized in the following paragraphs.
1)Change in Net Assets: (Page 3A)
For the month of January, the net income or the positive change in net assets was
$498,065, increasing the year to date net income to$2,424,272. The year to date
budgeted net income was $4,945,104, resulting in net income being under budget
by 2,520,831 or 50.98%. Actual year to date fuel expenses exceeded fuel
revenues by$603,035.
2) Revenues: (Page 11111)
Year to date base revenues were under budget by $1,956,634 or 6.69%. Actual
base revenues were$27.3 million compared to the budgeted amount of$29.2
million.
It 3) Expenses: (Page 12A)
*Year to date purchased power base expense was under budget by$1,025,092 or
6.42%. Actual purchased power base costs were $14.9 million compared to the
budgeted amount of$15.9 million.
*Year to date operating and maintenance (O&M) expenses combined were under
budget by $196,513 or 2.8%. Actual O&M expenses were $6.7 million compared
to the budgeted amount of$6.9 million.
*Depreciation expense and voluntary payments to the Towns were on budget.
4)Cash (Page 9)
*Operating Fund was at $9,618,141.
*Capital Fund balance was at $4,010,961
• Rate Stabilization Fund was at$6,068,389.
• Deferred Fuel Fund balance was at$2,452,189.
• Energy Conservation Fund balance was at $173,774.
5) General Information:
Year to date k«h sales(Page 5) were 419,400,557 which is 15 million kwh or
3.46%, behind last year's actual figure. GAW revenues collected ytd were
$419,402 bringing the total collected since inception to $1,026,576.
19 6) Budget Variance:
Cumulatively, the five divisions were under budget by $234,610 or 2.1%.
ATTACHMENT 3
FINANCIAL REPORT
JANUARY 31 , 2012
ISSUE DATE : FEBRUARY 24, 2012
TOWN OF READING, NASSACHUSBTT9
MUNICIPAL LIGHT DEPARTMENT
BUSINRSS-TYPE PROPRIETARY FUND
14 STATEMENT OF NET ASSETS
br /31/12
PREVIOUS YEAR CORAHNT YEAR
ASSETS
CDXAEXT
UNRESTRICTED CASH (SCM A P.9) 6,857,766.85 9,621,191.12
RESTRICTED CASH (SCM A P.9) 15.656,]11.]9 18,301,526.39
RESTRICTED INVESTMBITTS (S CH A P.9) 2.300.000.00 0.00
RECEIVABLES, NET (S CH B P.10) 0,139,935.61 7,SOB,999.01
PREPAID EXPENSES (S CH B P.10) 3,306,0]6.]9 2,310,533.99
INVRNIORY 1,]23,36].67 1,903,358.36
TOTAL CURRENT ASSETS 37.X63.].3 B.]1 39,935.069.35
NONCURRENT
INVESTMENT IN ASSOCIATED CO (ECH C P.3) 80,151.26 73,765.66
CAPITAL ASSETS, NET (8CN C P.3) 6],99],387.61 61,859,196.97
TOTAL NONCURRENT ASSETS fi].S15.530.81 6],92],912.63
TOTAL ASSETS 106.619.317.58107.352,961.98
LIABILITIES
CURRENT
ACCOUNTS PAYABLE 6,898,931.98 6,370,495.64
CUSTOMER DEPOSITS 515,693.30 604,388.69
CUSTOMER ADVANCES BOB CONSTRUCTION 330,793.90 396,339.94
ACCRUED LIABILITIES 1,090,221.95 1,321,183.70
TOTAL CURRENT LIABILITIES 8.]85.199.03 8.390.90].9]
NONCURRENT
ACCRUED EMPLOYEE COMPENSATED ABSENCES 3,020,032.15 3,934,698.58
TOTAL NONCURRENT LIABILITIES 3.0]0.033.>5 2.939.698.58
TOTAL LIABILITIES 11,805.116.78 11,325.106.55
NET ASSETS
INVESTED IN CAPITAL ASSETS, NET OF RELATED DEBT 6],447,38].61 6],654,146.9]
RESTRICTED FOR DEPRECIATION POND (P.9) 4,790,173.37 4,010.961.89
UNRESTRICTED 10,626,539.81 39,163,746.57
TOTAL NET ASSETS (P.3) 9].811.100.80 96.027.855.43
TOTAL LIABILITIES AND NET ASSETS 101.619.3]].58 301.352,9fi 1.98
T01M OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
NONCURRENT ASSET SCHEDULE
1/31/13
SCHEDULE C
SCHEDULE OF INVBSTMENTE IN ASSOCIATED CONPANIBB PREVIOUS YEAR CURRENT YEAR
NEW ENGLAND HYDRO ELECTRIC 33,538.60 15,761.66
NEM ENGLAND HYDRO TRANSMISSION 66,613.66 58,018.03
TOTAL INVESTMENTS IN ASSOCIATED COMPANIES BB.151 16 ]).]68.66
SCHEDULE OF CAPITAL ASSETS
LAND 1,365,863.33 1,365,863.33
STRUCTURES AND I"ROVEMENTS 6,753,629.88 6,585,553.36
EQUIPMENT AND FURNISHINGS 13,16],136.]9 12,930,140.56
INFRASTRUCTURE 46,360,]80.]1 6],0]3,610.86
TOTAL CAPITAL ASSETS, NET 67 66],38] 61 67,854,146.97
TOTAL NONCURRENT ASSETS 67,535.536.8] 6].9I].913.63
OI
TONIC 09 RZAOINO, NASSACB09t'1TR
MUNICIPAL LIMIT MPARTNtNT
B08INi5R-TY9t PR09RICHANG SONO
9iAitMRR OF R[VBU51 t1PtN9t9 AND CWNOR9 IN JOIN NR ARRBTR
1/31/13
MONTH NOWIN LAST YBAR CURRENT YtAR YTID 1
LAST YtAR CORRIMPT YW TO OATt TO OATS CHANON
OPBRATINO RNEMUE9; IRON 0 P.11)
BARt RtveNOt 4034,163.61 3,745,3]].16 37,324,930.54 27,280,963.22 -0.16%
SOIL REVMOOE 3,639,699.16 311141395.49 35,147,934.40 32,542,547.15 -10.36%
PURCHASED P0WER CAPACITY 33,606.08 (10,759.13) 1,156,560.63 (79,673.49) -106.89%
SORSEITN DISCOUNTS 94,513.95 87.893.05 613,667.00 566,459.2B -7.69%
ENSROT CONSERVATION RWXPUZ 30.397.73 55,711.95 311,149.11 353,307.69 13.52%
DAN RNMMUZ 61,534.17 56,637.77 394,545.11 419,402.62 43.39%
MPA CREDIT (59.931.36) 151,411.30) (4]7.390.41) (397.014.54) -6.92%
TOTAL OPERATING RtV S 7,533,476.33 6.997,609.99 54,431,386.57 50,665,090.93 -6.87%
OPBRATINO EEPMSZB: (SCH t 1.13)
PORCBAS90 POKER RARB 3,343,845.82 1,970,396.64 16,308,717.33 14,934,346.54 -8.07%
PURCHASNO POKER NEL 3,630,614.67 3.336,331.18 34,651,335.51 22,747,761.61 -7.73%
OPRRATINO 863,010.77 453,931.67 4,950,034.69 4,969,115.69 0.39%
HAINTmmA 655.595.39 383,566.15 3,639,911.03 1,800,631.68 -31.79%
DNPRSCIATION 287,719.05 396,037.47 3,014,103.35 3,07],193.]9 3.80%
VOLUNTARY PATNENTB TO TONICS 105,885.00 111 000.00 765.885.00 7871166.00 2.78%
TOTAL OPERATING t2PW8N8 7,775,880.60 6,453,153.11 51.409,886.00 47,311,139.81 -7.97%
OPERATING INCOMN 47,595.73 544,536.88 3,011,499.77 3,373.961.12 12.04%
4ERATING 0.748740743 (BEPMSZBI
CONTRIBUTIONS IN AID OF CONST 35.00 3.975.90 34.987.42 31,639.64 7.86%
RSTORN ON INVBBTNLIT TO RBADINO (180,990.00) (103,9]9.75) (1,266,930.00) (1,305,808.]3) 1.57%
ISTEREBT INCOMS 6,749.10 3.867.39 67,066.73 60,559.01 -9.70%
INT9REBT EIP9NBE (1,000.34) (500.3]) (9,294.00) (5,336.99) -43.76%
OTHAR (MVS9 AND AMORT) 3,380.00 130,015.09 157,006.37 344,199.43 55.51%
I=. NONOPEHATINO REV (EXP) (172,836.24) (46.471.60) 11.017,363.58) (949.689.16) -6.674
CHANGE IN NNT AMIN1135.330.311 499.065.38 1,994,316.19 2,434,373.96 31.567
NBT MINTS AT BEOIIMINO OF IRAN 90,019,864.61 93,603,582.47 3.07%
NST A99NTR AT END OF JANUARY 9].814.100.8096.0]7.855.43 3.46%
TOWN OF READING, NASSACHD88TTS
HLIORT NENT
BINESS-TYPE PROPRIETARY FUN
D
BTASBNEN1OP RN8SURS' EXPENSES AND CHANGES
IN FUND NET ASSETS
1/31/13
ACTUAL SUDOET \
OP&AATING REVENUES: (BCH P P.11B) YEAR TO DATE YEAR TO DATE VARIANCE- CHARM,
BABE RBVEHUE ]),]80,96].22 39,23),59).00 (1,956,634.78) \
FUEL REVENUE 32,542,547.15 25,])0,846.00 1] )]639885) -6.6-30.699%
PURCHASED POWER CAPACITY 1i 9,6J 3.4 , , .9) (0,5)5.00) 3,861.51
FORFEITED DISCOUNTS 566,459.10 -4.62%
ENERGY CONSERVATION REVERT, 641,]2).00 176,)6].72) -11.93%
CAN REVENUE
353,207.69 325,024.00 17,383.69 8.40%NYPA CREDIT 419,402.62 404,691.00 14,711.62 3.64%
(397,914,54) (350,000,00) (47,814,54) 13.66%
TOTAL OPERATING REVENUES 50,685,090.93 55,456,650.00 (4,))1,559.07) -8.60%
OPERATING 8%P@1889: (8CH O P.1]A)
PURCHASED POWER BABE 14,934,346.54 15,959,339.00 (1,035,09].46) -6.42%
PURCNASED POWER FUEL 21,)4),76).61 ]3,8)1,456.00 (1,1]3,688.39) -4.]1!
HAIOPENATIMTSHAN 41969,115.69 5,332,685.00 (363,569.31) -6.82!
DEPRECIATION
1,800,621.68 1,633,566.00 167,055.66 10.23%
VOLUNTARY
],0)],19].19 2,100,000.00 (27,807.71) -1.32%
VOLUNTARY PAYMEDTB TO TOWNS 787.186.00 )91.000 00 (3.814.00) -0.48%
TOTAL OPERATING EXPENSES 47,311,129.81 49,688,046.00 (2,376,916.19) -4.78%
OPERATING INCOME 3.373,961.22 5,766,604.00 (2,394,642.68) -41.51%
NONOPEMTIWO RW,,OES (EXPENSES)
CONTRIBUTIONS IN AID OF CORBY 37,629.64 300,000.00
RETURN ON INVESTHRNT TO READING (1,386,808.]5) (20,3)0.36) -87.46%
INTEREST INCOIHt (1,]95,000.00) 8,191.75 -0.63%
INTEREST REFERS[ 60,559.01 1051000.00 144,440.991 -42.32%
OTHER (ROSE AND AMORT) (51126.991 (3,500.00) (1,7]6.99) 49.34%
344,158.43 70,000.00 174,158.43 218.80%
TOTAL NONOPERATING REV (EXP) (949 688.16) (82-3,500,00) (116.180 161
15.3]%
CHANGE IN NET ASSETS 2,424,372.96 4,945,104.00 (2,520,831.04) -50.98%
NET ASSETS AT BEGINNING OP YEAR 93.603,582.47 93,603,583.47
0.00 0.00%
NET ASSETS AT END OF UANUARY 96 02),855.4] 98,548.686.47 (].520.831.0 -3.56%
( 1 ACTUAL UNDER BUDOBT
TONE OF READING, MASSACHUSETTS
MUNICIPAL LIONT DEPARTMENT
RECONCILIATION OF CAPITAL FUNDS
Aw 1/31/12
SOURCE OF CAPITAL FUNDS:
DEPRECIATION FUND BALANCE 7/1/11 6,294,944.13
CONSTRUCTION FUND BALANCE 7/1/11 0.00
INTEREST ON DEPRECIATION FUND PY 12 6.655.16
DEPRECIATION TRANSFER PY 12 2,072,192.19
FORCED ACCOUNTS REIMBURSEMENT 0.00
DAN SUBSTATION (FY 12( 0.00
TOTAL SOURCE OF CAPITAL FUNDS 6,376.791.56
USE OF CAPITAL FUNDS:
PAID ADDITIONS TO PLANT TNRU JANUARY 2,365,829.67
PAID ADDITIONS SO DAN TNRU JANUARY 0.00
TOTAL USE OF CAPITAL PONOS 2,165,829.67
GENERAL LEDGER CAPITAL FUNDS BALANCE 1/31/12 6,010,961.89
PAID ADDITIONS TO GAM PROM PY 12 0.00
PAID ADDITIONS TO OAK PROM PY 11 $31,704.00
PAID ADDITIONS TO DAN PEON PY 10 1,372,876.00
PAID ADDITIONS TO GAM FROM PY 09 3,136,766.00
PAID ADDITIONS TO GAN FROM PY OB 1,895,975.00
TOTAL 6.917,199.00
TOM OF READING, MASSACHUSETTS
M AL LIOMT O OSALES OF /ILONATT HOOPS
1/]1/13
MONTH METE LAST YEAR CURRENT YEAR YTD
ENt
SALES OF ELECTRICITY: LAST YEAR CURRENT YEAR TO DATE TO DATE CHANGE
RESIDENTIAL SALES 33,596,837 23,442,293 16),587,5)8 156,374,445 -4.41%
COMM. AND INDUSTRIAL SALES 34,924,989 31,431,195 353,473,362 245,224,771 -2.87%
PRIVATE STREET LIGHTING 73,252 73,395 502,929 510,436 1.49%
TOTAL PRIVATE CONSUMeRB 58.595.078 53.946,782 41fi.561.729 402.109,652 -3.47%
MUNICIPAL SALES:
STREET LIGHTING 339,009 239,395 1,671,587 1,673,927 0.14%
MUNICIPAL BUILDINGS 964,827 858,971 5,835,481 51666,016 -3.89%
TOTAL MUNICIPAL CONSUNER9 1.20E 8l6 1.098.266 7,507 O68 7.340.743 -2.32%
SALES FOR RESALE 312,394 282,836 2,124,784 2,049,706 -3.53%
SCHOOL 1,409,774 1,316,235 81235,900 7,900,456 -4.07%
TOTAL EILONATT HOURS SOLD 61.5]0.983 S6,fi44.119 4)4.4)1.481 419,400.557 -3.46%
•
TOM OF READING, MA68ACHUSRT7B ISI
MUNICIPAL LIGHT DEPABTMBMT
MILONATT ROGER BOLD BY TONS
few 1/31/13
TOTAL READING LYNNPISLD NO.READING WILMINGTON
MONTH
RESIDENTIAL 33,443.393 7,111.119 3,015,073 5,446,383 61869,718
COg6 i IND 31,431,195 4.144,014 254,630 1,928,190 33,004.361
PPI' BY LIGHTS 73,395 13,737 1,360 21,956 36.342
POB ST LIGHTS 239,295 80,536 33,480 39,920 86,359
NONI BLDOB 858,971 162,177 137,397 146,929 313,466
SRLRS/ASSAL8 283,836 282,836 0 0 0
SCHOOL 1,316,335 483,145 268,030 161,280 401,780
TOTAL 56.644.119 12.577.564 3,708,969 30,616.658 29,730.938
YEAR TO DATE
RRSIDENTIAL 156,374,445 48,878,075 32.339,481 16,480,422 48,676,461
COMM R IND ]15,2]4,771 31,163,673 1.975,519 38,039,964 174,055,616
PVT ST LIGHTS 510,436 97,575 9,530 149,664 253,677
POB ST LIGHTS 1,673,927 563,352 ]37,10] 379,340 604,333
MUNI HUGE 5,666,816 1,408,517 966,513 1,136,920 2.154.858
SALES/RESALE 2,049,706 2,049.706 0 0 0
SCHOOL 7,900,456 2,826.875 1,746,008 1,006,080 2,319,493
TOTAL 419,100,557 86,987 67L ]7.]64.143 7 0081.]98 ]28.064.N4
LAST YEAR
TO DATE
RESIDENTIAL 163,597,538 51,137,761 ]1,166,37] 38,108,144 50,975,361
COMM 6 IND 151,473,]6] 31,146,536 21016,005 38,129,078 1B3.179,653
PVT ST LIGHTS 502,939 97.889 9,520 118,922 316,598
PDB ST LIGHTS 1.671,587 561,052 227,211 277,B19 603,505
KURI 3=9 5,835,481 1150],035 1,012,702 1,106,439 2,114,305
SALRS/RRSALB 2,131,784 1,134.784 0 0 0
SCHOOL 8,135,900 ]19]8,145 1.748,130 1,073,360 3,486,265
TOTAL 414.411.481 89.500.19] 18,381.940 70.943,763 337,605.587
KILOWATT HOURS BOLD TO TOTAL
TOTAL READING LYNNPIBLD NO.RRADINO WILMINGTON
MOWN
RBSIDSMIAL 39.63\ 13.55\ 5.32\ 9.62\ 13.134
COMM 8 IND 55.49\ 7.67\ 0.45\ 8.52\ 38.85\
PVT ST LIGHTS 0.13\ 0.03\ 0.00\ 0.04\ 0.07\
PUB ST LIGHTS 0.43\ 0.14\ 0.06\ 0.07\ 0.15\
HOW BLDG9 1.51\ 0.46\ 0.24\ 0.26\ 0.56\
SALES/RR9ALR 0.50\ 0.50\ 0.00\ 0.00\ 0.00\
SCHOOL 2.31\ 0.95\ 0.47\ 0.39\ 0.71\
TOTAL 100.00\ 33.19\ 19.80\ 52.17\
YEAR TO DATE
RESIDENTIAL 37.39\ 11.65\ 5.33\ 8.70\ 11.61\
COMM R IND 58.47\ 7.41\ 0.47\ 9.07\ 41.50\
PVT ST LIGHTS 0.13\ 0.03\ 0.00\ 0.04\ 0.06\
PUB BY LIGHTS 0.40\ 0.13\ 0.05\ 0.07\ 0.15\
MUNI SLINGS 1.35\ 0.31\ 0.23\ 0.27\ 0.51\
SALBB/RKSALR 0.49\ 0.49\ 0.00\ 0.00\ 0.00\
SCHOOL 1.08\ 0.67\ 0.42\ 0.24\ 0.55\
TOTAL 100.00\ 20.73\ 6.50\ 18.39\ 54.36\
LAST YEAR
TO DATE
RESIDENTIAL 37.65\ 11.77\ 5.38\ 8.771 11.73\
COMM A IND 58.11\ 7.17\ 0.46\ 8.78\ 41.71\
PVT ST LIGHTS 0.13\ 0.03\ 0.00\ 0.03\ 0.07\
PUB ST LIGHTS 0.38\ 0.13\ 0.05\ 0.06\ 0.11\
MUNI BLDGS 1.34\ 0.35\ 0.13\ 0.28\ 0.49\
SALES/RESALE 0.49\ 0.49\ 0.00\ 0.00\ 0.00\
SCHOOL 1.90\ 0.67\ 0.40\ 0.35\ 0.58\
TOTAL 100.00\ 20.60\ 6.53\ 18.171 54.11\
161
TOW OF READING, MASSACHUSETTS
MUNICIPAL
POPI 113 ILA INCOMEOMIRDEPARTMENT!
1/ll/11
TOTAL OPERATING REVEN06S (P.J) 50,605,090.93
ADO:
POLE RENTAL 1,455.00
INTEREST INCOME ON CUSTONSR DEPOSITS ]9].03
LESS:
OPERATING EXPENSES (P.3) (47,311,139.01)
CUSTOMER DEPOSIT INTEREST EXPENSE (5,316.99)
FORMULA INCOME (LOSS) J,J]0,9E1.15
i
TOWN OF READING, MASSACHUSETTS
HURT CIPAL LIGHT DEPAR37@TT
GENERAL 8SA9I9SIC8
1/ll/13
M1
MONTHOP MONTH or \ CHANGE YEAR THEO
JAN 3011 JAM 3013 3010 3011 JAN 3011 SAN 3013
SALE OF RNH (P.5) 61,530.983 $6,644,119 7.358 -3.464 434,431,481 419,400,557
ENS PURCHASED 63,563,960 59,550,350 5.70\ -3.87\ 446,397,850 433,579,697
AVE BASE COST PER RNH 0.035865 0.033086 -4.83\ -48.69% 0.067130 0.034444
AVE BASE SALE PER RNH 0.065504 0.066116 9.67% 3.43\ 0.063898 0.065040
AVE COST PER RWM 0.093740 0.009145 -5.70% -5.47% 0.091936 0.086909
AVE SALE PER SNH 0.134583 0.131100 .0.76% -1.65% 0.130785 0.118797
FURL CHARGE REVENUE (P.3) 3,639,698.16 3,114.395.49 -3.41% .10.36% 35,147,934.40 33,543,547.15
LOAD FACTOR 76.40% 76.564
^CAR LOAD 113,174 106,558
iw
cn >
0 v >
U Cl (3)
N U' Q)
ZI
J
�/�
°,"g,
3
s
E°7^
m
' ddb
In O LO O l() p
00 f�- U') N IT-
CD O O O O O
CD Ef} b9 � (/> K) 6�?
TOW OF READING, NASSACHUSE3'T9
MUNICIPAL LIOHY DEPARTMENT
"\ BCHRDULE OF GSH AND INVBSTNENTS
1/31/12
��. SCHEDULE A
PR6 IOUS YEAH CURRENT YEAH
UNSESTRICIED CASH:
CASH - OPERATING FUND 6,854,766.05 9,618,141.12
CASH - PETTY CASH 31000.00 3,000.00
TOTAL UNRESTRICTED CASH6,853,)66.85 9.621.141.12
RESTRICTED GSH:
CASH - DEPRECIATION FUND 4,740,173.37 4,010,961.89
CASH - TONS PAYMENT 291,250.00 596,000.00
CASH - DEPERRRD FUEL RESERVE 2,395,420.56 2,452,189.78
CASH - RATE STABILIZATION FUND 4,361,131.86 6,068,389.05
CASH - UNCOLLECTIBLE ACCT RESERVE 200,000.00 200,000.00
CASH - SIM LEAVE BENEFITS 2,024,793.05 2,952,851.04
CASH - HAZARD WASTE RESERVE 150,000.00 150,000.00
CASH - CUSTONER DEPOSITS 515,69340 604,386.69
CASH - ENERGY CONSERVATION 343,796.77 173,774.12
CASH - OPER 614,450.98 1,172,973.02
TOTAL RESTRICTED CASH15.656.711 A9 18,381.520.39
RRHTifTEn 1RY88T11@FI$t
Aw RATE STABILIZATION • 11000,000.00 0.00
BICE LEAVE BUYBACE • 11000,000.00 0.00
OPER ••• 200,000.00 0.00
TOTAL RESTRICTED INVESTMENTS 2,200.000.00 0.00
TOTAL CASH BALANCE 24.714.478.64 28.002.669.51
,3AN 3011
• PREDDIE HAC 1,000,000.009 DTD 09/10/109 INT 2.00\9 MATURITY 09/15/20
•• PREDDIE HAT 1,000,000.009 DTD 09/10/109 IMT 2.00\9 HATURITY 09/15/20
••• PRBDOIE NAC 200,000.009 DTD 09/10/109 INT 2.00\9 MATURITY 09/15/20
f
191
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
SCHEDULE OF ACCOUNTS RECEIVABLE
31/1]
6CNEOOLi B
PREVIOUS YEAR CURRENT YEAR
SCHEDULE OF ACCOUNTS RECEIVABLE
RESIDENTIAL AND CONIZRCIAL 6,605,309.83 3,298,034.16
ACCOUNTS RECEIVABLE - OTHER 130,]44.]0 173,757.74
ACCOUNTS RECEIVABLE - LIENS IOS,S86.11 68,665.99
ACCOUNTS RECEIVABLE - EMPLOYEE ADVANCES 1,067.16 893.16
SALES DISCOUNT LIABILITY (357,716.60) (172,197.53)
RESERVE FOR VRCOLLECTIBU ACCOUNTS (308,319.611 (]90.897.86)
TOTAL ACCOUNTS RECEIVABLE BILLED 6,389,676.50 2.978,109.66
UNBIGLRD ACCOUNTS RECEIVABLE 6,055.159.11 4,330,196.37
TOTAL ACCOUNTS RECSIVABLE, NET 8.639.835.61 7.308499.01
SCHEDULE OP PRSPAYWHETe
PREPAID INSURANCE 1,911,723.81 1,965,398.59
PRSPATHIRT PORCHASRD POWER 379,185.17 336,853.70
PREPAYMENT PA.SNY 139,666.63 238,330.65
PRSPAYMINT WATSON 159,877.37 155,615.85
PURCHASED POWER WORKING CAPITAL 16.513.70 16,513.70
TOTAL PREPAYMENT 1,106.076.79 1.]10.5]1.99
ACMUNTS RECEIVABLE AGING JANUARY 2012:
RESIDENTIAL AND CONNERCIAL 3.198.036.16
LESS: SALES DISCOUNT LIABILITY 127].167.53)
GENERAL LEDGER BALANCE 3.015.796.63
CURRENT 1,670,306.31 82.184
30 DAYS ]79,91].05 8.614
60 DAYS 137,584.99 3.93%
90 DAYS 55,963.13 1.72%
OVER 90 DAYS 112.199.01 3.664
TOTAL 3.295.513.66 100.00%
TORN OF READING, RASSACHU9RTTB
MUNICIPAL LIGHT DEPARTMENT
SCHEDULE OF OPERATING REVERTS
1/31/12
SCHEDULE O
MONTH MONTH LAST YEAR CORREIT YEAR YTD \
BALES OR ELECTRICITY, LAST YEAR CURRENT YEAR TO DATE TO DATE CHANGE
RESIDENTIAL SALES 3.330,381.85 2,986,106.3] 21,591,805.90 20,631,257.22 -6.65%
CONN AND INDUSTRIAL SALES 6.069,710.57 3,565,526.02 28,501.661.35 2],056,60].06 -5.07%
PRIVATE STREET LIGHT3N0 10,981.56 6,336.67 73,639.51 67.717.32 -35.30%
TOTAL PRIVATE CONSUMERS 7.291.103.96 6,537,969.06 50.167.]06.]6 67.735.581.66 -6.BS%
N ICIPAL SALES:
STREET LIGHTING 67.157.01 30,661.88 326,965.18 226,671.87 -30.31%
MUNICIPAL BUILDINGS 119.103.91 106,255.50 716,661.00 690,109.80 -3.68%
TOTAL MUNICIPAL CONSUMERS 166.260.92 136.717.38 1.011.606.18 916,S81,67 -11.99%
SALES FOR RESALE 39,967.63 35.092.33 262,906.76 251,016.50 -6.16%
SCHOOL 167,129.26 151,838.98 1,001.235.36 919.331.72 -8.18%
SUB-TOTAL 7,664,461.77 6,859,617.75 52,672,856.96 69,823,509.37 -5.05%
PORPRITED DISCOUNTS 96,513.95 87,893.05 613,667.00 566,659.28 -7.69%
PURCHA38D POWER CAPACITY 32,606.08 (10,759.23) 1,156,560.83 179,673.691 -106.89%
ENERGY CONSERVATION - RESIDENTIAL 11,803.65 22,653.71 81,633.66 133,998.66 62.$2%
eRRRGY CONSERVATION - COMMERCIAL 10,496.27 33,359.26 229,315.67 220,209.05 -3.97%
GAN REVENUE 61,534.17 56,637.77 396,565.11 619,602.62 62.39%
MYPA CREDIT 159,937.361 151,611.301 (627,390.43) 1397,816.541 -6.92%
TOTAL REVENUE 7.823176.33 6.997.689.99 56.621.386.5] 50.685.090.93 -6.87%
to
Ili]
TOW OF READING, MASSACHUSETTS
MUNICIPAL LIOX1' 08PARY
SEVERITY
SC11®ULE OF OPERATING RBVMIHI6 BY TOWN
1/31/1]
NOMAD TOTAL BRAIDING LYMPIRLD NO.READING WILMINGTON
RESIDENTIAL 3,986,106.37 948,530.33 399,915.20 ]3],338.10 914,312.74
INDUS/NOMI BLDG 3,649,781.52 546,439.66 47,799.28 576,647.19 1,478,895.39
PUB.ST.LIGHTS 30,461.88 9,606.15 3,801.84 5,514.88 11,537.91
PRV.ST.LIGNTS 6,336.67 1,159.82 114.90 11909.61 3,071.33
CO-OP RESALE 35,092.33 35,093.33 0.00 0.00 0.00
SCHOOL 151,838.98 55,780.00 30,664.17 19.541.71 45,853.09
TOTAL6,859,61).)51.596.608.39 483.396.]91,337.041.51 _ 3,453.6)1.46
THIS YEAR TO DATE
RESIDENTIAL 20,631,357.21 6,464,504.95 1,938,871.91 4,801,274.13 6,416,606.33
IEDUS/MUNI BLOC 27,746,716.84 3,822,007.92 352.644.62 4,433,337.19 19,138,)2).11
PUB.ST.LIGHTS 116,471.87 72,935.06 28,OB7.06 40,374.65 851085.10
PAV.ST.LIGHTS 4),71).33 8,917.68 873.00 14,702.26 23,214,28
CO-OP RESALE 253,014.50 351,014.50 0.00 0.00 0.00
SCHOOL 919,331.73 331,052.32 199,337.84 120,267.15 267,674.41
TOTAL 49,813.509.]) �p 952.433.431.519.814 Al 9,409.955.39 25.941.31).34
LAST YEAR TO OATH
RESIDENTIAL 31,591,805.90 6,782,125.34 3,057,452.60 5,036,665.92 6,715.562.04
INDUS/MUNI BLDG 29,218,102.35 3,923,838.61 365,997.70 4,544,681.78 30,383,594.26
PUB.ST.LIGHTS 324,965.18 113,774.$9 39,633.23 53,530.13 116.027.23
PRV.ST.LIOHTB 73,839.51 13,985.66 11392.01 22,866.05 35,595.79
CO-OP RESALE 163,906.76 361,906.76 0.00 0.00 0.00
SCHOOL 1,001,335.14 357,097.86 209,030.09 133,608.17 301,499.13
TOTAL 51,473.854.9411.453.715.823,673.505.6] 9.)91.JSI.05 2i.554.3)8.45
PERCENTAGE OF OPERATING INCOME TO TOTAL
MONTH TOTAL READING LYNNPIBLD M.RESIDING WILMINGTON
RESIDENTIAL 43.53% 13.93% 5.83% 10.54% 13.33%
INDUS/MONS BLDG 53.21% 7.97% 0.70% 8.41% 36.14%
PUB.ST.LZOHTS 0.44% 0.14% 0.06% 0.08% 0.16%
PRV.ST.LIGHTS 0.09% 0.02% 0.00% 0.03% 0.04%
CO-OP RESALE 0.51% 0.51% 0.00% 0.00% 0.00%
SCHOOL 1.21% 0.81% 0.45% 0.28% 0.67%
TOTAL 100.00\ ]J.]8% 7.01% 39.34\ 50.3
4%
THIS YEAR TO DATE
RESIDENTIAL 41.41% 13.97% 5.90% 9.64% 13.90%
INDUS/MUNI BLDG 55.69% 7.67% 0.71% 8.90% 30.41%
PUB.ST.LIGHTH 0.44% 0.15% 0.06% 0.08% 0.15%
PRV.ST.LIGHTS 0.10% 0.02% 0.00\
CO-OP RESALE 0.51% 0.03% D.p$%
0. 0.00% 0.00%
SCHOOL I.85\ 0.67%67% 0.40\ 0.34% 0.54%
SOTAL100.00{ 11.99% 1.07\ 18.89\ 53.05%
LAST YEAR TO DATE
RESIDENTIAL 41.16% 12.93% 5.83% 9.60\
INDUS/MUNI BLDG 55.68% 7.48% 0.70% 12.80%
e.10%
PUB.ST.LIGHTS 0.63% 0.22\ 36.84%
PRV.ST.LIGHT9 0.00% 0.14% 0.22%
0.34% 0.03% 0.00% 0.00% 0.00%
CO-OP RESALE 0.50% 0.50% 0.00% 0.00% 0.57%
SCHOOL 1.90% 0.68\ 0.40% 0.35% 0.57\
TOTAL 100.00% 31.84% 7.01\ 18.65\ 53.50%
II SAI
TORN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
BUDGETED REVRKUR VARIANCE REPORT
1/31/1]
SCHRDULi I
ACTUAL BODGES {
YEAR TO MIR YEAR TO DATE VARIANCE • CHANGE
SALES OF ELECTRICITY:
RESIDENTIAL 12,208,590.02 13,129.335.00 (920,766.98) -7.01{
COMM AND INIMISMAL SALES
PRIVATE STREET LIGHTING 16,397,303.93 15,115.903.00 (818,599.07) -5.62{
MUNICIPAL BUILDINGS
PUBLIC STREET LIGHTING 136,796.83 300,886.00 (166,089.17) -56.561
SALES FOR RESALE 161,566.03 176,615.00 (3],850.98) -18.83{
SCHOOL 696.707.62 517.058.00 (30.350.58) -3.96{
TOTAL BABE SALES 37,380,962.22 ]9,]37,597.00 (1,956,634.78) -6.69{
TOTAL FUEL SALES ]3.56].567.15 ]5.]78.866.00 12,736,298.85) -10.03{
TOTAL OPERATING RNBHUE 69,833,509.37 56,516,663.00 (6.69],933.63) -8.61{
PORPEITED DISCOUNTS 566,659.38 643,137.00 176,767.721 -11.93{
PURCHASED POKER CAPACITY 179,673.691 (83,535.00) 3,861.51 -6.62{
ENERGY CONSERVATION - RESIDENTIAL 132,998.66 123,693.00 10,306.66 8.60{
ENERGY CONSERVATION - COMBERCIAL 120,309.05 303.132.00 17,077.05 8.61%
GAM REVENUE 619,602.62 606,691.00 16,711.62 3.66{
"PA CREDIT (397,816.56) (350,000.00) 167,816.561 13.66{
TOTAL OPERATING REVENUES 50.655.090.93 55.656.650.0016.771.559.071 -6.60{
• ( 1 ACTUAL UNDER BUDGET
"M
TORN OF READING, RABEACHUBRITS
NONICIPOF LIGHT OPERATING
EXPENSES BCXURICI OF LIGHT DEO BXPRPT
1/31/1]
ec9EDm.E s
NONRH IPoNTB LAST TEAR CURRENT YEAR YTD {
OPERATION EXPSN988: LAST IRAN CORREOT YEAR TO DATE TO DATE CHANGE
PURCHASED PONER BASE EXPENSE 3.]4],845.81 1,9]0,]96.64 16,388,]1] 23 14,934,146.54 -8.87{
OPERATION SUPER AND ENGIN-TRANS 0.00 0.00 0.00 0.00 0.00{
OPERATION SUP AND ENGINEERING EXP 33,660.76 31,507.31 170,114.05 309,]01.]4 14.61{
STATION SUP LABOR AND RISC 01859.33 ],]36.16 63,115.19 66,914.43 5.00{
LINE MIBC LABOR AND EXPENSE 43,691.14 38,506.15 356,]0].13 384,941.19 9.07{
STATION LABOR AND EXPENSE 19,641.11 ]9,66].64 268,217.62 282,BS3.46 5.46{
STREET LIGHTING EXPENSE 7,599.91 14,177.67 50,440.16 69,081.51 34.9]{
PETER EXPENSE 14,501.33 8,000.36 194,366.47 150,315.95 -21.66{
MIBC DISTRIBUTION EXPENSE 14,046.]] 15,]39.]0 193,257.83 194,912.25 1.36{
INTER RENTING LABOR c EXPENSE 5,200.39 6,977.37 44,281.91 53,954.07 31.6]{
ACCT A LOLL LABOR c EXPENSE 103.201.55 112,805.63 756,901.41 811,969.78 7.26{
UNCOLLECTIBLE ACCOUNTS 15,000.00 16.000.00 105,000.00 112.000.00 6.67{
ENERGY AUDIT EXPENSE 29,958.16 30,615.79 227,665.91 262,481.13 15.29{
RONIN 9 GER SALARIBE $3,561.74 55,D33.95 411,056.66 437,113.65 6.34{
OFFICE SUPPLIES A EXPENSE 161735.90 19,168.89 158.667.39 126.641.10 -20.38{
OUTSIDE SERVICES 17,380.36 36,302.15 115,609.34 333,657.00 93.66{
PROPERTY INSURANCE 31.705.39 23,265.13 216,066.71 216,567.94 1.16{
INJURIES AND DAMAGR$ 3,]90.]5 3,966.18 24,576.49 7,936.33 -67.75{
81ELOYEB3 PENSIONS A BENEFITS 359,736.87 (62,284.63) 1,034.538.66 683,198.42 -33.41{
RISC GENERAL RIPENER 7,131.58 9,144.80 93.735.53 110,960.38 30.44{
RENT EXPENSE 16,613.93 51695.19 101,878.33 103,691.72 1.98{
ENERGY CONSERVATION 30.485.20 39.835.13 176,331.80 350,211.BS 26.79{
TOTAL OPERATION EXPENSES 862,010.77 153 9)3.67 4 9 0 034.69 4 9fi9 115.69 0.
RAINTENANcs EXPENSES:
MAIM OF TRANSMISSION PLANT 127.08 227.08 1,589.60 1.589.58 0.00{
NAINT OF $TRUCT AND EQUIPM 12,647.93 76,364.71 89.163.69 198.042.40 110.90{
PAINT OP LINES - ON 122,308.06 140,398.03 800,519.41 1,070,013.21 33.66{
MAIM OF LINES - On 17,303.03 91400.19 83,078.45 115,281.36 36.76{
MAIM OF LINE IRAIRFOR1ERS •• 432,482.03 (01399.19) 1,293,045.04 31,187.43 -97.59{
NAIM OF ST OS A $I0 SYSTEM (18.34) (48.03) 4117.88) (350.511 197.34{
NAIM OF GARAGE AND STOCKROOM 57,796.92 49,668.05 307,482.09 198,546.82 -2.91{
MAIM OF PETERS 7,593.73 9,454.55 7,593.73 49,608.01 553.18{
KRIM OF GEN PLANT 5,175.06 51489.96 57,547.90 46,703.38 -18.84{
TOTAL HAIMENANCE EXPENSES 655.595.29 38].566 13 2.639.911.02 1,900,621.68 -31.79{
DEPRECIATION EXPENSE 187,129.05 296,027.47 3,014,103.35 ],07].192.39 2.58{
PURCHASED PONES FUEL EXPENSE 3.620.814.67 3,338,331.18 24,651,335.51 ]].74],76].61 -7.72{
VOLUNTARY PAYPEMB
TO TONNE 103,885.00 113,000.00 163,985.00 787,186.00 2.78{
TOTAL OPERATING EXPENSES 7.7751880660 6.453.153.13 51.409.886.80 47.311.1]9,81 -7,9]{
•• FY 12 total lnclVd.. SAN Aoil caaadiation aapaNuu totalling $0.00
Total coat. tP data TOK anti.. Propct 1. $2,481,825.11.
9
u]�
TOM OP R=ING, MASSACHUSETTS
NONICIPAL LIGHT DEPARTMENT
BUDGETED OPERATING EXPENSE VARIANCE REPORT
co 1/31/12
SCHEDULE G
ACTUAL BUDGET 6
OPERATION EXPENSES, YEAR TO DATE YEAR TO DATE VARIANCE • CHANGE
PURCHAStO POWER BABE EXPENSE 14,931.346.56 15.959.]]9.00 (1.025.092.46) -6.42%
OPERATION SUPER AND ENGIN-TRANS 0.00 O.OD 0.00 0.00%
OPERATION SUP AND ENGINEERING EXP 309,702.74 355,549.00 54,153.74 11.19%
STATION BW LABOR AND NISC 66,914.43 35,363.00 31,552.43 89.23%
LINE MISC LABOR AND EXPENSE 384,941.18 418,459.00 (33,517.82) -8.014
STATION LABOR AND EXPENSE 382,853.46 357,401.00 25,452.46 9.096
STREET LIGHTING EXPENSE 68,061.51 49,735.00 18,346.51 36.59%
WEYER EXPENSE 150,335.95 09,159.00 611166.95 66.60%
NISC DISTRIBUTION EXPENSE 194,912.25 302.468.00 (7,555.75) -3.73%
MYER READING LABOR R EXPENSE 53.854.07 44,098.00 9,756.07 23.12%
ACCT 6 COLL LABOR R EXPENSE 811.869.78 829,190.00 (17,320.22) -2.094
UNCOLLECTIBLE ACCOUNTS 112,000.00 112,000.00 0.00 0.00%
ENERGY AUDIT EXPENSE 262,482.13 245,466.00 17,016.13 6.936
ADMIN 6 GEN SALARIES 437,113.65 439,237.00 7,886.65 1.846
OFFICE SUPPLIES 6 EXPENSE 126,641.10 155,137.00 (29,485.90) -18.366
OUTSIDE SERVICES 223,657.00 321,320.00 (97,663.00) -30.39\
PROPERTY INSURANCE 218,567.84 271,264.00 (52,696.16) -19.436
INJURIES AND DAMAGES 7,936.23 32,741.00 (24,014.77) -75.796
EMPLOYEEB PENSIONS c BENEFITS 682,190.42 933,189.00 (250,990.58) -26.906
MISC GENERAL EXPENSE 130,960.36 142,255.00 (21,294.62) -14.976
REST EXPENSE 103,891.72 123,669.00 (19,777.28) -15.996
ENERGY CONSERVATION 350.231.05 385,006.00 (34,784.15) -9.036
TOTAL OPERATION EXPENSES 6.969.115.69 5.332.685.00 (363.569.31) -6.824
NAINTRIIANCE EXPENSES:
Min OF TRANSMISSION PLANT 1,389.58 1,750.00 (160.42) -9.176
MAIN) OF STRUCT AND EQUIPMENT 188,062.10 64,203.00 123,839.40 192.896
MAIN) OF LIMB - ON 1,070,013.31 816,026.00 353,987.21 31.126
MAIN) OF LIMB - UG 115.381.36 124,813.00 (9,531.64) -7.646
MAIN) OF LINE TNUIRBPORNERS •• 31,187.43 136,199.00 (95,011.57) -75.296
WAIST OF ST IT 6 SIO SYSTEM (350.51) 51610.00 (5,960.51) -106.256
SAINT OF GARAGE ANO STOCRROON 298,546.82 370,811.00 (72,264.18) -19.49%
MAIN) OF METERS 49,606.01 49,828.00 (219.99) -0.446
SAINT OP OE1 PLANT 46,703.38 74,326.00 (27.623.62) -37.166
TOTAL MAINTENANCE EXPENSES 1.800.6]1.68 1,6]3.566.00 167.055.68 10.236
DEPRECIATION EXPENSE 2,073,193.29 21100,000.00 (27,807.71) -1.336
PURCHASED POWER FUEL EXPENSE 22,747,767.61 33.871.456.00 (1,123.698.39) -4.716
VOLUNTARY PAYMENTS TO TOWS 787,186.00 791,000.00 (3.814.00) -0.486
TOTAL OPERATING EXP USERS 47,]11.139.81 49.688,046.00 (2.376.916.19) -4.79%
• ( ) • ACTUAL UNDER BUOGST
••
BY 12 total include. OAK Boll remediation expenses totalling $0.00
Total coats to data for entire project is $3,483,835.80.
Iti11
TOWN OF READING, NASSACNU88TTS
MUNICIPAL LIGHT ARIAN
BUDGETED OPERATING EXPENSE VARIANCE
E REPORT
1/ll/1]
RESPONSIBLE REMAINING
SENIOR 2012 ACTUAL BUDGET RSM,SININO
OPERATION 8XPRNSBA: NANAGER ANNUAL BUDGET YEAR TO DATE BALANCE BUDGET %
PURCRA6® PONBR BABE EXPENSE SP 37,402.177.00 14.934.246.54 12,467.930.46 45.50%
OPERATION SUPER AND ENGIN-TRANS E8 0.00 0.00 0.00 0.00%
OPERATION SDP AND ENGINEERING EXP RS 438,974.00 309,702.74 129,271.26 29.45%
STATION SUP LABOR AND MISC ES 62,909.00 66,914.43 (4,005.43) -6.37%
LINE M29C LABOR AND EXPENSE RS 692,484.00 384,941.18 307,542.62 44.41%
STATION LABOR AND EXPENSE RS 441,924.00 282,853.46 159,070.54 35.99%
STREET LIGHTING EXPENSE RS 85,336.00 68,081.51 17,256.49 20.22%
METER EXPENSE ES 152,130.00 150,325.95 11804.05 1.19%
NISC DISTRIBUTION EXPENSE 0I1 352,508.00 194,912.25 157,595.75 44.71%
NBTER READING LABOR R EXPENSE EB 76,220.00 53,854.07 22,365.93 29.34%
ACCT 6 COLL LABOR 4 EXPENSE RE 1,437,255.00 811,869.78 615,385.32 43.12%
UNCOLLSCTISLS ACCOUNTS AE 193,000.00 112,000.00 801000.00 41.67%
ENERGY AUDIT EXPENSE 0P 414,098.00 262,482.13 151,615.67 36.61%
ADMIN A CEN SALARIES VC 745,939.00 437,113.65 300,825.35 41.40%
OFFICE SUPPLIES A EXPENSE VC 265,700.00 126,641.10 139,055.90 52.34%
OUTSIDE SERVICE& VC 454,250.00 223,657.00 230,593.00 50.76%
PROPERTY INSURANCE .10 465,000.00 215,567.84 246,432.16 53.00%
INJURIES AND CADENCES JD 55,559.00 7,926.23 47,932.77 85.81%
RNPLOYEBS PENSIONS A BENEFITS GD 1,441,637.00 682,198.42 759,438.56 52.68%
MISC GENERAL EXPENSE VC 203,091.00 120,960.38 82,130.62 40.44%
RENS EXPENSE m 212,000.00 103,891.72 108,108.28 50.99%
ENERGY CONSERVATION JP 643,789.00 350,221.85 293,567.15 45.60%
TOTAL OPERATION EXPENSES 0,823,105.00 4,969,115.69 3,053,989.31 43.68%
MAINTENANCE EXPENSES:
MAIMT OF TRANSMISSION PLANT RS 3,000.00 1,589.58 1,410.42 47.01%
MAINT OF STRUM ANO BGUIPMT RA 107,072.00 188,042.40 (80,970.40) -75.62%
NAINT OF LINES - ON RS 1,419,953.00 1,070,013.21 349,939.79 24.64%
NAIM OF LINES - CG [A 214,037.00 115,281.36 98,755.64 46.14%
NAINT OF LINE TRANSPOMENS •• as 188,500.00 31,107.43 157,312.57 83.45%
MAINT OF ST IT A 910 SYSTEM GD 9,636.00 (350.51) 9,986.51 103.64%
MAINT OF GARAGE AND STOCRROON GD 662,139.00 298,546.82 363,592.18 54.91%
NAINT OF METERS ES 85,444.00 49,600.01 35,835.99 41.94%
NAINT OF GEN PLANT RP 127,620.00 46,703.35 80,916.62 63.40%
TOTAL MAINTENAKCE EXPENSES 2,017,401.00 1.800.621.68 1.016,779.32 36.09%
DEPRECIATION EXPENSE RF 3,600,000.00 2,072,192.29 1,527,807.71 43.44%
PURCNASeD POTTER FUEL EXPENSE TP 39,768,617.00 22,747,767.61 17,021,049.39 42.80%
VOLUNTARY PAYNENT9 TO TOWNS RP 1,356,000.00 707,186.00 568,814.00 41.95%
TOTAL OPERATING EXPENSES 83.767.500.00 47.111.119.81 36.456.370.39 43.52%
•• PY 12 total inclu0e. GAN soil remediation expenses totalling 80.00
Total coat. to Este for entire project is 62,482,825.80.
IM
TOWN OF READING. NASSACHOBETTS
MUNICIPAL LIGHT DEPARTNENT
PROFESSIONAL SERVICES
01/31/3013
PROFESSIONAL SERVICES BY PROJECT
ITEM DEPARTMBWF ACTUAL BUDGCT VARIANCE
1 RNID AND PENSION TRUST AUDIT PEGS ACCOUNTING 36,960.00 3],]50.00 2,690.00
1 PENSION ACTUARIAL EVALUATION ACCOUNTING 0.00 0.00 0.00
3 LEGAL- PBRC/I90 ISSUES ENERGY SERVICE 0.00 10,500.00 (10,500.00)
6 LEOAL- POWER SUPPLY ISSUES ENERGY SERVICE 30,109.35 ]6,]50.00 3,659.35
5 PROPEBSIONAL SERVICES ENERGY SERVICE 7,606.33 16,000.00 (61515.65)
6 ESRC CONPLIANCS 9 6 O 11,990.00 10,650.00 1,160.00
7 LOAD CAPACITY STUDY/GIS ENGINEERING 9.200.00 11,350.00 (1,970.00)
8 LEGAL SERVICES- GBN6RA, ON 91,670.70 29,169.00 63,501.70
9 LEGAL SERVICES-GENERAL HA 36,356.61 26,500.00 1,756.61
10 LEGAL SERVICES-NEGOTIATIONS HE 632.30 0.00 633.20
11 LEGAL GENERAL BLDG. MAIM. ],31].50 875.00 1,637.50
13 SURVEY RIGHT OF WAY IWO. NAINT. 0.00 21919.00 (31919.00)
13 ENVIRONMENTAL BLDG. MAIST. 0.00 21919.00 (21919.00)
16 STATION 1 STRUCTURAL FBASABILITY BLDG. SAINT. 0.00 50,000.00 (50,000.00)
15 DEIOLITION OF CONTROL CRNTER BLDG. SAINT. 2,S33.19 100,000.00 (97,676.01)
16 INSURANCE CONSULTANT GEN. BENEFIT 6,650.33 2,919.00 3,539.33
17 LEGAL GEN. BENEFIT 0.00 21919.00 (31919.00)
i TOTAL 333,657.00 3]1,3]0.00 (97,663.00)
i
PROFESSIONAL SERVICES BY VENDOR
ACTUAL
RONARRS INSURANCE 6,061.66
RUBIN AND RUDNAN 110,965.94
UTILITY SERVICES INC. 13,681.67
HBLANSON HUM 4 COMPANY 61,903.63
DUNCAN AND ALLEN 6,182.99
CHOATE HALL AND STEWART 26,880.61
PROFESSIONAL ENVIRONMENTAL SERVICES 3,110.00
CDM 9,300.00
CMREC 6.169.33
COVINO ENVIRONNENTAL ASSOCIATION ].5]3.19
TOTAL 133,657.00
(13)
RULD
BUDGET VARIANCE REPORT
FOR PERIOD ENDING JANUARY 31, 2012
DIVISION ACTUAL BUDGET VARIANCE CHANGE
ENGINEERING AND OPERATIONS 2,912,154 2,475,829 436,325 17.62%
ENERGY SERVICES 650,367 681, 516 (31,149) -4.57%
GENERAL MANAGER 495,434 431,685 63,750 14.779
FACILITY MANAGER 1,559,655 2,156,370 (596,715) -27.679
BUSINESS DIVISION 5,303,539 5,410,361 (106,821) -1.979
SUB-TOTAL 10, 921,150 11, 15 (234,610) -2.10%
PURCHASED POWER - BASE 14, 934,247 15,959,339 (1,025,092) -6.429
PURCHASED POWER - FUEL 22,747,768 23,871,456 (1,123,688) -4.719
TOTAL 48,603,164 50,986,555 (2,383,391) -4.679
•
J
® RSD
DEFERRED POBL CA88 RESERVE ANALY828
01/31/12
OR0SS NOMI7D,Y TOTAL
DATE CNAROEE RSVENOEB NYFA CREDIT DEFERRED DEFERRED
Jun-11 3,055,214.78
Jul-11 4,131,396.83 4,049,745.45 (79,163.651 (160,815.03) 2,894,409.75
Aug-11 3,795,607.97 3,924,541.80 (52,328.74) 76,605.09 2,971,014.84
9"-11 2,914,869.40 3,166,562.64 (56,669.90) 192,823.34 3,163,638.18
Oct-11 2,955,398.39 2,852,952.53 (45,133.69) (147,579.55) 3.016,258.63
NOV-11 2,643,246.46 2,544,526.70 (47,451.31) (145,171.07) 2,070,087.56
Dec-11 2,968,917.38 2,889,823.94 (63,455.95) (142,550.79) 2,727,336.77
Jen-12 3,338,331.18 3,114,393.49 (51,411.30) 1275,346.99) 2,452,189.78
w
uo
RNLD
STAFFING REPORT
FOR FISCAL YEAR ENDING JUNE, 2012
ACTUAL
12 BUD JUL AUG SEP OCT NOV DEC JAN
TOTAL 11 11 11 11 11 11 12
GENERAL.-MANAGER
GENERAL MANAGER 2 2 2 2 2 2 2 2
HUMAN RESOURCES 1 1 1 1 1 1 1 1
COMMUNITY RELATIONS 1 1 1 1 1 1 1 1
TOTAL 4 4 4 4 4 4 9 9
v_ *aINEaa
ACCOUNTING 2.00 1.50 1.50 1.50 2.00 2.00 2.00 2.00
CUSTOMER SERVICE • 7.75 8.75 8.75 8.75 8.75 8.75 0.75 8.75
MONT INFORMATION SYS + 6.25 5.25 5.25 5.25 5.25 5.25 5.25 5.25
MISCELLANEOUS 1 1 1 1 1 1 1 1
TOTAL 17.00 16.50 16.50 16.50 17.00 17.00 17.00 17.00
ENGINEERING 4 OPEReTIONa
AGN E4O 2 2 2 2 2 2 2
ENGINEERING 5 5 5 5 5 5 5
LINE 21 20 20 20 20 20 20 21
METER 4 4 4 9 4 9 9 9
STATION 8 8 8 8 8 8 8 7
TOTAL 40 39 39 39 39 39 39 39
PROJECT
BUILDING 2 2 2 2 2 2 2 2
GENERAL BENEFITS 2 2 2 2 2 2 2 2
TRANSPORTATION 0 0 0 0 0 0 0 0
MATERIALS MGMT 4 4 4 4 9 4 9 9
TOTAL 8 8 8 S 8 8 8 8
KNERGY-aERVICKS
ENERGY SERVICES + 5.5 5.5 5.5 5.5 5.5 5.5 5.5 4.5
TOTAL 5.5 5.5 5.5 5.5 5.5 S.5----T 5 9 5
RNLD TOTAL 74.5 73 73 73 73.5 73.5 73.5 72.5
CONTRACTORS
DO LINE 2 2 2 2 2 2 2 2
TOTAL 2 2 2 2 2 2 2
GRAND TOTAL 76.5 75 75 75 75.5 75.5
75.5 74.5
Part time employee
To: Vincent Cameron
From: Energy Services
Date: February 22, 2012
Subject: Purchase Power Summary —January,2012
Energy Services Division(ESD) has completed the Purchase Power Summary for the
month of January, 2012.
ENERGY
The RMLD's total metered load for the month was 59,550,250 kwh, which was a
decrease of 4.71%, compared to the January, 2011 figures.
Table I is a breakdown by source of the energy purchases.
TABLE 1
Amount of Cost of %of Told Total 5 $as e
Resource
Energy Energy Energy Costs %
® (kWh) (&Wwh)
Millstone k3 3,702,713 -55.74 6.22%
- , 5 - %
$35
Seabrook 1,357,337 $6.18 732% 535,66511 107%
JP Morgan 9.390,800 $56.15 15.77% $527,261 15.79%
StonySrook CC 202,919 5170.44 0.34% $34.586 1.04%
Constellation 13,008,600 $68.47 21.84% $890,735 26.66%
NYPA 2,027.882 54.92 3.41% $9,977 0.30%
ISO Interchange 6.158,228 847.15 10.34% $290,352 8.70%
NEMA Congestion 0 50.00 0.00% -51,983 -0.06%
Coop Resales 88.408 $13210 0.15% $11,687 0.35%
Slonyerook Peaking 0 50.00 0.00% $24 0.00%
MacOuarie 18.072,000 $72.75 30.35% $1,314,662 39.38%
Braintree Watson UnB 97.769 $126.06 016% 512.325 0.37%
Swift River Projects 2,443,794 $95.88 4.10% S234,309 7.02%
Monthly Total 59.550,250 $56.08 100.00% $3.338.331 100.00%
ATTACHMENT
Table 2 breaks down the ISO interchange between the DA LMP Settlement and the RT
net Energy for the month of January, 2012.
Table 2
Amount Cost %of Total
Resource of Energy of Energy Energy
(kWh) ($/Mwh)
ISO OA LMP' 7,416,503 44.46 12.45%
Settlement
RT Net Energy -1,258,275 26.57 -2.11%
Settlement
ISO Interchange 6,158,228 47.15 10.34%
(subtotal)
CAPACITY
The RMLD hit a demand of 106,558 kW, which occurred on January 16, 2012 at 6 pm.
The RMLD's monthly UCAP requirement for January, 12,was 201,318 Ms.
Table 3 shows the sources of capacity that the RMLD utilized to meet its requirement.
Table 3
Amount of Cost of %of %of
Capacity Capacity Total Total
Source (kWs) ($/kW-month) Capacity Total Cost$ Cost
Millstone e3 4,991 $51.65 2.48% $257,774 19.28%
Seabrook 7,910 $49.81 3.93% $393,962 29.46%
Stonybrook Peaking 24,981 $2.00 12.41% $50,021 3.74%
Stonybrcok CC 42,925 $3.85 21.32% $165,263 12.36%
NYPA 4,665 $2.81 2.32% $13,101 0.98%
Hydro Quebec 4,274 $4.78 2.12% $20,446 1.53%
ISO-NE Supply Auction 101,051 $3.25 50,19% $328,647 24.57%
Braintree Watson Unit 10.520 $10.28 5.23% $108,133 8.09%
Total 201,318 56.64 10000% $1,337,348 100.00%
i
Table 4 shows the dollar amounts for energy and capacity per source.
Table
Coat of
%of AM of Enaroy Power
Resource Energy Capacity Total cost Total Cost (kWh) ($kWh)
Millstone e3 -521,254 $257,774 $236,520 5.06% 3,702,713 $0.0639
Seabrook $35,651 $393,962 $429,613 9.19% 4,357,337 $0.09W
Stonybrook CC $34,586 $165,263 $199,849 4.27% 202,919 $0.9849
Hydro Ousbec $0 $20,448 $20,446 0.44% 0 $0.0000
Constellation $890,735 $0 $890,735 19.05% 13,008,800 50.0685
NYPA $9,977 $1,101 $23,079 0.49% 2,027,882 $0.0114
ISO Interchange $290,352 $328,647 $618.999 13.24% 6,158.228 $0.1005
NEMA Congestion -$1,983 $0 41.983 -0.04% 0 $0000lo
Coop Resales $11,687 s0 $11,687 0.25% 88,408 $0.1322
Slonybrook Peaking $24 $50,021 $50,044 1.07% 0 $0.0000
JP Morgan $527,261 $0 $527,261 11.28% 9,390.600 $0.0581
MacOuarb $1,314,662 50 $1,314,662 28.12% 18,072,000 $0.0727
Braintree Watson Unit $12,325 $108,133 $120,459 2.58% 97,769 $1.2321
Swift River Projects $234,308 so $234,309 5.01% 2,443,794 $0.0959
Monthly Total $3,338,331 $1,337,348 $4,675,680 100.00% 59,550,150 $0.0785
TRANSMISSION
The RMLD's total transmission costs for the month of January were $638,899. This is an
increase of 2.74% from the December transmission costs of$621,443. In January, 2011
the transmission costs were $754,397.
Table 5 shows costs for the current month vs. last month and last year(January, 201 1)
Table 5
Current Month Last Month(Dec'11) Last Year(Jan'l 1)
Peak Derrane(kW) 106,558 108.371 112.174
Energy(kWh) 59.550.250 59,123.502 5,81.807
Energy S) S3,338.331 $2.968,917 $3.620.815
Capacity(5) $1.337.348 $1,397.529 SI 492.489
Tranamlssion(11 1138.191 5621441 1754191
Total $5.314.578 54.987,089 S5 867,701
�
) /0000//// ) /\///////
| |
2
# k ! 020 i / ) ) \ \ § kk §
0
! !
E 2 ■ ! ! § ! § ! « E 888888888
, -
,
`3 .!65, , }, !3 $ . ■ , ■
| | G� ■`# $;@e(� $§, !`k
CL
Im
k $ {¥ | | |
| {) !/ � k $� ; ) 0 ) ( \/ , ) k
\ ! ) > ! ! 7t/ +
k ! E ` Q ! ! ! ! ! ) lk � kkkk � �
\ \ }k ) / kk \ \ . \ ) \ } kms {
ATTACHMENT
�l
18 of
w+
ILCL
d'
rn �
06"
oE00)
d' c II
0
m m r co Ln V co N r O
suolll!W ul saelloa y
IT N O tO a a
a m a n n
r LL N m
O (V r r
� a
---------- -------------
V7 m (o rn r r
> Cl) m m m m rn m
ar •Z v (o m to to ao
�y L
3 7
d x m o - 00 M4WO rnnrnm Noo� or
� A m f� O O � m 7 N 0 0 0 O V V 000
N
� W � m on ao .- mo mo .- o 0000 rn
caV O O O O N C 0 0 [ 0000 0 0 0 0 W
Q
______� ___�____________ ________________ _______________ _______________
Lo
O 3 r` O O + O O A N � W OD ao ao
4
Y �
� 1
L m O O O O N E
aD M 0 0 O V O O O O O
Y m m N 0 N O M(A O It a m O M m 0000
O O m m 7 N nN � N � � O O N O 0009
CT Y N 0 0 O N 0 0 0 0 0000 0000O
C
________ ___ ---------------------
___________________ ________________
U �
C } a0 OI O N
Q i 0 0 1
11 N N N N N N
d
ILL
C C C C C
N C EE C N C N C E
E E c i E c E c E c
c as a rn m aa a a F
C d N W a d m CU W m ani a W a° aa, W � ami O
r •� J
O U N J ¢ U N J U N J fp F
ID w@ ❑ d Tn N ❑ ❑ O m m
c U J D C U J -O U J U J
U 10 o ° f d m o o d o ° a0i o o -2 d o •o
UaaELL F- ULL ¢ LL 0a ¢ LL c-> aCrLL as
2/24/2012 READING MUNICIPAL LIGHT DEPARTMENT
10'.58 AM FY 12 CAPITAL BUDGET VARIANCE REPORT
FOR PERIOD ENDING JANUARY 31,2012
ACTUAL YTD ACTUAL ANNUAL
COST COST BUDGET
0 PROJECT DESCRIPTION TOWN JANUARY THRU 1/31112 AMOUNT VARIANCE
E8O Construction-System Proiects
1 5W9 Reconductoring-Ballardvale Street W 31,951 159.632 242.649 83.017
2 High Capacity Tie 4WIS and 3W5 Franklin Street R 40.702 112,368 157.766 45.398
7 Upgrading Old Lynnf*W Ctr URDs LC 377 579,927 579.550
SCADA Protects
4 RTU Replacement R 1,640 130.255 128.615
Distribution Automation Pro,go
5 Reclosures ALL 197,901 197901
e Capacitor Banks ALL 8,362 9,542 105.052 95,510
7 SCADA Radio Communication System ALL 231.386 231 386
Station Upgrades(Station a4 GAWI
S Relay Replacement Project R 343 2,803 99.656 96.853
9 11 51,V Disconnect Replacement R 22.650 49,738 88,585 38,847
New Customer Service Connections
12 Service Installations-CommeraialAndustrlal Customers ALL 4,998 29.980 62,530 32,550
17 Service Installations-Residential Customers ALL 10,591 104,152 206,017 101.865
4 Routine Construction
Various Routine Construction ALL 152,543 1,296,880 1.016,382 (280.498)
Total Construction Projects 272,179 1,787,112 7,118,108 7,750,994
Other Prolecb
/5 GIS 8,715 50.000 41.285
18 Transformers/Capacitors Annual Purchases 102,340 157,352 198.800 41,448
17 Meter Annual Purchases 7,855 7,855 46.360 38,505
17A Meter Upgrade Project 21,759 316.050 1,740.656 1,424606
18 Purchase New Small Vehicle 31,544 36,000 4,456
19 Purchase Line Department Vehicle 386,000 386.000
20 Purchase Puller Trailer 75.000 75,000
21 Roof Top Units 30.000 30,000
22 Engineering Software and Data Conversion 76,690 76.690
23 Plotter 18,000 18.000
27 Hardware Upgrades 7.B09 32,436 40.000 7.564
28 Software and Licensing 26 060 94 435 68.375
OTH Cooling Tower Replacement 18.706 - (18.706)
Total Other Projects 139,763 598,718 2,791,941 2,197,227
TOTAL RMLD CAPITAL PROJECT EXPENDITURES 411,902 2,365,830 5,910,047 3,544,217
® 29 Force AccounuReimbursable Projects ALL -
TOTAL 112 CAPITAL PROJECT EXPENDITURES 411,902 2,365,870 5,910.047 7,544,217
Reading Municipal Light Department
Engineering and Operations
Monthly Report
January, 2012
FY 2012 Capital Plan
E&O Construction -System Projects
1. 5W9 Reconductoring- Ballardvale Street - Wilmington - Installed primary spacer
cable and cutouts;pole transfers; engineering labor; installed swamp anchor;
2. High Capacity Tie 4W18/3W8 Franklin Street- Reading - Installed pulling blocks,
rope, pole to pole guy, spacer cable, spacers, transformer, and gang operated switch;
spliced; pole transfers.
3. Upgrading of Old Lynnfield Center URDs- Engineering correspondence with
Town of Lynnfie/d; developing specifications.
SCADA Proiects
4. RTU Replacement at Station 4 - Reading - No activity.
Distribution Automation (DA) Proiects
5. Reclosers - No activity.
6. Capacitor Banks - Build capacitor banks.
7. SCADA Radio Communication System - No activity.
Station Upgrades
8. Relay Replacement Project- Station 4- Reading - Technical Services Manager
labor.
9. 115 kV Disconnect Replacement- Station 4 - Reading - No activity.
New Customer Service Connections
12. Service Installations - Commercial/Industrial Customers-This item includes new
service connections, upgrades, and service replacements for the commercial and
industrial customers. This represents the time and materials associated with the
replacement of an existing or installation of a new overhead service, the connection of
an underground service, etc. This does not include the time and materials associated
with pole replacements/installations, transformer replacement/installations, primary or
secondary cable replacement/installations etc. This portion of the project comes under
routine construction. Notable: Charles River-261Ballardvale Street, Wilmington and 57-59
High Street, Reading.
13. Service Installations— Residential Customers—This item includes new or upgraded
overhead and underground services, temporary overhead services, and large
underground development.
14. Routine Construction—The drivers of the Routine Construction budget category
YTD are listed. This is not an inclusive list of all items within this category.
Pole SettinglTransters $208,490
Maintenance OverheadNnde round $299,101
PTIects Assigned as Required $357,754
Pole Damage includes knockdowns some reimbursable $33,791
Station Group $2,967
Hazmat/OilSpills $3,118
Porcelain Cutout Replacement Program $2,533
Lighting Street Light Connections $58,526
Storm Trouble $77,567
Underground Subdivisions $52,164
Animal Guard Installation $50,446
Miscellaneous Capital Costs $150,424
TOTAL $1,296,880
'In the month of January two cutouts were charged under this program.
Approximately 22 cutouts were installed new or replaced because of damage
making a total of 24 cutouts replaced this month.
2
Reliability Report
Two key industry standard metrics have been identified to enable the RMLD to measure and
track system reliability. A rolling 12-month view is being used for the purposes of this report.
Customer Average Interruption Duration Index (CAIDI)— Measures how quickly the
RMLD restores power to customers when their power goes out.
CAIDI = Total of Customer Interruption Duration for the Month in Minutes/Total
number of customers interrupted.
RMLD 12 month system average outage duration — 60.29 minutes
RMLD 4 year average outage (2006-2009) — 50.98 minutes per outage
On average, RMLD customers that experience an outage are restored in 60.29 minutes.
18000
55.09
60.00
140.00
M
120.00
100.00
80.00 62.54
m 54.69 56.31 57
.05
Q 60.00
S
U 40.00 23.2
G 20.W
0.00 , ^ nn w ♦ ♦ `L
a4't d` 2°'r peu Yep'
0 Monthly minutes per outage
— • RMLD 12 month system average outage duration 60.29
3
System Average Interruption Frequency (SAIFI) - Measures how many outages each
customer experiences per year on average.
SAIFI =Total number of customer's interrupted/Total number of customers.
RMLD 12 month system average - .44 outages per year
RMLD 4 year average outage frequency - .82
The graph below tracks the month-by-month SAIFI performance.
1.00
0.91
0.90
F 0.80
0.70
r 0.80
b o.so
0.50
e 0.40
� 31
0 s
zo a z1
0.20 0. t
0.10
0.00
H—RMLD monthly outage frequency
— • RMLD 12 month system average outage frequency .44
—RMLD 4 ear average outage frequency.82(2006-2009)
Months Between Interruptions (MBTI)
Another view of the SAIFI data is the number of months Reading customers have no
interruptions. At this time, the average RMLD customer experiences an outage
approximately every 27.3 months.
4
j RMLD R.�,�MI.... ole.
...,:i.. :u... . .c.x...a.a
230 A. atlas
P.O.a 130
Real%MA0186/-0230
T&(781)9141340
Fm:(791)942-2409
Web:www.mdd.cao
February 21,2032
Town of Reading Municipal Light Board
Subject: RTU Station Controllers and Supplementary Services
On January 11, 2012 a bid invitation was placed as a legal notice in the Reading
Chronicle requesting proposals for RTU Station Controllers and Supplementary
Services for the Reading Municipal Light Department.
An invitation to bid was emailed to the following:
Power Equipment Sales Schneider Electric Nova Tech
Reliatronics JF Gray Power Tech UPSC
Power Sales Group WESCO Graybar Electric Company
Shamrock Power Sales Hasgo Power Robinson Sales
EL Flowers Stuart Irby HD Supply
Bids were received from Survalent Technology Corporation and CG Automation
Solutions USA Inc.
The bids were ppublicly opened and read aloud at ll:oo a.m. February 8, 2012 in the
Town of Readin Municipal Light Department's Board Room, 23o Ash Street,
Reading,Massachusetts.
The bids were reviewed, analyzed and evaluated by the General Manager and the
staff.
Move that bid 2012-27 for RTU Station Controllers and Supplementary Services be
awarded to:
Survalent Technology Corp. for a total cost of$94,023.00
Item(desc.) Manufacturer Total Net Cos[
Item 1 Two RTU Station Controllers& Survalent 94,023.00
support services
as the lowest qualified bidder on the recommendation of the General Manager.
Fik:aidM12/RTU,
ATTACHMENT
� .
R[a imiiht n cipa1 U&D.Par,��,
RMLD
2 O Ash Suet.P.O.Box 150
Reading.MA 018674250
The total FY12 Capital Budget allocation for 'Remote Terminal Unit (RTU)
Replacement — Station q" is $52,000. in 2011, the RMLD was found to be out of
compliance regarding substation distribution transmission as required by ISO
OPx18. Fulfilling OF x18 requires the installation of an additional RTU beyond
what had been planned for FY12.
V.-,j
cent F.C. eron Jr. 61
Kevip
Sullivan
Peter Price
Foe Bid/M2/RTUs
| | All,
$! § f £ ! | ) { � § ! { ■ i | |
§ § ! ! 2 a U ® ! ■
! ,
| | ` ■ ` ! � � � � 2 ! | ! � !
• ! ! : { � ! , | | | ■ ■ ! : ! : ! ! « � !
§ ■ ! a ! ° !
) )
,
. , !
§ § § ) \ \ } \ \ \ { \ § ) \ \
RMLDRawly ma-kip.1 Ll,ht Dq,,A a.
ae a La eU.re-ro. LaaparlOae
I 130 AA Shear
P.O.Boa 130
Reading,MA 018670230
Tel:1781I94a-1340
Fax:17811942-2109
Web:
February 14,'_012
Town of Reading Municipal Light Board
Subject: Line Truck Lift Equipment Inspection and Preventative Maintenance Service
On January 12, 2012 a bid invitation was placed as a legal notice in the Reading Chronicle requesting
Proposals for Line Truck Lift Equipment Inspection and Preventative Maintenance Service for the Reading
Municipal Light Department.
An invitation to bid was emailed to the following:
D.C. Bates Equipment Consolidated Utility Equipment
Services,Inc.(C.U.E.S.) 1&D Power Equipment,Inc.
James A. Kiley Co.
A bid was received from James A. Kiley Co.
The bid was publicly opened and read aloud at 11:00 a.m.February 8,2012 in the Town of Reading Municipal
Light Department's Audio Visual Spurt Room,230 Ash Street,Reading, Massachusetts.
The bid was reviewed,analyzed and evaluated by the General Manager and staff.
Move that bid 2012-29 for Line Truck Lift Equipment Inspection and Preventative Maintenance Service be
awarded to:
James A.Kiley Co.for 5115,560.00
Item 1 Lim Truck Lift Equipment Inspection and Preventative Maintenance 5715,560.00
Service
as the lowest qualified and responsive bidder on the recommendation of the General Manager. This is a
three-year contract.
IFB 2012-29 is funded through the Transportation Operating budget.
7
Lutcc �u, b
nn•ntF Came n.1r - _ - - --
1 vs l� I lana)kif -
1
Craig Lln
YII2 N I in• rruck I.Jt Fqupm,•m Imry%tem anJ Pnv rntmn',•11.untrnar.-a•ti•n ua•,ha
\ ) �
] °
\ 2 !
\ ) .
e !
)
!
3 �
)
3 i
)
§ _ }
\ k
/ �
\ � § k \ 0 k
i
RMLDRe.dra8 MuUkipd Lir61 Npanmear
� rnuue . ... ro• �rxr.,n„n I,
270 Ash sueer
p0.Boa 170
Rsadini,MA 01867-0270
Tel:178119 a 1140
Fu:(781)WZd409
WW wwwrmlacom
February 14,'_012
Town of Reading Municipal Light Board
Subject: Line Truck Chassis Inspection and Preventative Maintenance Service
On January 12, 2012 a bid invitation was placed as a legal notice in the Reading Chronicle requesting
proposals for Line Truck Chassis Inspection and Preventative Maintenance Service for the Reading Municipal
Light Department.
An invitation to bid was emailed to the following:
Dynamic Heavy Repair Glynn Equipment Repair Lowell Fleet Maintenance
Ryder Truck Rental&Leasing Taylor&Lloyd, Inc. S. Benedetto&Sons, Inc.
A bid was received from Taylor&Lloyd, Inc.
Fhe bid was publicly opened and read aloud at 11:00 a.m.February 8,2012 in the Town of Reading Municipal
Light Department's Audio Visual Spurt Room,230 Ash Street Reading, Massachusetts,
fhe bid was reviewed,analyzed and evaluated by the General Manager and staff.
Move that bid 2012-30 for Line Truck Chassis Inspection and Preventative Maintenance Service be awarded
to:
Taylor&Lloyd,Inc.for$106517.56
Item 1 Line Truck Chassis Inspection and Preventative Maintenance Service $106,517.66
as the lowest qualified and responsive bidder on the recommendation of the General Manager. This is a
three-yearconttact.
IFB 2012-10 is funded through the Transportation Operating budget.
r
GGcef,• p(,i L c
mmol F k a Cron, Ir.
Ju . Dun�htfe -
('ralg� lq n
\� ]u1±.V1I nu• rnr.Ar'bae.0 lmpvum anJ Pnn.nlan�r \lamrtrraac Fn.vda
N
v
m
N
m
of r c
i° W
d
o '9c
Fel nl
p
C ry f'ypC N
U
2
r
J
D A
O m ~ A
N N
u
N R
5 c
N m
u
t � V
V i o O
� C
~ m N v I O
e !
cot p a S E
� m m
RMLD a adiag Maiikip.l Deputmew
........ ....at ... ..........
230 Ne San
P.O.aw 170
Reading.MA 018674270
41:(781)9141340
Fee:(781)912-2409
we►:...,add.caa
February 15,2012
Town of Reading Municipal Light Board
Subject: Meters
On January 18, 2012 a bid invitation was placed as a legal notice in the Reading Chronicle requesting
proposals for Form 12 S Network ERT Meters for the Reading Municipal Light Department
An invitation to bid was emailed to the following:
WESCO Graybar Electric Company Austin International Inc. Power Tech UPSC
Stuart Irby Holbrook Associates Sensus Metering Systems AvCom Inc.
JF Gray Meterman Supply Inc. Shamrock Power Hasgo Power
Robinson Sales EL Flowers Power Sales HD Supply
Bids were received from Aveom,Irby and Graybar Electric.
The bids were publicly opened and read aloud at t1:oo a.m. February 8, 2012 in the Town of Reading
Municipal Light Department's Board Room,23o Ash Street,Reading, Massachusetts.
The bids were reviewed,analyzed and evaluated by the General Manager and the staff.
Move that bid 2012-31 for Form 12 S Network ERT Meters he awarded to: AvConz Inc. for a total
coat of 837,550.00
Item(desc.l Manufactamr Qty Unit Cost Total Net Q
1 Form 12S,Class 200,12o volts Network ERT meters Itron 500 75.10 37.550.00
as the lowest qualified bidder on the recommendation of the General Manager.
These meters are for the new projects Reading Woods,3o Haven St. and the Diamond Crystal project
in Wilmington. The Capital Budget allowed for 130 units totaling$10,400(item B).
;,'neentV
.C-1 1eron,Jr.
Kevl Sullivan
Nick D'Alleva
1.1. lea. F)12 21.12.It
f! � §
| .
! t ! ! ! |
\
! ) | ■ ! ! IJ
i fiq
4 ■ � \ � | �
! $ ^ $) }
m ) fi
! $ ) |
] � | ! :
| ! (
\ j �
} | ■ ! f |
„ � � � � � 4 , , � | ; � , , „ • |
■
,
)it \ |
�
!Ism
�
\� \� h� \r 19
is R § |
| .
tj
\�
�
Page I of I
Jeanne Fotl
�'11111ir From: Vincent Cameron
Sent: Tuesday, January 24, 2012 1 SS PM
To: RMLD Board Members Group
Cc: Bob Fournier; Steve Kazanjian; Jane Parenteau; Jared Carpenter; Jeanne Fo i; Kevin Sullivan
Subject: FW. Account Payable Questions-January 13, 2012
Categories: Red Category
O'Neill
1. Mini (customer) - I am curious why all the documentation provided from the customer was unsigned
quotes, not actual invoices.
The RMLD rebates are based on technologies and not what was spent by the customer. Information on
the projects is for RMLD records and to see how the market is progressing. We keep a record of many
projects costs, however, the projects costs are private and for internal use only. If the
customer negotiated a better price for the project, we would not know about it. The RMLD does actual
inspections and we do not require signed invoices as proof the work was complete.
2. United Power Group-This cost will be added to the Gaw capital project? Why was no contract
prepared, there seemed to be ample time?
Some of this cost was a Gaw project extra and some of the cost was NERC based. The work related to
the transfer scheme rewiring was Gaw project related. While UPG was on site present,we asked UPG
to do some work on the Under Frequency relays to satisfy the North American Electric Reliability Council
requirements.
1 14 '1111
Page I of 3
Jeanne Foil
From: Vincent Cameron
Sent: Tuesday, February 07, 2012 11 04 AM
To: RMLD Board Members Group
Cc: Bob Fournier, Steve Kazanjian; Jeanne Foil, Wendy Markiewicz
Subject: FW. Account Payable Questions - Februray 3, January 27 d 20
Categories: Red Category
February 3
O'Neill
1. Wire Transfer-MA -GM signature needed.
It is signed.
2. Asplundh-One invoice for$2,236.25 is missing.
Thera was a Question on one of the Asplundh bills, which was put in for payment. I pulled it out to review
it and didn't get it back in. It turned out the bill was correct.
3. Rubin 6 Rudman-Please discuss first invoice re 2011 power supply in Feb. exec. session. Please
discuss fourth invoice re EOEEA in Feb exec, session.
Yes.
Soil
1. Sales Tax-GM signature?
It is signed.
2. Rubin 6 Rudman-What is a tolling agreement?What is EOEEA?
A tolling agreement is an agreement to waive a right to claim that litigation should be dismissed due to the
expiration of a statute of limitations, which was related to the MMWEC Arbitration, The EOEEA is the
Executive Office of Energy and Environmental Affairs.
Snyder
1. Asplundh-3rd bill work dated 1/21/11-1 assume this is a typo?No invoice. no customer copy for the
$2.23625
There was a Question on one of the bills I pulled it out to review it and didn't geld back 'n We are talking
to Asplundh about it.
2 ECNE - What is this organization? Does it provide good value?
Energy Council of Northeast The Engineering Dept. uses this group for engineering support and input on
,andue subjects
3 Office Depot - Ahat s Ire osollaung heater for?
Some of the areas in me office can be cold and this provides heat for the employees
2 7 2012
Page 2 of 3
i January 27
O'Neill
1. Cushing, Jamallo+ Wheeler- Please detail what"LSP services"are included in the$15K on PO 12-E00164.
The spill at Ryan Road was a transformer that came o0 a pole and hit the ground after a tree hit a pole during the
October snow storm. There was a release of od, which needed to be cleaned up.
2. Rubin and Rudman-Are legal expenses usually this high for finalizing a bid? I would like both bids and
associated legal costs discussed in the next executive session, if appropriate, in open session.
Yes. I will do this.
3. TransDala -Please explain this bill. What happened to these meters? Why were they worth repairing at this
price?
These meters needed repair due to lightening and other problems. The RMLD spent$3,317 to repair them. To
replace each meter would have cost over a$1k a pieta.
4. Town of Wilmington-Why no PO?
This is payment to the Town of Wilmington for a pole relocation. This is necessary for relocating pole, so there is
no PO necessary.
Snyder
1. Century Bank- How,do you check these -some of the numbers aro extraordinarily large.
The last column"Required Balances"is for Century Bank internal use only and is not related to the RMLD
transactions We have called Century and asked them to take this off the statement.
2. Concentra -Who gets these physicals?
New employees.
3. TransDala-What is"scrambled memory"and why some ®250 - some at 3757(-Ditto Above)
The memory has been affected due to lightening or some other problem. It is cheaper to fix the memory than to
buy a new unit.
4. Utility Services - What is Aurora Vulnerability? + What is misoperalions report?
Aurora Vulnerability - The destabilization of rotating equipment via physical or cyber means with a motive to
destroy such equipment
M,sopelation reporting- Quarterly reporting of any mrsoperations on the 115kV that may have influenced the DP
Gistnbution Provider) reliabdhty Causes to this may be vegetation. relay ovennp operations, equipment failure.
etc
January20
LO'Neill
1 Fourrver Pettycash 'Why didn't Granite City order go through the PO process
272III_2
Page 3 of 3
The RMLO needed a circuit breaker box for the Wildwood substation, immediately. The employees made the
purchase on an emergency basis without a PO.
Snyder
1. ISO- Some of these go back to 2008 how are we checking?
The Energy Service Division (ESD)balances kwh and dollars monthly. ESD will call the ISO-NE if they believe the
credits are incorrect.
2. Petty cash remember: Need receipts for everything.
I have checked the receipts and they are all there.
3. Reading Car Care t Stoneham Motor- Reminder: P.O. post dates work. Should be done before work
authorized.
Sometimes there is work needed to be done that the RMLD needs estimates on. When we find out the amount
we cut the PO. The vendor may date their invoice the day the car arrived.
4. Standard Electric- The standard electric confusion .explanation re: lack of P.O. is an example of why need
P.O. front. Please explain what was billed vs. credit.
The RMLD needed a circuit breaker box for the Wildwood substation, immediately. The employees made the
purchase on an emergency basis without a PO.
One for$214.77 and another for$188.98. The credit part of the bills is the payment for each purchase. There
was a discount of$2.20 on one bill. The payment is correct.
Jeanne Foti
Executive Assistant.
Reading Municipal Light Department
781-942-8434 Phone
781-942-2409 Fax
Please consider the environment before printing this e-mail.
2:7 2012
Page I of I
Joanna Fill
19 From: Vincent Cameron
Sent: Friday, February 17, 2012 9:35 AM
To: RMLD Board Members Group
Cc: Bob Fournier; Steve Kazanjian;Jeanne Fol Wendy Markiewicz
Subject: FW: Account Payable Questions- February 10
Categories: Red Category
Snyder
1. Pfeiffer-Why is this from May 2011 +customer listed is Timothy Shand?
Commissioner-Please call me on this and I will explain the sitivation.
2. Sage-Could you clarify each of these line items please.
1. Automatic Check Handling 2. Paperless Invoices, 3. Bounced Checks,4. Rejected Transactions, 5.
Total Transactions, 8. Statement Fee, and T. Credit Card Fee.
3. PURMA-Why wasn't door repair paid by the insurance?
Under the contract with JCM the repair is RMLD's responsibility. The repair cost is under our deductible
amount.
IL 4. TCI of NY-Why are we still seeing PCB's?
This was a pole mounted distribution transformer installed in 1978 on Old Farm Road, Reading. It was
taken out of service recently and a larger transformer was installed.
After being taken out of service, the transformer tested out at 97 PPM of PCBs and was disposed of
property. We have approximately 885 transformers in service that were purchased between 1980- 1979.
We are checking manufacturer records for these transformers to determine the insulating oil make up.
The RMLD has an approximate total of 3,208 transformers in service.
O'Neill
1, TCI of NV-Where was this material from?
Please see Item 4 above.
Payroll
Hahn
1 Overtime discrepancies between payroll and OT listing.
The Line Deptpayroll overtime costs for 2/17112 matched against the Bi-Weekly 0fr payroll listing in the
Excel spreadsheet. The Bi-Weekly O/T payroll listing is a new report on the OR Bo-Weekly payroll and
when it printed out(in EXCEL) it printed the 2/3112 Bi-Weekly OR amounts column and not the
®2117112 Bi-Weekly 0?amounts column.
Ike reprinted the O!T report for 2117112 with the correct Bi-Weekly amounts. I put the 2117112 Bi-Weekly
0?report with a copy of the 2/17/12 payroll in your mail slot.
22 2012
Page I of I
Jeanne Fold
From: Vincent Cameron
Sent: Wednesday, February 22, 2012 1:45 PM
To: RMLD Board Members Group
Cc: Bob Fournier; Jane Parenteau; Steve Kazanjian; Jeanne Foh; Wendy Markiewicz
Subject: Answer to Payables 2/17112
Categories: Red Category
Snyder
1. MacQuarie-Financials-What is Energy Swap + what is the relation between Volume, Fixed, and
Float prices+amount due? How do we track the peak and off peak usage in the physicals sales?
Energy Swap represents the Heat Rate contract that RMLD signed with MacQuarie. On four separate
occasions in 2011, RMLD locked in the Natural gas prices which represent the Fixed Prices column. The
Float prices are the penultimate pricing for natural gas when the market closes in December,2011 for
January 2012. The amount due for financial is simply the difference between fixed and float price times
the volume. The On-Peak and Off Peak usage is the original amount that RMLD issued the RFP
for. Those amounts are fixed within the Purchase Power Agreement. RMLD tracks the amounts through
the ISO-NE billing system. We are able to verity the Mwhs supplied by each supplier. Once the natural
gas prices are "locked" in, RMLD calculates the pricing of the contract and verifies the amounts that are
invoiced.
2. Accurate Calibration-What is the annual calibration? This seems like something for which the PO
should have done upfront for sure. Same goes for American Arbitration.
The RMLD has it meter testing equipment calibrated once a year. The Requisition was created on
January 28, 2012, the day of the invoice. The PO was cut the next day.
The American Arbitration bill goes to our attorneys first and then to us. We didn't get the bill
until February 7, 2012 , the day the requisition was created. The PO was cut on February 10, 2012.
3. Collins-Wasn't this door a recent bill?
The recent bill was replacement of the entry door in the Barbas Warehouse that had to be replaced. The
Collins bill is to repair an overhead door at 218 Ash Street, which is the garage.
4. DOER-Is this a new assessment?
No. We get this assessment once a year for Residential Conservation Services from the Massachusetts
Department of Energy Resources.
5. JCM Realty-What is so much electricity in the warehouse?
The etec ricity is for lighting, heating, ventilation(fans), office space, etc. The history on the bill shows
that it is very steady usage.
O'Neill
1. Choate. Hall. and Stewart - Please review at the Feb. Executive Session.
Yes I was going to suggest to put that on the agenda.