HomeMy WebLinkAbout2012-05-30 RMLD Board of Commissioners Minutes(W
Start Time of Regular Session:
End Time of Regular Session:
Reading Municipal Light Board of Commissioners
Regular Session
230 Ash Street
Reading, MA 01867
May 30, 2012
7:30 p.m.
9:02 P.M.
Commissioners:
Philip B. Pacino, Chairman, Secretary Gina Snyder, Vice Chair
Mary Ellen O'Neill, Commissioner Robert Soli, Commissioner
Marsie West, Commissioner
Staff:
Vinnie Cameron, General Manager Beth Ellen Antonio, Human Resources Manager
Robert Fournier, Accounting/Business Manager Patricia Mellino, Facilities Operational Assistant
Kevin Sullivan, Engineering and Operations Manager Jane Parenteau, Energy Services Manager
Citizens' Advisory Board:
George Hooper, Member
Public:
John Carpenter
Opening Remarks /Approval of Meeting Agenda
Chairman Pacino called the meeting to order and stated that the meeting of the Reading Municipal Light Department (RMLD) Board
of Commissioners is being broadcast live at the RMLD's office at 230 Ash Street, Reading, MA. Live broadcasts are available only
in Reading due to technology constraints. This meeting was being videotaped for distribution to the community access channels in
North Reading, Wilmington and Lynnfield.
airman Pacino explained the order of this evening's meeting, first would be introductions, any public opinion or input would be
greatly appreciated at that point, then discussion of the Renewable Energy Policy with reports from the Policy and Power & Rate
Committees, the RECs, the approval of the minutes, reports in terms of the Budget Committee, additional items under the Power &
Rate Committee, public bids and if they are able to get to them, the reports from the staff. Chairman Pacino stated that in terms of
input that the public wants to make on the Renewable Energy policy and on the RECs which are items three and four on the agenda
that he would appreciate if that is made at the Public Input area which is number two. Chairman Pacino said that there has been a lot
of discussion about the Renewable Energy policy in various forums and also about the RECs and that he would really like to keep
items three and four as discussion among the Commissioners. Chairman Pacino stated that he respects everyone's opinion in terms of
that and does not want to cut anybody off. He reiterated that he would really appreciate it if what needs to be said about the
Renewable Energy policy and the RECs be said under the Public Input. Chairman Pacino also requested that all be respectful of other
member's opinions and rights in terms of where we are at. Chairman Pacino stated that he would be respectful of everyone's opinion
and will listen and asked that all would do that as well.
Introductions
Chairman Pacino turned the floor over to CAB member George Hooper. George Hooper introduced himself as being from the Town
of Wilmington and a CAB member.
Chairman Pacino asked if there were any members of the public that wished to speak. John Carpenter thanked Chairman Pacino and
introduced himself noting that most would know him from Town Meeting and long time volunteer etc. Mr. Carpenter stated that he is
here tonight because he is concerned about the Renewable Energy Credits and this Board's policy toward them. Mr. Carpenter said
that his personal opinion is that the wider, longer term conservationist's position should be to sell the Renewable Energy Credits
because it creates an economy that further incentivizes conservation investment. Mr. Carpenter said that he looked forward to the
Board's comments and then thanked Chairman Pacino.
Chairman Pacino stated that at the last meeting, it was not decided who would be the Secretary for this evening's meeting and then
asked for volunteers. Chairman Pacino said that since it is a critical meeting he would again serve as the Secretary for this meeting
d asked for a volunteer for the next meeting. Mr. Soli volunteered to serve as the Secretary for the next meeting.
Regular Session Meeting Minutes
May 30, 2012
Renewable Energy Policy
Policy Committee — Commissioner Soli (Attachment 1)
Mr. Soli reported that the Policy Committee met in early May and was sent a policy draft that came from the Power & Rati
Committee. Mr. Soli said that the draft contained four changes. Mr. Soli stated that the first it laid the responsibility on Energy
Services here at the Light Department and the Committee felt as the Board they could give responsibilities to themselves and could
give responsibility to our committees, and could give responsibilities to the General Manager and that is about it, so that was taken
out. Mr. Soli said that in the time between the Power & Rate Committee came up with their draft and it got to the Policy Committee
the Commonwealth of Massachusetts had stepped in and biomass as a renewable energy source got much stricter so the Committee
added the word "potential" biomass as a source. Mr. Soli said that in terms of smaller changes, since the value of the RECs is
considerable and some people have estimated that $30 million over fifteen years, a paragraph was added saying that there should be
accounting for these in the financial reports each month and in the annual report each year. Mr. Soli commented that the Committee
thought that was a small, but important change. Mr. Soli said that the one that is bigger and probably controversial was to change
what would be the disposition of the RECs. Mr. Soli stated that previously coming out of the Power & Rate Committee it said
anything above a moving threshold, that threshold was quite high and could be sold, otherwise retired and coming out of the Policy
Committee it said we would retain only the RECs to account for the monies from the customers of Green Choice, anything above that
the RECs would be sold. Mr. Soli explained that is one in some sense probably controversial and at the end a motion was made to
recommend to the Board that the policy as amended for their edit and approval, that was 3:0.
Chairman Pacino asked if Mr. Soli wanted to make a motion that the Board adopt the policy and go from there.
Mr. Soli replied that he would make a motion.
Mr. Soli made a motion seconded by Ms. West to move that the Renewable Energy Policy as sent to the Board by the Policy
Committee be adopted by the Board of Commissioners.
Mr. Pacino then turned to the Power & Rate Committee.
Power & Rate Committee — Vice Chair Snyder (Attachment 2)
Ms. Snyder reported that the Power & Rate Committee had two meetings on the Renewable Energy policy, the first one was to crea
a policy as recommended and it was sent to the Policy Committee with a request that it be sent back if substantial changes were made.
The second meeting was to see if the Committee could somehow mesh the two policies and come to a consensus in order to achieve
certain goals of the General Manager and the desire on the part of the Board to take leadership, to address the questions about the
Green Choice Program and to clarify what it would be. Ms. Snyder said that the committee also discussed giving people an option for
a Brown Choice Program, to allow people who do not want to partake in renewable energy to opt out and to keep the Green Choice for
people who wanted to opt into more renewable energy than we currently have in our power supply which is somewhere between two
to three percent.
Ms. Snyder stated that it was felt at this point and time that it was too difficult to implement in the timeframe that they had and
thought this would be a good thing to pursue, but they would not have the time to do it with the kind of deadlines that they were
facing.
Ms. Snyder said that there was no motion or recommendations made, the committees could not agree on the policy
Ms. Snyder said that there were two members of the public at the Policy Committee meeting on May 1 and they were treated rather
shabbily, when they were finally allowed to speak, one of them told Ms. Snyder after the meeting that he was afraid to speak
considering how the other member of the public was treated. Ms. Snyder stated that the other member of the public did very strongly
support the Power & Rate Committee policy to keep the RECs and that was the only public comment they had at that meeting.
Chairman Pacino stated that if Ms. Snyder wanted she could move to amend the motion that Mr. Soli has made by replacing it with the
one by the Power & Rate Committee as recommended if they want.
Ms. Snyder replied, so moved.
Ms. O'Neill seconded the motion
Chairman Pacino said that they do have an amendment on the floor which is to basically to replace what the Policy Committee hi
proposed which is the original motion with what the Power & Rate Committee has proposed.
Chairman Pacino opened the floor for discussion.
Regular Session Meeting Minutes
May 30, 2012
Power & Rate Committee — Vice Chair Snyder (Attachment 2)
' 'Jiairman Pacino stated that he very much supports in terms of the policy element item `B" which is the goal to have five percent of
%pie renewable energy in our portfolio and it was one of the reasons that he originally voted in the Power & Rate Committee to move
this forward and reiterated that he very much supports that. Chairman Pacino said that he does feel that in terms of the RECs for the
years 2012 and 2013 that some of them need to be sold and some of them need to be retired.
Chairman Pacino said that if they do adopt what the Policy Committee has that the Green Choice Program needs to be strengthened
and reinvented in order to get the word out to more people as to what the Green Choice Program is going forward. Chairman Pacino
stated that Ms. Snyder had a good idea with what she termed "the Brown Choice Program ", but is not sure quite how to adopt that.
Chairman Pacino asked if the Committee at this point would they like to move to table this, hold off and look at it further and
particularly to take a look at Ms. Snyder's idea going forward in terms of the Brown Choice at that point.
Chairman Pacino stated that there was another item on the agenda is item 4 which actually deals with RECs that are due to expire on
June 15 and that there will be discussion and a possible motion made on that.
Ms. West stated that she would like to reiterate some comments that she had made earlier at the Power & Rate Committee discussion
related to policy. Ms. West said that we have a Policy Committee that would be where she would expect policies to be developed and
to come out of and the subcommittee that is the Power & Rate Committee is related to approving power contracts and approving rates.
Ms. West stated that this is neither of those things and so it is outside the realm of the subcommittee and does not think that this is
necessarily the right place to be getting guidance on that particular policy. Ms. West also pointed out that there are a lot of good goals
being reflected in there, but there is definitely not consistency in terms of the definition of renewable energy, whether renewable
energy has to include the REC certificates or not, is not a consistent thing. Ms. West said that we have a legal opinion from RMLD
attorneys that says that is not necessary to be part of it. Ms. West believes that if we are looking at a total environmental benefit using
funds we get from selling the RECs and using that money in the following year to invest in a truly renewable energy source would be
a much better benefit than if we had bought power from a renewable energy source. Then we would also have additional money to
invest that we would have had originally. Ms. West said that from an environmental benefit, that total all in benefit to the
environment is much greater than if we take RECs and just retire them. Ms. West stated that we have some very clear input that we
ve gotten when this Board met last year or the beginning of this year; the Board said that we will take seriously the input of the
mmunity and will act upon that input from the community. Ms. West said that the entire Board of Selectmen from North Reading
had come to a RMLD Board meeting and said that they felt that there needed to be a balanced approach to this and that all RECs
should not be retired. Ms. West stated that there was an email from the Board of Selectmen in Reading that stated the same thing, and
also a motion from the CAB that repeats that, and so coming up with any kind of an approach that at our current levels means that we
retire every REC we have does not seem to be getting at the public opinion that we stated that we would be responding to. Ms. West
said that her inclination would be at this point is to completely table all policy discussion, that there are still a lot of things that need to
be worked out and that it is really not clear enough at this moment for us to be able to move forward and that she is not comfortable
moving forward with the Brown Choice or Opt Out Program for all of the rate payers and is not comfortable that they have clarity or
consistency or agreement in terms of definitions.
Chairman Pacino asked Ms. West if she would like to move to table. Ms. West replied that if people want to discuss it that would
probably be an important thing to happen.
Ms. Snyder stated that she wanted to clarify that the Power & Rate Committee is the committee that originally voted to recommend
these renewable energy projects, the concept and at the time when she was on that committee was that it was for all the attributes and
that there was no question at that point and time about selling any of the attributes which is what the Renewable Energy Certificates
are that is why it is her thought that it is appropriately the Power & Rate Committee that was looking at the issue and asking questions
of the General Manager and Energy Services Division. Ms. Snyder said that we will not be able to invest funds of the renewable
energy source without doing additional filing for a different rate because this money will need to go back into the purchased power.
Ms. Snyder stated that one thing that you could do was to go back and ask for a rate increase so you could invest in renewable energy.
Ms. Snyder said that as our former Chair indicated that energy efficiency is probably the best investment actually for what you can get
for your money. Ms. Snyder reported that the input that she had from the community and that quite a few people have mentioned to
her that they appreciate the work that we have done to get renewable energy and money to support all the attributes. Ms Snyder
wanted to make those points stating that she believes that keeping the Renewable Energy Certificates is supported by quite a few
embers of the community and in fact the Policy Committee heard that as well.
Regular Session Meeting Minutes 4
May 30, 2012
Power & Rate Committee — Vice Chair Snyder (Attachment 2)
Mr. Soli said that we have a couple of things that deal with this, "Purpose" it says from the strategic plan, "demonstrate leadership and
excellence in providing low cost, clean and reliable electric service ", further the Board has a policy governing its actions, Policy 1
which talks about having low cost power, lower than any investor owned utility in the state and lower than any municipal that touche
our service territory. Mr. Soli stated that the hydro power that we get right now is running about $.096 per kilowatt hour and the cost
of just energy alone is $.04 per kilowatt hour, clearly the hydro power without the RECs is much higher and if you include the price of
capacity our average cost is $.0667. Mr. Soli said that if we sold the RECs for the Swift River Projects it would actually come in at a
lower price, but if you let the RECs go away you are almost 50% higher and if you are buying something that is 50% higher he
doesn't think that is low cost electricity. Mr. Soli said that he is sure that all the Commissioners have heard from people and all the
folks he has talked to mostly said that they think that renewable energy is good, but keep the price down, some of the people have said
that some of those projects are so expensive and have suggested that we should try and get rid of them because they are so costly. Mr.
Soli stated that he is a coordinator for a volunteer tax preparation site where they did about 550 tax returns, among them a lot of retired
people. Mr. Soli said that some of the widows are living on social security and for one in particular he did a calculation, when taking
away the cost of her property tax she is left to live on sixteen dollars a day and believes she would surely back let's have low cost
power. Mr. Soli thinks that we ought to not just throw away this piece of paper that has value. Mr. Soli thanked Chairman Pacino.
Mr. Cameron wanted to respond to one thing that Commissioner Snyder said about the rate. Mr. Cameron said that he does not
believe that we would have to increase our rates or have another rate increase in order to develop our own Renewable Energy Project
and thinks that could come from the Capital Budget. Mr. Cameron stated that it would be a Capital Budget item because he believes
we would own say a solar installation that we could put together so he does not think that we would need a rate increase or a special
rate for that. Mr. Cameron said that Capital budget items are items that we decide to spend money on that we capitalize and own and
that we could own a solar development.
Chairman Pacino asked if anyone was waiting to make a motion to table at this point.
Ms. West stated that she would like to make a motion to table at the moment, it is her belief that they are probably not going to come
to an agreement and that it will probably be a really close vote and that it would be best to continue to work on this and wait.
Chairman Pacino said that he personally agreed and wished that they had more time to work out some of their differences.
1 e item. Ms. West replied that she did not know that was something
Mr. Soh asked Ms. West to identify the period of time to table the p g
that she needed to say.
Chairman Pacino said that the idea was to table it but not bring it back in December and thinks that it would need to come back
probably within the next two to three months. Mr. Cameron said that we still have the date of June 15 to retire the RECs
Chairman Pacino stated that potentially the policy would come back for discussion within the next couple of months where we can
work out some of our differences and wished that they had more time to work out their differences.
Mr. Soli asked the Chairman if he could get a second so that they could discuss item four and that he would feel uncomfortable tabling
the policy discussion for months until after they have dealt with item four and moved to table all motion on the policy until item four
has been resolved.
Ms. West seconded the motion.
Chairman Pacino stated that they would then go to item four where there would be discussion and potential motions as to item four
and once item four is resolved item three would potentially be taken back from the table at that point and be re- discussed.
Ms. Snyder asked if she could make a motion to amend the motion to be tabled for three months. Chairman Pacino replied that they
could certainly do that.
Mr. Soli stated point of order and that the tabled motion is not discussable or amendable.
Chairman Pacino said that he was absolutely right and that Ms. West's motion was not seconded therefore that a motion is not on the
table at this point and Mr. Soli's motion is to table until discussion and resolution of item four is taken care of is on the table.
Chairman Pacino said that the motion has been moved and seconded, asked if there was discussion on the motion.
Mr. Soli made a motion seconded by Ms. West to table the policy discussion until after agenda item four has been resolved.
Motion carried 3:2:0. Mses. Snyder and O'Neill voted against.
Regular Session Meeting Minutes
May 30, 2012
Discussion/Motions relating to Renewable Energy Certificates expiring June 15, 2012
"hairman Pacino asked Mr. Cameron to report on the present status of the RECs that are going to expire on June 15.
Mr. Cameron reported that we have not done anything with them, they are just banked.
Chairman Pacino asked the value of the RECs. Mr. Cameron replied the approximate value based on the market that we have seen
recently is that we have over 18,000 megawatt hours of RECs 60% of those RECs are worth about $5,000 to $7,000, about 40% of the
RECs are worth about $300,000 and that these are estimates based on the market that we have seen recently. Mr. Cameron stated that
he could not guarantee those numbers it is like looking at the stock market you take a snapshot and make an estimate.
Chairman Pacino asked for discussion at this point.
Ms. West asked that if the RECs that were worth more money are the Connecticut Class I. Mr. Cameron replied Connecticut Class I.
Ms. West stated that she would like to make a motion.
Ms. West made a motion seconded by Mr. Soli to move that the RMLD Board of Commissioners respond to the input and direction
from the CAB and Boards of Selectmen in Reading and North Reading with a balanced treatment of RECs by selling all the holdings
of Connecticut Class I RECs and retiring all holdings of Connecticut Class II RECs for 2011 with the proceeds to be returned to the
fuel fund.
Ms. West wanted to point out that there has been a lot of input on this and that we do not have any requirement as a municipal utility
to hold RECs and that she remains unconvinced of the fact that there is really a true environmental benefit for holding these and is not
in agreement with others on her committee. Ms. West said that she understands that they have a different view on things and that she
believes that it is much more valuable for us to sell some and retire some of the RECs, sell the ones that are worth more money and
use that money to invest in our utility and to benefit rate payers as a whole. Ms. West stated that the current level of RECs that we
have in our supply is about 2.5% versus the policy that was proposed at 5% so it is significantly below the policy that was proposed.
Ms. West said that the Green Choice is around .1% and is a small portion overall, and by taking this move we are still making an
Qort that is above and beyond the clear direction we have from people who have said that they want to pay extra for their energy no
atter what. Ms. West stated if we are coming to an agreement and compromise here in this particular case and it is in alignment with
the direction that we have gotten from different votes.
Ms. West said that she thinks this is a good idea and thinks that the Board should continue to purchase renewable energy when it
makes sense fiscally for us to purchase that energy with Renewable Energy Certificates which allows us for in the future if we need
that we got it and does not believe that when we buy that we should automatically say we are going to hold and retire them forever.
Mr. Cameron asked Ms. West for clarification that if she had said for calendar year 2011. Ms. West replied it is the 2011 RECs that
are getting ready to expire.
Chairman Pacino asked for further discussion. Chairman Pacino also pointed out that we are retiring 60% of the RECs which is pretty
significant number and we are actually only selling 40% in terms of that.
Ms. Snyder wanted to clarify a point that was made earlier that when we buy the RECs, we incentivize to use a term that Mr.
Carpenter used, power generators to invest in renewable energy and create renewable energy, when we sell those RECs we put them
back on the market so somebody else is then creating the incentive by buying them, we are no longer creating the incentive. Ms.
Snyder wanted people to understand how it actually works.
Chairman Pacino stated that since this has been an important issue he was going to poll each member of the Board so it is reflected on
the record so there is no doubt. The vote was taken in order of seniority with the Chairman being the last vote.
Mr. Soli, Aye; Ms. O'Neill, Nay; Ms. Snyder, Abstain; Ms. West, Aye; and Mr. Pacino, Aye.
Motion carried 3:1:1. Ms. O'Neill against and Ms. Snyder abstaining.
Chairman Pacino said the vote being three in favor, one against and one abstention, the motion to sell the RECs and retire a portion of
the RECs has passed at this point.
scussion on Renewable Energy Policy
airman Pacino said they will now go back to agenda item three for the discussion on the Renewable Energy Policy and it is now
back on the table for discussion.
Regular Session Meeting Minutes
May 30, 2012
Discussion on Renewable Energy Policy
Ms. West stated that she would like to make a motion on a particular policy that they have being the policy that was voted on by th
Policy Committee.
Ms. West made a motion seconded by Mr. Soli to move that the RMLD Board of Commissioners amends the Renewable Energy
Policy Section III A. as approved by the Policy Committee on May 1, 2012 to replace the current wording with the following: "III A.
Renewable energy includes all energy acquired from renewable energy generating sources as defined in M.G.L. Chapter 25A, Section
11F (b)."
Ms. West stated that when they were in the Policy Committee meeting that she did not believe that they should be coming up with our
own definition of renewable energy and believes that we should be using the state law's definition. Ms. West said that it is a much
safer way to go and allows us to as the state changes their policy as to what is allowable or not permissible as new energies become
available we do not need to continually change our policy to reflect that.
Chairman Pacino stated that a motion has been made and that is on the original motion, the amendment that is on the table now is to
substitute the Power & Rate Committee policy for the Policy Committee policy. Chairman Pacino will hold the motion from Ms.
West until the amendment that is on the table is voted upon.
Chairman Pacino asked for further discussion or if there is a desire at this point to table all motions on the issue.
Ms. Snyder moved to table for three months.
Ms. Snyder made a motion seconded by Mr. Pacino to table all motions on the Renewable Energy Policy.
Chairman Pacino stated that the motion they made under item four only deals with the RECs that are expiring on June 15 and does not
deal with any of the future RECs at all and is not to be interpreted as any kind of direction going forward, it only deals with the RECs
that are expiring in the next fifteen days.
Chairman Pacino said that Ms. Snyder's idea of the Brown Choice maybe something that they needs to be explore, stating that he sa
it tonight for the first time
Motion carried 3:2:0. Mr. Soli and Ms. West voted against.
Chairman Pacino wanted to thank all the members stating that John Fitzgerald Kennedy who is one of his heroes in life wrote a book
called "Profiles in Courage ", and that this issue has been a profile in courage among all here stating that there has been a lot of
pressure on all and does thank and respect everybody's opinion and everybody's thoughts and is hopeful that going forward something
can be worked out.
Approval of April 25, 2012 Board Minutes
Ms. Snyder made a motion seconded by Ms. West to move that the RMLD Board of Commissioners approve the Regular Session
meeting minutes of April 25, 2012 with changes.
Motion carried 4:0:1. Ms. O'Neill abstained.
Mr. Soli said that on page six, paragraph under Optic Splicing fourth line asked if the word "caption" is the right word.
Mr. Cameron said that the word should be "capture" and Mr. Sullivan agreed.
Mr. Soli said that on page three under Power Supply report, first paragraph, last line to insert the word "per" after $.046.
Ms. Snyder stated that there were a couple of typos and she thought she could give to them instead of taking our time.
Mr. Pacino asked that all typos be passed on to the Department.
Report of Board Committees
Budget Committee — Chairman Pacino
Mr. Cameron reported that the budget was presented jointly to the Budget Committee and the CAB on May 9 and 16, with the Capita
budget first and the Operating budget second. Mr. Cameron said that both budgets were approved by the CAB and the Budget
Committee at those meetings.
Regular Session Meeting Minutes 7
May 30, 2012
Report of Board Committees
Budget Committee — Chairman Pacino
airman Pacino reported that they met in joint session the Budget Committee and the CAB; one meeting was here at the RMLD and
the other in Wilmington Town Hall in accordance with the agreement to have one meeting outside of Reading. Chairman Pacino said
that they went over the budget, the first night to vote on the Capital budget where there were a lot of questions and in the end it was
approved. The Budget Committee recommended the Capital budget by a vote of 3:0:0. Chairman Pacino stated that in terms of the
Operating budget there that was held in the Wilmington Selectmen's room, the budget was reviewed, changes presented and the
Budget Committee did recommend the Operating budget by a vote of 3:0:0.
Chairman Pacino stated that the Budget Committee is recommending that both budgets be accepted. Chairman Pacino did say that
there was discussion that they need to review the process as to what and how the budgets get presented.
Fiscal Year 2013 Capital Budget
Ms. West made a motion seconded by Ms. O'Neill to move that the RMLD Board of Commissioners approve and recommend the
draft of the FY13 Capital Budget as presented in the amount of $6,423,414 on the recommendation of the Budget Committee.
Motion carried 5:0:0.
Fiscal Year 2013 Operating Budget
Ms. West made a motion seconded by Ms. O'Neill to move that the RMLD Board of Commissioners approve and recommend the
RMLD FY13 Operating Budget as presented based on a Net Income Amount of $3,280,709 on the recommendation of the Budget
Subcommittee.
Motion carried 5:0:0.
Chairman Pacino stated that the Budget Subcommittee within the next month or so needs to meet and discuss the presentation in terms
of that noting that part of the problem when looking at the current year's budgets and not having prior years to compare figures. This
is an issue that going forward should be looked at.
L I wer & Rate Committee — Vice Chair Snyder
lar Energy Hub —16 Upton Drive, Wilmington
Ms. Snyder made a motion seconded by Ms. West that the Reading Municipal Light Department (RMLD) Board of Commissioners
authorize the General Manager of the RMLD to finalize negotiations and execute a contract with Solar Energy Hub for the purchase of
not more than 500 kilowatts of solar power, in a term not to exceed 15 years, on a site at 16 Upton Drive, Wilmington, Massachusetts.
Motion carried 4:0:1. Mr. Soli abstained.
Ms. Snyder reported that there were two items on the agenda and asked if the first item had gone to the Board at the last meeting. Mr.
Cameron replied that it had not and that they had to move both of these this evening.
Ms. Snyder said that we have a couple of projects that are very similar to the one that we also approved and the staff speaks very
highly of them and they will help a couple of our customers as well as helping us to shave our peak by using solar energy.
Mr. Cameron stated that you are going to see more of these and that there will probably be more discussion in the Power & Rate
Committee about maybe trying to streamline the process because we have a single developer that has been coming to us with these
types of projects. Mr. Cameron said that he would just assume get this one and the next one done so we can get going with those. Mr.
Cameron stated that these are good projects which are beneficial to the RMLD.
Mr. Soli asked if this was to buy power and said that he heard no mention of the rate. Mr. Cameron replied that the rate was done in
Executive Session and presented the rate to the CAB and to the Power & Rate Committee; the contracts are not signed yet and
therefore did not want to make the rate public.
Mr. Soli asked if it was like previous solar projects. Mr. Cameron replied, yes.
Mr. Soli said that he sure did wish we had a policy to deal with this stuff. Mr. Cameron stated that he did not think
that it would make a difference.
Snyder said that the philosophy behind these projects is different from the projects that we are going out for under the recent
olicy discussion so they are not particularly comparable.
Regular Session Meeting Minutes
May 30, 2012
Report of Board Committees
Power & Rate Committee — Vice Chair Snyder
Solar Energy Hub — 24 Industrial Way, Wilmington
Ms. Snyder made a motion seconded by Ms. O'Neill that the Reading Municipal Light Department (RMLD) Board of Commissioners
authorize the General Manager of the RMLD to finalize negotiations and execute a contract with Solar Energy Hub for the purchase of
not more than 1.5 megawatts of solar power, in a term not to exceed 15 years, on a site at 24 Industrial Way, Wilmington,
Massachusetts.
Motion carried 4:0:1. Mr. Soli abstained.
M.G.L. Chapter 30B Bids — Material (Attachment 3)
2012 -37 Puller Tensioner Trailer
Ms. Snyder made a motion seconded by Mr. Soli that bid 2012 -37 for Puller Tensioner Trailer be awarded to Sherman & Reilly, Inc.
for $68,910.00 as the lowest qualified and responsive bidder on the recommendation of the General Manager.
Motion carried 5:0:0.
Mr. Sullivan stated that the first bid is 2012 -37 for a Puller Tensioner Trailer which is a piece of equipment that gets hooked up to the
back of a line truck, which can pull wire underground and overhead. Mr. Sullivan said that we sent out six bids and received one back.
Mr. Sullivan explained that the bid was built around looking at two different trailers both in the Commonwealth. RMLD employees
went to the sites and checked out both the trailers. Mr. Sullivan stated that the resounding comment from both the utilities visited was
that if you are looking to obtain something that is both compact in design and heavy duty that is the way to go. Mr. Sullivan said the
thought process was that this piece of equipment hooked up to the back of a line truck would get moved out of the roadway and does
not need to take up a lane and can get left there. Mr. Sullivan stated that the line truck can pull away, pull off to the side and the piece
of equipment acts as a standalone. Mr. Sullivan reported that this bid was built around a single axle dual wheel trailer and the FY2012
Capital budget amount for this item is $75,000.
Chairman Pacino asked why we only got one bidder. Mr. Sullivan replied that no one wanted to break from their current design which
is usually a single wheel, dual axle trailer.
Chairman Pacino asked what are we doing different here. Mr. Sullivan replied that we actually built this around a more compact desi
based on our visits to the two utilities.
Chairman Pacino asked if we had the other design would we have gotten more bidders then and would it had been a lower or higher
cost. Mr. Sullivan replied higher cost and that there was actually another trailer out there with a single axle but it was light duty.
Mr. Cameron said that he thought Mr. Sullivan covered it but when we do bids like this we go to the employees that have to use the
equipment and they actually look at the equipment. Mr. Cameron stated that this is what they can do the job with. Mr. Sullivan said
that we did put a committee together on this.
Chairman Pacino said that we seem to get a lot of one bidders on a lot of these things and it is concerning to the Board and other
Commissioners have expressed that opinion. Mr. Pacino stated that we do not want to be at the point where we are saying that our
specifications are so geared to just one bidder at this point and asked if anyone would like to address this. Mr. Cameron replied that we
do our bids under Chapter 30B. Mr. Cameron said that answering Chapter 30B bids is cumbersome for some companies, they have to
follow a lot of rules, and a lot more rules than they would have to follow in the private sector. Mr. Cameron stated that there is no
requirement for bid bonds in the private sector, so some companies choose not to put the bids together. Mr. Cameron said that the fact
that we had a committee put together that said this is the type of equipment we want for the Tensioner Puller Trailer and that we did not
make it proprietary, it was a piece of equipment that we wanted and resulted in what we got for bidders.
Ms. Snyder wanted to further emphasize what was just said and stated that what your are indicating is that there was a committee for
what the employee wants and that in this particular instance will support this and asked if there was any training that people get on 30B.
Ms. Snyder stated that we have got to get more bidders to bid and that this is not working. Mr. Cameron replied that he does not think
that it has to do with training. Mr. Cameron said that when they get the bids they look at what they have to respond with and a lot of
these people deal with the public sector not the private sector.
Regular Session Meeting Minutes
May 30, 2012
M.G.L. Chapter 30B Bids — Material (Attachment 3)
'12 -41 Outdoor, Pole Mounted, Solid Dielectric, Auto - Recloser (AR)
s. Snyder made a motion seconded by Mr. Soli to move that bid 2012 -41 for Outdoor, Pole - Mounted, Solid Dielectric, Auto - Recloser
(AR) be awarded to Schneider for a total cost of $76,500.00 as the lowest qualified and responsive bidder on the recommendation of the
General Manager.
Motion carried 5:0:0.
Mr. Sullivan stated that bid 2012 -41 is for an Outdoor, Pole Mounted, Solid Dielectric, Auto - Recloser which is a piece of equipment
essentially a switch in the sky that operates as a circuit breaker midway between the beginning and end of the circuit. Mr. Sullivan said
that this bid is for five reclosers; we sent out nine invitations and received five responses. Mr. Sullivan reported that in the Engineering
notes, the initial bidder Stuart Irby was found to be nonresponsive on two separate counts; the customer list only listed two municipal
utilities in Massachusetts both Chicopee and Princeton. Mr. Sullivan said that there was a third, Braintree light who actually had an
issue with the recloser and that none of these units are connected to a SCADA system which ours will be and it was stated in the bid.
Mr. Sullivan stated that the operator control panel of this particular recloser does not include push buttons and LEDs with the
programmable functions and indications which were also required. Mr. Sullivan reported that the FY12 Capital budget allocation for
reclosers is $125,000.
2012 -43 Licensed Site Professional LSP
Ms. Snyder made a motion seconded by Ms. West to move that bid 2012 -43 for Licensed Site Professional (LSP) Services be awarded
a contract to Cushing, Jammallo, and Wheeler, Inc., for a three year period beginning July 1, 2012 for an estimated cost of $27,000.00
per year based on a 3 year average at the rates indicated in their price proposal, as the lowest, most qualified bidder on the
recommendation of the General Manager.
Motion failed 0:3:2. Mr. Pacino, Mses. Snyder and O'Neill voted against. Mr. Soli and Ms. West abstained.
Ms. Snyder stated that she was not in support of this bid.
r. Sullivan reported that on April 16 we sent out sixteen invitations, two were received back for the LSP which is an individual that
(licensed by the Commonwealth to provide professional guidance, to secure and mitigate hazmat situations and also give
o`Icumentation over to the EPA and DEP. Mr. Sullivan stated that based on the Engineering evaluation there is minimal and
comparative criteria and that between the two bidders under the minimal criteria there is no training provided by Vineyard
Engineering & Environmental Services that was a provision of the spec. Mr. Sullivan said that the bidder hires outside vendors to
provide training. In addition under the comparative criteria Vineyard Engineering Environmental was found not advantageous, they
have less than three and one half years of experience with Massachusetts utilities.
Ms. Snyder stated that she had requested that when we went out for Licensed Site Professional Services that part of what we would
request and evaluate the bids on is whether they have had any issues, orders, or penalties at the sites that they were overseeing. Ms.
Snyder said that she really wanted to see that information from the bidders and stated that she could not support this particular
company.
Chairman Pacino asked that Mr. Cameron address this.
Mr. Cameron said that he had talked with Commissioner O'Neill and thought that the request had come from her. Mr. Cameron
believed that he must have misunderstood and thought that in making our decision we were to take into consideration that Cushing,
Jammallo, and Wheeler did have a fine in the past related to our clean up. Mr. Cameron stated that he not realize that we were
supposed to put it in the bid analysis and that it was not in there. Mr. Cameron said that quite frankly we will have to go back out for
bid if that is what you want and that you cannot just ask two people to say what happened here. Mr. Cameron stated that he could not
say that we would get more bidders. You can see right here that of the two people that responded, one of them had some concerns
with the RMLD.
Ms. Snyder asked what about last year specific last year all the various clean ups. Mr. Sullivan replied that analysis is in there.
Ms. Snyder said that is the average and asked if that is going up or down.
AV 4 . Sullivan replied that the estimated cost is only based on the three years. Ms. Snyder asked that over those three years has
cost been going up or down.
Mr. Sullivan replied that he did not know for sure and said that it depends on how often the spills occur, how bad they are, etc.
Regular Session Meeting Minutes
May 30, 2012
10
M.G.L. Chapter 30B Bids — Material (Attachment 3)
2012 -43 Licensed Site Professional LSP
Chairman Pacino asked that if we delay on this do we have to go out for rebid. Mr. Cameron replied, yes.
Chairman Pacino asked what the affects would be for rebidding. Mr. Cameron replied that given what we would be asking he did not
believe that we would get any more than two.
Chairman Pacino said you could get less than two. Mr. Cameron replied that you might.
Ms. O'Neill said that when we bid this back in 2009 we did get numerous responses and does not understand why this time we got so
few. Ms. O'Neill stated that she would not be able to vote in favor of this either and would like to see a better effort made to get some
more bids. Ms. O'Neill realizes that it is small but said there was more interest the last time. Ms. O'Neill said that she knows that
they certainly did well by us, so maybe other people would see that some of the big things are out of the way.
Ms. West said that what she is hearing is conflicting things from members of the Board; people are saying that they would like to see
more people bidding on the business, but they would also like to put more constraints and more requests for information. Ms. West
stated that the more information and the more constraints that you put in there the fewer responses you are going to see, not more. Ms.
West said that given the fact that we are talking about $27,000 a year what might be best is to go ahead and vote on this particular item
and to incorporate this into future bids.
Chairman Pacino stated that the concern he has is his thought that this was asked for and just information and asked Ms. Snyder if that
was correct.
Ms. Snyder replied that it was information and also a very good way to assess and that other public agencies do ask for this kind of
information so that they can assess the qualifications considering the issues that we have had in the past using this LSP.
Mr. Soli said that what he would like to have seen somehow or other we know that for Cushing & Jammallo that the cost wa
estimated at $27,000 the other item is there no such bottom line.
Mr. Sullivan said that the cost is estimated based on Cushing, Jammallo, and Wheeler and that they have been our LSP for the past
three years so the cost had to be estimated with them. Mr. Sullivan stated that is was an historical cost based on history and that the
numbers that you see under the price table those numbers from 7/1/12- 6/30/13 are the exact same numbers that we have right now.
Mr. Soli said that he understands that but somehow or other you took so many of the site professional manager, blah, blah, blah and it
worked out to be $27,000 a year average. Mr. Sullivan replied, actually no sir. Mr. Sullivan stated that what we did was to take the
historical spills, the total amount of historical spills and divided that into three and it came out to $27,000 per year.
Mr. Soli said that when you are in Engineering, you would have to get similar certain person there at their billing rates and some
bottom line estimate an estimated number would come out, is that so. Mr. Cameron replied yes, and it would probably be higher
because their rates are higher.
Ms. West said that every one of the rates appears to be higher when comparing tables so it would certainly be higher and that she does
not see anything lower.
Mr. Soli said that it would be a number that is higher but you don't know what that number is.
Chairman Pacino asked Mr. Cameron what the process would be if this bid is not affirmed, would he rebid it? Mr. Cameron replied,
yes.
Ms. West asked that if we have a need for this type of service in the interim, is this for some time in the future that we are going to
have this bid for. Mr. Cameron replied that the bid runs out this month.
Mr. Sullivan added June 30.
Ms. West said so then we will have a period of time when we do not have someone under contract, necessarily. Mr. Cameron stated
that under the 30B rules you can extend a contract up to 25% of the original contract price and hopefully that this will carry us throug
until we have to do another bid.
Regular Session Meeting Minutes
May 30, 2012
11
M.G.L. Chapter 30B Bids — Material (Attachment 3)
112 -43 Licensed Site Professional LSP
%Whairman Pacino said that his feeling where two members of the Commission have raised concerns that this needs to be rebid and
address the concerns of the two members who have expressed concerns.
2012 -44 Hazmat Remediation Services
Ms. Snyder made a motion seconded by Ms. West to move that bid 2012 -44 for Hazmat Remediation Services be awarded to ENPRO
for a three year period ending June 30, 2015 for an estimated budgeted cost of $150,000.00, as the lowest qualified bidder on the
recommendation of the General Manager.
Motion carried 4:0:1. Ms. Snyder abstained.
Mr. Sullivan reported that the bid was sent out April 12, was for Hazardous Waste removal services which was sent out to twenty-five
prospective bidders and received five in return. Mr. Sullivan stated that the total award is for $150,000 for a three year period and
ENPRO met all of our requirements as you see in the Engineering spreadsheet.
Ms. Snyder asked how it is that you came up with the actual number or is it the same that you did before. Mr. Sullivan asked the
$150,000. Ms. Snyder replied, yes. Mr. Sullivan added that is actually in the Operating budget for a three year period at $50,000 per
year.
Ms. Snyder asked if that number is based on previous year's experience. Mr. Sullivan replied no, that it is based on the number in the
Operating budget.
Ms. Snyder asked where that number came from. Mr. Cameron replied that number is kind of historic based on regular spills that we
see, not anything big or intrusive. Mr. Cameron said that it is an estimate in the budget.
2012 -45 Pad - Mounted Switchgear
Ms. Snyder made a motion seconded by Ms. O'Neill to move that bid 2012 -45 for Pad - Mounted Switchgear be awarded to WESCO
C r a total cost of $39,483.00 as the lowest qualified bidder on the recommendation of the General Manager.
otion carried 5:0:0.
Mr. Sullivan reported that on April 26, we sent out eleven invitations for bid, four were received in return and that this bid is for three
pad -mount units which consists of two separate feeds on the pad -mount for commercial installations. Mr. Sullivan stated that there are
approximately thirty of these in place system -wide and that this unit is for Reading Woods and also to replenish inventory. Mr.
Sullivan said as seen on the Engineering spreadsheet that WESCO met all the requirements, although he would bring to the Board's
attention that we did specify S & C and did obtain four separate bids for one manufacturer.
Chairman Pacino asked on which one. Mr. Soli replied the previous one.
Ms. Snyder stated that the vote was 4:0:1.
Mr. Soli asked who the one was. Ms. Snyder replied it was her.
Mr. Sullivan said to Chairman Pacino that before they go on he had one last note also on a bid that he wanted to re -cover from last
month. Mr. Sullivan stated that a couple of the members of the Board had a question on the Fiber Optic Splicing. Mr. Sullivan
reported that 2012 -38 is the bid number and the question from the Board was why there were there only responses from one bidder on
the Fiber Optic Splicing. Mr. Sullivan said that they had polled a couple of the other bidders that attended the pre bid here at the
RMLD and found that one bidder did not have the personnel to work in the power space and they could not take the splicing cases
down to the ground and put them back up and would have been financially improper to do that. Mr. Sullivan stated that the second
bidder's experienced splicers are deployed with the National Guard overseas and these are the email responses from them.
Chairman Pacino said, "God bless those men ".
Power Supply Report — April 2012 — Ms. Parenteau (Attachment 4)
Ms. Parenteau reported that RMLD's load for April was approximately 52.5 million kWhs and that was about a little less than 2%
crease when compared to April 2011. RMLD's energy cost came in at approximately $2.15 million and that is equivalent to a little
er $.04 per kilowatt hour.
Regular Session Meeting Minutes 12
May 30, 2012
Power Supply Report — April 2012 — Ms. Parenteau (Attachment 4)
The Fuel Charge adjustment which the customers pay was set at $.0475 per kilowatt hour for the month of April, the sales totaled 53.
million kilowatt hours, as a result of that the RMLD over collected by approximately $334,000 resulting in a Deferred Fuel Cash
Reserve balance of $2.4 million. The Fuel Charge remained at $.0475 for the month of May and it is currently projected to be
increased slightly to $.05 for the month of June.
The RMLD purchased about 13.6% of our energy requirements from the ISO New England Spot Market and that was at an
approximate cost of about $28 per megawatt hour. Ms. Parenteau reported on the Capacity side the RMLD hit a peak demand of 104
megawatts on April 16, 2012 at 5:00 p.m., the average temperature was about 90 degrees and this compares to a peak demand of 93
megawatts last year where the average temperature was about 67 degrees. Ms. Parenteau stated that in April we had a string of
considerably hot weather. The RMLD's monthly capacity requirement was set at 200.9 megawatts; the total dollars paid for capacity
totaled $1.35 million which is equivalent to approximately $6.73 per kilowatt month.
Table 4 shows capacity and energy as well as the amount of energy in kilowatt hours. The April average cost for capacity and energy
came in a little over $.066/Kwh.
Table 5 shows the transmission costs for April came in at $613,000 and that is approximately a 4% increase when compared to the
previous month of March.
Tables 6 and 7 are the energy efficiency reports where table 6 shows the commercial side savings are a result of work with the
commercial/industrial customers by the Energy Efficiency Engineer and Key Account Managers. Ms. Parenteau stated that they are
utilizing the Customized Rebate Program as well as lighting rebates, for FY12 they have rebated 35 projects and that resulted in
project savings of up to 150 kW which included one solar commercial installation and the account projected kilowatt hour sales were
3,531,000.
Ms. Parenteau reported on the residential side for tables 6 and 7 these savings are a result of our Residential Energy Audits and
Appliance Rebates. For FY12 there have been approximately 173 residential audits performed, on the Appliance Rebate side for
FY12 we have totaled 1,082 rebates and the value of rebates returned to our customers has been $51,540. Ms. Parenteau stated thak
the current estimated demand savings for the residential program is 186 kW and the energy savings are projected at 90 megawa;
hours.
Chairman Pacino asked if there was anything unusual or unexpected in the Power Supply Report.
Ms. Parenteau replied that she would like to report to the Board, that on May 18, the Energy Services and the General Manager went
out for the annual RFP and received final prices, as a result of that they selected Constellation and the total four year megawatt hour
purchase was 467,000 and that came in under $.045, they have very attractive prices.
Ms. West requested that in table 4 where they are getting the energy information she would like to see an indicator on here if any of
these energy sources meet the state definition of renewable energy sources, so if we are purchasing any of our energy from that she
would like to see an indicator that says yes, that it meets the state definition.
Engineering and Operations Report — April 2012 - Mr. Sullivan (Attachment 5)
Gaw Update
Mr. Sullivan reported that Projects 1 and 2 are complete. Project 3 — Upgrading Old Lynnfield Center URD's — the excavation
contract is mobilized and the work will begin tomorrow. Project 4 — RTU Replacement — the equipment delivery is expected on June
4 and the install FY13. Project 5 — Reclosers — we began preparation for two recloser installs today and the balance will be done in
June. Project 6 — Capacitor Banks — will be complete next month. Project 7 — SCADA Radio Communication System — has been
postponed until FY14. Project 8 — Relay Replacement Project — all the relays have been received and the installation will take place in
FY13. Project 9 — 115kV Disconnect Replacement — the third disconnect was installed between May 1 -3, the last unit will be installed
during the July Fourth week.
There were two new commercial installations this past month condos at 30 Haven Street, Reading and 911 Main Street, Wilmington,
and twenty -five residential installations for the month.
Mr. Sullivan reported that 40 cutouts were replaced the past month bringing the total to 278 fiscal year to date.
Mr. Sullivan reported on the Reliability Report and the Customer Average Interruption Duration Index (CAIDI) is very static for the
month it is virtually exact to the prior month, also monthly value and the rolling average.
Regular Session Meeting Minutes
May 30, 2012
13
Engineering and Operations Report — April 2012 - Mr. Sullivan (Attachment 5)
'aw Update
e System Average Interruption Frequency Index (SAIFI) rolling average and incidents numbers for the month are just about the
same with the monthly number being lower than the previous month other than that things are exact.
The Months Between Interruptions (MBTI) remains static at 29.3 months between interruptions.
Number of calls for the month was 95; outage incidents 9; customers affected 260; feeder outages 1; area outages 10; and 1 service
outages. Causes of outages were the normal distribution that we have had over several months.
The meter project has approximately 19,000 residential meters installed.
Chairman Pacino asked if there was anything unusual or unexpected in the Engineering and Operations Report. Mr. Sullivan replied,
no.
Mr. Soli said that he noticed that Mr. Sullivan did not say anything about Gaw. Mr. Sullivan apologized and reported that it will
actually be closed out next month.
Chairman Pacino asked if everything is done. Mr. Sullivan replied just billing retainage that is it. Mr. Sullivan said that we got the
last invoice this month.
Mr. Soli asked if it would be closed out in the June report. Mr. Sullivan replied that it should be closed out in the June report.
Chairman Pacino asked so all you are doing is holding retainage on the contract and that there is no work being done. Mr. Sullivan
replied that all the work for the project was completed months ago.
MSnyder asked for clarification on Project 4, if Mr. Sullivan said that the equipment is coming on June 4, but the project is being
G;Sted in FY14.
Mr. Sullivan replied, correct.
Ms. Snyder asked if all the equipment is here are we going to store it until FY14.
Mr. Sullivan replied that the equipment is not here the expected arrival is the week of June 4
Ms. Snyder asked if we were going to store it for a year. Mr. Sullivan replied FYI 3.
Ms. Snyder said that she thought Mr. Sullivan said FY14. Mr. Sullivan stated that it is FYI 3.
Financial Report — April 2012 — Mr. Fournier (Attachment 6)
Mr. Fournier reported on the Financial Report for April 2012. Mr. Fournier said that there was nothing unusual or unexpected to be
reported on for the fast ten months of the year. Mr. Fournier stated that he would be reporting on the April 30 financials for the first
ten months of this fiscal year.
Mr. Fournier reported that the Net Income or the positive change in Net Assets was approximately $600,000 increasing the year to
date Net Income to a little over $3 million; year to date budgeted Net Income is $5 million resulting Net Income being under budget
by $2 million or 40 %.
Mr. Fournier stated that actual year to date Fuel Expenses exceeded Fuel Revenues by $622,000. Year to date Base Revenues are
under budget by $2.3 million or about 6 %. Actual Base Revenues are at $37.6 million compared to the budgeted amount of $40
million. Year to date Purchase Power Base expense is under budget by $1.5 million or about 7 %. Actual Purchase Power Base costs
were at $20.7 million compared to the budgeted amount of $22.2 million.
Mr. Fournier reported that the year to date Operating and Maintenance expenses combined are under budget by a little less than
-'300,000 or 3 %. Actual Operating and Maintenance expenses were at $9.5 million compared to the budgeted amount of $9.8 million.
EL preciation Expense and Voluntary Payments to the Towns were on budget and those payments will be going out next month to the
our towns. Operating Fund balance was at $10.1 million, Capital Fund $3.8 million, Rate Stabilization Fund a little over $6,072,000,
Deferred Fuel Fund $2.4 million, and the Energy Conservation Fund balance was at $238,000.
Regular Session Meeting Minutes 14
May 30, 2012
Financial Report — April 2012 — Mr. Fournier (Attachment 6)
Year to date kilowatt hour sales were 577 million which is about 23.1 million kilowatt hours or 4% behind last year's actual figure.
The Gaw revenues collected year to date were $577,000 bringing the total collected since the inception of the Gaw rate to $1.1
million.
Mr. Fournier reported that on the budget variance side, cumulatively the five divisions are under budget by $348,000 or 2.2%
General Manager's Report — Mr. Cameron
Northeast Public Power Association Annual Conference — Annual Conference (Attachment 7)
September 16 to September 19 - Sunday River Resort Bethel, Maine
Mr. Cameron reported that the Annual NEPPA Conference is September 16 -19, Sunday River Resort in Bethel, Maine and for any
Commissioners that would like to attend please let him know so reservations can be made.
US- Pakistan Exchange Program for Young Public Officials
Mr. Cameron reported that the Town of Reading hosted an exchange program with Pakistan for young public officials. On May 11,
Altaf Gohar, of the Inspector Federal Investigation Agency from Lahore, Pakistan and Sheyrar Sikander, Superintendent of Police, of
the Azad Jammu & Kashmir visited the RMLD. Mr. Cameron stated that they were in Reading for about seven or eight days and on
May 11 the RMLD had them for just the morning where they talked with each one of the departments, got an idea of how the RMLD
managed each department, and then took them out and showed them the system. Mr. Cameron said that they culturally they were
interesting to talk to and believed that their next stop would be Melrose.
Friends and Family Day — June 16
RMLD will have a booth and distribute safety and conservation materials.
RMLD Open Positions
Mr. Cameron stated that there are two open positions at the RMLD, Facilities Manager and Materials Management Manager.
Chairman Pacino asked Mr. Cameron to address what he would be doing with each of those positions. Mr. Cameron said that we are
filling the positions and that hopefully we will have both of those positions filled before the end of June.
Mr. Soli said that it looked like the profit for the year is problematical and there should be some discussion in June. Mr. Cameron
asked Mr. Soli if he meant the Net Income or change in Net Assets and that we could have a discussion in June.
Mr. Soli said that we would hope for hot weather, right. Mr. Cameron stated that wouldn't be bad and that we would just have to see
where we are for the end of the year, what we are looking like as far as a change in Net Assets go and have to see what our Operating
Fund looks like. Mr. Cameron said that we will not know as far as transfers until sometime in July or early August, after we have the
auditors come in. Mr. Cameron stated that we will have a Budget Committee meeting for that purpose.
Chairman Pacino said that at the last meeting that he did propose to put on the agenda questions for the General Manager and after
thinking about it and getting input from the other Commissioners, he decided that it was not a good idea and took it off.
General Discussion
Mr. Soli asked what National Grid is doing and that they beat us under three of the categories, three of the seven. Mr. Cameron
replied that he believed that they have lowered their fuel charge, having to do with natural gas prices.
Mr. Soli asked if they only have short duration contracts. Mr. Cameron replied that they can only go out for contract based on rules
pertaining to deregulation but does not know what the details are.
Mr. Soli commented that they are pretty dramatic numbers. Chairman Pacino asked if there was anything else for general discussion,
there was none.
BOARD MATERIAL AVAILABLE BUT NOT DISCUSSED
Rate Comparisons, May 2012
E -Mail responses to Account Payable /Payroll Questions
RMLD Board Meetinas
Wednesday, June 27, 2012 and Wednesday, July 25, 2012
Regular Session Meeting Minutes
May 30, 2012
Citizens' Advisory Board Meeting
pesday, June 12, 2012, 6:30 p.m.
IRW
Adjournment
At 9:02 p.m. Mr. Soli made a motion seconded by Ms. O'Neill to adjourn the Regular Session.
Motion carried 5:0:0.
A true copy of the RMLD Board of Commissioners minutes
as approved by a majority of the Commission.
Philip B. Pacino, Secretary
RMLD Board of Commissioners
15
Revision No. 1
General Manager
Purpose
POLICY COMMITTEE
RENEWABLE ENERGY POLICY
RMLD Policy No. Effective Date
Renewable Energy Policy
Review Date
Per Board Vote
Chairman /Date
ATTACHMENT 1
A. To develop an approach for implementing the vision of its strategic plan that the
RMLD "demonstrate leadership and excellence in providing low cost, clean and
reliable electric service."
B. To establish general guidelines that promote the inclusion of renewable energy
projects in order to further implement one of the primary strategies of the RMLD's
strategic plan to procure a long — term diverse and environmentally responsive
power supply portfolio.
Il. Responsibilities
A. RMLD Board of Commissioners
1. Responsible for approving this policy.
B. RMLD Power and Rate Committee
1. Review all staff - recommended renewable energy project proposals
and make recommendations to the Board of Commissioners.
C. General Manager
1. Responsible for implementing this policy.
Ill. Policy Elements
A. Renewable energy includes energy which comes from hydro,
solar, wind, geothermal, and (potentially) biomass sources and which include
the renewable energy certificates (RECs) that certify them.
B. The goal of the RMLD is to have five percent of its power supply portfolio
come from renewable energy sources by the end of calendar year 2012.
The percentage of the power supply portfolio deriving from renewable
energy resources will increase by one percent per year for the five
year period of 2013 -2017 at which time the RMLD Board will assess this
goal.
C. RECs associated with power supply contracts exceeding in value of the
customer purchased Green Choice RECs will be sold and the revenue will be
returned to the fuel charge.
D. If Massachusetts state law requires the RMLD to participate in the
Massachusetts Renewable Portfolio Standard (RPS) the RMLD will review
and make required adjustments to its power supply portfolio.
E. The RMLD will strive to diversify renewable energy projects by type, size,
and location and will also include environmental impacts in the evaluation
process.
F.. The value of the RECs held, sold, and retired by the RMLD shall be included in
the monthly financial reports prepared for the Board of Commissioners as well
as included in the RMLD Annual Report. The valuation of the RECs held and
retired shall be based on a mark -to- market valuation on the respective
reporting date.
W
POWER & RATE COMMITTEE ATTACHNtENT
RENEWABLE ENERGY POLICY
Revision No. 1 RMLD Policy No. Effective Date Review Date
Renewable Energy Policy
General Manager
1. Purpose
Per Board Vote
Chairman /Date
A. To develop an approach for implementing the vision of its strategic plan that the
RMLD "demonstrate leadership and excellence in providing low cost, clean and
reliable electric service."
B. To establish general guidelines that promote the inclusion of renewable energy
projects in order to further implement one of the primary strategies of the RMLD's
strategic plan to "procure a long — term diverse and environmentally responsive
power supply portfolio."
II. Responsibilities
A. RMLD Board of Commissioners
1. Responsible for approving this policy.
B. RMLD Power and Rate Committee
1. Review all staff - recommended renewable energy project proposals and make
recommendations to the Board of Commissioners.
C. General Manager
1. Responsible for Implementing this policy.
D. Energy Services Division
1. Responsible for assisting the General Manager in implementing this policy
and associated activities.
2. Responsible for presenting, evaluating, and overseeing the projects
necessary to achieve the goals of this policy.
III. Policy Elements
A. Renewable energy projects include those whose energy comes from hydro,
solar, wind, geothermal, and biomass sources and which include the renewable
energy certificates (RECs) that certify them.
B. The goal of the RMLD is to have five percent of its power supply portfolio
come from renewable energy sources by the end of calendar year 2012.
The percentage of the power supply portfolio deriving from renewable
energy resources will increase by one percent per year for the five
year period of 2013 -2017 at which time the RMLD Board will assess this
goal.
C. RECs associated with power supply contracts that are in excess of the
(i-W
1C
goal for 2012, 2013, 2014, 2015, 2016, and 2017 will be sold and the
revenue received will be returned to the fuel charge.
D. If Massachusetts state law requires the RMLD to participate in the
Massachusetts Renewable Portfolio Standard (RPS) the RMLD will review
and make required adjustments to its power supply portfolio.
E. The RMLD will strive to diversify renewable energy projects by type, size,
and location and will also include environmental impacts in the evaluation
process.
Reading Municipal Light Department
RMLD
RELIABLE POWER FOR GENFRArIONS
230 Ash Street
P.O. Boa 150
Reading, MAO 1867-0250
Tel: (781) 944-1340
Fax: (781)942 -2409
Web: www.nnid.com
May 8, 2012
"Town of Reading Municipal Light Board
Subject: Puller Tensioner Trailer
ATTACHMENT 3
On March 12, 2012 a bid invitation was placed as a legal notice in the Reading Chronicle requesting proposals
for one Puller Tensioner Trailer for the Reading Municipal Light Department.
An invitation to bid was emailed to the following:
DC Bates Equipment Co. Nesco Sales
Sherman & Reilly, Inc.
TSE International
A bid was received from Sherman & Reilly, Inc.
Sauber Manufacturing
Wagner -Smith Equipment Co.
,The bid was publicly opened and read aloud at 11:00 a.m. April 11, 2012 in the Town of Reading Municipal
Light Department's Audio Visual Spurr Room, 230 Ash Street, Reading, Massachusetts.
The bid was reviewed, analyzed and evaluated by the General Manager and the staff.
Move that bid 2012 -37 for Puller Tensioner Trailer be awarded to:
Sherman & Reilly, Inc. for $68,910.00
Item 1
Sherman & Reilly, Inc.
as the lowest qualified and responsive bidder on the recommendation of the General Manager.
'The FY2012 Capital Budget amount for this item is $75,000.00.
Kt F. meron, Jr.
_ n
i
Kevi Sulliv� -
2012 -37 I'llller Censioner l railer.doc
$68,910.00
Puller Tensioner Trailer
Bid 2012 -37
Responsive
Bidder Total Price Bidder Exceptions
Sherman & Reilly, Inc.
Item 1 $68,910.00 Yes Yes'
Notes:
i Excepouns are for piaceement of stop, turn, tad, running and nu~ lights 2nd
tire size - exceptions meet or exceed RMLP expectations
2412 -37 Puller Tensioner TrailerAs
two� (4w (460
RMLD
May 21, 2012
Reading Municipal Light Department
RELIABLE POWER FOR GENEVA r1UN5
230 Ash Street
p0. Box 150
Reading. MA 0 1867 -02 50
Tel: (781) 944 -1340
Fax: (781) 942 -2409
Web: www.rmld.com
Town of Reading Municipal Light Board
Subject: Outdoor, Pole - Mounted, Solid Dielectric, Auto - Recloser (AR)
On March 23, 2012 a bid invitation was placed as a legal notice in the Reading Chronicle
requesting proposals for Outdoor, Pole- Mounted, Solid Dielectric, Auto - Recloser (AR) for
the Reading Municipal Light Department.
An invitation to bid was emailed to the following:
Wesco Distributors J.F. Gray Co. Robinson Sales Graybar Electric
Stuart C Irby Powertech -UPSC Shamrock Power Sales Hasgo Power
Power Sales Group
Bids were received from Stuart C Irby, Schneider Electric, WESCO, Power Sales Group and
Cooper.
(W The bids were publicly opened and read aloud at woo a.m. April 18, 2012 in the Town of
Reading Municipal Light Department's Board Room, 230 Ash Street, Reading,
Massachusetts.
The bids were reviewed, analyzed and evaluated by the General Manager and the staff.
Move that bid 2012 -41 for Outdoor, Pole- Mounted, Solid Dielectric, Auto - Recloser (AR) be
awarded to:
Schneider for a total cost of $76,500-00
Item (desc.) Q.Yt Manufacturer Unit Cost Total Net Cost
Item 1 Auto Recloser 5 Schneider 15,300.00 76,5oo.00
as the lowest qualified and responsive bidder on the recommendation of the General
Manager.
f ilk, find / Fl l-'; Rot Io-wr, 21112-41
RMLD 0
Reading .Municipal I ight Department
N1 1 I \PI t VWX I K 1 0K I %I N. %I ION,
231) Ash Street, P.O Box 150
Reading, �lA 1)1 W -0250
The total FY12 Capital Budget allocation for "Distribution Automation Installation -
Reclosers" is $125,000.
incent F. ameron Jr. 0
4(
Kev' Sulliva
Peter Price
I Ile: Hid /I 1 11; R(N lowr; 2012 -41
P]
Outdoor, Poie- mounted, Solid Dielectric Auto-Reckmw (AR)
Bid 2012 -41
Meet Certified Exceptions to
Total Net Specification Specification Firm All forms Check or stated bid Authorized
Bidder Manufacturer Delivery Date Unit Cost U2t Cost requirement Data Sheets Price filled out Bid Bond reoutrements signature
Stuart C Irby — non responsive no yes yes yes yes no yes
Rem 1 Auto Recloser NOJA Power 16-18 weeks 13,130.00 5 65,650.00
Engineers Notes: Scope stated that the units must be acceptable to major Electric Utilities in the area.
Customer List only listed 2 municipal utilities in Massachusetts (Chicopee and Princeton).
Braintree Light Department purchased a unit and is having trouble with the recloser. Bidder did not include Braintree on the customer list.
None of the units at Chicopee or Princeton are connected to a SCADA system.
There is no technical support office in the US. All technical support is out of Brisbane Queensland, Australia. The 10 hour time difference does not allow same day contact.
Lead times are 16 to 18 weeks and may be subject to delays because of customs.
NOJA operator control panel does riot include pushbuttons and LEDs with programmable functions and indications.
Schneider Electric yes yes yes yes yes no yes
Rem 1 Auto Recloser Schneider 6-8 weeks 15,300.00 5 76,500.00
WESCO yes yes yes yes yes yes yes
Rem 1 Auto Recloser ABB 12 weeks 17,178.00 5 85,890.00
Exceptions: The battery shall be capable of providing a minimum of 15 open and close operations.
The design allows 38 hours of standby battery power capable of performing multiple open -close operations.
Units shall come equipped with 3 voltage and 3 current sensors (one set per phase) for protection and metering purposes.
Units come with voltage and current detection sensors for metering purposes.
The Auto-Recloser shall include an optional accessory for converting an EW232 serial port to encrypted and authenticated IEEE 802.1 lb. Wireless communication.
Software shall be provided with this accessory to allow a personal computer (PC) or personal data assistant (PDA) access to the wireless port.
ABB will not provide a radio, but the 232 serial port allows users to supply their own radio.
The Auto-Recloser shall measure and report the battery level.
The Gridshield Recloser does not report the battery voltage level, but does provide the status of the battery.
The Auto-Recloser control shall include three independentEIA -232 serial ports and one EM 485 serial port for external communications. The recloser control shall
include two independent EIA -232 serial ports and one optional EIA-485 serial port for extemal communication. There shall be an option for DNP3 Level 2 protocol with bitmapping.
The Gridsheild Recloser is supplied with Ethernet RJ-45 + RS485/IRIG -B + RS232 + serial fiber optic with ST connector (COMB323A)
Power Sales Group yes yes yes yes yes no yes
Rem 1 Auto Recloser G&W 12 weeks 17,486.00 5 87 430.00
Cooper — non responsive no yes yes yes yes yes yes
Cooper 7 weeks 17,493.00 5 87,465.00
Exceptions: Battery BackLVUPS: Exception take to IEEE C62.41 Surge Protection. The F6 Control was tested for SW C using IEEE C37.60, C37.90.1, C37.92.2 and IEC 6000 -4 -2.
Control Cabinet: SS cabinet is painted.
Auto Recloser Control: Load Encroachment logic is not standard feature however special schemes have been provided and further details are needed from the customer.
See S280 -704 for a description of directional operations, voltage over /under operations and demand current.
Exception taken to communicate internal logic between F6 Controls.
No wireless Accessory offered however rear RS -232 port could be used for customer's wireless adapter.
Recloser Control does not have wear monitor with user- defined wear curves. See C280 -704.
See S280 -704 for Control Elements, remote mode and local modes.
J, 2012-41 A Jer Analysis.xis Page 1 VJ
RMLD CO)
May 24, 2012
Reading Municipal Light Department
RELIABLE POWER FOR GENERATIONS
230 Ash Street
P.O. Box 150
Reading, MA 01867 -0250
Tel: (781) 944 -1340
Fax: (781) 942-2409
Web: www.rmld.com
Town of Reading Municipal Light Board
Subject: Licensed Site Professional (LSP) Services
On April 16, 2012 a bid invitation was placed as a legal notice in the Reading Chronicle requesting proposals
for Licensed Site Professional (LSP) Services for the Reading Municipal Light Department.
An invitation for the request for proposal was emailed to the following:
Ankiewicz Environmental Services ATC Associates Inc.
EBI ENSOL, Inc.
Fay, Spofford & Thorndike, Inc. GEI Consultants, Inc.
Goldman Environmental Consultants, Inc. Lord Associates, Inc.
Ransom Environmental Consultants, Inc. Sak Environmental
Woodward & Curran
Cushing, Jammallo, and Wheeler, Inc.
EnTact Solutions, Inc.
GeoInsight, Inc.
Nobis Engineering Inc.
Weston & Sampson Engineers
Bids were received from Cushing, Jammallo, and Wheeler, Inc., and Vineyard Engineering & Environmental
Services, Inc.
The bids were publicly opened and read aloud at 11:00 a.m. May 9, 2012 in the Town of Reading Municipal
Light Department's Board Room, 230 Ash Street, Reading, Massachusetts.
The bids were reviewed, analyzed and evaluated by the General Manager and the staff.
Move that bid 2012 -43 for Licensed Site Professional (LSP) Services be awarded a contract to:
Cushing, Jammallo, and Wheeler, Inc., for a three year period beginning July 1, 2012 for an estimated cost
of $27,000.00 per year based on a 3 year average at the rates indicated in their price proposal, as the lowest,
most qualified bidder on the recommendation of the General Manager.
kincent nt F. Ca eron Jr.
Ke Sullivan
— –�rl -
(W Nick D'Alleva
File: Bid /FY12 /2012 -43 LSP
RFP 2012 -43
Licensed Site Professional (LSP) Services
Engineering Evaluation
Cushing, Jammallo, and Wheeler, Inc. and Vinyard Environmental Services Inc. are available for
further evaluation under the Comparative Criteria section of RFP 2012 -43.
Comparative Criteria lCushing, Jammallo & Wheeler
Demonstrated knowledge of Mass
contingency Plan, emphasis on LRA,
IRA, RAO, Method 1 and 3 Risk
Characterizations, in furnishing
services to electrical utilities in Mass.
Must have principal location to afford
minimal response time between
notification and arrival on site of
incident.
This category is 'Highly Advantageous'
They demonstrate the knowledge with
numerous MODF cleanups and they
have experience with several
Massachusetts utilities for a period of
more than 5 years.
This category is 'Highly Advantageous'
85 Constitution Lane, Danvers, MA
13.3 miles, 18 minutes (Mapquest)
Services, Inc.
This category is Not Advantageous' - They
demonstrate the knowledge with
numerous MODF cleanups, but they have
less than 3 1/2 years experience with
Massachusetts utilities.
This category is 'Highly Advantageous'
400 West Cummings Park, Woburn, MA
3 miles, 10 minutes (Mapquest)
Cushing, Jammallo, and Wheeler, Inc. was able to show more than five years of experience
performing LSP services relating to MODF releases for electrical utilities in Massachusetts.
F
Vineyard Engineering & Environmental
Minimal Criteria
Cushing, Jammallo & Wheeler
Services, Inc.
Licensed in Mass as a hazardous
yes
yes
Waste Site Cleanup professional
On call, available, willing to respond
yes
yes
24/7
Demonstrated 15 Min response time
Stated /demonstrated they could comply
Stated they could comply
to initial contact.
Demonstrated, experience, ability to
yes
yes
effectively sample and screen soil
samples in the field for MODF
(MODF - Mineral Oil Dielectric Fluid)
Demonstrated ability to perform soil
yes
yes
and groundwater sampling, oversee
soil boring contractor, perform soil
characterization and oversee the
installation of monitoring wells.
Demonstrated ability to provide
yes
No training. Hires outside vendors to
training and other environmental
provide training.
consulting services (SPCC plan)
SPCC yes.
(SPCC - Spill Prevention Control and
Countermeasures
Cushing, Jammallo, and Wheeler, Inc. and Vinyard Environmental Services Inc. are available for
further evaluation under the Comparative Criteria section of RFP 2012 -43.
Comparative Criteria lCushing, Jammallo & Wheeler
Demonstrated knowledge of Mass
contingency Plan, emphasis on LRA,
IRA, RAO, Method 1 and 3 Risk
Characterizations, in furnishing
services to electrical utilities in Mass.
Must have principal location to afford
minimal response time between
notification and arrival on site of
incident.
This category is 'Highly Advantageous'
They demonstrate the knowledge with
numerous MODF cleanups and they
have experience with several
Massachusetts utilities for a period of
more than 5 years.
This category is 'Highly Advantageous'
85 Constitution Lane, Danvers, MA
13.3 miles, 18 minutes (Mapquest)
Services, Inc.
This category is Not Advantageous' - They
demonstrate the knowledge with
numerous MODF cleanups, but they have
less than 3 1/2 years experience with
Massachusetts utilities.
This category is 'Highly Advantageous'
400 West Cummings Park, Woburn, MA
3 miles, 10 minutes (Mapquest)
Cushing, Jammallo, and Wheeler, Inc. was able to show more than five years of experience
performing LSP services relating to MODF releases for electrical utilities in Massachusetts.
F
RFP 2012 -43
Licensed Site Professional (LSP) Services
Price Table
Cushing, Jammallo & Wheeler, Inc.
STAFF
LICENSED SITE PROFESSIONAL
SR. ENG /PROJ MANAGER
ENGINEER /PROJECT MANAGER
FIELD GEOLOGIST
FIELD ENGINEER
CAD PERSONNEL
EQUIPMENT
PHOTOIONIZATION DETECTOR
PETROFLAG TEST KIT
7/1/12— 7/1/13— 7/1/14—
6/30/13 6/30/14 6/30/15
$125 /Hour
$130 /Hour
$135 /Hour
$103 /Hour
$108 /Hour
$108 /Hour
$85 /Hour
$90 /Hour
$90 /Hour
$55/Hour
$60 /Hour
$65 /Hour
$55 /Hour
$60 /Hour
$65 /Hour
$55 /Hour
$60 /Hour
$65 /Hour
$ 75 /DAY $ 75 /DAY $ 75 /DAY
N/A N/A N/A
$ 25 /SAMPLE $ 25 /SAMPLE $ 28 /SAMPLE
Comments:
Also, the above hourly rates reflect our services during a typical Monday
through Friday, 8AM to 5PM work week. Should our services be required
at other times, such as from 5PM to 8AM, Monday through Friday, or on
weekends or holidays, a 25% surcharge will be added to the applicable
hourly rates.
Vineyard Engineering & Environmental Services, Inc.
STAFF
LICENSED SITE PROFESSIONAL
SR. ENG /PROJ MANAGER
ENGINEER /PROJECT MANAGER
FIELD GEOLOGIST
FIELD ENGINEER
CAD PERSONNEL
EQUIPMENT
PHOTOIONIZATION DETECTOR
PETROFLAG TEST KIT
I'M
7/1/12— 7/1/13— 7/1/14—
6/30/13 6/30/14 6/30/15
$135 /Hour
$140 /Hour
$150 /Hour
$120 /Hour
$130 /Hour
$135 /Hour
$115 /Hour
$120 /Hour
$125 /Hour
$90 /1-lour
$95 /Hour
$95 /Hour
$90 /Hour
$100 /Hour
$100 /Hour
$80 /Hour
$80 /Hour
$80 /Hour
$ 85 /DAY $ 85 /DAY $ 85 /DAY
$ 100 /DAY $ 100 /DAY $ 100 /DAY
$ 30 /SAMPLE $ 35 1SAMPLE $ 35 /SAMPLE
Price table
RMLD
May 22, 2012
Reading Municipal Light Department
RELIABLE POWER FOR GENERATIONS
230 Ash Street
P.O. Box 150
Reading, MA 01867 -0250
Tel: (781) 944-1340
Fax: (781) 942 -2409
Web: www.rrnid.com
Town of Reading Municipal Light Board
Subject: Hazmat Remediation Services
On April 12, 2012 a bid invitation was placed as a legal notice in the Reading Chronicle requesting proposals
for Hazmat Remediation Services for the Reading Municipal Light Department.
An invitation for the request for proposal was emailed to the following:
Oil Recovery Corporation
Ar Sandri Inc.
New England Disposal Technologies Inc.
H &S Tank Cleaning Inc.
Clean Harbors Environmental Services Inc.
Autobody Solvent Recovery Corp.
Boston Green Fuel Company Inc.
Lighthouse Environmental Solutions LLC
Frank Corp
Western Mass Environmental LLC
Goulet Trucking Inc..
The Aulson Company Inc.
Univar Usa Inc.
Cyn Oil Corporation
Triumvirate Environmental Inc.
Advanced Pollution Control Corp.
Nasdi LLC
Maxymillian Technologies Inc.
Corporate Environmental Advisors Inc.
WL French Excavating Co Inc.
TMC Services Inc.
EQ Northeast Inc.
All And Inclusive Environmental Inc.
Arlex Oil Corporation
Global Remediation Services Inc.
Bids were received from TMC Services Inc., Triumvirate Environmental, Inc., Corporate Environmental
Advisors, Inc. ENPRO and Clean Harbors Environmental Services.
The bids were publicly opened and read aloud at 11:oo a.m. May 9, 2012 in the Town of Reading Municipal
Light Department's Board Room, 23o Ash Street, Reading, Massachusetts.
The bids were reviewed, analyzed and evaluated by the General Manager and the staff.
I lic: Hick/1 YI 211 la/mat _'1112 -1-1
Reading Municipal Light Department
RMLD
NFI�I�RLF 1'U�l'FR 1't1N 4r Vf R:111u��
_30 Ash Street. P.O. Box 150
Reading, MA 01967 -0_250
Move that bid 2012 -44 for Hazmat Remediation Services be awarded a contract to:
ENPRO for a three year period ending June 30, 2015 for an estimated budgeted cost of $150,000.00, as the
lowest qualified bidder on the recommendation of the General Manager.
The award of this bid provides for Hazmat Remediation services as required. This will be done under the
direction of the RMLD Licensed Site Professional.
ncent F. C 76eron Jr.
Key Sullivan
- e5�
Nick D'Alleva
File Bids / n 12/ f laimat 2()12 34
Hazmat Remediation Services
Bid 2012 -44
Bidder
Item A
Furnish all
Disposal
Soil impacted with
Soil impacted with
Soil impacted with
forms &
Treatment
Audited
PCB concentrations
PCB concentrations
MODF recycled in a
Firm
information
Transporter
Facility
Financial
Judgements
Certificate
?- 50 p m
s 50 p m
MA Class A facility
Price
Exceptions
required
License
License
Statement
& Fines
of Insurance
(per ton) (per ton) (per ton)
ENPRO
$1110.00' $75.00 $45.00 yes no s yes s none yes
Note: Transportation cost is $150.00 per truck load.
Triumvirate Environmental, Inc.
$2224.00 $100.00 $71.00{ yes yes yes yes Yes yes i yes no
Note: Rates are based on 30 tons per load.
Exceptions: All hydraulic equipment used as a part of this contract is leased, not owned. Triumvirate has extensive experience completing similar projects and
jobs utilizing equipment that is leased, not owned.
TMC Services, Inc.
$275.00' $120.00 $85.00' yes no 1 yes yes no yes yes no
Note: Disposal Treatment Facility License information for Vermont is out of date.
Corporate Environmental Advisors, Inc.
$225.00 $140.00 yes I no yes yes I no no none yes
Note: Rates are based on 10 tons per load.
Clean Harbors Environmental Services,
Inc. — non - responsive $W.00/drum! yes yes no' yes no yes yes no
Exceptions: Exceptions to Bid Terms and Conditions
Notes: Non - responsive based on exceptions and documentation.
'Bid lists sites and notes permits. Copy of permit not included in bid documentation.
Analysis.xis
J J J
page 1 of t
Reading Municipal Light Department
RMLD
RELIABLE POWER FOR GENERATIONS
230 Ash Street
PO. Box 150
Reading, MAO 1867 -0250
Tel: ( 781) 944 -1340
Fax: (781) 942-2409
Web: www.rtnld.com
May 23, 2012
L 2
-A
IM
Town of Reading Municipal Light Board
Subject: Pad - Mounted Switchgear
On April 26, 2012 a bid invitation was placed as a legal notice in the Reading Chronicle requesting
proposals for Pad - Mounted Switchgear for the Reading Municipal Light Department.
Specifications were emailed to the following:
WESCO Graybar Electric Company Diversified Electric Scrrvices, Inc.
f ID Supply Utilities Circuit Breaker Sales Co., Inc. National Switchgear
Electric Control Equipment BCSSwitchgear, Inc. Electrical Surplus LLC
MetroWest Electric Sales, Inc. HD Industrial Services
Bids were received from WESCO, Stuart C Irby, Graybar and HD Supply Utilities
The bids were publicly opened and read aloud at 11:00 a.m. May 23, 2012 in the Town of Reading
Municipal Light Department's Board Room, 230 Ash Street, Reading, Massachusetts.
['he bids were reviewed, analyzed and evaluated by the General Manager and the staff.
Move that bid 2012 -45 for Pad - Mounted Switchgear be awarded to: WESCO for a total cost of $39,483.00
Item uanti Description
1 3 S & C Model PMH -9
Unit Cost Net Cost
13,161.00 $39,483.00
as the lowest qualified bidder on the recommendation of the General Manager.
-1 here units are for Reading Woods and to replenish inventory.
t L L
incept F. Can 'roll, Jr.
1
I\evi t Sulli� +n
i'et or i'ri�e
, -ted Switch ear
F. C! 2 `.2 -45
Lidding Company
(tern 1 - S &C Model PMH -9
Manufacturer
Quantity
Unit Cost
WESCO
S & C
3
13,161.00
Stuart Irby
S & C
3
13,200.00
Graybar
S & C
3
13,380.00
HD Supply Utilities
S &C
3
15,390.00
Total Cost
39,483.00
39,600.00
40,140.00
46,170.00
Delivery Date
12 -14 weeks ARO
12 -14 weeks ARO
12 -14 weeks ARO
12 -14 weeks ARO
Firm Price
yes
yes
yes
no
_
All forms filled out
yes
yes
yes
yes
Certified Check or Bid Bond
yes
yes
yes
yes
Exce,_)t ons to stated bid requirements
no
no
yes
yes
Authorized signature
yes
yes
yes
yes
E;,ceptions:
Graybar
C,uotinq to S &C Terms & Conditions of Sale only. No other Terms & Conditions of Sale would apply to this quote or to any order
generated from this quote.
Engineers Note:
AJ b cders bid S &C and included the same letter from S &C Electric Company in whole or in part.
(WW (40� (Wo�
ATTACHNIEM 4
To: Vincent Cameron
From: Energy Services
Date: May 23, 2012
Subject: Purchase Power Summary — April, 2012
Energy Services Division (ESD) has completed the Purchase Power Summary for the
month of April, 2012.
ENERGY
The RMLD's total meter load for the month was 52,482,025 kWh, which was a decrease
of 1.7 % compared to the April, 2011 figures.
Table 1 is a breakdown by source of the energy purchases.
TABLE 1
Amount of
Cost of
% of Total
Total $
$ as a
Resource
Energy
Energy
Energy
Costs
%
(kWh)
($ /Mwh)
Millstone #3
3,587,608
$6.97
6.83%
$25,020
1.16%
Seabrook
4,437,608
$7.28
8.44%
$36,144
1.68%
JP Morgan
4,501,200
$54.70
8.56%
$246,218
11.43%
Stonybrook CC
1,178,783
$51.10
2.24%
$60,235
2.80%
NextEra
9,971,000
$45.03
18.97%
$449,034
20.84%
NYPA
2,187,807
$4.92
4.16%
$10,764
0.50%
ISO Interchange
7,143,428
$27.62
13.59%
$197,332
9.16%
NEMA Congestion
0
$0.00
0.00%
- $74,233
-3.45%
Coop Resales
83,196
$5.89
0.16%
$10,985
0.51%
Stonybrook Peaking
0
$0.00
0.00%
$0
0.00%
MacQuarie
17,088,000
$59.26
32.51%
$1,012,552
46.99%
Braintree Watson Unit
832,508
$34.56
1.58%
$28,770
1.34%
Swift River Projects
1,554,493
$97.72
2.96%
$151,909
7.05%
Monthly Total
52,565,631
$40.99
100.00%
$2,154,730
100.00%
Table 2 breaks down the ISO interchange between the DA LMP settlement and the RT
Net Energy for the month of April, 2012.
Resource
ISO DA LMP'
Settlement
RT Net Energy"
Settlement
ISO Interchange
(subtotal)
Table 2
Amount
Cost
% of Total
of Energy
of Energy
Energy
(kWh)
($ /Mwh)
% of
11,075,758
27.53
21.07%
- 3,932,329
27.35
-7.48%
7,143,428
27.62
13.59%
*Independent System Operator Day -Ahead Locational Marginal Price
* *Real Time Net Energy
CAPACITY
The RMLD hit a demand of 104,469 kW, which occurred on April 16, 2012 at 5 pm. The
RMLD's monthly UCAP requirement for April, 2012 was 200,926 kWs.
Table 3 shows the sources of capacity that the RMLD utilized to meet its requirements.
Table 3
Amount of
Cost of
% of
% of
Capacity
Capacity
Total
Total
Source
(kWs)
($ /kW- month)
Capacity
Total Cost $
Cost
Millstone #3
4,991
$51.69
2.48%
$257,990
19.07%
Seabrook
7,910
$49.80
3.94%
$393,942
29.12%
Stonybrook Peaking
24,981
$2.02
12.43%
$50,362
3.72%
Stonybrook CC
42,925
$3.86
21.36%
$165,667
12.24%
NYPA
4,666
$2.81
2.32%
$13,101
0.97%
Hydro Quebec
4,274
$5.11
2.13%
$21,821
1.61%
ISO -NE Supply Auction
100,659
$3.33
50.10%
$335,257
24.78%
Braintree Watson Unit
10,520
$10.91
5.24%
$114,796
8.48%
Total
200,926
$6.73
100.00%
$1,352,937
100.00%
Table 4 shows the dollar amounts for energy and capacity per source.
TRANSMISSION
The RMLD's total transmission costs for the month of April were $613,473. This is an
increase of 4.2% from the March transmission cost of $588,790. In April, 2011 the
transmission cost were $620,461.
Table 5
Table 4
Current Month
Last Month (March '12)
Last Year (April '11)
Peak Demand (kW)
104,469
100,894
92,584
Energy (kWh)
Cost of
56,054,267
53,431,859
Energy ($)
$2,154,730
% of
Amt. of Energy
Power
Resource
Energy
Capacity
Total cost
Total Cost
(kWh)
($kWh)
Millstone #3
$25,020
$257,990
$283,010
8.07%
3,587,608
$0.0789
Seabrook
$36,144
$393,942
$430,086
12.26%
4,437,608
$0.0969
Stonybrook CC
$60,235
$165,667
$225,902
6.44%
1,178,783
$0.1916
Hydro Quebec
$0
$21,821
$21,821
0.62%
0
$0.0000
NextEra
$449,034
$0
$449,034
12.80%
9,971,000
$0.0450
NYPA
$10,764
$13,101
$23,865
0.68%
2,187,807
$0.0109
ISO Interchange
$197,332
$335,257
$532,589
15.18%
7,143,428
$0.0746
NEMA Congestion
- $74,233
$0
- $74,233
-2.12%
0
$0.0000
Coop Resales
$10,985
$0
$10,985
0.31%
83,196
$0.1320
Stonybrook Peaking
$0
$50,362
$50,362
1.44%
0
$0.0000
JP Morgan
$246,218
$0
$246,218
7.02%
4,501,200
$0.0547
MacQuarie
$1,012,552
$0
$1,012,552
28.87%
17,088,000
$0.0593
Braintree Watson Unit
$28,770
$114,796
$143,566
4.09%
832,508
$0.1725
Swift River Projects
$151,909
$0
$151,909
4.33%
1,554,493
$0.0977
Monthly Total
$2,154,730
$1,352,937
$3,507,667
100.00%
52,565,631
$0.0667
TRANSMISSION
The RMLD's total transmission costs for the month of April were $613,473. This is an
increase of 4.2% from the March transmission cost of $588,790. In April, 2011 the
transmission cost were $620,461.
Table 5
Current Month
Last Month (March '12)
Last Year (April '11)
Peak Demand (kW)
104,469
100,894
92,584
Energy (kWh)
52,565,631
56,054,267
53,431,859
Energy ($)
$2,154,730
$2,585,840
$2,748,672
Capacity ($)
$1,352,937
$1,337,034
$1,616,704
Transmission ($)
$613,473
$588,790
$620,461
Total
$4,121,140
$4,511,664
$4,985,837
ENERGY EFFICIENCY
Fable 6 shows the comprehensive results from the Energy Conservation program. The amount of savings is broken down by both demand and energy, for the Commercial and Residential
ectors.
- ommercial
Year
Saved (kW)
Saved (kwh)
Capacity
$ /kW
Energy
$ /kWh
Rebate
Rebate /kWh
Rebate /kW
Cost Benefit
rota) to date
FY07 -11
5,351
22,461,456
$ 447,584
1 $ 9.00
1,418,876
1 $ 0.04
$ 767,938
$ 0.03
$ 143.52
$ 1,098,522
current
FY12
841
3,531,548
$ 90,806
$ 9.00
1 141,262
$ 0.04
$ 210,618
$ 0.06
1 $ 250.50
$ 21,450
Reside
rota) to date
FY07-11
1 832
1 893,638
1 $ 71,587
1
1 48,794
1
1 $ 331,385
1 $ 0.37
1 $ 398.491
$ (211,004)
3urrent
IFY12
1 186
1 90,295
1 $ 20,066
1 $ 9.00
1 3,612
1 $ 0.04
1 $ 53,9911
$ 0.60
1 $ 290.59
1 $ (30,313)
rota
Total to date
FY07-11
1 6,182
1 23,355,094
1 $ 519,171
1
1 1,467,670
1
$ 1,099,323
1 $ 0.05
1 $ 177.81
1 $ 887,518
,urrent
IFY12
1 1,027
1 3,621,843
1 $ 110,872
1 $ 9.00
1 144,874
1 $ 0.04
1 $ 264,609
1 $ 0.07
J $ 257.76
1 $ (8,864)
Fable 7 shows the breakdown for residential appliance rebates by type and year.
fable 7
Year
2007
200E
2004
201(
201'
201,
total
Washing Machine
Refrigerator
Dishwasher
Dehumidifier
Central A/C
Window A/C
Thermostat
Audits
Renewable
HP Water Heater
Fan
QTY
Dollars
QTY
Dollars
QTY
Dollars
QTY
Dollars
QTY
Dollars
QTY
Dollars
QTY
Dollars
QTY
Dollars
QTY
Dollars
QTY
Dollars
QTY
Dollars
86
$ 4,300
47
$ 2,350
55
$ 2,750
7
$ 175
17
$ 1,700
10
$ 250
23
$ 230
107
$ 14,940
406
$ 20,300
259
$ 12,950
235
$ 11,750
40
$ 1,000
41
$ 4,100
50
$ 1,250
114
$ 1,140
107
$ 14,940
519
$ 25,950
371
$ 18,550
382
$ 19,100
37
$ 925
64
$ 6,400
49
$ 1,225
127
$ 1,270
64
$ 8,960
6
$ 20,700
425
$ 21,250
383
$ 19,150
313
$ 15,650
47
$ 1,175
57
$ 5,700
65
$ 1,625
118
$ 1,180
180
$ 26,960
4$
18,000
293
$ 14,650
312
$ 15,600
251
$ 12,550
35
$ 875
40
$ 4,000
46
$ 1,150
97
$ 970
173
$ 1,496
3
$ 14,000
8
$ 2,000
0
$ -
1729 $ 86,450 1372 $ 68,600 1236 $ 61,800 166 $ 4,150 219 $ 21,900 220 $ 5,500 479 $ 4,790 631 $ 67,296 13 $ 52,700 8 $ 2,000 0 0
(W LO L,
r r r
Gaw Transformer Upgrade Project
Schedule Milestones
Start Date
% Complete
Completion Date
Notes
Conceptual Engineering
Jul -08
100
Jun -09
Complete
Major Equipment Procurement
Feb -09
100
Oct -10
Complete
Design Engineering
Jul -08
100
Jun -09
Complete
Scheduled Transformer Delivery
Dec -08
100
Dec -08
Complete
Construction Bid
Jan -09
100
Mar -09
Complete
Construction Contractor
May -09
100
Dec -10
Complete
Construction Transformer Replacement
May -09
100
Oct -10
Complete
Construction Switchgear Upgrades
Dec -09
100
Jul -11
Complete
Construction RMLD Personnel
Jan -09
100
Jul -11
Complete
Tangible Milestones
Start Date
% Complete
Completion Date
Notes
Relocate Station Service transformers
06/22109
100
07/17/09
Complete
Transformer 110C on concrete pad
06/01/09
100
07/22/09
Complete
11 5k circuit switchers replaced
07/25/09
100
08/02/09
Complete
Transformer 110C secondary work
07/27/09
100
10/05/09
Complete
Transformer 110C replacement
08/31/09
100
10/09/09
Complete
Transformer 110A replacement
09/21/09
100
09/30/10
Complete
Transformer 1108 replacement
02/19/10
100
03/31/10
Complete
Switchgear upgrade
12/01/09
100
07/31/11
Complete
Feeder Reassignment work
08/16/10
100
01/30/11
Complete
Changes highlighted in bold
ATTACHMENT 5
0
M
c 7
0 6
5
= 4
.N
L 3
c�
0
p 2
1
X
Gaw Transformer Upgrade Project
` J J
Date by Month -* -Total Actual $
-Total Projected $
Lw (MOV (404
r r r
Reconciling the Gaw Upgrade Project
Gaphai item guagei
txpenanure
uena
Description Fiscal Yr ; Item
Cumulative ; Actual I Cumulative
by FY
Transformer Payment
2008 2.080
2.080 1.8361
1.836;
-0.244
Contract Labor
2009 1.380:
1
" 0.170
Procured Equipment
0.360
f° 0.101
���� '
^
RMLD Labor
0.446,11'',
, n 0.111}
Feeder Reassignment
0.282
� 0.000
Transformer Payments
1 2.757
7.305; 2.755
4.973;
-2.332
Contract Labor
2010 0.285
Procured Equipment
0.195
1 0.1551FrY
RMLD Labor
0.200
0.380
Feeder Reassignment
0.110
8.095; 0.000
6.346;
-1.749
Contract Labor
2011 0.545
0.369
Procured Equipment
0.030
n ;j 0.007
1u
RMLD Labor
0.064�'i
0.109
r `
Feeder Reassignment
0.236
8.095; 0.048
6.879;
-1.216
Contract Labor
2012
0.000
10.142
Procured Equipment
0.000
�� °'� 0.000
RMLD Labor
0.000
0.000,
Feeder Reassignment
0.000
8.0951
7.021;
-1.074
Project Sub -Total 0.000 8.095 7.021 7.021
Project Total 7.021 -1.074
5/24/2012
2:18 PM
READING MUNICIPAL LIGHT DEPARTMENT
FY 12 CAPITAL BUDGET VARIANCE REPORT
FOR PERIOD ENDING APRIL 30, 2012
# PROJECT DESCRIPTION
E &O Construction - System Projects
1 5W9 Reconductoring - Ballardvale Street
* 2 High Capacity Tie 4W18 and 3W8 Franklin Street
3 Upgrading Old Lynnfield Ctr URDs
SCADA Projects
4 RTU Replacement
Distribution Automation Projects
5 Reclosures
6 Capacitor Banks
7 SCADA Radio Communication System
Station Upgrades (Station #4 GAW)
8 Relay Replacement Project
9 115kV Disconnect Replacement
New Customer Service Connections
12 Service Installations - Commercial /Industrial Customers
13 Service Installations - Residential Customers
14 Routine Construction
Various Routine Construction
Total Construction Projects
Other Projects
15 GIS
16 Transformers /Capacitors Annual Purchases
17 Meter Annual Purchases
17A Meter Upgrade Project
18 Purchase New Small Vehicle
19 Purchase Line Department Vehicle
20 Purchase Puller Trailer
21 Roof Top Units
22 Engineering Software and Data Conversion
23 Plotter
27 Hardware Upgrades
28 Software and Licensing
OTH Cooling Tower Replacement
Total Other Projects
TOTAL RMLD CAPITAL PROJECT EXPENDITURES
29 Force Account/Reimbursable Projects
TOTAL FY 12 CAPITAL PROJECT EXPENDIITURES
* completed projects
2,031
ACTUAL
YTD ACTUAL
ANNUAL
157,352
COST
COST
BUDGET
45,405
TOWN
APRIL
THRU 4/30112
AMOUNT
VARIANCE
W
160,588
242,649
82,061
R
122,873
157,766
34,893
LC
333
1,010
579,927
578,917
R
30,000
1,640
130,255
128,615
ALL
197,901
197,901
ALL
29,181
47,595
105,052
57,457
ALL
94,435
63,740
231,386
231,386
R
(18,706)
2,803
99,656
96,853
R
383,004
49,738
88,585
38,847
ALL
5,857
36,707
62,530
25,823
ALL
11,869
157,426
206,017
48,591
ALL
238,011
2,038,340
1,016,382
(1,021,958)
499,386
3,118,106
2,618,720
285,251
2,031
10,746
50,000
39,254
157,352
198,800
41,448
37,550
45,405
46,360
955
33,674
494,911
1,740,656
1,245,745
31,544
36,000
4,456
386,000
386,000
75,000
75,000
30,000
30,000
76,690
76,690
18,000
18,000
19,862
60,711
40,000
(20,711)
4,635
30,695
94,435
63,740
18,706
-
(18,706)
97,752
850,070
2,791,941
1,941,871
383,004
3,468,790
5,910,047
2,441,257
ALL - - - -
383,004 3,468,790 5,910,047 2,441,257
Reading Municipal Light Department
Engineering and Operations
Monthly Report
April 2012
FY 2012 Capital Plan
E &O Construction - System Proiects
1. 5W9 Reconductoring - Ballardvale Street - Wilmington - Complete
2. High Capacity Tie 4W18/3W8 Franklin Street -Reading -Complete
3. Upgrading of Old Lynnfield Center URDs - Engineering labor.
SCADA Proiects
4. RTU Replacement at Station 4 - Reading - No activity.
Distribution Automation (DA) Proiects
5. Reclosers - No activity.
6. Capacitor Banks - Installation of new capacitor banks, Line Crew, Engineering, and
Senior Tech(s) labor.
7. SCADA Radio Communication System - No activity.
Station Upgrades
8. Relay Replacement Project - Station 4 - Reading - No Activity.
9. 115 kV Disconnect Replacement - Station 4 - Reading - No activity.
New Customer Service Connections
12. Service Installations — Commercial /Industrial Customers — This item includes new
service connections, upgrades, and service replacements for the commercial and
industrial customers. This represents the time and materials associated with the
replacement of an existing or installation of a new overhead service, the connection of
an underground service, etc. This does not include the time and materials associated
with pole replacements /installations, transformer replacement/installations, primary or
secondary cable replacement/installations etc. This portion of the project comes under
routine construction. Notable: 30 Haven Street Condos, Reading, 911 Main Street,
(W Wilmington.
13. Service Installations — Residential Customers — This item includes new or upgraded
overhead and underground services, temporary overhead services, and large
underground development.
14. Routine Construction — The drivers of the Routine Construction budget category
YTD are listed. This is not an inclusive list of all items within this category.
Pole Setting/Transfers
$271,733
Maintenance Overhead/Underground
$693,715
Projects Assigned as Required
$405,329
Pole Damage includes knockdowns some reimbursable
$39,534
Station Group
$2,967
Hazmat/Oil Spills
$3,118
Porcelain Cutout Replacement Program
$6,855
Lighting Street Light Connections
$90,303
Storm Trouble
$80,174
Underground Subdivisions
$57,760
Animal Guard Installation
$61,004
Miscellaneous Capital Costs
$325,848
TOTAL
$2,038,340
*In the month of April four cutouts were charged under this program. Approximately
36 cutouts were installed new or replaced because of damage making a total of 40
cutouts replaced this month.
9
2
Reliability Report
Two key industry standard metrics have been identified to enable the RMLD to measure and
track system reliability. A rolling 12 -month view is being used for the purposes of this report.
Customer Average Interruption Duration Index (CAIDI) — Measures how quickly the
RMLD restores power to customers when their power goes out.
CAIDI = Total of Customer Interruption Duration for the Month in Minutes/ Total
number of customers interrupted.
RMLD 12 month system average outage duration — 62.31 minutes
RMLD 4 year average outage (2006 -2009) — 50.98 minutes per outage
On average, RMLD customers that experience an outage are restored in 62.31 minutes.
180.00
160.00
d
140.00
120.00
d
100.00
0 80.00
d
E 60.00
0
+-N
2) 40.00
U
� "Iffl
I w
�N �N �N �N �N �r�'
--�– Monthly minutes per outage
• - RMLD 12 month system average outage duration 62.31
—_--.. RMLD 4 year average outage duration 50.98 (2006 -2001,
3
System Average Interruption Frequency (SAIFI) — Measures how many outages each
customer experiences per year on average.
SAIFI = Total number of customer's interrupted / Total number of customers.
RMLD 12 month system average - .41 outages per year
RMLD 4 year average outage frequency - .82
The graph below tracks the month -by -month SAIFI performance.
1.00
MN
,1 : N
N
a�
0.70
V
�'U 0.60
0 0.50
v
0.40
0
0.30
L
0.20
W H
A M
SW
— 0 RMLD monthly outage frequency
- -- RMLD 12 month system average outage frequency .41
RMLD 4 vear average outage freauencv .82 (2006 -200
Months Between Interruptions (MBTI)
Another view of the SAIFI data is the number of months Reading customers have no
interruptions. At this time, the average RMLD customer experiences an outage
approximately every 29.3 months.
H
ATTACHMENT 6
Dt: May 24, 2012
To: RMLB, Vincent F. Cameron, Jr., Jeanne Foti
Fr: Bob Fournier
Sj: April 30, 2012 Report
The results for the ten months ending April 30, 2012, for the fiscal year 2012 will
be summarized in the following paragraphs.
1) Change in Net Assets: (Page 3A)
For the month of April, the net income or the positive change in net assets was
$596,632, increasing the year to date net income to $3,024,693. The year to date
budgeted net income was $5,079,448, resulting in net income being under budget
by 2,054,754 or 40.45 %. Actual year to date fuel expenses exceeded fuel
revenues by $622,153.
2) Revenues: (Page 11B)
Year to date base revenues were under budget by $2,372,320 or 5.93 %. Actual
base revenues were $37.6 million compared to the budgeted amount of $40.0
million.
3) Expenses: (Page 12A)
*Year to date purchased power base expense was under budget by $1,501,648 or
6.78 %. Actual purchased power base costs were $20.7 million compared to the
budgeted amount of $22.2 million.
*Year to date operating and maintenance (O &M) expenses combined were under
budget by $295,446 or 3.02 %. Actual O &M expenses were $9.5 million
compared to the budgeted amount of $9.8 million.
*Depreciation expense and voluntary payments to the Towns were on budget.
4) Cash (Page 9)
*Operating Fund was at $10,153,260.
*Capital Fund balance was at $3,799,330.
* Rate Stabilization Fund was at $6,072,949.
* Deferred Fuel Fund balance was at $2,433,071.
* Energy Conservation Fund balance was at $238,695.
5) General Information:
Year to date kwh sales (Page 5) were 577,396,206 which is 23.1 million kwh or
3.85 %, behind last year's actual figure. GAW revenues collected ytd were
$577,435 bringing the total collected since inception to $1,184,607.
6) Budget Variance:
Cumulatively, the five divisions were under budget by $348,964 or 2.21%.
L!
11
FINANCIAL REPORT
APRIL 30, 2012
Aw ISSUE DATE: MAY 24 2012
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
BUSINESS -TYPE PROPRIETARY FUND
STATEMENT OF NET ASSETS
4/30/12
(1)
PREVIOUS YEAR
CURRENT YEAR
ASSETS
CURRENT
UNRESTRICTED CASH
(SCH A
P.9)
5,642,131.37
10,156,260.45
RESTRICTED CASH
(SCH A
P.9)
16,316,333.81
19,128,107.64
RESTRICTED INVESTMENTS
(SCH A
P.9)
2,200,000.00
0.00
RECEIVABLES, NET
(SCH B
P.10)
8,545,498.69
7,371,254.30
PREPAID EXPENSES
(SCH B
P.10)
1,111,552.37
1,300,983.52
INVENTORY
11580,950.08
1,417,191.60
TOTAL CURRENT ASSETS
35,396,466.32
39,373,797.51
NONCURRENT
INVESTMENT IN ASSOCIATED CO
(SCH C
P.2)
85,253.67
61,574.36
CAPITAL ASSETS, NET
(SCH C
P.2)
67,799,172.60
68,069,025.39
TOTAL NONCURRENT ASSETS
67,884,426.27
68,130,599.75
TOTAL ASSETS
103,280,892.59
107,504,397.26
LIABILITIES
CURRENT
ACCOUNTS PAYABLE
4,646,349.36
5,745,418.65
CUSTOMER DEPOSITS
515,001.03
615,040.37
CUSTOMER ADVANCES FOR CONSTRUCTION
330,793.90
358,279.94
ACCRUED LIABILITIES
1,341,701.19
1,222,683.70
TOTAL CURRENT LIABILITIES
6,833,845.48
7,941,422.66
NONCURRENT
ACCRUED EMPLOYEE COMPENSATED ABSENCES
3,020,032.75
2,934,698.58
TOTAL NONCURRENT LIABILITIES
3,020,032.75
2,934,698.58
TOTAL LIABILITIES
9,853,878.23
10,876,121.24
NET ASSETS
INVESTED IN CAPITAL ASSETS, NET OF
RELATED DEBT
67,799,172.60
68,069,025.39
RESTRICTED FOR DEPRECIATION FUND
(P.9)
4,396,630.66
3,799,330.55
UNRESTRICTED
21,231,211.10
24,759,920.08
TOTAL NET ASSETS
(P.3)
93,427,014.36
96,628,276.02
TOTAL LIABILITIES AND NET ASSETS
103,280,892.59
107,504,397.26
(1)
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
NONCURRENT ASSET SCHEDULE
4/30/12
SCHEDULE OF INVESTMENTS IN ASSOCIATED COMPANIES
NEW ENGLAND HYDRO ELECTRIC
NEW ENGLAND HYDRO TRANSMISSION
TOTAL INVESTMENTS IN ASSOCIATED COMPANIES
SCHEDULE OF CAPITAL ASSETS
STRUCTURES AND IMPROVEMENTS
EQUIPMENT AND FURNISHINGS
INFRASTRUCTURE
TOTAL CAPITAL ASSETS, NET
TOTAL NONCURRENT ASSETS
(2)
PREVIOUS YEAR
23,538.60
61,715.07
85,253.67
1,265,842.23
6,886,443.43
13,481,025.03
46,165,861.91
67,799,172.60
67,884,426.27
SCHEDULE C
CURRENT YEAR
12,631.19
48,943.17
61,574.36
1,265,842.23
6,714,259.24
12,950,273.39
47,138,650.53
68,069,025.39
68,130,599.75
9
El
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
HIISINSSS -TYPE PROPRIETARY FIIND
44 STATEMENT OF REVENUES, EXPENSES AND CHANGES IN FUND NET ASSETS
4/30/12
OPERATING REVENUES: (SCH D P.11)
BASE REVENUE
FUEL REVENUE
PURCHASED POWER CAPACITY
FORFEITED DISCOUNTS
ENERGY CONSERVATION REVENUE
GAN REVENUE
NYPA CREDIT
TOTAL OPERATING REVENUES
OPERATING EXPENSES: (SCH E P.12)
PURCHASED POWER BASE
PURCHASED POWER FUEL
OPERATING
MAINTENANCE
DEPRECIATION
VOLUNTARY PAYMENTS TO TOWNS
TOTAL OPERATING EXPENSES
OPERATING INCOME
(NOPERATING REVENUES EXPENSES
CONTRIBUTIONS IN AID OF CONST
RETURN ON INVESTMENT TO READING
INTEREST INCOME
INTEREST EXPENSE
OTHER (NDSE AND AMORT)
TOTAL NONOPSRATING REV (EXP)
CHANGE IN NET ASSETS
NET ASSETS AT BEGINNING OF YEAR
NET ASSETS AT END OF APRIL
MONTH MONTH LAST YEAR CURRENT YEAR
LAST YEAR CURRENT YEAR TO DATE TO DATE
3,660,111.34
3,486,681.36
38,308,752.41
37,641,884.02
3,010,590.83
2,528,368.89
34,304,618.99
30,309,286.21
42,210.28
(10,113.56)
1,281,097.12
(109,691.11)
80,357.89
68,066.18
662,533.16
773,692.14
38,776.10
52,419.31
425,520.44
508,683.49
56,288.13
53,240.55
460,613.87
577,435.22
(32,781.99)
(39,924.10)
(645,295.28)
(563, 165 .35)
6,855,552.58 6,138,736.63 74,997,840.71 69,138,124.62
YTD 4
CHANGE
-1.74%
- 11.654
- 108.564
- 10.304
19.544
25.364
- 12.734
-7.814
2,239,347.49
1,970,219.80
23,080,815.94
20,754,989.35
- 10.084
2,748,671.80
2,154,729.79
33,321,091.62
30,368,274.49
-8.864
668,734.55
643,778.63
7,148,937.95
7,125,785.35
-0.324
254,047.37
193,900.11
3,363,683.32
2,349,450.24
- 30.154
287,729.05
296,027.47
2,877,290.50
2,960,274.70
2.884
110.000.00
113.000.00
1.095.885.00
1.126.186.00
2.764
6,308,530.26 5,371,655.80 70,887,704.33 64,684,960.13 -8.754
547,022.32 767,082.83 4,110,136.38 4,453,164.49 8.354
25.00
9,220.70
47,164.02
54,965.54
16.544
(180,990.00)
(183,829.75)
(11809,900.00)
(1,838,297.50)
1.574
3,070.12
3,741.81
95,189.56
73,563.19
- 22.724
(1,006.30)
(502.01)
(12,307.63)
(6,731.50)
- 45.314
2,405.00
918.95
176,867.42
288,029.33
62.854
(176,496.18)
(170,450.30)
(1,502,966.63)
(1,428,470.94)
-4.964
370,526.14
596,632.53
2,607,149.75
3,024,693.55
16.024
(3)
90,819,864.61 93,603,582.47 3.074
93,427,014.36 96,628,276.02 3.434
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
BUSINESS -TYPE PROPRIETARY FUND
STATEMENT OF REVENUES, EXPENSES AND CHANGES IN FUND NET ASSETS
4/30/12
OPERATING REVENUES: (SCH F P.11B)
BASE REVENUE
FUEL REVENUE
PURCHASED POWER CAPACITY
FORFEITED DISCOUNTS
ENERGY CONSERVATION REVENUE
GAW REVENUE
NYPA CREDIT
TOTAL OPERATING REVENUES
OPERATING EXPENSES: (SCH G P.12A)
PURCHASED POWER BASE
PURCHASED POWER FUEL
OPERATING
MAINTENANCE
DEPRECIATION
VOLUNTARY PAYMENTS TO TOWNS
TOTAL OPERATING EXPENSES
OPERATING INCOME
NONOPERATING REVENUES (EXPENSES)
CONTRIBUTIONS IN AID OF CONST
RETURN ON INVESTMENT TO READING
INTEREST INCOME
INTEREST EXPENSE
OTHER (MDSE AND AMORT)
TOTAL NONOPERATING REV (EXP)
CHANGE IN NET ASSETS
NET ASSETS AT BEGINNING OF YEAR
NET ASSETS AT END OF APRIL
* ( ) - ACTUAL UNDER BUDGET
ACTUAL
BUDGET
(1,510,648.65)
YEAR TO DATE
YEAR TO DATE
VARIANCE*
37,641,884.02
40,014,205.00
(2,372,320.98)
30,309,286.21
34,401,124.00
(4,091,837.79)
(109,691.11)
(113,680.00)
3,988.89
773,692.14
880,313.00
(106,620.86)
508,683.49
443,402.00
65,281.49
577,435.22
578,130.00
(694.78)
(563,165.35)
(500,000.00)
(63,165.35)
69,138,124.62
75,703,494.00
(6,565,369.38)
CHANGE
-5.93%
- 11.89%
-3.51%
- 12.11%
14.72%
-0.12%
12.63%
-8.67%
20,754,989.35
22,265,638.00
(1,510,648.65)
-6.78%
30,368,274.49
33,252,726.00
(2,884,451.51)
-8.67%
7,125,785.35
7,446,640.00
(320,854.65)
-4.31%
2,349,450.24
2,324,042.00
25,406.24
1.09%
2,960,274.70
3,000,000.00
(39,725.30)
-1.32%
1,126,186.00
1,130,000.00
(3,814.00)
-0.34%
64,684,960.13 69,419,046.00 (4,734,085.87) -6.82%
-9
4,453,164.49 6,284,448.00 (1,831,283.51) - 29.14% 4
54,965.54
400,000.00
(345,034.46)
- 86.26%
(1,838,297.50)
(11850,000.00)
11,702.50
-0.63%
73,563.19
150,000.00
(76,436.81)
- 50.96%
(6,731.50)
(5,000.00)
(1,731.50)
34.63%
288,029.33
100,000.00
188,029.33
188.03%
(1,428,470.94)
(1,205,000.00)
(223,470.94)
18.55%
3,024,693.55 5,079,448.00 (2,054,754.45)
93,603,582.47 93,603,582.47 0.00
96,628,276.02 98,683,030.47 (2,054,754.45)
0A)
- 40.45%
0.00%
-2.08%
0
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
44 RECONCILIATION OF CAPITAL FUNDS
4/30/12
SOURCE OF CAPITAL FUNDS:
DEPRECIATION FUND BALANCE 7/1/11 4,297,944.13
CONSTRUCTION FUND BALANCE 7/1/11 0.00
INTEREST ON DEPRECIATION FUND FY 12 9,902.22
DEPRECIATION TRANSFER FY 12 2,960,274.70
FORCED ACCOUNTS REIMBURSEMENT 0.00
GAW SUBSTATION (FY 12) 0.00
TOTAL SOURCE OF CAPITAL FUNDS 7,268,121.05
USE OF CAPITAL FUNDS:
PAID ADDITIONS TO PLANT THRU APRIL 3,483,790.50
PAID ADDITIONS TO GAW THRU APRIL (15,000.00)
TOTAL USE OF CAPITAL FUNDS 3,468,790.50
(60 GENERAL LEDGER CAPITAL FUNDS BALANCE 4/30/12 3,799,330.55
PAID ADDITIONS
TO
GAW
FROM
FY
12
(15,000.00)
PAID ADDITIONS
TO
GAW
FROM
FY
11
531,784.00
PAID ADDITIONS
TO
GAW
FROM
FY
10
1,372,876.00
PAID ADDITIONS
TO
GAW
FROM
FY
09
3,136,764.00
PAID ADDITIONS
TO
GAW
FROM
FY
08
1,895,975.00
TOTAL
6,922,399.00
(4)
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
SALES OF KILOWATT HOURS
4/30/12
MUNICIPAL SALES:
STREET LIGHTING
MUNICIPAL BUILDINGS
TOTAL MUNICIPAL CONSUMERS
SALES FOR RESALE
SCHOOL
TOTAL KILOWATT HOURS SOLD
239,009
MONTH
MONTH
LAST YEAR
CURRENT YEAR
YTD %
SALES OF ELECTRICITY:
LAST YEAR
CURRENT YEAR
TO DATE
TO DATE
CHANGE
RESIDENTIAL SALES
19,064,952
18,567,108
223,822,024
212,503,624
-5.06%
COMM. AND INDUSTRIAL SALES
34,316,102
32,041,245
349,904,958
339,150,384
-3.07%
PRIVATE STREET LIGHTING
72,762
73,143
720,110
731,133
1.53%
TOTAL PRIVATE CONSUMERS
53,453,816
50,681,496
574,447,092
552,385,141
-3.84%
MUNICIPAL SALES:
STREET LIGHTING
MUNICIPAL BUILDINGS
TOTAL MUNICIPAL CONSUMERS
SALES FOR RESALE
SCHOOL
TOTAL KILOWATT HOURS SOLD
239,009
237,506
2,388,614
2,388,277
876,643
752,751
8,461,992
8,027,042
1,115,652
990,257
10,850,606
10,415,319
280,673
212,200
2,977,455
2,757,558
1,452,876
1,344,012
12,228,694
11,838,188
56,303,017
53,227,965
600,503,847
577,396,206
(5)
-0.01%
-5.14%
-4.01%
-7.39%
-3.19%
-3.85%
M-1
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
(40
KILOWATT HOURS SOLD
BY TOWN
4/30/12
TOTAL
READING
LYNNFIELD
NO.READING
WILMINGTON
MONTH
RESIDENTIAL
18,567,108
5,947,045
2,374,102
4,293,088
5,952,873
COMM & IND
32,041,245
3,895,039
247,808
5,159,731
22,738,667
PVT ST LIGHTS
73,143
13,585
11360
21,956
36,242
PUB ST LIGHTS
237,506
80,536
32,480
39,963
84,527
MUNI BLDGS
752,751
201,559
128,224
151,370
271,598
SALES /RESALE
212,200
212,200
0
0
0
SCHOOL
1,344,012
485,135
279,190
174,880
404,807
TOTAL
53,227,965
10,835,099
3,063,164
9,840,988
29,488,714
YEAR TO DATE
RESIDENTIAL
212,503,624
66,793,970
29,800,714
49,639,405
66,269,535
COMM & IND
339,150,384
43,000,210
2,727,943
52,527,718
240,894,513
PVT ST LIGHTS
731,133
138,990
13,600
216,140
362,403
PUB ST LIGHTS
2,388,277
804,860
324,542
399,129
859,746
MUNI BLDGS
8,027,042
2,101,686
1,367,457
1,552,039
3,005,860
SALES /RESALE
2,757,558
2,757,558
0
0
0
SCHOOL
11,838,188
4,224,330
2,569,474
1,521,440
3,522,944
TOTAL
577,396,206
119,821,604
36,803,730
105,855,871
314,915,001
LAST YEAR
TO DATE
RESIDENTIAL
223,822,024
70,331,320
31,480,187
52,139,409
69,871,108
COMM & IND
349,904,958
43,752,481
2,830,827
53,021,642
250,300,008
PVT ST LIGHTS
720,110
140,048
13,600
211,201
355,261
PUB ST LIGHTS
2,388,614
804,360
324,522
397,330
862,402
MUNI BLDGS
8,461,992
2,303,481
1,444,107
1,685,386
3,029,018
SALES /RESALE
2,977,455
2,977,455
0
0
0
SCHOOL
12,228,694
4,324,662
2,587,968
1,607,920
3,708,144
TOTAL
600,503,847
124,633,807
38,681,211
109,062,888
328,125,941
KILOWATT HOURS SOLD TO TOTAL
TOTAL
READING
LYNNFIELD
NO.READING
WILMINGTON
MONTH
RESIDENTIAL
34.88%
11.17%
4.46%
8.07%
11.18%
COMM & IND
60.20%
7.32%
0.47%
9.69%
42.72%
PVT ST LIGHTS
0.14%
0.03%
0.00%
0.04%
0.07%
PUB ST LIGHTS
0.45%
0.15%
0.06%
0.08%
0.16%
MUNI BLDGS
1.41%
0.38%
0.24%
0.28%
0.51%
SALES /RESALE
0.40%
0.40%
0.00%
0.00%
0.00%
SCHOOL
2.52%
0.91%
0.52%
0.33%
0.76%
TOTAL
100.00$
20.36$
5.75%
18.49%
55.40%
YEAR TO DATE
RESIDENTIAL
36.80%
11.57%
5.16%
8.60%
11.47%
COMM & IND
58.74%
7.45%
0.47%
9.10%
41.72%
PVT ST LIGHTS
0.13%
0.02%
0.00%
0.04%
0.07%
PUB ST LIGHTS
0.41%
0.14%
0.06%
0.07%
0.14%
MUNI BLDGS
1.39%
0.36%
0.24%
0.27%
0.52%
SALES /RESALE
0.48%
0.48%
0.00%
0.00%
0.00%
SCHOOL
2.05%
0.73%
0.45%
0.26%
0.61%
TOTAL
100.00$
20.75%
6.38%
18.34%
54.53%
LAST YEAR
TO DATE
RESIDENTIAL
37.27%
11.71%
5.24%
8.68%
11.64%
COMM & IND
58.27%
7.29%
0.47%
8.83%
41.68%
PVT ST LIGHTS
0.13%
0.02%
0.00%
0.04%
0.07%
PUB ST LIGHTS
0.40%
0.13%
0.05%
0.07%
0.15%
MUNI BLDGS
1.39%
0.38%
0.24%
0.28%
0.49%
SALES /RESALE
0.50%
0.50%
0.00%
0.00%
0.00%
SCHOOL
2.04%
0.72%
0.43%
0.27%
0.62%
TOTAL
100.00%
20.75%
6.43%
18.17%
54.65%
(6)
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
FORMULA INCOME
4/30/12
TOTAL OPERATING REVENUES (P.3)
ADD:
POLE RENTAL
INTEREST INCOME ON CUSTOMER DEPOSITS
LESS:
OPERATING EXPENSES (P.3)
CUSTOMER DEPOSIT INTEREST EXPENSE
FORMULA INCOME (LOSS)
69,138,124.62
1,455.00
1,214.52
(64,684,960.13)
(6,731.50)
4,449,102.51
LT
SALE OF KWH (P.5)
KWH PURCHASED
AVE BASE COST PER KWH
AVE BASE SALE PER KWH
AVE COST PER KWH
AVE SALE PER KWH
FUEL CHARGE REVENUE (P.3)
LOAD FACTOR
4;All LOAD
Ll.pj
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
GENERAL STATISTICS
4/30/12
MONTH OF
APR 2011
56,303,017
53,431,859
0.041910
0.065007
0.093353
0.118479
3,010,590.83
79.06%
92,584
MONTH OF
% CHANGE
YEAR
THRU
APR 2012
2011
2012
APR 2011
APR 2012
53,227,965
4.95%
-3.85%
600,503,847
577,396,206
50,565,631
4.12%
-3.17%
613,733,632
594,276,445
0.038964
-3.74%
-7.13%
0.037607
0.034925
0.065505
11.82%
2.19%
0.063794
0.065192
0.081576
-4.51%
-6.39%
0.091900
0.086026
0.113005
0.16%
-2.68%
0.120921
0.117686
2,528,368.89
-6.46%
- 11.65%
34,304,618.99
30,309,286.21
66.30%
104,469
(8)
� V
7
N � �
W
to (�
N
R
�c0
3
21�
db
zr �,
� zt 88
�l y
1 Nbr
L
it <!
SON
It
It
It l�r
It
It r
'fb
It
t db
t �b
118
11 8y
Nbr
01 J
0
l�
p ON
1,0
01 O
d3s
01 J
017b
O 1�r
O Nr
01 V
p db
t�bW
8�y
01N
6 br
008
sp a
SON
601
6 0O
0`x'3
60 S
6
Onb
60N
60 �r
\\ 60 byy
N 0.
o � o•
� �. o kft
o. o kft
o 40
kft
:1
UNRESTRICTED CASH:
CASH - OPERATING FUND
CASH - PETTY CASH
TOTAL UNRESTRICTED CASH
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
SCHEDULE OF CASH AND INVESTMENTS
4/30/12
RESTRICTED CASH-
CASH - DEPRECIATION FUND
CASH - TOWN PAYMENT
CASH - DEFERRED FUEL RESERVE
CASH - RATE STABILIZATION FUND
CASH - UNCOLLECTIBLB ACCTS RESERVE
CASH - SICK LEAVE BENEFITS
CASH - HAZARD WASTE RESERVE
CASH - CUSTOMER DEPOSITS
CASH - ENERGY CONSERVATION
CASH - OPEB
TOTAL RESTRICTED CASH
RESTICTRD INVESTMENTS:
RATE STABILIZATION
SICK LEAVE BUYBACK **
OPEB * **
TOTAL RESTRICTED INVESTMENTS
TOTAL CASH BALANCE
APR 2011•
* FREDDIE MAC
** FREDDIE MAC
* ** FREDDIE MAC
PREVIOUS YEAR
5,639,131.37
3,000.00
5,642,131.37
4,396,630.66
1,165,000.00
2,664,344.18
4,394,423.98
200,000.00
2,036,505.05
150,000.00
515,001.03
179,455.96
614,972.95
16,316,333.81
1,000,000.00
1,000,000.00
200,000.00
2,200,000.00
24,158,465.18
SCHEDULE A
CURRENT YEAR
10,153,260.45
3,000.00
10,156,260.45
3,799,330.55
1,490,000.00
2,433,071.15
6,072,949.69
200,000.00
2,955,070.22
150,000.00
615,040.37
238,695.38
1,173,950.28
19,128,107.64
0.00
0.00
0.00
0.00
29,284,368.09
11000,000.00; DTD 09/10/10; INT 2.00 %; MATURITY 09/15/20
11000,000.00; DTD 09/10/10; INT 2.00 %; MATURITY 09/15/20
200,000.00; DTD 09/10/10; INT 2.00 %; MATURITY 09/15/20
(9)
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
SCHEDULE OF ACCOUNTS RECEIVABLE
4/30/12
UNBILLED ACCOUNTS RECEIVABLE 4,055,159.11
TOTAL ACCOUNTS RECEIVABLE, NET 8,545,498.69
SCHEDULE OF PREPAYMENTS
PREPAID INSURANCE
PREVIOUS YEAR
SCHEDULE OF ACCOUNTS RECEIVABLE
(1,843.12)
RESIDENTIAL AND COMMERCIAL
5,003,503.79
ACCOUNTS RECEIVABLE - OTHER
134,235.15
ACCOUNTS RECEIVABLE - LIENS
88,707.99
ACCOUNTS RECEIVABLE - EMPLOYES ADVANCES
892.14
SALES DISCOUNT LIABILITY
(384,074.89)
RESERVE FOR UNCOLLECTIBLE ACCOUNTS
(352,924.60)
TOTAL ACCOUNTS RECEIVABLE BILLED
4,490,339.58
UNBILLED ACCOUNTS RECEIVABLE 4,055,159.11
TOTAL ACCOUNTS RECEIVABLE, NET 8,545,498.69
SCHEDULE OF PREPAYMENTS
PREPAID INSURANCE
739,896.45
PREPAYMENT PURCHASED POWER
(1,843.12)
PREPAYMENT PASNY
239,666.63
PREPAYMENT WATSON
119,308.71
PURCHASED POWER WORKING CAPITAL
14,523.70
TOTAL PREPAYMENT 1,111,552.37
ACCOUNTS RECEIVABLE AGING APRIL 2012:
RESIDENTIAL AND COMMERCIAL
2,971,970.37
LESS: SALES DISCOUNT LIABILITY
(277,713.81)
GENERAL LEDGER BALANCE
2,694,256.56
CURRENT
2,294,248.35
85.15%
30 DAYS
223,378.62
8.29%
60 DAYS
57,511.91
2.13%
90 DAYS
19,485.29
0.72%
OVER 90 DAYS
99,632.39
3.70%
TOTAL
2,694,256.56
100.00%
(10)
SCHEDULE B
CURRENT YEAR
2,971,970.37
124,212.52
59,902.43
892.14
(277,713.81)
(338.303.72)
2,540,959.93
4,830,294.37
7,371,254.30
803,130.88
131,727.31
240,782.65
110,818.98
14,523.70
1,300,983.52
"w
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
SCHEDULE OF OPERATING REVENUE
4/30/12
40 SUS -TOTAL 6,670,702.17 6,015,050.25 72,613,371.40 67,951,170.23 -6.42%
FORFEITED DISCOUNTS
80,357.89
68,066.18
862,533.16
SCHEDULE D
- 10.30%
PURCHASED POWER CAPACITY
MONTH
MONTH
LAST YEAR
CURRENT YEAR
YTD $
SALES OF ELECTRICITY:
LAST YEAR
CURRENT YEAR
TO DATE
TO DATE
CHANGE
RESIDENTIAL SALES
2,517,605.48
2,343,103.34
29,638,016.80
27,808,655.72
-6.17%
COMM AND INDUSTRIAL SALES
3,794,118.09
3,380,957.66
39,540,594.08
37,111,500.90
-6.14%
PRIVATE STREET LIGHTING
10,455.65
5,772.90
105,852.50
65,498.39
- 38.12%
TOTAL PRIVATE CONSUMERS
6,322,179.22
5,729,833.90
69,284,463.38
64,985,655.01
-6.20%
MUNICIPAL SALES:
STREET LIGHTING
45,837.15
27,978.55
463,671.69
312,293.01
- 32.65%
MUNICIPAL BUILDINGS
104,941.52
87,918.13
1,033,833.51
966,938.57
-6.47%
TOTAL MUNICIPAL CONSUMERS
150,778.67
115,896.68
1,497,505.20
- 14.58%
1,279,231.58
SALES FOR RESALE
34,376.97
24,751.87
368,770.02
335,800.04
-8.94%
SCHOOL
163,367.31
144,567.80
1,462,632.80
1,350,483.60
-7.67%
40 SUS -TOTAL 6,670,702.17 6,015,050.25 72,613,371.40 67,951,170.23 -6.42%
FORFEITED DISCOUNTS
80,357.89
68,066.18
862,533.16
773,692.14
- 10.30%
PURCHASED POWER CAPACITY
42,210.28
(10,113.56)
1,281,097.12
(109,691.11)
- 108.56%
ENERGY CONSERVATION - RESIDENTIAL
13,342.12
18,578.91
123,990.03
189,170.40
52.57%
ENERGY CONSERVATION - COMMERCIAL
25,433.98
33,840.40
301,530.41
319,513.09
5.96%
GAW REVENUE
56,288.13
53,240.55
460,613.87
577,435.22
25.36%
NYPA CREDIT
(32,781.99)
(39,924.10)
(645,295.28)
(563,165.35)
- 12.73%
TOTAL REVENUE
6,855,552.58
6,138,738.63
74,997,840.71
69,138,124.62
-7.81%
(11)
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
SCHEDULE OF OPERATING REVENUE BY TOWN
4/30/12
[--tI
LAST YEAR TO DATE
RESIDENTIAL
TOTAL
READING
LYNNFIELD
NO.READING
WILMINGTON
MONTH
40,574,427.59
5,523,436.43
516,723.00
6,337,614.04
28,196,654.12
RESIDENTIAL
2,343,103.34
752,734.85
298,851.06
541,233.86
750,283.57
INDUS /MUNI BLDG
3,468,875.79
465,053.98
43,301.56
572,078.98
2,388,441.27
PUB.ST.LIGHTS
27,978.55
9,002.25
3,559.25
5,230.36
10,186.69
PRV.ST.LIGHTS
5,772.90
1,045.87
104.71
1,824.97
2,797.35
CO -OP RESALE
24,751.87
24,751.87
0.00
0.00
0.00
SCHOOL
144,567.80
52,599.76
29,601.69
19,156.29
43,210.06
TOTAL
1,305,188.58
375,418.27
1,139,524.46
3,194,918.94
6,015,050.25
THIS YEAR TO DATE
RESIDENTIAL
27,808,655.72
8,762,175.35
3,889,576.84
6,482,386.33
8,674,517.20
INDUS /MUNI BLDG
38,078,439.47
5,264,231.72
486,703.29
6,076,732.63
26,250,771.83
PUB.ST.LIGHTS
312,293.01
100,334.45
38,927.19
56,265.53
116,765.84
PRV.ST.LIGHTS
65,498.39
12,174.89
1,193.91
20,332.12
31,797.47
CO -OP RESALE
335,800.04
335,800.04
0.00
0.00
0.00
SCHOOL
1,350,483.60
486,054.61
288,242.43
177,901.06
398,285.50
TOTAL
14,960,771.06
4,704,643.64
12,813,617.68
35,472,137.85
67,951,170.23
LAST YEAR TO DATE
RESIDENTIAL
29,638,016.80
9,352,132.56
4,137,899.60
6,908,602.26
9,239,382.38
INDUS /MUNI BLDG
40,574,427.59
5,523,436.43
516,723.00
6,337,614.04
28,196,654.12
PUB.ST.LIGHTS
463,671.69
162,257.44
56,501.51
76,465.76
168,446.98
PRV.ST.LIGHTS
105,852.50
19,975.00
1,983.91
32,747.32
51,146.27
CO -OP RESALE
368,770.02
368,770.02
0.00
0.00
0.00
SCHOOL
1,462,632.80
519,394.92
304,463.07
196,630.48
442,144.33,
TOTAL
72,613,371.40
15,945,966.37
51017,571.09
13,552,059.86
38,097,774.08
PERCENTAGE OF OPERATING INCOME TO TOTAL
TOTAL 100.00% 21.69% 6.24% 18.95% 53.12%
THIS YEAR TO DATE
RESIDENTIAL
TOTAL
READING
LYNNFIELD
NO.READING
WILMINGTON
MONTH
56.04%
7.75%
0.72%
8.94%
38.63%
RESIDENTIAL
38.95%
12.51%
4.97%
9.00%
12.47%
INDUS /MUNI BLDG
57.67%
7.73%
0.72%
9.51%
39.71%
PUB.ST.LIGHTS
0.47%
0.15%
0.06%
0.09%
0.17%
PRV.ST.LIGHTS
0.10%
0.02%
0.00%
0.03%
0.05%
CO -OP RESALE
0.41%
0.41%
0.00%
0.00%
0.00%
SCHOOL
2.40%
0.87%
0.49%
0.32%
0.72%
TOTAL 100.00% 21.69% 6.24% 18.95% 53.12%
THIS YEAR TO DATE
RESIDENTIAL
40.92%
12.89%
5.72%
9.54%
12.77%
INDUS /MUNI BLDG
56.04%
7.75%
0.72%
8.94%
38.63%
PUB.ST.LIGHTS
0.46%
0.15%
0.06%
0.08%
0.17%
PRV.ST.LIGHTS
0.10%
0.02%
0.00%
0.03%
0.05%
CO -OP RESALE
0.49%
0.49%
0.00%
0.00%
0.00%
SCHOOL
1.99%
0.72%
0.42%
0.26%
0.59%
TOTAL
100.00%
22.02%
6.92%
18.86%
52.20%
LAST YEAR TO DATE
RESIDENTIAL
40.81%
12.88%
5.709b
9.51%
12.72%
INDUS /MUNI BLDG
55.88%
7.61%
0.7196
8.73%
38.839'
PUB.ST.LIGHTS
0.64%
0.22%
0.08%
0.11%
0.23
PRV.ST.LIGHTS
0.15%
0.03%
0.00%
0.05%
0.07.,
CO -OP RESALE
0.51%
0.51%
0.00%
0.00%
0.0091
SCHOOL
2.01%
0.72%
0.42%
0.27%
0.60%
TOTAL 100.00% 21.97% 6.91% 18.67% 52.45%
(11A)
:1
• ( ) - ACTUAL UNDER BUDGET
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
BUDGETED REVENUE VARIANCE REPORT
4/30/12
SCHEDULE F
ACTUAL
SALES OF ELECTRICITY:
RESIDENTIAL
YEAR TO DATE
COMM AND INDUSTRIAL SALES
VARIANCE •
PRIVATE STREET LIGHTING
16,625,615.75
MUNICIPAL BUILDINGS
(1,147,677.25)
PUBLIC STREET LIGHTING
19,903,953.92
SALES FOR RESALE
(909,520.08)
SCHOOL
187,494.17
TOTAL BASS SALES
(241,707.83)
TOTAL FUEL SALES
190,487.45
TOTAL OPERATING REVENUE
(49,798.55)
FORFEITED DISCOUNTS
734,332.73
PURCHASED POWER CAPACITY
(23,617.27)
ENERGY CONSERVATION - RESIDENTIAL
ENERGY CONSERVATION - COMMERCIAL
40,014,205.00
GAW REVENUE
-5.93%
NYPA CREDIT
34,401,124.00
TOTAL OPERATING REVENUES
• ( ) - ACTUAL UNDER BUDGET
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
BUDGETED REVENUE VARIANCE REPORT
4/30/12
SCHEDULE F
ACTUAL
BUDGET
%
YEAR TO DATE
YEAR TO DATE
VARIANCE •
CHANGE
16,625,615.75
17,773,293.00
(1,147,677.25)
-6.46%
19,903,953.92
20,813,474.00
(909,520.08)
-4.37%
187,494.17
429,202.00
(241,707.83)
- 56.32%
190,487.45
240,286.00
(49,798.55)
- 20.72%
734,332.73
757,950.00
(23,617.27)
-3.12%
37,641,884.02
40,014,205.00
(2,372,320.98)
-5.93%
30,309,286.21
34,401,124.00
(4,091,837.79)
- 11.89%
67,951,170.23
74,415,329.00
(6,464,158.77)
-8.69%
773,692.14
880,313.00
(106,620.86)
- 12.11%
(109,691.11)
(113,680.00)
3,988.89
-3.51%
189,170.40
165,461.00
23,709.40
14.33%
319,513.09
277,941.00
41,572.09
14.96%
577,435.22
578,130.00
(694.78)
-0.12%
(563,165.35)
(500,000.00)
(63,165.35)
12.63%
75,703,494.00
-8.67%
69,138,124.62
(6,565,369.38)
(11B)
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
SCHEDULE OF OPERATING EXPENSES
4/30/12
SCHEDULE E
w
(12)
MONTH
MONTH
LAST YEAR
CURRENT YEAR
YTD 4
OPERATION EXPENSES:
LAST YEAR
CURRENT YEAR
TO DATE
TO DATE
CHANGE
PURCHASED POWER BASE EXPENSE
2,239,347.49
1,970,219.80
23,080,815.94
20,754,989.35
- 10.084
OPERATION SUPER AND ENGIN -TRANS
0.00
0.00
0.00
0.00
0.004
OPERATION SUP AND ENGINEERING EXP
39,652.68
31,427.69
378,617.58
423,125.08
11.764
STATION SUP LABOR AND MISC
10,643.58
10,160.33
91,828.21
93,624.95
1.964
LINE MISC LABOR AND EXPENSE
45,469.11
48,104.79
528,855.84
549,230.65
3.854
STATION LABOR AND EXPENSE
40,941.40
30,038.27
376,036.63
384,430.17
2.234
STREET LIGHTING EXPENSE
8,474.31
9,374.24
78,265.12
99,061.40
26.57%
METER EXPENSE
26,959.83
16,628.22
266,335.96
202,262.28
- 24.064
MISC DISTRIBUTION EXPENSE
29,808.84
26,080.55
273,533.47
279,622.24
2.234
METER READING LABOR & EXPENSE
4,885.34
6,795.52
59,913.72
76,327.20
27.404
ACCT & COLL LABOR & EXPENSE
116,022.92
142,074.45
1,066,382.19
1,191,748.84
11.76%
UNCOLLECTIBLE ACCOUNTS
15,000.00
16,000.00
150,000.00
160,000.00
6.674
ENERGY AUDIT EXPENSE
32,516.99
24,834.07
317,393.33
353,528.58
11.394
ADMIN & GEN SALARIES
67,046.89
64,675.19
585,867.31
628,192.60
7.224
OFFICE SUPPLIES & EXPENSE
20,545.08
18,789.29
223,144.00
187,757.00
- 15.864
OUTSIDE SERVICES
28,184.47
15,682.72
197,940.65
341,877.62
72.724
PROPERTY INSURANCE
31,705.39
31,678.40
311,182.88
322,017.33
3.484
INJURIES AND DAMAGES
4,265.93
3,839.18
37,762.39
17,976.56
- 52.404
EMPLOYEES PENSIONS & BENEFITS
96,791.56
94,295.52
1,341,509.98
1,059,024.75
- 21.064
MISC GENERAL EXPENSE
7,530.19
10,640.00
139,428.83
149,879.70
7.504
RENT EXPENSE
15,660.04
18,793.60
169,992.92
165,322.01
-2.754
ENERGY CONSERVATION
26,630.00
23,866.60
554,946.94
440,776.39
- 20.574
TOTAL OPERATION EXPENSES
668 734.55
643 778.63
7,148,937.95
7,125,785.35
-Q
MAINTENANCE EXPENSES:
MAINT OF TRANSMISSION PLANT
227.08
227.08
2,270.84
2,270.82
0.004
MAINT OF STRUCT AND EQUIPMT
12,896.37
4,363.86
136,541.41
205,520.23
50.524
MAINT OF LINES - OR
135,625.47
103,449.47
1,144,913.31
1,365,217.57
19.244
MAINT OF LINES - UG
20,354.86
17,419.74
127,660.68
149,258.74
16.924
MAINT OF LINE TRANSFORMERS
7,802.45
4,806.77
1,316,942.64
37,569.36
- 97.15#
MAINT OF ST LT & SIG SYSTEM
12.20
145.02
(129.07)
(345.48)
167.674
MAINT OF GARAGE AND STOCKROOM
54,924.84
41,386.03
522,845.71
443,704.50
- 15.14%
MAINT OF METERS
8,425.07
6,909.33
21,664.86
71,595.83
230.474
MAINT OF GEN PLANT
13,779.03
15,192.81
90,972.94
74,658.67
- 17.934
TOTAL MAINTENANCE EXPENSES
254,047.37
193,900.11
3,363,683.32
2,349,450.24
- 30.154
DEPRECIATION EXPENSE
287,729.05
296,027.47
2,877,290.50
2,960,274.70
2.884
PURCHASED POWER FUEL EXPENSE
2,748,671.80
2,154,729.79
33,321,091.62
30,368,274.49
-8.864
VOLUNTARY PAYMENTS TO TOWNS
110,000.00
113,000.00
1,095,885.00
1,126,186.00
2.76A
TOTAL OPERATING EXPENSES
-8.759
64,684,960.13
70,887,704.33
5,371,655.80
6,308,530.26
w
(12)
A
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
BUDGETED OPERATING EXPENSE VARIANCE REPORT
4%30/12
SCHEDULE G
+ ( ) : ACTUAL UNDER BUDGET
(12A)
ACTUAL
BUDGET
%
OPERATION EXPENSES:
YEAR TO DATE
YEAR TO DATE
VARIANCE *
CHANGE
PURCHASED POWER BASE EXPENSE
20,754,989.35
22,265,638.00
(1,510,648.65)
-6.78%
OPERATION SUPER AND ENGIN -TRANS
0.00
0.00
0.00
0.00%
OPERATION SUP AND ENGINEERING EXP
423,125.08
365,902.00
57,223.08
15.64%
STATION SUP LABOR AND MISC
93,624.95
51,489.00
42,135.95
81.83%
LINE MISC LABOR AND EXPENSE
549,230.65
596,007.00
(46,776.35)
-7.85%
STATION LABOR AND EXPENSE
384,430.17
367,527.00
16,903.17
4.60%
STREET LIGHTING EXPENSE
99,061.40
70,896.00
28,165.40
39.73%
METER EXPENSE
202,262.28
126,186.00
76,076.28
60.29%
MISC DISTRIBUTION EXPENSE
279,622.24
291,110.00
(11,487.76)
-3.95%
METER READING LABOR & EXPENSE
76,327.20
63,206.00
13,121.20
20.76%
ACCT & COLL LABOR & EXPENSE
1,191,748.84
1,183,659.00
8,089.84
0.68%
UNCOLLECTIBLE ACCOUNTS
160,000.00
160,000.00
0.00
0.00%
ENERGY AUDIT EXPENSE
353,528.58
348,277.00
5,251.58
1.51%
ADMIN & GEN SALARIES
628,192.60
616,482.00
11,710.60
1.90%
OFFICE SUPPLIES & EXPENSE
187,757.00
221,560.00
(33,803.00)
- 15.26%
OUTSIDE SERVICES
341,877.62
412,200.00
(70,322.38)
- 17.06%
PROPERTY INSURANCE
322,017.33
387,520.00
(65,502.67)
- 16.90%
INJURIES AND DAMAGES
17,976.56
46,565.00
(28,588.44)
- 61.39%
EMPLOYEES PENSIONS & BENEFITS
1,059,024.75
1,238,620.00
(179,595.25)
- 14.50%
MISC GENERAL EXPENSE
149,879.70
182,950.00
(33,070.30)
- 18.08%
RENT EXPENSE
165,322.01
176,670.00
(11,347.99)
-6.42%
ENERGY CONSERVATION
440,776.39
539,814.00
(99,037.61)
- 18.35%
TOTAL OPERATION EXPENSES
7,125,785.35
7,446,640.00
(320,854.65)
-4.31%
MAINTENANCE EXPENSES:
NAINT OF TRANSMISSION PLANT
2,270.82
2,500.00
(229.18)
-9.17%
MAINT OF STRUCT AND EQUIPMENT
205,520.23
89,319.00
116,201.23
130.10%
MAINT OF LINES - OR
1,365,217.57
1,165,124.00
200,093.57
17.17%
MAINT OF LINES - UG
149,258.74
178,282.00
(29,023.26).
- 16.284
MAINT OF LINE TRANSFORMERS
37,569.36
172,070.00
(134,500.64)
- 78.17%
NAINT OF ST LT & SIG SYSTEM
(345.48)
8,002.00
(8,347.48)
- 104.32%
MAINT OF GARAGE AND STOCKROOM
443,704.50
531,373.00
(87,668.50)
- 16.50%
MAINT OF METERS
71,595.83
71,192.00
403.83
0.57%
MAINT OF GEN PLANT
74,658.67
106,180.00
(31,521.33)
- 29.69%
TOTAL MAINTENANCE EXPENSES
2,349,450.24
2,324,042.00
25,408.24
1.09%
DEPRECIATION EXPENSE
2,960,274.70
3,000,000.00
(39,725.30)
-1.32%
PURCHASED POWER FUEL EXPENSE
30,368,274.49
33,252,726.00
(2,884,451.51)
-8.67%
VOLUNTARY PAYMENTS TO TOWNS
1,126,186.00
1,130,000.00
(3,814.00)
-0.34%
TOTAL OPERATING EXPENSES
-6.82%
(4,734,065.87)
69,419,046.00
64,684,960.13
+ ( ) : ACTUAL UNDER BUDGET
(12A)
0
(128)
TOWN OF
READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
BUDGETED OPERATING EXPENSE VARIANCE REPORT
4/30/12
RESPONSIBLE
REMAINING
SENIOR
2012
ACTUAL
BUDGET
REMAINING
OPERATION EXPENSES:
MANAGER
ANNUAL BUDGET
YEAR TO DATE
BALANCE
BUDGET %
PURCHASED POWER BASE EXPENSE
JP
27,402,177.00
20,754,989.35
6,647,187.65
24.26%
OPERATION SUPER AND ENGIN -TRANS
KS
0.00
0.00
0.00
0.00%
OPERATION SUP AND ENGINEERING EXP
KS
438,974.00
423,125.08
15,848.92
3.61%
STATION SUP LABOR AND MISC
KS
62,909.00
93,624.95
(30,715.95)
- 48.83%
LINE MISC LABOR AND EXPENSE
KS
692,464.00
549,230.65
143,253.35
20.69%
STATION LABOR AND EXPENSE
KS
441,924.00
384,430.17
57,493.83
13.01%
STREET LIGHTING EXPENSE
KS
85,338.00
99,061.40
(13,723.40)
- 16.08%
METER EXPENSE
KS
152,130.00
202,262.28
(50,132.28)
- 32.95%
MISC DISTRIBUTION EXPENSE
JD
352,508.00
279,622.24
72,885.76
20.68%
METER READING LABOR & EXPENSE
KS
76,220.00
76,327.20
(107.20)
-0.14%
ACCT & COLL LABOR & EXPENSE
RF
1,427,255.00
1,191,748.84
235,506.16
16.50%
UNCOLLECTIBLE ACCOUNTS
RF
192,000.00
160,000.00
32,000.00
16.67%
ENERGY AUDIT EXPENSE
JP
414,098.00
353,528.58
60,569.42
14.63%
ADMIN & GEN SALARIES
VC
745,939.00
628,192.60
117,746.40
15.78%
OFFICE SUPPLIES & EXPENSE
VC
265,700.00
187,757.00
77,943.00
29.33%
OUTSIDE SERVICES
VC
454,250.00
341,877.62
112,372.38
24.74%
PROPERTY INSURANCE
JD
465,000.00
322,017.33
142,982.67
30.75%
INJURIES AND DAMAGES
JD
55,859.00
17,976.56
37,882.44
67.82%
EMPLOYEES PENSIONS & BENEFITS
JD
1,441,637.00
1,059,024.75
382,612.25
26.54%
MISC GENERAL EXPENSE
VC
203,091.00
149,879.70
53,211.30
26.20%
RENT EXPENSE
JD
212,000.00
165,322.01
46,677.99
22.02%
ENERGY CONSERVATION
JP
643,789.00
440,776.39
203,012.61
31.53%
TOTAL OPERATION EXPENSES
8,823,105.00
_ 7,125,785.35
19.24°
1,697,319.65
MAINTENANCE EXPENSES:
MAINT OF TRANSMISSION PLANT
KS
3,000.00
2,270.82
729.18
24.31%
MAINT OF STRUCT AND EQUIPMT
KS
107,072.00
205,520.23
(98,448.23)
- 91.95%
MAINT OF LINES - OH
KS
1,419,953.00
1,365,217.57
54,735.43
3.85%
MAINT OF LINES - UG
KS
214,037.00
149,258.74
64,778.26
30.26%
MAINT OF LINE TRANSFORMERS
KS
188,500.00
37,569.36
150,930.64
80.07%
MAINT OF ST LT & SIG SYSTEM
JD
9,636.00
(345.48)
9,981.48
103.59%
MAINT OF GARAGE AND STOCKROOM
JD
662,139.00
443,704.50
218,434.50
32.99%
MAINT OF METERS
KS
85,444.00
71,595.83
13,848.17
16.21%
MAINT OF GEN PLANT
RP
127,620.00
74,658.67
52,961.33
41.50%
TOTAL MAINTENANCE EXPENSES
2,817,401.00
2,349,450.24
16.61%
467,950.76
DEPRECIATION EXPENSE
RF
3,600,000.00
2,960,274.70
639,725.30
17.77%
PURCHASED POWER FUEL EXPENSE
JP
39,768,817.00
30,368,274.49
9,400,542.51
23.64%
VOLUNTARY PAYMENTS TO TOWNS
RF
1,356,000.00
1,126,186.00
229,814.00
16.95%
TOTAL OPERATING EXPENSES
19,082,539.87
22.78%
83,767,500.00
64,684,960.13
0
(128)
:1
TOWN OF READING, MASSACHUSETTS
MUNICIPAL LIGHT DEPARTMENT
PROFESSIONAL SERVICES
04/30/2012
PROFESSIONAL SERVICES BY PROJECT
ITEM
DEPARTMENT
ACTUAL
BUDGET
VARIANCE
1 RMLD AND PENSION TRUST AUDIT FEES
ACCOUNTING
34,940.00
32,250.00
2,690.00
2 PENSION ACTUARIAL EVALUATION
ACCOUNTING
0.00
6,000.00
(61000.00)
3 LEGAL- FERC /ISO ISSUES
ENERGY SERVICE
0.00
15,000.00
(15,000.00)
4 LEGAL- POWER SUPPLY ISSUES
ENERGY SERVICE
49,684.60
37,500.00
12,184.60
5 PROFESSIONAL SERVICES
ENERGY SERVICE
7,484.32
20,000.00
(12,515.68)
6 NERC COMPLIANCE
E 4 0
16,192.40
13,350.00
2,842.40
7 LOAD CAPACITY STUDY /GIS
ENGINEERING
0.00
15,000.00
(15,000.00)
8 LEGAL SERVICES- GENERAL
GM
97,318.52
41,670.00
55,648.52
9 LEGAL SERVICES - GENERAL
HR
50,943.74
35,000.00
15,943.74
10 LEGAL SERVICES - NEGOTIATIONS
HR
16,037.52
3,500.00
12,537.52
11 LEGAL GENERAL
BLDG. MAINT.
2,312.50
1,250.00
1,062.50
12 SURVEY RIGHT OF WAY
BLDG. MAINT.
0.00
4,170.00
(4,170.00)
13 ENVIRONMENTAL
BLDG. MAINT.
0.00
4,170.00
(4,170.00)
14 STATION 1 STRUCTURAL FEASABILITY
BLDG. MAINT.
0.00
75,000.00
(75,000.00)
15 DEMOLITION OF CONTROL CENTER
BLDG. MAINT.
60,505.69
100,000.00
(39,494.31)
16 INSURANCE CONSULTANT
GEN. BENEFIT
6,458.33
4,170.00
2,288.33
17 LEGAL
GEN. BENEFIT
0.00
4,170.00
(4,170.00)
TOTAL
341,877.62
412,200.00
(70,322.38)
PROFESSIONAL SERVICES BY VENDOR
ACTUAL
ROMAREE INSURANCE
6,041.66
RUBIN AND RUDMAN
135,196.18
UTILITY SERVICES INC.
15,506.67
MELANSON MEATH i COMPANY
44,153.62
DUNCAN AND ALLEN
8,265.72
CHOATE HALL AND STEWART
66,981.26
PROFESSIONAL ENVIRONMENTAL SERVICES
2,240.00
CMEEC
4,169.32
FRANCESCO DEMOLITION INC.
56,800.00
COVINO ENVIRONMENTAL ASSOCIATION
2,523.19
TOTAL
341,877.62
(13)
RMLD
BUDGET VARIANCE REPORT
FOR PERIOD ENDING APRIL 30, 2012
DIVISION
ENGINEERING AND OPERATIONS
ENERGY SERVICES
GENERAL MANAGER
FACILITY MANAGER
BUSINESS DIVISION
SUB -TOTAL
PURCHASED POWER - BASE
PURCHASED POWER - FUEL
TOTAL
ACTUAL BUDGET VARIANCE CHANGE
3,839,978
3,521,214
318,764
9.05%
851,544
961,011
(109,467)
- 11.39%
683,479
602,654
80,825
13.41%
2,423,711
2,950,610
(526,900)
- 17.86%
7,608,014
7,720,200
(112,186)
-1.45%
-2.21%
15,406,725
15,755,689
(348,964)
20,754,989 22,265,638 (1,510,649) -6.78%
30,368,274 33,252,726 (2,884,452) -8.67%
66,529,989 71,274,053 (4,744,064) -6.66%
1w.n
pl]
L�
Ll
RMLD
DEFERRED FUEL CASH RESERVE ANALYSIS
04/30/12
GROSS
MONTHLY
TOTAL
DATE
CHARGES
REVENUES
NYPA CREDIT
DEFERRED
DEFERRED
Jun -11
3,055,224.78
Jul -11
4,131,396.83
4,049,745.45
(79,163.65)
(160,815.03)
2,894,409.75
Aug -11
3,795,607.97
3,924,541.80
(52,328.74)
76,605.09
2,971,014.84
Sep -11
2,914,869.40
3,166,562.64
(58,869.90)
192,823.34
3,163,838.18
Oct -11
2,955,398.39
2,852,952.53
(45,133.69)
(147,579.55)
3,016,258.63
Nov -11
2,643,246.46
2,544,526.70
(47,451.31)
(146,171.07)
2,870,087.56
Dec -11
2,968,917.38
2,889,822.54
(63,455.95)
(142,550.79)
2,727,536.77
Jan -12
3,338,331.18
3,114,395.49
(51,411.30)
(275,346.99)
2,452,189.78
Feb -12
2,879,936.88
2,594,141.71
(62,465.74)
(348,260.91)
2,103,928.87
Mar -12
2,585,840.21
2,644,228.46
(62,960.97)
(4,572.72)
2,099,356.15
Apr -12
2,154,729.79
2,528,368.89
(39,924.10)
333,715.00
2,433,071.15
GENERAL MANAGER
GENERAL MANAGER
HUMAN RESOURCES
COMMUNITY RELATIONS
TOTAL
BUSINESS
ACCOUNTING
CUSTOMER SERVICE
MGMT INFORMATION SYS
MISCELLANEOUS
TOTAL
ENGINEERING & OPERATIONS
AGM E &O
ENGINEERING
LINE
METER
STATION
TOTAL
PROJECT
BUILDING
GENERAL BENEFITS
TRANSPORTATION
MATERIALS MGMT
TOTAL
ENERGY SERVICES
ENERGY SERVICES
TOTAL
RMLD TOTAL
CONTRACTORS
UG LINE
TOTAL
GRAND TOTAL
* 7.75 8.75 8.75 8.75 8.75 8.75 8.75 8.75 8.75 8.75 8.75
* 6.25 5.25 5.25 5.25 5.25 5.25 5.25 5.25 5.25 6.25 6.25
1 1 1 1 1 1 1 1 1 1 1
17.00 16.50 16.50 16.50 17.00 17.00 17.00 17.00 17.00 18.00 18.00
2 2 2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5 5 5
21 20 20 20 20 20 20 21 21 21 21
4 4 4 4 4 4 4 4 4 4 4
8 8 8 8 8 8 8 7 7 7
40 39 39 39 39 39 39 39 39 39
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 1
0 0 0 0 0 0 0 0 0 0 0
4 4 4 4 4 4 4 4 4 4 4
8 8 8 8 8 8 8 8 8 8 7
* 5.5 5.5 5.5 5.5 5.5 5.5 5.5 4.5 4.5 4.5 4.5
5.5 5.5 5.5 5.5 5.5 5.5 5.5 4.5 4.5 4.5 4.5
74.5 73 73 73 73.5 73.5 73.5 72.5 72.5 73.5 72._
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
76.5 75 75 75 75.5 75.5 75.5 74.5 74.5_ 75.5 74.
* part time employee
*# part time employee and a coop student
*A part time employee and a temp
F]
RMLD
STAFFING REPORT
FOR FISCAL YEAR ENDING JUNE, 2012
ACTUAL
12 BUD J
JUL A
AUG S
SEP O
OCT N
NOV D
DEC J
JAN F
FEB M
MAR A
APR
TOTAL 1
11 1
11 1
11 1
11 1
11 1
11 1
12 1
12 1
12 1
12
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1
4 4
4 4
4 4
4 4
4 4
4 4
4 4
4 4
4 4
4 4
4
2.00 1
1.50 1
1.50 1
1.50 2
2.00 2
2.00 2
2.00 2
2.00 2
2.00 2
2.00 2
2.00
2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2
76.5 75 75 75 75.5 75.5 75.5 74.5 74.5_ 75.5 74.
* part time employee
*# part time employee and a coop student
*A part time employee and a temp
F]
* part time employee
*# part time employee and a coop student
*A part time employee and a temp
F]
U
U
ATTACHMENT 7
Preliminary Program Highlights-and .Events
Sunday Evening
Welcoming Reception with Cocktails
and Light Refreshments
Kickoff for a Cause
Join us for a Sunday Night Football event.
The event is free - square proceeds will go to
The Cromwell Center for Disabilities Awareness
founded to help ensure that people with all kinds of
disabilities receive the same respect acceptance, and
opportunities.
Monday Morning
Power Hungry: The Myths of "Green" Energy
and the Real Fuels of the Future
Robert Bryce, author /journalist
Many of the claims being made about our energy future
are simply wrong. We cannot, and will not, quit using
carbon -based fuels at any time in the near future for a
simple reason: they provide the power that we crave.
Nine out of every 10 units of energy we consume come
from hydrocarbons. Most renewable sources - and wind
and solar in particular -- are not "green" and cannot
provide the scale of energy that the world demands. The
good news for America -- and for US industry -- is the
shale revolution. Breakthroughs in the recovery of natural
gas and oil from shale beds are providing low -cost feed-
stocks that manufacturers can use to help create jobs
and stimulate the US economy.
Bioenergy in the Northeast:
Economic growth, energy independence, and envi-
ronmental stewardship for Maine and its neighbors
Dr. William Strauss, Economist
Les Otten, Maine Energy Systems
A review of the Northeast region's dependence on fossil
fuels for heating and the negative economic impacts that
dependency creates on the regional economy. There
will be a discussion on how much of Europe, and in par-
ticular Sweden and Austria, have already solved their
fossil fuel heating dependency. The presentation will
show how that right here in Maine and the nearby states
European residential bioenergy heating technology is
being successfully deployed and its use is not only cut-
ting heating fuel costs in half but is also supporting the
traditional forest products industry and lowering green-
house gas emissions. The positive economic and envi-
ronmental benefits will be discussed in detail.
Monday Afternoon
Lunch
Roundtable discussion
Led by Robert Bryce, Bill Strauss and Les Otten
Monday Evening
Reception and Banquet
Tuesday Morning
Energy Policy and the 112th Congress
Deborah Sliz, president & CEO of Morgan Meguire,
LLC, will bring her intimate knowledge of the U.S.
Congress and federal energy policy to the conference
and tell us what's going on behind the scenes, and who
is making it happen.
People Fuel
Chris Stevens Vice President of Corporate Relations and
Customer Development, Keurig Coffee
Stevens will call on life experiences from his own back-
ground and endeavors to illustrate how he learned that
we are all called to do something greater than some-
thing for ourselves. His inspiring talk will push people
to excel in their work while being a charitable steward to
others.
Tuesday Afternoon
Afternoon free for golf and sight seeing. (see enclosed
activity sheet)
Tuesday Evening
Dinner begins with a scenic Chondola ride up to Sunday
River's North Peak to take in views of the Mahoosuc
Mountain Range and the surrounding area. Followed by
beer tasting at South Ridge Base Lodge hosted by local
micro breweries.
Wednesday Morning
Farewell Breakfast
As at.prjys, this event will feature social activitues during which participants vot be
able to speak with other iitilrty offiaais, service providers and experts in the industry -
all in a relaxing and elegant a.mosphere conducive to casual networking.
Sunday River
The Grand Summit Resort Hotel combines
the best of both worlds. It offers all the
amenities you would expect from a full -
service hotel including two restaurants,
a health club, spa and a heated outdoor
pool - all set in a beautiful mountain loca-
tion. Accommodations include 230 well -
appointed guest rooms, all of which were
recently renovated, ranging from stan-
dard hotel rooms to suites with kitchens.
The resort features a championship golf
course, tennis courts, and hiking and
walking paths. The resort is located out-
side of Bethel, known as Maine's most
beautiful mountain village. Fine artisans
and craftspeople create and sell their
wares in retail shops, studios or in gallery
settings. The rich historic district offers
a gem museum. Zipline tours, mining
tours, whitewater rafting and horseback
riding are available as well as nature
walks and van tours.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Speakers
Robert Bryce, author /journalist
Bryce is one of America's most promi-
nent energy journalists. His articles have
appeared in numerous publications rang-
ing from the Wall Street Journal and
New York Times to National Review and
Counterpunch. He's the author of four
books on energy including, most recently,
Power Hungry: The Myths of "Green"
Energy and the Real Fuels of the Future.
Dr. William Strauss, Chief Economist,
Biomass Thermal Energy Council;
President and Founder, FutureMetrics
Strauss and FutureMetrics are globally
recognized as the leading US experts in
the economics of the production and use
of renewable bioenergy. Strauss is also
a co- founder and a director of Maine
Energy Systems and is chief economist
for the Biomass Thermal Energy Council
(Washington, DC) and the chief economist
for the Maine Pellet Fuels Association.
He has an MBA (specializing in Finance)
and a PhD (Economics and Earth Systems
Science) from the University of New
Hampshire. He is the recipient of the
2012 "Excellence in Bioenergy" award.
Less Otten, Maine Energy Systems, has
been a businessman and entrepreneur for
nearly four decades. He is former owner
of Sunday River Ski Resort and was part
of an investment group that bought the
Boston Red Sox several years ago. He
served as vice chairman of the baseball
franchise from 2002 to 2007, oversee-
ing renovations at Fenway Park. He is
the principal of four Maine businesses:
Maine Energy Systems, Sports Vision
Technologies, the Phoenix Restaurant
and Colony Development and Builders
Co. He is currently serving as chairman of
the The Cromwell Center for Disabilities
Awareness. Otten and Maine Energy
Systems has identified a number of ways
in which improving energy production
and usage in Maine would help the citi-
zens and the economy of Maine.
Chris Stevens Vice President of
Corporate Relations and Customer
Development, Keurig Coffee
Stevens is responsible for building the
Keurig brand through outreach efforts to
the media, key customers, trade associa-
tions and other influencer groups. Chris
joined Keurig in 1996 and is one of the
original members of the Keurig Senior
Team. He brought to Keurig more than 20
years of experience in consumer goods
sales and marketing, as well as general
management with such companies as
Anheuser- Busch, United Liquors and
Proctor & Gamble. He also served as the
Executive Director of the Sports Museum
of New England. He is a graduate of
Notre Dame University and the Executive
Education program at the Columbia
Business School.
NEPPA ANNUAL CONFERENCE 2Olz
�iJ�LLACT NAMF
FMAII
COMPANY
ADDRFSS
PHQNF FAX
Please indicate below the number of attendees, total cost and names as they will appear on the name badges. Please note:
All children must be registered in order to attend meal functions. Indicate age(s) of children to assist with program planning.
FIRST CORPORATF MFMRFR one rump limen a WigiLration e t 0 NAMF
a ADDITIONAL ('nRPORATF MFMRFRS A tAM TOTAI t NAMFM
a AMCIATF MFMRFR e t tisn TOTAI t AMF(S)
# A t 750 TOTAL t AMRSI
Y GIIFST OR CHII DRFN OVFR 17 e It 200 TOTAI t NAMES)-
..M CHIC DRFN lAGF t_1 1 A t 100 TOTAt t NAMM
we
E _. SIN ,I F DAY RATF e t W TOTAI t NAMMV
Total to be biNed or diAraedd to eompmor firm a If you would like to make a separate payment for guests,
II---11 fiN out belovw
PL FAS $ ND INVOICE FAR t I"Nuiiiisim ANLY1 PI FASF SFND INVOLCF FOR t ANLV1
CHFCK NC OSFD FOR t
��11 C-1. CHFCK ENCLOSED FOR t
ICI
PLFASF CHARGF A TOTAI OF t TO MY
I—I PI FASF CHARGE A TOTAL OF t TO MY
1140 0
M xP
r FKP
SIGNED
PRINT !NAMF SIGNED
SFND CREW CARD RF FIPT TO THr FOLLOWING OWING DD FSS PRINT NAMF
SEND INVCIICF ANDiOR C RFDIT CARD FCFIPT TO TWIF FO[ LOWING ADDRF;i
Mail or fax registration to: Northeast Public Power
Association,100 Medway Road, Suite 201, Milford, MA
01757 or fax: 508.482.0932
Lopcollation Policy:
Conference cancellations received by August 17 will be enti-
tled to a full refund. Cancellations after August 17 wiN be
subject to a prorated refund based on any costs incurred
by the Association.
Hotel reservations must be made directly with the
Sunday River Resort (form enclosed) Hotel cancellations
are the responsibility of the individual and must comply with
hotel policies. For more information on the resort and travel
information, go to www.sundayriver.com.
Register by August 17.
Any questions, special dietary needs, or accommodations for
disabilities, please call Kristin DiGirolamo at (508) 482 -5906
Northeast Public Power Association Annual
Conference 2012
Individual Reservation Form
Grand Summit Resort Hotel
Sunday River Resort and Conference Center
800- 207 -2365
ARRIVAL: Sunday, September 16, 2012 DEPARTURE: Wednesday, September 19, 2011
4
Standard Room (2 queen beds)
( ) $134.00++
If reservation is for only one night,
one night's lodging is due within
Studio Superior (1 queen Murphy bed do kitchenette,)
( ) $ 134.00++
five (5) days of booking the
reservation. If reservation is for
Studio Deluxe 1 queen Mu
( q Murphy, /sleep sofa do kitchenette)
( ) $134.00++
multiple nights, Vz of the total
reservation is due within five
1 Bedroom Superior (1 queen bed I sleep sofa or Murphy bed
( ) $169.00++
h Kitchenette )
(5) days of booking the reservation.
Final payment is due two weeks
3 Bedroom Suite (Bedding Varies) LIMITED AVAILABILITY
( ) $329.00++
prior to arrival and will be
automatically charged.
of lodging and the use of all hotel
Please check your lodging preference and rate. Each Per Room Nightly Rate includes: 1 night
amenities; taxes and resort fees totaling 14% are additional.
Please indicate -- Arrival day /date: Departure day /date:
Reservation and deposit must be received by August 17, 2012. Group rate and availability cannot be guaranteed past this date. 1J
Please make your reservation early for best choice of rooms. Unless requested, reservations will be made first at the
Grand SummR Hotel and overflow reservations will be made at the Jordan Grand Hotel.
When making a reservation, please refer to group code:
Last Name First
Company Phone #
Address
City State Zip
Special Requests
Email Address
Credit Card Card # Exp. Date Security Code
To participate In this event, please complete this form and mail It to Sunday River, PO Box 4500, Newry, ME 04261 or
FAX this forrn directly to our Reservations Offike at 207- 824 -5195. If you have questions, please call the Reservations
Office at 1- 800 - 207 -2365 between 8 AM - 5 PM, Monday through Friday. Sunday River accepts checks, Mastercard, Visa,
American Express, and Discover. A deposit is due within five days of booking a reservation and the reservation will be canceled
if the deposit is not received within the five -day period. For refund of deposit, less a $50 00 cancellation lee, notification of
cancellation must be received at least 15 days prior to the scheduled arrival. The entire deposit will be forfeited if cancellations
are made 14 days or less prior to scheduled arrival.
Signature Date
Check -in time is guaranteed at 6:00 PM. All attempts will be made to accommodate guests who arrive early.
Check -out time is 10:30 AM. The above rates are subject to a 7% Maine State Tax and a 7% Service charge.
TOWN OF READING MUNICIPAL LIGHT DEPARTMENT
RATE COMPARISONS READING & SURROUNDING TOWNS
NSTAR COMPANY
RESIDENTIAL
RESIDENTIAL -TOU
RES. HOT WATER
TOTAL BILL
750 kWh's
1500 kWh's
1000 kWh's
PER KWH CHARGE
$0.16800
7512S Split
$0.16586
READING MUNICIPAL LIGHT DEPT.
32.83%
37.77%
51.34%
TOTAL BILL
$94.86
$167.19
$109.59
PER KWH CHARGE
$0.12648
$0.11146
$0.10959
NATIONAL GRID
$0.12158
$0.11651
$0.11956
TOTAL BILL
$108.82
$193.62
$129.62
PER KWH CHARGE
$0.14510
$0.12908
$0.12962
%DIFFERENCE
14.72%
15.81%
18.27%
NSTAR COMPANY
INDUSTRIAL - TOU
TOTAL BILL
$126.00
$230.34
$165.86
PER KWH CHARGE
$0.16800
$0.15356
$0.16586
% DIFFERENCE
32.83%
37.77%
51.34%
PEABODY MUNICIPAL LIGHT PLANT
$165.13
$3,922.44
$10,692.69
TOTAL BILL
WAS
$174.77
$119.56
PER KWH CHARGE
$0.12158
$0.11651
$0.11956
% DIFFERENCE
-3.87%
4.53%
910%
MIDDLETON MUNICIPAL LIGHT DEPT.
INDUSTRIAL - TOU
TOTAL BILL
599.77
$198.39
$132.64
PER KWH CHARGE
$0.13303
$0.13226
$0.13264
% DIFFERENCE
5.18%
18.66%
21.03%
WAKEFIELD MUNICIPAL LIGHT DEPT.
$165.13
$3,922.44
$10,692.69
TOTAL BILL
$104.99
$203.67
$137.88
PER KWH CHARGE
$0.13998
$0.13578
$0.13788
DIFFERENCE
10.68%
21.82%
25.81%
I May -12 I
ATT ACHA'
i J i
INDUSTRIAL - TOU
COMMERCIAL
SMALL COMMERCIAL
SCHOOL RATE
109,500 kWh's
7,300 kWh's
1,080 kWh's
35000 kWh's
250.000 kW Demand
25.000 kW Demand
10.000 kW Demand
130.5 kW Demand
80120 Split
$845.62
$165.13
$3,922.44
$10,692.69
$0.11584
$0.15290
$011207
$0.09765
$1,048.46
$149.74
$3,705.62
$10,099.95
$0.14363
$0.13865
$0.10587
$0.09224
23.99%
-9.32%
-5.53%
- 5.54%
$1,158.27
$174.88
$6,379.23
$13,507.97
$0.15867
$0.16192
$0.18226
$0.12336
36.97%
5.90%
62.63%
26.33%
$944.26
$158.04
$4,598.69
$10,34216
$0.12935
$0.14634
$0.13139
$0.09445
11.66%
-4.29%
17.24%
-3.28%
$959.51
$168.44
$4,762.93
$13,330.75
$0.13144
$015596
$0.13608
$0 12174
13.47%
2.00%
21.43%
24.67%
$1,045.84
5168.46
$4,895.58
$13,519.62
$0.14327
$0.15599
$0 13987
$012347
23.68%
2.02%
2481%
2644%
ATT ACHA'
i J i
FW: Account Payable Questions - April 20, 2012
Vincent Cameron
Sent: Monday, April 23, 2012 11:05 AM
To: RMLD Board Members Group
CC. . Bob Fournier; Steve Kazanjian; Wendy Markiewia; Jeanne Fod
Categories: Red Category
O'Neill
1. Reading Lumber - Why are we not using the petty cash for these minor purchases?
This is an open account, in which we purchase materials and then are billed to the RMLD monthly.
West
Page I of I
1. MEAM 2012 Dues - Why are these based on 2010 kWh sales - isn't 2011 data avail. or does this always go back 2
years?
MEAM's uses the sales from two years back because some municipal electric utilities' sales figures from the
preceding year are not ready when MEAM does their billing calculation.
2. Can't police details be scheduled so that we are able to use the full hours we pay for? 2 hrs. vs. 4 hrs. and 6 hrs. vs.
8 hrs. - both were sergeants so extra pay was at a premium.
The RMLD tries to schedule jobs needing a police detail in the most efficient and economic manner possible.
In some instances a job may not take a full four or eight hours to complete. The towns determine who performs the detail
out of the officers available the day of the detail.
3. How is the capital calculated on police details - most work is Asplundh - is this capital? Or is it a percent of the work
done?
There were two Reading Police details that were capitalized this week. Both police details were performed on capital
(W projects done by RMLD Line Crews. The Asplundh work was expensed.
https: / /owa.rmid.com/owa/ ?ae= Item &t =IPM. Note& id= RgAAAACOkZIrikKLQ6uBL6Pyd... 4/23/2012
Account Payable Question - April 27, 2012
Account Payable Question - April 27, 2012
Vincent Cameron
sent: Monday, April 30, 2012 9:29 AM
To: RMLD Board Members Group
Cc: Bob Fournier; Steve Kazanjian; Wendy Markiewia; Jeanne Foti
Categories: Red Category
O'Neill
1 arp. 1 V ■ 1
1. Progressive Gourmet - Please explain. (Given the unusual nature of this payable, I am surprised that you
did not take a few minutes to write a note to us about this.)
The explanation on the payable cover sheet is in italics.
Progressive Gourmet, Inc. qualified for a sales tax abatement for the period from May, 2008 thru March, 2011.
Checks from the state are made out to the Town of Reading: RMLD deposits the checks into its account, RMLD
then pays the customer.
Here is more detail on the Progressive Gourmet payable.
In the 1990's, the municipal electric light departments and plants were ordered to collect sales tax from their
commercial /industrial customers. The RMLD then pays what is collected to the state. If a customer falls under
certain criteria they may be exempt from the sales tax. The Progressive Gourmet falls within the tax exempt
criteria and they received a rebate for the taxes they paid back to March, 2008.
A company may apply for a maximum of three years of abatements.
httns: / /owa.rmid.com/owa/ ?ae= Item &t =[PM. Note &id= RgAAAACOkZIrlkKLQ6uBL6Pyd... 4/30/2012
Ic
9
RE: Account Payable Question - April 27, 2012
Phil Pacino [philpacino @grmp.net)
Sent: Monday, April 30, 2012 9:39 AM
To: Vincent Cameron; RMLD Board Members Group
Cc: Bob Fournier; Steve Kazanjian; Wendy Markiewicz; Jeanne Fob
My understanding is Progressive Gourmet won their appeal to the MA Tax court to be classified as a
manufacturer.
Thus they were entitled to the benefits of being a manufacturer.
From: Vincent Cameron (mailto:vcameron @RMLD.com)
Sent: 04/30/2012 9:29 AM
To: RMLD Board Members Group
Cc: Bob Fournier; Steve Kazanjian; Wendy Markiewicz; Jeanne Foti
Subject: Account Payable Question - April 27, 2012
O'Neill
Page 1 of 1
1. Progressive Gourmet - Please explain. (Given the unusual nature of this payable, I am surprised that you
did not take a few minutes to write a note to us about this.)
(W- The explanation on the payable cover sheet is in italics.
Progressive Gourmet, Inc. qualit"►ed for a sales tax abatement for the period from May, 2008 thru March, 2011.
Checks from the state are made out to the Town of Reading: RMLD deposits the checks into its account; RMLD
then pays the customer.
Here is more detail on the Progressive Gourmet payable.
In the 1990's, the municipal electric light departments and plants were ordered to collect sales tax from their commercial /industrial
customers. The RMLD then pays what is collected to the state. If a customer falls under certain criteria they may be exempt from the sales
tax. The Progressive Gourmet falls within the tax exempt criteria and they received a rebate for the taxes they paid back to March, 2008.
A company may apply for a maximum of three years of abatements.
https: / /owa.nnid.com/owa/ ?ae= Item& t = IPM. Note &id= RgAAAACOkZ[r[kKLQ6uBL6Pyd... 4/30/2012
RE: Account Payable Question - April 27, 2012
RE: Account Payable Question - April 27, 2012
MaryEllen O'Neill [maryellenoneill @hotmaii.com]
Sent: Monday, May 07, 2012 8:22 AM
To: Vincent Cameron; Phil Pacino; Gina Snyder; Marsie West [marsie .west @bnymellon.com]; Bob Soli
Cc: Bob Fournier; Steve Kazanjian; Wendy Markiewicz; Jeanne Fob
Page IofI
Follow -up questions: Is this something the RMLD still does? Are there any other companies in our
service area that we are responsible for in this regard?
From: vcameron @RMLD.com
To: GroupRMLDBoardMembers @RMLD.com
CC: bfournier @RMLD.com; skazanjian @RMLD.com; wmarkiewicz@RMLD.com;jfoti@RMLD.com
Subject: Account Payable Question - April 27, 2012
Date: Mon, 30 Apr 2012 13:29:12 +0000
O'Neill
1. Progressive Gourmet - Please explain. (Given the unusual nature of this payable, I am surprised that you
did not take a few minutes to write a note to us about this.)
The explanation on the payable cover sheet is in italics.
Progressive Gourmet, Inc. qualified for a sales tax abatement for the period from May, 2008 thru March, 2011.
Checks from the state are made out to the Town of Reading: RMLD deposits the checks into its account; RMLD
then pays the customer.
Here is more detail on the Progressive Gourmet payable.
In the 1990's, the municipal electric light departments and plants were ordered to collect sales tax from their
commercial /industrial customers. The RMLD then pays what is collected to the state. If a customer falls under
certain criteria they may be exempt from the sales tax. The Progressive Gourmet falls within the tax exempt
criteria and they received a rebate for the taxes they paid back to March, 2008.
A company may apply for a maximum of three years of abatements.
https: / /owa.rmld.com /owa/ ?ae= Item& t = IPM. Note& id= RgAAAACOkZIrikKLQ6uBL6Pyd... 5/7/2012
-C,- ■ v l G
FW: Account Payable Questions - May 4 and 11
Vincent Cameron
Sent: Tuesday, May 15, 2012 12:11 PM
To: RMLD Board Members Group
Cc: Bob Fournier; Steve Kazanjian; Wendy Markiewicz; Jeanne Fob
Categories: Red Category
May 4 - Questions and Answers
O'Neill
1. Image Technology - Why don't we purchase all toner, in bulk, from one supplier?
The RMLD purchases toner and toner cartridges for copiers and printers, the toners are different. The copiers
use a certain type of toner and cartridge whereas the printers use another type of toner and cartridge.
The copy machine toner is changed about twice annually depending on use. The printers need a change of toner
once every six months or so depending on the use of the printer. Then there is the bill printer that requires the
toner to be changed about once a month, however this will change when we go to third party billing this year.
We don't purchase enough toner annually to qualify for a bulk discount. If we tried to procure under a bulk
purchase we would have to store the toner in a location where it would not be damaged or spoiled because of
the shelf life.
The copy machines are on a three year lease and I would not want to have extra toner cartridges around that may
not be used.
2. Reading Police - No hours on blue RMLD sheet for last detail 4/21.
The times (8 am to 2 pm) were written on the blue sheet, which is the same as the Town of Reading recorded on
the white sheet that was attached.
3. The Board approved a bid from Itron at its December 7, 2011 meeting in the amount of $876,379 with the
understanding that this bid required additional negotiation between the RMLD and Itron.
There was a bill in this week's payables from Itron for $302,760 for collectors and repeaters only and the PO
doted that this was bid 2012 -08.
https: /!owa.nnld.com /owal`ae= Item& t= IPM.Note &id =RgAAAACOkZlrl kKLQ6uBL6Pyd... 5/15/201-1
FW: Account Payable Questions - May 4 and 11
Standard practice, I thought, was to draw up a PO for the entire bid with the specific elements itemized on the
PO. Has this been done for IFB 2012 -08? If so, I would like to see a copy of that PO. If not, how is it
being handled?
Since no specifics were provided to the Board about the cost breakout within this very large bid, e.g. no
estimated costs for hardware, software, labor, etc., I think the Board should be updated on this.
1. Requisition #1949 was create January 24, 2102 for the full amount.
2. The RMLD thought it would be more accurate to manage with the project, from a purchasing viewpoint, if it
was separated into several purchase orders since invoices were expected to be for partial payments.
Open purchase orders:
• 50% of repeaters and collectors (1st half) - received @ RMLD (PO# 765 $302,760)
e professional services, software and servers (PO# 764 $263,181.11) Servers and Software received @ RMLD
e Balance of collectors (2nd half) - on order (PO# 1200 $29,960)
May 11 - Questions and Answers
O'Neill
1. Cushing, Jamallo + Wheeler - What was the cause of these spills?
In the course of performing preventative maintenance on its pad mounted transformers the RMLD found a leak at
a transformer on Spruce Road, North Reading. The transformer was removed and the spill was cleaned up.
2. General - Is there a system for time /date stamping mail so it can be seen when bills arrived in the office?
No, we do not time stamp the bills that come into the office. The mail is delivered to the employees and bills are
opened by the addressees when they arrive. I don't think it is necessary for the bills to be time stamped.
P1
https: / /owa.rmid.com /'owa/ "ae= Item &t =IPM. Note& id= RgAAAACOkZIrikKLQ6uBL6Pyd... 5/15/2012
v- . . .-
RE: Account Payable Questions - May 4 and 11
MaryEllen O'Neill [maryellenoneill @hotmail.com]
Sent: Wednesday, May 16, 2012 8:05 AM
To: Vincent Cameron; Phil Pacino; Gina Snyder; Marsle West [marsie.westObnymellon.com]; Bob Soil
Cc: Bob Fournier; Steve Kazanjian; Wendy Markiewicz; Jeanne Fotl
Regarding my question on the Reading Police detail sheet, there were no hours filled out on the last
RMLD blue detail sheet in this batch when I viewed it in the payables. I'm sure it was simply an
oversight. As that is our internal control, that is what must be matched with the billing submitted by any
police department.
Regarding my question on time /date stamping incoming bills, the question again is one of controls.
Invoices should be time stamped and forwarded directly to the accounting department to provide for a
secure, clear path for all RMLD bills.
Regarding my question on the Itron bid, the dollar amount listed in the response under "open purchase
orders" totals $595,901.11; the bid approved by the Board totaled $876,379. What purchase orders
account for the difference? Also, other purchase orders that I have seen, for either a multi -year or large
project, had one purchase order which listed all the items /functions and provided a vehicle to oversee the
invoices linked to the bid in a complete manner. How will this be accomplished with the Itron bid?
From: vcameron @RMLD.com
To: GroupRMLDBoardMembers @RMLD.com
CC: bfoumier @RMLD.com; skazanjian @RMLD.com; wmarkiewicz @RMLD.com; jfoti @RMLD.com
Subject: FW: Account Payable Questions - May 4 and l 1
Date: Tue, 15 May 2012 16:11:21 +0000
May 4 - Questions and Answers
O'Neill
1. Image Technology - Why don't we purchase all toner, in bulk, from one supplier?
The RMLD purchases toner and toner cartridges for copiers and printers, the toners are different. The copiers
use a certain type of toner and cartridge whereas the printers use another type of toner and cartridge.
The copy machine toner is changed about twice annually depending on use. The printers need a change of toner
once every six months or so depending on the use of the printer. Then there is the bill printer that requires the
toner to be changed about once a month, however this will change when we go to third party billing this year.
We don't purchase enough toner annually to qualify for a bulk discount. If we tried to procure under a bulk
purchase we would have to store the toner in a location where it would not be damaged or spoiled because of
the shelf life.
The copy machines are on a three year lease and I would not want to have extra toner cartridges around that may
not be used.
2. Reading Police - No hours on blue RMLD sheet for last detail 4/21.
The times (8 am to 2 pm) were written on the blue sheet, which is the same as the Town of Reading recorded on
the white sheet that was attached.
https :�'%owa.rmld.coiivowa/')ae= Item &t = IPM. Note& id= RgAAAACOkZIrikKLQ6uBL6Pyd... 5/16/2012
RE: Account Payable Questions - May 4 and I I
Iubv. Z. UI'L
3. The Board approved a bid from Itron at its December 7, 2011 meeting in the amount of $876,379 with the
understanding that this bid required additional negotiation between the RMLD and Itron.
There was a bill in this week's payables from Itron for $302,760 for collectors and repeaters only and the PO
noted that this was bid 2012 -08.
Standard practice, I thought, was to draw up a PO for the entire bid with the specific elements itemized on the
PO. Has this been done for IFB 2012 -08? If so, I would like to see a copy of that PO. If not, how is it
being handled?
Since no specifics were provided to the Board about the cost breakout within this very large bid, e.g. no
estimated costs for hardware, software, labor, etc., I think the Board should be updated on this.
1. Requisition #1949 was create January 24, 2102 for the full amount.
2. The RMLD thought it would be more accurate to manage with the project, from a purchasing viewpoint, if it
was separated into several purchase orders since invoices were expected to be for partial payments.
Open Purchase orders:
• 50% of repeaters and collectors (1st half) - received @ RMLD (PO# 765 $302,760)
• professional services, software and servers (PO# 764 $263,181.11) Servers and Software received Q RMLD
• Balance of collectors (2nd half) - on order (PO# 1200 $29,960)
May 11 - Questions and Answers
O'Neill
1. Cushing, Jamallo + Wheeler - What was the cause of these spills?
In the course of performing preventative maintenance on its pad mounted transformers the RMLD found a leak at
a transformer on Spruce Road, North Reading. The transformer was removed and the spill was cleaned up.
2. General - Is there a system for time /date stamping mail so it can be seen when bills arrived in the office?
No, we do not time stamp the bills that come into the office. The mail is delivered to the employees and bills are
opened by the addressees when they arrive. I don't think it is necessary for the bills to be time stamped.
https: /,'owa.rrnld.comiowa/ "ae= Item &t = IPM. Note& id= RgAAAACOkZlrlkKLQ6uBL6Pyd... 5/16/2012