Laserfiche WebLink
READING CONSERVATION COMMISSION <br />_ Minutes of Wednesday, September 3,199" , Torun Hall Selectmen's Meeting Room <br />PRESENT: Chair Nancy Eaton, Members. Vice Chair Stephen Chapman, David Danis, <br />Clifton Proctor, John Kilborn, Harold "Lucky" Hulse, Mark Gillis, Consultant Leo <br />Kenney, Conservation Administrator Ronald Nadeau, and Recording Secretary Kathy <br />Morgan. <br />7:15 PM Meeting was called to order. <br />7: ib PM Scenic Road Designation petition - Walnut St Ur <br />. Hopkins St to Pine <br />Ridge R~ -'Lvh-. Daniel Sulls presented photos to the Commission of the streets that would <br />be affected by the construction of a new street and sidewalk and explained his reasons why <br />the project should riot be done. His neighbors; Harvey Lardel, 149 Walnut St.; Joanne <br />Fuller, 169 Walnut St., Al Thomann, 113 Walnut St., Craig Starble, 55 Walnut St. also <br />expressed their concerns of the project ruining large trees, stone walls and the overall <br />esthetic beauty of the street. A motion was made and seconded to endorse the petition <br />for a T own Meeting Warrant and also for the Selectmen not to take any action with <br />respect to construction until after Town Meeting has an opportunity to vote on the <br />warrant article. Voted: 7-0-0. <br />7:45 PM RGB Extension Permit - restoration at Route 93dpswich River RGB# <br />122-21 Ms. Ingeborg Hegemann from the BSC Group gave an update of the oil spill. <br />She explained that 1.3 acres of soil was taken out and also some of the buffer area. <br />Because they wanted to make sure they cleared up all the gasoline the restoration was <br />delayed and she was asking for an extension of their local permit. She passed out new <br />plans showing the planting plan and also passed out a Proposed Planting Plan proposal. <br />Ms. Hegerrrann stated they expect construction to start this fall. A motion was made and <br />seconded to retroactively issue an extension from 4/30/97 to 4/30/98. Voted: 7-0-0. <br />8:15 PM Notice - rill in detention basin at 3 Lindsay ane Dr. Larmhut, the owner, <br />was given a copy of the site visit report. Chair explained the 100' buffer zone law. <br />Dr. Lamhut explained that he had tried to comply with the wetlands regulations but <br />misunderstood where the limits of work were. Chair read Public Use Limits of Liability. <br />A motion was made and seconded for the Commission to order the owner to remove the <br />f dl at the end of the property so that the grade is brought down to the existing grade on <br />the high side. Noted: 7-0-0. <br />9:07 PM Continued Public Meetirsr - 1-1-5 TakPvi~ Avi-_ i3GR# tEDs}7_2?_ <br />Mr. Michael Kos,-mo, Civil Engineer at Everett M. Brooks, explained to the members some <br />of the changes; replacing the catch basin with 4' deep sump catch basins and reducing the <br />impervious area by about 1/10 of an acre by making some pavement areas grass. A <br />motion was made and seconded to close the Public Meeting. Voted: 7-0-0 A motion <br />was made and seconded to issue a negative determination of applicability with standard <br />