Laserfiche WebLink
SPECIAL TOWN MEETING <br />Reading Memorial High School <br />Preforming Arts Center <br />January 6, 2015 <br />The meeting was called to order by the Moderator, Alan E Foulds, at 7:41 PM, there being a quorum <br />present. <br />Motion made by John Arena, Board of Selectmen to dispense of the reading of all motions in their entirety. <br />Motion Carried <br />ARTICLE 6: Motion made by Jeff Struble, Bylaw Committee that the Town vote to amend the <br />General Bylaws by adding a new section 3.3.6 thereto as follows: <br />3.3.6 Permanent Building Committee <br />There shall be a Permanent Building Committee ( "PBC") consisting of five (5) Permanent Members and, <br />except as otherwise provided herein, up to two (2) Associate Members for each project that the PBC <br />undertakes. Permanent and Associate Members of the PBC shall be appointed by an Appointment <br />Committee consisting of the Chair of the Board of Selectmen, the Chair of the School Committee and the <br />Town Moderator. <br />Permanent Members shall be volunteers having practical experience and skills in professions that <br />concentrate on the design, construction, management and financing of commercial / institutional buildings <br />such as architects: civil engineers; structural engineers; mechanical, electrical and plumbing (MEP) <br />engineers, building contractors, project managers, property managers, attorneys and building <br />tradespersons. The terms shall be so arranged that as nearly an equal number of terms as possible shall <br />expire each year. <br />Associate Members may be appointed for each individual project that the PBC undertakes. Associate <br />Members shall have the same participation and voting rights as Permanent Members on matters affecting <br />the particular project for which they were appointed. Associate Members shall be registered voters of the <br />Town, selected by the Board or Committee that proposes a particular building or renovation project (the <br />"Sponsoring Agency ") and shall serve only for the time during which the PBC is exercising its functions <br />with respect to such project. In the event that a particular project is subject to participant requirements of <br />a state funding authority, the Appointment Committee may appoint additional Associate Members to the <br />PBC for that particular project; provided, however, that, in no event, shall the aggregate number of <br />Permanent and Associate Members for a particular project exceed nine (9). Quorum requirements for the <br />PBC shall be the majority of the Permanent and Associate Members for a particular project. <br />The PBC shall be responsible for the oversight and management of all major municipal and school building <br />design studies and construction projects having expected aggregate costs exceeding two million dollars <br />($2,000,000). The PBC's jurisdiction shall not extend to projects of the Reading Municipal Light <br />Department. The PBC shall present all such projects to the Finance Committee for consideration of funding <br />options and shall sponsor and present all such projects to Town Meeting for its consideration and approval <br />of funding. <br />The PBC shall work with the School Committee, the Board of Selectmen and any other Sponsoring Agency. <br />The Sponsoring Agency shall notify the PBC of its intention to undertake any such projects within seven <br />(7) calendar days of a positive vote or general affirmation to do so. <br />11P-_.- <br />