My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-18 Community Planning and Development Commission Minutes
TownOfReading
>
Public Access
>
Minutes
>
Community Planning and Development Commission
>
2000-2009
>
2008
>
2008-03-18 Community Planning and Development Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2011 9:09:07 AM
Creation date
7/20/2011 1:30:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town of Reading <br />16 Lowell Street <br />Reading, MA 01867-2683 <br />Phone: 781-942-6612 <br />Fax: 781-942-9071 <br />Email: ckowalski@ci.reading.ma.us <br />Community Planning and Development Commission <br />CPDC MINUTES <br />Planning Subcommittee Meeting Dated: March 18, 008 <br />Location: Conference Room Town Hall ' Timed 7:30 PM <br />1, <br />Members Present: Brant Ball ntyne;-(-AB), Chairman; David t-uttle-(DT); S-ecfetary; John Sasso (JS), <br />Nicholas Safina (NS), and John Weston (TW)- <br />Associate Members Present: Christopher Nolty (CN) <br />Also Present: Carol Kowalski, Town Planner; Abigale McCabe, Staff Planner; and Michael Schloth. <br />Downtown 4011 Guidelines discussion <br />Downtown Streetscape <br />The Town Manager summarized the upcoming Downtown Streetscape construction. <br />• Locations: everything in public right-of-way along: <br />➢ Main Street from Washington Street to Salem Street, <br />➢ Hamden Street, <br />➢ Lowell Street (in front of the Town Hall): one-way traffic and more parking spaces <br />➢ Ash Street: reconfigured to "T"-intersect Main St. in front of 580 Main St.' rather than <br />continue to Haven Street. <br />• General Improvements: <br />➢ Rebuilding street; new curbs, crosswalks (granite banding and pavers); and sidewalks <br />(brick banding); new street trees <br />➢ New street lighting and traffic signals (cement kiosk to be removed) <br />➢ Bike racks and benches <br />• Schedule: <br />➢ Dependent on weather. Currently tree removal and some catch basins done. Contractor <br />expects project to be in full swing in March. <br />➢ Completed: September 2009 but most could be done by November 2008. <br />• Information: <br />➢ Downtown-construction webpage: plans and elevations to be posted; updated throughout <br />construction <br />➢ Series of public meetings <br />• During Construction: <br />➢ Main Street will have at least one lane open both North and South <br />➢ Attempting to be granted the authority to change parking regulations on a day-to-day basis <br />as needed. <br />➢ Five-Year Moratorium on Street Openings (utility, water, sewer connections) <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.