Laserfiche WebLink
Town o Reading PF"ElvFD <br />16 Lowell Street T 0~ N! C L E R K <br />R ~ r'~GI~S. M 55. <br />Reading, MA 01867-2683 <br />Phone: 781-942-6612 <br />Fax: 781-942-9071 201 t <br />JUN 2 1 P 12: 5 2 <br />Email: jdelios@ci.reading.ma.us <br />Community Planning and Development Commission <br />CPDC MINUTES <br />Meeting Dated: September 13, 2010 <br />Location: Selectmen's Meeting Room <br />Time: 7:30 PM <br />Members Present: John Weston (JW), Chairman; Joseph Patterson (JP), Secretary; David Tuttle (DT), <br />Nicholas Safina (NS) and Paul Bolger (PB). <br />Also Present: Abigail McCabe (AM), Staff Planner; and Michael Schloth (MS), Recording Secretary. <br />Mr. Prakash Badola, 670 Main Street <br />Mr. Bill Bergeron, Hayes Engineering, Wakefield, MA. <br />Mr. & Mrs. Ralph Blunt, 22 Linden Street <br />Marie & Joe Calareso, 28C Carnation Circle <br />Ms. Sheila Clarke Economic Development Committee (EDC) <br />Mr. Anthony D'Arezzo, 130 John Street <br />Mr. Joe DiMambo, 5 Mile Post Road <br />Ms. Lori Doughty, 348 South Street <br />Ms. Susan Gravallese, 5 Mile Post Road <br />Attorney Brad Latham of Latham Law Offices, LLC, 643 Main Street <br />Attorney Chris Latham of Latham Law Offices, LLC, 643 Main Street <br />Mr. Phil Terzis, Oaktree Development <br />Mr. Neal Roberts, 102 Main Street <br />Ms. Michelle Williams Economic Development Committee (EDC) <br />Mr. Imad A. Zrein, P.E., Devellis Zrein Inc., Foxborough, MA <br />There being a quorum the Chair called the meeting to order at 7:36 PM. <br />The Board welcomed new member Paul Bolger. <br />Public Hearing: Site Plan Review and Special Permit (continued) <br />80-100 Main Street, Calareso's Farm Stand <br />The owner, Mr. Joseph Calareso, was present with his attorney, Mr. Brad Latham, and his engineer, Mr. <br />Bill Bergeron. <br />JW noted there were two main issues: 1) Drainage - Need assurance pipe is of sufficient size to handle a <br />25-year storm without surcharge. 2) Driveway layout - number of access lanes (2 or 3) and sloped vs <br />vertical granite curbing. <br />Drainage: JW noted that Cons Comm suggested a re-design of the drainage. Hayes Eng. proceeded to <br />explain why this is not necessary. The discussion got technical but the gist appeared to be that the <br />drainage plan would meet all requirements although GZ wanted an as-built of the site prior to occupancy <br />Page 1 of 5 <br />