BOARD OF APPEALS <br />READING, MA <br />MINUTES - AUGUST 5, 1987 <br />Members Present: Catherine Quimby <br />Stephen Tucker <br />Ardith Wieworka <br />Catherine Quimby opened the scheduled public hearing at 7:05 PM in the <br />Selectmen's Meeting Room for Mr. Ross D. Petty, 19 Criterion Road, <br />Reading, MA. The public hearing was continued from July 29, 1987 to allow <br />Mr. Petty to,seek the building permit on the structure. <br />Mr. Petty then submitted the building permit dated September 24, 1977 <br />to the Board. Building permit indicated the 15 foot setback was present. <br />The Board was intending to clarify the granting of a Variance for what now <br />appeared in the most recent tape survey to be a 6 inch discrepancy on the <br />easterly side of the property. <br />Ardith Wieworka then moved to grant Variance to Ross D. Petty, 19 <br />Criterion Road, under Section 5.1.2. citing structure which may encroach <br />on the easterly side lot line. The Board voted unanimously to grant <br />Variance, and the public hearing moved on to the continuance of the <br />Fafard/Greenhouse Acres appeal for Special Permit. <br />Chairman John Jarema and Carol Scott were also in attendance for this <br />portion of the meeting. <br />Chairman Jarema opened the meeting at 7:30 PM stating he had spoken to <br />Town Councel regarding designating another individual as agent for the <br />ZBA. Town Councel found this acceptable as long as duties did not <br />conflict with the zoning administrator, or building inspector. Discussion <br />by Mr. Jarema and Catherine Quimby then continued regarding whether there <br />was a need for an agent in this issue. The Board then moved on to discuss <br />the pre-construction conditions drafted for inclusion in the Special <br />Permit. These issues were discussed by the Board and edited for final <br />draft to be discussed with Town Councel. The Board then moved on to <br />discuss the construction-phase conditions. <br />Mr. Latham, Councel for the Petitioner, then requested copies of the <br />draft be distributed to the attendees to enable them to better understand <br />what was being discussed. Mr. Jarema granted this request, and the <br />meeting then continued. After much discussion on the construction phase <br />of the project between the Board and the Petitioner, the meeting moved on <br />to discuss post-construction issues. <br />