My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-15 Community Planning and Development Commission Minutes
TownOfReading
>
Public Access
>
Minutes
>
Community Planning and Development Commission
>
2000-2009
>
2002
>
2002-07-15 Community Planning and Development Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2010 5:42:32 PM
Creation date
10/7/2010 3:03:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0` f CLERK <br />TOWN OF READIN&POING, Mass` <br />16 Lowell Street _q P W. 03 <br />Reading, MA 01867-2683 <br />Phone: 781-942-9012 <br />Fax: 781-942-9071 <br />Email: akrieg@ci.reading.ma.us <br />COMMUNITY PLANNING AND DEVELOPMENT COMMISSION <br />CPDC MINUTES <br />Meeting Dated: July 15, 2002 <br />Members Present: Richard Howard (RH), Chairman; Jonathan Barnes(JB); Neil <br />Sullivan, (NS); Paul Devlin, (PD) <br />Also Present: Joseph Delaney, Town Engineer (JD); Anne Krieg, Tozvn Planner (AK); <br />Kelley Meier, Recording Secretary (KM). <br />The Chair called the meeting to order at 7:36 PM. <br />STAFF BRIEFING <br />AK discussed the 93/95 Interchange with the Commission. <br />RH spoke about the Ad-Hoc Committee on the 93/95 Interchange and asks the <br />Commission if anyone woud like to represent the CPDC. <br />NS volunteered to represent the Commission. <br />ADMINISTRATIVE REVIEW <br />7:45 PM: 80-90-100 SOUTH MAIN STREET <br />Mr. Tambone spoke about his plans for the redevelopment of the property. The <br />existing buildings are 40/50 years old. They keep up the buildings as much as <br />possible. The property is approximately 2.5 acres. The three buildings have a <br />floor area of 30,000 square feet. This new project probably wouldl t happen <br />right away, maybe in the next 2-5 years. It would consist of a 3-story, 70,000 <br />square foot building. It would require new zoning for setbacks, parking, buffer, <br />etc. The back of the property, for the most part are trees. <br />The Commission requested for staff to work on options for the parcel as well as <br />8:05 PM: Longwood Poultry Farm <br />C:\Mv Documents\CPDC\Agenda-Minutes\7.15.02 minutes.doc <br />Last printed 08/28/02 9:50 AM <br />Created by Kelley Meier <br />Created on 08/23/023:56 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.